Status of Grid Connected Ground Mounted Solar Power Projects
Status of Grid Connected Ground mounted Solar Power Projects Phase-IV:500MWs Solar Power Date of allotment: 22 .11.2014 Name of the Company Capacity Tariff Present project location Original Locations Commissioned Sl No Technology ESCOM PPA date (MWs) (`) Village Taluk District date Photon suryakiran Pvt Ltd varavu village, nayakanahatty hobli, challakere district under process 1 20 SPV 6.71 HESCOM 12.01.2015 Pavagada Tumkur (M/s. Today Green Power Pvt. Ltd.) M/s. Asian Fab Tec Limited Sira taluk, Tumkur dist under process 2 10 SPV 6.74 BESCOM 12.01.2015 Sira Tumkur Photon suryakiran Pvt Ltd varavu village, nayakanahatty hobli, challakere district under process 3 20 SPV 6.81 GESCOM 14.01.2015 Pavagada Tumkur (M/s. Today Green Power Pvt. Ltd.) Sun Edison Energy Holdings Nelagettanahatty village, Nayakanahatty hobli, Challakere, Chitradurga under process 4 30 SPV 6.83 HESCOM Challakere Chitradurga Singapore Pvt Ltd dist. Sun Edison Energy Holdings Nagalamadike village, pavagada taluk, tumkur dist. under process 5 30 SPV 6.86 BESCOM 18.12.2014 Challakere Chitradurga Singapore Pvt Ltd Azure Sunrise Power Limited Kandekere, gollahalli village, hiriyur taluk, chitradurga and under process 6 (M/s. Azure Power India Private 50 SPV 6.89 CESC 8.01.2015 kapparahalli, holikunte and jadekunte villages, challakere taluk, Rangenahalli Hiryur , Chitradurga Limited) chitradurga Sun Edison Energy Holdings Pallavalli, Pavagada, Tumkur dist under process 7 30 SPV 6.89 BESCOM 18.12.2014 Challakere Chitradurga Singapore Pvt Ltd Sun Edison Energy Holdings Nelagettanahatty village, Nayakanahatty hobli, Challakere, Chitradurga under process 8 30 SPV 6.92 BESCOM 18.12.2014 Challakere Chitradurga Singapore Pvt Ltd dist.
[Show full text]