Shawsheen River Watershed 2000 Water Quality Assessment Report I 83Wqar.Doc DWM CN 086.0 LIST of TABLES and FIGURES

Total Page:16

File Type:pdf, Size:1020Kb

Shawsheen River Watershed 2000 Water Quality Assessment Report I 83Wqar.Doc DWM CN 086.0 LIST of TABLES and FIGURES 83-AC-2 SHAWSHEEN RIVER WATERSHED 2000 WATER QUALITY ASSESSMENT REPORT Bend in the river near Ballardvale COMMONWEALTH OF MASSACHUSETTS EXECUTIVE OFFICE OF ENVIRONMENTAL AFFAIRS ELLEN ROY HERZFELDER, SECRETARY MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION ROBERT GOLLEDGE JR., COMMISSIONER BUREAU OF RESOURCE PROTECTION CYNTHIA GILES, ASSISTANT COMMISSIONER DIVISION OF WATERSHED MANAGEMENT GLENN HAAS, DIRECTOR View from the Steven's Street Bridge in Andover NOTICE OF AVAILABILITY LIMITED COPIES OF THIS REPORT ARE AVAILABLE AT NO COST BY WRITTEN REQUEST TO: MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF WATERSHED MANAGEMENT 627 MAIN STREET WORCESTER, MA 01608 This report is also available from MADEP’s home page on the World Wide Web at: http://www.state.ma.us/dep/brp/wm/wqassess.htm Furthermore, at the time of first printing, eight copies of each report published by this office are submitted to the State Library at the State House in Boston; these copies are subsequently distributed as follows: • On shelf; retained at the State Library (two copies); • Microfilmed retained at the State Library; • Delivered to the Boston Public Library at Copley Square; • Delivered to the Worcester Public Library; • Delivered to the Springfield Public Library; • Delivered to the University Library at UMass, Amherst; • Delivered to the Library of Congress in Washington, D.C. Moreover, this wide circulation is augmented by inter-library loans from the above-listed libraries. For example a resident in Rehoboth can apply at their local library for loan of any MADEP DWM report from the Worcester Public Library. A complete list of reports published since 1963 is updated annually and printed in July. This report, entitled, “Publications of the Massachusetts Division of Watershed Management – Watershed Planning Program, 1963- (current year)”, is also available by writing to the DWM in Worcester. DISCLAIMER References to trade names, commercial products, manufacturers, or distributors in this report constituted neither endorsement nor recommendations by the Division of Watershed Management for use. SHAWSHEEN RIVER WATERSHED 2000 WATER QUALITY ASSESSMENT REPORT Prepared by: Stella D. Kiras Department of Environmental Protection Division of Watershed Management Report Number: 83-AC-2 DWM Control Number: 86.0 Massachusetts Department of Environmental Protection Division of Watershed Management Worcester, Massachusetts July 2003 ACKNOWLEDGEMENTS The Massachusetts Watershed Approach is a collaborative effort between state and federal environmental agencies, municipal agencies, citizens, non-profit groups, businesses and industries in the watershed. We would like to thank William Dunn, Executive Office of Environmental Affairs and the Shawsheen River Watershed Team. Data and information used in this report was provided in part by the following agencies and organizations: State • Massachusetts Executive Office of Environmental Affairs Shawsheen River Watershed Team • Massachusetts Department of Environmental Protection (MADEP): − Division of Watershed Management (DWM) − Bureau of Resource Protection − Bureau of Strategic Policy and Technology, Wall Experiment Station • Massachusetts Department of Public Health (MDPH) • Massachusetts Department of Fisheries, Wildlife, and Environmental Law Enforcement (DFWELE) − Division of Fisheries and Wildlife − Riverways Program • Massachusetts Department of Environmental Management (DEM) Federal • United States Environmental Protection Agency (EPA) • United States Army Corps of Engineers (ACOE) • United States Geological Survey (USGS) − Water Resources Division Much appreciation is also extended to several MADEP employees for their contributions: Mark Casella, Jane Colonna-Romano, Ken Dominick, Laurie Kennedy, Rick McVoy, and Arthur Screpetis. It is impossible to thank everyone who contributed to the assessment report process: field, laboratory, data management, writing, editing, and graphics, as well as meetings, phone calls, and many e-mails. All of these contributions are very much appreciated. Cover photo credit: KD Talbot Photography Inc. TABLE OF CONTENTS Table of Contents........................................................................................................................................... i List of Tables and Figures..............................................................................................................................ii List of Acronyms............................................................................................................................................iii List of Units ...................................................................................................................................................iii Executive Summary ......................................................................................................................................iv Introduction ................................................................................................................................................... 1 Assessment Methodology............................................................................................................................. 1 Designated Uses........................................................................................................................................... 6 Shawsheen River Watershed Description and Classification..................................................................... 12 Summary of Existing Conditions and Perceived Problems......................................................................... 13 Sources of Information................................................................................................................................ 15 Total Maximum Daily Loads (TMDLs)......................................................................................................... 18 Objectives.................................................................................................................................................... 19 Report Format ............................................................................................................................................. 20 Shawsheen River Watershed - River Segment Assessments.................................................................... 21 Shawsheen River (Segment MA83-08) ......................................................................................... 22 Kiln Brook (Segment MA83-10) ..................................................................................................... 28 Shawsheen River (Segment MA83-01) ......................................................................................... 30 Elm Brook (Segment 83-05) .......................................................................................................... 34 Shawsheen River (Segment MA83-17) ......................................................................................... 39 Vine Brook (Segment MA83–06) ................................................................................................... 43 Long Meadow Brook (Segment MA83-11)..................................................................................... 47 Sandy Brook (Segment MA83-13) ................................................................................................. 48 Spring Brook (Segment MA83-14)................................................................................................. 49 Shawsheen River (Segment MA83-18) ......................................................................................... 51 Content Brook (Segment MA83-09)............................................................................................... 56 Strong Water Brook (Segment MA83-07)...................................................................................... 59 Meadow Brook (Segment MA83-12).............................................................................................. 62 Pinnacle Brook (Segment MA83-15) ............................................................................................. 64 Shawsheen River (Segment MA83-19) ......................................................................................... 66 Unnamed Tributary (Segment MA83-16)....................................................................................... 71 Rogers Brook (Segment MA83-04)................................................................................................ 73 Shawsheen River Watershed - Lake Assessments....................................................................................76 Literature Cited .............................................................................................................................................. 86 LIST OF APPENDICES APPENDIX A - SHAWSHEEN WATERSHED DWM YEAR 2000 WATER QUALITY MONITORING DATA APPENDIX B - 2000 MA DEP DWM BASELINE LAKE SURVEYS IN THE SHAWSHEEN RIVER WATERSHED APPENDIX C - MA DEP OWM/DWM FISH TOXICS MONITORING IN THE SHAWSHEEN RIVER WATERSHED 1995, 1999, AND 2000 APPENDIX D - 1995 MA DEP DWM WATER QUALITY MONITORING IN THE SHAWSHEEN RIVER WATERSHED APPENDIX E - SUMMARY OF NPDES AND WMA PERMITTING INFORMATION, SHAWSHEEN RIVER WATERSHED APPENDIX F - DEP GRANT AND LOAN PROGRAMS Shawsheen River Watershed 2000 Water Quality Assessment Report i 83wqar.doc DWM CN 086.0 LIST OF TABLES AND FIGURES Table 1. Summary of Massachusetts Surface Water Quality Standards .............................................4
Recommended publications
  • Shawsheen River Watershed Stream Management Plan
    TABLE OF CONTENTS SECTION........................................................................................................................................PAGE NO. 1. INTRODUCTION................................................................................................................................1-1 1.1 Drivers for Study.............................................................................................................................1-1 1.2 Project Objectives...........................................................................................................................1-2 2. STREAM ASSESSMENT...................................................................................................................2-1 2.1 Watershed Description ...................................................................................................................2-1 2.1.1 Sub-Basins.....................................................................................................................................2-1 2.1.1.1 Impervious Cover ...........................................................................................................................2-1 2.1.1.2 Land Uses with High Potential Pollutant Loads..............................................................................2-2 2.1.2 Water Quality in the Shawsheen River Watershed in Lexington ....................................................2-2 2.2 Stream Survey................................................................................................................................2-6
    [Show full text]
  • Merrimack Valley Region Multi-Hazard Mitigation Plan 2013-2018 Updating the Current 5-Yr Plan What Is Hazard Mitigation?
    Merrimack Valley Region Multi-Hazard Mitigation Plan 2013-2018 Updating the Current 5-Yr Plan What is Hazard Mitigation? “mit-i-gate” 1. to make less severe or painful 2. to cause to become less harsh or hostile Hazard Mitigation Any sustained action taken to reduce or eliminate the long-term risk to human life and property from hazards and their effects. Why Prepare an Updated Plan? Disaster Mitigation Act of 2000: Congress enacted the Disaster Mitigation Act of 2000 (DMA 2000) on October 10, 2000. The law established a national program for pre-disaster mitigation, and streamlined the federal administration of disaster relief. DMA 2000 requires all communities to have a FEMA-approved “Multiple Hazards Mitigation Plan” to qualify for FEMA funding under the Pre-Disaster Mitigation (PDM), Flood Mitigation Assistance (FMA), and Hazard Mitigation Grant Program (HMGP). What is a Natural Hazard? • An event or physical condition that has the potential to cause fatalities, injuries, property damage, agricultural loss, damage to the environment, interruption of business, or other types of harm or loss. • In the Merrimack Valley region, this includes: flooding, winter storms, severe thunderstorms, hurricanes (including coastal storm surges), tornadoes, earthquakes, wildfire, drought, etc. • The updated Multi-Hazard Mitigation Plan will also consider the impacts of climate change Merrimack Valley Natural Hazards Floods Coastal Storms Wildfire Natural hazards are a part of the world around us. Their occurrence is natural and inevitable, and our capacity to control their frequency, intensity, and duration is limited. Winter Storms Hurricanes Natural hazards threaten the safety of our residents and visitors, and have the potential to damage or destroy public and private property, disrupt the local and regional economy, and diminish the overall quality of life of those who live and work in the region.
    [Show full text]
  • Flood Insurance Study 25017CV006B
    VOLUME 6 OF 8 MIDDLESEX COUNTY, MASSACHUSETTS (ALL JURISDICTIONS) COMMUNITY NAME COMMUNITY NUMBER ACTON, TOWN OF 250176 ARLINGTON, TOWN OF 250177 Middlesex County ASHBY, TOWN OF 250178 ASHLAND, TOWN OF 250179 AYER, TOWN OF 250180 BEDFORD, TOWN OF 255209 COMMUNITY NAME COMMUNITY NUMBER BELMONT, TOWN OF 250182 MELROSE, CITY OF 250206 BILLERICA, TOWN OF 250183 NATICK, TOWN OF 250207 BOXBOROUGH, TOWN OF 250184 NEWTON, CITY OF 250208 BURLINGTON, TOWN OF 250185 NORTH READING, TOWN OF 250209 CAMBRIDGE, CITY OF 250186 PEPPERELL, TOWN OF 250210 CARLISLE, TOWN OF 250187 READING, TOWN OF 250211 CHELMSFORD, TOWN OF 250188 SHERBORN, TOWN OF 250212 CONCORD, TOWN OF 250189 SHIRLEY, TOWN OF 250213 DRACUT, TOWN OF 250190 SOMERVILLE, CITY OF 250214 DUNSTABLE, TOWN OF 250191 STONEHAM, TOWN OF 250215 EVERETT, CITY OF 250192 STOW, TOWN OF 250216 FRAMINGHAM, TOWN OF 250193 SUDBURY, TOWN OF 250217 GROTON, TOWN OF 250194 TEWKSBURY, TOWN OF 250218 HOLLISTON, TOWN OF 250195 TOWNSEND, TOWN OF 250219 HOPKINTON, TOWN OF 250196 TYNGSBOROUGH, TOWN OF 250220 HUDSON, TOWN OF 250197 WAKEFIELD, TOWN OF 250221 LEXINGTON, TOWN OF 250198 WALTHAM, CITY OF 250222 LINCOLN, TOWN OF 250199 WATERTOWN, TOWN OF 250223 LITTLETON, TOWN OF 250200 WAYLAND, TOWN OF 250224 LOWELL, CITY OF 250201 WESTFORD, TOWN OF 250225 MALDEN, CITY OF 250202 WESTON, TOWN OF 250226 MARLBOROUGH, CITY OF 250203 WILMINGTON, TOWN OF 250227 MAYNARD, TOWN OF 250204 WINCHESTER, TOWN OF 250228 MEDFORD, CITY OF 250205 WOBURN, CITY OF 250229 Map Revised: July 7, 2014 Federal Emergency Management Agency FLOOD INSURANCE STUDY NUMBER 25017CV006B NOTICE TO FLOOD INSURANCE STUDY USERS Communities participating in the National Flood Insurance Program have established repositories of flood hazard data for floodplain management and flood insurance purposes.
    [Show full text]
  • City of Lawrence 2004 Open Space Plan
    CITY OF LAWRENCE 2004 OPEN SPACE PLAN Michael J. Sullivan, Mayor Prepared by the City of Lawrence Office of Planning and Development and Groundwork Lawrence City of Lawrence 2004 Open Space Plan CITY OF LAWRENCE 2004 OPEN SPACE PLAN Table of Contents Section 1: Executive Summary 5 Section 2: Introduction 9 A. Statement of Purpose B. Planning Process and Public Participation Section 3: Community Setting 11 A. Regional Context B. History of the Community C. Population Characteristics D. Growth and Development Patterns Section 4: Environmental Inventory and Analysis 17 A. Geology, Soil and Topology B. Landscape Character C. Water Resources D. Vegetation E. Fisheries and Wildlife F. Scenic Resources and Unique Environments G. Environmental Challenges Section 5: Inventory of Lands of Conservation and Recreation Interest 25 A. Private Parcels B. Public and Non-Profit Parcels Section 6: Community Vision 29 A. Description of Process B. Statement of Open Space and Recreation Goals Section 7: Analysis of Needs 31 1 City of Lawrence 2004 Open Space Plan A. Summary of Resource Protection Needs B. Summary of Community’s Needs C. Management Needs, Potential Changes of Use Section 8: Goals and Objectives 39 Section 9: Five-Year Action Plan 42 Section 10: Public Comments 48 Section 11: References 49 Attachment A: Maps Open Space Improvements Since 1997 Regional Context Land Use Lawrence Census Tracts Lawrence Voting Wards Zoning Districts Recreational and Conservation Areas Population Density Density of Children Ages 0-5 Density of Children Ages 6-15
    [Show full text]
  • Massachusetts Year 2010 Integrated List of Waters
    Massachusetts Year 2010 Integrated List of Waters Final Listing of the Condition of Massachusetts’ Waters Pursuant to Sections 305(b), 314 and 303(d) of the Clean Water Act Featuring new water quality assessments for the Chicopee, French, Quinebaug and Nashua watersheds and the Narragansett Bay and Mount Hope Bay Coastal Drainage Areas Commonwealth of Massachusetts Executive Office of Energy and Environmental Affairs Richard K. Sullivan, Jr., Secretary Massachusetts Department of Environmental Protection Kenneth L. Kimmell, Commissioner Bureau of Resource Protection Ann Lowery, Acting Assistant Commissioner Massachusetts Category 5 Waters “Waters requiring a TMDL” NAME SEGMENT ID DESCRIPTION SIZE IMPAIRMENT CAUSE [EPA TMDL No.] Aquatic Plants (Macrophytes) (Non-Native Aquatic Plants*) Outlet Sheomet Lake, Warwick to confluence with East Branch Tully River forming headwaters Tully River, West Branch Tully River MA35-11 Orange/Athol. 6.619 MILES PCB in Fish Tissue Confluence of Tully Brook and Falls Brook in Royalston State Forest, Royalston through Long Pond and Tully Lake to confluence with the West Branch Tully River East Branch Tully River MA35-12 forming headwaters Tully River, Orange/Athol. 10.013 MILES PCB in Fish Tissue New Hampshire state line, Royalston through Doane Falls to confluence with East Branch Tully River, Lawrence Brook MA35-13 Royalston. 7.124 MILES PCB in Fish Tissue Confluence East and West Branches Tully River, Tully River MA35-14 Orange/Athol to confluence with Millers River, Athol. 1.585 MILES PCB in Fish Tissue Headwaters just north of Montague Road, Wendell to Mormon Hollow Brook MA35-15 confluence with Millers River, Wendell. 3.825 MILES PCB in Fish Tissue Headwaters Great Swamp Northfield State Forest, Keyup Brook MA35-16 Northfield, to confluence with Millers River, Erving.
    [Show full text]
  • Mercury Pollution in Massachusetts' Waters
    Photo: Supe87, Under license from Shutterstock.com from Supe87, Under license Photo: ToXIC WATERWAYS Mercury Pollution in Massachusetts’ Waters Lauren Randall Environment Massachusetts Research & Policy Center December 2011 Executive Summary Coal-fired power plants are the single larg- Human Services advises that all chil- est source of mercury pollution in the Unit- dren under twelve, pregnant women, ed States. Emissions from these plants even- women who may become pregnant, tually make their way into Massachusetts’ and nursing mothers not consume any waterways, contaminating fish and wildlife. fish from Massachusetts’ waterways. Many of Massachusetts’ waterways are un- der advisory because of mercury contami- Mercury pollution threatens public nation. Eating contaminated fish is the main health source of human exposure to mercury. • Eating contaminated fish is the main Mercury pollution poses enormous public source of human exposure to mercury. health threats. Mercury exposure during • Mercury is a potent neurotoxicant. In critical periods of brain development can the first two years of a child’s life, mer- contribute to irreversible deficits in verbal cury exposure can lead to irreversible skills, damage to attention and motor con- deficits in attention and motor control, trol, and reduced IQ. damage to verbal skills, and reduced IQ. • While adults are at lower risk of neu- In 2011, the U.S. Environmental Protection rological impairment than children, Agency (EPA) developed and proposed the evidence shows that a low-level dose first national standards limiting mercury and of mercury from fish consumption in other toxic air pollution from existing coal- adults can lead to defects similar to and oil-fired power plants.
    [Show full text]
  • Burlington Admission to the MWRA Waterworks System
    THE COMMONWEALTH OF MASSACHUSETTS WATER RESOURCES COMMISSION 100 CAMBRIDGE STREET, BOSTON MA 02114 REPORT OF THE FINDINGS, JUSTIFICATIONS, AND DECISION OF THE WATER RESOURCES COMMISSION Relating to the Approval of the Town of Burlington’s Request for an Interbasin Transfer Pursuant to M.G.L. Chapter 21 § 8C DECISION On November 12, 2020, by a ten to one (10-1) vote, the Massachusetts Water Resources Commission (WRC) approved the Town of Burlington’s request for an Interbasin Transfer to join the Massachusetts Water Resources Authority (MWRA) Water Works System. This vote was taken after review of the facts provided by the Town of Burlington, analysis of the associated data, and consideration of comments received concerning this request. INTRODUCTION On November 26, 2019, the WRC received a request from the Town of Burlington for approval of an action to increase the present rate of interbasin transfer under the Interbasin Transfer Act (ITA) (M.G.L. Chapter 21 §§ 8B-8D) as part of a Draft Environmental Impact Report (DEIR) submitted to the Massachusetts Environmental Policy Act (MEPA) office. The DEIR proposed a water supply transfer through an interconnection to MWRA. Additional information was requested by the WRC and received in the Final EIR, submitted in February 2020. The Secretary’s Certificate on the FEIR was issued on April 17, 2020. The WRC accepted Burlington’s application as complete at its May 14, 2020 meeting. Burlington is proposing to purchase a maximum of 6.5 million gallons per day (MGD) of water from MWRA to supplement its existing water supply source, the Mill Pond Reservoir (Figure 1).
    [Show full text]
  • Water Quality
    LAWRENCE HYDROELECTRIC PROJECT LIHI APPLICATION ATTACHMENT B WATER QUALITY 314 CMR 4.00: DIVISION OF WATER POLLUTION CONTROL 4.06: continued 314 CMR 4.00 : DIVISION OF WATER POLLUTION CONTROL 4.06: continued TABLE 20 MERRIMACK RIVER BASIN BOUNDARY MILE POINT CLASS QUALIFIERS Merrimack River State line to Pawtucket Dam 49.8 - 40.6 B Warm Water Treated Water Supply CSO Pawtucket Dam to Essex Dam, 40.6 - 29.0 B Warm Water Lawrence Treated Water Supply CSO Essex Dam, Lawrence to 29.0 - 21.9 B Warm Water Little River, Haverhill CSO Little River, Haverhill to 21.9 - 0.0 SB Shellfishing Atlantic Ocean CSO The Basin in the Merrimack River - SA Shellfishing Estuary, Newbury and Newburyport Stony Brook Entire Length 10.3 - 0.0 B Warm Water Beaver Brook State line to confluence 4.2 - 0.0 B Cold Water with Merrimack River Spicket River State line to confluence 6.4 -0.0 B Warm Water with Merrimack River Little River State line to confluence with 4.3 - 0.0 B Warm Water Merrimack River Cobbler Brook Entire Length 3.7 - 0.0 B Cold Water Powwow River Outlet Lake Gardner to tidal 6.4 - 1.3 B Warm Water portion Tidal portion 1.3 - 0.0 SB Shellfishing Plum Island River North of High Sandy sand bar SA Shellfishing Outstanding Resource Water 1 Water quality standards for Class B and Class SB waters Designated Use/Standard Parameter Support ≥ 5.0 mg/l Inland waters, Class B, Dissolved Oxygen ≥ 60% saturation unless background conditions warm water fishery lower Massachusetts waters, MADEP Temperature ≤ 28.3ºC (83ºF) pH 6.0 to 8.3 S.U.
    [Show full text]
  • 69 Dams Removed in 2020 to Restore Rivers
    69 Dams Removed in 2020 to Restore Rivers American Rivers releases annual list including dams in California, Connecticut, Illinois, Indiana, Iowa, Massachusetts, Michigan, Minnesota, Montana, New Hampshire, New Jersey, New York, North Carolina, Ohio, Oklahoma, Oregon, Pennsylvania, South Carolina, Texas, Vermont, Virginia, Washington, and Wisconsin for a total of 23 states. Nationwide, 1,797 dams have been removed from 1912 through 2020. Dam removal brings a variety of benefits to local communities, including restoring river health and clean water, revitalizing fish and wildlife, improving public safety and recreation, and enhancing local economies. Working in a variety of functions with partner organizations throughout the country, American Rivers contributed financial and technical support in many of the removals. Contact information is provided for dam removals, if available. For further information about the list, please contact Jessie Thomas-Blate, American Rivers, Director of River Restoration at 202.347.7550 or [email protected]. This list includes all dam removals reported to American Rivers (as of February 10, 2021) that occurred in 2020, regardless of the level of American Rivers’ involvement. Inclusion on this list does not indicate endorsement by American Rivers. Dams are categorized alphabetically by state. Beale Dam, Dry Creek, California A 2016 anadromous salmonid habitat assessment stated that migratory salmonids were not likely accessing habitat upstream of Beale Lake due to the presence of the dam and an undersized pool and weir fishway. In 2020, Beale Dam, owned by the U.S. Air Force, was removed and a nature-like fishway was constructed at the upstream end of Beale Lake to address the natural falls that remain a partial barrier following dam removal.
    [Show full text]
  • Middlesex County, Massachusetts (All Jurisdictions)
    VOLUME 4 OF 8 MIDDLESEX COUNTY, MASSACHUSETTS (ALL JURISDICTIONS) COMMUNITY NAME COMMUNITY NUMBER ACTON, TOWN OF 250176 ARLINGTON, TOWN OF 250177 Middlesex County ASHBY, TOWN OF 250178 ASHLAND, TOWN OF 250179 AYER, TOWN OF 250180 BEDFORD, TOWN OF 255209 COMMUNITY NAME COMMUNITY NUMBER BELMONT, TOWN OF 250182 MELROSE, CITY OF 250206 BILLERICA, TOWN OF 250183 NATICK, TOWN OF 250207 BOXBOROUGH, TOWN OF 250184 NEWTON, CITY OF 250208 BURLINGTON, TOWN OF 250185 NORTH READING, TOWN OF 250209 CAMBRIDGE, CITY OF 250186 PEPPERELL, TOWN OF 250210 CARLISLE, TOWN OF 250187 READING, TOWN OF 250211 CHELMSFORD, TOWN OF 250188 SHERBORN, TOWN OF 250212 CONCORD, TOWN OF 250189 SHIRLEY, TOWN OF 250213 DRACUT, TOWN OF 250190 SOMERVILLE, CITY OF 250214 DUNSTABLE, TOWN OF 250191 STONEHAM, TOWN OF 250215 EVERETT, CITY OF 250192 STOW, TOWN OF 250216 FRAMINGHAM, TOWN OF 250193 SUDBURY, TOWN OF 250217 GROTON, TOWN OF 250194 TEWKSBURY, TOWN OF 250218 HOLLISTON, TOWN OF 250195 TOWNSEND, TOWN OF 250219 HOPKINTON, TOWN OF 250196 TYNGSBOROUGH, TOWN OF 250220 HUDSON, TOWN OF 250197 WAKEFIELD, TOWN OF 250221 LEXINGTON, TOWN OF 250198 WALTHAM, CITY OF 250222 LINCOLN, TOWN OF 250199 WATERTOWN, TOWN OF 250223 LITTLETON, TOWN OF 250200 WAYLAND, TOWN OF 250224 LOWELL, CITY OF 250201 WESTFORD, TOWN OF 250225 MALDEN, CITY OF 250202 WESTON, TOWN OF 250226 MARLBOROUGH, CITY OF 250203 WILMINGTON, TOWN OF 250227 MAYNARD, TOWN OF 250204 WINCHESTER, TOWN OF 250228 MEDFORD, CITY OF 250205 WOBURN, CITY OF 250229 Map Revised: July 7, 2014 Federal Emergency Management Agency FLOOD INSURANCE STUDY NUMBER 25017CV004B NOTICE TO FLOOD INSURANCE STUDY USERS Communities participating in the National Flood Insurance Program have established repositories of flood hazard data for floodplain management and flood insurance purposes.
    [Show full text]
  • Shawsheen River
    Executive Office of Environmental Affairs SHAWSHEEN RIVER 5-Year Watershed Action Plan 2003-2008 The Commonwealth of Massachusetts Executive Office of Environmental Affairs 251 Causeway Street, Suite 900 Boston, MA 02114-2119 Mitt Romney GOVERNOR Kerry Healey LIEUTENANT GOVERNOR Tel: (617) 626-1000 Fax: (617) 626-1181 Ellen Roy Herzfelder or (617) 626-1180 SECRETARY http://www.state.ma.us/envir July 11, 2003 Dear Friends of the Shawsheen River Watershed: It is with great pleasure that I present you with the 5-Year Watershed Action Plan for the Shawsheen River Watershed. The plan will be used to guide local and state environmental efforts within the Shawsheen River Watershed over the next five years, as well as implement the goals of the Executive Office of Environmental Affairs. These goals include improving water quality; restoring natural flows to rivers; protecting and restoring biodiversity and habitats; improving public access and balanced resource use; improving local capacity; and promoting a shared responsibility for watershed protection and management. The Shawsheen River Watershed Action Plan was developed with input from state and federal agencies, Regional Planning Agencies, watershed groups, former watershed team members, local municipalities, and with extensive public involvement throughout the reaches of the watershed. This unique approach helps us focus on the problems and challenges that are identified with stakeholders and community partners in each watershed, rather than being decided solely at the state level. The priority issues and action strategies identified in the plan are to: • Improve Water Quality • Manage Flows • Restore Wetlands and Healthy Habitats • Promote Recreation Access/Use and Open Space, and • Promote Outreach and Education on Resources in the Watershed I commend everyone that was involved in this endeavor.
    [Show full text]
  • Provides This File for Download from Its Web Site for the Convenience of Users Only
    Disclaimer The Massachusetts Department of Environmental Protection (MassDEP) provides this file for download from its Web site for the convenience of users only. Please be aware that the OFFICIAL versions of all state statutes and regulations (and many of the MassDEP policies) are only available through the State Bookstore or from the Secretary of State’s Code of Massachusetts Regulations (CMR) Subscription Service. When downloading regulations and policies from the MassDEP Web site, the copy you receive may be different from the official version for a number of reasons, including but not limited to: • The download may have gone wrong and you may have lost important information. • The document may not print well given your specific software/ hardware setup. • If you translate our documents to another word processing program, it may miss/skip/lose important information. • The file on this Web site may be out-of-date (as hard as we try to keep everything current). If you must know that the version you have is correct and up-to-date, then purchase the document through the state bookstore, the subscription service, and/or contact the appropriate MassDEP program. 314 CMR: DIVISION OF WATER POLLUTION CONTROL 4.06: continued FIGURE LIST OF FIGURES A River Basins and Coastal Drainage Areas 1 Hudson River Basin (formerly Hoosic, Kinderhook and Bashbish River Basins) 2 Housatonic River Basin 3 Farmington River Basin 4 Westfield River Basin 5 Deerfield River Basin 6 Connecticut River Basin 7 Millers River Basin 8 Chicopee River Basin 9 Quinebaug
    [Show full text]