Summary of the Mineral Block PART A - GENERAL INFORMATION ABOUT MINERAL BLOCK FEATURES DETAILS

1. LOCATION

MINERAL BLOCK SITAPURI -DEORA-UDIYAPURA LIMESTONE BLOCK

CORNER POINTS PILLAR DGPS COORDINATES

(LATITUDE, LONGITUDE) LATITUDE LONGITUDE

1 22 ⁰20'07 .00" 75 ⁰05'31 .00"

2 22 ⁰19'39 .00" 75 ⁰06'14 .00"

3 22 ⁰20'17 .00" 75 ⁰07'08 .00"

4 22 ⁰19'09 .00" 75 ⁰06'59 .00"

VILLAGES SITAPURI-DEORA -UDIYAPURA

TEHSIL/ TALUKA MANAWAR

DISTRICT

STATE

2 AREA (HECTARES) 344.783 HECTARES

MINERALISED AREA ABOUT 297.035 HECTARE

NON-MINERALISED AREA 47.748 HECTARE

3 EXPLORATION

STATUS (G2/ G3/ G4 ETC.) G2

EXPLORATION AGENCY THE DIRECTORATE OF GEOLOGY AND MINING, MINERAL RESOURCES DEPARTMENT, GOVT. OF MADHYA PRADESH

TOTAL NUMBER OF BOREHOLES TOTAL NUMBER OF BOREHOLES: 80 NO. WITH METERAGE TOTAL METERAGE:1146.40M

BOREHOLE SPACING (DENSITY) Not at regular grid

4 QUANTITY OF MINERALS (GRADE WISE)

MINERAL LIMESTONE CEMENT GRADE TOTAL GEOLOGICAL 61.96 MILLION TONNES RESOURCES

5 MINERALISED ZONES

NUMBER OF MINERAL ZONES 03(Sitapuri-Deora A, Deora B-Udiyapua A, Deora C-Udiyapua B sub blocks with 135.801,86.337 and 74.897 hectares area respectively.

TREND (DIP AND STRIKE) HORIZONTAL

TOTAL THICKNESS Average thickness of Limestone is 9.59 M

6 ACCESSIBILLITY

FEATURES DETAILS

NEAREST RAIL HEAD 52 KM, 63 KM

ROAD DHAR-MANGOD-MANAWAR ROAD

AIRPORT INDORE

7 HYDROGRAPHY

LOCAL SURFACE DRAINAGE DENDRITIC TO SUB-DENDRITIC PATTERN, PATTERN (CHANNELS)

RIVERS/ STREAMS MAN RIVER, FLOWS FROM North TO South.

8 CLIMATE

MEAN ANNUAL RAINFALL 800 TO 900 MM

TEMPERATURE (DECEMBER) 80 C

TEMPERATURE (JUNE) 44 0 C

9 TOPOGRAPHY

TOPOSHEET NUMBER 46 N/3

MORPHOLOGY OF THE AREA THE AREA IS GENTLY UNDULATING.

PART B-PARTICULARS OF STATUTORY LICENCES, PERMITS, PERMISSIONS, CONCESSIONS, APPROVALS AND CONSENTS RELATED TO MINING OPERATIOS

PARTICULARS DETAILS/STATUS 1 FOREST CLEARANCE TO BE OBTAINED BY THE PREFFERED BIDDER

2 WILD LIFE CLEARANCE(SANCTUARY,RESERVE OR SPECIAL TO BE OBTAINED BY THE PREFFERED ZONE CLEARANCE) BIDDER

3 ENVIRONMENT CLEARANCE TO BE OBTAINED BY THE PREFFERED BIDDER

4 MINING PLAN APPROVAL TO BE OBTAINED BY THE PREFFERED BIDDER

5 CONSENT TO ESTABLISH TO BE OBTAINED BY THE PREFFERED BIDDER

6 EXPLOSIVE LICENCE TO BE OBTAINED BY THE PREFFERED BIDDER

7 PERMISSION FOR MINE OPENING TO BE OBTAINED BY THE PREFFERED BIDDER

8 PERMISSION OF INSTALLATION/TRIAL OPERATION OF TO BE OBTAINED BY THE PREFFERED EQUIPMENT BIDDER

9 GROUND WATER CLEARANCE (CENTRE/STATE) TO BE OBTAINED BY THE PREFFERED BIDDER

10 RAILWAY SIDING APPROVAL TO BE OBTAINED BY THE PREFFERED BIDDER

11 APPROVAL FOR DIESEL STORAGE TO BE OBTAINED BY THE PREFFERED BIDDER

12 POWER LINE FROM STATE DISCOM TO BE OBTAINED BY THE PREFFERED BIDDER

13 CLEARANCES RELATING TO WORK UNDER AN EXISTING TO BE OBTAINED BY THE PREFFERED TRANSMISSION LINE OR SHIFTING OF THE TRANSMISSION BIDDER LINE

14 GRAM SABHA CONSENT TO BE OBTAINED BY THE PREFFERED BIDDER

15 ANY OTHER CLEARANCES TO START MINING OPERATION TO BE OBTAINED BY THE PREFFERED BIDDER

PART C-PARTICULARS OF LAND S.NO. LAND TYPE AREA (IN HECTARES)

1 TOTAL CONCESSION AREA 344.783 HECTARES

2 FOREST LAND WITH STATUS NIL

3 GOVERNMENT LAND WITH STATUS 56.33 HECTARES

4 PRIVATE LAND WITH STATUS 288.453 HECTARES

5 CHARAGAH/PASTURE LAND (*) 42.82 HECTARES

6 REVENUE SURVEY DETAILS OF THE AREA SCHEDULE ATTACHED