RAIL DEVELOPMENTAL WORKS Panapakkam Platform `0.24 Crore Proposed 1

RAIL DEVELOPMENTAL WORKS Panapakkam Platform `0.24 Crore Proposed 1

Green Initiatives 1. Towards energy saving, installed 10 kWp solar power panels at Madanapalle Road station at the cost of ` 6 lakh. 2. LED lighting is provided at all the stations (on South Central Railway jurisdiction) at cost of ` 6.8 lakh and work in progress at remaining stations (South Western Railway jurisdiction) with the cost of `12.2 lakhs 3. Revival of water bodies is being undertaken towards water conservation measure. Chittoor Passenger Amenities Parliamentary Constituency Station Amenity Amount Status Pakala Platform `10 Lakh Constructed Shri Narendra Modi Hon’ble Prime Minister Provision of Passenger Amenities and Panapakam Platform `24 Lakh Constructed facilities, and its improvements at Chandragiri Platform `0.24 crore Proposed Railway Stations is one of the most Pakala Platform `1.10 crore Proposed important aspect Railway Services. Siddampalli Platform `0.24 crore Proposed RAIL DEVELOPMENTAL WORKS Panapakkam Platform `0.24 crore Proposed 1. Development of traffic facility works at Puttalapattu Platform `0.24 crore Proposed Chittoor Parliamentary Constituency Jurisdiction Bommasamudram New Crossing Station Chittoor Ticket Window `0.5 Lakh Completed with a cost of `6 crore is in progress Chittoor 16 CCTV Cameras `37 Lakh Proposed Chittoor 2 ATVMs `3 Lakh Installed Pakala CIB/TIB `80 Lakh Progress South Central Railway Chittoor Signages `5 Lakh Completed serving the entire state of Chittoor Concrete Apron `1.84 crore Constructed Telangana, major portion Bommasamudram Conversion to Halt Station `7 crore Completed of Andhra Pradesh and Pakala Toilets `0.75 crore Completed considerable portion of SOUTH CENTRAL Chittoor Platform works `1.10 crore Proposed Karnataka, Maharastra Pakala Wi‐Fi `1.5 lakh Provided states and small parts of Tamilnadu and RAILWAY Passenger Train Services Madhya Pradesh. Details of Additional Stoppage provided for Existing Trains in Chittoor Parliamentary Chittoor Parliamentary Constituency Jurisdiction. Constituency falls under Provision of Stoppage Andhra Pradesh State. 1) Tr.No.16353/16354 Kacheguda–Nagercoil–Kacheguda Weekly Express stoppage has been given at Chittoor Major share of Railway lines of this constituency Extension of Train Services is being served by 1) Tr.No.17401/17402/17403/17404 Machilipatnam/Narsapur – Tirupati Express extended up to Dharmavaram South Central Railway and with new Tr.No.17245/17246/17247/17248 partly by South Western & Southern Railway. ASSEMBLY SEGMENTS Safety – The First Priority Safety is the priority on SCR, to ensure safety of the Rail Proposed FOBs users, Foot over Bridges (FoBs)/ Road under/over Bridges are Chandragiri constructed / proposed for construction at various stations/ Station Cost (`) locations in Chittoor Parliamentary Constituency Chandragiri 1.67 crore Nagari Jurisdiction. Chittoor 1.67 crore Gangadhara Nellore Chittoor Road Over / Under Bridges Puthalapattu Palamaner With a view to strengthen safety at Level Crossing gates and to avoid untoward incidents and also to provide seamless Kuppam journey to road traffic, the following Road under /over Bridges (RuB/RoB) are constructed / proposed for construction under Chittoor Parliamentary constituency. RAIL DEVELOPMENTAL WORKS Chittoor Parliamentary Constituency Jurisdiction Road Under Bridge 1. Construction of RUB in lieu of LC No 56(UM) between Ramapuram‐Katpadi Stns in Katpadi‐Tirupati Section with an estimated cost of ` 2.14 crore is completed Infrastructural Development 2. Construction of RUB in lieu of LC No 70(M) between Pakala‐Ramapuram stations Katpadi‐Tirupati Section with an estimated cost of `2.17 crore is in progress New Railway Line works 3. Construction of RUB in lieu of LC No 86(M) between Mungilipattu‐Chandragiri stations in Katpadi‐Tirupati Section 1. New Railway line works from Kadapa to Bengaluru for distance of 225 kms at an anticipated cost of `2030 crore is in with an estimated cost of `2.17 crore is completed progress. 4. Construction of RUB in lieu of LC No 88(M) between Panapakam‐Chandragiri stations in Katpadi‐Tirupati Section with an estimated cost of `2.27 crore is in progress 2. It is proposed for construction of New Railway Line between Kuppam– Marikuppam for a distance of 24 kms at anticipated cost of `279 crore. 5. Proposed construction of RUB in lieu of LC No 136(M) between Mangalampeta‐Damalcheruvu stations in Dharmavaram‐Pakala Section with an estimated cost of ` 2.17 crore 3. It is proposed for construction of New Railway Line between Srinivasapuram – Madanapalli for a distance of 6. Construction of RUB in lieu of LC No 90(M) between Panapakam‐Chandragiri stations in Katpadi‐Tirupati Section with 75 kms at anticipated cost of `466 crore. an estimated cost of ` 2.17 crore is completed Electrification Works 7. Construction of RUB in lieu of LC No 92(M) between Panapakam‐Chandragiri stations in Katpadi‐Tirupati Section 1. Proposed for Electrification of Dharmavarm – Pakala Railway Line for a distance of 228 RKm at a cost of with an estimated cost of ` 2.17 crore is completed `210.47 crore. 8. Construction of RUB in lieu of LC No 16(M) between Putalapattu‐Chittoor stations in Katpadi‐Tirupati Section with an estimated cost of ` 2.17 crore is completed 9. Construction of RUB in lieu of LC No 97(M) between Chandragiri‐Tirupati stations in Katpadi‐Tirupati Section with an estimated cost of ` 2.17 crore is in progress 10. Construction of RUB in lieu of LC No 98(M) between Chandragiri‐Tirupati stations in Katpadi‐Tirupati Section with an estimated cost of ` 2.17 crore is in progress 11. Construction of RUB in lieu of LC No 99(M) between Chandragiri‐Tirupati stations in Katpadi‐Tirupati Section with an estimated cost of ` 2.17 crore is in progress 12. Construction of RUB in lieu of LC No 19(M) between Putalapattu‐Chittoor stations in Katpadi‐Tirupati Section with an estimated cost of ` 2.27 crore is in progress 13. Construction of RUB in lieu of LC No 24(M) between Putalapattu‐Chittoor stations in Katpadi‐Tirupati Section with an estimated cost of ` 2.27 crore is in progress 14. All Unmanned Level Crossings in Chittoor Parliamentary jurisdiction are eliminated through construction RuB/LHS/Manning/Closure.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us