CTRI Trial Data

Total Page:16

File Type:pdf, Size:1020Kb

CTRI Trial Data PDF of Trial CTRI Website URL - http://ctri.nic.in Clinical Trial Details (PDF Generation Date :- Sat, 25 Sep 2021 02:13:00 GMT) CTRI Number CTRI/2019/01/017017 [Registered on: 09/01/2019] - Trial Registered Prospectively Last Modified On 27/05/2019 Post Graduate Thesis Yes Type of Trial Observational Type of Study Cross Sectional Study Study Design Other Public Title of Study Views of publics towards reproductive health care services in private hospitals Scientific Title of A study on public perception towards private hospitals regarding reproductive services in Thrissur Study Secondary IDs if Any Secondary ID Identifier NIL NIL Details of Principal Details of Principal Investigator Investigator or overall Name Febin P Baby Trial Coordinator (multi-center study) Designation Postgraduate student Affiliation Prasanna School of Public Health, Manipal Academy of Higher Education Address Prasanna School of Public Health, Manipal Academy of Higher Education, Manipal. Udupi KARNATAKA 576104 India Phone 9482091179 Fax Email [email protected] Details Contact Details Contact Person (Scientific Query) Person (Scientific Name Kumar Sumit Query) Designation Assistant professor Affiliation Prasanna School of Public Health Address Prasanna School of Public Health, Manipal Academy of Higher Education, Manipal, Udupi Udupi KARNATAKA 576104 India Phone 8867620088 Fax Email [email protected] Details Contact Details Contact Person (Public Query) Person (Public Query) Name Aravind Gopinath Designation Post graduation Affiliation Post graduation at Aswini hospital Thrissur Address Swapnam house, Industrial estate, umayanalloor p.o, Kollam ,Kerala Kollam KERALA 691589 India Phone 9207772358 page 1 / 3 PDF of Trial CTRI Website URL - http://ctri.nic.in Fax Email [email protected] Source of Monetary or Source of Monetary or Material Support Material Support > Aswini Hospital Thrissur, Karunakaran Nambiar Rd,aswani junction, opposite to big bazaar, Patturaikkal, Thrissur, Kerala 680020 GEM Hospital, St Marys College Rd, Chembukkav, Thrissur, Kerala 680020 Primary Sponsor Primary Sponsor Details Name Febin P Baby Address Prasanna School of Public Health, Manipal Academy of Higher Education. Manipal, Udupi,Karnataka, 576104 Type of Sponsor Other [Self sponsored ] Details of Secondary Name Address Sponsor Nil Nil Countries of List of Countries Recruitment India Sites of Study Name of Principal Name of Site Site Address Phone/Fax/Email Investigator DrRaji benjamin Aswini Hospital, and Aswini hospital, 9447148492 GEM Hospital Karunakaran Nambiar Rd,aswani junction, Dr.rajibenjamin99@gm opposite to big bazaar, ail.com Patturaikkal, Thrissur, Kerala 680020 GEM Hospital, St Marys College Rd, Chembukkav, Thrissur, Kerala 680020 Thrissur KERALA Details of Ethics Name of Committee Approval Status Date of Approval Is Independent Ethics Committee Committee? Kasturba Medical Approved 13/11/2018 No College and Kasturba Hospital Institutional Ethics Committee Regulatory Clearance Status Date Status from DCGI Not Applicable No Date Specified Health Condition / Health Type Condition Problems Studied Healthy Human Volunteers In this study i recruit the individuals approaching the hospital for the normal reproductive services. As pregnancy is a physiological condition my participants are healthy human volunteers Intervention / Type Name Details Comparator Agent Inclusion Criteria Inclusion Criteria Age From 18.00 Year(s) Age To 45.00 Year(s) Gender Female Details Patients who are seeking the reproductive services from the private hospitals taken for the study.<br/> Community members who had utilized reproductive services from government hospitals<br/> page 2 / 3 PDF of Trial CTRI Website URL - http://ctri.nic.in Exclusion Criteria Exclusion Criteria Details NA Method of Generating Not Applicable Random Sequence Method of Not Applicable Concealment Blinding/Masking Not Applicable Primary Outcome Outcome Timepoints public perception towards private hospitals Outcomes will be analyzed by April 2019 regarding reproductive services Secondary Outcome Outcome Timepoints •To understand the perception of beneficiaries Outcomes will be analyzed by April 2019 towards private hospitals regarding reproductive services •To analyze the delivery records from the private hospitals in last 3 years Target Sample Size Total Sample Size=40 Sample Size from India=40 Final Enrollment numbers achieved (Total)=0 Final Enrollment numbers achieved (India)=28 Phase of Trial N/A Date of First 14/01/2019 Enrollment (India) Date of First No Date Specified Enrollment (Global) Estimated Duration of Years=0 Trial Months=6 Days=0 Recruitment Status of Not Applicable Trial (Global) Recruitment Status of Completed Trial (India) Publication Details Energy efficiency of ambulation - A comparison of various orthopaedic possibilities. Journal of Bodywork & Movement Therapies 22 (2018) 622e626. Brief Summary According to DLHS 4 (2012-13) the institutional delivery in Thrissur district is 100%, but out of this 71.8% of delivery is conducting in the private hospitals and only 28.2 deliveries only take cared by the government hospitals. Central and state governments are spending stacks of money to improve the facilities in the government hospitals and thereby increase the utilization of government hospitals. Increase in the delivery of pregnancy in the government hospitals is just 5% from the DLHS 3 report. Institutional deliveries in the government hospitals can reduce the out of pocket money of the beneficiaries. The study aim to understand the perception of beneficiaries towards private hospitals regarding reproductive services. Approach the private hospitals in Thrissur where got the permission to carry out the study. Collect the last 3 year delivery status from these hospitals and analyze the data to know the progression of the private hospitals demand regarding reproductive services. Interview the beneficiaries those who are seeking reproductive services from the hospitals, 25-30 beneficiaries will be recruited. Recruit 10-15 beneficiaries from the community level those who are seeking or pursued reproductive treatment recently from the government hospitals page 3 / 3 Powered by TCPDF (www.tcpdf.org).
Recommended publications
  • Crisis Management Plan Thrissur Pooram 2018
    T H R I S S U R P O O R A M Sree Vadakkunnatha Temple Thiruvambady Temple Paramekkavu Bhagathy Temple Chekbukkavu Bhagavathy Temple Kanimangalam SasthaTemple Panamukkumpally Sastha Temple Paramekkavu Bhagathy Temple Karamukku Bhagavathy Temple Laloor Bhagavathy Temple Choorakkottukavu Bhagavathy Temple Paramekkavu Bhagathy Temple Ayyanthole Bhagavathy Temple Neithalakkavu Bhagavathy Temple : Thrissur Pooram 2018 : : CHAPTER – I : [ INTRODUCTION 1.1 PURPOSE The purpose of the Crisis Management Plan for Thrissur Pooram is to set out actions to be taken by the in the event of any crisis or emergency occurring in connection with Thrissur Pooram. The Crisis Management Plan is designed to assist Crowd Management and Emergency Operations and creation of a system for protection of life and property in the event of a natural, manmade or hybrid hazard requiring emergency activation. The Crisis Management Plan provides guidance for all line departments in order to minimize threats to life and property. 1.2 SCOPE Crisis Management Plan covers all phases of crisis management right from mitigation, preparedness, emergency response, relief to recovery. The plan discusses roles and responsibilities of each stakeholder and should be used as a guide by all the concerned line departments to prepare their respective department to play these critical roles and responsibilities. 1.3 OBJECTIVE To protect the life of people who have assembled for the event and to avoid confusion among major stakeholders during emergency and to develop a basic structure for time sensitive, safe, secure, orderly and efficiently handling the crisis. Crisis Management Plan Page No: 1 : Thrissur Pooram 2018 : Aerial VIEW of THEKINKAD MAIDAN Page No: 2 Crisis Management Plan : Thrissur Pooram 2018 : CHAPTER – 2 [THRISSUR POORAM – POORAM OF CULTURAL CAPITAL 2.1 HISTORY & RITUALS OF THRISSUR POORAM Life in Kerala is punctuated by the annual festivals dedicated to village deities.
    [Show full text]
  • Trade Marks Journal No: 1962 , 24/08/2020 Class 6 3794187 02/04/2018 Trading As
    Trade Marks Journal No: 1962 , 24/08/2020 Class 6 3794187 02/04/2018 KALPESH GORDHANBHAI VORA trading as ;BHAGYA HARDWARE shed N0-3,chorawala Compound,70-1B,Bside Parkesh Estate,Shantinath mill street,nr.Navjivan Circle Udhna-Magdala road,Surat- 395007.(Gujarat) Address for service in India/Agents address: CHIRAG A. SHAH, ADVOCATE. 401,ANUSHREE BLDG.,NR. BANK OF BARODA,USMANPURA, AHMEDABAD- 380 013. Used Since :17/02/2013 AHMEDABAD HARDWARE. 1572 Trade Marks Journal No: 1962 , 24/08/2020 Class 6 3892162 19/07/2018 M/S. B. N. INDUSTRIES 75/80 Bharat Industrial Estate, Bhimpore, Daman - 396210 Partnership Firm Address for service in India/Attorney address: K. KIRAN F-97, 4th Floor, Anna Nagar (East), Chennai - 600102, Tamil Nadu Used Since :01/07/1994 AHMEDABAD COMMON METALS AND THEIR ALLOYS, ORES; METAL MATERIALS FOR BUILDING AND CONSTRUCTION; TRANSPORTABLE BUILDINGS OF METAL; NON-ELECTRIC CABLES AND WIRES OF COMMON METAL; SMALL ITEMS OF METAL HARDWARE; METAL CONTAINERS FOR STORAGE OR TRANSPORT; SAFES, ALUMINIUM, ALUMINIUM WIRE, ALLOYS OF COMMON METAL REGISTRATION OF THIS TRADE MARK SHALL GIVE NO RIGHT TO THE EXCLUSIVE USE OF THE DISCRIPTIVE WORDS. THIS IS CONDITION OF REGISTRATION THAT BOTH/ALL LABELS SHALL BE USED TOGETHER. 1573 Trade Marks Journal No: 1962 , 24/08/2020 Class 6 SEVIS 3988316 31/10/2018 SHRI. ASIF KHAN trading as ;A.K. ENTERPRISES 6/748, SARAI REHMAN, GALI NO 8, ALIGARH UTTAR PRADESH INDIA MANUFACTURERS AND MERCHANTS Used Since :06/03/2017 DELHI LOCKS & HARDWARE 1574 Trade Marks Journal No: 1962 , 24/08/2020 Class 6 3993323
    [Show full text]
  • Final Report 11.3 Acres Land Parcel Located in Thrissur, Kerala, India - 1
    Development Advisory Services for Proposed Mixed-Use Development Project on Final Report 11.3 Acres Land Parcel Located in Thrissur, Kerala, India - 1 - DEVELOPMENT ADVISORY SERVICES FOR PROPOSED MIXED-USE DEVELOPMENT PROJECT ON 11.3 ACRES LAND PARCEL LOCATED IN THRISSUR, KERALA, INDIA FINAL REPORT SUBMITTED TO KENZ INN COMMERCIAL COMPLEX LIMITED THRISSUR, KERALA, INDIA SUBMITTED BY Jones Lang LaSalle Property Consultants India Private Limited Level 3, Concorde UB City, No. 24, Vittal Mallya Road, Bangalore - 560 001 Ph : +91 80 4118 2900, Fax: +91 80 4118 2901 Internet: www.joneslanglassale.co.in MARCH 2014 Development Advisory Services for Proposed Mixed-Use Development Project on Final Report 11.3 Acres Land Parcel Located in Thrissur, Kerala, India - 2 - CONTROLLED COPY Report for Development Advisory Services for Proposed Mixed-Use Development Project on 11.3 Acres Land Parcel Located in Thrissur, Kerala, India Submitted to Kenz Inn Commercial Complex Limited Thrissur, Kerala, India Document Number: 2013/04/DEVELOPMENT ADVISORY/YU/BLR/428 Document Status: Final Report Date: March 18, 2014 Document prepared by: Abhilasha Bhagat & Y. Umakanth Document approved by: Girish K. S. No. of copies circulated: 02 Circulation Copy 01: Kenz Inn Commercial Complex Limited, Thrissur, Kerala, India Copy 02: Office Copy - Bangalore Contact Information For further information please contact: Mr. Girish K. S. MRICS Local Director - Strategic Consulting Jones Lang LaSalle Property Consultants India Private Limited Level 3, Concorde, UB City, #24, Vittal Mallya Road Bangalore - 560 001 Ph: +91 80 4118 2900, Fax: +91 80 4118 2901 Mobile: +91 9900154567 E-mail: [email protected] Development Advisory Services for Proposed Mixed-Use Development Project on Final Report 11.3 Acres Land Parcel Located in Thrissur, Kerala, India - 3 - TABLE OF CONTENTS 1 THE ASSIGNMENT ..................................................................................................
    [Show full text]
  • Chinmaya Vidyalaya Thrissur Annual Report 2019-20
    CHINMAYA VIDYALAYA THRISSUR ANNUAL REPORT 2019-20 Hari om, A warm good evening to one and all assembled here. Pranams to the supreme Lord and humble salutations to Pujya Gurudev H.H. Swami Chinmayanandaji. Respected members on the dais, invited dignitaries, parents, teachers and dear students Years back , Poojya Gurudev had a vision where children were the focal point, a vision to transform our country through our children, a vision to make them empowered in different areas. This vision is now fructified as we find our children scripting history at the National level. Chinmaya Vidyalya Thrissur is gaining National & International recognition and progressing by leaps and bounds, First came the class X CBSE 2019 results where 2 of our children Bhamasree S & Anaika Afsal created history by securing 99 percentage aggregate and standing 5th in Ranking at National level. Prayers, hopes Excitement, dreams and blessings enabled our young heros who donned the jersy of Chinmaya Vidyalaya Kerala to become runners of the CBSE National Level in the U- 19 Football Tournament thus scripting history. Then came the silver lining of being one among 2000 . Devi Nanda of Class IX had the life time opportunity of being selected as one 2000 children of India to personally interact with Honorable Prime Minister Narendra Modi for a special programme referred as “Pareeksha Pe Charcha” Yes … we are living up to the expectation of our Poojya Gurudev & we shall continue so. I am extremely happy to present before you the annual report for the academic year 2019 20. Academic excellence has always been one of our prime goals.
    [Show full text]
  • Ac Name Ac Addr1 Ac Addr2 Ac Addr3 Superior Asst Superior Assissi Nilayam Convent Franciscan Handmaids of Good Sheperd,Thathampally
    AC_NAME AC_ADDR1 AC_ADDR2 AC_ADDR3 SUPERIOR ASST SUPERIOR ASSISSI NILAYAM CONVENT FRANCISCAN HANDMAIDS OF GOOD SHEPERD,THATHAMPALLY. ABRAHAM T POTHEN GOSPEL CENTRE (SHARON) ASOKAPURAM ALUVA ANTONY M M MULAKKAL HOUSE MAROTTICHAL ARUN M R MULLAKKAPARAMBIL HOUSE ALAGAPPANAGAR AMBALLUR 680302 DAVIS P A POTTAKKARAN HOUSE PUDUKAD THRISSUR ELIAKUTTY W/O PULIKKAN ANTONY MANNAMPETTA P.O.VARAKKARA ELIZABETH SEBASTIAN PALAMATTAM PALAMATTAM, VARANDARAPALLY THRISSUR DIST JESSY ANTONY MULAKKAL H MAROTTICHAL JOICY JOHNSON W/O LATE V D JOHNSON VAZHAKALA HOUSE KALLUR P O JOSE T P S/O PAUL THATLA HOUSE P O PARAPPUKKARA K C Y M NENMANIKKARA VICAR FR JOSE THEKKEKARA SINOJ I L FEENA PAUL K K GEORGE KOKKADAN VENDORE ALAGAPPANAGAR LAILA A W/O K R RENUGOPAL KANIYAMPARAMBIL HOUSE P.O.VELUPPADAM LONAPPAN C D CHULLIKADAN HOUSE CHITTISSERY TRICHUR NARASIMHA MOORTHY N N AMBALLUR ALAGAPPANAGAR PYLOTH A D ATTOOKKARAN HOUSE MDAVAKKARA TCR RAMADASAN V K S/O.KUNJUMANI, VAZHAPPILLY HOUSE, MUTHRATHIKKARA,P.O.PARAPPUKARA RAMAN V N AMBALLUR TRICHUR REETHA M L THEKKANATH CHERPUKARAN HOUSE VENDORE ALAGAPANAGAR P O SATHYAN P S PANKARA HOUSE PALLIYARA THRIKKUR PO THRISSUR SHELBIN BABY S/O.BABY,VELLANIKKARAN HOUSE, KALLUR P.O THRISSUR DIST VELAYUDHAN K S KARUKUTTY HOUSE MANNAMPETTA VARAKKARA PO VINCENT T V THATTIL HOUSE VENDORE AMMINI K V KIZHAKUMUTHU HOUSE AMBHAZHAKAD ANNIS XAVIER PUTHUSSERY KIZHEDATHUPARAMBIL AMBAZHAKKAD ASHTAMICHIRA ANTONY C J CSB LTD ASHTAMICIRA BABU C C CHELLAKUDAM HOUSE MALAPALLIPURAM P O CHATHAN KALYANI & B.D.O MALA . CHINNAMMA JOSE DOOR NO 38/155 ERNAKULAM,COCHIN-35 CICILY K V W/O LATE DEVASSY PYNADATH HOUSE MALA P O DAVIS E K MALA MALA DHANYA VINOD CHEMBAKASSERY HOUSE KOTTAT P O W -CHALAKUDY DILEEP KUMAR P K PALAKKADAN HOUSE ASHTAMICHIRA FRANCIS M C .
    [Show full text]
  • Kerala Sustainable Urban Development Project
    Government of Kerala Local Self Government Department Kerala Sustainable Urban Development Project (PPTA 4106 – IND) FINAL REPORT VOLUME 2 - CITY REPORT THRISSUR MAY 2005 COPYRIGHT: The concepts and information contained in this document are the property of ADB & Government of Kerala. Use or copying of this document in whole or in part without the written permission of either ADB or Government of Kerala constitutes an infringement of copyright. TA 4106 –IND: Kerala Sustainable Urban Development Project Project Preparation FINAL REPORT VOLUME 2 – CITY REPORT THRISSUR Contents 1. BACKGROUND AND SCOPE 1 1.1 Introduction 1 1.2 Project Goal and Objectives 1 1.3 Study Outputs 1 1.4 Scope of the Report 1 2. CITY CONTEXT 2 2.1 Geography and Climate 2 2.2 Population Trends and Urbanization 2 2.3 Economic Development 4 2.3.1 Sectoral growth 4 2.4 Industrial Development 6 2.4.1 Tourism Growth and Potential 7 2.4.2 Growth Trends and Projections 7 3. SOCIO-ECONOMIC PROFILE 8 3.1 Introduction 8 3.2 Household Profile 9 3.2.1 Employment 9 3.2.2 Income and Expenditure 9 3.2.3 Land and Housing 10 3.2.4 Social Capital 11 3.2.5 Health 11 3.2.6 Education 11 3.3 Access to Services 12 3.3.1 Water Supply 12 3.3.2 Sanitation 12 3.3.3 Drainage 12 3.3.4 Solid Waste Disposal 13 3.3.5 Roads, Street Lighting & Access to Public Transport 13 4. POVERTY AND VULNERABILITY 14 4.1 Overview 14 4.1.1 Employment 15 4.1.2 Financial Capital 15 4.1.3 Poverty Alleviation in Thrissur 15 5.
    [Show full text]