List of SPDs selected in (Non Solar Park) under JNNSM Phase-II, Batch-III Location Scheduled SI Project Capacity ESCOMs Bidder name Date of No Category (MW) Village taluk District commissioning Hero Future Energies Pvt Ltd Open 40 Parashuramade Sep-17 1 vara kote 2 JK Petro Energy Pvt ltd open 10 Honnalli Davanagere Sep-17 3 Solitaire Power tech pvt ltd open 30 Kanajanahalli Hiriyur Chitradurga Sep-17 4 Paramapujya Solar Energy Pvt open 50 Davanagere Sep-17 5 Paramapujya Solar Energy Pvt open 50 Kolar Sep-17 6 Hero Future Energies Pvt Ltd open 40 Kurudi Manvi Raichur Sep-17 BESCOM 7 Hero Future Energies Pvt Ltd open 40 Bellagurai Sindhanoor Raichur Sep-17 8 Paramapujya Solar Energy Pvt open 50 Bidar Sep-17 9 Paramapujya Solar Energy Pvt open 50 Raichur Sep-17 10 Acme solar Holdings pvt ltd open 40 Vajramatti Mudhool Bagalkot Sep-17 11 Paramapujya Solar Energy Pvt open 50 Bagalkot Sep-17 Talettutayi Solar Projects one open 30 Sindhanoor Sindhanoor Raichur Sep-17 12 pvt

Hero Future Energies Pvt Ltd open 40 Ittigi Hoovinahadaga Bellary Sep-17 13 lli GESCOM 14 Hero Future Energies Pvt Ltd open 40 , Aurad Bidar Sep-17 15 PCIL pune open 40 Santapura Aurad Bidar Sep-17

16 Acme solar Holdings pvt ltd open 40 Vajramatti Mudhool Bagalkot Sep-17 17 Paramapujya Solar Energy Pvt open 50 Shivamogga Sep-17 18 Paramapujya Solar Energy Pvt open 40 Vijayapura Sep-17 HESCOM Karnataka power corporation DCR 10 Chandapura Shiggaon Haveri Sep-17 19 pvt 20 Acme solar Holdings pvt ltd open 40 Vajramatti Mudhool Bagalkot Sep-17

21 Acme solar Holdings pvt ltd open 40 Ghataprabha Gokak Belagavi Sep-17 MESCOM 22 Paramapujya Solar Energy Pvt open 40 Siraptna Nallur Hassan Sep-17

Energone Soleq Ravi open 100 Vajramatti Mudhool Bagalkot Sep-17 23 CESC Indiapower resources Pvt ltd 24 Paramapujya Solar Energy Pvt open 10 Koppal Sep-17 Total 970 ESCOM wise allotment

Actual MW Capacity in no and project ESCOMS actual % to be allotted as per MW after No of Projects Remarks capacities Govt Order allotment BESCOM 47.78% 477.8 480 12 1*10+2*30+4* 40+5*50 GESCOM 13.68% 136.8 120 3 3*40 * Balance 30MW is yet to be HESCOM 19.46% 194.6 180 5 1*10+3*40+1* allocated to GESCOM and HESCOM. 50 MESCOM 8.02% 80.2 80 2 2*40 CESC 11.06% 110.6 110 2 1*10+1*100 Total 1000 970 24 List of SPDs selected in Karnataka (Non Solar Park) under JNNSM Phase-II, Batch-III

Sl. Project Capacity No. of Awarded VGF Total VGF Bidder Name Project Location Identified Proposed Substation No. Category (MW) Projects (INR/MW) Eligibility(INR)

i) Parashuramdevrakote Teh.-Hiriyur Distt. - chitradurga i) 66/11 kV Kote

ii) Village -Ittagi Teh. -Huvinahadagali Distt. - bellary ii) 220/66 kV IttAgi Hero Solar Energy 1 Open 200 5 (40X5) 68,00,000 13600,00,000 Private Limited iii) Village -Lingadalli, gundapalli,santhapur Teh. -Aurad Distt -bidar iii) 110/11 kV santhapur iv) Village -Kurdi Teh. -Manvi Distt. -raichur iv) 110/33/11kV kurdi cross v) Village -bellaguraiTeh. -sindhnoor Distt- raichur v) 110/33/11 sindhanoor J K Petroenergy 2 Open 10 1 73,48,990 734,89,900 Honnali, Devangere 220/66 kV, Honnali,Devangere Private Limited

Solitaire Powertech 3 Open 30 1 73,49,000 2204,70,000 Kanajanahalli, Hiriyur, Chitradurga 66/11 kV P.D.Kote Private Limited

4 PCIL Pune Open 40 1 73,49,000 2939,60,000 Santhapur, Aurad Taluka, Bidar Dist 110/11 kV Santhapur Sub Station Energon Soleq Ravi Power 5 Open 100 1 73,49,990 7349,99,000 Vajramatti, Tehsil-Mudhol, Dist: Bagalkot 220/110 kV Vajramatti, Bagalkot Resources Private Limited

i) Village -Vajramatti Taulaka -Mudhol Distt. -bagalkot ii) Village - i) 220/110 kV VAJRAMATI ii) 220/110 Acme Solar Holdings Vajramatti Taluaka -Mudhol Distt. -bagalkot iii) Village -rannabelagali kV VAJRAMATI iii) 110/11 kV 6 Open 160 4 (40X4) 73,49,997 11759,99,520 PrivateLimited Taluka -MudholDistt. -bagalkot iv) VillAge -GHATAPRABHA Taluka - rannabelagali gokak Distt. -belgavi iv)110/33/11GHATAPRABHU

Talettutayi Solar 7 Projects One Private Open 30 1 73,49,999 2204,99,970 Vill: Sindhanoor, The: Sindhanoor, Dist: Raichur 110/33 kV Sindhanoor Substation Limited 110/11 kV Rajeshwar, 110/33/11 kV Kurdi Parampujya 7 cross, 220/66 kV Honnali, 8 SolarEnergy Open 350 (50X6+40 73,50,000 25725,00,000 Bidar, Devangere, Raichur, Bagalkot, Kolar, Shivmoga, Vijaypura, Koppal 110/11kV Rannabelagali, 220/66 kV PrivateLimited X1+10X1) Malur, 110/11 kV Barangi, 110/11 kV Tekkalakki, 110/33/11 kV Yelburga

Karnataka Power 9 DCR 10 1 130,74,900 1307,49,000 Chandapur Village, Shiggon Taluk, Haveri District 110/33/11 kV Shiggon Substation Corporation Limited

Parampujya Solar 10 Energy Private DCR 40 1 130,89,000 5235,60,000 Nallur, CR Patna, Hasan 220/66 kV Channarayapatna Limited Total 970 73062,27,390