County Council ( Road, Ongar &High Ongar Road, Straightening &ChelmsfordRoad, Ongar) (Temporary Introduction of 40MPH Speed Limit) Order 2019 Notice is hereby given that the Essex County Council has made the above Order under Section 14(1) of the Road Traffic Regulation Act 1984. Effect of the order: To temporarily introduce a40mph speed limit in that length of High Ongar Road, Ongar,High Ongar Road, Straightening and ChelmsfordRoad, Ongar in the District of , from the junction with Four WantzRoundabouttothe junction with Forest Lane, Ongar,adistance of approximately 1560m (The current speed limit is 60 mph). The temporary speed limit is scheduled to commence on 29th July 2019 for 19 days, or wherestated on avalid permit (EP201EH10002631 –Essex County Council). The scheduled dates may vary for these works with appropriate signs showing and/or displayed on www.roadworks.org. The temporary speed limit is required for the safety of the public and workforce while works are undertaken by Essex County Council. The Order came into effect on 18th July 2019 and may continue in force for 18 months or until the works have been completed, whichever is the earlier. (Mutton Row,StanfordRivers) (Temporary Prohibition of Traffic) Order 2019 Notice is hereby given that the Essex County Council intends, not less than seven days from the date of this notice, to make the above Order under Section 14(1) of the Road Traffic Regulation Act 1984. Effect of the order: To temporarily close that length of Mutton Row, StanfordRivers in the District of Epping Forest, from apoint approximately 320m north of its junction with Colmans Farm Lane for adistance of approximately 200m in anortherly direction. The closure is scheduled to commence on 14th August 2019 for 9days, or where stated on avalid permit (EC30034816134 –UKPower Networks). The scheduled dates may vary for these works with appropriate signs showing and/or displayed on www.roadworks.org. The closureis required for the safety of the public and workforce while overhead cable works areundertaken by UK Power Networks. An alternative route is available via Mutton Row,Toot Hill Road, School Road, Mutton Row and vice versa. The Order will come into effect on 1st August 2019 and may continue in force for 18 months or until the works have been completed, whichever is the earlier. (Laundry Lane, ) (Temporary Prohibition of Traffic) Order 2019 Notice is hereby given that the Essex County Council has made the above Order under Section 14(1) of the Road Traffic Regulation Act 1984. Effect of the order: To temporarily close that length of Laundry Lane, Nazeing in the District of Epping Forest, from apoint approximately 90m southeast of its junction with St Leonards Road for adistance of approximately 65m in an easterly direction. The closureis scheduled to commence on 29th July 2019 for 3days, or wherestated on avalid permit (MX054286208700 –Affinity Water). The scheduled dates may vary for these works with appropriate signs showing and/or displayed on www.roadworks.org. The closureisrequired for the safety of the public and workforce while communication pipe works areundertaken by Affinity Water. An alternative route is available via Laundry Lane, St Leonards Road, Waltham Road and vice versa. The Order came into effect on 18th July 2019 and may continue in force for 18 months or until the works have been completed, whichever is the earlier. (Little Laver Road, Little Laver) (Temporary Prohibition of Traffic) Order 2019 Notice is hereby given that the Essex County Council intends, not less than seven days from the date of this notice, to make the above Order under Section 14(1) of the Road Traffic Regulation Act 1984. Effect of the order: To temporarily close that length of Little Laver Road, Little Laver in the District of Epping Forest, from its junction with Abbess Roding for adistance of approximately 325m in a southeasterly direction. The closureisscheduled to commence on 12th August 2019 for 2days, or wherestated on avalid permit (BC005CC1W0013AUGIBYG81LZ –BT). The scheduled dates may vary for these works with appropriate signs showing and/or displayed on www.roadworks.org. The closureisrequired for the safety of the public and workforce while overhead cable works areundertaken by BT. An alternative route is available via Little Laver Road, Fyfield Road, Maltings Hill, Church Road, Road, Mill Lane, Bottle Road, Abbess Road and vice versa. The Order will come into effect on 1st August 2019 and may continue in force for 18 months or until the works have been completed, whichever is the earlier.