Federal Register/Vol. 85, No. 149/Monday, August 3, 2020/Notices

Total Page:16

File Type:pdf, Size:1020Kb

Federal Register/Vol. 85, No. 149/Monday, August 3, 2020/Notices Federal Register / Vol. 85, No. 149 / Monday, August 3, 2020 / Notices 46619 Dated: July 28, 2020. Services, Humboldt County Public The Commission strongly encourages Nathaniel J. Davis, Sr., Works Department, 1106 Second Street, electronic filing. Please file scoping Deputy Secretary. Eureka, CA 95501, (707) 268–2680, comments using the Commission’s [FR Doc. 2020–16810 Filed 7–31–20; 8:45 am] [email protected]. eFiling system at https:// BILLING CODE 6717–01–P i. FERC Contact: Quinn Emmering, ferconline.ferc.gov/FERCOnline.aspx. [email protected], 202–502– Commenters can submit brief comments 6382. up to 6,000 characters, without prior DEPARTMENT OF ENERGY j. Cooperating agencies: Federal, state, registration, using the eComment system local, and tribal agencies with at https://ferconline.ferc.gov/ Federal Energy Regulatory jurisdiction and/or special expertise QuickComment.aspx. You must include Commission with respect to environmental issues your name and contact information at the end of your comments. For [Project No. 77–298; Project No. 77–285] that wish to cooperate in the preparation of the environmental assistance, please contact FERC Online NOI Parties; Notice Soliciting Scoping document should follow the Support at FERCOnlineSupport@ Comments instructions for filing such requests ferc.gov, (866) 208–3676 (toll free), or described in item o below. Cooperating (202) 502–8659 (TTY). In lieu of Take notice that the following agencies should note the Commission’s electronic filing, you may submit a hydroelectric application has been filed policy that agencies that cooperate in paper copy. Submissions sent via the with Commission and is available for the preparation of the environmental U.S. Postal Service must be addressed public inspection: document cannot also intervene. See 94 to: Kimberly D. Bose, Secretary, Federal a. Type of Application: Major, new FERC 61,076 (2001). Energy Regulatory Commission, 888 license. k. Please note that on April 6, 2017, First Street NE, Room 1A, Washington, b. Project Nos.: P–77–298; P–77–285. DC 20426. Submissions sent via any c. Date filed: June 28, 2019. Pacific Gas and Electric Company (PG&E) initiated the Commission’s other carrier must be addressed to: d. Applicant: NOI Parties (the NOI Kimberly D. Bose, Secretary, Federal Parties are proxies for a new Regional Integrated Licensing Process (ILP) to relicense the Potter Valley Project by Energy Regulatory Commission, 12225 Entity that ultimately would be the Wilkins Avenue, Rockville, Maryland license applicant for the project. The filing, pursuant to 18 CFR 5.6, a Notice of Intent (NOI) and Pre-Application 20852. The first page of any filing Regional Entity has not yet been formed should include docket number P–77– under California law, but once formed, Document (PAD), which included a proposed process plan and schedule. 298. the Regional Entity would supplant the The Commission’s Rules of Practice However, on January 25, 2019, PG&E NOI Parties in this Integrated Licensing and Procedure require all interveners filed a notice of withdrawal indicating Process [ILP] proceeding. The NOI filing documents with the Commission that it was discontinuing its efforts to Parties are Mendocino County Inland to serve a copy of that document on relicense the project, which became Water Agency and Power Commission; each person on the official service list effective on February 11, 2019. As a Sonoma County Water Agency; for the project. Further, if an intervener California Trout, Inc.; County of result, on March 1, 2019, the files comments or documents with the Humboldt, California; and the Round Commission issued a Notice Soliciting Commission relating to the merits of an Valley Indian Tribes). Applications for interested applicants to issue that may affect the responsibilities e. Name of Project: Potter Valley file NOIs, PADs, and requests to of a particular resource agency, it must Project. complete the pre-filing stages of the also serve a copy of the document on f. Location: On the Eel and East Fork relicensing process. that resource agency. Russian Rivers in Lake and Mendocino On June 28, 2019, the NOI Parties m. This application is not ready for Counties, California, about 15 miles filed a NOI to seek a new license for the environmental analysis at this time. northeast of the City of Ukiah. The project and that it incorporates by n. The Potter Valley Project stores existing 9.959-megawatt (MW) Potter reference PG&E’s PAD as part of the winter runoff from the upper Eel River Valley Project occupies lands owned by project record as all the general Basin and annually diverts an average of Pacific Gas and Electric Company (2,328 information on the existing project is approximately 60,000 acre-feet of Eel acres), National Forest System Lands the same. On August 1, 2019, the River water into the Russian River to administered by the United States Commission issued a public notice of generate hydroelectric power, provide Forest Service, Mendocino National the NOI Parties’ intent to continue the water to local water users, and meet Forest (1,146 acres), and privately- ILP initiated by PG&E and file a final regulatory streamflow requirements for owned lands (41 acres). license application by April 14, 2022. the Eel River and East Branch Russian g. Filed Pursuant to: Federal Power On May 13, 2020, the NOI Parties filed River. Act, 16 U.S.C. 791a—825u. a Feasibility Study Report, which Existing project facilities include: (1) h. Applicant Contacts: Grant Davis, includes information on the proposed Lake Pillsbury, a 2,275-acre storage General Manager, Sonoma County Water Regional Entity to operate and maintain reservoir with a current storage capacity Agency, 404 Aviation Boulevard, Santa the project and its proposed changes to of 76,876 acre-feet at normal maximum Rosa, CA 95403, (707) 547–1900, project facilities and operations from water surface elevation (NMWSE) of [email protected]; Janet Pauli, what PG&E originally proposed. 1,828.3 feet impounded by Scott Dam Chair, Mendocino County Inland Water Therefore, in addition to the Feasibility on the Eel River; (2) Scott Dam, a 130- and Power Commission, P.O. Box 1247, Study Report and NOI, participants foot-high, 805-foot-long, concrete Ukiah, CA 95482, (707) 743–1173, should also refer to PG&E’s PAD for gravity dam with an ogee-shaped, [email protected]; Curtis Knight, general information about existing overflow spillway structure with five Executive Director, California Trout, 360 project facilities, project operations, and 32-foot-wide, 10-foot-high, radial gates, Pine Street, 4th Floor, San Francisco, environmental resources in the project and 26 10-foot-high, 7.5- to 10-foot- CA 94104, (415) 392–8887, cknight@ area. wide, steel slide gates; (3) a 72-inch- caltrout.org; and Hank Seemann, l. Deadline for filing scoping diameter, riveted-steel outlet pipe Deputy Director—Environmental comments: August 27, 2020. passing through Scott Dam at invert VerDate Sep<11>2014 20:39 Jul 31, 2020 Jkt 250001 PO 00000 Frm 00034 Fmt 4703 Sfmt 4703 E:\FR\FM\03AUN1.SGM 03AUN1 khammond on DSKJM1Z7X2PROD with NOTICES 46620 Federal Register / Vol. 85, No. 149 / Monday, August 3, 2020 / Notices elevation 1,730.3 feet, controlled by a reduce environmental impacts in the ENVIRONMENTAL PROTECTION 42-inch Lauren-Johnson needle valve river basins. AGENCY that releases water downstream into the o. In addition to publishing the full [R01–OW–2020; FRL–10012–96–Region 1] Eel River; (4) Van Arsdale Reservoir, a text of this document in the Federal 106-acre reservoir at NMWSE of 1,494.3 Register. The Commission provides all Program Requirement Revisions feet with a current storage capacity of interested persons an opportunity to Related to the Public Water System 390 acre-feet impounded by Cape Horn view and/or print the contents of this Supervision Programs for the Dam on the Eel River; (5) Cape Horn Commonwealth of Massachusetts, the Dam, consisting of a 60-foot-high, 237- document via the internet through the Commission’s Home Page (http:// State of Connecticut and the State of foot-long, earthfill section and a 63-foot- New Hampshire high, 283-foot-long, concrete, gravity www.ferc.gov) using the eLibrary link. overflow spillway section with the crest Enter the docket number excluding the AGENCY: Environmental Protection at 1,490.3 feet msl elevation; (6) release last three digits in the docket number Agency (EPA). gates at the center of the dam passing field to access the document. At this ACTION: Notice. water downstream through a 434-foot- time, the Commission has suspended SUMMARY: Notice is hereby given that long, pool-and-weir type fish ladder that access to the Commission’s Public the Commonwealth of Massachusetts, rises a vertical distance of 400 feet for Reference Room, due to the the State of Connecticut and the State of anadromous fish passage to the Eel proclamation declaring a National New Hampshire are revising their River and its tributaries; (7) Van Arsdale Emergency concerning the Novel respective approved Public Water intake diversion structure, that includes Coronavirus Disease (COVID–19), issued System Supervision (PWSS) programs to fish screens and a fish return channel, by the President on March 13, 2020. For meet the requirements of the Safe diverting water from the Eel River about assistance, contact FERC Online Drinking Water Act (SDWA). 400 feet upstream of Cape Horn Dam; (8) Support. DATES: All interested parties may a trans-basin diversion system p. You may also register online at comprised of a 5,826-foot-long tunnel, a request a public hearing for any of the https://ferconline.ferc.gov/ 457-foot-long conduit, an 807-foot-long above EPA determinations. A request for FERCOnline.aspx to be notified via a public hearing must be submitted by tunnel, and a 367-foot-long conduit that September 2, 2020, to the Regional conveys water to the penstocks; (9) a email of new filings and issuances Administrator at the address shown butterfly valve house and penstock related to this or other pending projects.
Recommended publications
  • BSR History #1
    ar C, 'f t' + t 4 4 \ " • '. ' , . • ' ' Vs'l . 4 y "."'-'-" '- : : * : : . ­ . ' . 'iw, ~ , y p i 1 I 4 t A • ' • - " 'k P+g 1 EfC ' <r THE POTTER VALLEY STORY Potter Valley was or1ginally known as Potter's Valley. F r om t he t i m e o f t h e adv e n t o f t h e f i r s t Ame r i c a n t o v 1 e w i t s b eau t y until the present time, it has been called. the Gem of Mendocino County, Of the twenty-two or so valleys in Mendocino County, it can be consicLered outstanding. I t is not a large valley, being ap­ proximately four mlles wid.e and eight miles long. T h e North Fork o f the Russian River divides the valley's ten thousand acres. T h e headwaters of the Russian River are at the extreme head. of the val­ ley. Th e lower hills of the Mayacamas Mountains of the Coast Range almost surround the valley with the usual upland. at their f eet. The high peaks, a few of which are perpetually snow-covered., can be seen in the d.istance. This combinat1on of valley, upland. and. mountains give a charm and, simplicity that has apparently d.evelop­ ed. a fascination to those who settled. here. Many of the descend.­ ants of the early settlers have for several generations remained here. It is not only the beauty of the area but its f ertility that has earned it the title "grain basket of Mendocino County." The Thomas Potter party, looking for more grazing lancL for Sonoma County cattle, decid.ed.
    [Show full text]
  • Scoping Document 1 for the Potter Valley Project
    FEDERAL ENERGY REGULATORY COMMISSION Washington, DC 20426 June 1, 2017 OFFICE OF ENERGY PROJECTS Project No. 77-285 – California Potter Valley Project Pacific Gas & Electric Company Subject: Scoping Document 1 for the Potter Valley Project To the Party Addressed: The Federal Energy Regulatory Commission (Commission) is currently reviewing the Pre-Application Document submitted by Pacific Gas & Electric Company (PG&E) for relicensing the 9.4-megawatt (MW) Potter Valley Project (FERC No. 77). The proposed project is located on the Eel and East Fork Russian Rivers, in Lake and Mendocino Counties, California. The project occupies lands owned by PG&E and National Forest System Lands administered by the United States Forest Service, Mendocino National Forest. Pursuant to the National Environmental Policy Act (NEPA) of 1969, as amended, Commission staff intends to prepare an Environmental Impact Statement (EIS), which will be used by the Commission to determine whether, and under what conditions, to issue a new license for the project. To support and assist our environmental review, we are beginning the public scoping process to ensure that all pertinent issues are identified and analyzed and that the EIS is thorough and balanced. We invite your participation in the scoping process and are circulating the enclosed Scoping Document 1 (SD1) to provide you with information on the Potter Valley Project. We are also soliciting your comments and suggestions on our preliminary list of issues and alternatives to be addressed in the EIS. We are also requesting that you identify any studies that would help provide a framework for collecting pertinent information on the resource areas under consideration necessary for the Commission to prepare the EIS for the project.
    [Show full text]
  • Lake Mendocino Water Supply Reliability Evaluation Report Term 17
    State Water Resources Control Board Order 5/1/2013 Lake Mendocino Water Supply Reliability Evaluation Report Term 17 April 30, 2015 Prepared by Sonoma County Water Agency 404 Aviation Blvd Santa Rosa, CA 95403 LAKE MENDOCINO WATER SUPPLY RELIABILITY EVALUATION REPORT TABLE OF CONTENTS Executive Summary ..................................................................................................................................... 1 1.0 Introduction .......................................................................................................................................... 3 1.1 Purpose and Scope ........................................................................................................................... 3 1.2 Organization of Report ..................................................................................................................... 3 2.0 Background ........................................................................................................................................... 4 2.1 Project History and Description ........................................................................................................ 4 2.2 Flood Management Operations ....................................................................................................... 5 2.3 Water Supply Operations ................................................................................................................. 5 2.4 Potter Valley Project Operations .....................................................................................................
    [Show full text]
  • Russian River Hydrologic Report June 25, 2021 - July 1, 2021
    State Water Resources Control Board Temporary Urgency Change Order (6/14/2021) Russian River Hydrologic Report June 25, 2021 - July 1, 2021 Prepared as a requirement of the Order approving Sonoma Water's Petition for Temporary Urgency Change in Permits 12947A, 12949, 12950, and 16596 (Applications 12919A, 15736, 15737, and 19351). Instream Flow Requirements as of July 1, 2021 Basis Reach Instantaneous (cfs) 5-day Average (cfs) Modified Per Order: Critical Condition Upper Russian River 15 25 D-1610: Dry Condition Dry Creek 25 - Modified Per Order: Critical Condition Lower Russian River 25 35 Upper Russian River and Lower Russian River based on criteria as established in the Order issued 6/14/2021. Lake Mendocino Lake Mendocino Storage 2015 - 2021 and Storage Curve 120,000 100,000 80,000 feet - 60,000 Acre 40,000 July 01, 2021 30,586 Acre-feet 20,000 2015 2016 2017 2018 2019 2020 2021 Storage Curve Major Deviation Curve Emergency Regulation Storage Threshold 0 3/1 4/1 5/1 6/1 7/1 8/1 9/1 1/1 2/1 10/1 12/1 11/1 Storage July 1, 2021 30,586 (acre-feet) Total Average Daily Rate Change in Storage Last 30 days -4,337 -145 (acre-feet) Last 7 days -1,112 -159 Min 7 Daily Inflow Last 7 days Max 24 (cfs) Mean 15 Min 82 Release (cfs) Last 7 days Max 84 Mean 83 Release Flow Change Ramping Rates : Approved Adjusted Rates Event Requested: 3/1/2021 Purpose: California Department of Fish and Wildlife (CDFW) and National Marine Fisheries Service (NMFS) has requested the discharge from Coyote Valley Dam be increased from 25 cfs to 100 cfs to facilitate the second and final release of steelhead smolts from the Coyote Valley Fish Facility.
    [Show full text]
  • A History of the Salmonid Decline in the Russian River
    A HISTORY OF THE SALMONID DECLINE IN THE RUSSIAN RIVER A Cooperative Project Sponsored by Sonoma County Water Agency California State Coastal Conservancy Steiner Environmental Consulting Prepared by Steiner Environmental Consulting August 1996 Steiner Environmental Consulting Fisheries, Wildlife, and Environmental Quality P. O. Box 250 Potter Valley, CA 95469 A HISTORY OF THE SALMONID DECLINE IN THE RUSSIAN RIVER A Cooperative Project Sponsored By Sonoma County Water Agency California State Coastal Conservancy Steiner Environmental Consulting Prepared by Steiner Environmental Consulting P.O. Box 250 Potter Valley, CA 95469 August 1996 (707) 743-1815 (707) 743-1816 f«x [email protected] EXECUTIVE SUMMARY BACKGROUND Introduction This report gathers together the best available information to provide the historical and current status of chinook salmon, coho salmon, pink salmon, and steelhead in the Russian River basin. Although the historical records are limited, all sources depict a river system where the once dominant salmonids have declined dramatically. The last 150 years of human activities have transformed the Russian River basin into a watershed heavily altered by agriculture and urban development. Flows in the main river channel river are heavily regulated. The result is a river system with significantly compromised biological functions. The anthropogenic factors contributing to the decline of salmonids are discussed. Study Area The 1,485 square mile Russian River watershed, roughly 80 miles long and 10 to 30 miles wide, lies in Mendocino, Sonoma, and Lake counties. The basin topography is characterized by a sequence of northwest/southeast trending fault-block ridges and alluvial valleys. Lying within a region of Mediterranean climate, the watershed is divided into a fog-influenced coastal region and an interior region of hot, dry summers.
    [Show full text]
  • Index of Surface-Water Records
    GEOLOGICAL SURVEY CIRCULAR 72 January 1950 INDEX OF SURFACE-WATER RECORDS PART 11.PPACIFIC SLOPE BASINS IN CALIFORNIA TO SEPTEMBER 30, 1948 Prepared by San Francisco District UNITED STATES DEPARTMENT OF THE INTERIOR Oscar L. Chapman, Secretary GEOLOGICAL SURVEY W. E. Wrather, Director WASHINGTON, D. C. Free on application to the Director, Geological Survey, Washington 26, D. C. INDEX OF SURFACE-WATER RECORDS PART 11.PPACIFIC SLOPE BASINS IN CALIFORNIA TO SEPTEMBER 30, 1948 EXPLANATION The index lists the stream-flow ana reservoir stations in the Pacific Slope Basins in California for which records have been or are to be pub­ lished for periods prior to September 30, 1948. The stations are listed in downstream order. Tributary streams are indicated by indention. Station names are given in their most recently published forms. Paren­ theses around part of a station name indicate that the enclosed word or words were used in an earlier published name of the station or in a name under which records were published by some agency other than the Geological Survey. The drainage areas, in square miles, are the latest figures published or otherwise available at this time. Drainage areas that were obviously inconsistent with other drainage areas on the same stream have been omitted. Some drainage areas not published by the Geological Survey are listed with an appropriate footnote stating the published source of the figure of drainage area. Under "period of record" breaks of less than a 12-month period are not shown. A dash not followed immediately by a closing date shows that the station was in operation on September 30, 1948.
    [Show full text]
  • A Tale of Two Rivers, 2004
    A Tale of Two Rivers Photograph by Michael Amsler Gently Down the Stream: Russian RiverKeeper Don McEnhill out on a recent sampling foray. The Russian, the Eel and why you should care about both every single time you turn on a tap By R.V. Scheide, June 2004 Editor's note: This is the first in a summer-long series about the history, health and impact of the Russian and Eel rivers on the North Bay's environment and citizenry. The Russian River begins as a trickle in the pine-studded hills at the far end of Redwood Valley, a dozen or so miles north of Ukiah. It's not much to speak of, this narrow, meandering rivulet; in some places, it's possible to easily step across from one bank to the other. Fed by the creeks and culverts etched into the hillsides, the stream gradually gains breadth, if not depth, as it courses south, where just past the lumberyards of Ukiah, the main stem joins forces with its east fork, and the Russian River, at least as we commonly perceive it, begins. Picking up speed and volume, the thick band of olive-drab water winds through southern Mendocino County, farms and vineyards suckling its banks, and enters Sonoma County just north of Cloverdale. It cuts through a scenic serpentine canyon and pours into the Alexander Valley, where more thirsty vineyards nestle up to the trough, patchwork swatches of green and gold blanketing the valley floor. Gazing out over this vast, verdant empire, which receives nearly four times the average rainfall of Southern California, it's tempting to think that water is not a problem for us, like it is for, say, Los Angeles, which over the years has developed an unseemly reputation for stealing water from other regions.
    [Show full text]
  • DRAFT Aquatic Life and Aquatic-Dependent Wildlife Selenium Water Quality Criterion for Freshwaters of California (Xx November 2018)
    United States Region 9 & Office of Water EPA-xxx-x-xx-xxx Environmental Protection November 2018 Agency DRAFT Aquatic Life and Aquatic-Dependent Wildlife Selenium Water Quality Criterion for Freshwaters of California (xx November 2018) U.S. Environmental Protection Agency Region 9 Water Division San Francisco, CA U.S. Environmental Protection Agency Office of Water Office of Science and Technology Washington, D.C. TABLE OF CONTENTS TABLE OF CONTENTS ....................................................................................................................... II LIST OF TABLES .............................................................................................................................. IV LIST OF FIGURES .............................................................................................................................. V EXECUTIVE SUMMARY .................................................................................................................... IX PART 1 INTRODUCTION AND BACKGROUND ................................................................................. 1 1.1 Early Selenium Efforts .................................................................................................... 1 1.2 California Toxics Rule .................................................................................................... 4 PART 2 PROBLEM FORMULATION ................................................................................................. 6 2.1 Overview of Selenium Sources and Occurrence in
    [Show full text]
  • School Way Bridge Replacement Project Delineation of Waters of the United States
    School Way Bridge Replacement Project Delineation of Waters of the United States February 24, 2010 Prepared for: Mendocino County Department of Transportation Attn: Park Steiner 340 Lake Mendocino Drive Ukiah, CA 95482 Prepared by: North State Resources, Inc. 5000 Bechelli Lane, Ste. 203 Redding, CA 96002 (530) 222-5347 51175 Delineation of Waters of the United States School Way Bridge Replacement Project BRLSZO 5910(039) Township 16N, Range 12W, Unsectioned Portion of Yokaya Land Grant Mendocino County, Redwood Valley, California USGS quadrangle February 24, 2011 STATE OF CALIFORNIA Department of Transportation Consultant Prepared by: Date: 2/24/11 Paul Kirk Botanist/Wetland Scientist North State Resources, Inc., Chico, CA (530) 345-4552 Local Agency Approved By: Date: Park Steiner Environmental Compliance Specialist Mendocino County Department of Transportation (707) 463-4363 Caltrans Approved By: Date: Brandon Larsen Associate Environmental Planner, Office of Local Assistance District 1, Caltrans (707) 445-6410 Caltrans SEP Approved By: Date: Deborah Harmon Senior Environmental Planner District 1, Caltrans (707) 445-6431 School Way Bridge Replacement Project Delineation of Waters of the United States S ection 1 Summary............................................................................................................................ 1 S ection 2 Project Location ................................................................................................................ 1 2.1 Proximity to Major Highways and Streets ...............................................................
    [Show full text]
  • Initial Study Report for FERC Projects
    Potter Valley Project FERC Project No. 77 Initial Study Report September 2020 ©2020, Potter Valley Project Notice of Intent Parties California Trout Humboldt County Mendocino County Inland Water and Power Commission Round Valley Indian Tribes Sonoma County Water Agency This Page Intentionally Left Blank POTTER VALLEY PROJECT NOTICE OF INTENT PARTIES Potter Valley Hydroelectric Project FERC Project No. 77 Initial Study Report September 2020 ©2020, Potter Valley Project Notice of Intent Parties California Trout Humboldt County Mendocino County Inland Water and Power Commission Round Valley Indian Tribes Sonoma County Water Agency This Page Intentionally Left Blank Potter Valley Project, FERC Project No. 77 Initial Study Report TABLE OF CONTENTS SECTION 1.0 INTRODUCTION .................................................................................... 1-1 1.1 Project Background ....................................................................................... 1-1 1.2 FERC Requirements for Proposed Modification to Approved Studies and New Studies .................................................................................................... 1-4 SECTION 2.0 STATUS OF FERC-APPROVED STUDIES AND PROPOSED STUDY MODIFICATIONS .............................................. 2-1 2.1 AQ 1 – Hydrology .......................................................................................... 2-3 2.2 AQ 2 – Water Temperature ........................................................................... 2-5 2.3 AQ 3 – Water Quality ...................................................................................
    [Show full text]
  • Southern California Fires
    Mendocino National Forest Burned Area Emergency Response (BAER) Post-Fire BAER Assessment September 25, 2018 RANCH POST-FIRE BAER PHASE 1 ASSESSMENT REPORT SUMMARY The Ranch Fire started on July 27, 2018, and is located approximately northeast of Ukiah, California. The southern half of the Ranch Fire burned area was surveyed and assessed as Phase 1 by a Forest Service Burned Area Emergency Response (BAER) team comprised of scientists and specialists. The Forest Service (FS) is responsible for addressing risks on NFS land. The BAER team evaluated the burned watersheds to determine post-fire conditions, and identify values-at-risk such as threats to human life and safety, property, and critical natural and cultural resources. In addition to these critical values, other threats were also assessed, such as the risk for increased post-fire flooding, sediment flows, rock slides, hazard trees and noxious weed spread. Proposed emergency stabilization treatments are recommended by the BAER team which reduce these potential threats. The Phase 1 BAER assessment team analyzed approximately 191,068 acres with 87,849 acres of Forest Service System (NFS) land, 30,007 acres of Bureau of Land Management (BLM) land, 24 acres of other federal land, 2,484 acres of state land, 78 acres of local government land, and 70,626 acres on private land. Notably, the US Department of Interior (DOI) conducted their own separate but similar (Emergency Stabilization & Burned Area Rehabilitation) assessment for BLM/DOI lands, in coordination and communication with Forest Service efforts. Dominant vegetation types within the NFS burned area include chaparral consisting of mixed-chaparral, Chamise-Redshank chaparral, and Montane chaparral transitioning to coniferous-hardwood forest, including Montane hardwood, and Montane hardwood- conifer.
    [Show full text]
  • Assessing Flows for Fish Below Dams
    ASSESSING FLOWS FOR FISH BELOW DAMS A SYSTEMATIC APPROACH TO EVALUATE COMPLIANCE WITH CALIFORNIA FISH AND GAME CODE 5937 THEODORE E. GRANTHAM PETER B. MOYLE CENTER FOR WATERSHED SCIENCES UNIVERSITY OF CALIFORNIA, DAVIS ONE SHIELDS AVENUE DAVIS, CA 95616 OCTOBER 22, 2014 This report was prepared by: Theodore E. Grantham and Peter B. Moyle Center for Watershed Sciences University of California, Davis One Shields Avenue Davis, CA 95616 Corresponding author: Theodore (Ted) Grantham [email protected] Copyright ©2014 The Regents of the University of California All rights reserved The University of California prohibits discrimination or harassment of any person on the basis of race, color, national origin, religion, sex, gender identity, pregnancy (including childbirth, and medical conditions related to pregnancy or childbirth), physical or mental disability, medical condition (cancer-related or genetic characteristics), ancestry, marital status, age, sexual orientation, citizenship, or service in the uniformed services (as defined by the Uniformed Services Employment and Reemployment Rights Act of 1994: service in the uniformed services includes membership, application for membership, performance of service, application for service, or obligation for service in the uniformed services) in any of its programs or activities. University policy also prohibits reprisal or retaliation against any person in any of its programs or activities for making a complaint of discrimination or sexual harassment or for using or participating in the investigation or resolution process of any such complaint. University policy is intended to be consistent with the provisions of applicable State and Federal laws. Please cite this report as: Grantham, T. E. and P. B. Moyle. 2014.
    [Show full text]