RAIL DEVELOPMENTAL WORKS Panapakkam Platform `0.24 Crore Proposed 1

Total Page:16

File Type:pdf, Size:1020Kb

RAIL DEVELOPMENTAL WORKS Panapakkam Platform `0.24 Crore Proposed 1 Green Initiatives 1. Towards energy saving, installed 10 kWp solar power panels at Madanapalle Road station at the cost of ` 6 lakh. 2. LED lighting is provided at all the stations (on South Central Railway jurisdiction) at cost of ` 6.8 lakh and work in progress at remaining stations (South Western Railway jurisdiction) with the cost of `12.2 lakhs 3. Revival of water bodies is being undertaken towards water conservation measure. Chittoor Passenger Amenities Parliamentary Constituency Station Amenity Amount Status Pakala Platform `10 Lakh Constructed Shri Narendra Modi Hon’ble Prime Minister Provision of Passenger Amenities and Panapakam Platform `24 Lakh Constructed facilities, and its improvements at Chandragiri Platform `0.24 crore Proposed Railway Stations is one of the most Pakala Platform `1.10 crore Proposed important aspect Railway Services. Siddampalli Platform `0.24 crore Proposed RAIL DEVELOPMENTAL WORKS Panapakkam Platform `0.24 crore Proposed 1. Development of traffic facility works at Puttalapattu Platform `0.24 crore Proposed Chittoor Parliamentary Constituency Jurisdiction Bommasamudram New Crossing Station Chittoor Ticket Window `0.5 Lakh Completed with a cost of `6 crore is in progress Chittoor 16 CCTV Cameras `37 Lakh Proposed Chittoor 2 ATVMs `3 Lakh Installed Pakala CIB/TIB `80 Lakh Progress South Central Railway Chittoor Signages `5 Lakh Completed serving the entire state of Chittoor Concrete Apron `1.84 crore Constructed Telangana, major portion Bommasamudram Conversion to Halt Station `7 crore Completed of Andhra Pradesh and Pakala Toilets `0.75 crore Completed considerable portion of SOUTH CENTRAL Chittoor Platform works `1.10 crore Proposed Karnataka, Maharastra Pakala Wi‐Fi `1.5 lakh Provided states and small parts of Tamilnadu and RAILWAY Passenger Train Services Madhya Pradesh. Details of Additional Stoppage provided for Existing Trains in Chittoor Parliamentary Chittoor Parliamentary Constituency Jurisdiction. Constituency falls under Provision of Stoppage Andhra Pradesh State. 1) Tr.No.16353/16354 Kacheguda–Nagercoil–Kacheguda Weekly Express stoppage has been given at Chittoor Major share of Railway lines of this constituency Extension of Train Services is being served by 1) Tr.No.17401/17402/17403/17404 Machilipatnam/Narsapur – Tirupati Express extended up to Dharmavaram South Central Railway and with new Tr.No.17245/17246/17247/17248 partly by South Western & Southern Railway. ASSEMBLY SEGMENTS Safety – The First Priority Safety is the priority on SCR, to ensure safety of the Rail Proposed FOBs users, Foot over Bridges (FoBs)/ Road under/over Bridges are Chandragiri constructed / proposed for construction at various stations/ Station Cost (`) locations in Chittoor Parliamentary Constituency Chandragiri 1.67 crore Nagari Jurisdiction. Chittoor 1.67 crore Gangadhara Nellore Chittoor Road Over / Under Bridges Puthalapattu Palamaner With a view to strengthen safety at Level Crossing gates and to avoid untoward incidents and also to provide seamless Kuppam journey to road traffic, the following Road under /over Bridges (RuB/RoB) are constructed / proposed for construction under Chittoor Parliamentary constituency. RAIL DEVELOPMENTAL WORKS Chittoor Parliamentary Constituency Jurisdiction Road Under Bridge 1. Construction of RUB in lieu of LC No 56(UM) between Ramapuram‐Katpadi Stns in Katpadi‐Tirupati Section with an estimated cost of ` 2.14 crore is completed Infrastructural Development 2. Construction of RUB in lieu of LC No 70(M) between Pakala‐Ramapuram stations Katpadi‐Tirupati Section with an estimated cost of `2.17 crore is in progress New Railway Line works 3. Construction of RUB in lieu of LC No 86(M) between Mungilipattu‐Chandragiri stations in Katpadi‐Tirupati Section 1. New Railway line works from Kadapa to Bengaluru for distance of 225 kms at an anticipated cost of `2030 crore is in with an estimated cost of `2.17 crore is completed progress. 4. Construction of RUB in lieu of LC No 88(M) between Panapakam‐Chandragiri stations in Katpadi‐Tirupati Section with an estimated cost of `2.27 crore is in progress 2. It is proposed for construction of New Railway Line between Kuppam– Marikuppam for a distance of 24 kms at anticipated cost of `279 crore. 5. Proposed construction of RUB in lieu of LC No 136(M) between Mangalampeta‐Damalcheruvu stations in Dharmavaram‐Pakala Section with an estimated cost of ` 2.17 crore 3. It is proposed for construction of New Railway Line between Srinivasapuram – Madanapalli for a distance of 6. Construction of RUB in lieu of LC No 90(M) between Panapakam‐Chandragiri stations in Katpadi‐Tirupati Section with 75 kms at anticipated cost of `466 crore. an estimated cost of ` 2.17 crore is completed Electrification Works 7. Construction of RUB in lieu of LC No 92(M) between Panapakam‐Chandragiri stations in Katpadi‐Tirupati Section 1. Proposed for Electrification of Dharmavarm – Pakala Railway Line for a distance of 228 RKm at a cost of with an estimated cost of ` 2.17 crore is completed `210.47 crore. 8. Construction of RUB in lieu of LC No 16(M) between Putalapattu‐Chittoor stations in Katpadi‐Tirupati Section with an estimated cost of ` 2.17 crore is completed 9. Construction of RUB in lieu of LC No 97(M) between Chandragiri‐Tirupati stations in Katpadi‐Tirupati Section with an estimated cost of ` 2.17 crore is in progress 10. Construction of RUB in lieu of LC No 98(M) between Chandragiri‐Tirupati stations in Katpadi‐Tirupati Section with an estimated cost of ` 2.17 crore is in progress 11. Construction of RUB in lieu of LC No 99(M) between Chandragiri‐Tirupati stations in Katpadi‐Tirupati Section with an estimated cost of ` 2.17 crore is in progress 12. Construction of RUB in lieu of LC No 19(M) between Putalapattu‐Chittoor stations in Katpadi‐Tirupati Section with an estimated cost of ` 2.27 crore is in progress 13. Construction of RUB in lieu of LC No 24(M) between Putalapattu‐Chittoor stations in Katpadi‐Tirupati Section with an estimated cost of ` 2.27 crore is in progress 14. All Unmanned Level Crossings in Chittoor Parliamentary jurisdiction are eliminated through construction RuB/LHS/Manning/Closure.
Recommended publications
  • GA-10.03 CHITTOOR, KOLAR and VELLORE DISTRICTS.Pdf
    77°50'0"E 78°0'0"E 78°10'0"E 78°20'0"E 78°30'0"E 78°40'0"E 78°50'0"E 79°0'0"E 79°10'0"E 79°20'0"E 79°30'0"E 79°40'0"E 79°50'0"E 80°0'0"E GEOGRAPHICAL AREA CHITTOOR, KOLAR AND N N " " VELLORE DISTRICTS 0 0 ' ' 0 0 ° ° 4 ± 4 1 1 Peddamandyam ! CA-03 CA-05 KEY MAP PEDDAMANDYAM MULAKALACHERUVU ! Kalicherla N CA-52 N " CA-11 " 0 Sompalle CA-04 CA-06 CA-60 0 ' ! SRIKALAHASTI ' 0 Veligallu KAMBHAMVARIPALLE 0 5 THAMBALLAPA! LLI ! GURRAMKONDA ! THOTTAMBEDU 5 ° ° 3 Thamballapalle Kalakada Kambhamvaripalle CA-21 3 1 Mulakalacheruvu 1 ! ! Á! CA-10 YERRAVARIPALEM 565 ANDHRA Gurramkonda ! ¤£ CA-02 ! Pedda Kannali PRADESH Kosuvaripalle KALAKADA CA-20 Bodevandlapalle Á! ! PEDDATHIPPASAMUDRAM ! Gundloor PILERU KARNATAKA ! CA-51 CA-53 (! Á! CA-40 Á! Á! Pattamvandlapalle Burakayalakota RENIGUNTA Srikalahasti ! ! TIRUPATI Á! YERPEDU Peddathippasamudram Rangasamudram ! ! ! Maddin!ayanipalCle H MudIivedu T T O O R CA-22 URBAN Á! Á ! ¤£31 CA-12 ! Karakambadi (Rural) ! ROMPICHERLA Á ! ! N Á N " Thummarakunta CA-07 KALIKIRI (! Tirumala CA-61 " 0 0 ' ! ' CA-09 Rompicherla ! Á 0 B.Kothakota KURÁ!ABALAKOTA ! Mangalam 0 4 ! CA-01 Á Chinnagotti Gallu ! BN 4 ° 71 ( ° ! VALMIKIPURAM Kalikiri ¤£ (! ! CA-39 3 Pileru 3 ! ! ! Renigunta 1 B Kurabalakota Á! ! KHANDRIGA 1 Thettu ! Á Akkarampalle (! TA M I L N A D U ChinnathippasamudÁ!ram Á!Chintaparthi CHINNAGOTTIGALLU (! ! Á! KOTHAKOTA ! ! Á! Kalikirireddivari Palle ! Doddipalle ! Á! Á Vikruthamala Badikayalapalle ! Angallu ! (! Á ! Kothavaripalle Á! CA-4(!1 ! Valmikipuram Á! Cherlopalle (! Varadaiahpalem Gattu ! ! ! Daminedu
    [Show full text]
  • Patchaiamman Cement Pvt Ltd Survey Number 346/1, 347/1C, Velkuru Village, Gangadhara Nellore Mandal, Chittoor District, Andhra Pradesh
    STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES S.No Information required Information to be furnished by the proponents 1 Name of the project or activity M/s. Patchaiamman Cement Pvt Ltd., 2 Name of the organization/owner. S.Suganthi – Managing Director 3 Address for communication M/s. Patchaiamman Cement Pvt Ltd No 268a, Panatoor Village, Pallur post,Gudipalla Mandal, Chittoor – 517132 Andhra Pradesh Mobile No:+91 9655247901 E-mail: [email protected] 4 Telephone numbers Mobile No:+91 9655247901 Fax: 040-23748666 5 Email ID of the organization or E-mail: [email protected] contact person 6 Location of the Proposed project or survey number 346/1, 347/1C, Velkuru village, activity Gangadhara Nellore mandal, Chittoor district, Andhra Pradesh 7 Appraisal Category (B2 or B1) B1 8 Nearest habitation and distance from Velkuru – 1.01 km – Northeast direction the project or activity 9 Installed capacity / Production Production Capacity Capacities Name of Units Production Capacity Product Phase I Phase II Total Cement TPD 300 300 600 (OPC/PPC) 10 Specify the Fuel (Coal / CNG / Enclosed in Annexure I biomass/Others) and quantity required 11 Details of Land use/Land Cover Rainfed agricultural land 12 Occupancy, ownership of the land in Private land which the activity is proposed: (Government land / Private land / Forest land /Revenue land /Temple land /leased land/ land belongs to other Department) 13 If it is a Forest land, the following NA details shall be furnished: (Whether it is a Reserved forest / Protected forest/Demarcated forest/ National Parks/Sanctuaries/any land S.No Information required Information to be furnished by the proponents in possession of Forest Department.) 14 Total investment of the Rs.
    [Show full text]
  • Premises Application for PALACE ROAD BRANCH- KUPPAM Br Page 1 out of 12
    THE REGIONAL MANAGER, STATE BANK OF INDIA REGIONAL BUSINESS OFFICE IV, TIRUPATHI RURAL, AO, TIRUPATI – 517501 Phone no : 0877 – 2237250 Fax no : 0877 – 2237259 ___________________________________________________________________ Website: www.sbhyd.com/Tenders REQUIREMENT OF ALTERNTE PREMISES TO OUR ” PALACE ROAD BRANCH-, KUPPAM ”, AT CHITTOOR DIST. ANDHRA PRADESH Our Bank requires Premises on lease basis for shifting our existing PALACE ROAD BRANCH-KUPPAM in to an alternate premises at KUPPAM, CHITTOOR DIST. ANDHRA PRADESH, having rentable area of approximately 3500-4000 sq.ft in KUPPAM TOWN, CHITTOOR DIST. ANDHRA PRADESH. Tender forms and complete details can be obtained from Regional Office at the above address or down- load from our Bank's website at www.sbi.co.in/eprocurements Willing Landlords/Owners of the premises may submit the completely filled tender documents in two separate sealed envelopes, superscribed "Technical Bid PALACE ROAD BRANCH " and "Financial Bid PALACE ROAD BRANCH -KUPPAM ", to the REGIONAL MANAGER, State Bank of India, Region – IV, ADMINIS- TRATIVE OFFICE, 4TH FLOOR, KALANJALI BUILDING, RENIGUNTA RAOD, TIRUPATI- so as to reach latest by 3.00 PM on 30-11-2017. Tenders will be opened at 4.00 PM on 30-11-2017 and for further details please contact the under signed. Tenders may be downloaded from the bank’s website(www.sbi.co.in/eprocurements) and the same to be submitted by depositing in theTender box provided in the office of REGIONAL MANAGER, REGION IV, RBO, TIRUPATI RURAL, 4TH FLOOR, KALANJALI BUILDING, RENIGUNTA RAOD, TIRUPATI -517 501. Tenders proform should not be altered/ modified/changed as otherwise the your tenders stands rejected.
    [Show full text]
  • Territorial Jurisdiction of Criminal Courts
    TERRITORIAL JURISDICTION OF CRIMINAL COURTS I. JURISDICTION OF DISTRICT COURT AND ADDITIONAL DISTRICT COURTS AT CHITTOOR. S.No Court Name Name of Police Stations 1. Insecticides Act 1968 the Seed Act 1966 and Fertilizer (Control) Order 1985 (Special Court), entire Chittoor District. 2. Chittoor Mahila. 3. Chittoor Traffic. 4. Chittoor Taluk. 5. G.D Nellore. 6. N.R. Pet. 7. Palasamudram. 8. Puthalappattu . 9. Bangarupalem P.S. 10. DVC Cases (Spl. Court at Ctr). 11. C.C.S., 12. Chittoor, I Town. 13. Chittoor II Town P.S. 14. Gudipala. 15. Yadamari. i. District and Sessions Court, Chittoor. 16. Kanipakam. 17. Thavanampalle. 18. CBCID Cases. ii. I Additional District and Sessions Court, 19. Factories Act. Chittoor. 20. Food Adulteration Act and Drugs & Cosmetics Act. 21. Forest East and West, 1. Tirupati-APSEB, iii. VIII Additional District and Sessions Court , 22. Theft Squad Chittoor. 23. All Excise cases from Chittoor (Urban and Rural). 24. Bangarupalem. iv. IX Additional District and Sessions Court, 25. Yadamari. Chittoor. 26. Gudipala. 27. Thavanampalle. 28. Puthalapat. 29. G.D.Nellore. 30. Karvetinagaram. 31. Penumur. 32. Irala. 33. Pakala PS & Excise. 34. Kallur PS 35. Palamaner. 36. Gangavaram. 37. Palamaner Excise. 38. Palamaner FRO. 39. Baireddipalle . 40. V. Kota. 41. Kuppam. 42. Gudipalle. 43. Rallabudur. 44. Kuppam FRO. 45. Kuppam Excise. 46. Ramakuppam. II. JURISDICTION OF ADDITIONAL DISTRICT COURTS AT MADANAPALLE. S.No Court Name Name of Police Stations 1. Madanapalle Taluk. 2. Madanapalle I Town. 3. MadanapalleII Town, 4. Mudivedu. 5. Nimmanapalle. 6. B. Kothakota. 7. Madanapalle Excise. i. II Additional District & Sessions Court, 8. Madanapalle FRO Madanapalle 9.
    [Show full text]
  • The Kuppam Kalanjia Samakhya Experience
    Restoring Trust – The Kuppam Kalanjia Samakhya Experience - J.Dharmendra kumar, Managing Director, Kuppam kalanjia Samakhya Background of the location Chittoor district of Andhra Pradesh in Rayalaseema region was characterized by backwardness and poor performance in basic social indicators. Kuppam is one of the mandal in Chittor district, which is in the extreme corner of AP, surrounded by Tamilnadu on eastern and southern sides and on west by Karnataka. In order to strengthen the existing DWCRA groups and regularize the systems DRDA has approached DHAN Foundation and made an agreement in the month of Nov. 99. The main objective of this project was graduating the existing DWCRA groups in to savings and credit groups and promotion of mandal level federation. DHAN Foundation would act as an implementing agency and has agreed to implement the project. DRDA, chittoor would provide necessary guidance and promotional cost for implementing the project in installment on half-yearly basis. Dhan entered in the month of January 2000 with the objective of initiating a process of demonstrating successful establishment of savings and credit groups which will emerge in to a self managed federation to provide financial services to the poor. At present Kuppam Kalanjia Samakhya is working with 253 groups in 104 villages with 3536 and 10 restructured cluster development associations. The starting scenario Kuppam mandal is located in a very remote and backward area in Andhra Pradesh. The socio-economic status of the people, especially women is very low. Due to extreme poverty, people frequently required small loans. “However banks are unwilling to entertain these amounts.
    [Show full text]
  • Patchaiamman Cement Pvt Ltd Executive Summary
    PATCHAIAMMAN CEMENT PVT LTD SURVEY NUMBER 347/1B, 347/1C, VELKURU VILLAGE, GANGADHARA NELLORE MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH EXECUTIVE SUMMARY SUBMITTED BY STUDIES AND DOCUMENTATION BY TEAM Labs and Consultants M/s. Patchaiamman Cement Pvt Ltd No 268a, Panatoor Village, B-115 - 117 & 509, Annapurna Block, Pallur post, Gudipalla Mandal, Aditya Enclave, Ameerpet, Chittoor – 517132 Andhra Pradesh Hyderabad-500 038 Mobile No:+91 9655247901 Phone: 040-23748 555/616, E-mail: [email protected] Tele fax: 040-23748666 Email: [email protected] Submitted to ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI Patchaiamman Cement Pvt Ltd Executive Summary CHAPTER 1.0 EXECUTIVE SUMMARY Introduction Patchaiamman Cement Pvt Ltd (PCPL) proposes to establish a greenfield standalone grinding unit for cement manufacturing with a production capacity of 600 TPD (Phase I : 300 TPD, Phase II : 300 TPD) at survey number 347/1B, 347/1C, Velkuru village, Gangadhara Nellore Mandal, Chittoor district, Andhra Pradesh in an area of 1.47 ha. The capital cost of the proposed unit is Rs.4.4 crores. The ministry of environment, forest and climate change (MoEFCC), Government of India issued a notification vide S.O. 1533, dt. 14.9.2006 prescribing prior environmental clearance for cement grinding units of less than 1 million ton capacity/year. Accordingly the project proponent obtained the terms of Reference (ToR) following the due process as mentioned in the said notification vide letter no. SEIAA/AP/CTR/IND/07/201/ 361, dt. 14.08.2017, dt.16.04.2018. The EIA report is based on the prescribed TOR's to obtain environmental clearance.
    [Show full text]
  • Are You Suprised ?
    Chapter 2 Physical features 2.1 Geographical Disposition The Pennar (Somasila) – Palar - Cauvery (Grand Anicut) link canal off takes from the existing Somasila reservoir located across the Pennar River near Somasila village in Nellore district of Andhra Pradesh state. The link canal is proposed to pass through the Kaluvaya, Rapur, Dakkili, Venkatagiri mandals of Nellore district; Srikalahasti, Thottambedu, Pitchattur and Nagari mandals of Chittoor district of Andhra Pradesh state, Tiruttani taluk of Tiruvallur district; Arakonam taluk of Vellore district; Cheyyar and Vandavasi taluks of Tiruvannamalai district; Kancheepuram, Uthiramerur taluks of Kancheepuram district; Tindivanam, Gingee, Villupuram, Tirukoilur taluks of Villupuram district; Ulundurpettai, Vridhachalam, Tittagudi taluks of Cuddalore district; Udaiyarpalayam, Ariyalur taluk of Perambalur district; and Lalgudi taluk of Tiruchchirappalli district of Tamil Nadu state.The link canal alignment passes through Pennar basin, Streams between Pennar and Palar basins, Palar basin and streams between Palar and Cauvery basins. The link canal takes off from the right flank of Somasila dam with a full supply level of 95.420 m. and runs parallel on right side of the Kandaleru flood flow canal, upto RD 10 km. The canal generally runs in south direction till it out-falls into Grand Anicut across Cauvery River at RD 529.190 km. The major rivers that would be crossed by the canal are Swarnamukhi, Arani Ar, Nagari, Palar, Cheyyar, Ponnaiyar, and Vellar. The districts that would be benefited by the link canal through enroute irrigation are Nellore, Chittoor of Andhra Pradesh state and Tiruvallur, Kancheepuram, Vellore, Tiruvannamalai, Villupuram, Cuddalore districts of Tamil Nadu state and Pondicherry (U.T).
    [Show full text]
  • List of Units Uploaded in Finance Dept Portal for Release
    Transaction SlNo Beneficiary Name District Amount Gopal Metal Roofing and Ceiling Systems, RS East 1 No.349, Pidimgoyya 2000000 Godavari Village, Rajahmundry Rural Mandal Gopal Metal Roofing and Ceiling Systems, RS East 2 No.349, Pidimgoyya 270 Godavari Village, Rajahmundry Rural Mandal Gopal Metal Roofing and Ceiling Systems, RS East 3 No.349, Pidimgoyya 98895 Godavari Village, Rajahmundry Rural Mandal Gopal Metal Roofing and Ceiling Systems, RS East 4 No.349, Pidimgoyya 7278 Godavari Village, Rajahmundry Rural Mandal M/s DeconAgri Oils Pvt Ltd, 257/2, East 5 290341 Yerrampalem Village, Godavari Gandepalle Mandal M/s Royal Lubricants, RS No. 74/1, East 6 134415 Jagapathinagaram, Godavari Kirlampudi Mandal M/s. Geetha Ice Factory, East 7 Plot No.74/1A, Bye pass 89538 Godavari road, Mandapeta M/s Asvini Agro Exports, Plot No 12, Phase-III, East 8 1195677 IDA, Peddapuram, East Godavari Godavari Dt M/s Sri Padma Refractory Monolithics, East 9 RS No 99/1, 164412 Godavari Neeladriraopeta, Gandepalle Mandal M/s Sri Padma Refractory Monolithics, East 10 RS No 99/1, 60427 Godavari Neeladriraopeta, Gandepalle Mandal M/s Sri Vajra Electro Porcelains Pvt Ltd, RS East 11 No 164, VT Puram Road, 62157 Godavari Peddapruam, East Godavari Dt M/s. Auro Energy, East 12 Balabadrapuram village, 181877 Godavari Biccavolu(M) M/s. Sri Hari Bio Fuels, R.S.No.144/2, East 13 9453 Malapadu, Godavari Ramachandrapuram M/s. Sri Hari Bio Fuels, R.S.No.144/2, East 14 31719 Malapadu, Godavari Ramachandrapuram M/s. Sri Buvanas Enterprises, Plot No.8, East 15 510983 phase-III, IDA, Godavari Peddapuram M/s.
    [Show full text]
  • Handbook of Statistics 2014 Chittoor District Andhra Pradesh.Pdf
    HAND BOOK OF STATISTICS CHITTOOR DISTRICT 2014 ***** Compiled and Published by CHIEF PLANNING OFFICER CHITTOOR DISTRICT SIDDHARTH JAIN I.A.S., District Collector & Magistrate, Chittoor District. PREFACE I am happy to release the Twenty EighthEdition of Hand Book of Statistics of Chittoor District which incorporates Statistical Data of various departments for the Year 2014. The Statistical Data in respect of various departments and schemes being implemented in the district are compiled in a systematic and scientific manner reflects the progress during the year. The sector-wise progress is given in a nutshell under the chapter “DISTRICT AT A GLANCE” apart from Mandal-wise data. The publication reflects the latest data on various aspects of the District Economy. The information has been given Mandal-wise in a concise form to facilitate an over all assessment of the District Economy for the year. This compilation will serve as a useful reference book for the General public, Planners, Administrators, Research Scholars, Bankers and also special Agencies that are involved in the formulation and implementation of various developmental programmes in the district. I am thankful to all District Officers and the heads of other institutions for extending their helping hand by furnishing their respective Statistical data to theChief Planning Officer for publication of this Hand Book. I appreciate the efforts made by Sri. Ch. V.S.BhaskaraSarma, Chief Planning Officer, Chittoor, other Officers and Staff Members of the Chief Planning Office in bringing out this publication which projects the development of the District during the year 2014. Any suggestions aimed at improving the quality of data incorporated in this Hand Book are most welcome.
    [Show full text]
  • Unpaid Dividend-17-18-I3 (PDF)
    Note: This sheet is applicable for uploading the particulars related to the unclaimed and unpaid amount pending with company. Make sure that the details are in accordance with the information already provided in e-form IEPF-2 CIN/BCIN L72200KA1999PLC025564 Prefill Company/Bank Name MINDTREE LIMITED Date Of AGM(DD-MON-YYYY) 17-JUL-2018 Sum of unpaid and unclaimed dividend 696104.00 Sum of interest on matured debentures 0.00 Sum of matured deposit 0.00 Sum of interest on matured deposit 0.00 Sum of matured debentures 0.00 Sum of interest on application money due for refund 0.00 Sum of application money due for refund 0.00 Redemption amount of preference shares 0.00 Sales proceed for fractional shares 0.00 Validate Clear Proposed Date of Investor First Investor Middle Investor Last Father/Husband Father/Husband Father/Husband Last DP Id-Client Id- Amount Address Country State District Pin Code Folio Number Investment Type transfer to IEPF Name Name Name First Name Middle Name Name Account Number transferred (DD-MON-YYYY) 49/2 4TH CROSS 5TH BLOCK MIND00000000AZ00 Amount for unclaimed and A ANAND NA KORAMANGALA BANGALORE INDIA Karnataka 560095 54.00 23-May-2025 2539 unpaid dividend KARNATAKA 69 I FLOOR SANJEEVAPPA LAYOUT MIND00000000AZ00 Amount for unclaimed and A ANTONY FELIX NA MEG COLONY JAIBHARATH NAGAR INDIA Karnataka 560033 72.00 23-May-2025 2646 unpaid dividend BANGALORE ROOM NO 6 G 15 M L CAMP 12044700-01567454- Amount for unclaimed and A ARUNCHETTIYAR AKCHETTIYAR INDIA Maharashtra 400019 10.00 23-May-2025 MATUNGA MUMBAI MI00 unpaid
    [Show full text]
  • 3.Applied-A STUDY on AWARENESS of WOMEN LIVESTOCK FARMERS on LIVESTOCK MANAGEMENT PRACTICES
    IMPACT: International Journal of Research in Applied, Natural and Social Sciences (IMPACT: IJRANSS) ISSN(P): 2347-4580; ISSN(E): 2321-8851 Vol. 4, Issue 11, Nov 2016, 21-24 © Impact Journals A STUDY ON AWARENESS OF WOMEN LIVESTOCK FARMERS ON LIVESTOCK MANAGEMENT PRACTICES ROSHAN BAIG 1, K PRAVEEN KUMAR 2 & G R K SHARMA 3 1Department of Veterinary & A.H. Extension Education, College of Veterinary Science, Sri Venkateswara Veterinary University, Tirupati, Andhra Pradesh, India. 2Shreeja Mahila Milk Producer Company, Tirupati, Andhra Pradesh, India 3Department of Veterinary & A.H. Extension Education, College of Veterinary Science, Sri Venkateswara Veterinary University, Tirupati, Andhra Pradesh, India ABSTRACT An ex-post-facto research was conducted to study the awareness of women livestock farmers on livestock management practices by administering a pretested structured interview schedule. The results revealed that farm women are more aware of practices like deworming, vaccination, housing and balanced feed. The research recommended a focus on conducting awareness programmes on teat dips, record keeping, enrichment of paddy straw and hydroponics as the urgent need for improvement of milk production and thus for the development of dairy women. KEYWORDS: Andhra Pradesh, Chittoor, Dairy, Farmer, Livestock, Women INTRODUCTION Indians started livestock farming thousands of years ago and women were the most important holders of dairy animals since the history of civilization in India. Women play an impeccable role in dairy animal management starting the day with cleaning the sheds to taking the care of new born and handling the milk related activities. To escalate the farm economics and to make the dairy farming sustainable and profitable one has to be well aware of the different management practices which will alter the income and expenditure due to their adoption and continued usage.
    [Show full text]
  • PCPL/TLC/SEIAA/EC/Tor-2 Date.10.01.2018
    Ref: PCPL/TLC/SEIAA/EC/ToR-2 Date.10.01.2018 To The Member Secretary, State Level Environmental Impact Assessment Authority (SEIAA), Hyderabad- 500 018 Respected Sir, Sub: Terms of Reference documentation for the proposed greenfiled stand alone cement Grinding unit– M/s. Patchaiamman Cement Pvt Ltd – reg Ref: 1.Online proposal No. SIA/AP/IND/19826/2017, dt.13.07.2017 We have obtained Terms of Reference for our Standalone cement grinding unit. we have purchased the 347/1B of land area 1.82 acres. Kindly amend the ToR from survey Numbers 346/1, 3471/1C of land area 2.61 ha to 347/1B, 347/1C of land area 1.47 ha. We herewith submit copy of revised Form I, Prefeasibility report and land documents for the proposed 600 TPD (Phase I: 300 TPD, Phase II: 300 TPD greenfiled stand alone cement grinding at survey number 347/1B, 347/1C, Velkuru village, Gangadhara Nellore Mandal, Chittoor district, Andhra. Kindly process the application at the earliest and acknowledge the receipt of the same. Thanking You Yours Sincerely, for Patchaiamman Cement Pvt Ltd., S.Suganthi Managing Director Encl: 1. Form-I, 2. Pre-feasibility Report. 3. Land documents PATCHAIAMMAN CEMENT PVT LTD SURVEY NUMBER 347/1B, 347/1C, VELKURU VILLAGE, GANGADHARA NELLORE MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH 1. Form I 2. PRE-FEASIBILITY REPORT Project Number 0118-0101 January, 2018 Submitted by: Studies & Documented By M/s. Patchaiamman Cement Pvt Ltd M/s Team Labs and Consultants No 268a, Panatoor Village, B-115,116, 117 & 509, Annapurna Block, Pallur post, Gudipalla Mandal, Aditya Enclave, Ameerpet, Chittoor – 517132 Hyderabad- 500 038 Andhra Pradesh Phone: +91-40-23748555, 23748616 Mobile No:+91 9655247901 Fax: +91-40-23748666 E-mail: E-mail: [email protected] [email protected] Submitted To STATE LEVEL ENVIRONMENTAL IMPACT ASSESSMENT AUTHORITY ANDHRA PRADESH GOVERNMENT OF INDIA PATCHAIAMMAN CEMENT PVT LTD SURVEY NUMBER 347/1B, 347/1C, VELKURU VILLAGE, GANGADHARA NELLORE MANDAL, CHITTOOR DISTRICT, ANDHRA PRADESH 1.
    [Show full text]