City of Albany Bicycle Signage and Wayfinding Strategy

JUNE 2013

PREPARED FOR: City of Albany

PREPARED BY: Alta Planning + Design IN ASSOCIATION WITH: Creighton Manning Engineering

Acknowledgements

CITY OF ALBANY ALBANY COUNTY Department of Development and Planning Department of Public Health Doug Melnick, AICP, Director of Planning Kathleen Bronson, Principal Planner Charles Welge Kate Lawrence, Planner Suzanne Swan Engineering Division Department of Public Works Randy Milano, City Engineer James Mearkle Police Department Bill Trudeau, Coordinator of Traffic Engineering Janet Zalatan

CAPITAL DISTRICT REGIONAL PLANNING CAPITAL DISTRICT TRANSPORTATION COMMISSION COMMITTEE Todd Fabozzi Jason Purvis Jennifer Ceponis

CAPITAL DISTRICT TRANSPORTATION STATE DEPARTMENT OF AUTHORITY TRANSPORTATION Carrie Ward Korie McAllister Susan Olsen

ALBANY BICYCLING COALITION Don Odell

COLLEGE OF SAINT ROSE Andrew Gravelle

STATE UNIVERSITY OF NEW YORK AT ALBANY Mary Ellen Mallia

CONSULTANT TEAM Alta Planning + Design

Jeff Olson, Principal Phil Goff Lindsay Zefting Shannon Simms Creighton Manning Engineering Mark Sargent Kenneth Davis

Table of Contents

1 INTRODUCTION ...... 1

2 EXISTING CONDITIONS INVENTORY ...... 2

2.1 RELEVANT PLANNING DOCUMENTS ...... 2 2.2 GENERATORS OF BICYCLE TRAFFIC ...... 4 2.3 EXISTING BICYCLE CONDITIONS ...... 6 2.4 EXISTING WAYFINDING SIGNAGE ...... 6

3 WAYFINDING SIGNAGE ...... 8

3.1 SIGNAGE GUIDANCE...... 8 3.2 ALBANY SIGNAGE ...... 13 3.3 IMPLEMENTATION ...... 16

APPENDIX A: PRIORITY ROUTE COST ESTIMATES ...... 19

APPENDIX B: DETAILED PRIORITY ROUTE MAPS ...... 33

ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY 1 Introduction

The City of Albany Bicycle Signage and Wayfinding Strategy is part of a larger effort to promote bicycling as a healthy and sustainable mode of transportation in Albany. It is a follow-up to the Albany Bicycle Master Plan (2009). A Bike Share Feasibility Study is being produced in tandem with this report. The Bicycle Signage and Wayfinding Strategy included two public workshops. At the first workshop, attendees defined important routes and destinations in the city to be included in wayfinding signage. The Alta team presented a draft of the detailed signage plans for 11 priority routes for feedback at the second workshop. Along with input from the Bicycle Master Plan Implementation Plan Committee, and a review of adopted plans and policies, the feedback from both workshops helped to inform recommendations found in this document. This report includes an existing conditions inventory of relevant planning documents and analysis of bicycle traffic in Albany. The strategy also includes overall guidance on the type and design of proposed signage, as well as the identification of 11 priority wayfinding signage routes. Detailed maps and cost estimates for these routes are included in the Appendices to this report.

Figure 1: Jeff Olson from Alta Planning + Design speaks at a public workshop at the College of St. Rose on January 24, 2013.

1 | Page

ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY 2 Existing Conditions Inventory

In preparation for the bicycle-related signage and wayfinding recommendations, Alta reviewed relevant planning documents adopted by the City and conducted an inventory of existing conditions. This inventory included: • generators of bicycle traffic (college campuses, parks, retail areas, etc.) • existing bike accommodations both on-road (bike lanes and shared lane markings) and off-road (shared use paths and trails) • existing signage within city limits 2.1 Relevant Planning Documents

City of Albany Bicycle Master Plan (2009) The Bike Master Plan outlines a comprehensive strategy to encourage increased bicycling in the City of Albany. Seven key design ideas are presented to facilitate bicycle movements. These include major bikeways, neighborhood routes, multi-use trails, bike gutters on stairs, bikeable buses, a signage strategy, and bicycle parking in the City of Albany. The signage strategy recommends that bike route guide signs be located at decision points along designated bike routes. Signage should follow guidelines in the 2010 Manual for Uniform Control Devices (MUTCD). Specific recommendations include providing separate signing of bike routes for wayfinding, informational signage on distances and destinations, advanced trail signage, and a coherent and consistent system of signage that is easily identifiable. The Master Plan recommends a 20 Year Bikeway Network Plan that includes both major and neighborhood bikeways, as well as trails and greenways. Major bikeways are identified on major routes through the City. These routes include: Western Avenue, Madison Avenue, Washington Avenue, Central Avenue, New Scotland Avenue, Delaware Avenue, Whitehall Road, Clinton Avenue, Broadway, Green Street/South Pearl Street, , Northern Boulevard/Manning Boulevard/Ten Broeck Street, Quail Street, Manning Boulevard, McCarty Avenue/Southern Boulevard, and Holland Avenue/Morton Avenue/Rensselaer Street. A variety of design options are proposed for these major bikeways, including shared lane markings and bike lanes.

Albany 2030 Plan On Monday, April 2, 2012 the City of Albany Common Council voted unanimously to adopt the Albany 2030 Comprehensive Plan. This momentous vote officially established the first comprehensive plan in the City's 400 year history. The Albany 2030 Plan will greatly improve local quality of life for generations to come. In a tremendous demonstration of collaboration, thousands of community stakeholders from diverse backgrounds and neighborhoods came together to build consensus about their local priorities for the City of Albany. The Albany 2030 Plan and the City’s Bicycle Master Plan are coordinated documents that a guide for policy makers to make decisions on bicycle amenities, infrastructure and improvements. Albany 2030 built a framework for the City’s future based on extensive research and community input. The Albany 2030 Plan identifies the need to promote multi-modal connections. Specific strategies include developing a Complete Streets policy and coordinating transportation investment to support preferred land uses. Improving the pedestrian environment is also a recommendation with strategies including maintaining and improving sidewalk connections and expanding greenways. Encouraging cycling to improve health and reduce

2 | Page

ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY vehicle miles travel is also recommended through promoting and implementing the Bicycle Master Plan, connecting regional trails, and educating cyclists and drivers. This sustainable approach will guide local (re)development and (re)investment in a manner that meets the needs of residents, businesses and stakeholders while maintaining and elevating the City’s character, quality of life, and environmental and fiscal health. The interconnection of the various City systems is identified throughout the plan and summarized in Chapter 3.9 of the report. The Albany 2030 Plan identifies the correlations between transportation and other systems such as community form, the economy, natural resources, housing and neighborhoods, utilities and infrastructure, and institutions.

City of Albany Neighborhood Plans Several localized neighborhood plans have been completed for areas within the City of Albany, such as the Arbor Hill and South End neighborhoods. The following is a list of the studies reviewed and summaries of the bicycle and wayfinding improvements they recommend.

Crossing Study (CDTC/NYSDOT, 2008) – Bicyclist improvements on the Dunn Memorial Bridge and rehabilitation of the Livingston Avenue walkway.

• Lawn Avenue Gateway Design Study (Albany Housing Authority/CDTC, 2002) – The presence of cyclists is acknowledged as an existing condition.

• North Swan Street Multi-modal Accessibility Study (City of Albany/Albany Housing Authority/CDTC, 2008) – Construction of new sidewalks, street tree plantings, and crosswalks; return to two-way traffic.

• Pinebush Transportation Study Update (CDTC, 2004) – Incorporation of Fuller Road and New Karner Road as part of the bicycle and pedestrian network.

• Capital South Plan: SEGway to the Future (City of Albany/South End Action Committee, 2007) – Conversion of Morton Avenue to a pedestrian and bicycle-friendly boulevard from Lincoln Park to the Hudson River with continuous bike lanes and sidewalks. Create a link to the waterfront under I-787.

• Albany Education District Enhancement Study (City of Albany/CDTC, 2012) - Improve pedestrian and bicycle connections within the district, to local schools, and to retail centers. In addition to improved crosswalks, the installation of bicycle racks is also recommended.

• Harriman Campus – University at Albany Transportation Linkage Study (CDTC, 2007) – Examine potential to stripe a curb-side bicycle lane or shoulder on Fuller Road; improve wayfinding; create bicycle lanes on the Harriman Ring Road; improve non-motorized access at Brevator and Belvedere and along University Drive.

3 | Page

ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY 2.2 Generators of Bicycle Traffic The City of Albany has a variety of institutions, schools, parks, commercial centers, and cultural destinations that generate existing bike traffic, or create the latent demand for future bicycling. One of the largest generators in the city is the and surrounding Capital buildings. Thousands of people travel to and from these buildings every day. Albany Medical Center and St. Peter’s Hospital, both located in midtown Albany, are large generators, as are the few other large office complexes located around the City of Albany, specifically on Western Avenue Extension. There are also several colleges located within the City of Albany that become large generators during the school year. The University at Albany has its large main campus in the western portion of the city and a downtown campus near Washington Park. The College of St Rose is located along Madison Avenue and Sage College is located near the Albany Medical Center. There are also several other significant open-space destinations within the City of Albany. Washington Park, Lincoln Park, 6 Mile Waterworks, the Corning Preserve and the Pinebush Preserve are all popular recreational destinations. Retail centers are located throughout the City of Albany. There are several retail districts in the downtown area; along Lark Street, State Street, and N Pearl Street. Several other large retail centers are located along Central Avenue, Madison Avenue, and Washington Avenue Extension. In aggregate, the Generators of Bicycle Traffic are shown on the map on the following page. They are illustrated to help Alta and the project team understands areas of the city where bicyclists are currently riding and to indicate where future demand exists. This, in turn, helps to inform recommendations for bicycle wayfinding signage and other improvements. The map also includes existing locations of bike racks throughout the city. This too helps the project team comprehend where current demand exists for bicycle-related improvements and hints at areas where future use can be expected.

4 | Page

ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY 2.3 Existing Bicycle Conditions There are several multi-use trails and bicycle accommodations throughout the City of Albany (see map on page 7). Multi-use trails are prevalent in both Washington and Lincoln parks, as well as the Pinebush Preserve. The Mohawk-Hudson Bike-Hike Trail is located along the Hudson River waterfront; the 10’ wide asphalt trail starts near the Dunn Memorial Bridge and runs north through the city. An additional multi-use trail is located on the north side of Hackett Boulevard. The University at Albany has also created a greenway around the main campus. On-road bicycle accommodations are present on several roadways within the City. Shared lanes with sharrow markings exist on Washington Ave, Main St, Western Ave, Madison Ave, Delaware Ave, Academy Rd, New Scotland Ave and Lark Street. There are 5 foot bike lanes in either direction on Clinton Ave between Ten Broeck St and Lexington Avenue. There are several roadways that have been reconstructed to provide a wide 14 foot outside lane that provides some breathing room for bicyclists. These roadways include: Central Ave (Everett Rd to City line); Whitehall Rd (New Scotland to Cardinal); Western Ave (Manning to Brevator); Washington Ave (Jemain to UAlbany); and New Scotland Ave (I-87 to City line). There are two New York State Bike Routes (NYSBR) that transverse the City of Albany. NYS BR5 runs east to west from the Dunn Memorial Bridge, along Madison Ave and Western Ave to the City line. NYS BR9 runs north to south extending from the northern City line on Broadway to the Dunn Memorial Bridge. 2.4 Existing Wayfinding Signage A range of wayfinding signage is located throughout the City of Albany. Route information and vehicle signage is prevalent throughout the City. This includes regulatory signage, route markers, and both route and destination directional signage. Small bicycle markers are also located along the NYS Bike Routes. Additional on-road bicycle signage (such as ‘share the road’ signs) are minimal throughout the city. In addition to wayfinding signage that is oriented to motor vehicles, there is pedestrian scale wayfinding signage located throughout the downtown district, specifically on North Pearl St and State St. These blue signs are located on the sidewalk (roughly 8 feet in height) and provide directions to local businesses and destinations, such as the Corning Preserve. Various wayfinding and historic information signage is also located sporadically throughout the rest of the city.

6 | Page

ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY

3 Wayfinding Signage

The section begins with an introduction to bicycle wayfinding and its benefits, guidelines for bicycle wayfinding signage as outlined in the Manual for Uniform Control Devices (MUTCD), as well as the New York State Supplement to the MUTCD and the National Association of City Transportation Officials (NACTO) Urban Bikeway Design Guide. Further on, a summary of the eleven priority signage routes are included with detailed maps. A signage inventory and cost estimates are included for the routes in the appendix of this report. Signage can serve both wayfinding and safety purposes, including:

• Helping to familiarize users with the bikeway system; • Helping users identify the best routes to significant destinations; • Directing bicyclists to preferred routes; • Helping to address misperceptions about time and distance; and • Helping to overcome a “barrier to entry” for people who do not bicycle often, but who want to get started. Placing signs throughout the city indicating to bicyclists their direction of travel, the location of destinations, and the riding distance to those destinations will make the bicycle system more accessible to all users. To be most effective, wayfinding signage should be coupled with other bike-facility improvements along a given roadway, either striped bike lanes or, at a minimum, shared lane markings in the travel lane. Wayfinding signs also provide visual cues to motorists that they are driving along a bicycle route and should use caution. Signs are typically placed at key locations leading to and along bicycle routes, including the intersection of multiple routes. Choosing the right number of signs is important, since having too many road signs can clutter the right-of-way. It is recommended that bikeway signs be posted at a level most visible to bicyclists and pedestrians. 3.1 Signage Guidance Uniformity, legibility and adherence to existing standards are among the elements to consider when determining the appropriate wayfinding sign design for Albany. National, state, and local standards, along with local input, should guide the development of signage design. Specifically, the 2009 MUTCD and the New York State Supplement to the 2009 MUTCD provide the most relevant standards, while additional guidelines can be found in the NACTO Urban Bikeway Design Guide.

3.1.1 Signage Types Confirmation Signage: The purpose of confirmation signage is to indicate to cyclists and drivers that the roadway is a designated bikeway. Directional arrows should not be included on this type of signage. Placement should be every ¼ to ½ mile on off-street accommodations and every 2 to 3 blocks along on- street bicycle accommodations, unless another Figure 2: Variety of Confirmation Signage type of sign is used (e.g., within 150 feet of a turn 8 | Page

ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY or destination sign). Confirmation signage should also be placed soon after turns to confirm destination(s). Pavement markings can also act as confirmation that a bicyclist is on a preferred route. The images in Figure 2 are examples of existing confirmation signage from different communities. Destination Signage: Turn Signs: The purpose of turn signs is to indicate a change in the bicycle route; where the bicycle route turns from one street onto another. Information should include destinations and arrows. Placement of turn signs should be located on the near-side of intersections where bike routes turn (e.g., where the street ceases to be a bicycle route or does not go through). Pavement markings can also indicate the need to turn to the bicyclist. Examples of turning signs from a few sources that conform to standards and guidelines are shown in Figure 3.

Figure 3: Turn Signs Decision Signs: The purpose of decision signs is to mark the junction of two or more bikeways and to inform bicyclists of correct designated bike routes to access key destinations. It is recommended that decision signs include destinations, arrows, distances, and travel times. Placement of decision signs should be located on the near-side of intersections in advance of a junction with another bicycle route and along a route to indicate a nearby destination. The following are examples of decision signs that conform to standards and guidelines. Figure 5 exemplifies the placement of these types of signage locations at an intersection as outlined by the MUTCD.

Figure 4: Decision Signs

9 | Page

ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY

Figure 5: Example of Bicycle Guide Signing, Figure 9B-6 from the MUTCD

3.1.2 Design Guidance

Bicycle Route Signage The bicycle route signage standard contains a route destination and a green background with a retroreflective white legend and border. The signage shall also include a pictograph or words that are associated with the route or agency that has jurisdiction over the route, for example, the route name or identification as a New York State or City of Albany bicycle route. Bicycle route signage should establish continuous routing, and can be used with various types of bikeways.

Auxiliary plaques indicate additional information about the bicycle route. Figure 6 Colors need to match the associated bicycle route sign. Junction, cardinal direction, and alternative route plaques should be mounted above the bicycle route sign, while advanced turn arrows and direction arrows should be mounted below the bicycle route sign. Auxiliary plaques with word legends should be a minimum of 12 x 6 inches and plaques with Figure 7 arrow symbols should be a minimum of 12 x 9 inches. Destination signs may also be mounted below the bicycle route signs.

10 | Page

ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY Destination Signage

Destination, or wayfinding, signage directs bicyclists to stay on bicycle routes or other routes. Wayfinding signage also directs users to different types of destinations such as commercial centers, schools, parks, and hospitals. Primary destinations, such as the downtown area, should be included on signage up to five miles away from the location. Secondary destinations may be included up to two miles away, while tertiary destinations that are more local in nature may be included on signage up to one mile way. In the future, signage can also help direct people to nearby bike share stations, if a system were to be implemented.

Neighborhood Bikeway Signage & Pavement Markings

Neighborhood bikeways are low-volume streets where motorists and bicyclists share the same space and generally travel at the same speed. There are several techniques for identifying and signing neighborhood bikeways. Street sign modification such as color coding or adding a bicycle symbol is an unobtrusive way of identifying a neighborhood greenway without adding new signage to the roadway. Traditional bicycle route signs as described above can also be used. Additional or different symbols are recommended to differentiate the neighborhood bikeway from other higher traffic bicycle routes.

Pavement markings can be used in tandem with signage. Pavement markings are another way to identify routes and alert vehicles to the presence of bicyclists. Pavement markings can range from shared lane markings to small dots that measure a foot across to identify that the street is a designated neighborhood bikeway. These markings can also vary by route. Any signage or pavement markings that are non-standard require permission from New York State Department of Transportation and the Federal Highway Administration.

Other Bicycle Route Signs

There are other bicycle route signs that can be used to identify roadways as bicycle routes and warn drivers of the presence of bicyclists. The NYS supplement to the MUTCD does not allow for the use of "Bikes May Use Full Lane" signage. The preference is given to shared lane markings and "Share the Road" signage (MUTCD W16-1), which should be used when there is a need to warn motorists to watch for bicyclists, such as sharp curves or narrow lanes. "Share the road" signs must accompany a bicycle warning sign (MUTCD W11- 1), as shown in Figure 8, and should be installed at least 50 feet prior to the condition that would warrant this additional alert to drivers. The "Share the road" signs can be used on their own, or in conjunction with the bicycle sign, as shown.

Mile Markers Figure 8 Shared use paths should include mile markers that indicate direction or distance to the trail terminus, a trailhead or other access point. Mile markers are also helpful when providing locational information to maintenance crews or for emergency response. Mile markers are typically good locations to also post signs with phone number or e-mail addresses where someone can report any maintenance, security or safety issues along the path.

11 | Page

ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY Pavement Markings There are several options for bicycle pavement markings. Bicycle lane markings are used to designate a portion of the roadway for preferential use by bicyclists. According to MUTCD guidelines, longitudinal pavement markings must be used to define these bicycle lanes. Bicycle lane markings should be placed at the beginning of a bicycle lane, and at periodic intervals, based on engineering judgment. Markings and designations can be used approximately every 250 feet, and should be located prior to intersections and crossings. Bicycle lanes must not be positioned to the right of a right turn only lane or to the left of a left turn only lane, to avoid conflicts with turning vehicles. Shared lane markings are road markings used to indicate a shared lane environment for bicyclists and automobiles. According to the AASHTO Guide for the Development of Bicycle Facilties (2012), these markings are intended to alert all road users to the lateral position bicyclists are likely to occupy within the traveled way, therefore encouraging safer passing practices. The NACTO Urban Bikeway Design Guide additionally states that shared lane markings may be configured to offer directional or way finding guidance.

Shared lane markings (SLM) cannot Figure 9 be used on shoulders or in designated bicycle lanes and should not be placed on roadways with a speed limit above 35 mph. Shared lane markings should be placed immediately after an intersection and spaced no greater than 250 feet thereafter. If used in a shared lane with parallel parking, shared lane markings should be placed so that the center of the markings are at least 11 feet from the face of the curb or the of the pavement. If the shared lane that sits adjacent to the parallel parking is less than 14’ in width, one option is to place the SLM in the center of the travel lane. This configuration places the SLM between most vehicles’ wheel-wells and can therefore reduce wear and tear on the roadway marking. If no on-street parking is present, the center of the SLM should be at least 4 feet from the face of curb or edge of pavement.

Figure 10

12 | Page

ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY

3.2 Albany Signage This Strategy report recommends that Albany implement bicycle route signage along wayfinding routes throughout the City of Albany and identify priority destinations for cyclists. Signage design should include the identification of the bicycle route name (such as "Washington") and a list of key destinations along each route with directional arrows. The addition of mileage readings is intended to help bicyclists understand the approximate distance to each destination. The Strategy also recommends that wayfinding signage should be coordinated in conjunction with other safety and accessibility improvements for bicyclists along the particular roadway. The wayfinding signage, therefore, should be considered one item within a toolbox of potential enhancements including shared lane Figure 11 markings ("sharrows"), bike lanes or other, more innovative facilities such as bicycle signals, cycle tracks and bike boxes. Ultimately, some type of signage should identify all of the routes indicated in the Albany Bike Master Plan. However, priority routes and destinations for wayfinding signage are identified below.

3.2.1 Wayfinding Routes Eleven priority wayfinding routes were identified through comments made at the September community workshop and in conversation with the study advisory committee. These routes run along a handful of key streets throughout the city, some with existing or planned bike facilities, some with low volumes and speeds, and some on busier streets without existing/planned shared lane markings or bike lanes. Signage is recommended at or near the City line wherever possible to help cyclists transition to or from Albany’s adjacent communities. The priority routes are described below and identified on Map 3. Priority Routes

1. Western Avenue, Madison Avenue, Lark Street, Washington Avenue and State Street from University at Albany to the Corning Preserve

2. Washington Avenue from University at Albany to Lark Street 3. Western Avenue from Madison Avenue to Washington Avenue 4. Broadway from City Line to State Street 5. Central Avenue from the City Line to Clinton Avenue 6. New Scotland Avenue from City Line to Madison Avenue 7. Manning Boulevard from New Scotland Avenue to Clinton Avenue 8. Clinton Avenue from Manning Boulevard to Broadway 9. Delaware Avenue from City Line to Madison Avenue 10. Lark Street from Washington Avenue to Livingston Ave 11. South Pearl Street from State Street to City Line

13 | Page

ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY

If and when a bicycle route map is developed, this study recommends that the map be incorporated into public kiosks installed in key locations in the city, primarily at the intersections of the priority routes or at important destinations such as the University at Albany campus or City Hall (see Map 3 for proposed locations). QR codes can also be included on map kiosks and linked to an online interactive bicycle route and destination map.

3.2.2 Priority Destinations A number of priority destinations were also identified by participants in the community workshop. Priority destinations are those that should be highlighted by Figure 12: In key locations throughout Madison, wayfinding signage, on maps and directional signs. WI, map kiosks show the city-wide bicycle These included: Corning Preserve, University at Albany network along with primary destinations (main and downtown campus), Empire State Plaza, Lark Street, miscellaneous grocery stores, Washington Park, Albany Medical Center, and Central Avenue. These destinations are also highlighted in Map 1 on the following page. Other key destinations that should be noted include area hospitals, city schools, parks, government buildings, and other universities. Each destination that is identified should be given a hierarchy level to determine at what distance signage begins.

14 | Page

Pine Ln Ramp

RensselaerAccess Rd Lake 1. Palace Theater Ramp Park & Preserve Colonie 2. Visitors Center/ Quackenbush Square Access Rd I 90 3. Capital Repertory Theater 4. Hudson River Walkway

Fuller Rd I 90 W Carillon Dr Washington Ave 5. City Hall Central Ave 6. NYS Capitol Ramp 7. Albany Public Library - Ramp Main UAlbany Anderson Dr 8. Lark Street Main Campus Westland Hills Park Guilderland 2 9. Washington Park 5 10. Central Ave Commercial Corridor Harriman Campus I 90 11. UAlbany Downtown

Tudor Rd I 90 YMCA/Albany PublicN 3rd St Campus Watervliet Ave 12. Albany Public Library - Glynn St Oxford Rd Library - North Albany Cottage Ave Ramp Arbor Hill/West Hill 1 Swinburne Park/ 13. Center Bleecker 14. Empire State Plaza Pine Hills Hackett Park 15. Boys & Girls Club Manning BlvdLibrary Tivoli Preserve Albany 3rd St Albany High SchoolClinton Ave Tivoli St StateBuckingham Hwy 85 Lake Park 12 College of St. Rose 8 Woodville Ave 3 Ramp 7 Krumkill Rd 11 4 I 87 10 Ten Broeck Mansion Maria College 10 Hurst Ave Albany Public 1 9 7 Library - Bach New Scotland Ave 1 St. Peter’s Hospital Albany 8 6 1 1 2 Medical 6 Mohawk-Hudson Sawyer Pl 5 3 S Main Ave Center Bike-Hike Trail North Helderberg Ave 4 14 Greenbush Whitehall Rd Sage College Albany Law Corning Preserve New Scotland Rd Oneil Rd Hackett Blvd School 13 Capital Hills Albany Bus Station Lincoln Park/ Golf Course I 87 US Hwy 9 Seneca Pl 15 Rensselaer Albany Public City Pool I 87 Library - Delaware 9 USS Slater/ Legend Dutch Apple Cruises 2nd Ave Albany Public Priority Wayfinding Routes Library - Howe (with Detailed Signage Normanskill Hoffman Park I 787 Plans on following pages) Farm Historic Cherry Hill 11 Bethlehem Additional Major Bikeways or Graceland Trails/Greenways (per 2009 Cemetery Albany Bicycle Master Plan) Rail Trail East Greenbush

Southern Blvd

Potential Location for City-wide S Pearl St Port of Albany Bike Route Map Kiosk Smith Blvd Key Destinations

Map 3: Priority Routes for Wayfinding Signage Port St

City of Albany Bicycle Master Plan Implementation 0 0.5 1 I Miles Source: Data obtained from City of Albany | Author: Shannon Simms | Date: 1/18/13 ALBANY BICYCLE SIGNAGE AND WAYFINDING STRATEGY 3.3 Implementation Wayfinding plans for the 11 priority routes have been developed to illustrate how and where bicycle wayfinding should be implemented on key bicycle routes throughout the city. The signage plans are shown in Appendix B. In addition, cost estimates were developed for materials and installation of the routes. Approximate quantities for each type of bicycle wayfinding signage have been developed based on bicycle route mileage proposed. Table 1 summarizes the cost for each route, and detailed cost estimates are included in Appendix A. Table 1: Cost Estimates for Materials and Installation of Priority Routes

Route Description Endpoint 1 Endpoint 2 Number Total cost of Signs

1 Western Ave. / Madison Ave. University at Corning Preserve 28 $11,200 / Lark St. / Washington Ave. / Albany

State St.

2 Washington Ave. University at Lark St. 13 $5,400 Albany

3 Western Ave. Madison Ave. Washington Ave. 9 $3,800

4 Broadway City Line State St. 15 $6,000

5 Central Ave. City Line Clinton Ave. 3 $1,400

6 New Scotland Ave. City Line Madison Ave. 13 $5,400

7 Manning Blvd. New Scotland Clinton Ave. 8 $3,400 Ave.

8 Clinton Ave. Manning Blvd. Broadway 10 $4,200

9 Delaware Ave. City Line Madison Ave. 13 $5,400

10 Lark St. Washington Livingston Ave. 6 $2,500

11 South Pearl St. State St. City Line 9 $3,800

TOTAL 127 $52,500

16 | Page

Appendix A: Priority Route Cost Estimates

19 | Page

CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: CDF DATE: 6/28/2013

Albany Bicycle Linkage 28-Jun-13

Summary of Cost Estimates 28-Jun-13

Route # DescriptionSegment Length Construction Cost Total Cost 1 UAlbany to Corning Preserve via. Western, Madison, Lark, Washington/State 5.0$ 11,200.00 $ 11,200.00 2 Washington Ave: SUNY to Lark St 4.0$ 5,400.00 $ 5,400.00 3 Western Ave: Madison Ave to Washington Ave 1.4$ 3,800.00 $ 3,800.00 4 Broadway: City Line to End 1.3$ 6,000.00 $ 6,000.00 5 Central Ave: City Line to Clinton Ave 1.6$ 1,400.00 $ 1,400.00 6 New Scotland Ave: City Line to Madison Ave 4.2$ 5,400.00 $ 5,400.00 7 Manning Blvd: New Scotland Ave to Clinton Ave 1.9$ 3,400.00 $ 3,400.00 8 Clinton Ave: Manning Blvd to Broadway 2.0$ 4,200.00 $ 4,200.00 9 Delaware Ave: City Line to Madison Ave 2.1$ 5,400.00 $ 5,400.00 10 Lark St: Washington Ave to Livingston Ave 0.8$ 2,500.00 $ 2,500.00 11 S.Pearl St: State St to City Line 2.3$ 3,800.00 $ 3,800.00

TOTALS: $52,500.00 $52,500.00

Summary Page 1 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: CDF DATE: 6/28/2013

Albany Bicycle Linkage 28-Jun-13

Description of Major Improvements: Route 1: UAlbany to Corning Preserve via. Western, Madison, Lark, Washington/State *Approximately 5.0 miles

Approximate ROW required: SF 0.0000 Acres

ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL

Signs EA $150.00 28$ 4,200.00 Sign Posts - Type A w/ knockouts EA $175.00 28$ 4,900.00

-All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $9,100.00

ROUNDED SUBTOTAL:$ 9,100 CONTINGENCY (10%)$ 1,000 MAINT.AND PROT. OF TRAFFIC (4%)$ 400 SURVEY AND STAKEOUT (2%)$ 200 MOBILIZATION (4%)$ 500

CONSTRUCTION TOTAL:$ 11,200

SOFT COSTS: DESIGN ENGINEERING (0%)$ - CONSTRUCTION INSPECTION (0%)$ -

PROJECT TOTAL:$ 11,200

UAlb-Corning Preserve Page 2 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: GEG DATE: 1/16/2013

Albany Bicycle Linkage 28-Jun-13

Description of Major Improvements: Route 2: Washington Ave: SUNY to Lark St *Approximately 4.0 miles

Approximate ROW required: SF 0.0000 Acres

ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL

Signs EA $150.00 13$ 1,950.00 Sign Posts - Type A w/ knockouts EA $175.00 13$ 2,275.00

-All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $4,225.00

ROUNDED SUBTOTAL:$ 4,300 CONTINGENCY (10%)$ 500 MAINT.AND PROT. OF TRAFFIC (4%)$ 200 SURVEY AND STAKEOUT (2%)$ 100 MOBILIZATION (4%)$ 300

CONSTRUCTION TOTAL:$ 5,400

SOFT COSTS: DESIGN ENGINEERING (10%)$ - CONSTRUCTION INSPECTION (0%)$ -

PROJECT TOTAL:$ 5,400

Washington Page 3 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: GEG DATE: 1/16/2013

Albany Bicycle Linkage 28-Jun-13

Description of Major Improvements: Route 3: Western Ave: Madison Ave to Washington Ave *Approximately 1.4 miles

Approximate ROW required: SF 0.0000 Acres

ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL

Signs EA $150.00 9$ 1,350.00 Sign Posts - Type A w/ knockouts EA $175.00 9$ 1,575.00

-All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $2,925.00

ROUNDED SUBTOTAL:$ 3,000 CONTINGENCY (10%)$ 300 MAINT.AND PROT. OF TRAFFIC (4%)$ 200 SURVEY AND STAKEOUT (2%)$ 100 MOBILIZATION (4%)$ 200

CONSTRUCTION TOTAL:$ 3,800

SOFT COSTS: DESIGN ENGINEERING (10%)$ - CONSTRUCTION INSPECTION (0%)$ -

PROJECT TOTAL:$ 3,800

Western Page 4 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: GEG DATE: 1/16/2013

Albany Bicycle Linkage 28-Jun-13

Description of Major Improvements: Route 4: Broadway: City Line to End *Approximately 1.3 miles

Approximate ROW required: SF 0.0000 Acres

ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL

Signs EA $150.00 15$ 2,250.00 Sign Posts - Type A w/ knockouts EA $175.00 15$ 2,625.00

-All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $4,875.00

ROUNDED SUBTOTAL:$ 4,900 CONTINGENCY (10%)$ 500 MAINT.AND PROT. OF TRAFFIC (4%)$ 200 SURVEY AND STAKEOUT (2%)$ 100 MOBILIZATION (4%)$ 300

CONSTRUCTION TOTAL:$ 6,000

SOFT COSTS: DESIGN ENGINEERING (10%)$ - CONSTRUCTION INSPECTION (0%)$ -

PROJECT TOTAL:$ 6,000

Broadway Page 5 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: GEG DATE: 1/16/2013

Albany Bicycle Linkage 28-Jun-13

Description of Major Improvements: Route 5: Central Ave: City Line to Clinton Ave *Approximately 1.6 miles

Approximate ROW required: SF 0.0000 Acres

ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL

Signs EA $150.00 3$ 450.00 Sign Posts - Type A w/ knockouts EA $175.00 3$ 525.00

-All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $975.00

ROUNDED SUBTOTAL:$ 1,000 CONTINGENCY (10%)$ 100 MAINT.AND PROT. OF TRAFFIC (4%)$ 100 SURVEY AND STAKEOUT (2%)$ 100 MOBILIZATION (4%)$ 100

CONSTRUCTION TOTAL:$ 1,400

SOFT COSTS: DESIGN ENGINEERING (10%)$ - CONSTRUCTION INSPECTION (0%)$ -

PROJECT TOTAL:$ 1,400

Central Page 6 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: CDF DATE: 6/28/2013

Albany Bicycle Linkage 28-Jun-13

Description of Major Improvements: Route 6: New Scotland Ave: City Line to Madison Ave *Approximately 4.2 miles

Approximate ROW required: SF 0.0000 Acres

ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL

Signs EA $150.00 13$ 1,950.00 Sign Posts - Type A w/ knockouts EA $175.00 13$ 2,275.00

-All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $4,225.00

ROUNDED SUBTOTAL:$ 4,300 CONTINGENCY (10%)$ 500 MAINT.AND PROT. OF TRAFFIC (4%)$ 200 SURVEY AND STAKEOUT (2%)$ 100 MOBILIZATION (4%)$ 300

CONSTRUCTION TOTAL:$ 5,400

SOFT COSTS: DESIGN ENGINEERING (10%)$ - CONSTRUCTION INSPECTION (0%)$ -

PROJECT TOTAL:$ 5,400

New Scotland Page 7 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: GEG DATE: 1/16/2013

Albany Bicycle Linkage 28-Jun-13

Description of Major Improvements: Route 7: Manning Blvd: New Scotland Ave to Clinton Ave *Approximately 1.9 miles

Approximate ROW required: SF 0.0000 Acres

ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL

Signs EA $150.00 8$ 1,200.00 Sign Posts - Type A w/ knockouts EA $175.00 8$ 1,400.00

-All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $2,600.00

ROUNDED SUBTOTAL:$ 2,600 CONTINGENCY (10%)$ 300 MAINT.AND PROT. OF TRAFFIC (4%)$ 200 SURVEY AND STAKEOUT (2%)$ 100 MOBILIZATION (4%)$ 200

CONSTRUCTION TOTAL:$ 3,400

SOFT COSTS: DESIGN ENGINEERING (10%)$ - CONSTRUCTION INSPECTION (0%)$ -

PROJECT TOTAL:$ 3,400

Manning Page 8 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: CDF DATE: 6/28/2013

Albany Bicycle Linkage 28-Jun-13

Description of Major Improvements: Route 8: Clinton Ave: Manning Blvd to Broadway *Approximately 2.0 miles

Approximate ROW required: SF 0.0000 Acres

ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL

Signs EA $150.00 10$ 1,500.00 Sign Posts - Type A w/ knockouts EA $175.00 10$ 1,750.00

-All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $3,250.00

ROUNDED SUBTOTAL:$ 3,300 CONTINGENCY (10%)$ 400 MAINT.AND PROT. OF TRAFFIC (4%)$ 200 SURVEY AND STAKEOUT (2%)$ 100 MOBILIZATION (4%)$ 200

CONSTRUCTION TOTAL:$ 4,200

SOFT COSTS: DESIGN ENGINEERING (10%)$ - CONSTRUCTION INSPECTION (0%)$ -

PROJECT TOTAL:$ 4,200

Clinton Page 9 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: CDF DATE: 6/28/2013

Albany Bicycle Linkage 28-Jun-13

Description of Major Improvements: Route 9: Delaware Ave: City Line to Madison Ave *Approximately 2.1 miles

Approximate ROW required: SF 0.0000 Acres

ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL

Signs EA $150.00 13$ 1,950.00 Sign Posts - Type A w/ knockouts EA $175.00 13$ 2,275.00

-All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $4,225.00

ROUNDED SUBTOTAL:$ 4,300 CONTINGENCY (10%)$ 500 MAINT.AND PROT. OF TRAFFIC (4%)$ 200 SURVEY AND STAKEOUT (2%)$ 100 MOBILIZATION (4%)$ 300

CONSTRUCTION TOTAL:$ 5,400

SOFT COSTS: DESIGN ENGINEERING (10%)$ - CONSTRUCTION INSPECTION (0%)$ -

PROJECT TOTAL:$ 5,400

Delaware Page 10 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: GEG DATE: 1/16/2013

Albany Bicycle Linkage 28-Jun-13

Description of Major Improvements: Route 10: Lark St: Washington Ave to Livingston Ave *Approximately 0.8 miles

Approximate ROW required: SF 0.0000 Acres

ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL

Signs EA $150.00 6$ 900.00 Sign Posts - Type A w/ knockouts EA $175.00 6$ 1,050.00

-All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $1,950.00

ROUNDED SUBTOTAL:$ 2,000 CONTINGENCY (10%)$ 200 MAINT.AND PROT. OF TRAFFIC (4%)$ 100 SURVEY AND STAKEOUT (2%)$ 100 MOBILIZATION (4%)$ 100

CONSTRUCTION TOTAL:$ 2,500

SOFT COSTS: DESIGN ENGINEERING (10%)$ - CONSTRUCTION INSPECTION (0%)$ -

PROJECT TOTAL:$ 2,500

Lark Page 11 CALCULATED BY: KGD DATE: 1/14/2013 CHECKED BY: CDF DATE: 6/28/2013

Albany Bicycle Linkage 28-Jun-13

Description of Major Improvements: Route 11: S.Pearl St: State St to City Line *Approximately 2.3 miles

Approximate ROW required: SF 0.0000 Acres

ITEM DESCRIPTION UNITS PRICE QUANTITY TOTAL

Signs EA $150.00 9$ 1,350.00 Sign Posts - Type A w/ knockouts EA $175.00 9$ 1,575.00

-All signs assumed dimensions = 24"x36" = 6.0 sf x $25/sf = $150 SUB-TOTAL $2,925.00

ROUNDED SUBTOTAL:$ 3,000 CONTINGENCY (10%)$ 300 MAINT.AND PROT. OF TRAFFIC (4%)$ 200 SURVEY AND STAKEOUT (2%)$ 100 MOBILIZATION (4%)$ 200

CONSTRUCTION TOTAL:$ 3,800

SOFT COSTS: DESIGN ENGINEERING (10%)$ - CONSTRUCTION INSPECTION (0%)$ -

PROJECT TOTAL:$ 3,800

S.Pearl Page 12

Appendix B: Detailed Priority Route Maps

33 | Page

d

a

o

s R

u

d a

o amp

r R e C BIKE ROUTE 5

o t

d a u t UAlbany UAlbany Main Campus BIKE ROUTE 5 T S Main Campus 0.8 mi. UAlbany Harriman Campus Main Campus Harriman Campus

Western Avenue

d a o t e e l R 5 l r e t e u s e 8 n s t e e S u u n v o i R z BIKE ROUTE 5 R BIKE ROUTE 5 a a A g n Harriman Campus a Corning Preserve o t 0.8 mi. M 4.1 mi. y Corning Preserve Downtown Albany a 4.9 mi. 3.7 mi. D Downtown Albany Harriman Campus 4.4 mi.

ard

v e e l e u u u n o n e B e v e v g B l v n i i n der p A ain A n BIKE ROUTE 5 a e A hro t M h M UAlbany t n r i Main Campus v o e W 1.9 mi. N n u Pine Hills Library e Pine Hills Library Western Avenue BIKE ROUTE 5 UAlbany Main Campus College of St. Rose 2.1 mi. College of St Rose

e e u u n n e e ard v v v BIKE ROUTE 5 e l l A d A i u College of St Rose a l i o 0.2 mi. c n u Corning Preserve BIKE ROUTE 5 o l E g B 3.0 mi. o n i C Downtown Albany Corning Preserve 2.5 mi. 2.8 mi. ann Pine Hills Library Downtown Albany M 1 .8 mi. College of St Rose

Route 1: Western Ave./Madison Ave./Lark St./Washington Ave./State St./ from UAlbany to Corning Preserve UAlbany - Corning Preserve City of Albany Bicycle Master Plan Implementation Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet

t

e e

r LARK STREET t

S BIKE ROUTE 5

BIKE ROUTE l BIKE ROUTE 5 i Albany Medical a UAlbany Center u Main Campus UAlbany 1.0 mi.

Q 3.2 mi. Main Campus Washington Park 2.6 mi. Albany Medical Center UAlbany College of 0.3 mi. Main Campus Saint Rose 3.5 mi. Washington Park Washington Park

Madison Avenue

e

d u

a D

n

t o

d e

e

e R

a l

v

e a

o

r A

d w

t

n

S a

e

BIKE ROUTE 5 a l R

e e r

k l

i e A

t a

a BIKE ROUTE 5 BIKE ROUTE 5 o

Corning Preserve L

u

c g

rid 2.3 mi. Lark Street v

S t

Q Corning Preserve

S e

r Downtown Albany 1.7 mi. Corning Preserve n a 2.0 mi. w 1.4 mi. u

P Washington Park e Albany Public e

Lark Street Albany Medical N 0.9 mi. Library - Delaware Center 0.9 mi. 0.3 mi.

WASHINGTON BIKE ROUTE Albany Public Libary - Main Branch BIKE ROUTE Lark Street Downtown Albany UAlbany 0.6 mi. Main Campus BIKE ROUTE UAlbany 3.9 mi. Main Campus NYS Capitol Albany Public Wa 5.0 mi. Library - Main shin CAPITOL HILL CAPITOL HILL 0.4 mi. gton Av enue BIKE ROUTE BIKE ROUTE BIKE ROUTE 9 UAlbany M ain Campus Corning Preserve/ CAPITOL HILL Albany Bus Station NYS Capitol 4.8 mi. Waterfront 0.2 mi. UAlbany BIKE ROUTE 0.6 mi. NYS Capitol Corning Preserve Downtown Albany Main Campus NYS Capitol 0.3 mi. 4.5 mi. 0.3 mi. UAlbany South End M ain Campus LARK STREET NYS Capitol 2.2 mi. 4.7 mi. State Str t BIKE ROUTE eet e

e r BIKE ROUTE t NYS Capitol City Hall 0.3 mi. BIKE ROUTE 9 Town of Menands k S 3 mi. r Corning Preserve t State S a 1.1 mi. e treet Corning Preserve/ City of Troy L e 6 mi. Downtown Albany r Waterfront t LARK STREET 0.6 mi. 0.2 mi.

t n S

BIKE ROUTE e a

e

w r Empire State Plaza CAPITOL HILL t 0.4 mi. CAPITOL HILL t h S e l S t e BIKE ROUTE BIKE ROUTE r B Corning Preserve u r t a CAPITOL HILL r 1.1 mi. o Corning Preserve o e a S City Hall 0.4 mi. d Downtown Albany BIKE ROUTE w e S l 0.6 mi. Corning Preserve/ h P a t y Waterfront g Corning Preserve/ 0.6 mi. a South End Waterfront E 2.2 mi. 0.3 mi. Downtown Albany Sou Albany Bus Station Route 1 (con’t): Western Ave./Madison Ave./Lark St./Washington Ave./State St./ from UAlbany to Corning Preserve 0.2 mi.

City of Albany Bicycle Master Plan Implementation UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet I - 90

WASHINGTON BIKE ROUTE Park and Preserve 0.8 mi. UAlbany Main Campus Washington Avenue

Campus Access Road

WASHINGTON WASHINGTON BIKE ROUTE BIKE ROUTE Downtown Albany Harriman Campus 3.6 mi. 0.4 mi. UAlbany Downtown Albany UAlbany Downtown Campus Harriman Campus 4.2 mi. 2.7 mi. UAlbany Main Campus Harriman Campus Downtown Campus 3.1 mi.

Lincoln Avenue WASHINGTON WASHINGTON BIKE ROUTE

BIKE ROUTE e UAlbany u Main Campus

UAlbany 1.8 mi. n

Main Campus ve St. Peter’s Hospital

1.3 mi. A

evard Rensselaer Lake 1.2 mi. Manning Boul

Park and Preserve Swinburne Park /

n vi 2.1 mi. Bleeker Stadium

0.6 mi. l Harriman Campus Co 0.3 mi.

Washington Avenue

t

e

t

e

e

r

t

e

S r

WASHINGTON d

t

r

e

t ee Str

S a

BIKE ROUTE

n WASHINGTON

v

n r

Downtown Albany e

l

e o

BIKE ROUTE l

2.9 mi. l

u

h

t A

UAlbany UAlbany o

tor eva B

w Downtown Campus

h

Downtown Campus r

t

a g

1.8 mi. B

Harriman 1.3 mi. r

H n

Washington Park o

Swinburne Park / i N Campus 2.1 mi. Bleeker Stadium n

0.6 mi. n St. Peter’s Hospital a

1.2 mi. M

Route 2: Washington Avenue UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line City of Albany Bicycle Master Plan Implementation 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet Centr WASHINGTON WASHINGTON al Avenue BIKE ROUTE WASHINGTON BIKE ROUTE Rensselaer Lake BIKE ROUTE Kent Street Park and Preserve UAlbany Harriman Campus West St 4.1 mi. Downtown Campus 1.1 mi. reet UAlbany 0.2 mi. UAlbany Main Campus UAlbany Main Campus 3.1 mi. 2.4 mi. Main Campus UAlbany 3.3 mi. Downtown Campus

Washington Avenue

UAlbany t

e Downtown Campus

e

r

t

S

l

i

t

a

e

u

e

r WASHINGTON Q

WASHINGTON t S

BIKE ROUTE

e WASHINGTON

BIKE ROUTE Downtown Albany/ g

NYS Capitol t BIKE ROUTE e d

Downtown Albany i e

r 0.8 mi. Downtown Albany/ r

1.7 mi. t t

r Washington Park NYS Capitol

S

a UAlbany

ern Avenue 0.2 mi. 1.0 mi. P

Downtown Campus n

West UAlbany i 0.7 mi. Corning Preserve/ Downtown Campus b Washington Park Waterfront Corning Preserve/ o

Waterfront R 1.8 mi. 2.3 mi. Washington Park 0.1 mi.

Route 2 (con’t): Washington Avenue

City of Albany Bicycle Master Plan Implementation UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet e u B n WESTERN WESTERN e e l v v BIKE ROUTE BIKE ROUTE i der p A UAlbany Pine Hills Library o Main Campus e A r UAlbany h 1.9 mi. t Main Campus n 2.0 mi. v i Pine Hills Library e W n u e Pine Hills Library Western Avenue Western Avenue

e e u u d n r n e a e v v v e WESTERN l M l A d A u adi i BIKE ROUTE so o n A l ve c nu nia Corning Preserve e u o l E g B 2.6 mi. o Washington Park C 1.0 mi. nnin a Downtown Albany/

M NYS Capitol 1.8 mi.

Ce nt W ral A ashin v gton A en venue ue WESTERN t WESTERN WESTERN e e BIKE ROUTE BIKE ROUTE r BIKE ROUTE t UAlbany UAlbany Rensselaer Lake Main Campus Main Campus Park & Preserve ail S 3.0 mi. 3.2 mi. 5.0 mi. u Washington Park Central Avenue Q UAlbany Commercial Main Campus Corridor 3.4 mi.

Western Avenue

e c a t t l e e e e r r t t WESTERN WESTERN ood P WESTERN t o S e S w BIKE ROUTE i e t k BIKE ROUTE e BIKE ROUTE r e l e r a Downtown Albany/ a g NYS Capitol e t t Downtown Albany/ n NYS Capitol r 0.6 mi. t l S h L NYS Capitol E 0.5 mi. On i t Central Avenue a 0.8 mi. u Corning Preserve k S u o Washington Park Commercial 1.3 mi. r Q S Corridor a L Washington Park

Route 3: Western Ave. City of Albany Bicycle Master Plan Implementation UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet BIKE ROUTE 9

Town of Menands

Broadway

BIKE ROUTE 9 BIKE ROUTE 9 Downtown Albany YMCA/ Library 1.7 mi. 0.4 mi. YMCA/ Library/ Hackett Park Hackett Park 0.5 mi.

Lawn Avenue Downtown Albany 2.1 mi. YMCA / Library

Erie Street BIKE ROUTE 9

Tivoli Street Tivoli YMCA/ Library/ Hackett Park 1.0 mi. Ten Broeck Mansion 0.2 mi. B roadway

BIKE ROUTE 9 Town of Menands 0.5 mi.

YMCA/ Library/ BIKE ROUTE 9 Hackett Park 0.1 mi. Downtown Albany 0.7 mi. Tivoli Street Ten Broeck Mansion Loundonville Road 0.2 mi. Livingston TenAvenue Broeck Mansion Hackett Park

North 1st Street Route 4: Broadway City of Albany Bicycle Master Plan Implementation UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet e g

rid

l B a i r Corning Preserve o

m

BIKE ROUTE 9 n Me BIKE ROUTE 9 n

North Albany Corning Preserve Du 0.5 mi. Palace Theatre 0.1 mi. BIKE ROUTE 9 BIKE ROUTE 9 Albany Bus Station Swimburne Park Corning Preserve 2.0 mi. NYS Capitol 0.3 mi. 0.4 mi. BIKE ROUTE 9 NYS Capitol Washington Park 0.3 mi. 1.5 mi. Washington Park 1.5 mi. B Corning Preserve/ roadway Waterfront

BIKE ROUTE 9 Corning Preserve 0.4 mi. Palace Theatre Albany Bus Station 0.1 mi. Swinburne Park 2.1 mi. e u BIKE ROUTE 9 n e Washington Park BIKE ROUTE 9 Palace Theatre v BIKE ROUTE 9 t 1.5 mi. e e USS Slater/ Dutch Albany Bus Station r n A t Apple Cruises o Corning Preserve/ 0.2 mi. t Waterfront NYS Capitol 0.5 mi. n e S li 0.2 mi. 0.3 mi. t Albany Bus Station a C t Washington Park S 1.5 mi.

Route 4 (con’t): Broadway

City of Albany Bicycle Master Plan Implementation UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet C ENTRAL AVE d

a

BIKE ROUTE o

R

Westland Hills t

t

Park e

r

e

v

E Central Avenue

CENTRAL AVE

e

u BIKE ROUTE

n

e

e Swinburne Park/ u

v Bleeker Stadium n

A

e 1.1 mi.

v

n

i

A

Westland Hills

a

t Park n

i

s

v

u Westland Hills Park l

A

o

C

N

o

r

t

h M

annin

g B 2nd Street

o

u

l CLINTON AVE

e

v

CLINTON AVE a BIKE ROUTE

r

d BIKE ROUTE Swinburne Park / Swinburne Park / Bleeker Stadium Westland Hills Park Bleeker Stadium Clinton Avenue

Centra l Avenue

ard v le u o

t g B CLINTON AVE e CENTRAL AVE n e r t BIKE ROUTE nni BIKE ROUTE a l S Swinburne Park / i M Palace Theatre Bleeker Stadium a Ce u n 1.6 mi. tral Ave 0.2 mi. Q nu Swinburne Park / e Bleeker Stadium Route 5: Cental Ave. and Route 8: Clinton Ave. City of Albany Bicycle Master Plan Implementation UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet ute 85 Ro

New Scotland Avenu e rac e er T Wood

NEW SCOTLAND d BIKE ROUTE oa R St. Peter’s Hospital k 1.9 mi. Washington Park rmac 3.7 mi. Downtown Albany McCo 5.4 mi.

Buc

k ingham Dr

NYS

ive

T hruway

NEW SCOTLAND BIKE ROUTE (I-87) Capital Hills Golf Course Washington Park 2.5 mi. Downtown Albany 4.6 mi. NEW SCOTLAND BIKE ROUTE Capital Hills Golf Course New 0.8 mi. Scot land Avenue

W h i teh H urst Avenu a ll

Roa Capital Hills d Golf Course e

Route 6: New Scotland Rd. City of Albany Bicycle Master Plan Implementation UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet NEW SCOTLAND BIKE ROUTE

Capital Hills reet Golf Course t 1.2 mi. S d St. Peter’s Hospital/ NEW SCOTLAND o Maria College BIKE ROUTE Swinburne Park St. Peter’s Hospital 1.8 mi. 0.5 mi. arkwo

P Main Avenue h Capital Hills t Golf Course u Maria College New o 1.4 mi. Sco S tland Albany Public Aven Library - Bach d ue Albany Public Library - Bach Branch

NEW SCOTLAND BIKE ROUTE ing Boulevar Albany Medical n Center

1.5 mi. Man Swinburne Park 1.8 mi. e St Peter’s Hospital/ e Maria College NEW SCOTLAND venu NEW SCOTLAND A BIKE ROUTE Avenu BIKE ROUTE Albany Medical ain d Albany Medical St. Peter’s Hospital Center o M 1.0 mi. Center h 0.8 mi. t Washington Park

lywo Washington Park 1.3 mi. l 1.1 mi. Sou Albany Public o Library - Bach H Downtown Albany 2.6 mi.

Myrtle Aven Washington Park

e u ue ven A

ake L ail Street th u u Q NEW SCOTLAND o BIKE ROUTE S

St. Peter’s Hospital 1.0 mi. NEW SCOTLAND Ma Sage College BIKE ROUTE diso NEW SCOTLAND St. Peter’s Hospital n Avenu Albany Medical 1.5 mi. BIKE ROUTE Street rk a Center Albany Medical Washington Park e L New Center UAlbany Scotland Avenue Ma in Campus 3.2 mi. Downtown Albany Myr 1.4 mi. tle Avenue e

u

n

e NEW SCOTLAND v H

A o BIKE ROUTE llan e NEW SCOTLAND v Albany Medical d o Center BIKE ROUTE r A 0.3 mi. ven G Washington Park Sage College Washington Park Albany Law 0.6 mi. 0.3 mi. u Albany Medical e Sage College School Center Route 6 (con’t): New Scotland Rd. Albany Law School City of Albany Bicycle Master Plan Implementation UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet Maria College MANNING BLVD BIKE ROUTE St Peter’s Hospital/ Maria College Mario Albany Medical n Ave MANNING BLVD Center nue 1.5 mi. BIKE ROUTE Manning B St. Peter’s Hospital oulevard 0.8 mi. Downtown Albany 2.5 mi. UAlbany Main Campus 2.5 mi.

t

e

e MANNING BLVD r St Peter’s t BIKE ROUTE Hospital r S

Swinburne Park t

e

1.8 mi. d owe e

a r B Albany Medical t

o

Center R W e

r S 1.5 mi. u e d e n s

n c e t r

a e

l v

r

t

n A Me o MANNING BLVD c e A l

S t v BIKE ROUTE e yr

w Swinburne Park / n

e M Bleeker Stadium u e N MANNING BLVD 1.0 mi. BIKE ROUTE UAlbany Main Campus St Peter’s Hospital 1.8 mi. 1.2 mi. Downtown Albany UAlbany 2.5 mi. Main Campus 1.8 mi. C e n tr a l A et e v tr e n u llen S e M rd a th A a nnin r v o le g B N u o o ul g B ev ar d annin MANNING BLVD h M rt BIKE ROUTE MANNING BLVD o Swinburne Park / N Bleeker Stadium BIKE ROUTE 0.6 mi. St Peter’s Hospital ard UAlbany 1.8 mi. v Main Campus le Capital Hills u 1.8 mi. W o ashin Golf Course g B 3.1 mi. Swinburne Park / nin gt an on A Bleeker Stadium M v en ue L a nc ast MANNING BLVD er S BIKE ROUTE t re Swinburne Park / et Bleeker Stadium Route 7: Manning Blvd. City of Albany Bicycle Master Plan Implementation UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet T e

n B

d ar v

t r CLINTON AVE

e oe l

e 2nd Street B u

e c BIKE ROUTE r

CLINTON AVE r o o

t k S a d

BIKE ROUTE Swinburne Park/ w

B n n t S

Swinburne Park k r Bleeker Stadium a o r e y

s 1.9 mi. e 2.0 mi.

CLINTON AVE a t n

Albany Public L Palace Theatre BIKE ROUTE Library - Main Swinburne Park 0.3 mi.

1.5 mi. Albany Medical

h Jo y

r Center

n 1.7 mi. Palace Theatre

e H

Clinton Avenue Clinton Avenue

CLINTON AVE

e BIKE ROUTE

CLINTON AVE u t

n CLINTON AVE Mohawk-Hudson e

BIKE ROUTE e Bike-Hike Trail e

v

CLINTON AVE r 0.6 mi.

t BIKE ROUTE

Palace Theatre A t

1.0 mi. e Corning Preserve

n

BIKE ROUTE e

Corning Preserve 0.4 mi.

r

S n

Corning Preserve o t

t Palace Theatre 1.4 mi. a 0.4 mi.

g 0.6 mi. w Downtown Albany

n S Corning Preserve k

i

r 0.2 mi.

x 1.0 mi.

S h a t e Palace Theatre

Albany Medical L u

L Center o

1.7 mi. S

Route 8 (con’t): Clinton Ave. City of Albany Bicycle Master Plan Implementation UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet DELAWARE BIKE ROUTE Graceland Cemetery 0.6 mi. Albany School of Humanities 0.3 mi. Myers Middle School 0.5 mi. DELAWARE BIKE ROUTE Normanskill Farm DELAWARE BIKE ROUTE Normanskill Farm 0.2 mi. Town of Delmar Graceland Cemetey venue Normanskill Farm are A Delaw

M DELAWARE cA lp BIKE ROUTE Se in S co Albany Medical nd A tr Center e 1.3 mi. v et en Graceland Cemetery Albany School of ue Humanities 0.3 mi. Myers Middle School 0.5 mi. DELAWARE DELAWARE BIKE ROUTE BIKE ROUTE Albany Medical Graceland Cemetary Center 0.2 mi. 1.9 mi. Washington Park Washington Park 2.0 mi. 2.0 mi. Normanskill Farm Graceland Cemetery e u M M

n yr a

e d

t v i

l son A

e A d A LARK STREET

n v a e t l v BIKE ROUTE l n

e e Washington Park o u Albany Medical e n

r H e t u Center Albany Medical Center / e 1.0 mi. l S Washington Park a Albany Law School / UAlbany Main Campus der DELAWARE e Sage College of Albany 3.5 mi. F

BIKE ROUTE M Graceland Cemetery yr Lark Street 1.0 mi. t

Albany Public Library - l Town of Delmar DELAWARe A E Delaware Branch 1.2 mi. BIKE ROv UTE

Albany Public e

Library - Delaware n DELAWARE Lincoln Parku & City Poole DELAWARE BIKE ROUTE BIKE ROUTE Albany Public Library - Delaware 0.4 mi. Washington Park e 0.8 mi. Boys & Girls Club/ enu Albany Medical Lincoln Park v 0.5 mi. are A Center law DELAWARE 0.5 mi. Albany Medical De Boys & Girls Club/ Center BIKE ROUTE Lincoln Park 0.5 mi. Washington Park DELAWARE 0.5 mi. M yr UAlbany BIKE ROUTE Main Campus DELAWARt E l 3.5 mi. Albany Medical e A Center BIKE ROUTE 0.9 mi. Lincoln Park &v Albany Public e

City Pool n Library - Delaware

u

e Route 9: Delaware Ave. and Route 10: Lark St. City of Albany Bicycle Master Plan Implementation UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet

N

.

LARK STREET LARK STREET M a

BIKE ROUTE BIKE ROUTE n n

Albany Medical i

Palace Theatre n Center 0.6 mi. g

1.4 mi.

Albany Medical B Albany Pubic

Center o Library - Main 1.7 mi. u

NYS Capitol l

Swinburne Park/ e 0.3 mi. Bleeker Stadium v

1.9 mi. a

r d Lark Street

Lark Street Albany Public Library - Main LARK STREET

Branch L LARK STREET BIKE ROUTE C

i

2 l v LARK STREET i n n BIKE ROUTE i

Swinburne Park / n t d S W

o BIKE ROUTE Arbor Hill Bleeker Stadium g a n A 1.9 mi. st shi Arbor Hill 0.7 mi. t

o Palace Theatre r e 0.7 mi. n A NYS Capitol v

n e 0.3 mi. 0.6 mi. e Empire State Plaza g t n

0.4 mi. t v u Corning Preserve o

e

e Corning Preserve 1.1 mi. n A n

1.1 mi. u

e

v

e

n

u

e

Route 10 (con’t): Lark St. City of Albany Bicycle Master Plan Implementation UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet R

4th e

y n a Westerl s w Aven d s I - 787 a ela SOUTH PEARL ro BIKE ROUTE B SOUTH PEARL e

r u o St BIKE ROUTE Corning Preserve/ e S Downtown Albany Times Union Center t r

reet 0.1 mi. eet Albany Public SOUTH PEARL Corning Preserve Library - Howe 0.7 mi. Schuyler Mansion BIKE ROUTE Empire State Plaza 0.1 mi. l 0.4 mi. NYS Capitol a 0.2 mi. eri l Street t h Pear Washington Park r Sout 1.0 mi. A Corning Preserve 0.4 mi. Broad S uth Mall treet o Albany Public Library - S Howe Branch SOUTH PEARL BIKE ROUTE

M

a Albany Public SOUTH PEARL 1st d Library - Howe

ison BIKE ROUTE Mor Rail Trail Schuyler Mansion SOUTH PEARL A Times Union Schuyler Mansion 1.3 mi. BIKE ROUTE venu 0.4 mi. Schuyler Mansion t A o venue 0.1 mi. n Rail Trail Center Rail Trail ven A 0.7 mi. e 1.6 mi. A d Empire State Plaza venue r Historic Cherry Hill u t 3 0.4 mi. e e

e r t

S

e t

a t

S

Port of Albany SOUTH PEARL South Port Roa BIKE ROUTE Historic Cherry Hill 1.1 mi. Corning Preserve/ Downtown Albany SOUTH PEARL Port of Albany BIKE ROUTE Corning I - 787 d Corning Preserve/ Downtown Albany

Historic Cherry Hill H Schuyler Mansion ill

0.7 mi. R oad

SOUTH PEARL BIKE ROUTE rl Street Rail Trail Rail Trail ea M P

c th SOUTH PEARL Historic Carty Sou BIKE ROUTE Cherry Hill South Port of Albany Pearl Street A

venue

SOUTH PEARL BIKE ROUTE Rail Trail Route 11: South Pearl St.

City of Albany Bicycle Master Plan Implementation UAlbany - Corning Preserve Central - Clinton Avenue Delaware - Lark Street Manning Boulevard Match Line 0 400 800 Source: Imagery obtained from NYS GIS Clearinghouse | Author: Lindsay Zefting | Date: 01/08/13 Western Avenue Broadway New Scotland Road Washington Avenue South Pearl Street Destinations Feet