UNOPS : Rural Renewable Energy Project - RREP Lot 2 (, Kathantha Yimboi, Installation of the Network Distribution Infrastructure , Kagbere, Rokonta, Mara and ) - Bills of Quantities - # Item Unit QTY Rate (USD) Total (USD) 0 General All-inclusive costs of the participation of the kick-off workshop Per lot 0.1 (up to two days) in Freetown, date and place will be specified 1 - - with the award of the tender. Project management including travelling for site visits and Per lot supervision of works for the time of ongoing works and 0.2 1 - - availability during the warranty period after completion of works. Costs of tools and rental of machinery (please specify detailed Per lot 0.3 1 - - costs in a separate list) Mobilization, de-mobilization, inspection & testing, report 1 Travelling to the site, transport of tools and material to the site Per site and in between sites, manual offloading of the materials delivered by the customer to the site, safe storage of the 1.1 material, removal of all waste, cleaning of the site, tests and 8 - - measurements, hand over, documentation, individual report per site, and de-mobilization from the site.

Initial site visits together with the UNOPS Engineer, workshops Per site with the local village administration, protocol of the workshop, 1.2 preparation and continuous updating of the work plan 8 - - regularly communicated to UNOPS.

Visual inspection of all poles, documentation, tests, Per site 1.3 8 - - measurements, commissioning, report, and handover. Installation works (labor, transport, accommodation, 2 insurances, …) Per 9 m steel power pole, including excavation, local transport Per unit 2.1 in the village from central storage, installation with concrete 465 - - foundation Per stay in addition to the pole including excavation, concrete Per unit works, assembly of the stay, mounting of the stay, final 2.2 177 - - tightening of the stay wire after curing of the concrete

Stringing of the ABC cable (maximum 40m) per pole including Per unit transport of the cable from the storage, pay out of the cable from the drums, mechanical and electrical installation of 2.3 1061 - - everything related to the ABC cable on the pole, including connectors, clamps, network switch, overvoltage surge arrestor, etc. Grounding per pole; installation for the earth rod(s), Per unit 2.4 installation and connection of the cable to the overhead power 109 - - line, other related works. Excavation 10m trench in average, connection of one Per unit 2.5 18 - - underground cable, connection in the power station. 3 Material Cast in situ Concrete Grade 15 (1:2:4) including placing and m³ Rate 3.1 - vibration as specified Only Rock excavation to the required depth and dimensions as m³ Rate 3.2 - directed by the Engineer Only

Total (0, 1, 2 only) -