Statistics and Programme Implementation on Environment: Rajya Sabha 2013-14

Q. No. Q. Type Date Ans by Ministry Members Title of the Questions Subject Specific Politica State l Party Representative 1395 Unstarred 08.03.2013 Statistics and Dr. T.N. Seema Incomplete infrastructure Environmental Conservation CPI(M) Kerala Programme projects Implementation 2945 Unstarred 22.03.2013 Statistics and Shri Vijay Nation wide sample surveys Health and Sanitation INC Maharashtra Programme Jawaharlal Darda Implementation Water Management 3565 Unstarred 26.04.2013 Statistics and Shri D.P. Tripathi Delay in implementation of EIA NCP Maharashtra Programme projects Implementation Environmental Conservation 4184 Unstarred 03.05.2013 Statistics and Shri Aayanur Delaying in infrastructure EIA BJP Karnataka Programme Manjunatha projects Implementation Environmental Conservation 1240 Unstarred 16.08.2013 Statistics and Shri Vivek Gupta Natural Capital Accounts Environmental Conservation AITC Programme Implementation Environmental Education, NGOs and Media 1084 Unstarred 13.12.2013 Statistics and Shri Prabhat Jha Clearance to industrial EIA BJP Madhya Programme projects Pradesh Implementation 3103 Unstarred 21.02.2014 Statistics and Shri Ajay Poor execution of EIA BJP Maharashtra Programme Sancheti infrastructure projects Implementation Environmental Conservation Forest Conservation 3106 Unstarred 21.02.2014 Statistics and Shri Avinash Delay in infrastructure EIA INC Maharashtra Programme Pande projects Implementation Environmental Conservation

Forest Conservation

INCOMPLETE INFRASTRUCTURE PROJECTS 8th March, 2013

RSQ 1395

DR. T.N. SEEMA

(a) the details of incomplete major infrastructure projects in the country during last five years and the reasons therefor;

(b) Whether there is any ''Investment Tracking System'' to ensure speedy implementation of these projects;

(c) if so, the details thereof;

(d) the total cost overrun on major infrastructure projects during the Eleventh Five Year Plan, project-wise and the reasons therefor;

(e) the steps taken to overcome such shortfalls and losses in future; and

(f) the details of coordinated efforts made by various Government Departments to solve land issues, fuel supply shortage and environmental clearances for faster implementation of such projects?

MINISTER OF STATE (INDEPENDENT CHARGE), MINISTRY OF STATISTICS AND PROGRAMME IMPLEMENTATION AND MINISTER OF STATE IN THE MINISTRY OF CHEMICALS AND FERTILIZERS (SHRI SRIKANT KUMAR JENA)

(a): Ministry of Statistics and Programme Implementation monitors the Central Sector Infrastructure Projects costing Rs. 150 crore and above (Rs. 20 crore and above before 31st March 2010) on the basis of information supplied by the project implementing agencies. The details of incomplete major infrastructure projects in the country during the years 2008-09, 2009-10, 2010-11, 2011-12 and the current year 2012-13 (upto 1st January 2013) is at Annexure - I. The projects are delayed mainly due to delay in regulatory approvals, non-availability/delayed-availability of funds, delay in land acquisition, law and order situation, lack of strong R&R (Rehabilitation & Resettlement) policies, ineffective procurement planning, design/scope change, delay in decision-making, weak/ineffective project planning & monitoring, contractual disputes, problem in location and connectivity to project site, delay in equipment supply, pre-commissioning teething troubles, geological surprises, etc.

(b) & (c): Government has set up in May 2012 an Investment Tracking System for projects with an investment of Rs. 1000 crore and above. National Manufacturing Competitiveness Council (NMCC) has been mandated to track all Public Sector Undertaking projects with an investment of Rs. 1000 crore and above. The Department of Financial Services has been mandated to monitor projects with an investment of Rs. 1000 crore and above in the private sector.

(d): During the 11th Plan Period (1st April 2007 to 31st March 2012), 551 projects were completed, out of which 168 projects reported cost overruns; the details are Annexure-II. As on 31st March 2012, 555 projects were on- going, out of which 179 projects reported cost overruns; the details are at Annexure – III. Major reasons for cost overruns are under estimation of original cost, change in rates of foreign exchange and statutory duties, escalation in cost of land, high cost of environmental safeguards and rehabilitation measures, inflation and delay in projects, etc.

(e) & (f): The major steps undertaken to ensure timely completion of projects include rigorous project appraisal, on- line computerised monitoring system(OCMS) for better monitoring, setting up Standing Committees in the Ministries for fixation of responsibility for time & cost overruns, regular review of the infrastructure projects by the concerned administrative Ministries and setting up of Central Sector Project Coordination Committees (CSPCCs) in the States under the Chief Secretaries for removal of bottlenecks and for facilitating the speedy implementation of major projects. A Cabinet Committee on Investment (CCI) has also been constituted in December 2012 to review and monitor the implementation of major projects, including issues relating to clearances/approvals, to ensure their accelerated and timely implementation.

ANNEXURE –I ANNEXURE REFERRED TO IN REPLY TO PART (a) OF THE RAJYA SABHA UNSTARRED QUESTION NO. 1395 DUE FOR ANSWER ON 08.03.2013

Details of incomplete major infrastructure projects in the country during the years 2008-09,2009-10, 2010-11, 2011-12 and the current year 2012-13 (up to 01.01.2013)

COST DATE OF ORIGINAL DATE OF DATE OF TIME SN PROJECTS SECTOR APPROVAL (Rs.; COMMISSIONING COMMISSIONING OVERRUN crore) ORIGINAL ANTICIPATED (MONTHS) 2008 - 2009 Road Transport & 1 NALBARI T BIJNI (AS-7) Highways 12/2003 208.00 04/2008 12/2013 68 Road Transport & 2 GUWHATI TO NALBARI (AS-4) Highways 12/2003 175.96 04/2008 03/2014 71 Road Transport & 3 GUWAHATI TO NALBARI (AS-5) Highways 12/2003 198.16 04/2008 03/2014 71 BPUTRA BRIDGE AT BOGIBIL 4 & LINK LINES,NEFR Railways 09/1997 1000.00 04/2008 12/2015 92 5 LALITPUR-SATNA-REWA-SINGRULI NL, Railways 09/1998 925.00 05/2008 NR 53* (NCR) PATHANKOT- BHOGPUR, KM.26-KM.70, Road Transport & 6 NS-38 Highways 12/2003 284.00 05/2008 03/2013 58 NH-1A DHARAMTUL TO SONAPUR,KM 205-183 Road Transport & 7 (AS- Highways 12/2003 160.00 05/2008 03/2013 58 20) BIJNI TO ASSAM WB BORDER (NH- Road Transport & 8 31.C)(1)(NHAI) Highways 12/2003 195.00 06/2008 03/2013 57 Road Transport & 9 DHARAMTUL TO SONAPUR (AS-19) Highways 12/2003 200.00 06/2008 03/2013 57 Road Transport & 10 NALBARI TO BIJNI (AS-6) Highways 12/2003 225.00 06/2008 03/2013 57 Road Transport & 11 NAGAON TO DHARAMTUL (AS-2) Highways 12/2003 264.72 06/2008 03/2013 57 Road Transport & 12 NALBARI TO BIJNI (AS-8) Highways 12/2003 200.00 06/2008 12/2013 66 Road Transport & 13 BIJNI TO ASSAM /WB.BORDER (NH- Highways 12/2003 237.80 06/2008 12/2013 66 31.C)(NHAI) Road Transport & 14 SILIGURI TO ISLAMPUR (WB-7) Highways 12/2003 225.00 07/2008 03/2013 56 GANGA BRIDGE TO RAMDEVI CROSSING Road Transport & 15 PH.II NH-25, KM.75-80.06 Highways 12/2003 155.00 09/2008 03/2013 54 KUNADANKULAM APP TRANS SYSTEM

16 (PGCIL) Power 05/2005 1779.29 09/2008 03/2013 54 Road Transport & 17 FORBESGANJ TO SIMRAHI (NH-57)(NHAI) Highways 12/2003 332.94 09/2008 05/2013 56 18 SETHUSAMUDRAM SHIP CHANNEL Shipping & Ports 06/2005 2427.40 10/2008 NR 50* PROJECT RAJMARG CHORAHA TO Road Transport & 19 LAKHNANDON,KM Highways 12/2003 229.91 10/2008 01/2013 51 351 TO KM 405.7, NH-26 (NHA SAGAR - RAJMARG CHORAHA,KM 211 TO Road Transport & 20 KM Highways 12/2003 203.43 10/2008 02/2013 52 255, NH-26 (NHAI) Road Transport & 21 KOTA BYPASS,RJ-4, NH-76 (NHAI) Highways 12/2003 275.00 10/2008 02/2013 52 KOTWA TO DEWAPUR(10 LMNHP),NH-28 Road Transport & 22 PHASE-II, KM.440 TO KM.402 Highways 12/2003 240.00 10/2008 03/2013 53 RAJMARG CHORAHA TO Road Transport & 23 LAKHNANDON,KM Highways 12/2003 251.03 10/2008 06/2013 56 297 TO KM 351, NH-26 (NHAI) DEEWAPUR TO UP/BIHAR BORDER Road Transport & 24 (LMNHP- Highways 12/2003 300.00 10/2008 01/2014 63 9)-NH-28, KM.402-360.915 MAIBANG TO LUNDING (AS-24), Road Transport & 25 KM.111.000 TO KM.126.450 Highways 12/2003 155.04 11/2008 07/2013 56 Road Transport & 26 ASSAM/WB BORDER TO GAIRKATTA (WB- Highways 12/2003 221.82 11/2008 12/2013 61 1) MAIBANG TO LUNDING (AS-26), Road Transport & 27 KM.60.500 TO KM.83.400, NH-54 Highways 12/2003 167.64 11/2008 01/2014 62 28 KUDANKULAM APP (NPCIL) Atomic Energy 12/2001 13171.00 12/2008 03/2013 51 GSM EQUIPMENT OF 390K LINES(2G) AND 29 130K LINES(3G) PH-5.1 Punjab Telecommunications 02/2008 373.94 12/2008 03/2013 51 30 DEVELOPMENT OF C-SERIES FIELDS Petroleum 08/2006 3195.16 12/2008 04/2013 52 Road Transport & 31 NAGPUR-KONDHALI,NH-6(NHAI) Highways 03/2005 168.00 12/2008 06/2013 54 NEW MAYNAGURI TO 32 JOGIGHOPA VIA Railways 04/2000 733.00 12/2008 03/2014 63 CHANGRABANDHA (NL),NEFR Road Transport & 33 AURANG-RAIPUR, NH-6, KM.232 TO Highways 03/2005 190.00 01/2009 01/2013 48 KM.281

34 Assam Telecom Circle, Phase-V.I, 2G & 3G Telecommunications 06/2007 336.81 01/2009 06/2013 53 35 NANDYAL-YERRAGUNTLA(NL),SCR Railways 03/1996 155.74 02/2009 NR 46*

HARANGAJO TO MAIBANG (AS-23), Road Transport & 36 KM.126.450 Highways 12/2003 280.00 02/2009 03/2013 49 TO KM.140.700 37 RAJATGARH-BARANG(LD),ECOR Railways 04/1999 166.16 02/2009 04/2013 50 Execution of telecom network 38 requirement of defence forces Telecommunications 05/2006 1077.00 03/2009 NR 45* PALWAL-BHUTESWAR 39 3RD LINE Railways 04/2005 240.00 03/2009 NR 45* DOUBLING(NCR)(RVNL) RAIL-CUM-ROAD BRIDGE AT 40 MUNGER (NL), ECR Railways 04/2002 921.00 03/2009 NR 45* GSM equipment of 799000Lines (2G) 41 101000 lines 3(G) JharkhandPhase V.1 Telecommunications 03/2008 328.13 03/2009 03/2013 48 Telecom Circle KHURDA ROAD - BARANG 3RD LINE (DL) 42 (ECOR) Railways 04/2000 133.41 03/2009 04/2013 49 Lumding-SILCHAR Jiribam, Badarpur- 43 Baraigram Railways 04/1996 1676.31 03/2009 12/2014 69 Kumarghat national project 2009 - 2010 C/o office building for IDBI at bandra Kurla 44 Complex,Mumbai Urban Development 11/2006 114.18 04/2009 NR 44* RAIL CONNECTIVITY TO ICTT AT 45 VALLARPADAM AT COCHIN PORT Shipping & Ports 03/2007 245.67 04/2009 NR 32* TRUST MAIBANG TO LUNDING (AS-27), Road Transport & 46 KM.40.000 TO KM.60.500 Highways 12/2003 200.00 04/2009 03/2013 47 MAIBANG TO LUNDING (AS-25), Road Transport & 47 KM.83.400 TO KM.111.000 Highways 12/2003 199.81 04/2009 07/2013 51 48 KOLDAM HEP (NTPC) Power 10/2002 4527.15 04/2009 09/2014 65 Road Transport & 49 THANJAUR-TRICHY,NH-67(NHAI) Highways 03/2005 280.00 06/2009 01/2013 43 GSM EQUIPMENT OF 283000 LINES (2G) 50 AND Telecommunications 01/2009 149.15 06/2009 03/2013 45 75000 LINES (3G) IN UTTRANCHAL TPS-II EXPANSION (1470MW TO 51 1970MW) (NLC) Coal 10/2004 2030.78 06/2009 09/2013 51 Road Transport & 52 HARANGAJO TO MAIBANG, NH-54 Highways 12/2003 196.00 07/2009 04/2014 57 Road Transport & 53 JHANSI TO LALITPUR, NH-25,26 Highways 12/2003 355.06 09/2009 03/2013 42 54 TEESTA LOW DAM HEP, STAGE-IV (NHPC) Power 09/2005 1061.38 09/2009 12/2013 51 LAKHNADON TO MP/MH BORDER (NS- Road Transport &

55 1/BOT/MP-2), NH-7 Highways 12/2003 263.17 09/2009 09/2014 60 56 PARBATI HEP (NHPC) II Power 09/2002 3919.59 09/2009 03/2018 102 GSM equipment of 200000Lines 57 (2G) UP(West)Phase V.2 Telecommunications 10/2008 336.84 10/2009 NR 38* Telecom Circle Road Transport & 58 GWALIOR BYPSS, NH-75,3 Highways 12/2003 300.93 10/2009 02/2013 40 EXPANSION OF LIQUID 59 CAPACITY FROM 3MT TO 6.3MT Steel 10/2005 8692.00 10/2009 03/2013 41 (RINL) EASTERN REGION STRENGTHENING 60 SCHEME-I Power 10/2006 975.96 10/2009 03/2013 41 61 URI H.E.P STAGE -II (NHPC) Power 08/2005 1729.29 11/2009 03/2013 40 AGRA-ETAWAH VIA FATEHABAD AND 62 BAH Railways 04/1999 108.00 12/2009 NR 36* (NL) NCR Road Transport & 63 GWALIOR-JHANSI, NH-75 Highways 12/2003 604.00 12/2009 07/2013 43 64 BARH STPP(3X660MW) NTPC Power 12/2003 8692.97 12/2009 03/2016 75 TRANSMISSION SYSTEM ASSOCIATED 65 WITH PARBATI-III HEP Power 07/2006 557.24 01/2010 02/2013 37 66 REWARI-ROHTAK (NL),NR Railways 01/2004 149.38 02/2010 NR 32* Road Transport & 67 CHAMBAL BRIDGE, NH-76 (RJ-5) Highways 12/2003 275.00 02/2010 12/2013 46 NH CONNECTIVITY TO ICTT Road Transport & 68 VALLARPADAEU NH - SH Highways 03/2005 557.00 02/2010 12/2014 58 69 PANSPURA-KHARAGPUR 3D LINE Railways 09/2007 252.50 02/2010 12/2015 70 Implementation of FTTH, the state of the art 70 Access Network,procurement of gepon Telecommunications 12/2007 152.65 03/2010 NR 33* equipment Implementation of FTTH, the state of the art 71 access network.Procurement of gpon Telecommunications 12/2007 952.88 03/2010 NR 33* equipmant 72 SALKA ROAD -ANUPNAGAR LINE Railways 09/2006 324.90 03/2010 NR 31* DOUBLING 73 BHOPAL BINA 3D LINE DOUBLING Railways 09/2007 687.20 03/2010 NR 33* OFFSHORE GRID 74 INTERCONNECTIVITY PROJECT Petroleum 01/2007 740.02 03/2010 05/2013 38 IN MUMBAI HIGH 75 KULDA OCP ( Coal 01/2005 302.96 03/2010 03/2014 48 LTD) 76 UTRATIA-ZAFRABAD, NR (LINE Railways 04/2006 325.00 03/2010 06/2014 51 DOUBLING)

77 BALRAM OCP EXTENSION,MCL 8.00 Mty Coal 12/2007 172.08 03/2010 03/2015 60 2010 - 2011 Road Transport & 78 BRAHMPUTRA BRIDGE,NH NO-31 Highways 12/2003 217.61 04/2010 03/2014 47 CONSTRUCTION OF NEW 79 PROCESS COMPLEX MHN Petroleum 01/2007 2853.29 05/2010 01/2013 32 80 MUMBAI HIGH SOUTH REDEVELOPMENT Petroleum 10/2007 5713.03 05/2010 03/2013 34 PH-2 Road Transport & 81 DELHI/ HARYANA BORDER TO ROHTAK Highways 04/2007 486.00 05/2010 03/2013 34 Mechanization of coal handling facilities to 82 200000 DWT Vessels on DBFOT basis Shipping & Ports 02/2010 444.10 06/2010 NR 30* LAKHNAADON TO MP/MH BORDER,KM Road Transport & 83 596.75- Highways 12/2003 407.60 06/2010 12/2013 42 653.22 (NS-1/BOT/MP-2),NH7 Road Transport & 84 TRICHY - KORUR NH-67 Highways 03/2005 516.00 07/2010 03/2013 32 85 DEVELOPMENT OF B-46 CLUSTER FIELD Petroleum 06/2007 1436.21 07/2010 05/2013 34 86 TEHRI PUMPED STORAGE Power 07/2006 1657.00 07/2010 11/2016 76 PLANT(1000MW) 87 330 TPH BOILER-6 AND AUXILIARY Steel 07/2007 260.00 08/2010 01/2013 29 SYSTEM 88 NIMOO BAZGO HYDROELECTRIC Power 08/2006 611.01 08/2010 06/2013 34 PROJECT 89 DEVELOPMENT OF B-193 CLUSTER Petroleum 06/2007 3248.78 08/2010 12/2013 40 FIELDS PROTOTYPE FAST BREEDER 90 REACTOR (BHAVINI, 500 MWE) Atomic Energy 09/2003 3492.00 09/2010 NR 27* WESTERN REGION STRENGTHENING 91 SCHEME-V Power 12/2007 477.69 09/2010 03/2013 30 92 DEVELOPMENT OF B-22 CLUSTER FIELDS Petroleum 01/2007 2323.40 09/2010 04/2013 31 DHOLPUR - MORENA SECTION Road Transport & 93 (INCLUDING CHAMBOL BRIDGE) NH-3 Highways 12/2003 232.45 09/2010 06/2013 33 94 SUBANSIRI LOWER H.E.P (NHPC) Power 09/2003 6285.33 09/2010 03/2017 78

95 ERP implementation in BSNL on Turnkey basis Telecommunications 10/2009 384.00 10/2010 06/2013 32 96 PARBATI H.E.P. STAGE -III (NHPC) Power 10/2005 2304.56 10/2010 09/2013 35 97 JHAJJAR HISSAR PIPE LINE PROJECT Petroleum 11/2007 281.07 10/2010 12/2014 50 GSM equipment of 1625000Lines (2G) 98 325000 lines 3(G) MP Phase V.1 Telecom Telecommunications 11/2009 916.70 11/2010 NR 25* Circle 99 BARDHAMAN-KATWA (GC) Railways 04/2007 245.15 12/2010 NR 24* CONST. & DEV. OF 2 OFFSHORE

100 CONTAINER BERTHS & TERMINAL Shipping & Ports 11/2007 1228.00 12/2010 10/2013 34 101 KATIHAR - JOGBANI (GC)(NEFR) Railways 09/2001 100.00 12/2010 03/2015 51 D/O KAMARAJ DOMESTIC TER-PH-II 102 And EXP. ANNA INT. TER BLDG(K1) Civil Aviation 08/2008 1808.00 01/2011 NR 23* Road Transport & 103 SALEM - U / UNDRUPET(BOT -1/TN-06) NH Highways 03/2005 941.00 01/2011 02/2013 25 -68 104 C/o new Airport at Pakyong(Sikkim) Airport Civil Aviation 01/2009 309.46 01/2011 04/2013 27 Construction of berthing and allied facilities off 105 Tekra near Tuna,Kandla Port Trust Shipping & Ports 04/2005 882.00 02/2011 NR 22* 106 CHUTAK HYDRO-ELECTRIC PROJECT Power 08/2006 621.26 02/2011 01/2013 23 107 GADWAL - RAICHUR (NL), SCR Railways 04/1998 92.63 02/2011 02/2013 24 67.5 MW TG-5 AUX. S'TEM 108 EMERGENCY POWER Steel 07/2007 230.00 02/2011 03/2013 25 REQUIREMENT EXP. UNIT Bhavnagar-workshop facilities for 50 BG 109 coaches Railways 04/2006 117.36 03/2011 NR 21* POH per month (WR) 110 ELECTRIFICATION OF MORADABAD- Railways 12/2004 129.17 03/2011 NR 21* ROZA 111 North Tapti Gas Field Development Petroleum 07/2008 589.70 03/2011 03/2013 24 CONSTRUCTION OF 13 & 14 CARGO 112 BERTH AT KANDLA Shipping & Ports 12/2005 702.00 03/2011 03/2013 24 113 ASHOK EXPN.OCP -CCL (10 MTY) Coal 12/2007 471.66 03/2011 03/2013 24 114 Churi Benti UG Coal 08/2007 163.51 03/2011 03/2014 36 115 JHANJRA R-VI SEAM PSLW Coal 11/2006 287.18 03/2011 03/2015 48 116 JIRIBAM TO IMPHAL (TUPUI)(NL)(NEFR) Railways 04/2003 727.56 03/2011 03/2016 60

2011 - 2012 URANIUM ORE MINE and 117 PROCESSING PLANT AT Atomic Energy 09/2007 1106.29 04/2011 NR 20* TUMMALAPALLE COMPRESSOR STATIONS (KAILARAS 118 AND CHAINSA) Petroleum 11/2007 1167.00 04/2011 NR 20* ACQUISITION OF 4 NO. OF 119 ANCHOR HANDLING CUM Shipping & Ports 10/2007 359.44 04/2011 NR 20* SUPPLY VESSELS ADDITIONAL GAS PROCESSING FACILITY 120 AT Petroleum 02/2008 370.11 04/2011 01/2013 21 HAZIRA C/O INTEGRATED PASSENGER TER. 121 BULD. NSCBI AIRPORT Civil Aviation 08/2008 1942.51 05/2011 03/2013 22 122 Acquisition of two nos. of 120 B.P BY 079& 080 Shipping & Ports 04/2009 290.85 06/2011 NR 18*

Road Transport & 123 NEW MANGALORE PORT NH-17 AND 48 Highways 04/2000 196.50 06/2011 01/2013 19 124 BANGALORE METRO RAIL PROJECT Urban Development 05/2006 6395.00 06/2011 03/2013 21 Four Lanning from MP/Maharashtra Road Transport & 125 Border to nagpur, Nagpur bypass Highways 04/2010 1170.52 06/2011 12/2013 30 TR. SYSTEM ASSOCIATED WITH 126 CHAMERA III HEP Power 04/2008 297.37 07/2011 01/2013 18 127 BONGAIGAON THERMAL POWER Power 01/2008 4375.35 07/2011 10/2015 51 PROJECT Road Transport & 128 Surat- Dahisar(Six Lane) Km 263 to Km 502 Highways 02/2009 1693.75 08/2011 01/2013 17 DIESEL HYDROTREATOR 129 PROJECT AT MUMBAI REFINERY Petroleum 03/2009 3284.00 09/2011 02/2013 17 DIESEL HYDROTREATOR 130 PROJECT AT VISAKH REFINERY Petroleum 03/2009 3597.00 09/2011 03/2013 18 CONSTRUCTION OF 12 OFFSHORE 131 SUPPLY VESSELS(OSV) Petroleum 06/2007 736.65 09/2011 12/2013 27 Chilkaluripet-Vijaywada 6 lane (km 355 to Km Road Transport & 132 434.15) Highways 05/2009 572.30 10/2011 06/2013 20 Road Transport & 133 Gurgaon-Kotputli Km 42.70 to 54.4 Km Highways 04/2009 1673.70 10/2011 06/2013 20 Road Transport & 134 Chennai-Tada(Six lane) Highways 04/2009 353.37 10/2011 03/2014 29 Road Transport & 135 Panipat-Jalandhar 6 lane(Km 96 to 387.1 km) Highways 05/2009 1108.00 11/2011 08/2013 21 136 TR. SYSTEM ASSOCIATED WITH RAMPUR Power 02/2009 184.19 11/2011 09/2013 22 HEP NORTHERN REGION 137 SYSTEM STRENGHTENING Power 02/2009 509.66 11/2011 12/2013 25 SCHEME-XVIII NORTHERN REGION 138 SYSTEM Power 02/2009 520.48 11/2011 12/2013 25 STRENGHTENING SCHEME-XV 139 Dakshin-barasal-lakshmikantapur Railways 04/2009 259.51 12/2011 NR 12* 140 Acquisition of Two nos. of 3060 DWT Shipping & Ports 04/2009 277.03 12/2011 NR 12* 141 EXPANSION OF IISCO STEEL PLANT Steel 02/2008 14443.00 12/2011 NR 12* 142 EXPANSION OF Steel 01/2008 6325.00 12/2011 NR 12* ADDITIONAL GAS PROCESSING UNITS AT 143 URAN Petroleum 10/2008 1797.35 12/2011 01/2013 13 144 MANDARHILL-DUMKA-RAMPURHAT Railways 04/1995 184.00 12/2011 03/2013 15 (NL ),ER

145 Bailadila Iron Ore Project Deposit- 11B (NMDC) Steel 01/2007 295.89 12/2011 03/2013 15 146 Ghutiasharif-Canning (ER) Railways 04/2009 189.97 12/2011 11/2013 23 KARANPUR MORADABAD- 147 KASHIPUR- RUDRAPUR PIPELINE Petroleum 07/2009 238.68 01/2012 01/2013 12 PROJECT PHASE-I SETTING UP OF LNG 148 REGASIFICATION TERMINAL AT Shipping & Ports 03/2009 3500.00 01/2012 02/2013 13 PUTHUVYPEEN COCHIN 149 MRPL Phase-III Expansion Petroleum 08/2008 12412.00 01/2012 03/2013 14 150 RAMPUR HEP(412 MW) Power 01/2007 2047.03 01/2012 02/2014 25 Road Transport & 151 Armur to kadloor yellareddy Highways 02/2010 390.56 02/2012 01/2013 11 765 KV SYSTEM FOR CENTRAL 152 PART OF NORTHERN GRID PART-I Power 02/2009 1347.32 02/2012 03/2013 13 NORTHERN REGION 153 SYSTEM Power 02/2009 410.29 02/2012 12/2013 22 STRENGHTENING SCHEME-XIX Bhuj-Naliya(GC) with extension from naliya to 154 Vayor (WR) Railways 04/2008 318.24 03/2012 NR 9* 155 SHANTIKHANI LONGWALL PROJ-SCCL Coal 10/2006 249.03 03/2012 NR 9* VKPL UPGRADATION AND LAYING OF SPURLINE (TO 156 BHILWARA AND Petroleum 12/2009 463.32 03/2012 NR 9* CHITTORGARH) DABHOL-BANGALORE PIPELINE PROJECT 157 PHASE-I Petroleum 06/2009 4543.43 03/2012 NR 9* 158 JIND-SONEPAT (NL),NR Railways 01/2004 190.81 03/2012 NR 9* JAYANAGAR-DARBHANGA-NARKATIA 159 GANJ(GC),ECR Railways 04/1997 233.00 03/2012 02/2013 11 160 Tinpahar - Sahibganj (ER) Railways 04/2008 167.73 03/2012 02/2013 11 DELHI CONVERGENT BILLING AND CRM 161 PE- Telecommunications 02/2006 229.41 03/2012 02/2013 11 5834 MANSI-PURNIA (EXTENSION OF 162 MANSI- SAHARSA) GAN ECR Railways 04/1996 114.01 03/2012 03/2013 12 KADUR-CHIKMAGALUR-SAKLESHPUR 163 (NL),(SWR) Railways 04/1996 157.00 03/2012 03/2013 12 164 KOSI BRIDGE (NL), ECR Railways 04/2002 323.41 03/2012 03/2013 12 165 Ratlam-Mhow-Khandwa-Akola (GC) Railways 04/2008 603.04 03/2012 03/2013 12 TUTICORIN THERMAL POWER PROJECT- 166 2X500 MW Coal 05/2008 4904.54 03/2012 03/2014 24 167 North Urimari OCP Coal 12/2007 179.87 03/2012 03/2014 24

168 MANUGURU OC-II EXTENSION PHASE-II Coal 03/2010 181.19 03/2012 03/2014 24 169 ANANTA OC EXPANSION PH-III (15.0 Mty) Coal 08/2008 207.28 03/2012 03/2014 24 170 Tapin OCP Coal 08/2008 264.68 03/2012 03/2014 24 NIGAHI OC EXPANSION PROJECT 10 MTY 171 TO Coal 10/2007 259.40 03/2012 03/2015 36 15 MTY, SINGRAULI 172 RAMAGUNDAM OC-II EXTENSION Coal 12/2009 418.97 03/2012 03/2015 36 2012 - 2013 PIPELINE FOR TRANSFER OF LPG 173 FROM BPCR/HPCR TO URAN LPG Petroleum 08/2009 246.81 04/2012 NR 8* PLANT SINGLE POINT MOORING FACILITY(SMP) 174 PROJECT Petroleum 07/2010 1043.57 04/2012 01/2013 9 175 System Strengthening -X of SR Power 12/2009 276.61 04/2012 03/2013 11 176 Assam gas Cracker project Petrochemicals 04/2006 5460.61 04/2012 12/2013 20 Road Transport & 177 Kishangarh-Ajmer-Beawer Highways 11/2009 795.00 05/2012 02/2013 9 Construction of New International Terminal 178 Building(Goa) Civil Aviation 05/2010 335.61 05/2012 03/2013 10 765KV System for Central part of Northern 179 Region Power 11/2009 1075.12 05/2012 06/2013 13 Grid - Part-III 180 Augmentation of Iron Ore Storage in RMHP Steel 05/2008 480.00 05/2012 06/2013 13 Road Transport & 181 Pune-sholapur,pkg1 Highways 11/2009 1110.00 05/2012 10/2013 17 182 System Strengthening -XII of SR Power 02/2010 232.34 06/2012 03/2013 9 Road Transport & 183 MP/Maharashtra Border-Dhula Highways 12/2009 835.00 06/2012 03/2013 9 Integrated crude Oil handling facilities at 184 Paradip(2nd SPM) Petroleum 12/2009 1492.33 06/2012 03/2013 9 765KV System for Central part of Northern 185 Region Power 07/2009 1736.36 06/2012 03/2013 9 Grid - Part-II 186 ADDITIONAL DEV. OF D-1 FIELD Petroleum 01/2010 2163.64 06/2012 06/2013 12 187 102 MW WIND POWER PROJECT Petroleum 07/2010 1106.00 06/2012 03/2014 21 188 NANGALDAM-TALWARA(NL),NR Railways 03/1981 37.68 07/2012 NR5* 189 Polypropylene unit Petroleum 05/2009 1803.78 07/2012 NR 5* 190 BNPL SPURLINE (UTTRANCHAL AND Petroleum 12/2009 540.92 07/2012 NR 5* PUNJAB) PIMPALGAON-NASIK-GONDE, NH-3 Road Transport & 191 (NHDP- PHASE-III) Highways 03/2005 940.00 07/2012 06/2013 11 Road Transport & 192 LUCKNOW-RAIBAREILI Highways 07/1999 635.90 07/2012 07/2014 24

193 MAGADH OC (CCL) Coal 08/2008 469.78 07/2012 03/2016 44 194 MOUDA STPP Power 11/2008 5459.28 08/2012 03/2013 7 Up-gradation of Konaban GGS and Pipeline Grid 195 Project, Tripura Petroleum 07/2008 288.04 08/2012 05/2013 9 System Strengthening in NR for 196 SASAN & MUNDRA (UMPP) Power 12/2009 1216.83 08/2012 12/2013 16 SUPPLIMENTARY TRANSMISSION 197 ASSOCIATED WITH DVC AND Power 08/2008 2360.95 08/2012 12/2013 16 MAITHON RBC 765 KV POOLING STATION AND 198 NETWORK WITH DVC AND Power 08/2008 7075.33 08/2012 12/2013 16 MAITHOB RBC 199 PARE HYDRO ELECTRIC PROJECT Power 12/2008 573.99 08/2012 09/2014 25 SIX LANNING OF Road Transport & 200 VADAKKANCHERRY Highways 02/2010 617.00 08/2012 03/2015 31 THRISSURESECTION(KM 240- 270KM) Gujarat/Maharashtra BorderSurat-Hazira Port Road Transport & 201 Section Highways 03/2010 1509.10 09/2012 03/2013 6 MUMBAI HIGH NORTH DEVELOPMENT 202 PHASE- II Petroleum 01/2009 7133.39 09/2012 09/2013 12 203 Construction of 6 ETPs Petroleum 03/2009 302.26 09/2012 09/2013 12 204 COKE OVEN BATTERY NO. 4 PHASE-II Steel 08/2007 108.00 10/2012 03/2013 5 INTERCONNECTION BETWEEN ELECTTRICAL GRIDS OF 205 INDIA AND BANGLADESH - Power 10/2010 160.32 10/2012 03/2013 5 INDIAN PORTION Road Transport & 206 Hyderabad-Vijaywada Km. 40 to 221.50 Km Highways 04/2010 1740.00 10/2012 03/2013 5 207 VINDHYACHAL STTP STAGE-IV Power 01/2009 5915.00 10/2012 03/2013 5 208 RIHAND STTP STAGE-III (2X500MW) Power 01/2009 6230.81 10/2012 11/2013 13 TR. SYSTEM ASSOCIATED WITH 209 MUNDRA ULTRA MEGA POWER Power 10/2008 4824.12 10/2012 12/2013 14 PROJECT Road Transport & 210 AMRITSAR-PATHANKOT Highways 05/2010 705.00 11/2012 06/2013 7 211 PARADIP REFINERY PROJECT Petroleum 02/2009 29777.00 11/2012 09/2013 10 212 Development of SB-14 field Petroleum 01/2011 410.44 11/2012 10/2013 11 WADNER-DEVDHARI(NS-60/MH)(KM 94- Road Transport & 213 123 Highways 02/2011 193.45 11/2012 12/2013 13 KM) Northern Region Transmission Strengthening 214 Scheme Power 03/2010 965.58 11/2012 12/2013 13

215 EASTERN REGION TRANSMISSION Power 07/2010 1272.80 11/2012 03/2014 16 SYSTEM-III Transmission System of Vindhuachal -IV & 216 Rihand Power 03/2010 4672.99 11/2012 03/2014 16 -III Gen. Proj. 217 CHANDIGARH-LUDHIANA(NEW BG Railways 07/1998 248.44 12/2012 01/2013 1 LINE ),NR 218 DEOGHAR - SULTANGANJ (INL), ER Railways 04/2000 138.00 12/2012 02/2013 2 Road Transport & 219 Jaipur-Tonk-Deoli Highways 06/2010 792.06 12/2012 03/2013 3 220 EXPANSION OF STEEL PLANT Steel 06/2009 2875.00 12/2012 03/2013 3 TRANSMISSION SYSTEM ASSOCIATED 221 WITH SASAN ULTRA MEGA POWER Power 12/2008 7031.88 12/2012 06/2013 6 PROJECT Acquisition of 4 nos of 82000 DWT kamsavmax Bulk carriers from M/S Jiangsu Eastern Heavy 222 Industries Shipping & Ports 08/2010 612.72 12/2012 10/2013 10 Bandel-Naihati new rail bridge in 223 replacement of jubilee bridge no.8 (ER) Railways 04/1999 207.52 12/2012 12/2013 12 Trans. System associated with 224 PALLATANA GBPP & BPTS. Power 02/2010 2144.00 12/2012 12/2013 12 KOCHI-KOOTANAD BANGALORE 225 MANGALORE PIPELINE PROJECT Petroleum 06/2009 2915.00 12/2012 03/2014 15 226 KAKATIYA LONGWALL Coal 12/2008 453.63 12/2012 03/2015 27 227 Katakhal to Bhairabi Railways 04/1998 227.90 12/2012 03/2015 27

NR: Not reported by the project implementation agencies

* Delay (in months) as on 01.01.2013 for projects where anticipated date of commissioning is not reported

ANNEXURE - II

ANNEXURE REFERRED TO IN REPLY TO PART (d) OF THE RAJYA SABHA UNSTARRED QUESTION NO. 1395 DUE FOR ANSWER ON 08.03.2013 Project-wise details of cost overruns in 168 completed projects - 11th Plan

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) Civil Aviation MODULAR EXPANSION OF TERMINAL 1 BUILDING AT AMRITSAR AIRPORT 07/2005 12/2007 80.00 80.20 0.20 0.25

C/O OF APRON & EXT. OF RUNWAY AT 2 GUWAHATI AIRPORT 09/2006 06/2008 45.75 46.58 0.83 1.81 EXP. APRON & CONST AT V.S.AIRPORT 3 BLAIR 05/2007 03/2009 22.21 27.21 5.00 22.51 EXTENSION AND STRENTHENING OF 4 EXISTING RUNWAY AT SILCHAR AIRPORT 11/2001 03/2007 30.93 41.49 10.56 34.14 EXTEN. OF TER.BUILDING at Srinagar 5 Airport 03/2003 12/2006 60.07 77.48 17.41 28.98 C/O OF NEW DOMESTIC ARRIVAL BUILDING AT 6 AHMEDABAD AIRPORT 03/2005 05/2007 36.87 56.94 20.07 54.43 CONSTRUCTION OF NEW INTERNATIONAL 7 TERMINAL BUILDING 10/2006 12/2008 245.58 295.00 49.42 20.12 TOTAL 521.41 624.90 103.49 Coal 8 HINGULA-II OC EXPN 02/2003 03/2005 87.10 89.78 2.68 3.08 9 KTK-8 and 8A INCL UG 12/1995 01/2002 34.51 41.54 7.03 20.37 10 KOYAGUDEM OCP-II 03/2004 11/2010 43.25 58.89 15.64 36.16 11 JVR:(OCP-I) SATTUPALLI 12/2002 03/2008 43.44 91.24 47.80 110.04 EXPANSION OF MINE-II (10.5 MTPA TO 15.0 12 MTPA) (NLC) 10/2004 06/2009 2161.28 2295.93 134.65 6.23 13 BARSINGSAR TPS (2 125MW) (NLC) 12/2004 06/2009 1114.18 1868.71 754.53 67.72

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) BARSINGSAR MINE 2.10 MTPA LIGNITE 14 (NLC) 12/2004 06/2009 254.07 1687.78 1433.71 564.30 TOTAL 3737.83 6133.87 2396.04 Health & Family Welfare NORTH EAST INDIRA GANDHI INST-ITUTE OF 15 HEALTH AND MS 05/1986 03/1999 71.18 443.15 371.97 522.58 Mines SECOND PHASE EXPANSION OF NALCO MINE,REFINERY,SMELTER AND CAPTIVE POWER PLANT 16 10/2004 12/2008 4091.51 4401.76 310.25 7.58 Petroleum MSQ UPGRADATION PROJECT AT BARAUNI 17 REFINERY 04/2008 04/2010 1492.00 1525.00 33.00 2.21 18 CHENNAI-BANGALORE PIPELINE 07/2007 07/2009 232.11 273.00 40.89 17.62 C2-C3 AND LPG RECOVERY FROM LNG,

19 DAHEJ (ONGC) 12/2003 05/2008 900.92 976.08 75.16 8.34 DAHEJ-HAZIRA-URAN PIPELINE 20 PROJECT(GAIL) 12/2002 07/2005 1416.00 1521.23 105.23 7.43 Integrated Sugar, Ethanol, Cogen Power Plant at 21 Sugauli and Lauriya 06/2009 12/2010 613.54 727.88 114.34 18.64 22 MDPL PROJECT(HPCL) 04/2004 08/2007 1623.84 1756.93 133.09 8.20 23 DADRI- PANIPAT R-LNG SPUR PIPELINE 06/2005 06/2008 250.66 389.00 138.34 55.19 24 BINA DESPATCH TERMINAL 05/2007 12/2009 490.71 639.11 148.40 30.24 CRUDE OIL RECEIPT FACLITIES (KOCHI 25 REFINERIES LTD) 03/2004 05/2007 622.82 821.00 198.18 31.82 PARADIP-HALDIA CRUDE OIL PIPLINE 26 (IOCL) 03/2004 03/2006 1178.00 1380.00 202.00 17.15 EXPANSION OF PANIPAT REFINERY FROM 27 12 TO 15 MMTPA 06/2005 03/2008 806.00 1100.00 294.00 36.48

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) LUBE OIL BASE STOCK QUALITY 28 UPGRADATION AT MUMBAI REFINERY 10/2006 04/2009 638.90 1030.00 391.10 61.21 CLEAN FUELS PROJECT AT VISAKH 29 REFINERY(HPCL) 04/2003 05/2006 1635.00 2147.79 512.79 31.36 GREEN FUELS AND EMISSION CONTROL 30 (HPCL) MUMBAI REF. 10/2002 06/2009 1152.00 1731.01 579.01 50.26 DEVELOPMENT OF BASSEIN EAST 31 (ONGCL) 04/2003 03/2006 985.17 1688.38 703.21 71.38 RESIDUE UPGRADATION AND MS/HSD QUALITY IMPROVEMENT PROJECT AT 32 GUJRAT 01/2007 N.A. 5693.00 6825.00 1132.00 19.88 ADDL DEV. OF BASIN FIELD AND INST. OF 33 IIND BOSTER COMP. ONGC 03/2004 01/2008 1770.69 2937.01 1166.32 65.87 34 Pipeline Replacement project-2 12/2007 05/2011 2553.28 3796.21 1242.93 48.68 INST. OF FACILITIES FOR IMPROVEMENT IN 35 DIESEL QUALITY (IOCL) 11/2005 04/2009 1876.00 3155.00 1279.00 68.18 MUMBAI HIGH SOUTH DEVELOPMENT 36 (ONGCL) 10/2001 07/2007 5255.97 6579.25 1323.28 25.18 CAPACITY EXP. CUM MODERNISATION PH- 37 II 09/2009 12/2009 2591.80 3941.41 1349.61 52.07 NAPHTHA CRACKER & DOWNSTREAM 38 POLYMER PROJECT AT PANIPAT 04/2006 09/2009 12138.00 15292.00 3154.00 25.98 TOTAL 45916.41 60232.29 14315.88

Power EAST-WEST TRANSNISSION CORRIDOR 39 STRENGTHNING SCHEME 06/2006 06/2009 803.70 803.76 0.06 0.01 SYSTEM STRENGTHENING IN SOUTH- WESTERN PART OF NORTHERN GRID 40 (PART-B) SCHEME 10/2006 10/2009 150.26 153.24 2.98 1.98 TR. SYSTEM FOR STARTUP POWER TO DVC 41 AND MAITHON RB GEN. PROJ. 04/2008 04/2010 290.49 299.08 8.59 2.96

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) NORHEN REGION SYSTEM 42 STRENGTHENING-II (P.GRID) 01/2004 10/2006 247.78 260.15 12.37 4.99 43 STRENGTHING-V OF SR GRID 06/2004 06/2007 92.12 107.07 14.95 16.23 BINA-NAGDA TRANSMISSION SYSTEM 44 (P.GR.) 07/2004 03/2008 266.93 294.25 27.32 10.23 NORTHERN REGION SYSTEM 45 STRENGTHENING - I (P.GRID) 01/2004 07/2006 271.80 310.79 38.99 14.35 46 VINDHYACHAL-KORBA (P.GRID) 02/2004 02/2007 164.02 212.53 48.51 29.58 NORTHERN REGION SYSTEM 47 STRENGTHING SCHEME - III (P.GR.) 07/2004 03/2008 230.52 280.14 49.62 21.53 SIPAT STAGE-II TRANSMISSION SYSTEM 48 (PGCIL) 08/2004 08/2007 601.90 653.92 52.02 8.64 RAPP 5 and 6 TRANSMISSION SYSTEM 49 (PGCIL) 06/2005 03/2008 499.45 556.86 57.41 11.49 SYSTEM STRENGTHENING - VII OF 50 SOUTHERN REGION (PGCIL) 05/2005 07/2009 279.30 340.14 60.84 21.78 51 VINDHYACHAL STPP ST.-III (NTPC) 02/2003 08/2007 4125.00 4201.50 76.50 1.85 KAHALGOAN-II(PH.-II) TRANSMISSION 52 SYSTEM (PGCIL) 01/2005 10/2007 464.02 549.82 85.80 18.49 VINDHYACHAL STAGE -III TRANSMISSION 53 SYSTEM (P.GR.) 07/2004 07/2007 596.47 692.41 95.94 16.08 TRANSMISSION SYSTEM - TEESTA-V 54 HEP(3*170) (P.GRID) 12/2004 05/2008 208.75 315.58 106.83 51.18 NEYVELI TS-II TRANSIMISSION SYSTEM 55 (PGCIL) 01/2005 12/2007 691.83 913.33 221.50 32.02 56 TEESTA HE PROJECT STAGE-V (NHPC) 02/2000 02/2007 2198.04 2495.29 297.25 13.52 TR.SYSTEM ASSOCIATED WITH TALA 57 HEP.(P.GRID) 06/2003 06/2006 1980.70 2483.88 503.18 25.40 SIPAT TRANSMISSION SYSTEM STAGE-1

58 (P.GR.) 12/2003 02/2007 1454.79 2208.49 753.70 51.81

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) KAHALGAON-II(PHASE-I) TRANSMISSION 59 SYSTEM (PGCIL) 10/2004 10/2007 1771.93 2967.85 1195.92 67.49 TOTAL 17389.80 21100.08 3710.28 Railways 60 THANE-TURBHE-NERUL-VASHI(MTP) 05/1992 03/2000 403.39 403.92 0.53 0.13 GOOTY- RENIGUNTA PATCH DOUBLING PH- 61 II (DL) (SCR) 05/2002 N.A. 304.50 306.00 1.50 0.49 62 SETTING UP OF N.C.R. 04/1996 N.A. 69.96 71.53 1.57 2.24 63 KURLA PSR. TRM.FAC.PH2S 04/1996 12/1999 34.94 36.53 1.59 4.55 64 GONDA - MANKAPUR,NER 04/2004 N.A. 48.01 52.01 4.00 8.33 65 CONST.OF 50 LOCO SHEDS 04/1997 03/2003 15.26 23.88 8.62 56.49 66 KENGERRI RAMANAGARAM 03/1996 N.A. 45.00 58.84 13.84 30.76 67 AMROHA- MORADABAD,NR 04/1999 N.A. 49.00 65.38 16.38 33.43 68 ECOR:KHURDA ROADPURI 01/2001 N.A. 47.28 66.85 19.57 41.39 69 DIVA-KALYAN 5TH/6TH LINE 09/2000 N.A. 47.70 69.75 22.05 46.23 70 REBUILDING KRISHNA BDG. 03/2000 N.A. 18.06 45.76 27.70 153.38 2ND BRIDGE ON BIRUPA AND MAHANADI(B 71 and S) (ECOR) 04/1997 N.A. 93.10 122.00 28.90 31.04 ELECTRIFICATION OF ERNAKULAM- 72 TRIVANDRUM (RE) 05/2001 08/2003 162.03 196.15 34.12 21.06 73 JAFRABAD-UTRATIA PHASE-II,(LD)(NR) 04/2000 03/2005 64.20 100.42 36.22 56.42 KUTTIPURAM-CALICUT INCLD. SHORANUR- M- 74 LORE (DL) (SR) 03/2001 N.A. 178.76 219.94 41.18 23.04 75 KANPUR-PANKI3RD LINE,NCR 04/1995 12/2000 20.00 63.36 43.36 216.80 76 PUNTAMBA- SHIRDI 02/2002 N.A. 32.00 79.77 47.77 149.28 77 ROHTAK- JAKHAL 04/2003 12/2006 47.49 98.00 50.51 106.36 78 WHEELSHOPCAPAUGMENT,WAP 03/1989 03/1996 47.31 99.44 52.13 110.19 79 MADURAI-RAMESWARAM(GC).SR 07/1998 07/2006 193.18 246.97 53.79 27.84 UTRATIA-CHANDRAULI & SULTANPUR- 80 BANDHUAN KALAN,(LD)(NR) 04/1998 12/2004 47.12 102.65 55.53 117.85

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%)

81 HAPUR-KANKATHER (LD),NR 04/2003 03/2007 106.64 166.61 59.97 56.24 CUDDLORE - SALEM VIA VRIDHACHALAM 82 (GC) (SR) 04/1999 N.A. 198.68 261.10 62.42 31.42 83 ARA-SASARAM(NL),ECR 07/1997 03/2006 120.00 189.14 69.14 57.62 KATAPADI-PAKLA-TIRUPTI(GC) 84 ELECTRIFICATION ASP 04/1992 03/2007 130.00 202.66 72.66 55.89 PRATAPNAGAR-CHOTA UDAIPUR (GC) 85 (WR) 04/2005 03/2008 148.61 227.52 78.91 53.10 86 TITLAGARH-LANJIGARH (DL) ECOR 04/1997 N.A. 66.61 160.00 93.39 140.20 87 NIMACH-RATLAM(GC),WR 04/1993 03/1996 65.00 171.73 106.73 164.20 KHARAGPUR- BHUBANESWAR(RE) INCL. 88 ADRA-MIDNAPORE (RE) 03/1995 03/2000 258.58 371.01 112.43 43.48 89 GUNTUR-GUNTAKAL-KALLURU(GL)(SCR) 04/1992 N.A. 458.45 573.12 114.67 25.01 90 ABOHAR- FAZILKA, NR, NL 09/2001 03/2009 86.44 209.57 123.13 142.45 91 SURENDRANAGAR-BHAVNAGAR(GC),WR 03/1997 03/2004 437.40 563.25 125.85 28.77 TIRUMALAI-VELLACHERI EXTN. OF MRTS 92 (MTP) 04/1996 03/2002 605.70 733.39 127.69 21.08 93 MADURAI-DINDIGUL,(LD)(SR) 04/2003 N.A. 73.19 202.72 129.53 176.98 94 AMBALA-MORADABAD(RE) 03/1993 03/1998 152.21 283.00 130.79 85.93 95 GANDHIDHAM-PALANPUR(GC),WR 04/1998 N.A. 318.00 451.52 133.52 41.99 Sadulpur-Bikaner and Ratangarh-Degana 96 Gauge Canvession (NWR) 04/2007 03/2011 643.36 803.39 160.03 24.87 97 HOSPET-GUNTAKAL(LD),SCR 03/1996 12/1999 105.22 268.00 162.78 154.70 98 DELHI-REWARI GC NWR RVNL 04/1995 03/2007 42.27 212.30 170.03 402.25 99 SHIMOGA-TALAGUPPA (SWR), GC 12/1992 N.A. 46.00 218.00 172.00 373.91 100 TRICHY MANAMADURAI (GC) (SR) 02/2000 N.A. 175.00 347.48 172.48 98.56 DEOGHAR-DUMKA NEW BG LINE 101 (DOUBL.)(ER) 02/1999 12/2006 180.73 358.00 177.27 98.09 102 BORIVILI-VIRAR QUADRUPLING,WR (MTP) 04/1995 03/2004 325.47 504.22 178.75 54.92 103 REWARI-SADULPUR-HISSAR (GC),NWR 04/1997 N.A. 198.96 410.00 211.04 106.07 104 BHILDI-SAMDARI (GC) 04/1999 N.A. 244.74 479.00 234.26 95.72

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) 105 HOTGI-GADAG(GC),SWR 04/1994 03/1999 180.00 417.07 237.07 131.71 RAIL COACH FACTORY,KAPURTHALA PH -II 106 (NR) 08/1985 03/1992 180.00 463.69 283.69 157.61 107 PURNA-AKOLA (G.C), SCR 02/2000 N.A. 228.00 518.08 290.08 127.23 108 KUMARGHAT-AGARTALA(NL),NEFR 04/1996 03/2007 575.00 879.99 304.99 53.04 AJMER-CHITTAURGARH -UDAIPUR-UMRA

109 (GC),NWR 09/1996 N.A. 262.00 567.23 305.23 116.50 110 VILLUPURAM-KATPADI (GC)(SR) 02/2000 N.A. 175.00 513.16 338.16 193.23 RAJKOT-VERAVAL (GC) AND WANSJALIYA- JETALSAR GC AND VERAVAL SOMNATH 111 NL(WR) 04/1992 03/1996 112.53 464.50 351.97 312.78 AJMER-PHULERA-RINGUS-REWARI 112 (G.C.)(NWR)(RVNL) 04/2005 03/2008 352.00 718.30 366.30 104.06 113 DHARMAVARAM-PAKALA (GC), SCR 04/1997 N.A. 200.00 610.07 410.07 205.04 TAHANJAVUR-VILLUPURAM GAUGE 114 CONVERSION (G.C)(SR) 10/2001 N.A. 223.00 665.00 442.00 198.21 NEW JALPAIGURI-NEW BONGAIGAON 115 (GC),NEFR 11/1998 03/2003 536.85 1010.00 473.15 88.13 116 MIRAJ-LATUR ROAD(GC),CR 04/1993 03/2001 225.00 816.40 591.40 262.84 DAITARI-KEONJHAR-BANSPANI NEW 117 LINE(ECOR) 03/1993 12/1997 242.50 910.00 667.50 275.26 RESTORATION WITH GAUGE CONVERSION OF 118 SILIGHAT TOWN 04/1993 12/2009 100.41 955.29 854.88 851.39 119 LUMDING-SILCHAR(GC),NEFR 04/1996 03/2009 648.00 4074.10 3426.10 528.72 TOTAL 11395.84 24478.76 13082.92 Road Transport & Highways GARAMORE TO BAMANBORE (PACK.-III) 120 PH.-II, KM.254-KM.182.60 12/2003 11/2007 360.70 380.70 20.00 5.54 BHILADI TO PORBANDAR (PACK..-I) PH.-II 121 KM.52.5 TO 2.0, NH-8B 12/2003 02/2005 255.96 276.07 20.11 7.86

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) GOGUNDA TO UDAIPUR (RJ-3) NH.76 122 KM.104 TO KM.73 12/2003 08/2007 266.00 288.06 22.06 8.29 SWAROOPGANJ TO BAKARIA (RJ-1) PH.II, 123 KM.29-KM.0 (NH-76) 12/2003 04/2010 220.00 243.11 23.11 10.50 RJ/MP BORDER TO KOTA(RJ-11) NH-76, 124 KM.579 TO KM.509 12/2003 03/2008 311.35 349.59 38.24 12.28 125 ETAWAH BYPASS, KM.307.5-KM.321.1, NH-2 04/2000 10/2003 89.50 132.18 42.68 47.69 RAJASTHAN/MP BORDER TO KOTA(RJ-10), 126 KM.509 TO KM.449.15, NH-76 12/2003 04/2008 378.22 430.21 51.99 13.75 RJ/MP BORDER TO KOTA(RJ-9) NH-76, 127 KM.449.15 TO KM.406 12/2003 04/2008 297.72 359.43 61.71 20.73 KOTA TO CHITTORGARH (RJ-7) NH-76 128 KM.316 TO KM.253 12/2003 04/2008 440.50 503.66 63.16 14.34

129 CHITTORGARH BYPASS,KM 253-213 NH-76 12/2003 04/2008 384.25 447.90 63.65 16.56 GAGODHAR-GARAMORE(PK-IV,NH15) KM 130 245 TO 281.3 AND 308 TO 254 12/2003 11/2007 412.78 479.54 66.76 16.17 BAKARIA TO GOGUNDA(RJ-2) NH-76 131 PHASE-II KM.74-KM.30 12/2003 04/2008 457.00 530.90 73.90 16.17 DEESA TO RADHANPUR (PACK.-VI) PHASE- II, 132 KM.372.60-458, NH-14 12/2003 02/2005 399.89 479.74 79.85 19.97 KOTA TO CHITTORGARH (RJ-8) NH-76 133 KM.381 TO KM.316 12/2003 04/2008 446.40 528.44 82.04 18.38 COCHIN PORT, NH-47 (PORT 134 CONNECTIVITY) KMS 348 - KMS 358 04/2000 08/2006 106.00 193.00 87.00 82.08 JETPUR TO BHILADI (PACK. -II) PH.-II 135 KM.117 TO.52.50, NH-8B 12/2003 11/2007 399.89 508.50 108.61 27.16 RAJKOT BYPASS AND GONDAL JETPUR 136 (PACKAGE-VII) PHASE-II 12/2003 03/2008 265.00 388.09 123.09 46.45 DELHI-GURGAON SECTION (OTHERS) 137 KM.143-KM.42 (NH-8) 04/2000 07/2005 555.00 710.00 155.00 27.93

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) TOTAL 6046.16 7229.12 1182.96 Shipping & Ports 138 TERMINAL AT GAIGHAT 03/2002 03/2004 25.50 30.29 4.79 18.78 139 MOD.OF ORE HANDLING FAC 10/1999 02/2003 37.01 42.82 5.81 15.70 ACQ.OF 700 PASS-CUM 160MT CARGO 140 VESSEL FR.HINDUSTAN SHIPYARD 06/2000 02/2004 129.62 139.50 9.88 7.62 141 DEVE. OF INF CARGO JETTY 03/2004 01/2006 23.00 33.00 10.00 43.48 142 CONS 10TH CARGO BERTH 10/2002 03/2005 47.89 68.06 20.17 42.12 REPLACEMENT OF 4NW BARGE 143 UNLOADERS 12/2004 03/2007 34.07 80.00 45.93 134.81 RAIL CONNECTIVITY TO ICTT AT 144 VALLARPADAM 03/2007 04/2009 245.67 298.17 52.50 21.37 ACQUISITION OF 4 NOS. OF 115000 DWT 145 CRUDE OIL CARRIERS 08/2008 04/2011 1108.12 1238.88 130.76 11.80 TOTAL 1650.88 1930.72 279.84 Steel 146 HCI REGEN. PL./L-II AND CRM 01/2006 06/2007 35.92 35.99 0.07 0.19 COMPUTERISED PROCESS CONTROL 147 SYSTEM OF SMS 2 08/2006 02/2008 30.61 30.91 0.30 0.98 148 REBUILIDING OF COKE OVEN BATTERY-10 03/2007 09/2009 416.50 436.54 20.04 4.81

COKE OVEN BATTERY NO. 4(PHASE-1) 149 (RINL) 12/2003 12/2006 286.63 355.21 68.58 23.93 150 AIR SEPARATION PLANT (ASU-4) 03/2008 N.A. 96.00 170.00 74.00 77.08 TOTAL 865.66 1028.65 162.99 Telecommunications 151 GLOBAL SWIT-CHING MODULE 04/2004 11/2006 36.78 44.31 7.53 20.47 GSM EQUIPMENT OF 1625K LINES(2G) & 152 325K LINES IN M.P PH-V.I 06/2008 08/2009 908.30 916.70 8.40 0.92 CMTS(PH-IV) GSM BASED NETWORK 153 EXPANSION PH-IV (BSNL)(HARYANA 12/2004 06/2005 185.00 200.00 15.00 8.11

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) 154 CAMP.CONS. C-DOT PROJ. 04/1994 08/1998 80.00 99.41 19.41 24.26 155 INNOV.SERV. FOR BUSINESS 03/2003 12/2004 33.00 55.00 22.00 66.67 156 GSM - RAE BARELI 04/2004 11/2006 34.09 57.09 23.00 67.47 157 CELL AND PKT. VOICE AND DATA 03/2003 12/2005 25.23 48.84 23.61 93.58 158 PROJECT-1 NIB-II IP INFRASTRUCTURE 11/2003 05/2006 250.00 275.00 25.00 10.00 DELHI EXP. OF 1250K LINES OF 2G/3G GSM 159 LINES 02/2007 12/2009 463.61 488.76 25.15 5.42 160 NIB-II PROJECT RURAL BROADBAND12/2007 02/2008 312.86 353.00 40.14 12.83 161 C/O T.GRAPH AND ADMN.OFFICE 03/1989 08/2004 7.74 48.82 41.08 530.75 GSM equipment of 1700000Lines (2G) 234100 lines 3(G)Karnataka Phase V.1 Telecom 162 Circle 10/2008 10/2009 677.75 719.90 42.15 6.22 GSM EQUIPMENT OF 1006280 LINES IN 163 TAMILNADU PH-4.5 06/2008 12/2008 409.21 483.54 74.33 18.16 164 EXPANSION OF 750K GSM LINES 10/2006 12/2008 168.33 278.16 109.83 65.25 165 PROJECT 2.2 OF NIB-II BROAD BAND RAS 11/2003 05/2006 350.00 520.85 170.85 48.81 GSM equipment of 1900000Lines (2G) 401700 lines 3(G)Tamil Nadu Phase V.1 Telecom 166 Circle 01/2009 N.A. 760.20 1100.00 339.80 44.70 TOTAL 4702.10 5689.38 987.28 Urban Development INLAND WATER TRANSPORT TERMINAL AT 167 PANDU, GUWAHATI 04/2002 03/2007 29.92 38.14 8.22 27.47 168 DELHI MRTS PHASE-II PROJECT 08/2005 06/2010 8676.00 18894.36 10218.36 117.78 8705.92 18932.50 10226.58

ANNEXURE - III

ANNEXURE REFERRED TO IN REPLY TO PART (d) OF THE RAJYA SABHA UNSTARRED QUESTION NO. 1395 DUE FOR ANSWER ON 08.03.2013

Project-wise details of cost overruns in 179 ongoing projects - 11th Plan

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) Atomic Energy PROTOTYPE FAST BREEDER REACTOR (BHAVINI, 500 1 MWE) 09/2003 09/2010 3492.00 5677.00 2185.00 62.57 2 KUDANKULAM APP (NPCIL) 12/2001 12/2008 13171.00 15824.00 2653.00 20.14 TOTAL 16663.00 21501.00 4838.00 Civil Aviation D/O KAMARAJ DOMESTIC TER-PH-II And EXP. ANNA 3 INT. TER BLDG(K1) 08/2008 01/2011 1808.00 2015.00 207.00 11.45 C/O INTEGRATED PASSENGER TER. BULD. 4 NSCBI AIRPORT 08/2008 05/2011 1942.51 2325.00 382.49 19.69 TOTAL 3750.51 4340.00 589.49 Coal 5 MANIKPUR OC EXPANSION (3.5 MTY) 12/2009 03/2014 321.42 321.50 0.08 0.02 6 BHUBANESWARI OCP, MCL (20.0 Mty) 12/2007 03/2017 490.00 490.10 0.10 0.02 TUTICORIN THERMAL POWER PROJECT- 2X500 7 MW 05/2008 03/2012 4904.54 4909.54 5.00 0.10 8 AMLAI OC EXPANSION SECTOR B (1.50 MTY) 11/2009 03/2016 150.59 198.59 48.00 31.87 9 MAGADH OC 20 MTY (CCL) 08/2008 07/2012 469.78 706.40 236.62 50.37 10 ADRIYALA SHAFT PROJECT 12/2009 03/2013 212.34 779.26 566.92 266.99 11 TPS-II EXPANSION (1470MW TO 1970MW) (NLC) 10/2004 06/2009 2030.78 3027.00 996.22 49.06 TOTAL 8579.45 10432.39 1852.94 Petrochemicals 12 Assam gas Cracker project 04/2006 04/2012 5460.61 8920.00 3459.39 63.35

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) Petroleum CONSTRUCTION OF NEW TERMINAL AT ENNORE 13 CHENNAI 01/2008 N.A. 224.00 299.00 75.00 33.48 RESITMENT OF MARKETING INSTALATION AT

14 VISAKH 01/2009 N.A. 756.00 898.00 142.00 18.78 15 North Tapti Gas Field Development 07/2008 03/2011 589.70 755.76 166.06 28.16 DIESEL HYDRO TREATMENT PROJECT,BRPL 16 DHALIGAON 06/2006 09/2009 1431.91 1690.13 258.22 18.03 17 IOR LAKWA - LAKHMANI (ONGCL) 09/2001 03/2007 345.10 663.69 318.59 92.32 18 REVAMPING OF WIN PLATFORM AT MH ASSET 05/2008 05/2010 333.40 656.51 323.11 96.91 19 IOR, RUDRASAGAR (ONGCL) 09/2001 03/2006 113.90 438.85 324.95 285.29 20 DEVELOPMENT OF B-22 CLUSTER FIELDS 01/2007 09/2010 2323.40 2920.82 597.42 25.71 21 PARADIP REFINERY PROJECT 02/2009 11/2012 29777.00 30426.00 649.00 2.18 HYDROCRACKER REVAMP AND SETTING UP A NEW 22 CCR AT MUMBAI REFINERY 04/2008 04/2013 825.00 1827.00 1002.00 121.45 23 IOR GELEKI (ONGCL) 09/2001 03/2007 390.09 1674.11 1284.02 329.16 24 DEV OF G1 AND GS-15 (ONGCL) 04/2003 04/2006 429.82 2218.01 1788.19 416.03 25 DEVELOPMENT OF B-193 CLUSTER FIELDS 06/2007 08/2010 3248.78 5633.44 2384.66 73.40 26 MUMBAI HIGH SOUTH REDEVELOPMENT PH-2 10/2007 05/2010 5713.03 8813.41 3100.38 54.27 CONSTRUCTION OF NEW PROCESS COMPLEX 27 MHN 01/2007 05/2010 2853.29 6326.40 3473.11 121.72 TOTAL 49354.42 65241.13 15886.71 Power TR. SYSTEM ASSOCIATED WITH CHAMERA III HEP 28 04/2008 07/2011 297.37 297.91 0.54 0.18 29 URI H.E.P STAGE -II (NHPC) 08/2005 11/2009 1729.29 1794.00 64.71 3.74 30 TRIPURA GAS BASED POWER PROJECT 07/2009 N.A. 421.01 623.44 202.43 48.08 31 NIMOO BAZGO HYDROELECTRIC PROJECT 08/2006 08/2010 611.01 936.00 324.99 53.19 32 KAIGA 3 and 4 TRANSMISSION SYSTEM (PGCIL) 03/2005 12/2007 596.45 1007.16 410.71 68.86 33 PARBATI H.E.P. STAGE -III (NHPC) 10/2005 10/2010 2304.56 2716.00 411.44 17.85

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) 34 TEESTA LOW DAM HEP, STAGE-IV (NHPC) 09/2005 09/2009 1061.38 1501.75 440.37 41.49 35 TUIRIAL HE PROJECT(NEEPCO) 07/1998 07/2006 368.72 913.63 544.91 147.78 36 MOUDA STPP 11/2008 08/2012 5459.28 6010.89 551.61 10.10 37 CHAMERA,STAGE-III (NHPC) 08/2005 08/2010 1405.63 2084.00 678.37 48.26 TEESTA LOW DAM STAGE III HYDROELECTRIC 38 POWER PROJECT (NHPC) 10/2003 03/2007 768.92 1628.39 859.47 111.78 VISHNUGAD PIPALKOTI HYDRO ELECTRIC PROJECT 39 08/2008 07/2014 2491.58 3422.44 930.86 37.36 40 KOTESHWAR HEP(THDC) 04/2000 04/2005 1301.56 2283.68 982.12 75.46 41 TEHRI PUMPED STORAGE PLANT(1000MW) 07/2006 07/2010 1657.00 2978.86 1321.86 79.77

42 KISHANGANGA HEP 07/2007 01/2016 2238.67 3642.00 1403.33 62.69 43 PARBATI HEP (NHPC) II 09/2002 09/2009 3919.59 5524.00 1604.41 40.93 44 SUBANSIRI LOWER H.E.P (NHPC) 09/2003 09/2010 6285.33 10667.00 4381.67 69.71 TOTAL 32917.35 48031.15 15113.80 Railways Ramanagram-Mysore doubling with electrification of 45 Kengesii- Musore (SWR) 04/2007 03/2013 482.00 482.70 0.70 0.15 46 KOSI BRIDGE (NL), ECR 04/2002 03/2012 323.41 341.41 18.00 5.57 47 RAIL-CUM-ROAD BRIDGE AT MUNGER (NL), ECR 04/2002 03/2009 921.00 981.00 60.00 6.51 48 KISHANGANJ JALALGARH, NL, NEFR 04/2008 N.A. 282.92 359.86 76.94 27.19 49 RAJATGARH-BARANG(LD),ECOR 04/1999 02/2009 166.16 243.40 77.24 46.49 Bhavnagar-workshop facilities for 50 BG coaches 50 POH per month (WR) 04/2006 03/2011 117.36 196.95 79.59 67.82 51 KODERMA GIRIDH (NL), ECR 04/1996 N.A. 371.36 452.35 80.99 21.81 52 TALCHER-BIMALAGARH(NL)(ECOR) 04/2005 N.A. 726.96 810.78 83.82 11.53 53 KHAGARIA-KUSHESHWAR ASTHAN (NL) (ECR) 04/1997 N.A. 78.23 162.87 84.64 108.19 54 RAICHUR-GUNTAKAL(DL)(SCR) 04/2003 12/2007 136.62 221.90 85.28 62.42 PALWAL-BHUTESWAR 3RD LINE 55 DOUBLING(NCR)(RVNL) 04/2005 03/2009 240.00 329.70 89.70 37.38 56 KHURDA ROAD - BARANG 3RD LINE (DL) (ECOR) 04/2000 03/2009 133.41 225.00 91.59 68.65

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) 57 GOELKERA-MANOHARPUR,(LD)(SER) 03/1997 02/2006 186.92 283.10 96.18 51.46 58 TINDIVANAM-GINGEE-TIRUVANNAMALAI (NL) 09/2006 N.A. 125.00 227.40 102.40 81.92 KADUR-CHIKMAGALUR-SAKLESHPUR 59 (NL),(SWR) 04/1996 03/2012 157.00 262.82 105.82 67.40 FREIGHT OPERATIONS INFORMATION SYSTEM (FOIS) 60 03/1984 03/1995 520.00 634.13 114.13 21.95 61 SRIGANGANAGAR-SARUPSAR (GC), NWR 04/2001 03/2011 143.92 258.60 114.68 79.68 AGRA-ETAWAH VIA FATEHABAD AND BAH (NL) 62 NCR 04/1999 12/2009 108.00 227.42 119.42 110.57 63 ELECTRIFICATION OF MORADABAD-ROZA 12/2004 03/2011 129.17 250.00 120.83 93.54 64 BILASPUR-URKURA (DL) 04/1997 N.A. 151.52 273.00 121.48 80.17 65 TIDIVANAM-NAGARI (NL) 09/2006 N.A. 456.00 582.83 126.83 27.81 66 RENIGUNTA-GUNTAKAL(RE) 06/2000 04/2003 168.34 296.20 127.86 75.95 67 LANJHIGARH-JUNAGARH NL(ECOR) 04/1993 03/2002 100.00 227.94 127.94 127.94 Bhuj-Naliya(GC) with extension from naliya to Vayor 68 (WR) 04/2008 03/2012 318.24 468.62 150.38 47.25 69 ALIGARH-GAZIABAD 3RD LINE DOUBLING (RVNL) 04/2003 03/2009 230.73 399.50 168.77 73.15 70 GADWAL - RAICHUR (NL), SCR 04/1998 02/2011 92.63 270.00 177.37 191.48 NEW B.G. LINE FROM TETELIA TO BYRNIHAT 71 (NATIONAL PROJECT), NEFR 09/2006 N.A. 200.00 384.04 184.04 92.02 KAPTANGANJ-THAWE-SIWAN-CHHAPRA GC 72 (NER) 04/1999 N.A. 323.40 522.56 199.16 61.58 73 VIRAMGAM-BHILDI(WR),GC 04/1990 N.A. 155.66 356.87 201.21 129.26 74 CHHINDWARA - NAGPUR (GC)(SECR) 04/2005 N.A. 383.79 585.93 202.14 52.67 NEW B.G. LINE FROM ARARIA TO GALGALIA 75 (THAKURGUNG), NEFR 09/2006 N.A. 300.00 529.88 229.88 76.63 76 KOTTUR-HARIHAR(NL),(SWR) 04/1995 N.A. 65.94 302.23 236.29 358.34 HARNOUT -SET.UP OF W/S TO UND. POH OF UP TO50 77 COAC. WS&PU 04/2003 N.A. 98.74 337.30 238.56 241.60

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) 78 DAUSA-GANGAPUR CITY(NL),NWR 02/1997 N.A. 151.84 410.08 258.24 170.07 CONSTRUCTION OF NEW LINE FROM HARMATI- 79 ITANAGAR/NARHARIAGUN, NEFR 09/1996 N.A. 156.00 415.73 259.73 166.49 80 RANCHI-LOHARDAGA(GC),SER 04/1997 06/2004 194.07 456.45 262.38 135.20 ALUABARI ROAD SILIGURI JUNCTION VIA 81 GALGALIA, NEFR 12/2006 03/2011 170.00 435.87 265.87 156.39 82 PANSPURA-KHARAGPUR 3D LINE 09/2007 02/2010 252.50 529.23 276.73 109.60 83 JIND-SONEPAT (NL),NR 01/2004 03/2012 190.81 500.00 309.19 162.04 84 MUZAFFARPUR-SITAMARHI(NL),ECR 04/1997 03/2012 100.00 411.22 311.22 311.22 MANSI-PURNIA (EXTENSION OF MANSI- 85 SAHARSA) GAN ECR 04/1996 03/2012 114.01 427.89 313.88 275.31 86 MUNEERABAD-MAHABOOBNAGAR(NL),SCR 04/1997 N.A. 218.24 537.47 319.23 146.27 87 REWARI-ROHTAK (NL),NR 01/2004 02/2010 149.38 476.68 327.30 219.11 88 AGARTALA SABROOM, NL, NEFR 04/2008 03/2014 813.34 1141.75 328.41 40.38 89 MACHERLA-NALGONDA(NL)(SCR) 07/1998 07/2008 125.00 458.26 333.26 266.61 90 CALICUT-MANGALORE (DL) (SR) 02/1996 N.A. 240.00 579.37 339.37 141.40 91 KOTLPALLI-NARASAPUR (NL) (SCR) 12/2001 N.A. 330.00 695.00 365.00 110.61 92 OBULAVARIPALLE-KRISHNAPATNAM(RVNL) 07/2006 03/2008 743.00 1117.11 374.11 50.35 New BG Rly line from Eklakhi-Balurghat including 93 Gazole-Itahar(NL),NEFR 04/1983 N.A. 36.80 415.23 378.43 1028.34 94 LALITPUR-SATNA-REWA-SINGRULI NL, (NCR) 04/1985 03/1994 158.77 540.96 382.19 240.72 95 MANOHARABAD-KOTHPALL NEW LINE(SCR) 04/2006 N.A. 378.56 791.60 413.04 109.11 96 AMRAVATI-NARKHER NL(CR) 06/1994 06/1999 120.90 548.95 428.05 354.05 97 TAMLUK DIGHA,LINE DOUBLING (SER) 03/1984 06/2005 293.97 723.71 429.74 146.18 98 HARIDASPUR-PARADEEP(NL) 04/1996 N.A. 301.64 735.10 433.46 143.70 99 JALANDHAR-PATHANKOT-JAMMU-TAWI(LD),NR 03/2002 06/2007 409.00 847.76 438.76 107.28 100 TIRUCHIRAPPALI-NAGORE-KARAIKKAL(SR)(GC) 09/1995 N.A. 100.00 548.96 448.96 448.96 101 SUKINDA ROAD - ANGUL (NL)(ECOR) 04/1998 02/2015 183.23 638.00 454.77 248.20 102 HOWRAH-AMTA-CHAMPADANGA NL (SER) 04/1974 03/2007 31.42 499.16 467.74 1488.67 103 DEOGHAR - SULTANGANJ (INL), ER 04/2000 12/2012 138.00 607.09 469.09 339.92

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) GONDA-GORAKHPUR LOOP WITH ANAND NAGAR- 104 NAUTANWA GC (NER) 03/2002 N.A. 381.17 863.23 482.06 126.47 105 MANDARHILL-DUMKA-RAMPURHAT (NL),ER 04/1995 12/2011 184.00 675.00 491.00 266.85 106 UTRATIA-ZAFRABAD, NR (LINE DOUBLING) 04/2006 03/2010 325.00 819.40 494.40 152.12 MAYLADUTHURAI-THIRUVARUR-KARAIKUDI- 107 THIRU 'PONDI'-AGASTIYAMPALLI 09/2007 N.A. 404.19 900.00 495.81 122.67 108 RAMGANJMUNDI-BHOPAL (NL),WCR 04/2001 N.A. 727.13 1225.00 497.87 68.47 109 GULBARGA-BIDAR,SCR(NL) 02/1998 N.A. 242.42 776.00 533.58 220.11 110 KARUR-SALEM(NL),SR 02/1997 N.A. 155.55 712.00 556.45 357.73 DINDIGUL-POLLACHI-PALGHAT-POLLACHIAND 111 COIMBATORE 09/2006 N.A. 343.17 900.00 556.83 162.26 112 RUPSA-BANGRIPOSI (GC)(SER) 02/1996 03/1998 57.94 639.97 582.03 1004.54 TARAKESWAR - BISHNUPUR NEW BG LINE (NL), ER 113 04/2000 N.A. 157.96 762.33 604.37 382.61 114 KODERMA-RANCHI VIA BARKAKANA (NL),ECR 03/1999 07/2005 491.19 1099.20 608.01 123.78 CHURCHGATE-VIRAR CONV.OF 1500V DC 115 TRACTION TO 25 KV AC,WR 07/1996 06/2013 653.84 1302.12 648.28 99.15 HASSAN-BANGALORE VIA SHRAVANA- 116 BELGOLA(NL),SWR 02/1997 N.A. 295.00 944.55 649.55 220.19 117 GONDIA-JABALPUR(GC),(SECR) 02/1997 03/1998 386.30 1038.00 651.70 168.70 118 AHMEDNAGAR-PARLI VAIJNATH(NL) CR 02/1997 N.A. 353.08 1010.00 656.92 186.05 119 ANGAMALI-SABARIMALA (N.L.)(SR) 10/1998 N.A. 550.00 1214.00 664.00 120.73 DALLI-RAJHARA - RAOGHAT(PART OF DALLI- 120 RAJHARA-JAGDALPUR),NL,RVNL 04/1995 12/2012 304.00 968.60 664.60 218.62 JAYANAGAR-DARBHANGA-NARKATIA 121 GANJ(GC),ECR 04/1997 03/2012 233.00 903.56 670.56 287.79 122 NANDYAL-YERRAGUNTLA(NL),SCR 03/1996 02/2009 155.74 840.32 684.58 439.57 123 NANGALDAM-TALWARA(NL),NR 03/1981 07/2012 37.68 730.00 692.32 1837.37 124 PEDAPALLI-KARIMNAGAR-NIZAMABADNL(SCR) 12/1994 N.A. 124.43 820.32 695.89 559.26 125 KHURDA ROAD-BOLANGIR(NL)ECOR 04/1994 N.A. 355.38 1100.00 744.62 209.53

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) QUILON-TIRUNELVELI-TENKASI- 126 VIRUDHUNAGAR(SR)(GC) 03/1998 N.A. 280.00 1029.00 749.00 267.50 127 BANGLORE - SATYAMANGALAM (NL)(SWR) 02/1999 N.A. 138.00 901.62 763.62 553.35 128 PATNA GANGA BRIDGE (NL), ECR 04/2001 10/2007 624.47 1389.98 765.51 122.59 129 HUBLI-ANKOLA(NL),SWR 04/1997 N.A. 227.00 997.58 770.58 339.46 RANGIA-MURKONGSELEK, (GC) ALONG WITH 130 LINKED FINGERS NEFR 01/2004 N.A. 915.70 1717.29 801.59 87.54 131 CHANDIGARH-LUDHIANA(NEW BG LINE),NR 07/1998 12/2012 248.44 1103.47 855.03 344.16 NEW MAYNAGURI TO JOGIGHOPA VIA 132 CHANGRABANDHA (NL),NEFR 04/2000 12/2008 733.00 1655.80 922.80 125.89 133 KATIHAR - JOGBANI (GC)(NEFR) 09/2001 12/2010 100.00 1041.79 941.79 941.79 CHHAPRA-SETTING UP OF WHEEL 134 MANUFACTURING PLANT 03/2005 N.A. 470.09 1417.97 947.88 201.64 135 BANKURA - DAMODAR (GC) (SER) 03/1998 03/2005 111.90 1173.79 1061.89 948.96 BELAPUR-SEAWOOD-URAN ELECTRIFIED DOUBLE 136 LINE(MTP) 03/1996 03/2004 401.81 1512.86 1111.05 276.51 137 KANPUR-KASGANJ-MATHURA(GC),NER 03/1997 N.A. 395.00 1577.46 1182.46 299.36 138 MUMBAI URBAN TRANSPORT PROJECT PHASE-I 04/2003 06/2011 3125.20 4501.80 1376.60 44.05 139 BHAIRABI SAIRONG, NL, NEFR 04/2008 04/2014 619.34 2393.49 1774.15 286.46 140 SEVOK RANGPO, NEFR 04/2008 12/2015 1339.48 3380.57 2041.09 152.38 141 BPUTRA BRIDGE AT BOGIBIL & LINK LINES,NEFR 09/1997 04/2008 1000.00 3230.01 2230.01 223.00 TOLLYGANJ-GARIA with extension to Dum Dum- Noapara 142 and Noapara-NSCB Airport(MTP) 03/2000 12/2006 907.69 3176.10 2268.41 249.91 143 JIRIBAM TO IMPHAL (TUPUI)(NL)(NEFR) 04/2003 03/2011 727.56 3056.85 2329.29 320.15 Lumding-SILCHAR Jiribam, Badarpur-Baraigram 144 Kumarghat national project 04/1996 03/2009 1676.31 4027.93 2351.62 140.29 145 UDHAMPUR-SRINAGAR-BARAMULLA (NL),NR 03/1995 03/2001 2500.00 20000.00 17500.00 700.00 TOTAL 37954.07 107505.88 69551.81

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) Road Transport & Highways 146 CHAMBAL BRIDGE, NH-76 (RJ-5) 12/2003 02/2010 275.00 281.31 6.31 2.29 SUNAKHALA-GANJAM (GQ) KM.338-KM.284 (NH- 147 5) 04/2000 04/2004 225.00 241.53 16.53 7.35 VIJAYAPUR TO PATHANKOT (NS-35/J AND K) NH- 148 1A KM.50 TO KM.80 12/2003 03/2008 166.27 193.10 26.83 16.14 GANGA BRIDGE TO RAMDEVI CROSSING PH.II NH- 149 25, KM.75-80.06 12/2003 09/2008 155.00 201.66 46.66 30.10 PATHANKOT- BHOGPUR, KM.26-KM.70, NS-38 150 NH-1A 12/2003 05/2008 284.00 359.00 75.00 26.41 151 AGRA-BYPASS(NS-1/UP-1), NH-2,3 12/2003 09/2007 348.16 465.50 117.34 33.70 MAIBANG TO LUNDING (AS-24), KM.111.000 TO 152 KM.126.450 12/2003 11/2008 155.04 280.13 125.09 80.68 153 HARANGAJO TO MAIBANG, NH-54 12/2003 07/2009 196.00 363.74 167.74 85.58 HARANGAJO TO MAIBANG,km 164.08-190.587 154 NH-54 12/2003 09/2007 212.00 386.10 174.10 82.12 MAIBANG TO LUNDING (AS-25), KM.83.400 TO 155 KM.111.000 12/2003 04/2009 199.81 385.13 185.32 92.75 156 HALDIA PORT (PORT CONNECTIVITY) (NH-41) 04/2000 03/2005 273.00 522.00 249.00 91.21 157 Panipat-Jalandhar 6 lane(Km 96 to 387.1 km) 05/2009 11/2011 1108.00 2288.00 1180.00 106.50 TOTAL 3597.28 5967.20 2369.92 Shipping & Ports 158 Acquisition of two nos. of 120 B.P BY 079& 080 04/2009 06/2011 290.85 305.00 14.15 4.87 Acquisition of 4 nos of 82000 DWT kamsavmax Bulk 159 carriers from M/S Jiangsu Eastern Heavy Industries 08/2010 12/2012 612.72 627.64 14.92 2.44 ACQUISITION OF 6 NOS. OF 57000 DWT HANDYMAX 160 BULK CARRIERS 11/2007 03/2012 1061.96 1082.06 20.10 1.89 Acquisition of two(2) Nos. of 317000 DWT very large crude 161 carriers from M/S Jiangsu rongsheng heavy 10/2010 02/2014 966.46 994.82 28.36 2.93 CONSTRUCTION OF 13 & 14 CARGO BERTH AT 162 KANDLA 12/2005 03/2011 702.00 755.50 53.50 7.62

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) 163 DEEPENING OF CHANNEL AT PARADIP PORT 12/2005 N.A. 154.84 253.36 98.52 63.63 RAIL CONNECTIVITY TO ICTT AT VALLARPADAM AT 164 COCHIN PORT TRUST 03/2007 04/2009 245.67 373.22 127.55 51.92 Construction of berthing and allied facilities off Tekra near 165 Tuna,Kandla Port Trust 04/2005 02/2011 882.00 1060.00 178.00 20.18 CONST. & DEV. OF 2 OFFSHORE CONTAINER BERTHS 166 & TERMINAL 11/2007 12/2010 1228.00 1460.00 232.00 18.89 ENNORE MANALI EXPRESS WAY,F/O SPECIAL 167 PURPOSE VEHICLE (SPV) 10/2002 03/2006 150.00 600.00 450.00 300.00 TOTAL 6294.50 7511.60 1217.10 Steel 168 330 TPH BOILER-6 AND AUXILIARY SYSTEM 07/2007 08/2010 260.00 350.00 90.00 34.62 169 COKE OVEN BATTERY NO. 4 PHASE-II 08/2007 10/2012 108.00 216.68 108.68 100.63 67.5 MW TG-5 AUX. S'TEM EMERGENCY POWER 170 REQUIREMENT EXP. UNIT 07/2007 02/2011 230.00 343.58 113.58 49.38 171 Bailadila Iron Ore Project Deposit- 11B (NMDC) 01/2007 12/2011 295.89 607.17 311.28 105.20 172 EXPANSION OF IISCO STEEL PLANT 02/2008 12/2011 14443.00 16408.00 1965.00 13.61 EXPANSION OF LIQUID STEEL CAPACITY FROM 173 3MT TO 6.3MT (RINL) 10/2005 10/2009 8692.00 12291.00 3599.00 41.41 TOTAL 24028.89 30216.43 6187.54 Telecommunications GSM EQUIPMENT OF 283000 LINES (2G) AND 174 75000 LINES (3G) IN UTTRANCHAL 01/2009 06/2009 149.15 158.72 9.57 6.42 GSM equipment of 1625000Lines (2G) 325000 lines 175 3(G) MP Phase V.1 Telecom Circle 11/2009 11/2010 916.70 930.60 13.90 1.52 176 PROJ.III OF NIB-II OF MESSAGING STORAGE 11/2003 12/2005 250.00 425.51 175.51 70.20 TOTAL 1315.85 1514.83 198.98 Urban Development C/o office building for IDBI at bandra Kurla 177 Complex,Mumbai 11/2006 04/2009 114.18 173.08 58.90 51.59

COST COST DATE OF DATE OF ORIGINAL COST OVERRUN SN PROJECTS APPROVAL COMMISSIONING (Rs.; ANTICIPATED (Rs.; COST ORIGINAL crore) (Rs.; crore) crore) OVERRUN (%) 178 BANGALORE METRO RAIL PROJECT 05/2006 06/2011 6395.00 11609.00 5214.00 81.53 TOTAL 6509.18 11782.08 5272.90 Water Resources 179 PAGLADIYA DAM PROJECT 01/2001 12/2007 542.90 1187.00 644.10 118.64

NATION WIDE SAMPLE SURVEYS 22nd March, 2013

RSQ 2945

SHRI VIJAY JAWAHARLAL DARDA

(a) whether as nodal Ministry for conducting nation-wide sample surveys on subjects like employment, housing conditions, debt and investment, land and livestock holdings, unorganized manufacturing sectors, etc., such sample surveys were conducted by the Ministry during 2004, 2008 and 2012;

(b) if so, the subjects covered and the periodicity thereof with a view to have a comparative analysis which is a determinant input for launching welfare schemes, especially in rural areas; and

(c) whether these sample surveys were conducted suo-moto or the Ministry was requested by other Government Departments to do so?

MINISTER OF STATE (INDEPENDENT CHARGE), MINISTRY OF STATISTICS AND PROGRAMME IMPLEMENTATION AND MINISTER OF STATE IN THE MINISTRY OF CHEMICALS AND FERTILIZERS (SHRI SRIKANT KUMAR JENA)

(a) & (b): National Sample Survey Office (NSSO) in Ministry of Statistics & Programme Implementation conducts nation-wide sample surveys every year covering both rural and urban areas normally during July-June on various Socio-economic subjects and as such NSSO surveys spill over calendar years. During the years 2004, 2008 and 2012, NSSO undertook surveys devoted to the subjects of Morbidity & Health Care, Household Consumer Expenditure & Employment-Unemployment, Participation and Expenditure in Education, Migration, Domestic Tourism, Drinking Water, Sanitation, Hygiene, Housing Condition and Particulars of Slums as per pre-approved 10 year cycle of surveys.

In the Cycle of Surveys approved by the National Statistical Commission (NSC), the subjects like Household Consumer Expenditure & Employment-Unemployment and Un-organised Sector Enterprises are covered once in every five year period. The subjects such as Land & Livestock Holdings, Debt & Investment and Situation Assessment Survey of Farmers, Social Consumption, Drinking water, Sanitation, Hygiene and Housing Condition including Slums are taken up once in ten years. Three years of 10 year cycle are kept open so as to accommodate the requests of different Ministries/Departments of the Government for surveys on subjects of topical interest to them.

(c): Though the Surveys in the years 2004, 2008 and 2012 on the subjects mentioned in the reply to Parts (a) & (b) of the Question were taken up in accordance with approved 10 year Cycle of surveys for NSSO, yet the requirements of various Ministries/Departments like Ministry of Health & Family Welfare for covering Morbidity and Health Care in 2004, Ministry of Human Resources Development for covering Participation and expenditure in Education in 2007-08 and Ministry of Tourism for covering Domestic Tourism in 2008-09, etc were accommodated in these surveys.

DELAY IN IMPLEMENTATION OF PROJECTS 26th April, 2013

RSQ 3565

SHRI D.P. TRIPATHI

(a) whether it is fact that there is delay in clearances and implementation of large projects;

(b) if so, the details of large projects pending due to delay in clearances; and

(c) the steps Government is taking in this regards?

MINISTER OF STATE (INDEPENDENT CHARGE), MINISTRY OF STATISTICS & PROGRAMME IMPLEMENTATION AND MINISTRY OF CHEMICALS & FERTILIZERS (SHRI SRIKANT KUMAR JENA)

(a) & (b) Ministry of Statistics & Programme Implementation monitors Central Sector Infrastructure Projects costing Rs. 150 crore and above on time and cost overruns, on the basis of information supplied by the project implementing agencies. As on 1st January 2013, of a total of 566 projects on the monitor of this Ministry, 276 projects were delayed with respect to their original dates of commissioning. In these 276 projects, delay in clearances relating to environment & forest were reported by the project implementing agencies in 43 projects – 8 in Railways Sector, 10 in Coal Sector, 15 in Road Transport & Highways Sector, 2 in Petroleum Sector and 8 in Power Sector.

(c) The major steps undertaken to ensure timely completion of projects include rigorous project appraisal; On- line Computerised Monitoring System (OCMS) for better monitoring; setting up of Standing Committees in the Ministries for fixation of responsibility for time and cost overruns; regular review of the infrastructure projects by the concerned administrative Ministries; setting up of Cabinet Committee on Investment (CCI) to review and monitor the implementation of major projects, including issues relating to clearances/approvals; and setting up of Central Sector Projects Coordination Committees (CSPCCs) in the States under the Chief Secretaries for removal of bottlenecks and for facilitating the speedy implementation of major projects.

DELAYING IN INFRASTRUCTURE PROJECTS 3rd May, 2013

RSQ 4184

SHRI AAYANUR MANJUNATHA

(a) whether a number of infrastructure projects in several sectors are running behind schedule leading to cost and time overruns; (b) if so, the details thereof and the reasons therefor, State-wise; (c) whether to keep a watch on the infrastructure in five core sectors, Government has decided to set up a mechanism to monitor the progress of the projects on quarterly basis; (d) if so, the details thereof; (e) whether Government has chalked out a target for each Ministry handling infrastructure projects; and (f) if so, the details thereof?

MINISTER OF STATE (INDEPENDENT CHARGE), MINISTRY OF STATISTICS & PROGRAMME IMPLEMENTATION AND MINISTRY OF CHEMICALS & FERTILIZERS (SHRI SRIKANT KUMAR JENA)

(a) & (b) As on 1st February 2013, 571 Central sector projects costing ` 150 crore and above are on the monitor of this Ministry. Of these, 287 projects are running behind schedule. Details of these 287 projects are at Annexure - I.

As reported by the project implementing agencies, the main reasons for delay in implementation are law and order problems, delay in land acquisition, rehabilitation and resettlement problems, fund constraints, delay in forest and environment clearances, right of way/right of use issues, delay in supply of material, contractual issues, etc.

(c) & (d) In respect of key infrastructure projects executed by Ministries of Railways, Road Transport and Highways, Shipping, Civil Aviation and Power, the Planning Commission, in consultation with the Ministry concerned, prepares annual / quarterly targets, especially in respect of more critical areas of performance. High- level performance reviews against these targets are carried out on quarterly basis.

(e) & (f) The target dates for completion of infrastructure projects costing ` 150 crore and above are fixed by the project approving authorities. These projects are monitored closely by the concerned Ministry with respect to the target dates of completion. A Standing Committee has been set up in each Ministry to fix responsibility for cost and time overruns, where cost overruns are over 20% and are accompanied by time overruns of over 10%.

Ministry of Statistics and Programme Implementation monitors the Central Sector Infrastructure Projects costing ` 150 crore and above (` 20 crore and above before 31st March 2010) on the basis of information uploaded by the project implementing agencies on the Online Computerised Monitoring System (OCMS) of the Ministry. Over the years, projects having time overruns have decreased from 62% in 1991 to 50% in January 2013.

ANNEXURE - I Statement referred in reply to parts (a) & (b) of the Rajya Sabha Unstarred Question no. 4184 for answer on 03rd May 2013

Details of Projects running behind schedule as on 1st February 2013

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) Andhra Pradesh 1 Armur to kadloor yellareddy NHAI 02/2010 02/2012 02/2013 390.56 390.56 0.00 12 2 330 TPH BOILER-6 AND RINL 07/2007 08/2010 02/2013 260.00 350.00 34.62 30 AUXILIARY SYSTEM 3 Hyderabad-Vijaywada Km. 40 to NHAI 04/2010 10/2012 03/2013 1740.00 1740.00 0.00 5 221.50 Km 4 DIESEL HYDROTREATOR HPCL 03/2009 09/2011 03/2013 3597.00 2730.00 -24.10 18 PROJECT AT VISAKH REFINERY 5 67.5 MW TG-5 AUX. S'TEM RINL 07/2007 02/2011 03/2013 230.00 343.58 49.38 25 EMERGENCY POWER REQUIREMENT EXP. UNIT 6 EXPANSION OF LIQUID STEEL RINL 10/2005 10/2009 03/2013 8692.00 12291.00 41.41 41 CAPACITY FROM 3MT TO 6.3MT (RINL) 7 COKE OVEN BATTERY NO. 4 RINL 08/2007 10/2012 06/2013 108.00 216.68 100.63 8 PHASE-II 8 Chilkaluripet-Vijaywada 6 lane NHAI 05/2009 10/2011 06/2013 572.30 572.30 0.00 20 (km 355 to Km 434.15) 9 MANUGURU OC-II SCCL 03/2010 03/2012 03/2014 181.19 181.19 0.00 24 EXTENSION PHASE-II 10 ADRIYALA SHAFT PROJECT SCCL 12/2009 03/2013 07/2014 212.34 977.53 360.36 16 11 RAMAGUNDAM OC-II SCCL 12/2009 03/2012 03/2015 418.97 418.97 0.00 36 EXTENSION 12 KAKATIYA LONGWALL SCCL 12/2008 12/2012 03/2016 453.63 453.63 0.00 39 13 PARE HYDRO ELECTRIC NEEPCO 12/2008 08/2012 09/2014 573.99 573.99 0.00 25

PROJECT 14 KAMENG HYDROELECTRIC NEEPCO 12/2004 05/2013 03/2017 2496.90 2496.90 0.00 46 PROJECT (NEEPCO) 15 SUBANSIRI LOWER H.E.P NHPC 09/2003 09/2010 03/2017 6285.33 10667.00 69.71 78 (NHPC)

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) Assam 16 SILCHAR-UDARBAND (PH.II) NHAI 12/2003 09/2007 03/2013 157.47 154.57 -1.84 66 HN- 54, KM.309 TO KM.275 17 IOR, RUDRASAGAR (ONGCL) ONGC 09/2001 03/2006 03/2013 113.90 438.85 285.29 84 18 DHARAMTUL TO SONAPUR NHAI 12/2003 06/2008 05/2013 200.00 200.00 0.00 59 (AS- 19) 19 NAGAON TO DHARAMTUL NHAI 12/2003 06/2008 05/2013 264.72 264.72 0.00 59 (AS-2) 20 Assam Telecom Circle, Phase-V.I, BSNL 06/2007 01/2009 06/2013 336.81 336.81 0.00 53 2G & 3G 21 SONAPUR TO GUWAHTI (AS-3) NHAI 12/2003 03/2008 06/2013 245.00 245.00 0.00 63 22 NALBARI TO BIJNI (AS-6) NHAI 12/2003 06/2008 09/2013 225.00 225.00 0.00 63 23 NALBARI TO BIJNI (AS-8) NHAI 12/2003 06/2008 09/2013 200.00 200.00 0.00 63 24 Assam gas Cracker project BCPL 04/2006 04/2012 12/2013 5460.61 8920.00 63.35 20 25 DHARAMTUL TO NHAI 12/2003 05/2008 12/2013 160.00 160.00 0.00 67 SONAPUR,KM 205-183 (AS-20) 26 ASSAM RENEWAL PROJECT ONGC 03/2009 03/2013 03/2014 2465.15 2378.86 -3.50 12 FOR GROUP A 27 BIJNI TO ASSAM /WB.BORDER NHAI 12/2003 06/2008 03/2014 237.80 237.80 0.00 69 (NH-31.C)(NHAI) 28 BIJNI TO ASSAM WB BORDER NHAI 12/2003 06/2008 03/2014 195.00 195.00 0.00 69 (NH- 31.C)(1)(NHAI) 29 GUWAHATI TO NALBARI (AS- NHAI 12/2003 04/2008 03/2014 198.16 198.16 0.00 71 5) 30 GUWHATI TO NALBARI (AS-4) NHAI 12/2003 04/2008 03/2014 175.96 175.96 0.00 71

31 IOR LAKWA - LAKHMANI ONGC 09/2001 03/2007 03/2014 345.10 663.69 92.32 84 (ONGCL) 32 BIJNI TO ASSAM/WB BORDER NHAI 12/2003 06/2005 03/2014 230.00 230.00 0.00 105 PH.II, KM.30.00 TO 0.00, NH-31 C 33 HARANGAJO TO MAIBANG,km NHAI 12/2003 09/2007 04/2014 212.00 386.10 82.12 79 164.08-190.587 NH-54 34 HARANGAJO TO MAIBANG, NHAI 12/2003 07/2009 05/2014 196.00 363.74 85.58 58 NH-54 35 HARANGAJO TO MAIBANG NHAI 12/2003 02/2009 05/2014 280.00 280.00 0.00 63 (AS- 23), KM.126.450 TO KM.140.700 36 NALBARI T BIJNI (AS-7) NHAI 12/2003 04/2008 05/2014 208.00 208.00 0.00 73 37 MAIBANG TO LUNDING (AS- NHAI 12/2003 11/2008 06/2014 155.04 280.13 80.68 67 24), KM.111.000 TO KM.126.450 38 BRAHMPUTRA BRIDGE,NH NHAI 12/2003 04/2010 11/2014 217.61 217.61 0.00 55 NO-31

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) 39 MAIBANG TO LUNDING (AS- NHAI 12/2003 04/2009 12/2014 199.81 385.13 92.75 68 25), KM.83.400 TO KM.111.000 40 MAIBANG TO LUNDING (AS- NHAI 12/2003 04/2009 12/2014 200.00 200.00 0.00 68 27), KM.40.000 TO KM.60.500 41 Lumding-SILCHAR Jiribam, NEFR 04/1996 03/2009 12/2014 1676.31 4255.37 153.85 69 Badarpur Baraigram Kumarghat national project 42 MAIBANG TO LUNDING (AS- NHAI 12/2003 11/2008 12/2014 167.64 167.64 0.00 73 26), KM.60.500 TO KM.83.400, NH-54 43 Katakhal to Bhairabi NEFR 04/1998 12/2012 03/2015 227.90 223.01 -2.15 27 44 BONGAIGAON THERMAL NTPC 01/2008 07/2011 10/2015 4375.35 4375.35 0.00 51 POWER PROJECT

45 BPUTRA BRIDGE AT BOGIBIL NEFR 09/1997 04/2008 12/2015 1000.00 5016.00 401.60 92 & LINK LINES,NEFR 46 IOR GELEKI (ONGCL) ONGC 09/2001 03/2007 03/2017 390.09 1674.11 329.16 120 Bihar 47 JAYANAGAR-DARBHANGA- ECR 04/1997 03/2012 02/2013 233.00 1043.56 347.88 11 NARKATIA GANJ(GC),ECR 48 KOSI BRIDGE (NL), ECR ECR 04/2002 03/2012 03/2013 323.41 341.41 5.57 12 49 MANSI-PURNIA (EXTENSION ECR 04/1996 03/2012 03/2013 114.01 477.88 319.16 12 OF MANSI-SAHARSA) GAN ECR 50 KOTWA TO DEWAPUR(10 NHAI 12/2003 10/2008 03/2013 240.00 240.00 0.00 53 LMNHP),NH-28 PHASE-II, KM.440 TO KM.402 51 FORBESGANJ TO SIMRAHI NHAI 12/2003 09/2008 05/2013 332.94 332.94 0.00 56 (NH- 57)(NHAI) 52 DEEWAPUR TO UP/BIHAR NHAI 12/2003 10/2008 01/2014 300.00 300.00 0.00 63 BORDER (LMNHP-9)-NH-28, KM.402-360.915 53 2 LANNING OF MOKAMA- NHAI 05/2011 05/2013 03/2014 351.54 351.54 0.00 10 MUNGER 54 2-LANNING WITH PS NHAI 05/2011 02/2014 04/2014 664.00 664.00 0.00 2 KHAGARIA- PURNEA 55 BARH STPP STAGE -II NTPC 02/2008 08/2013 09/2014 7341.04 7341.04 0.00 13 56 RAIL-CUM-ROAD BRIDGE AT ECR 04/2002 03/2009 12/2014 921.00 2363.00 156.57 69 MUNGER (NL), ECR 57 KATIHAR - JOGBANI NEFR 09/2001 12/2010 03/2015 100.00 1041.79 941.79 51 (GC)(NEFR) 58 BARH STPP(3X660MW) NTPC NTPC 12/2003 12/2009 02/2017 8692.97 8693.00 0.00 86

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCYAPPROVALCOMMISSIONING COMMISSIONING ORIGINAL ANTICIPATED OVERRUN OVERRUN ORIGINAL ANTICIPATED (Rs.in (Rs. in crore) (%) (MONTHS) crore) Chhatisgarh 59 Bailadila Iron Ore Project NMDC 01/2007 12/2011 03/2013 295.89 607.17 105.20 15

Deposit- 11B (NMDC) 60 AURANG-RAIPUR, NH-6, NHAI 03/2005 01/2009 12/2013 190.00 190.00 0.00 59 KM.232 TO KM.281 61 EXPANSION OF BHILAI SAIL 09/2008 03/2013 03/2014 17265.00 17265.00 0.00 12 STEEL PLANT 62 DIPKA EXPANSION OCP SECL 12/2009 03/2014 03/2016 1943.66 1943.66 0.00 24 (SECL) (20-25) MTY 63 GEVRA EXPANSION OCP SECL 06/2010 03/2014 03/2016 2675.67 2675.67 0.00 24 (SECL) (25-35) MTY 64 KARTALI (EAST) OCP (2.50 SECL 07/2008 03/2014 03/2016 178.44 178.44 0.00 24 MTY) 65 MANIKPUR OC EXPANSION SECL 12/2009 03/2014 03/2016 321.42 321.50 0.02 24 (3.5 MTY) 66 JAGANNATHPOR OC SECL 09/2008 03/2015 03/2017 152.43 152.43 0.00 24 Delhi 67 DELHI CONVERGENT MTNL 02/2006 03/2012 02/2013 229.41 229.41 0.00 11 BILLING AND CRM PE-5834 68 CONVERGENT BILLING AND MTNL 12/2005 02/2007 02/2013 249.00 229.41 -7.87 72 CRM- MTNL(DELHI) Goa 69 Construction of New AAI 05/2010 05/2012 06/2013 335.61 335.61 0.00 13 International Terminal Building(Goa) Gujarat 70 ADDITIONAL GAS ONGC 02/2008 04/2011 02/2013 370.11 370.11 0.00 22 PROCESSING FACILITY AT HAZIRA 71 Gujarat/Maharashtra NHAI 03/2010 09/2012 03/2013 1509.10 1509.10 0.00 6 BorderSurat- Hazira Port Section 72 CONSTRUCTION OF 13 & 14 PORT 12/2005 03/2011 03/2013 702.00 755.50 7.62 24

CARGO BERTH AT KANDLA TRUST 73 Construction of 6 ETPs ONGC 03/2009 09/2012 09/2013 302.26 240.95 -20.28 12 74 SAMAIKHIALI - NHAI 09/2010 03/2013 12/2013 805.39 805.39 0.00 9 GANDHIDHAM 75 Kandla - Mundra port NHAI 01/2011 07/2013 06/2014 953.88 953.88 0.00 11 76 KAKRAPAR ATOMIC POWER NPCIL 10/2009 12/2015 11/2016 11459.00 11459.00 0.00 11 PROJECT - 3 and 4

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) Haryana 77 Butadiene Extraction Unit(BDEU) IOCL 11/2009 02/2013 03/2013 341.50 341.50 0.00 1 at Panipat 78 DELHI/ HARYANA BORDER TO NHAI 04/2007 05/2010 03/2013 486.00 486.00 0.00 34 ROHTAK 79 Panipat-Jalandhar 6 lane(Km 96 to NHAI 05/2009 11/2011 08/2013 1108.00 2288.00 106.50 21 387.1 km) 80 JHAJJAR HISSAR PIPE LINE GAIL 11/2007 10/2010 12/2014 281.07 281.07 0.00 50 PROJECT Himachal Pradesh 81 TRANSMISSION SYSTEM PGCIL 07/2006 01/2010 03/2013 557.24 758.75 36.16 38 ASSOCIATED WITH PARBATI- III HEP 82 PARBATI H.E.P. STAGE -III NHPC 10/2005 10/2010 09/2013 2304.56 2716.00 17.85 35 (NHPC) 83 RAMPUR HEP(412 MW) SJVNL 01/2007 01/2012 02/2014 2047.03 2047.03 0.00 25 84 KOLDAM HEP (NTPC) NTPC 10/2002 04/2009 09/2014 4527.15 6358.91 40.46 65 85 PARBATI HEP (NHPC) II NHPC 09/2002 09/2009 03/2018 3919.59 5366.00 36.90 102 Jammu & Kashmir 86 CHUTAK HYDRO-ELECTRIC NHPC 08/2006 02/2011 01/2013 621.26 913.00 46.96 23 PROJECT 87 URI H.E.P STAGE -II (NHPC) NHPC 08/2005 11/2009 03/2013 1729.29 2081.00 20.34 40 88 VIJAYAPUR TO PATHANKOT NHAI 12/2003 03/2008 03/2013 166.27 193.10 16.14 60 (NS- 35/J AND K) NH-1A KM.50 TO KM.80 89 NIMOO BAZGO NHPC 08/2006 08/2010 06/2013 611.01 936.00 53.19 34

HYDROELECTRIC PROJECT 90 JAMMU-UDHAMPUR KM.27.5 NHAI 07/2010 07/2013 06/2014 1813.76 1813.76 0.00 11 TO KM.67.00 91 NASHRI CHANANI NHAI 06/2010 06/2015 05/2016 2159.00 2159.00 0.00 11 92 QUAZIGUND-BANIHAL NHAI 07/2010 07/2015 06/2016 1987.00 1987.00 0.00 11 KM.220.00 TO KM.188.00 93 KISHANGANGA HEP NHPC 07/2007 01/2016 11/2016 2238.67 3642.00 62.69 10 94 UDHAMPUR-SRINAGAR- NR 03/1995 03/2001 12/2017 2500.00 20000.00 700.00 201 BARAMULLA (NL),NR

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) Jharkhand 95 GSM equipment of 799000Lines BSNL 03/2008 03/2009 01/2013 328.13 392.13 19.50 46 (2G) 101000 lines 3(G) JharkhandPhase V.1 Telecom Circle 96 Tinpahar - Sahibganj (ER) ER 04/2008 03/2012 02/2013 167.73 167.73 0.00 11 97 MANDARHILL-DUMKA- ER 04/1995 12/2011 03/2013 184.00 900.05 389.16 15 RAMPURHAT (NL),ER 98 Hazaribagh-Ranchi NHAI 08/2010 01/2013 06/2013 625.07 625.07 0.00 5 99 EXPANSION OF BOKARO SAIL 01/2008 12/2011 06/2013 6325.00 6325.00 0.00 18 STEEL PLANT 100 GOELKERA- SER 03/1997 02/2006 12/2013 186.92 261.70 40.01 94 MANOHARPUR,(LD)(SER) 101 ASHOK EXPN.OCP -CCL (10 CCL 12/2007 03/2011 03/2014 471.66 341.63 -27.57 36 MTY) 102 Purnadih OCP (3.0 MTY) CCL 07/2008 03/2013 03/2015 210.98 210.98 0.00 24 103 RAJMAHAL OC EXP. ECL 09/2009 03/2014 03/2016 153.82 153.82 0.00 24 104 MAGADH OC 20 MTY (CCL) CCL 08/2008 07/2012 03/2016 469.78 706.40 50.37 44 105 Tapin OCP (2.5 MTY) CCL 08/2008 03/2012 03/2016 264.68 264.68 0.00 48 106 Churi Benti UG (0.81 MTY) CCL 08/2007 03/2011 03/2016 163.51 163.51 0.00 60 107 North Urimari OCP (3.0 MTY) CCL 12/2007 03/2012 03/2017 179.87 179.87 0.00 60 Karnataka

108 SINGLE POINT MOORING Mangalore 07/2010 04/2012 01/2013 1043.57 1043.57 0.00 9 FACILITY(SMP) PROJECT Refin 109 HARIHAR-CHITRADURGA (GQ) NHAI 04/2000 08/2004 02/2013 318.00 207.56 -34.73 102 KM.284-KM.207 (NH-4) 110 HAVERI-HARIHAR (GQ) NHAI 04/2000 08/2004 02/2013 241.00 196.65 -18.40 102 KM.340- KM.284 (NH-4) 111 KADUR-CHIKMAGALUR- SWR 04/1996 03/2012 03/2013 157.00 333.50 112.42 12 SAKLESHPUR (NL),(SWR) 112 MRPL Phase-III Expansion Mangalore 08/2008 01/2012 03/2013 12412.00 12160.26 -2.03 14 Refin 113 BANGALORE METRO RAIL MRTP 05/2006 06/2011 03/2013 6395.00 11609.00 81.53 21 PROJECT 114 NEW MANGALORE PORT NH- NHAI 04/2000 06/2011 04/2013 196.50 196.50 0.00 22 17 AND 48 115 Polypropylene unit Mangalore 05/2009 07/2012 10/2013 1803.78 1803.78 0.00 15 Refin

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) 116 Ramanagram-Mysore doubling SWR 04/2007 03/2013 03/2014 482.00 482.70 0.15 12 with electrification of Kengesii- Musore (SWR) 117 4 LANNING OF BELGUM- NHAI 03/2011 09/2013 07/2014 359.00 359.00 0.00 10 KHANPUR SECTION AND 2 LANING OF KHANPUR-KNT/GOA BORDER Kerala 118 SETTING UP OF LNG PORT 03/2009 01/2012 02/2013 3500.00 4150.00 18.57 13 REGASIFICATION TERMINAL TRUST AT PUTHUVYPEEN COCHIN 119 FOUR LANNING OF NHAI 04/2011 10/2013 03/2014 682.00 682.00 0.00 5 WALAYAR- VADAKKANCHERRY SECTION 120 NH CONNECTIVITY TO ICTT NHAI 03/2005 02/2010 12/2014 557.00 557.00 0.00 58 VALLARPADAEU NH - SH

121 SIX LANNING OF NHAI 02/2010 08/2012 03/2015 617.00 617.00 0.00 31 VADAKKANCHERRY THRISSURESECTION(KM 240- 270KM) Madhya pradesh 122 GWALIOR BYPSS, NH-75,3 NHAI 12/2003 10/2009 02/2013 300.93 300.93 0.00 40 123 RAJMARG CHORAHA TO NHAI 12/2003 10/2008 02/2013 229.91 229.91 0.00 52 LAKHNANDON,KM 351 TO KM 405.7, NH-26 (NHA 124 SAGAR - RAJMARG NHAI 12/2003 10/2008 02/2013 203.43 203.43 0.00 52 CHORAHA,KM 211 TO KM 255, NH-26 (NHAI) 125 VINDHYACHAL STTP STAGE- NTPC 01/2009 10/2012 03/2013 5915.00 5915.00 0.00 5 IV 126 Ratlam-Mhow-Khandwa-Akola WR 04/2008 03/2012 03/2013 603.04 603.04 0.00 12 (GC) 127 GSM equipment of 1625000Lines BSNL 11/2009 11/2010 03/2013 916.70 916.70 0.00 28 (2G) 325000 lines 3(G) MP Phase V.1 Telecom Circle 128 RAJMARG CHORAHA TO NHAI 12/2003 10/2008 06/2013 251.03 251.03 0.00 56 LAKHNANDON,KM 297 TO KM 351, NH-26 (NHAI) 129 BHOPAL-SANCHI NHAI 10/2011 01/2013 10/2013 209.00 209.00 0.00 9

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) 130 LAKHNAADON TO MP/MH NHAI 12/2003 06/2010 12/2013 407.60 407.60 0.00 42 BORDER,KM 596.75-653.22 (NS- 1/BOT/MP-2),NH7 131 INDORE-DEWAS(NH-3) NHAI 11/2010 05/2013 02/2014 325.00 325.00 0.00 9 132 LAKHNADON TO MP/MH NHAI 12/2003 09/2009 09/2014 263.17 263.17 0.00 60 BORDER (NS-1/BOT/MP-2), NH-7 133 NIGAHI OC EXPANSION NCL 10/2007 03/2012 03/2015 259.40 259.40 0.00 36 PROJECT 10 MTY TO 15 MTY, SINGRAULI Maharashtra

134 CONSTRUCTION OF NEW ONGC 01/2007 05/2010 01/2013 2853.29 6326.40 121.72 32 PROCESS COMPLEX MHN 135 MOUDA STPP NTPC 11/2008 08/2012 03/2013 5459.28 6010.89 10.10 7 136 MP/Maharashtra Border-Dhula NHAI 12/2009 06/2012 03/2013 835.00 835.00 0.00 9 137 WESTERN REGION PGCIL 12/2007 09/2010 03/2013 477.69 477.69 0.00 30 STRENGTHENING SCHEME-V 138 MUMBAI HIGH SOUTH ONGC 10/2007 05/2010 03/2013 5713.03 8813.41 54.27 34 REDEVELOPMENT PH-2 139 DEVELOPMENT OF B-22 ONGC 01/2007 09/2010 04/2013 2323.40 2920.82 25.71 31 CLUSTER FIELDS 140 DEVELOPMENT OF C-SERIES ONGC 08/2006 12/2008 04/2013 3195.16 3690.37 15.50 52 FIELDS 141 DEVELOPMENT OF B-46 ONGC 06/2007 07/2010 05/2013 1436.21 1436.21 0.00 34 CLUSTER FIELD 142 OFFSHORE GRID ONGC 01/2007 03/2010 05/2013 740.02 740.02 0.00 38 INTERCONNECTIVITY PROJECT IN MUMBAI HIGH 143 PIMPALGAON-NASIK-GONDE, NHAI 03/2005 07/2012 06/2013 940.00 940.00 0.00 11 NH- 3 (NHDP-PHASE-III) 144 DIESEL HYDROTREATOR HPCL 03/2009 09/2011 06/2013 3284.00 2174.00 -33.80 21 PROJECT AT MUMBAI REFINERY 145 NAGPUR-KONDHALI,NH- NHAI 03/2005 12/2008 06/2013 168.00 168.00 0.00 54 6(NHAI) 146 ADDITIONAL GAS ONGC 10/2008 12/2011 07/2013 1797.35 977.00 -45.64 19 PROCESSING UNITS AT URAN 147 MUMBAI HIGH NORTH ONGC 01/2009 09/2012 09/2013 7133.39 6855.93 -3.89 12 DEVELOPMENT PHASE-II

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) 148 Acquisition of 4 nos of 82000 SHIPP. 08/2010 12/2012 10/2013 612.72 532.83 -13.04 10 DWT kamsavmax Bulk carriers from M/S

Jiangsu Eastern Heavy Industries 149 Pune-sholapur,pkg1 NHAI 11/2009 05/2012 10/2013 1110.00 1110.00 0.00 17 150 CONST. & DEV. OF 2 MUMBAI 11/2007 12/2010 10/2013 1228.00 1460.00 18.89 34 OFFSHORE PORT CONTAINER BERTHS & TRU TERMINAL 151 CONVERSION OF RIG SAGAR ONGC 03/2011 05/2013 11/2013 861.79 756.65 -12.20 6 SAMRAT TO MOBILE OFFSHORE PRODUCTION UNIT(MOPS) 152 WADNER-DEVDHARI(NS- NHAI 02/2011 11/2012 12/2013 193.45 193.45 0.00 13 60/MH)(KM 94-123 KM) 153 Four Lanning from NHAI 04/2010 06/2011 12/2013 1170.52 1170.52 0.00 30 MP/Maharashtra Border to nagpur, Nagpur bypass 154 DEVELOPMENT OF B-193 ONGC 06/2007 08/2010 12/2013 3248.78 5633.44 73.40 40 CLUSTER FIELDS 155 BELAPUR-SEAWOOD-URAN MRTP 03/1996 03/2004 03/2014 401.81 1512.86 276.51 120 ELECTRIFIED DOUBLE LINE(MTP) 156 PENGANGA OC WCL 10/2008 03/2014 03/2016 339.77 339.77 0.00 24 157 MUMBAI URBAN TRANSPORT MRTP 04/2008 03/2014 03/2016 5300.00 5300.00 0.00 24 PROJECT PHASE-II Manipur 158 JIRIBAM TO IMPHAL NEFR 04/2003 03/2011 03/2017 727.56 4444.00 510.81 72 (TUPUI)(NL)(NEFR) Mizoram 159 TUIRIAL HYDRO ELECTRIC NEEPCO 01/2011 07/2014 02/2015 913.63 913.63 0.00 7 PROJECT (60MW) 160 BHAIRABI SAIRONG, NL, NEFR NEFR 04/2008 04/2014 03/2017 619.34 2393.48 286.46 35 Multi State 161 KARANPUR MORADABAD- GAIL 07/2009 01/2012 01/2013 238.68 312.00 30.72 12 KASHIPUR-RUDRAPUR PIPELINE PROJECT PHASE-I 162 DEOGHAR - SULTANGANJ ER 04/2000 12/2012 02/2013 138.00 607.09 339.92 2 (INL), ER 163 DABHOL-BANGALORE GAIL 06/2009 03/2012 02/2013 4543.43 2500.00 -44.98 11 PIPELINE

PROJECT PHASE-I

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) 164 Surat- Dahisar(Six Lane) Km 263 NHAI 02/2009 08/2011 02/2013 1693.75 1693.75 0.00 18 to Km 502 165 COMPRESSOR STATIONS GAIL 11/2007 04/2011 02/2013 1167.00 798.00 -31.62 22 (KAILARAS AND CHAINSA) 166 GADWAL - RAICHUR (NL), SCR SCR 04/1998 02/2011 02/2013 92.63 270.00 191.48 24 167 INTERCONNECTION PGCIL 10/2010 10/2012 03/2013 160.32 160.32 0.00 5 BETWEEN ELECTTRICAL GRIDS OF INDIA AND BANGLADESH - INDIAN PORTION 168 765KV System for Central part of PGCIL 07/2009 06/2012 03/2013 1736.36 1736.36 0.00 9 Northern Region Grid - Part-II 169 System Strengthening -XII of SR PGCIL 02/2010 06/2012 03/2013 232.34 232.34 0.00 9 170 System Strengthening -X of SR PGCIL 12/2009 04/2012 03/2013 276.61 276.61 0.00 11 171 VKPL UPGRADATION AND GAIL 12/2009 03/2012 03/2013 463.32 330.47 -28.67 12 LAYING OF SPURLINE (TO BHILWARA AND CHITTORGARH) 172 765 KV SYSTEM FOR CENTRAL PGCIL 02/2009 02/2012 03/2013 1347.32 1347.32 0.00 13 PART OF NORTHERN GRID PART-I 173 TR. SYSTEM ASSOCIATED PGCIL 04/2008 07/2011 03/2013 297.37 386.32 29.91 20 WITH CHAMERA III HEP 174 North Tapti Gas Field Development ONGC 07/2008 03/2011 03/2013 589.70 755.76 28.16 24 175 FREIGHT OPERATIONS FOIS 03/1984 03/1995 03/2013 520.00 634.13 21.95 216 INFORMATION SYSTEM (FOIS) 176 Development of BHE and BH-35 ONGC 08/2010 03/2013 04/2013 372.11 372.11 0.00 1 Area. 177 NORTHERN REGION SYSTEM PGCIL 10/2010 01/2013 06/2013 182.68 182.68 0.00 5 STRENGHTENING SCHEME-XX 178 ACQUISITION OF ONE (1) NOS. SHIPP. 07/2011 01/2013 06/2013 220.49 220.49 0.00 5 OF

3500 TEU CELLULAR CONTAINER 179 TRANSMISSION SYSTEM PGCIL 12/2008 12/2012 06/2013 7031.88 7031.88 0.00 6 ASSOCIATED WITH SASAN ULTRA MEGA POWER PROJECT 180 ADDITIONAL DEV. OF D-1 ONGC 01/2010 06/2012 06/2013 2163.64 2163.64 0.00 12 FIELD 181 765KV System for Central part of PGCIL 11/2009 05/2012 06/2013 1075.12 1075.12 0.00 13 Northern Region Grid - Part-III

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) 182 Augmentation of Iron Ore Storage RINL 05/2008 05/2012 06/2013 480.00 450.00 -6.25 13 in RMHP 183 Gurgaon-Kotputli Km 42.70 to 54.4 NHAI 04/2009 10/2011 06/2013 1673.70 1673.70 0.00 20 Km 184 Supply Installation testing and BSNL 07/2010 05/2011 06/2013 1148.19 964.37 -16.01 25 commissioning of Rural Wimax network Phase-II 185 ERP implementation in BSNL on BSNL 10/2009 10/2010 06/2013 384.00 384.00 0.00 32 Turnkey basis 186 EASTERN REGION PGCIL 10/2006 10/2009 06/2013 975.96 975.96 0.00 44 STRENGTHENING SCHEME-I 187 DEV OF G1 AND GS-15 ONGC 04/2003 04/2006 06/2013 429.82 2735.65 536.46 86 (ONGCL) 188 GWALIOR-JHANSI, NH-75 NHAI 12/2003 12/2009 07/2013 604.00 604.00 0.00 43 189 TR. SYSTEM ASSOCIATED PGCIL 02/2009 11/2011 09/2013 184.19 184.19 0.00 22 WITH RAMPUR HEP 190 Development of SB-14 field ONGC 01/2011 11/2012 10/2013 410.44 410.44 0.00 11 191 GUNA-ETAWAH VIA NCR 04/1986 03/1994 10/2013 158.77 580.83 265.83 235 SHIVPURI- GWALIOR -BHIND NL, (NCR) 192 Construction of one Multipurpose ONGC 01/2010 03/2013 11/2013 723.64 723.64 0.00 8 Support Vessel (MSV) 193 Transmission system for transfer of PGCIL 05/2010 01/2013 11/2013 250.03 250.03 0.00 10

power from Gen.proj in sikkim to NR/WR part-A 194 Trans. System associated with PGCIL 02/2010 12/2012 12/2013 2144.00 2144.00 0.00 12 PALLATANA GBPP & BPTS. 195 Northern Region Transmission PGCIL 03/2010 11/2012 12/2013 965.58 965.58 0.00 13 Strengthening Scheme 196 TR. SYSTEM ASSOCIATED PGCIL 10/2008 10/2012 12/2013 4824.12 4824.12 0.00 14 WITH MUNDRA ULTRA MEGA POWER PROJECT 197 SUPPLIMENTARY PGCIL 08/2008 08/2012 12/2013 2360.95 2360.95 0.00 16 TRANSMISSION ASSOCIATED WITH DVC AND MAITHON RBC 198 NORTHERN REGION SYSTEM PGCIL 02/2009 02/2012 12/2013 410.29 410.29 0.00 22 STRENGHTENING SCHEME- XIX 199 NORTHERN REGION SYSTEM PGCIL 02/2009 11/2011 12/2013 520.48 520.48 0.00 25 STRENGHTENING SCHEME-XV

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) 200 NORTHERN REGION SYSTEM PGCIL 02/2009 11/2011 12/2013 509.66 509.66 0.00 25 STRENGHTENING SCHEME- XVIII 201 CONSTRUCTION OF 12 ONGC 06/2007 09/2011 12/2013 736.65 736.65 0.00 27 OFFSHORE SUPPLY VESSELS(OSV) 202 DHOLPUR - MORENA SECTION NHAI 12/2003 09/2010 12/2013 232.45 232.45 0.00 39 (INCLUDING CHAMBOL BRIDGE) NH-3 203 Construction of 23 Immediate ONGC 11/2010 08/2013 01/2014 331.20 269.10 -18.75 5 Supply Vessels (ISV) 204 765 KV POOLING STATION PGCIL 08/2008 08/2012 01/2014 7075.33 7075.33 0.00 17 AND NETWORK WITH DVC AND MAITHOB RBC

205 Northern region system PGCIL 08/2010 04/2013 03/2014 1677.57 1677.57 0.00 11 strengthening scheme-XXI 206 MUZAFFARNAGAR- NHAI 09/2011 03/2013 03/2014 754.00 754.00 0.00 12 HARIDWAR 207 EASTERN REGION PGCIL 07/2010 11/2012 03/2014 1272.80 1272.80 0.00 16 TRANSMISSION SYSTEM-III 208 Transmission System of PGCIL 03/2010 11/2012 03/2014 4672.99 4672.99 0.00 16 Vindhuachal -IV & Rihand -III Gen. Proj. 209 System Strengthening in NR for PGCIL 12/2009 08/2012 03/2014 1216.83 1216.83 0.00 19 SASAN & MUNDRA (UMPP) 210 NEW MAYNAGURI TO NEFR 04/2000 12/2008 03/2014 733.00 1655.81 125.89 63 JOGIGHOPA VIA CHANGRABANDHA (NL),NEFR 211 Development of Cluster-7 Fields ONGC 03/2010 03/2013 04/2014 3241.03 5916.65 82.55 13 212 KOCHI-KOOTANAD GAIL 06/2009 12/2012 05/2014 2915.00 2915.00 0.00 17 BANGALORE MANGALORE PIPELINE PROJECT 213 NORTH- EAST NORTH PGCIL 02/2009 08/2013 09/2014 11130.19 11130.19 0.00 13 WESTERN INTERCONNECTOR I PROJECT 214 NORTHERN REGION SYSTEM PGCIL 09/2012 04/2015 05/2015 524.40 524.40 0.00 1 STRENGTHENING SCHEME- XXVIII 215 JAGDISHPUR-HALDIA GAIL 07/2009 01/2013 07/2015 7596.18 7596.18 0.00 30 PIPELINE PROJECT PHASE-I

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) Nagaland 216 New Line from Dimapur to NEFR 04/2006 03/2015 03/2017 850.00 850.00 0.00 24 Zubza(Kohima) national project (NEFR) Odisha 217 SUNAKHALA-GANJAM (GQ) NHAI 04/2000 04/2004 02/2013 225.00 241.53 7.35 106

KM.338-KM.284 (NH-5) 218 Integrated crude Oil handling IOCL 12/2009 06/2012 03/2013 1492.33 1492.33 0.00 9 facilities at Paradip(2nd SPM) 219 BALASORE BHADRAK NHAI 04/2000 02/2004 03/2013 228.70 228.70 0.00 109 (REVIVED) KM 136.5 - 199.14 NH-5 220 GANJAM-ICCHAPURUM,NH- NHAI 04/2000 02/2004 03/2013 263.27 263.27 0.00 109 5(NHAI) 221 LANJHIGARH-JUNAGARH ECOR 04/1993 03/2002 03/2013 100.00 227.94 127.94 132 NL(ECOR) 222 RAJATGARH- RVNL 04/1999 02/2009 04/2013 166.16 243.40 46.49 50 BARANG(LD),ECOR 223 TRANSMISSION SYSTEM FOR PGCIL 09/2010 03/2013 06/2013 2074.86 2074.86 0.00 3 PHASE-I GEN PROJECT IN ORISSA - PART-A 224 PARADIP REFINERY PROJECT IOCL 02/2009 11/2012 11/2013 29777.00 30426.00 2.18 12 225 ENHANCEMENT OF SAIL 11/2011 11/2013 03/2014 254.55 254.55 0.00 4 PRODUCTION CAPACITY AT BOLANI IRON ORE MINES 226 ANANTA OC EXPANSION PH- MCL 08/2008 03/2012 03/2014 207.28 207.28 0.00 24 III (15.0 Mty) 227 KULDA OCP (MAHANADI MCL 01/2005 03/2010 03/2014 302.96 302.96 0.00 48 COALFIELDS LTD) 228 KHURDA ROAD - BARANG RVNL 04/2000 03/2009 03/2014 133.41 225.00 68.65 60 3RD LINE (DL) (ECOR) 229 BALRAM OCP MCL 12/2007 03/2010 03/2015 172.08 172.08 0.00 60 EXTENSION,MCL 8.00 Mty Punjab 230 CHANDIGARH- NR 07/1998 12/2012 02/2013 248.44 1115.21 348.89 2 LUDHIANA(NEW BG LINE),NR 231 NANGAL - AMMONIA PLANT NFL 01/2010 01/2013 03/2013 1478.63 1478.63 0.00 2 FEEDSTOCK PROJECT

DATE OF DATE OF DATE OF COST COST COST TIME

SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) 232 PATHANKOT- BHOGPUR, NHAI 12/2003 05/2008 03/2013 284.00 359.00 26.41 58 KM.26- KM.70, NS-38 NH-1A 233 AMRITSAR-PATHANKOT NHAI 05/2010 11/2012 06/2013 705.00 705.00 0.00 7 Rajasthan 234 Kishangarh-Ajmer-Beawer NHAI 11/2009 05/2012 02/2013 795.00 795.00 0.00 9 235 Jaipur-Tonk-Deoli NHAI 06/2010 12/2012 03/2013 792.06 792.06 0.00 3 236 KOTA BYPASS,RJ-4, NH-76 NHAI 12/2003 10/2008 06/2013 275.00 250.39 -8.95 56 (NHAI) 237 CHAMBAL BRIDGE, NH-76 (RJ- NHAI 12/2003 02/2010 12/2013 275.00 281.31 2.29 46 5) 238 102 MW WIND POWER ONGC 07/2010 06/2012 03/2014 1106.00 678.02 -38.70 21 PROJECT 239 RAJASTHAN ATOMIC POWER NPCIL 10/2009 12/2016 03/2017 12320.00 12320.00 0.00 3 PROJECT -7 and 8 (2X700 MW) Sikkim 240 C/o new Airport at AAI 01/2009 01/2011 12/2013 309.46 309.46 0.00 35 Pakyong(Sikkim) Airport 241 SEVOK RANGPO, NEFR NEFR 04/2008 12/2015 03/2020 1339.48 3380.58 152.38 51 Tamil Nadu 242 TRICHY - KORUR NH-67 NHAI 03/2005 07/2010 03/2013 516.00 516.00 0.00 32 243 THANJAUR-TRICHY,NH- NHAI 03/2005 06/2009 03/2013 280.00 280.00 0.00 45 67(NHAI) 244 KUDANKULAM APP (NPCIL) NPCIL 12/2001 12/2008 03/2013 13171.00 17270.00 31.12 51 245 KUNADANKULAM APP TRANS PGCIL 05/2005 09/2008 03/2013 1779.29 2159.07 21.34 54 SYSTEM (PGCIL) 246 SALEM - U / UNDRUPET(BOT - NHAI 03/2005 01/2011 05/2013 941.00 941.00 0.00 28 1/TN- 06) NH -68 247 ENNORE MANALI EXPRESS PORT 10/2002 03/2006 06/2013 150.00 600.00 300.00 87 WAY,F/O SPECIAL PURPOSE TRUST VEHICLE (SPV) 248 TPS-II EXPANSION (1470MW NLC 10/2004 06/2009 09/2013 2030.78 3027.59 49.09 51 TO 1970MW) (NLC) 249 EXT. OF MRTS FROM MRTP 04/2006 06/2013 03/2014 495.74 495.74 0.00 9

VELACHERY TO STN. THOMAS, MTP 250 TUTICORIN THERMAL POWER NLC 05/2008 03/2012 03/2014 4904.54 4909.54 0.10 24 PROJECT- 2X500 MW 251 Chennai-Tada(Six lane) NHAI 04/2009 10/2011 03/2014 353.37 353.37 0.00 29 252 NEYVELI NEW THERMAL NLC 06/2011 12/2015 08/2017 5907.11 5907.11 0.00 20 POWER PROJECT(2x500 MW)

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) Tripura 253 Up-gradation of Konaban GGS and ONGC 07/2008 08/2012 05/2013 288.04 253.66 -11.94 9 Pipeline Grid Project, Tripura 254 AGARTALA SABROOM, NL, NEFR 04/2008 03/2014 12/2015 813.34 1141.75 40.38 21 NEFR Uttar Pradesh 255 AGRA-SHIKOHABAD (GQ) NHAI 04/2000 03/2005 02/2013 367.49 367.49 0.00 95 KM.199.66-KM.250.50 (NH-2) 256 GANGA BRIDGE TO RAMDEVI NHAI 12/2003 09/2008 03/2013 155.00 201.66 30.10 54 CROSSING PH.II NH-25, KM.75- 80.06 257 ORAI TO JHANSI (UP-5),NH-25, NHAI 12/2003 03/2008 03/2013 340.68 340.68 0.00 60 KM.220.0 TO KM.170.0 258 HAPUR-GARHMUKTESWAR NHAI 03/2005 09/2007 03/2013 220.00 220.00 0.00 66 (OTHERS) KM.58-93, NH-24 259 JHANSI TO LALITPUR, NH- NHAI 12/2003 09/2009 06/2013 355.06 355.06 0.00 45 25,26 260 Fluidized catalytic cracking IOCL 07/2010 01/2013 08/2013 1000.00 1000.00 0.00 7 unit(FCCU) revamp at Mathura Refinery 261 AGRA-ETAWAH VIA NCR 04/1999 12/2009 10/2013 108.00 432.72 300.67 46 FATEHABAD AND BAH (NL) NCR 262 RIHAND STTP STAGE-III NTPC 01/2009 10/2012 11/2013 6230.81 6230.81 0.00 13 (2X500MW) 263 AGRA-BYPASS(NS-1/UP-1), NH- NHAI 12/2003 09/2007 03/2014 348.16 465.50 33.70 78 2,3

264 UTRATIA-ZAFRABAD, NR NR 04/2006 03/2010 06/2014 325.00 819.40 152.12 51 (LINE DOUBLING) 265 LUCKNOW-RAIBAREILI NHAI 07/1999 07/2012 07/2014 635.90 635.90 0.00 24 266 ETAWAH-MAINPURI (NL),NCR NCR 09/2001 12/2008 09/2014 129.70 245.39 89.20 69 267 TEHRI PUMPED STORAGE THDCL 07/2006 07/2010 11/2016 1657.00 2978.86 79.77 76 PLANT(1000MW) Uttarakhand 268 GSM EQUIPMENT OF 283000 BSNL 01/2009 06/2009 03/2013 149.15 158.72 6.42 45 LINES (2G) AND 75000 LINES (3G) IN UTTRANCHAL 269 HARIDWAR-DEHRADUN NHAI 11/2011 10/2013 03/2014 478.00 478.00 0.00 5 (APPROVED LENGTH 69)

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVALCOMMISSIONINGCOMMISSIONINGORIGINAL ANTICIPATED OVERRUNOVERRUN ORIGINAL ANTICIPATED (Rs.in crore) (Rs. in crore) (%) (MONTHS) 270 Tapovan-Vishnugad HEP NTPC 11/2006 03/2013 09/2015 2978.48 2978.48 0.00 30 (4x130MW) 271 VISHNUGAD PIPALKOTI THDCL 08/2008 07/2014 05/2016 2491.58 3422.44 37.36 22 HYDRO ELECTRIC PROJECT West Bengal 272 TEESTA LOW DAM STAGE III NHPC 10/2003 03/2007 02/2013 768.92 1628.00 111.73 71 HYDROELECTRIC POWER PROJECT (NHPC) 273 C/O INTEGRATED AAI 08/2008 05/2011 03/2013 1942.51 2325.00 19.69 22 PASSENGER TER. BULD. NSCBI AIRPORT 274 ASSAM/WB BORDER TO NHAI 12/2003 11/2008 03/2013 221.82 221.82 0.00 52 GAIRKATTA (WB-1) 275 SILIGURI TO ISLAMPUR (WB- NHAI 12/2003 07/2008 03/2013 225.00 225.00 0.00 56 7) 276 EXPANSION OF IISCO STEEL SAIL 02/2008 12/2011 06/2013 14443.00 16408.00 13.61 18 PLANT 277 Ghutiasharif-Canning (ER) ER 04/2009 12/2011 11/2013 189.97 611.03 221.65 23 278 Bandel-Naihati new rail bridge in ER 04/1999 12/2012 12/2013 207.52 207.52 0.00 12 replacement of jubilee bridge no.8 (ER)

279 EXPANSION OF DURGAPUR SAIL 06/2009 12/2012 12/2013 2875.00 2875.00 0.00 12 STEEL PLANT 280 TEESTA LOW DAM HEP, NHPC 09/2005 09/2009 03/2014 1061.38 1501.75 41.49 54 STAGE-IV (NHPC) 281 JHANJRA R-VI SEAM PSLW ECL 11/2006 03/2011 03/2015 287.18 287.17 0.00 48 282 HOWRAH-AMTA- SER 04/1974 03/2007 03/2015 31.42 535.40 1604.01 96 CHAMPADANGA NL (SER) 283 PANSPURA-KHARAGPUR 3D RVNL 09/2007 02/2010 12/2015 252.50 529.23 109.60 70 LINE 284 New Work for Construction of RVNL 04/2010 03/2014 03/2016 2069.60 2298.42 11.06 24 Metro railway from Baranagar to Barrackpore and Dakshineshwar (MTP) 285 New Work for Construction of RVNL 04/2010 03/2016 06/2016 2397.72 2397.72 0.00 3 Metro railway from Noapara-Barasai VIA Bimanbander (MTP) 286 TAMLUK DIGHA,LINE SER 03/1984 06/2005 06/2016 293.97 1074.47 265.50 132 DOUBLING (SER)

DATE OF DATE OF DATE OF COST COST COST TIME SN PROJECT AGENCY APPROVAL COMMISSIONING COMMISSIONING ORIGINAL ANTICIPATED OVERRUN OVERRUN ORIGINAL ANTICIPATED (Rs.in (Rs.in crore) (%) (MONTHS ) crore) 287BANKURA- DAMODAR SER 03/1998 03/2005 06/2016 111.90 1423.98 1172.55 135 (GC) (SER) TOTAL 458307.10 554356.40 20.96

NATURAL CAPITAL ACCOUNTS 16th August, 2013

RSQ 1240

SHRI VIVEK GUPTA

(a) whether Government has taken initiatives to include Natural Capital in the National Accounts; (b) if so, the details thereof; and (c) by when Government intends to include valuation of environment and natural resources in the GDP of the country?

MINISTER OF STATE (INDEPENDENT CHARGE), MINISTRY OF STATISTICS & PROGRAMME IMPLEMENATION AND MINISTRY OF CHEMICALS & FERTILIZERS (SHRI SRIKANT KUMAR JENA)

(a) to (c): In accordance with the directions of the Hon’ble Prime Minister, Ministry of Statistics and Programme Implementation (MOSPI) constituted an Expert Group in 2011 under the Chairmanship of Prof. Sir Partha Das Gupta, Frank Ramsey Professor Emeritus of Economics, University of Cambridge to develop a framework of Green National Accounts and prepare a road map for India to implement the framework. The Group submitted its Report in March, 2013. The Report is available in the Website of MOSPI (www.mospi.gov.in). The Report has recommended that the transition from the existing System of National Accounts (SNA) to a comprehensive set of National Accounts which includes accounting for natural resources can only occur in a step by step manner. The Report has suggested for exploratory research for identification of principles of valuation and to develop medium term plan extending upto a period of 5 years and long term plan extending upto a period of 10 years depending upon the feasibility of data collection as per data gaps and requirements identified in the Report.

CLEARANCE TO INDUSTRIAL PROJECTS 13th December, 2013

RSQ 1084

SHRI PRABHAT JHA

(a) whether it is a fact that industrial projects worth over 15 lakh crore of rupees which are approved and executed by Central Government are pending;

(b) if so, the details thereof along with the reasons therefor;

(c) whether economic growth has been hampered due to pendency of these industrial projects;

(d) if so, the details thereof; and

(e) the future of these pending projects and whether these projects are likely to get an early clearance, if so, the details thereof?

MINISTER OF STATE (INDEPENDENT CHARGE), MINISTRY OF STATISTICS & PROGRAMME IMPLEMENTATION AND MINISTRY OF CHEMICALS & FERTILIZERS (SHRI SRIKANT KUMAR JENA)

(a) to (e): Ministry of Statistics and Programme Implementation monitors the on-going Central Sector Infrastructure Projects costing ` 150 crore and above on time and cost overruns, after the projects are approved by the competent authority.

As on 1st October 2013, 738 on-going Central Sector Projects were on the monitor of this Ministry. Details of these projects is at Annexure. 301 projects are delayed as against their original date of commissioning.

As reported by the project implementing agencies, the main reasons for delay in implementation are law and order problems, delay in land acquisition, rehabilitation and resettlement problems, fund constraints, delay in forest and environment clearances, right of way/right of use issues, delay in supply of material, contractual issues, etc.

The major steps undertaken to ensure timely completion of projects include rigorous project appraisal; On-line Computerized Monitoring System (OCMS) for better monitoring; setting up of Standing Committees in the Ministries for fixation of responsibility for time and cost overruns; regular review of the infrastructure projects by the concerned administrative Ministries; setting up of Cabinet Committee on Investment (CCI) to review and monitor the implementation of major projects, including issues relating to clearances/approvals; and setting up of Central Sector Projects Coordination Committees (CSPCCs) in the States under the Chief Secretaries for removal of bottlenecks and for facilitating the speedy implementation of major projects.

ANNEXURE REFERRED TO IN REPLY TO PARTS (a) & (b) OF THE RAJYA SABHA UNSTARRED QUESTION NO 1084 DUE FOR ANSWER ON 13.12.2013

Project-wise details of on-going projects costing Rs. 150 crore & above

S PROJECT DATE ORIGINAL ANTICIPAT ORIGI ANTICIPA REPORTE N OF DATE OF ED DATE OF NAL TED D APPRO COMMISSIO COMMISSIO COST COST CUMULA VAL NING NING (Rs: (Rs: crore) TIV crore) EXPENDI TURE (Rs.: crore) Atomic Energy 1 PROTOTYPE FAST 09/2003 09/2010 03/2015 3492.00 5677.00 4681.60 BREEDER REACTOR (BHAVINI, 500 MWE) 2 RAJASTHAN 10/2009 12/2016 03/2017 12320.0 12320.00 2119.00 ATOMIC POWER 0 PROJECT -7 and 8 (2X700 MW) 3 KUDANKULAM APP 12/2001 12/2008 06/2014 13171.0 17270.00 16485.00 (NPCIL) 0 4 KAKRAPAR ATOMIC 10/2009 12/2015 11/2016 11459.0 11459.00 3088.00 POWER PROJECT - 3 0 and 4 Civil Aviation 5 Construction of New 05/2010 05/2012 11/2013 335.61 335.61 244.70 International Terminal Building(Goa) 6 C/O INTEGRATED 08/2008 05/2011 03/2013 1942.51 2325.00 2474.30 PASSENGER TER. BULD. NSCBI AIRPORT 7 D/O KAMARAJ 08/2008 01/2011 02/2012 1808.00 2015.00 1906.88 DOMESTIC TER-PH- II And EXP. ANNA INT. TER BLDG(K1) 8 C/o new Airport at 01/2009 01/2011 03/2015 309.46 309.46 231.71 Pakyong(Sikkim) Airport 9 DEVELOPMENT OF 02/2011 03/2015 03/2015 452.00 452.00 145.42 CHANDIGARH

INTERNATIONAL AIRPORT(MOHALI) PH - II 10 ESTABLISHMENT OF 02/2010 03/2014 06/2014 344.28 344.28 0.00 AIRPORT OPERATIONS CONTROL CENTRES AT 10 AIRPORTS 11 GAGAN PROJECT 09/2008 06/2013 06/2013 626.00 626.00 450.34 12 SUPPLY OF 56 Nos 10/2012 03/2015 03/2015 217.60 217.60 0.02 AIRFIELD FIRE TENDERS AT VARIOUS AIRPORTS Coal 13 Muraidih UG Turn-key 02/2011 04/2014 04/2014 339.88 339.88 0.00 Project 14 Moonidih XV Seam UG 08/2011 04/2015 04/2015 1230.27 1230.27 0.00 15 AMRAPALI 02/2012 03/2020 03/2020 858.11 858.11 49.40 OC(12MTY) 16 RCE OCP ( 12/2009 03/2016 03/2016 510.85 510.85 265.56 3.0 MTY) 17 North Urimari OCP (3.0 12/2007 03/2012 03/2017 179.87 179.87 61.20 MTY) 18 Churi Benti UG (0.81 08/2007 03/2011 03/2016 163.51 163.51 35.12 MTY) 19 Tapin OCP (2.5 MTY) 08/2008 03/2012 03/2016 264.68 264.68 138.21 20 Purnadih OCP (3.0 07/2008 03/2013 03/2015 210.98 210.98 89.33 MTY) 21 KARMA OCP 06/2009 03/2014 03/2014 162.46 162.46 40.81 (1.0MTY) 22 MAGADH OC 20 08/2008 07/2012 03/2016 469.78 706.40 27.60 MTY (CCL) 23 ASHOK EXPN.OCP - 12/2007 03/2011 03/2014 471.66 341.63 108.85 CCL (10 MTY) 24 RAJMAHAL OC EXP. 09/2009 03/2014 03/2016 153.82 153.82 19.29 25 JHANJRA R-VI SEAM 11/2006 03/2011 03/2017 287.18 287.17 4.74 PSLW 26 HINGULA OC-II EXP. 11/2008 03/2013 03/2015 479.63 479.63 116.91 PH-III (15 MTY) 27 BHUBANESWARI 12/2007 03/2017 03/2017 490.00 490.10 151.06 OCP, MCL (20.0 Mty) 28 GOPAL PRASAD OCP 02/2008 03/2015 03/2015 395.87 395.87 72.34 (15MTY) 29 KANIHA OCP, MCL, 12/2007 03/2013 03/2015 457.77 457.77 112.85 (10.0 Mty) 30 BALRAM OCP 12/2007 03/2010 03/2015 172.08 172.08 124.85 EXTENSION,MCL 8.00 Mty 31 KULDA OCP 01/2005 03/2010 03/2014 302.96 302.96 115.30 (MAHANADI COALFIELDS LTD) 32 TALABIRA OCP 03/2008 03/2016 03/2016 447.72 447.72 44.33 33 ANANTA OC 08/2008 03/2012 03/2014 207.28 207.28 115.88 EXPANSION PH-III (15.0 Mty)

34 AMLOHRI EPR (NCL) 12/2009 03/2016 03/2016 1352.04 1143.54 579.32 (6 MTY , INCR.) 35 BLOCK-B OCP NCL 06/2011 03/2015 03/2015 746.04 535.10 161.60 (3.5 MTY) 36 KRISHNASHILA 06/2011 03/2013 03/2014 789.88 741.62 374.23 (NCL) (4MTY) 37 BINA EXTN. PROJ(6.0 11/2006 03/2014 03/2014 168.97 168.97 45.02 Mtpa) 38 KHADIA 06/2011 03/2018 03/2018 1131.28 1131.28 4.92 EXPANSION OPENCAST PROJECT(4 TO 10 MTPA,6MTPA INCREMENTAL) 39 NIGAHI OC 10/2007 03/2012 03/2015 259.40 259.40 6.98 EXPANSION PROJECT 10 MTY TO 15 MTY, SINGRAULI 40 TUTICORIN 05/2008 03/2012 03/2014 4904.54 6540.93 4689.91 THERMAL POWER PROJECT- 2X500 MW 41 TPS-II EXPANSION 10/2004 06/2009 01/2014 2030.78 3027.59 2783.98 (1470MW TO 1970MW) (NLC) 42 NEYVELI NEW 06/2011 12/2015 02/2018 5907.11 5907.11 34.04 THERMAL POWER PROJECT(2x500 MW) 43 RCE OF INDARAM 07/2011 03/2015 03/2015 162.76 162.76 2.56 OCP(1.20 MTPA) 44 RFR OF MANUGURU 11/2012 03/2016 03/2016 430.14 430.14 58.90 OC PROJECT 45 SHANTIKHANI 10/2006 03/2012 N.A. 249.03 249.03 56.69 LONGWALL PROJ- SCCL 46 KAKATIYA 12/2008 12/2012 03/2016 453.63 453.63 91.60 LONGWALL 47 RAMAGUNDAM OC- 12/2009 03/2012 N.A. 418.97 418.97 236.07 II EXTENSION 48 Kistaram OCP 11/2010 03/2015 03/2015 242.29 242.29 0.00 49 RAMAGUNDUM OC - 06/2012 06/2015 06/2015 365.01 365.01 0.00 III EXTENSION (PHASE -II) PROJECT 50 KALYANIKHANI 07/2012 07/2016 07/2016 417.33 417.33 0.09 OPENCAST PROJECT 51 JALLARAM SHAFT 09/2007 03/2013 N.A. 467.78 467.78 12.31 PROJECT 52 JALAGAM 07/2011 03/2015 03/2015 447.06 447.06 14.03 VENGALA RAO OCP- II 53 ADRIYALA SHAFT 12/2009 03/2013 10/2014 212.34 977.53 802.36 PROJECT 54 RKP OCP PHASE-I 03/2010 03/2015 03/2015 209.78 209.78 51.42 55 MANUGURU OC-II 03/2010 03/2012 03/2015 181.19 181.19 34.67 EXTENSION PHASE- II

56 Batura OCP (2.0 MTY) 09/2008 03/2015 03/2015 203.82 203.82 0.00 57 CHURCHA 06/2008 03/2014 03/2016 462.35 462.35 267.52 ROUG(1.35MTY) 58 AMLAI OC 11/2009 03/2016 03/2016 150.59 198.59 89.92 EXPANSION SECTOR B (1.50 MTY) 59 JAGANNATHPOR OC 09/2008 03/2015 03/2017 152.43 152.43 0.00 60 KARTALI (EAST) 07/2008 03/2014 03/2016 178.44 178.44 0.00 OCP (2.50 MTY) 61 DIPKA EXPANSION 12/2009 03/2014 03/2016 1943.66 1943.66 1271.75 OCP (SECL) (20-25) MTY 62 KUSMUNDA 06/2008 03/2013 N.A. 1188.31 1188.31 738.84 EXPN.OCP(SECL)(10- 15)MTY 63 BAROUD OC 04/2012 03/2016 03/2016 258.56 258.56 52.65 EXPANSION (RCE)- 3MTY 64 MANIKPUR OC 12/2009 03/2014 03/2016 321.42 321.50 209.96 EXPANSION (3.5 MTY) 65 PELMA 07/2008 03/2015 03/2015 448.32 448.32 0.00 OCP(10.00MTY) 66 GEVRA EXPANSION 06/2010 03/2014 03/2016 2675.67 2675.67 1422.40 OCP (SECL) (25-35) MTY 67 PENGANGA OC 10/2008 03/2014 03/2016 339.77 339.77 1.23 Petrochemicals 68 Assam gas Cracker 04/2006 04/2012 12/2013 5460.61 8920.00 4510.51 project Petroleum 69 Integrated Refinery 01/1999 12/2015 05/2016 14225.0 14225.00 508.63 Expansion Project 0 70 Capacity Augmentation 04/2011 06/2013 06/2013 152.89 152.89 118.41 of Kota Piyala Section of MMBPL Pipeline 71 Replacement of 01/1999 12/2014 12/2014 1419.00 1419.00 134.21 CDU/VDU at Mumbai Refinery 72 PIPELINE FOR 08/2009 04/2012 12/2013 246.81 276.83 238.10 TRANSFER OF LPG FROM BPCR/HPCR TO URAN LPG PLANT 73 HYDROCRACKER 04/2008 04/2013 09/2013 825.00 1827.00 1469.11 REVAMP AND SETTING UP A NEW CCR AT MUMBAI REFINERY 74 Mounded Bullet Project 12/2012 12/2014 12/2014 279.00 279.00 4.87 at CPCL 75 JHAJJAR HISSAR 11/2007 10/2010 12/2014 281.07 281.07 4.42 PIPE LINE PROJECT 76 Surat Paradip Pipeline 10/2012 N.A. 04/2015 10281.0 10281.00 0.04 Project 0

77 BNPL SPURLINE 12/2009 07/2012 N.A. 540.92 540.92 330.96 (UTTRANCHAL AND PUNJAB) 78 PETROCHEMICAL 08/2010 02/2014 02/2014 8140.00 8140.00 5177.12 COMPLEX-II AT VIJAYPUR AND PATA 79 DABHOL 06/2009 09/2013 09/2013 486.00 486.00 61.61 BANGALORE PIPELINE PROJECT PHASE-II 80 VKPL 12/2009 03/2012 12/2013 463.32 330.47 263.46 UPGRADATION AND LAYING OF SPURLINE (TO BHILWARA AND CHITTORGARH) 81 KARANPUR 07/2009 01/2012 07/2013 238.68 312.00 293.12 MORADABAD- KASHIPUR- RUDRAPUR PIPELINE PROJECT PHASE-I 82 KOCHI-KOOTANAD 06/2009 12/2012 N.A. 2915.00 2300.00 1239.97 BANGALORE MANGALORE PIPELINE PROJECT 83 JAGDISHPUR- 07/2009 01/2013 12/2015 7596.18 7596.18 13.30 HALDIA PIPELINE PROJECT PHASE-I 84 DIESEL 03/2009 09/2011 08/2013 3597.00 2730.00 1697.33 HYDROTREATOR PROJECT AT VISAKH REFINERY 85 MANGALORE 11/2012 11/2015 11/2015 666.00 701.00 16.56 HASSAN MYSORE SOLUR LPG PIPELINE (MHMSLPL) 86 URAN 11/2012 10/2014 10/2014 309.81 309.82 48.71 CHAKAN/SHIKRAPU R LPG PIPELINE 87 RESITMENT OF 01/2009 N.A. 08/2013 756.00 898.00 913.72 MARKETING INSTALATION AT VISAKH 88 CONSTRUCTION OF 01/2008 N.A. 03/2013 224.00 394.00 312.61 NEW TERMINAL AT ENNORE CHENNAI 89 REWARI KANPUR 02/2012 11/2015 11/2015 1210.64 1210.64 281.76 PIPELINE PROJECT 90 DIESEL 03/2009 09/2011 09/2013 3284.00 2174.00 1459.18 HYDROTREATOR PROJECT AT MUMBAI REFINERY

91 De-bottlenecking of 12/2009 N.A. N.A. 1584.00 1584.00 487.90 SMPL 92 PARADIP HALDIA 02/2011 07/2015 07/2015 913.00 913.00 37.26 DURGAPUR LPG PIPELINE 93 PARADIP-RAIPUR- 08/2009 09/2012 N.A. 1793.00 1793.00 885.98 RANCHI PIPELINE 94 PARADIP REFINERY 02/2009 11/2012 05/2014 29777.0 32710.00 23278.00 PROJECT 0 95 Fluidized catalytic 07/2010 01/2013 12/2013 1000.00 1000.00 673.33 cracking unit(FCCU) revamp at Mathura Refinery 96 Ennore-Trichy-Madurai 05/2013 N.A. N.A. 711.00 711.00 0.88 LPG Pipeline 97 BUTENE-1 PROJECT 02/2012 03/2014 03/2014 190.00 190.00 80.85 AT PANIPAT 98 AUGMENTATION OF 08/2011 08/2015 07/2015 586.00 586.00 74.77 PARADIP HALDIA BARAUNI PIPELINE 99 STRATEGIC CRUDE 01/2006 10/2011 01/2014 672.00 1038.00 904.74 OIL STORAGE PROJECT AT VIZAG 10 STRATEGIC CRUDE 01/2006 10/2011 12/2013 732.00 1227.00 722.53 0 OIL STORAGE PROJECT AT MANGALORE 10 SINGLE POINT 07/2010 04/2012 12/2013 1043.57 957.10 655.84 1 MOORING FACILITY(SMP) PROJECT 10 MRPL Phase-III 08/2008 01/2012 10/2013 12412.0 12160.26 10773.71 2 Expansion 0 10 Polypropylene unit 05/2009 07/2012 12/2013 1803.78 1803.78 745.49 3 10 Wax Project 06/2010 12/2013 12/2013 576.60 576.60 306.39 4 10 UPGRADATION OF 09/2012 03/2015 06/2015 871.35 871.35 2.26 5 CRUDE OIL PUMP STATIONS OF NAHARKATIYA- BARAUNI CRUDE OIL TRUNK PIPELINE 10 CONSTRUCTION OF 08/2008 06/2012 03/2014 126.18 159.54 59.74 6 2 FGS IN CHABUA & BAGHJAN 10 Creation of Secondary 08/2006 09/2012 10/2016 374.56 374.56 10.46 7 Tank farm with dehydration facility and ETP at Madhuban 10 GAS TURBINE 07/2009 10/2011 12/2013 216.88 216.88 160.99 8 GENERATION SET 10 CENTRAL GAS 08/2008 06/2012 12/2013 144.02 204.29 133.48 9 GATHERING

STATION AND OFFTAKE POINT 11 Purchase of 2 Nos. of 04/2010 12/2014 12/2014 270.00 270.00 0.00 0 2000 HP Drilling Rig 11 IOR, RUDRASAGAR 09/2001 03/2006 12/2013 113.90 438.85 432.22 1 (ONGCL) 11 IOR GELEKI 09/2001 03/2007 12/2013 390.09 1674.11 1727.24 2 (ONGCL) 11 Development of BHE 08/2010 03/2013 12/2013 372.11 372.11 234.31 3 and BH-35 Area. 11 Construction of 23 11/2010 08/2013 03/2014 331.20 269.10 91.79 4 Immediate Supply Vessels (ISV) 11 Construction of three 03/2012 11/2014 11/2014 260.74 260.74 0.52 5 ETPs, Mehsana 11 DEV OF G1 AND GS- 04/2003 04/2006 02/2014 429.82 2735.65 2184.00 6 15 (ONGCL) 11 Pipeline Replacement 04/2012 05/2014 05/2014 2547.26 1417.00 515.24 7 Project-3 11 IOR of B-173A Field 01/2012 03/2014 05/2014 352.49 352.49 14.71 8 11 DEVELOPMENT OF 06/2007 08/2010 05/2014 3248.78 5633.44 5116.27 9 B-193 CLUSTER FIELDS 12 Ankleswar 11/2010 12/2014 12/2016 2189.63 2189.63 1039.14 0 Redevelopment 12 Up-gradation of 07/2008 08/2012 03/2014 288.04 253.66 199.40 1 Konaban GGS and Pipeline Grid Project, Tripura 12 MUMBAI HIGH 10/2007 05/2010 03/2014 5713.03 8813.41 7204.61 2 SOUTH REDEVELOPMENT PH-2 12 Reconstruction of BPA 03/2013 04/2015 04/2015 1138.50 1138.50 0.00 3 and BPB Platforms 12 ADDITIONAL DEV. 01/2010 06/2012 05/2014 2163.64 2331.62 1557.08 4 OF D-1 FIELD 12 Construction of one 01/2010 03/2013 06/2016 723.64 723.64 0.00 5 Multipurpose Support Vessel (MSV) 12 DEVELOPMENT OF 08/2006 12/2008 03/2014 3195.16 3690.37 2520.91 6 C-SERIES FIELDS 12 ADDITIONAL GAS 10/2008 12/2011 11/2013 1797.35 977.00 773.81 7 PROCESSING UNITS AT URAN 12 Integrated Development 12/2011 03/2015 03/2015 2059.63 2665.65 289.05 8 of B-127 fields 12 Heera and South Heera 03/2012 05/2015 05/2015 5608.40 5608.40 1278.32 9 Redevelopment Ph-II 13 ASSAM RENEWAL 03/2009 03/2013 03/2014 2465.15 2378.86 1496.19 0 PROJECT FOR GROUP A 13 CONSTRUCTION OF 06/2010 01/2014 01/2015 202.94 202.94 2.00 1 ONE ETP AND

THREE ETPS CUM WATER INJECTION PLANTS(WIP) 13 Development of WO-16 06/2010 01/2014 12/2015 2523.00 2523.00 957.44 2 Cluster Fields 13 OFFSHORE GRID 01/2007 03/2010 12/2013 740.02 740.02 730.97 3 INTERCONNECTIVIT Y PROJECT IN MUMBAI HIGH 13 MUMBAI HIGH 01/2009 09/2012 03/2014 7133.39 6855.93 5308.52 4 NORTH DEVELOPMENT PHASE-II 13 CONSTRUCTION OF 06/2007 09/2011 12/2014 736.65 736.65 445.86 5 12 OFFSHORE SUPPLY VESSELS(OSV) 13 102 MW WIND 07/2010 06/2012 03/2014 1106.00 678.02 28.10 6 POWER PROJECT 13 DEVELOPMENT OF 01/2007 09/2010 12/2015 2323.40 2920.82 1902.72 7 B-22 CLUSTER FIELDS 13 DEVELOPMENT OF 06/2007 07/2010 03/2014 1436.21 1436.21 1100.32 8 B-46 CLUSTER FIELD 13 CONVERSION OF 03/2011 05/2013 05/2014 861.79 761.68 289.87 9 RIG SAGAR SAMRAT TO MOBILE OFFSHORE PRODUCTION UNIT(MOPS) 14 Development of C-26 03/2012 05/2014 05/2014 2592.17 2592.17 26.61 0 Cluster Fields 14 Integrated Development 12/2012 02/2016 02/2016 3513.07 3513.07 0.00 1 of Bassein Field 14 Development of SB-14 01/2011 11/2012 10/2013 410.44 410.44 228.26 2 field 14 Development of 04/2012 12/2014 12/2014 600.17 600.17 99.87 3 Western Periphery of MH South Field 14 Pipeline Replacement 09/2011 07/2016 07/2016 202.25 160.16 0.00 4 Project, Ahmedabad 14 Construction of six 03/2009 09/2012 09/2013 234.78 317.64 96.88 5 Effluent Treatment Plants (ETP), Ahmedabad And Ankleswar 14 Construction of 6 ETPs 03/2009 09/2012 12/2013 302.26 240.95 98.72 6 14 Ahmedabad 11/2010 12/2014 12/2016 1916.10 1916.10 783.72 7 Redevelopment 14 Mehesana 11/2010 04/2015 03/2017 3823.00 3823.00 701.81 8 Redevelopment 14 Construction of one 10/2011 07/2014 07/2014 200.69 200.69 3.03 9 ETP at GGS-NADA, Ankleshwar

15 IOR LAKWA - 09/2001 03/2007 09/2013 345.10 750.00 729.07 0 LAKHMANI (ONGCL) 15 Development of 03/2010 03/2013 11/2014 3241.03 6638.94 1451.42 1 Cluster-7 Fields Power 15 PARE HYDRO 12/2008 08/2013 09/2014 573.99 1117.92 660.88 2 ELECTRIC PROJECT 15 TRIPURA GAS 07/2009 07/2013 05/2014 421.01 623.44 645.71 3 BASED POWER PROJECT 15 KAMENG 12/2004 12/2009 03/2017 2496.90 5139.00 2473.56 4 HYDROELECTRIC PROJECT (NEEPCO) 15 TUIRIAL HYDRO 01/2011 07/2006 02/2015 913.63 913.63 470.13 5 ELECTRIC PROJECT (60MW) 15 NIMOO BAZGO 08/2006 08/2010 10/2013 611.01 936.00 877.64 6 HYDROELECTRIC PROJECT 15 PARBATI H.E.P. 10/2005 10/2010 03/2014 2304.56 2716.00 2184.87 7 STAGE -III (NHPC) 15 URI H.E.P STAGE -II 08/2005 11/2009 10/2013 1729.29 2081.00 2053.70 8 (NHPC) 15 PARBATI HEP 09/2002 09/2009 07/2018 3919.59 5366.00 4058.55 9 (NHPC) II 16 TEESTA LOW DAM 09/2005 09/2009 11/2014 1061.38 1501.75 1387.84 0 HEP, STAGE-IV (NHPC) 16 SUBANSIRI LOWER 09/2003 09/2010 03/2018 6285.33 10667.00 6362.61 1 H.E.P (NHPC) 16 KISHANGANGA HEP 07/2007 01/2016 11/2016 2238.67 3642.00 2677.22 2 16 BONGAIGAON 01/2008 07/2011 06/2016 4375.35 4375.35 4050.00 3 THERMAL POWER PROJECT 16 BARH STPP STAGE - 02/2008 08/2013 09/2014 7341.04 7341.04 6354.00 4 II 16 KUDGI STPP STAGE 12/2011 12/2016 12/2016 15166.1 15166.19 1845.00 5 1 9 16 MOUDA STPP STAGE 03/2012 09/2016 09/2016 7921.47 7921.47 1194.00 6 2 16 Tapovan-Vishnugad 11/2006 03/2013 07/2017 2978.48 3846.30 1899.00 7 HEP (4x130MW) 16 SOLAPUR STPP 03/2012 11/2016 11/2016 9395.18 9395.18 1653.00 8 16 VINDHYACHAL 12/2011 08/2015 08/2015 3180.40 3180.40 503.00 9 STPP STAGE-V 17 Gadarwara Super 02/2013 09/2017 09/2017 11638.5 11638.55 687.00 0 Thermal Power Project 5 Stage-I 17 KOLDAM HEP 10/2002 04/2009 09/2014 4527.15 6414.56 5134.00 1 (NTPC) 17 Lata-Tapovan Hydro 07/2012 08/2017 08/2017 1527.00 1527.00 113.03 2 Electric Power Project 3x57 MW

17 LARA SUPER 11/2012 05/2017 05/2017 11846.0 11846.00 1115.00 3 THERMAL POWER 0 PROJECT STAGE-I (2 x 800 MW) 17 RIHAND STTP 01/2009 10/2012 10/2013 6230.81 6230.81 4512.00 4 STAGE-III (2X500MW) 17 MOUDA STPP 11/2008 08/2012 03/2013 5459.28 6010.89 4056.00 5 17 VINDHYACHAL 01/2009 10/2012 03/2013 5915.00 5915.00 3401.00 6 STTP STAGE-IV 17 BARH 12/2003 12/2009 03/2017 8692.97 8693.00 8704.00 7 STPP(3X660MW) NTPC 17 TRANSMISSION 11/2011 07/2014 07/2014 2127.51 2127.51 1186.02 8 SYSTEM STRENGTHENING IN WESTERN PART OF WR FOR IPPs GENERATION PROJECTS IN CHATTISGARH 17 TRANSMISSION SYS 02/2012 08/2014 08/2014 324.33 324.33 19.57 9 ASSOCIATED WITH KRISHNAPATNAM UMPP-PART C1 18 TRANSMISSION 07/2011 07/2013 12/2013 181.93 181.93 138.63 0 SYSTEM FOR ESTABLISHMENT OF 400/220 KV GIS SUB STATION AT KALA IN UT DNH 18 Transmission system for 05/2010 01/2013 03/2015 250.03 250.03 63.45 1 transfer of power from Gen.proj in sikkim to NR/WR part-A 18 EASTERN REGION 07/2010 11/2012 03/2015 1272.80 1272.80 725.71 2 TRANSMISSION SYSTEM-III 18 TRANSMISSION 09/2011 12/2013 03/2014 1366.34 1366.34 785.24 3 SYSTEM FOR IPP GENERATION PROJECTS IN MP AND CHATTISGARH 18 SYTEM 12/2011 08/2014 08/2014 297.33 297.33 144.01 4 STRENGTHENING OF SOUTHERN REGION - XIV 18 ESTABLISHMENT OF 03/2012 09/2014 09/2014 198.63 198.63 0.00 5 FIBER OPTIC COMMUNICATION SYSTEM IN NORTHERN REGION 18 TR. SYS. FOR PHASE- 02/2012 10/2014 09/2014 3201.44 3201.44 981.51 6 I PROJ. IN

JHARKHAN AND WEST BENGAL PART-B 18 NORTHERN REGION 09/2012 04/2015 05/2015 524.40 524.40 48.69 7 SYSTEM STRENGTHENING SCHEME-XXVIII 18 SYSTEM 09/2012 12/2014 11/2014 1935.35 1935.35 271.58 8 STRENGTHENING - XIX IN SOUTHERN REGIONAL GRID 18 AUGMENTION OF 12/2012 10/2014 10/2014 156.04 156.04 0.00 9 TRANSFORMERS IN NORTHEN REGION - PART A 19 NORTH- EAST 02/2009 08/2013 06/2015 11130.1 11130.19 6689.59 0 NORTH WESTERN 9 INTERCONNECTOR I PROJECT 19 765 KV POOLING 08/2008 08/2012 03/2014 7075.33 7075.33 5979.25 1 STATION AND NETWORK WITH DVC AND MAITHOB RBC 19 NORTHERN REGION 10/2010 01/2013 11/2013 182.68 182.68 134.45 2 SYSTEM STRENGHTENING SCHEME-XX 19 SYTEM 10/2011 06/2014 06/2014 487.49 487.49 203.81 3 STRENGTHENING XIII OF SR GRID 19 SYSTEM 06/2012 11/2014 11/2014 1263.26 1263.26 282.68 4 STRENGTHENING- XVIII IN SOUTHERN REGION GRID 19 NORTHERN REGION 09/2012 03/2015 03/2015 803.34 803.34 105.74 5 SYSTEM STRENGTHENING SCHEME-XXVI 19 TRANSMISSION 02/2012 10/2014 10/2014 1927.16 1927.16 444.72 6 SYSTEM ASSOCIATED WITH KRISHNAPATNAM UMPP-PART B 19 COMMON SYSTEM 06/2012 06/2015 06/2015 1909.24 1909.24 195.81 7 ASSOCIATED WITH EAST COAST ENERGY PVT. LTD. & NCC POWER PROJECTS LTD. LTOA GENERATION 19 Establishment of 12/2010 08/2013 03/2014 1719.52 1719.52 1289.56 8 pooling stations at Rajgarh and raipur for IPP generation projects

in chattisgarh 19 Transmission System of 03/2010 11/2012 03/2015 4672.99 4672.99 2719.39 9 Vindhuachal -IV And Rihand -III Gen. Proj. 20 System Strengthening - 02/2010 06/2012 11/2013 232.34 232.34 154.44 0 XII of SR 20 Transmission system for 03/2011 03/2014 05/2014 2569.25 2569.25 1906.96 1 phase-I gen.proj.in orissa part-C 20 Transmission system for 03/2011 11/2013 03/2015 1585.12 1585.12 1042.98 2 transfer of power from Gen.proj in sikkim to NR/WR part-B 20 TR SYSTEM FOR 12/2011 08/2014 08/2014 2422.66 2422.66 520.74 3 PHASE-I GENERATION PROJECTS IN JHARKHAND AND WEST BENGAL- PART-A2 20 SYSTEM 12/2011 08/2014 08/2014 1746.65 1746.65 174.49 4 STRENGTHENING IN NORTH/WEST PART OF WR FOR IPP PROJECTS IN CHATTISGARH 20 765KV System for 11/2009 05/2012 12/2013 1075.12 1075.12 847.35 5 Central part of Northern Region Grid - Part-III 20 Trans. System 02/2010 12/2012 06/2014 2144.00 2144.00 1427.35 6 associated with PALLATANA GBPP & BPTS. 20 Supplementary 08/2010 04/2013 12/2014 170.36 170.36 95.16 7 transmission associated with vellur TPS 20 NORTHERN REGION 09/2013 03/2016 03/2016 680.69 680.69 0.00 8 SYSTEM STRENGTHENING SCHEME-XXV 20 KUNADANKULAM 05/2005 09/2008 03/2013 1779.29 2159.07 1870.81 9 APP TRANS SYSTEM (PGCIL) 21 WESTERN REGION 12/2007 09/2010 N.A. 477.69 477.69 451.73 0 STRENGTHENING SCHEME-V 21 KAIGA 3 and 4 03/2005 12/2007 N.A. 596.45 1007.16 909.70 1 TRANSMISSION SYSTEM (PGCIL) 21 TRANSMISSION 07/2006 01/2010 07/2013 557.24 775.25 645.74 2 SYSTEM ASSOCIATED WITH PARBATI-III HEP 21 TRANSMISSION 12/2011 02/2014 02/2014 552.44 552.44 329.39 3 SYSTEM FOR

CONNECTIVITY OF ESSAR POWER GUJARAT LIMITED 21 COMMON SYSTEM 03/2012 06/2014 06/2014 206.44 206.44 41.42 4 ASSOCIATED WITH ISGS PROJECTS IN VEMAGIRI AREA OF ANDHRA PRADESH PART-A1 21 TRANSMISSION 10/2011 11/2013 09/2014 558.26 558.26 182.18 5 SYSTEM FOR PHASE-1 GENERATION PROJECTS IN JHARKHAND AND WEST BENGAL- PART-A1 21 SYSTEM 09/2012 06/2016 04/2015 1508.74 1508.74 76.61 6 STRENGTHENING - XVII IN SOUTHERN REGIONAL GRID 21 EASTERN REGION 10/2006 10/2009 03/2014 975.96 975.96 885.68 7 STRENGTHENING SCHEME-I 21 NORTHERN REGION 02/2009 11/2011 07/2014 520.48 520.48 363.51 8 SYSTEM STRENGHTENING SCHEME-XV 21 TR. SYSTEM 02/2009 11/2011 10/2013 184.19 184.19 159.08 9 ASSOCIATED WITH RAMPUR HEP 22 System Strengthening in 12/2009 08/2012 06/2014 1216.83 1216.83 910.02 0 NR for SASAN & MUNDRA (UMPP) 22 Northern Region 03/2010 11/2012 03/2014 965.58 965.58 607.55 1 Transmission Strengthening Scheme 22 NORTHERN REGION 11/2011 11/2014 11/2014 723.63 723.63 195.23 2 SYSTEM STRENGTHENING SCHEME-XXIV 22 Transmission System 09/2013 05/2016 05/2016 1575.30 1575.30 0.00 3 associated with Mauda Stage-II 22 TRANSMISSION 08/2011 10/2013 12/2013 425.51 425.51 331.70 4 SYSTEM FOR CONNECTIVITY OF MB POWER LIMITED 22 TR SYSTEM FOR 01/2012 01/2014 01/2014 259.28 259.28 111.93 5 ESTABLISHMENT OF 400/220 KV GIS SUBSTATION AT MAGARWADA IN UT DD 22 COMMON SYSTEM 08/2011 08/2014 08/2014 1637.34 1637.34 937.10

6 ASSOCIATED WITH ISGS PROJECTS IN KRISHNAPATTNAM OF ANDHRA PRADESH(PGCIL) 22 WR-NR HVDC 03/2012 06/2015 06/2015 9569.76 9569.76 872.60 7 INTERCONNECTOR FOR IPP PROJECTS IN CHHATTISGARH 22 TRANSMISSION 09/2010 03/2013 05/2014 2074.86 2074.86 1248.80 8 SYSTEM FOR PHASE-I GEN PROJECT IN ORISSA - PART-A 22 SYSTEM 02/2012 02/2015 02/2015 1310.85 1310.85 464.56 9 STRENGTHENING IN WARDHA- AURANGABAD CORRIDOR FOR IPP PROJECTS IN CHATTISGARH 23 ESTABLISHMENT OF 05/2011 05/2014 05/2014 1961.87 1961.87 1131.45 0 POOLING STATIONS AT CHAMPA AND RAIGARH FOR IPP GENERATION PROJECT IN CHHATTISGARH 23 INTEGRATION OF 08/2011 12/2013 12/2013 1391.97 1391.97 1059.23 1 POOLING STATION IN CHATTISGARH WITH CENTRAL PART OF WR FOR IPP GENERATION PROJECTS IN 23 SYSTEM 01/2012 01/2015 01/2015 1422.85 1422.85 432.96 2 STRENTHENING IN RAIPUR-WARDHA CORRIDOR FOR IPP PROJECTS IN CHHATTISGARH 23 NORTHERN REGION 02/2009 11/2011 12/2013 509.66 509.66 385.26 3 SYSTEM STRENGHTENING SCHEME-XVIII 23 NORTHERN REGION 02/2009 02/2012 12/2013 410.29 410.29 266.62 4 SYSTEM STRENGHTENING SCHEME-XIX 23 TR. SYSTEM 10/2008 10/2012 06/2014 4824.12 4824.12 3539.61 5 ASSOCIATED WITH MUNDRA ULTRA MEGA POWER PROJECT 23 SUPPLIMENTARY 08/2008 08/2012 03/2014 2360.95 2580.90 2066.28

6 TRANSMISSION ASSOCIATED WITH DVC AND MAITHON RBC 23 Northern region system 07/2010 07/2013 03/2014 752.64 752.64 327.34 7 strenghening scheme XVI 23 Northern region system 08/2010 04/2013 03/2015 1677.57 1677.57 891.31 8 strengthening scheme- XXI 23 COMMON TR. SYS. 03/2013 06/2015 06/2015 514.20 514.20 0.00 9 ASSOCIATED WITH EAST COAST AND NCC POWER PROJECTS IN SRIKAKULAM AREA A.P. PART- C 24 COMMON SYS. 03/2013 12/2015 12/2015 2514.88 2514.88 0.00 0 ASSOCIATED WITH EAST COAST ENERGY PVT LTD AND NCC POWER PROJECTS LTD LTOA GEN PART- B 24 Transm System for 04/2010 01/2015 12/2015 4404.57 4404.57 392.18 1 development of Pooling stn. in NR part of West Bengal And Transfer of power from B 24 Common System 09/2011 09/2014 09/2014 1940.13 1940.13 1040.50 2 Associated with Coastal Energen Private Limited and Ind-Barath Power(Madras) Limited L 24 COMMON 01/2013 10/2014 10/2014 182.80 182.80 3.60 3 TRANSMISSION SCHEME WITH ISSG PROJECTS IN NAGAPATTINAM/CU DDALOR OF TAMIL NADU - PART A1 24 Transmission system for 12/2010 12/2013 05/2014 2743.19 2743.19 1720.10 4 phase-I generation projects in orissa-part B 24 SYSTEM 03/2012 03/2014 03/2014 213.78 213.78 0.00 5 STRENGTHENING COMMON FOR WR AND NR (LINE BAYS AND REACTOR PROVISION) 24 IMMEDIATE 12/2011 08/2014 08/2014 901.77 901.77 377.02 6 EVACUATION SYSTEM WITH BARH-II TPS

24 RAMPUR HEP(412 01/2007 01/2012 03/2014 2047.03 2047.03 2763.64 7 MW) 24 VISHNUGAD 08/2008 07/2014 09/2017 2491.58 3745.08 364.22 8 PIPALKOTI HYDRO ELECTRIC PROJECT 24 TEHRI PUMPED 07/2006 07/2010 02/2017 1657.00 2978.86 518.78 9 STORAGE PLANT(1000MW) Railways 25 Nadikude-Sri Kalahasti 04/2011 N.A. N.A. 1313.48 1313.48 0.51 0 25 Bhadrachalam-Kovvur 04/2012 N.A. N.A. 923.23 923.23 0.00 1 25 Kondapalli- 04/2013 N.A. N.A. 723.00 723.00 0.00 2 Kothagudem 25 Cumbum-Proddatur 04/2013 N.A. N.A. 829.00 829.00 0.00 3 25 Bhadrachalam Road- 04/2010 N.A. N.A. 337.49 337.49 0.12 4 Sattupalli 25 Manuguru- 04/2013 N.A. N.A. 1112.00 1112.00 0.00 5 Ramagundam 25 Mudkhed-Parbhani 04/2011 N.A. N.A. 390.60 390.60 0.68 6 25 Akola-Khandwa GC 04/2008 N.A. N.A. 184.26 2000.00 21.02 7 Akola-Akot 25 Kadapa-Bangalore 04/2008 N.A. N.A. 2050.00 2050.00 92.95 8 (NL), Kadapa- Pendlimarri Ph-I 25 Akkannapet-Medak 04/2012 N.A. N.A. 153.00 153.00 0.00 9 26 Kazipet-Vijayawada 3rd 04/2012 N.A. N.A. 1054.35 1054.35 0.35 0 line with Electrification 26 Gudur-Durgarajapatnam 04/2011 N.A. N.A. 283.54 283.54 0.02 1 26 3rd line between 04/2011 N.A. N.A. 182.06 184.06 0.98 2 Bhusawal-Jalgaon 26 AMRAVATI- 06/1994 06/1999 03/2011 120.90 725.00 559.04 3 NARKHER NL(CR) 26 PEN ROHA 04/2007 N.A. 03/2014 203.00 203.00 156.83 4 DOUBLING 26 AHMEDNAGAR- 02/1997 N.A. N.A. 353.08 2820.00 141.29 5 PARLI VAIJNATH(NL) CR 26 Wardha-Sewagram 04/2012 N.A. N.A. 297.85 297.85 1.16 6 NGP 3rd line 26 Wardha-Nanded 04/2008 N.A. N.A. 697.00 1604.00 18.11 7 Maharashtra 26 Kalyan-Kasara 3rd line 04/2011 N.A. N.A. 277.70 279.70 1.64 8 26 PANVEL PEN 04/2006 N.A. 01/2014 191.00 191.00 196.89 9 DOUBLING 27 Gaya-Daltonganj via 04/2008 N.A. N.A. 445.25 445.25 0.94 0 Rafiganj (NL) 27 LANJHIGARH- 04/1993 03/2002 10/2013 100.00 227.94 229.64 1 JUNAGARH

NL(ECOR) 27 Gaya-Chatra (NL) 04/2008 N.A. N.A. 415.67 415.67 13.43 2 27 Chhapra-Muzaffarpur 04/2006 N.A. N.A. 285.07 378.56 104.60 3 (NL) 27 KHURDA ROAD- 04/1994 N.A. 03/2014 355.38 1995.25 265.42 4 BOLANGIR(NL)ECOR 27 TALCHER- 04/2005 N.A. N.A. 726.96 810.78 128.44 5 BIMALAGARH(NL)(E COR) 27 Bihta-Aurangabad (NL) 04/2008 N.A. N.A. 326.20 326.20 1.69 6 27 Sakri-Hasanpur Road 04/1999 N.A. N.A. 175.69 325.00 230.97 7 (NL) 27 Jaynagar-Bijalpura 04/2009 N.A. N.A. 470.00 470.00 34.32 8 including extension Bijalpura- Bardibas(Nepal) GC 27 DANIAWAN- 04/2001 N.A. N.A. 104.79 406.92 106.18 9 BIHARSARIF (NL), ECR 28 HAJIPUR-SUGAULI 04/2003 N.A. N.A. 324.66 528.65 191.64 0 VIA VAISHALI (NL), ECR 28 JAYANAGAR- 04/1997 03/2012 N.A. 233.00 1043.56 716.15 1 DARBHANGA- NARKATIA GANJ(GC),ECR 28 Sitamarhi-Jaynagar- 04/2008 N.A. N.A. 678.62 678.62 14.68 2 Nirmali via Sursand (NL) 28 KODERMA-RANCHI 03/1999 07/2005 N.A. 491.19 2957.21 1618.13 3 VIA BARKAKANA (NL),ECR 28 KOSI BRIDGE (NL), 04/2002 03/2012 03/2013 323.41 341.41 289.96 4 ECR 28 KODERMA-TILAIYA 04/2002 N.A. N.A. 459.91 418.17 171.00 5 (NL), ECR 28 PATNA GANGA 04/2001 10/2007 12/2015 624.47 2921.00 1880.08 6 BRIDGE (NL), ECR 28 MANSI-PURNIA 04/1996 03/2012 03/2013 114.01 477.88 442.21 7 (EXTENSION OF MANSI-SAHARSA) GAN ECR 28 Motihari-Sitamarhi 04/2006 N.A. N.A. 211.00 211.00 4.41 8 (NL) 28 Muzaffarpur-Katra- 04/2008 N.A. N.A. 228.05 228.05 0.64 9 Orai-Janakpur Road (NL) 29 Muzaffarpur-Darbangha 04/2008 N.A. N.A. 281.30 281.30 0.58 0 (NL) 29 Hajipur- 04/2013 N.A. N.A. 213.01 213.01 0.00 1 Ramdayalunagar Doubling 29 KODERMA GIRIDH 04/1996 N.A. 03/2010 371.36 768.87 496.29

2 (NL), ECR 29 KHAGARIA- 04/1997 N.A. N.A. 78.23 162.87 124.50 3 KUSHESHWAR ASTHAN (NL) (ECR) 29 RAIL-CUM-ROAD 04/2002 03/2009 12/2014 921.00 2363.00 1174.03 4 BRIDGE AT MUNGER (NL), ECR 29 Darbangha- 04/2005 N.A. N.A. 366.73 366.73 4.00 5 Kusheshwarsthan (NL) 29 Araria-Supaul (NL) 04/2008 N.A. N.A. 304.41 304.41 0.19 6 29 Kursela-Bihariganj 04/2008 N.A. N.A. 192.56 192.56 0.38 7 (NL) 29 Sakri-Nirmali and 04/2004 N.A. N.A. 372.14 355.81 365.77 8 Jhanjharpur- Laukahabazar and Saharsa-Forbesganj (GC) 29 Pandabeswar-Chinpai 04/2004 12/2010 12/2010 225.68 293.74 139.31 9 doubling (ER) 30 Pirpainti-Jasidih 04/2013 N.A. N.A. 915.98 915.98 0.00 0 30 Kalinarayanpur- 04/2010 N.A. N.A. 174.56 174.56 46.21 1 Shantipur doubling with new MM for Ranaghat- Duttaphulia new line 30 Boinchi-Shaktigarh 3rd 04/2011 N.A. N.A. 175.80 175.80 0.88 2 line 30 New Alipur to Akra, 04/2010 N.A. N.A. 494.54 494.54 31.92 3 MM for Budge Budge- Pujali NL, Pujali- Uluberia(Birshivpur) And Pujali-Bahrahat NL 30 Chandpara-Bangaon 04/2003 N.A. N.A. 337.96 337.96 59.07 4 doubling with exension to Chandbazar and new MM for Bongaon- Poramaheshtala & Chand 30 Howrah-Development 04/2011 N.A. N.A. 166.89 166.89 0.00 5 of station including segragation of aarival/departure and other amenities 30 TARAKESWAR - 04/2000 N.A. 02/2012 157.96 1188.91 640.12 6 BISHNUPUR NEW BG LINE (NL), ER 30 Habra-Chandpara, MM 04/2000 N.A. N.A. 157.17 157.17 75.86 7 for Machalandpur- Swarupnagar NL 30 Sonarpur-Canning with 04/2000 N.A. N.A. 297.47 297.47 51.70 8 new MM for Kalikapur- Minakhan via Ghatakpur NL 30 Magrahat-Diamond 04/2009 N.A. N.A. 493.96 493.96 115.49

9 Harbour with MM Sangrampur- Krishanchandpur and Diamond Hatbour - Bahrahat-Kulpi NL 31 Santoshpur-Remount 04/2010 N.A. N.A. 268.52 268.52 77.87 0 Road via Garden Reach- Metiabruze 31 Monigram- Nimtita 04/2012 N.A. N.A. 250.93 250.93 0.00 1 31 BARDHAMAN- 04/2007 12/2010 03/2011 245.15 1106.62 225.47 2 KATWA (GC) 31 Bandel-Naihati new rail 04/1999 12/2012 12/2013 207.52 207.52 179.63 3 bridge in replacement of jubilee bridge no.8 (ER) 31 Tinpahar - Sahibganj 04/2008 03/2012 02/2013 167.73 167.73 49.10 4 (ER) 31 Bazar Sau -Azimganj 04/2012 N.A. N.A. 255.64 255.64 0.00 5 Jn. doubling 31 DEOGHAR - 04/2000 12/2012 02/2013 138.00 607.09 501.62 6 SULTANGANJ (INL), ER 31 Sultanganj-Katuria via 04/2007 N.A. N.A. 450.00 450.00 7.70 7 Asarganj, Tarapur And Belhar 31 Chinpai-Sainthia 04/2005 N.A. N.A. 595.91 595.91 88.51 8 doubling, MM for Pranti-Suri, Chowrigacha-Sainthia via Kandi NL 31 Bariarpiur-Mananpurvia 04/2007 N.A. N.A. 450.55 450.55 9.35 9 Kharagpuer, Lachimpur-Barahat 32 Tarakeshwar-Magra 04/2010 N.A. N.A. 365.17 365.17 1.43 0 New BG line 32 Dakshin-barasal- 04/2009 12/2011 02/2012 259.51 533.38 99.95 1 lakshmikantapur 32 Plassey-Jiaganj 04/2011 03/2015 03/2015 248.07 248.07 9.83 2 Doubling 32 Princepghat-Majerhat 04/2011 03/2017 03/2017 299.60 299.60 1.09 3 Doubling of Circular Railway 32 MANDARHILL- 04/1995 12/2011 03/2013 184.00 900.05 730.72 4 DUMKA- RAMPURHAT (NL),ER 32 Ghutiasharif-Canning 04/2009 12/2011 11/2013 189.97 611.03 130.62 5 (ER) 32 Dankuni-Chandanpur 04/2010 N.A. N.A. 296.44 296.44 3.21 6 4th line, 1st phase of Dankuni-Shaktigarh 4th line with MM Baruipara Furfura NL 32 Pirpainti-Bhagalpur 04/2011 N.A. N.A. 261.38 261.38 14.55 7

32 Hansnabad-Hingalganj 04/2010 N.A. N.A. 172.03 172.03 2.93 8 New BG line 32 Kalinarayanpur- 04/2001 N.A. N.A. 923.52 923.52 232.54 9 Krishnanagar doubling alongwith Krishnanagar - Chapra new line and Naihati-Ranaghat 3 33 Sondalia-Champapukur 04/2010 N.A. N.A. 277.28 277.28 35.91 0 doubling with new MM for Bira-Chakia NL 33 Hansdiha-Godda NL 04/2011 N.A. N.A. 267.09 267.09 0.10 1 33 Sainthia-Tarapith 3rd 04/2011 N.A. N.A. 193.44 193.44 12.34 2 line 33 Liluah-Dankuni 3rd 04/2009 03/2014 03/2014 257.42 257.42 33.39 3 line, MM for Dankuni- Jongalpara-Furfura Sharif NL 33 Katwa-Patuli doubling 04/2010 03/2017 03/2017 423.66 423.66 136.58 4 with new MM for Ahmedpur-Katwa GC 33 Nabadwipdham-Patuli 04/2010 N.A. N.A. 169.82 169.82 32.10 5 doubling 33 Bandel-Boinchi 3rd line 04/2011 N.A. N.A. 288.35 288.35 3.99 6 33 Lakshmikantapur- 04/1999 N.A. N.A. 406.99 406.99 137.78 7 Namkhana subsequently MM for Namkhana- Chandranagar, Kakdwip-Budakhali and Chandranag 33 Howrah Division- 04/2010 N.A. N.A. 157.94 157.94 37.90 8 Platform shelter (40 C Category stations) 33 FREIGHT 03/1984 03/1995 03/2015 520.00 835.04 602.18 9 OPERATIONS INFORMATION SYSTEM (FOIS) 34 Hyderabad/Secunderabd 04/2012 04/2012 N.A. 632.68 816.55 0.44 0 Multi Modal Transport System(MMTS) Phase- II 34 EAST WEST METRO 03/2013 03/2016 03/2016 4874.58 4874.58 0.00 1 CORRIDOR FROM HOWRAH TO SALT LAKE 34 EXT. OF MRTS FROM 04/2006 06/2013 12/2014 495.74 495.74 252.46 2 VELACHERY TO STN. THOMAS, MTP 34 TOLLYGANJ-GARIA 03/2000 12/2006 08/2010 907.69 3176.10 3454.29 3 with extension to Dum Dum-Noapara and Noapara-NSCB Airport(MTP) 34 Circular Railway 04/2009 N.A. N.A. 573.78 573.78 166.84

4 including Remount Road to Santoshpur 34 MUMBAI URBAN 04/2008 03/2014 12/2016 5300.00 6220.15 1301.02 5 TRANSPORT PROJECT PHASE-II 34 Running of 12 car trains 04/2012 N.A. 12/2017 714.10 714.10 2.42 6 on Harbour Line 34 BELAPUR- 03/1996 03/2004 12/2014 401.81 1814.48 319.75 7 SEAWOOD-URAN ELECTRIFIED DOUBLE LINE(MTP) 34 AGRA-ETAWAH VIA 04/1999 12/2009 10/2013 108.00 432.72 406.74 8 FATEHABAD AND BAH (NL) NCR 34 ETAWAH-MAINPURI 09/2001 12/2008 09/2014 129.70 245.39 241.09 9 (NL),NCR 35 Dholpur-Sirmuttra with 04/2010 02/2019 02/2019 622.41 2030.50 1.22 0 extension to Gangapurcity And Mohari-Tantpur & Tanpur-Bansi Paharpur 35 GUNA-ETAWAH VIA 04/1986 03/1994 10/2013 158.77 580.83 580.90 1 SHIVPURI-GWALIOR -BHIND NL, (NCR) 35 LALITPUR-SATNA- 09/1998 05/2008 N.A. 925.00 1630.97 396.70 2 REWA-SINGRULI NL, (NCR) 35 Gwalior-Seopurkala 04/2011 02/2020 02/2020 1176.09 3845.60 1.71 3 with extension to Kota (GC) 35 CONSTRUCTION OF 09/1996 N.A. 12/2013 156.00 406.40 358.30 4 NEW LINE FROM HARMATI- ITANAGAR/NARHAR IAGUN, NEFR 35 NEW B.G. LINE 09/2006 N.A. 03/2015 200.00 385.20 143.25 5 FROM TETELIA TO BYRNIHAT (NATIONAL PROJECT), NEFR 35 Dimapur-Tizit NL 04/2013 N.A. N.A. 4274.00 4274.00 0.00 6 35 Agartala-Akhaura NL 04/2012 N.A. N.A. 252.00 252.00 0.00 7 35 Lumding-SILCHAR 04/1996 03/2009 12/2014 1676.31 5000.00 3677.32 8 Jiribam, Badarpur- Baraigram Kumarghat national project 35 Ambari Falakata to 04/2011 N.A. 03/2015 312.12 312.12 30.77 9 New Maynaguri 36 New Line from 04/2006 03/2015 03/2017 850.00 2441.48 8.94 0 Dimapur to Zubza(Kohima) national project (NEFR) 36 New BG line from 04/2010 N.A. N.A. 4083.02 4083.02 2.79

1 Byrnihat to Shillong 36 KISHANGANJ 04/2008 N.A. 03/2015 282.92 359.86 1.22 2 JALALGARH, NL, NEFR 36 NEW MAYNAGURI 04/2000 12/2008 03/2015 733.00 2350.00 1480.03 3 TO JOGIGHOPA VIA CHANGRABANDHA (NL),NEFR 36 New Jalpaiguri-Siliguri- 04/1999 N.A. N.A. 523.17 1393.44 1032.99 4 New Bongaigaon including Br. line And MM for Chalsa-Naxal& Rajabhatkhowa-Jai 36 New Coochbehar- 04/2012 N.A. 03/2015 283.55 283.55 0.40 5 Gumanihat Patch Doubling project 36 AGARTALA 04/2008 03/2014 12/2015 813.34 1741.00 489.13 6 SABROOM, NL, NEFR 36 SEVOK RANGPO, 04/2008 12/2015 03/2017 1339.48 3380.58 59.60 7 NEFR 36 New Bongaigaon- 04/2013 N.A. N.A. 1798.00 1798.00 0.00 8 Rangia-Kamakghya Doubling 36 New BG line from 04/1999 N.A. 03/2014 175.43 247.75 148.41 9 Dudhnoi-Mendipatar 37 New BG Rly line from 04/1983 N.A. 03/2015 36.80 703.17 250.34 0 Eklakhi-Balurghat including Gazole- Itahar(NL),NEFR 37 Murkongselek-Pasighat 04/2011 N.A. N.A. 165.82 165.82 0.25 1 NL 37 New BG line from 04/2010 N.A. N.A. 221.42 221.42 21.80 2 Kaliyaganj to Buniadpur 37 JIRIBAM TO IMPHAL 04/2003 03/2011 03/2017 727.56 4453.50 1655.40 3 (TUPUI)(NL)(NEFR) 37 KATIHAR - JOGBANI 09/2001 12/2010 03/2015 100.00 1041.79 741.39 4 (GC)(NEFR) 37 NEW B.G. LINE 09/2006 N.A. N.A. 300.00 532.87 42.20 5 FROM ARARIA TO GALGALIA (THAKURGUNG), NEFR 37 Lumding-Hojai Patch 04/2012 N.A. N.A. 246.07 246.07 0.11 6 Doubling Project 37 Construction of NL 04/1999 03/2007 03/2015 895.00 1151.00 944.37 7 from Kumarghat- Agartala 37 RANGIA- 01/2004 N.A. 03/2014 915.70 3019.17 2201.79 8 MURKONGSELEK, (GC) ALONG WITH LINKED FINGERS NEFR 37 ALUABARI ROAD 12/2006 03/2011 03/2011 170.00 435.87 412.10 9 SILIGURI JUNCTION

VIA GALGALIA, NEFR 38 New BG line from 04/2010 N.A. N.A. 242.22 242.22 37.95 0 Balurghat to Hilly NFR 38 New BG line from 04/2010 N.A. N.A. 241.52 238.83 98.33 1 Jagbani to Biratnagar 38 New Coochbehar to 04/2011 N.A. 03/2015 209.77 209.77 22.93 2 Samuktala 38 BHAIRABI SAIRONG, 04/2008 04/2014 03/2017 619.34 2384.34 96.43 3 NL, NEFR 38 BPUTRA BRIDGE AT 09/1997 04/2008 12/2015 1000.00 4996.19 2854.15 4 BOGIBIL AND LINK LINES,NEFR 38 Katakhal to Bhairabi 04/1998 12/2012 03/2015 227.90 223.01 126.12 5 38 MAHARAJGANJ- 04/2003 N.A. 02/2013 218.19 472.00 179.39 6 MASRAKH (NL) - NER 38 ANANDNAGAR 03/2013 N.A. N.A. 307.00 307.00 0.00 7 GHUGHALI VIA MAHRAJGANJ UP 38 AUNRIHAR 03/2012 N.A. N.A. 160.89 199.75 32.35 8 MANDUADIH GAZIPUR VARANASI UP 38 CHHITAUNI 03/2007 N.A. N.A. 243.78 243.78 26.31 9 TAMKUHI ROAD KUSHINAGAR GOPALGANJ UP 39 KANPUR-KASGANJ- 03/1997 N.A. 03/2013 395.00 1708.41 1481.00 0 MATHURA(GC),NER 39 CHHAPRA-BALLIA 03/2013 N.A. N.A. 295.00 295.00 0.06 1 UP 39 GONDA- 03/2002 N.A. 03/2012 381.17 863.23 725.50 2 GORAKHPUR LOOP WITH ANAND NAGAR-NAUTANWA GC (NER) 39 BHOJIPUR 03/2008 N.A. N.A. 195.64 195.64 67.91 3 TANAKPUR VIA PILIBHIT 39 KAPTANGANJ- 04/1999 N.A. 03/2014 323.40 744.71 511.57 4 THAWE-SIWAN- CHHAPRA GC (NER) 39 HATHUA-BHATNI (N 04/2005 N.A. 03/2014 230.03 230.03 149.24 5 L) (NER) 39 KAPILVASTU-BASTI 03/2013 N.A. N.A. 643.00 643.00 0.00 6 VIA BANSI SIDHARTHNAGAR BASTI NAUGARH UP 39 Hissar-Sirsa via Agroha 04/2013 N.A. N.A. 400.00 400.00 0.00 7 and Fatehabad 39 Delhi-Sohna-Nuh- 04/2013 N.A. N.A. 1239.00 1239.00 0.00 8 Firozpur-Jhirka-Alwar 39 Anand Vihar-Tilak 04/2012 N.A. N.A. 295.68 295.68 0.00

9 Bridge 3rd and 4th line 40 Rohtak-Meham Hansi 04/2012 N.A. N.A. 287.00 287.00 0.04 0 40 Haridwar-Laksar 04/2012 N.A. N.A. 219.83 444.18 0.00 1 40 NANGALDAM- 03/1981 07/2012 N.A. 37.68 1036.78 357.94 2 TALWARA(NL),NR 40 JALANDHAR- 03/2002 06/2007 06/2007 409.00 847.75 836.10 3 PATHANKOT- JAMMU-TAWI (LD),NR 40 Deoband 04/2007 N.A. N.A. 336.91 336.91 140.59 4 (Muzaffarnagar)- Roorkee NL 40 Jakhal-Mansa Doubling 04/2008 N.A. N.A. 165.65 165.65 131.83 5 on SPR Section 40 UTRATIA- 04/2006 03/2010 03/2017 325.00 1116.53 231.10 6 ZAFRABAD, NR (LINE DOUBLING) 40 Meerut-Muzafarnagar 04/2012 N.A. N.A. 289.79 289.79 0.00 7 Patch DL 40 Yamunanagar- 04/2013 N.A. N.A. 876.00 876.00 0.00 8 Chandigarh via Sadhaura Narayangarh 40 Mansa-Bhatinda Ph-1 04/2009 N.A. N.A. 396.04 396.04 76.07 9 including MM for Rama Mandi(Raman)-Maur Mandi via Talwandi Saboo NL 41 Qadian-Beas 04/2011 N.A. N.A. 205.22 205.22 1.22 0 41 Bhanupali-Bilaspur Beri 04/2008 N.A. N.A. 1046.88 2966.99 37.82 1 NL 41 JIND-SONEPAT 01/2004 03/2012 12/2012 190.81 693.39 477.36 2 (NL),NR 41 Ambala Cantt-Dhapper 04/2010 N.A. N.A. 338.54 338.54 77.27 3 Ph-1 with new MM of Dhapper-Chandigarh 41 Chandigarh-Baddi NL 04/2007 N.A. N.A. 328.14 328.14 1.03 4 41 Grade Seperator at 04/1999 N.A. N.A. 159.20 159.20 50.29 5 Dayabasti 41 Faizabad-Lalganj via 04/2013 N.A. N.A. 654.00 654.00 0.00 6 Akbarganj, Maharajganj and Raebareli 41 Unchahar-Amethi 04/2012 N.A. N.A. 380.00 380.00 0.35 7 41 CHANDIGARH- 07/1998 12/2012 04/2013 248.44 1115.21 970.35 8 LUDHIANA(NEW BG LINE),NR 41 UDHAMPUR- 03/1995 11/2002 12/2017 2500.00 20000.00 8822.50 9 SRINAGAR- BARAMULLA (NL),NR 42 Thiyat Hamira-Sanu 04/2013 N.A. N.A. 236.39 236.93 0.00

0 42 Ratangarh-Sardarsahar 04/2010 N.A. N.A. 739.65 872.22 789.67 1 (MM of Sadulpur- Bikaner And Ratangarh- Degana GC) 42 Rani-Marwar Jn. Patch 04/2012 N.A. N.A. 288.97 288.97 0.00 2 doubling 42 Bangurgram-Guriya 04/2012 N.A. N.A. 246.08 246.08 0.11 3 Patch doubling 42 Pushkar-Merta 04/2013 N.A. N.A. 323.00 323.00 0.00 4 42 Ajmer-Bangurgram 04/2011 N.A. N.A. 213.39 218.39 16.50 5 42 Ratlam-Dungarpur via 04/2012 N.A. N.A. 2082.75 2082.75 11.26 6 Banswara (NL) 42 DAUSA-GANGAPUR 02/1997 N.A. 03/2014 151.84 410.08 233.81 7 CITY(NL),NWR 42 Himmatnagar - Udaipur 04/2008 03/2015 03/2015 829.74 829.74 35.38 8 Gauge Canvession (NWR) 42 Suratpura - 04/2008 03/2014 03/2014 516.23 516.23 420.70 9 Hanumangarh - Sriganganagar Guage Conversion (NWR) 43 Ajmer-Kota (Nasirabad- 04/2013 N.A. N.A. 822.00 822.00 0.00 0 Jaundri) 43 Guriya-Marwar And 04/2011 N.A. N.A. 239.73 206.22 2.66 1 Karjoda-Palanpur 43 Mavli Jn.-Bari Sadri, 04/2013 N.A. N.A. 456.00 965.16 557.76 2 MM of Ajmer- Chittsurgarh-Udaipur 43 Alwar-Bandikui 04/2013 N.A. N.A. 242.09 242.09 0.00 3 doubling 43 Jaipur - Ringus - Churu 04/2008 03/2014 03/2014 653.19 653.47 248.21 4 and Sikar - Loharu Guage Conversion (NWR) 43 ELECTRIFICATION 02/2008 03/2012 03/2014 171.10 246.44 141.55 5 OF KHURJA- MEERUT- SAHARANPUR AND G'BAD-MEERUT 43 KHURDA ROAD - 04/2000 03/2009 08/2014 133.41 276.00 257.89 6 BARANG 3RD LINE (DL) (ECOR) 43 BHOPAL BINA 3D 09/2007 03/2010 12/2015 687.20 800.00 0.00 7 LINE DOUBLING 43 RAICHUR- 04/2003 12/2007 N.A. 136.62 289.93 264.93 8 GUNTAKAL(DL)(SCR ) 43 HARIDASPUR- 04/1996 N.A. N.A. 301.64 1185.64 242.38 9 PARADEEP(NL) 44 SALKA ROAD - 09/2006 03/2010 N.A. 324.90 385.54 0.00 0 ANUPNAGAR LINE DOUBLING

44 New Work for 04/2010 03/2014 03/2014 2069.60 2069.60 25.21 1 Construction of Metro railway from Baranagar to Barrackpore and Dakshineshwar (MTP) 44 New Work for 04/2010 03/2016 03/2016 2619.02 2619.02 332.96 2 Construction of Metro railway from Joka to Binoy Badal Dinesh Bagh. 44 RAJATGARH- 04/1999 02/2009 08/2014 166.16 288.00 285.59 3 BARANG(LD),ECOR 44 New Work for 04/2010 03/2016 06/2016 2397.72 2397.72 52.60 4 Construction of Metro railway from Noapara- Barasai VIA Bimanbander (MTP) 44 OBULAVARIPALLE- 07/2006 03/2008 N.A. 743.00 1117.11 459.49 5 KRISHNAPATNAM(R VNL) 44 DALLI-RAJHARA - 04/1995 12/2012 N.A. 304.00 968.60 0.00 6 RAOGHAT(PART OF DALLI-RAJHARA- JAGDALPUR),NL,RV NL 44 SUKINDA ROAD - 04/1998 02/2015 02/2015 183.23 818.29 105.60 7 ANGUL (NL)(ECOR) 44 New Work for 04/2010 03/2016 03/2016 3951.98 3951.98 187.23 8 Construction of Metro railway from NSCB Airport to New Garia VIA Rajarhat (MTP) 44 MANOHARABAD- 04/2006 N.A. N.A. 378.56 791.59 0.76 9 KOTHPALL NEW LINE(SCR) 45 NANDYAL- 03/1996 02/2009 03/2012 155.74 883.00 667.01 0 YERRAGUNTLA(NL), SCR 45 GULBARGA- 02/1998 N.A. 05/2009 242.42 832.00 355.51 1 BIDAR,SCR(NL) 45 PEDAPALLI- 12/1994 N.A. 02/2014 124.43 925.30 627.20 2 KARIMNAGAR- NIZAMABAD NL(SCR) 45 GADWAL - RAICHUR 04/1998 02/2011 03/2013 92.63 270.00 280.64 3 (NL), SCR 45 MACHERLA- 07/1998 07/2008 07/2008 125.00 480.00 0.61 4 NALGONDA(NL)(SC R) 45 MUNEERABAD- 04/1997 N.A. 03/2012 218.24 645.00 248.11 5 MAHABOOBNAGAR( NL),SCR 45 KOTLPALLI- 12/2001 N.A. N.A. 330.00 1045.20 9.41 6 NARASAPUR (NL) (SCR)

45 GONDIA- 02/1997 03/1998 N.A. 386.30 1038.00 590.26 7 JABALPUR(GC),(SEC R) 45 CHHINDWARA - 04/2005 N.A. 12/2013 383.79 585.93 194.91 8 NAGPUR (GC)(SECR) 45 Nawada-Laxmipur (NL) 04/2008 N.A. N.A. 620.57 620.57 0.00 9 46 Ara-Bhabhua Road 04/2008 N.A. N.A. 490.80 490.80 0.39 0 (NL) 46 Tamluk-Basulya- 04/2010 06/2013 N.A. 146.95 171.02 113.17 1 Sutahata Doubling 46 RUPSA-BANGRIPOSI 02/1996 03/1998 08/2005 57.94 639.97 176.01 2 (GC)(SER) 46 TAMLUK 03/1984 06/2005 06/2016 293.97 1074.47 448.95 3 DIGHA,LINE DOUBLING (SER) 46 Bhadutola-Jhargram via 04/2011 N.A. N.A. 289.64 289.64 0.07 4 Lalgarh (NL) 46 Champajharan- 04/2010 03/2015 12/2015 149.90 177.38 41.85 5 Bimalgarh Doubling extension 46 GOELKERA- 03/1997 02/2006 N.A. 186.92 261.70 111.25 6 MANOHARPUR,(LD)( SER) 46 Dangoaposi- 04/2010 12/2015 12/2015 309.44 388.67 42.55 7 Rajkharswan 3rd line Doubling 46 RANCHI- 04/1997 06/2004 12/2014 194.07 596.35 347.27 8 LOHARDAGA(GC),SE R 46 Manoharpur- 04/2012 N.A. 03/2016 258.20 258.20 0.14 9 Bondamunda 3rd line Doubling 47 HOWRAH-AMTA- 04/1974 03/2007 03/2015 31.42 535.40 178.39 0 CHAMPADANGA NL (SER) 47 BANKURA - 03/1998 03/2005 12/2016 111.90 1423.98 482.85 1 DAMODAR (GC) (SER) 47 Bowaichandi-Arambagh 04/2010 N.A. N.A. 267.37 267.37 33.79 2 47 Chengalpattu- 04/2007 N.A. N.A. 247.00 951.24 520.43 3 Villupuram doubling with new MM for Tambaram- Chengalpattu 3rd line GC alonwith electrif 47 Madurai- 04/2008 N.A. N.A. 164.41 260.72 10.87 4 Bodinayakkanur 47 Villupuram-Dindigul 04/2008 N.A. N.A. 822.39 1280.83 0.84 5 with Electrification 47 TIDIVANAM- 09/2006 N.A. N.A. 456.00 582.83 175.75 6 NAGARI (NL) 47 DINDIGUL- 09/2006 N.A. 12/2012 343.17 914.98 676.38 7 POLLACHI-

PALGHAT- POLLACHI AND COIMBATORE 47 Sriperumbudur- 04/2013 N.A. N.A. 839.00 839.00 0.00 8 Guduvanchery with spur to Irungattukkottai- Avadi-Sriperumbudur 47 Chennai Beach- 04/1999 N.A. N.A. 271.24 520.00 458.54 9 Tambaram- Chengalpattu Suburban GC 48 Chengannur- 04/2006 N.A. N.A. 191.72 222.95 91.12 0 Chingavanam 48 Chennai-Cuddalore via 04/2008 N.A. N.A. 523.52 1200.00 1.80 1 Mamallapuram 48 Kuruppanthara- 04/2007 N.A. N.A. 270.14 346.15 6.69 2 Chingavanam 48 TIRUCHIRAPPALI- 09/1995 N.A. N.A. 100.00 800.00 549.98 3 NAGORE- KARAIKKAL(SR)(GC ) 48 Ernakulam-Kumbalam 04/2010 N.A. N.A. 189.24 189.24 1.77 4 48 KARUR- 02/1997 N.A. 10/2012 155.55 775.36 755.54 5 SALEM(NL),SR 48 Attippattu-Puttur 04/2008 N.A. N.A. 446.87 527.00 2.88 6 48 ANGAMALI- 10/1998 N.A. N.A. 550.00 1566.00 120.90 7 SABARIMALA (N.L.)(SR) 48 Kumbalam-Turavur 04/2011 N.A. N.A. 252.96 252.96 1.57 8 48 CALICUT- 02/1996 N.A. 02/2012 240.00 579.37 599.40 9 MANGALORE (DL) (SR) 49 Cuddalore-Salem via 04/1999 N.A. N.A. 198.68 556.64 266.48 0 Vriddhachalam GC 49 Madurai-Tuticorin via 04/2011 N.A. N.A. 601.43 800.00 0.14 1 Aruppukkottai 49 Erode-Palani 04/2008 N.A. N.A. 288.57 603.22 1.31 2 49 MAYLADUTHURAI- 09/2007 N.A. N.A. 404.19 1383.45 359.56 3 THIRUVARUR- KARAIKUDI-THIRU 'PONDI'- AGASTIYAMPALLI 49 TINDIVANAM- 09/2006 N.A. N.A. 125.00 227.40 58.00 4 GINGEE- TIRUVANNAMALAI (NL) 49 QUILON- 03/1998 N.A. 03/2013 280.00 1029.92 818.25 5 TIRUNELVELI- TENKASI- VIRUDHUNAGAR(SR )(GC)

49 Gadag-Wadi NL 04/2013 N.A. N.A. 1117.00 1117.00 0.00 6 49 Shimoga-Harihar NL 04/2011 N.A. N.A. 562.74 562.74 0.06 7 49 Bagalkot-Kudachi NL 04/2010 N.A. N.A. 377.93 377.93 10.33 8 49 Ramanagram-Mysore 04/2007 03/2013 03/2014 482.00 482.70 505.38 9 doubling with electrification of Kengesii- Musore (SWR) 50 Rayadurga-Tumkur NL 04/2007 N.A. N.A. 970.34 970.34 188.92 0 50 Srinivasa-pura- 04/2013 N.A. N.A. 296.00 296.00 0.00 1 Madanapalli NL 50 KOTTUR- 04/1995 N.A. 12/2012 65.94 302.23 357.12 2 HARIHAR(NL),(SWR) 50 KADUR- 04/1996 03/2012 03/2013 157.00 333.50 319.60 3 CHIKMAGALUR- SAKLESHPUR (NL),(SWR) 50 HUBLI- 04/1997 N.A. N.A. 227.00 2135.00 101.17 4 ANKOLA(NL),SWR 50 Munirabad (gingera) - 04/2007 N.A. N.A. 179.65 645.00 167.20 5 Raichur NL 50 White Field-Kolar NL 04/2011 N.A. N.A. 341.05 348.85 0.18 6 50 Chikballa-pur- 04/2013 N.A. N.A. 327.25 327.25 0.00 7 Gowribidanur NL 50 Chikballa-pur- 04/2013 N.A. N.A. 558.00 558.00 0.00 8 Putttaparthy-Sri Satya Sai Nilayam NL 50 Digha-Jaleswar 04/2010 N.A. N.A. 553.63 651.17 7.08 9 including MM for Digha-Egra 51 BANGLORE - 02/1999 N.A. N.A. 138.00 901.62 0.51 0 SATYAMANGALAM (NL)(SWR) 51 Hospet-Hubli-Londa- 04/2010 N.A. N.A. 2127.00 2127.00 47.34 1 Vascodagama DL 51 HASSAN- 02/1997 N.A. 01/2013 295.00 412.91 717.04 2 BANGALORE VIA SHRAVANA- BELGOLA(NL),SWR 51 Tumkur-Chitradurga- 04/2011 N.A. N.A. 913.00 913.00 0.46 3 Davengere NL 51 Kolar-Chickbalapur GC 04/2006 01/1999 12/2013 287.99 287.99 421.25 4 51 RAMGANJMUNDI- 04/2001 N.A. N.A. 727.13 1225.90 227.86 5 BHOPAL (NL),WCR 51 Rajkot- 04/1994 N.A. N.A. 320.66 320.66 460.14 6 Veraval,Wansjalia to Jatalsar with new MM for Shapur-Saradiya And Somnath-Kodinar

(GC) 51 Ratlam-Mhow- 04/2008 03/2012 N.A. 603.04 1421.25 260.43 7 Khandwa-Akola (GC) 51 Ahmedabad- 04/2008 03/2013 03/2013 394.14 1215.30 35.42 8 Himmatnagar-Udaipur (WR) 51 Bhavnagar-workshop 04/2006 03/2011 N.A. 117.36 196.95 193.49 9 facilities for 50 BG coaches POH per month (WR) 52 Viramgam-Samakhiali 04/2011 N.A. N.A. 446.00 685.17 14.31 0 (DL) 52 Palanpur-Samakhayali 04/2013 N.A. N.A. 1266.89 1266.89 0.00 1 (DL) 52 Udhna-Jalgaon with 04/2008 03/2014 03/2014 1389.62 1389.62 675.23 2 electrification(doubling) (WR) 52 Dhasa-Jetalsar (GC) 04/2012 N.A. N.A. 376.59 376.59 0.17 3 52 Ahmedabad-Botad 04/2012 N.A. N.A. 567.18 567.18 0.17 4 (GC) 52 Chottaudepur-Dhar(NL) 04/2007 N.A. N.A. 1347.26 1347.26 139.03 5 52 Dahod-Indore via 04/2007 N.A. N.A. 1640.04 1640.04 151.56 6 Sardarpur, Jhabua and Dhar (NL) 52 Viramgam- 04/2010 N.A. 04/2014 279.40 264.06 113.62 7 Surendranagar (DL) 52 Bhuj-Naliya(GC) with 04/2008 03/2012 N.A. 318.24 485.65 1.76 8 extension from naliya to Vayor (WR) 52 Miyagam-Karjan- 04/2011 N.A. N.A. 439.88 439.88 0.70 9 Dabhoi-Samlaya (GC) 53 VIRAMGAM- 04/1990 N.A. N.A. 155.66 548.01 199.64 0 BHILDI(WR),GC 53 HARNOUT -SET.UP 04/2003 N.A. 03/2012 98.74 337.30 222.07 1 OF W/S TO UND. POH OF UP TO50 COAC. WS and PU 53 CHHAPRA-SETTING 03/2005 N.A. 03/2012 470.09 1417.97 1011.09 2 UP OF WHEEL MANUFACTURING PLANT Road Transport And Highways 53 Chilkaluripet- 05/2009 10/2011 06/2014 572.30 572.30 857.90 3 Vijaywada 6 lane (km 355 to Km 434.15) 53 BHUBANESWAR TO 03/2011 08/2013 12/2013 500.29 500.29 509.40 4 PURI 53 SAMBALPUR- 11/2011 05/2014 05/2014 909.00 909.00 941.90 5 BARGARH- CHHATISGARH/ORIS SA BORDER 53 2-LANNING OF 02/2011 02/2014 02/2014 226.00 226.00 189.10 6 SHILONG BYPASS

53 Pune-sholapur,pkg1 11/2009 05/2012 10/2013 1110.00 1110.00 1802.00 7 53 Talegaon-amravati 11/2009 11/2013 11/2013 567.00 567.00 1166.00 8 53 PUNE-SATARA(NH- 10/2010 03/2013 04/2014 1724.55 1724.55 1201.00 9 4) 54 PUNE- 09/2011 01/2014 01/2014 835.00 835.00 388.20 0 SHOLAPUR,Pkg-II 54 LAKHNADON TO 12/2003 09/2009 09/2014 263.17 263.17 235.20 1 MP/MH BORDER (NS- 1/BOT/MP-2), NH-7 54 BHOPAL-SANCHI 10/2011 01/2013 10/2013 209.00 209.00 34.38 2 54 FOUR LANNING OF 04/2011 10/2013 11/2015 682.00 682.00 160.00 3 WALAYAR- VADAKKANCHERRY SECTION 54 NEW MANGALORE 04/2000 06/2011 10/2013 196.50 196.50 288.40 4 PORT NH-17 AND 48 54 Hungund-Surathkal and 09/2010 N.A. 10/2013 946.00 946.00 1790.00 5 Mangalore-Knt/Kerala Border 54 KUNDUPUR- 09/2010 N.A. 06/2014 671.00 671.00 938.40 6 SURATHKAL & MANGLORE 54 DEVIHALLI-HASSAN 12/2010 N.A. 12/2013 453.00 453.00 718.70 7 54 VIJAYAPUR TO 12/2003 03/2008 02/2008 166.27 193.10 198.60 8 PATHANKOT (NS- 35/J AND K) NH-1A KM.50 TO KM.80 54 SRINAGAR TO 06/2011 06/2014 06/2014 1100.70 1100.70 0.00 9 BANIHAL 55 ROHTAK-BAWAL 05/2011 11/2013 11/2013 650.00 650.00 1119.00 0 55 SILCHAR- 12/2003 09/2007 03/2014 157.47 154.57 240.40 1 UDARBAND (PH.II) HN-54, KM.309 TO KM.275 55 MAIBANG TO 12/2003 11/2008 12/2014 167.64 167.64 72.60 2 LUNDING (AS-26), KM.60.500 TO KM.83.400, NH-54 55 NALBARI TO BIJNI 12/2003 06/2008 12/2013 200.00 200.00 288.30 3 (AS-8) 55 GUWHATI TO 12/2003 04/2008 03/2014 175.96 175.96 217.60 4 NALBARI (AS-4) 55 SONAPUR TO 12/2003 03/2008 03/2014 245.00 245.00 491.20 5 GUWAHTI (AS-3) 55 GUWAHATI TO 12/2003 04/2008 03/2014 198.16 198.16 276.20 6 NALBARI (AS-5) 55 HARANGAJO TO 12/2003 07/2009 05/2014 196.00 363.74 158.70 7 MAIBANG, NH-54 55 HARANGAJO TO 12/2003 09/2007 04/2014 212.00 386.10 70.00 8 MAIBANG,km 164.08-

190.587 NH-54 55 CHAMBAL BRIDGE, 12/2003 02/2010 07/2015 275.00 281.31 180.10 9 NH-76 (RJ-5) 56 Kishangarh-Ajmer- 11/2009 05/2012 12/2013 795.00 795.00 1127.00 0 Beawer 56 DEOLI-KOTA 01/2011 07/2013 12/2013 593.00 593.00 582.90 1 56 PATHANKOT- 12/2003 05/2008 12/2013 284.00 359.00 327.60 2 BHOGPUR, KM.26- KM.70, NS-38 NH-1A 56 AMRITSAR- 05/2010 11/2012 12/2013 705.00 705.00 2144.00 3 PATHANKOT 56 SUNAKHALA- 04/2000 04/2004 11/2013 225.00 241.53 162.71 4 GANJAM (GQ) KM.338-KM.284 (NH- 5) 56 NIROLI-ROXY- 07/2011 01/2014 12/2014 586.00 586.00 237.60 5 RAJAMUNDA 56 Indore-Jhabua- 10/2010 04/2013 12/2013 1175.00 1175.00 138.70 6 Gujrat/MP 56 six laning of 12/2011 06/2014 06/2014 1047.00 1047.00 202.40 7 Chandikhol-Jagatpur- Bhubaneswar 56 BARSAT- 08/2012 02/2015 02/2015 867.00 867.00 0.00 8 KRISHNANAGAR 56 2 LANING WITH PS 10/2012 10/2014 10/2014 250.50 250.50 230.10 9 AGRA ALIGARH 57 WALAJAPET 06/2013 11/2015 11/2015 1287.95 1287.95 0.00 0 POONAMALEE KM 106.8 TO KM 13.8 57 BEAWAR-PALI- 12/2011 06/2014 06/2014 2388.00 2388.00 1388.00 1 PINDWARA 57 REENGUS SIKAR 03/2012 09/2014 09/2014 333.51 333.51 236.80 2 57 LAKHNAADON TO 12/2003 06/2010 12/2013 407.60 407.60 186.50 3 MP/MH BORDER,KM 596.75-653.22 (NS- 1/BOT/MP-2),NH7 57 INDORE-DEWAS(NH- 11/2010 05/2013 02/2014 325.00 325.00 532.70 4 3) 57 CHITRADURGA- 03/2011 N.A. 12/2013 839.00 839.00 667.90 5 TUMKUR(NH-4) 57 BELGAUM- 12/2010 N.A. 10/2013 480.00 480.00 567.90 6 DHARWAD(NH-4) 57 4 LANNING OF 12/2010 06/2013 12/2013 1008.50 1008.50 1352.00 7 AHMEDABAD TO GODHARA 57 4 LANNING OF 03/2011 08/2013 12/2013 785.50 785.50 843.90 8 GODHARA TO GUJARAT/MP BORDER 57 BIJNI TO ASSAM/WB 12/2003 06/2005 03/2014 230.00 230.00 239.90 9 BORDER PH.II, KM.30.00 TO 0.00, NH-31 C

58 MAIBANG TO 12/2003 04/2009 12/2014 199.81 385.13 93.63 0 LUNDING (AS-25), KM.83.400 TO KM.111.000 58 NALBARI TO BIJNI 12/2003 06/2008 12/2013 225.00 225.00 266.10 1 (AS-6) 58 Armur to kadloor 02/2010 02/2012 06/2013 390.56 390.56 772.40 2 yellareddy 58 AURANG-RAIPUR, 03/2005 01/2009 12/2013 190.00 190.00 264.60 3 NH-6, KM.232 TO KM.281 58 DHOLPUR - 12/2003 09/2010 08/2014 232.45 232.45 305.20 4 MORENA SECTION (INCLUDING CHAMBOL BRIDGE) NH-3 58 RANCHI-RARGA- 12/2012 06/2015 06/2015 1479.00 1479.00 227.90 5 JAMSETHPUR 58 SALEM - U / 03/2005 01/2011 12/2013 941.00 941.00 1901.00 6 UNDRUPET(BOT - 1/TN-06) NH -68 58 New 4 Lane elevated 09/2010 09/2013 09/2013 1655.00 1655.00 393.70 7 road from chennai airport-maduravoyal NH no.4 58 JAIPUR-REENGUS 08/2010 02/2013 12/2013 267.81 267.81 651.60 8 58 PIMPALGAON- 03/2005 07/2012 12/2013 940.00 940.00 1325.00 9 NASIK-GONDE, NH-3 (NHDP-PHASE-III) 59 NAGPUR- 04/2012 10/2014 10/2014 484.19 484.19 282.80 0 WAINGANGA BRIDGE 59 2-LANING WITH 10/2011 10/2014 10/2014 1565.00 1565.00 691.40 1 PAVED SHOLDERS OF MULTAI CHHINDWARA SEONI SEC 59 JAMMU-UDHAMPUR 07/2010 07/2013 06/2014 1813.76 1813.76 0.00 2 KM.27.5 TO KM.67.00 59 PANIPAT-ROHTAK 04/2011 10/2014 10/2014 807.00 807.00 1318.00 3 59 4 LANING OF 03/2012 09/2014 09/2014 828.00 828.00 490.60 4 JETPUR SOMNATH SECTION OF NH 8D LENGTH KM 127.6 59 DEEWAPUR TO 12/2003 10/2008 06/2014 300.00 300.00 176.80 5 UP/BIHAR BORDER (LMNHP-9)-NH-28, KM.402-360.915 59 PATNA- 08/2010 02/2013 10/2013 671.30 671.30 625.90 6 MUZZAFFARPUR 59 2-LANNING WITH PS 05/2011 02/2014 04/2014 664.00 664.00 564.60 7 KHAGARIA-PURNEA 59 MAIBANG TO 12/2003 11/2008 06/2014 155.04 280.13 125.00

8 LUNDING (AS-24), KM.111.000 TO KM.126.450 59 NAGAON TO 12/2003 06/2008 03/2014 264.72 264.72 301.10 9 DHARAMTUL (AS-2) 60 NALBARI T BIJNI 12/2003 04/2008 05/2014 208.00 208.00 308.70 0 (AS-7) 60 DHARAMTUL TO 12/2003 06/2008 03/2014 200.00 200.00 253.90 1 SONAPUR (AS-19) 60 BRAHMPUTRA 12/2003 04/2010 12/2014 217.61 217.61 297.90 2 BRIDGE,NH NO-31 60 HARIDWAR- 11/2011 10/2013 03/2014 478.00 478.00 281.10 3 DEHRADUN (APPROVED LENGTH 69) 60 MUZAFFARNAGAR- 09/2011 03/2013 03/2014 754.00 754.00 515.80 4 HARIDWAR 60 FOUR LANING OF 02/2013 08/2015 08/2015 1232.00 1232.00 252.60 5 ORISSA CHATTISHGARH BORDER 60 HAPUR- 03/2005 09/2007 11/2013 220.00 220.00 284.20 6 GARHMUKTESWAR (OTHERS) KM.58-93, NH-24 60 GANJAM- 04/2000 02/2004 09/2013 263.27 263.27 276.46 7 ICCHAPURUM,NH- 5(NHAI) 60 PANIKHOLI-RIMOLI 03/2012 09/2014 10/2015 1410.00 1410.00 153.80 8 60 Four Lanning from 04/2010 06/2011 12/2013 1170.52 1170.52 4.41 9 MP/Maharashtra Border to nagpur, Nagpur bypass 61 WADNER- 02/2011 11/2012 03/2014 193.45 193.45 54.59 0 DEVDHARI(NS- 60/MH)(KM 94-123 KM) 61 RAJMARG 12/2003 10/2008 03/2014 251.03 251.03 338.40 1 CHORAHA TO LAKHNANDON,KM 297 TO KM 351, NH- 26 (NHAI) 61 UGRADATION OF 11/2010 N.A. 04/2013 680.00 680.00 0.00 2 HYDERABAD- BANGALORE SECTION 61 NASHRI CHANANI 06/2010 06/2015 05/2016 2159.00 2159.00 0.00 3 61 FORBESGANJ TO 12/2003 09/2008 12/2013 332.94 332.94 475.50 4 SIMRAHI (NH- 57)(NHAI) 61 DHARAMTUL TO 12/2003 05/2008 12/2013 160.00 160.00 207.70 5 SONAPUR,KM 205- 183 (AS-20)

61 GWALIOR-JHANSI, 12/2003 12/2009 12/2014 604.00 604.00 495.40 6 NH-75 61 Gurgaon-Kotputli Km 04/2009 10/2011 12/2013 1673.70 1673.70 2839.00 7 42.70 to 54.4 Km 61 VARANASI- 09/2011 03/2014 03/2014 2848.00 2848.00 921.30 8 AURANGABAD KM.786 TO KM.978.40 61 4-laning of 02/2011 08/2013 12/2014 998.79 998.79 1266.00 9 Brahampore-Faraka 62 4-laning of Raiganj- 02/2011 08/2013 12/2015 580.43 580.43 299.60 0 Dalkola 62 2-LANING OF 04/2012 04/2014 04/2014 624.00 624.00 314.70 1 KRISHNAGIRI- TINDIVANAM (APPROVED LENHTH 170 KM) 62 DELHI AGRA 10/2012 04/2015 04/2015 1928.22 1928.22 302.60 2 APPROVED LENGTH 180.0 KM 62 SILIGURI TO 12/2003 07/2008 03/2013 225.00 225.00 191.30 3 ISLAMPUR (WB-7) 62 6-LANING OF 04/2012 09/2014 09/2014 1396.18 1396.18 1048.00 4 DHANKUNI- KHARAGPUR SECTION 62 GANGA BRIDGE TO 12/2003 09/2008 03/2014 155.00 201.66 144.30 5 RAMDEVI CROSSING PH.II NH- 25, KM.75-80.06 62 JHANSI TO 12/2003 09/2009 12/2013 355.06 355.06 507.40 6 LALITPUR, NH-25,26 62 AGRA-BYPASS(NS- 12/2003 09/2007 03/2014 348.16 465.50 240.70 7 1/UP-1), NH-2,3 62 MURADABAD- 04/2010 06/2013 03/2014 1267.00 1267.00 1876.00 8 BAREILY 62 BAREILY-SITAPUR 03/2011 09/2013 12/2014 1046.00 1046.00 357.00 9 63 2-LANING WITH PS 07/2012 01/2014 01/2014 291.36 291.36 98.48 0 RAIBAREILI TO ALLAHABAD 63 2 LANING WITH PS 01/2013 07/2014 07/2014 373.47 373.47 40.66 1 KANPUR KABRAI 63 TRICHY - KORUR 03/2005 07/2010 03/2014 516.00 516.00 860.70 2 NH-67 63 SIX LANNING OF 06/2011 12/2013 12/2013 535.00 535.00 0.00 3 HOSUR- KRISHNAGRI NH-7 KM.33.130 TO KM.93.00 63 SIX LANNING OF 09/2011 12/2013 12/2013 1250.00 1250.00 16.15 4 KRISHNAGIRI- WALAJHAPET SECTION KM.0.00 TO KM.148.3 NH-46 63 DEVELOPMENT OF 06/2011 06/2013 12/2013 600.00 600.00 75.85

5 ADIQUATE ROAD CONNECTIVITY TO CHENNAI- ENNORE PORT CONNECTIVITY 63 Two laning of Trichy - 05/2010 05/2013 12/2013 374.00 374.00 119.10 6 Karaikudi and Trychi Bypass 63 2 laning of Dindigul - 09/2011 08/2013 02/2015 485.00 485.00 318.00 7 Perigulam Theni- kumili 63 KOTA BYPASS,RJ-4, 12/2003 10/2008 12/2013 275.00 250.39 280.40 8 NH-76 (NHAI) 63 Gujarat/Maharashtra 03/2010 09/2012 12/2013 1509.10 1509.10 2123.00 9 BorderSurat-Hazira Port Section 64 LUCKNOW- 07/1999 07/2012 07/2014 635.90 635.90 257.00 0 RAIBAREILI 64 Chennai-Tada(Six lane) 04/2009 10/2011 03/2014 353.37 353.37 446.20 1 64 CHENGAPALLI TO 09/2010 03/2013 12/2013 852.00 852.00 839.20 2 COIMBATORE BYPASS KM-102.035- 144.740 KM 64 Jaipur-Tonk-Deoli 06/2010 12/2012 02/2014 792.06 792.06 1975.00 3 64 NH CONNECTIVITY 03/2005 02/2010 12/2014 557.00 557.00 1129.00 4 TO ICTT VALLARPADAEU NH - SH 64 SIX LANNING OF 02/2010 08/2012 03/2015 617.00 617.00 154.50 5 VADAKKANCHERRY THRISSURESECTION (KM 240-270KM) 64 HARIHAR- 04/2000 08/2004 10/2013 318.00 207.56 196.57 6 CHITRADURGA (GQ) KM.284-KM.207 (NH- 4) 64 4 LANNING OF 03/2011 09/2013 07/2014 359.00 359.00 39.39 7 BELGUM-KHANPUR SECTION AND 2 LANING OF KHANPUR-KNT/GOA BORDER 64 Panipat-Jalandhar 6 05/2009 11/2011 12/2013 1108.00 2288.00 3466.00 8 lane(Km 96 to 387.1 km) 64 Kandla - Mundra port 01/2011 07/2013 06/2014 953.88 953.88 672.60 9 65 HARANGAJO TO 12/2003 02/2009 05/2014 280.00 280.00 324.60 0 MAIBANG (AS-23), KM.126.450 TO KM.140.700 65 MAIBANG TO 12/2003 04/2009 12/2014 200.00 200.00 169.00 1 LUNDING (AS-27),

KM.40.000 TO KM.60.500 65 BIJNI TO ASSAM WB 12/2003 06/2008 03/2014 195.00 195.00 252.60 2 BORDER (NH- 31.C)(1)(NHAI) 65 BIJNI TO ASSAM 12/2003 06/2008 03/2014 237.80 237.80 289.00 3 /WB.BORDER (NH- 31.C)(NHAI) 65 Surat- Dahisar(Six 02/2009 08/2011 12/2013 1693.75 1693.75 2721.00 4 Lane) Km 263 to Km 502 65 4-laning of Faraka- 02/2011 08/2013 12/2014 1078.84 1078.84 1328.00 5 Raiganj 65 PANVEL-INDAPUR 12/2011 06/2014 06/2014 942.69 942.69 198.50 6 65 KRISHNANAGAR- 02/2012 07/2014 07/2014 702.16 702.16 498.90 7 BERHAMPUR 65 GHAZIABAD- 02/2011 08/2013 06/2014 1141.00 1141.00 1287.00 8 ALIGARH NH-91 65 ETAWAH CHAKERI 03/2013 09/2015 09/2015 1573.00 1573.00 17.23 9 66 THANJAUR- 03/2005 06/2009 09/2014 280.00 280.00 581.50 0 TRICHY,NH- 67(NHAI) 66 Tirupati - Tiruthani - 04/2011 10/2013 10/2013 571.00 571.00 0.00 1 Chennai 66 BALASORE 04/2000 02/2004 11/2013 228.70 228.70 194.51 2 BHADRAK (REVIVED) KM 136.5 - 199.14 NH-5 66 JORBAT - BARAPANI 01/2011 01/2014 01/2014 536.00 536.00 518.00 3 66 NAGPUR- 03/2005 12/2008 03/2014 168.00 168.00 457.30 4 KONDHALI,NH- 6(NHAI) 66 HAVERI-HARIHAR 04/2000 08/2004 10/2013 241.00 196.65 204.82 5 (GQ) KM.340-KM.284 (NH-4) 66 QUAZIGUND- 07/2010 07/2015 06/2016 1987.00 1987.00 973.60 6 BANIHAL KM.220.00 TO KM.188.00 66 DELHI/ HARYANA 04/2007 05/2010 10/2013 486.00 486.00 660.30 7 BORDER TO ROHTAK 66 SAMAIKHIALI - 09/2010 03/2013 12/2013 805.39 805.39 725.40 8 GANDHIDHAM 66 KOTWA TO 12/2003 10/2008 12/2013 240.00 240.00 295.00 9 DEWAPUR(10 LMNHP),NH-28 PHASE-II, KM.440 TO KM.402 67 2 Laning of 05/2011 11/2013 11/2013 511.54 511.54 65.78 0 Muzaffarpur - Sonbarsa 67 PATNA- 09/2011 03/2014 03/2014 574.00 574.00 655.30 1 BAKTZARPUR

KM.181.3 TO KM.231.95 67 2-LANNING WITH PS 10/2011 04/2014 04/2014 375.09 375.09 174.40 2 MOTIHARI-RAXAUL 67 2 LANNING OF 05/2011 11/2013 11/2013 511.54 511.54 642.20 3 MUZAFFARPUR - SONBARSA 67 CUDDAPAH- 11/2010 05/2013 12/2013 1585.00 1585.00 957.80 4 MYDUKUR- KURNOOL KM- 167.750-356.502 KM 67 SIX LANNING OF 11/2011 05/2014 05/2014 1535.00 1535.00 1218.00 5 NELLORE- CHILKALURIPET KM.1182.802 TO KM.1366.547 67 Hazaribagh-Ranchi 08/2010 01/2013 10/2013 625.07 625.07 948.00 6 67 4-laning of Barhi- 02/2012 02/2014 02/2014 398.00 398.00 441.10 7 Hazaribagh 67 4 LANING OF 02/2011 08/2014 07/2015 2498.76 2498.76 1734.00 8 NAGPUR-BETUL 67 AHMEDABAD TO 01/2013 12/2015 12/2015 2125.24 2125.24 34.28 9 VADODARA SECTION 68 2 LANNING OF 05/2011 05/2013 03/2014 351.54 351.54 395.20 0 MOKAMA-MUNGER 68 4-LANNING OF 01/2011 07/2013 12/2013 575.00 575.00 714.40 1 CHAPRA-HAJIPUR 68 2laning with PS 12/2011 05/2014 05/2014 325.00 325.00 161.20 2 Gopalganj-Chappra 68 2-LANING WITH 07/2012 07/2014 07/2014 356.40 356.40 0.00 3 PAVED SHOULDER OF MUZAFFARPUR- BARAUNI Shipping And Ports 68 CONST. & DEV. OF 2 11/2007 12/2010 12/2014 1228.00 1460.00 974.80 4 OFFSHORE CONTAINER BERTHS & TERMINAL 68 Setting up of Single 02/2011 05/2013 05/2013 830.00 621.53 0.00 5 Point Mooring (SPM) and allied facilities off Veera in Gulf of Kutch on BOT bas 68 SETHUSAMUDRAM 06/2005 10/2008 N.A. 2427.40 2427.40 832.04 6 SHIP CHANNEL PROJECT 68 Modification & 06/2010 03/2012 03/2012 277.00 277.00 0.21 7 Strengthening of Existing Berth No. 1 to 6 68 DEEPENING OF 12/2005 N.A. 12/2010 154.84 253.36 221.58 8 CHANNEL AT

PARADIP PORT 68 DEEPENING AND 10/2005 10/2008 N.A. 800.00 1571.60 5.75 9 WIDENING OF MUMBAI HARBOUR CHANNEL AND JNPT CHANNEL 69 ENNORE MANALI 10/2002 03/2006 12/2013 150.00 600.00 139.80 0 EXPRESS WAY,F/O SPECIAL PURPOSE VEHICLE (SPV) 69 Mechanization of coal 02/2010 06/2010 11/2012 444.10 444.10 0.00 1 handling facilities to 200000 DWT Vessels on DBFOT basis 69 SETTING UP OF LNG 03/2009 01/2012 08/2013 3500.00 4150.00 3661.95 2 REGASIFICATION TERMINAL AT PUTHUVYPEEN COCHIN 69 CONSTRUCTION OF 12/2005 03/2011 03/2013 702.00 755.50 219.00 3 13 & 14 CARGO BERTH AT KANDLA 69 Construction of berthing 04/2005 02/2011 12/2012 882.00 1060.00 0.93 4 and allied facilities off Tekra near Tuna,Kandla Port Trust 69 RAIL 03/2007 04/2009 02/2011 245.67 373.22 371.18 5 CONNECTIVITY TO ICTT AT VALLARPADAM AT COCHIN PORT TRUST 69 Acquisition of 4 nos of 08/2010 12/2012 11/2013 612.72 532.83 448.43 6 82000 DWT kamsavmax Bulk carriers from M/S Jiangsu Eastern Heavy Industries 69 Acquisition of Two nos. 04/2009 12/2011 10/2012 277.03 277.03 294.87 7 of 3060 DWT 69 Acquistion of three(3) 10/2010 12/2013 11/2013 1028.10 1012.23 554.60 8 nos of 6500TEU Cellular container vessels from M/S stx shipbuilding co. ltd. 69 ACQUISITION OF 07/2011 01/2013 06/2013 220.49 220.49 98.31 9 ONE (1) NOS. OF 3500 TEU CELLULAR CONTAINER 70 ACQUISITION OF 4 10/2007 04/2011 11/2011 359.44 359.44 358.78 0 NO. OF ANCHOR HANDLING CUM SUPPLY VESSELS 70 ACQUISITION OF SIX 01/2012 03/2014 08/2014 511.87 511.87 106.72 1 (6) NOS. OF ANCHOR

HANDLING TUG CUM SUPPLY 70 Acquisition of two(2) 10/2010 02/2014 02/2014 966.46 994.82 363.20 2 Nos. of 317000 DWT very large crude carriers from M/S Jiangsu rongsheng heavy Steel 70 Bailadila Iron Ore 01/2007 12/2011 12/2013 295.89 607.17 354.04 3 Project Deposit- 11B (NMDC) 70 1.2 MTPA PELLET 04/2011 04/2013 12/2013 572.00 572.00 327.46 4 PLANT PROJECT ,DONIMALAI (NMDC) 70 7.0 MTPA 02/2011 05/2013 03/2014 898.55 898.55 222.75 5 KUMARASWAMY IRON ORE MINE PROJECT (NMDC) 70 330 TPH BOILER-6 07/2007 08/2010 06/2013 260.00 349.64 255.83 6 AND AUXILIARY SYSTEM 70 67.5 MW TG-5 AUX. 07/2007 02/2011 10/2013 230.00 343.58 280.63 7 S'TEM EMERGENCY POWER REQUIREMENT EXP. UNIT 70 EXPANSION OF 10/2005 10/2009 10/2013 8692.00 12291.00 10554.63 8 LIQUID STEEL CAPACITY FROM 3MT TO 6.3MT (RINL) 70 COKE OVEN 08/2007 10/2012 12/2013 108.00 216.68 152.61 9 BATTERY NO. 4 PHASE-II 71 Augmentation of Iron 05/2008 05/2012 12/2013 480.00 450.00 283.63 0 Ore Storage in RMHP 71 ENHANCEMENT OF 11/2011 11/2013 06/2015 254.55 254.55 74.38 1 PRODUCTION CAPACITY AT BOLANI IRON ORE MINES 71 EXPANSION OF 02/2008 12/2011 12/2013 14443.0 16408.00 15038.24 2 IISCO STEEL PLANT 0 71 Expansion of Rourkela 09/2008 03/2013 12/2013 11812.0 11812.00 9933.09 3 Steel Plant 0 71 Rebuilding of Coke 01/2012 12/2014 12/2014 254.90 254.90 3.54 4 Oven Battery-3 at RSP, Rourkela, Oddisha 71 EXPANSION OF 06/2009 12/2012 03/2014 2875.00 2875.00 1841.57 5 71 EXPANSION OF 01/2008 12/2011 12/2013 6325.00 6325.00 3779.97 6 BOKARO STEEL PLANT 71 EXPANSION OF 09/2008 03/2013 09/2014 17265.0 17265.00 10590.79

7 BHILAI STEEL 0 PLANT 71 Cold repair of Coke 07/2012 08/2014 08/2014 332.65 332.65 0.00 8 Oven Battery-9 at BSP, Bhilai, chattisgarh 71 INSTALLATION OF 12/2011 10/2013 06/2014 187.33 187.33 95.71 9 45MVA SAF T WITH OTHER ASSOCIATED FACILITIES 72 Rebuilding of Battery 03/2012 06/2015 06/2015 339.35 339.35 12.59 0 Block 5A and Re- construction of Battery Block 5B Telecommunications 72 Supply Installation 07/2010 05/2011 12/2013 1148.19 964.37 237.44 1 testing and commissioning of Rural Wimax network Phase- II 72 GSM EQUIPMENT OF 02/2008 12/2008 12/2012 373.94 373.94 227.58 2 390K LINES(2G) AND 130K LINES(3G) PH- 5.1 Punjab 72 Implementation of 12/2007 03/2010 N.A. 952.88 952.88 0.00 3 FTTH, the state of the art access network.Procurement of gpon equipmant 72 GSM equipment of 11/2009 11/2010 09/2013 916.70 930.60 828.80 4 1625000Lines (2G) 325000 lines 3(G) MP Phase V.1 Telecom Circle 72 Assam Telecom Circle, 06/2007 01/2009 12/2013 336.81 336.81 164.18 5 Phase-V.I, 2G & 3G 72 ERP implementation in 10/2009 10/2010 12/2013 384.00 384.00 29.45 6 BSNL on Turnkey basis 72 Implementation of 12/2007 03/2010 N.A. 152.65 152.65 0.00 7 FTTH, the state of the art Access Network,procurement of gepon equipment 72 GSM EQUIPMENT OF 01/2009 06/2009 12/2013 149.15 158.72 84.39 8 283000 LINES (2G) AND 75000 LINES (3G) IN UTTRANCHAL 72 GSM equipment of 03/2008 03/2009 01/2013 328.13 392.13 164.58 9 799000Lines (2G) 101000 lines 3(G) JharkhandPhase V.1 Telecom Circle 73 CONVERGENT 01/2006 02/2007 N.A. 247.00 247.00 75.89 0 BILLING AND CRM(MUMBAI)

73 EXPANSION OF 06/2006 10/2007 12/2013 231.38 176.00 86.11 1 EXISTING 750K GSM NETWORK PE NO. 9920/05-06 73 DELHI 02/2006 03/2012 N.A. 229.41 229.41 67.21 2 CONVERGENT BILLING AND CRM PE-5834 73 CONVERGENT 12/2005 02/2007 02/2013 249.00 229.41 67.21 3 BILLING AND CRM- MTNL(DELHI) Urban Development 73 C/o office building for 11/2006 04/2009 N.A. 114.18 173.08 0.00 4 IDBI at bandra Kurla Complex,Mumbai 73 DELHI MRTS PHASE- 09/2011 03/2016 03/2016 35242.0 35242.00 3853.30 5 III 0 73 FARIDABAD 09/2011 09/2014 05/2015 2494.00 2494.00 300.76 6 EXTENSION 73 BANGALORE 05/2006 06/2011 03/2013 6395.00 11609.00 2267.57 7 METRO RAIL PROJECT Water Resources 73 PAGLADIYA DAM 01/2001 12/2007 12/2012 542.90 1187.00 35.49 8 PROJECT GRAND TOTAL 904955. 1078958.4 505233.32 28 6

POOR EXECUTION OF INFRASTRUCTURE PROJECTS 21st February, 2014

RSQ 3103

SHRI AJAY SANCHETI

(a) whether poor implementation is the root cause for India’s poor performance in building its infrastructure;

(b) if so, the root causes identified for poor implementation of various projects particularly those relating to infrastructure sector; and

(c) in what manner Government propose to address this issue?

(a) to (c): Ministry of Statistics and Programme Implementation monitors the on-going Central Sector Infrastructure Projects costing Rs.150 crore and above on time and cost overruns. As on 1st December 2013, 739 on-going Central Sector Projects were on the monitor of this Ministry. Of these, 231 projects are delayed as against their original dates of commissioning.

As reported by the project implementing agencies, the main reasons for delay in implementation are law and order problems, delay in land acquisition, rehabilitation and resettlement problems, fund constraints, delay in forest and environment clearances, right of way/right of use issues, delay in supply of material, contractual issues, etc.

The major steps undertaken to ensure timely completion of projects include rigorous project appraisal; On-line Computerized Monitoring System (OCMS) for better monitoring; setting up of Standing Committees in the Ministries for fixation of responsibility for time and cost overruns; regular review of the infrastructure projects by the concerned administrative Ministries; setting up of Cabinet Committee on Investment (CCI) to review and

monitor the implementation of major projects, including issues relating to clearances/approvals; and setting up of Central Sector Projects Coordination Committees (CSPCCs) in the States under the Chief Secretaries for removal of bottlenecks and for facilitating the speedy implementation of major projects.

DELAY IN INFRASTRUCTURE PROJECTS 21st February, 2014

RSQ 3106

SHRI AVINASH PANDE

(a) whether it is a fact that 423 out of 925 projects each costing 20 crore or more, have failed to meet the deadline as stated by the Ministry;

(b) if so, the reasons for the delay thereof;

(c) the major reasons for the delay in implementing infrastructure projects in States like Assam and Maharashtra; and

(d) the State-wise list of the defaulters along with the list of the cost-overrun of the projects?

MINISTER OF STATE (INDEPENDENT CHARGE), MINISTRY OF STATISTICS & PROGRAMME IMPLEMENTATION AND MINISTRY OF CHEMICALS & FERTILIZERS (SHRI SRIKANT KUMAR JENA)

(a) to (d): Ministry of Statistics and Programme Implementation monitors the on-going Central Sector Infrastructure Projects costing Rs. 150 crore and above (Rs.20 crore and above before 1st April 2010) on time and cost overruns.

As on 1st April 2009, 925 ongoing Central Sector projects costing Rs. 20 crore and above were on the monitor of this Ministry. Of these, 445 projects were delayed as against their original dates of commissioning.

As on 1st December 2013, 739 on-going Central Sector Projects are on the monitor of this Ministry. Of these, 231 projects are delayed as against their original dates of commissioning.

As reported by the project implementing agencies, the main reasons for delay in implementation are law and order problems, delay in land acquisition, rehabilitation and resettlement problems, fund constraints, delay in forest and environment clearances, right of way/right of use issues, delay in supply of material, contractual issues, etc.

The State-wise details of projects having cost overruns on account of delay in completion are at Annexure.

ANNEXURE REFERRED TO IN REPLY TO PARTS (a) to (d) OF RAJYA SABHA UNSTARRED QUESTION NO 3106 DUE FOR ANSWER ON 21.2.2014

State-wise List of Projects Having Time & Cost Overruns as on 01.12.2013

SN PROJECT AGENCY DATE OF ORIGINAL ANTICIPATE COST COST COST COST TIME APPROVAL DATE OF D DATE OF ORIGINAL ANTICIPAT OVERRUN OVERRUN OVERRUN COMMISSIO COMMISSIO (Rs. ED (Rs. (Rs. (%) IN NING NING Crore) Crore) Crore) MONTHS Andhra Pradesh STRATEGIC CRUDE OIL 1 STORAGE ISPRL 01/2006 10/2011 06/2014 672.00 1038.00 366.00 54.46 32 PROJECT AT VIZAG Hyderabad/Secunderabd 2 Multi Modal MRTP 04/2012 04/2012 03/2016 632.68 816.55 183.87 29.06 47 Transport System(MMTS) Phase-II EXPANSION OF LIQUID 03/2014 3 STEEL RINL 10/2005 10/2009 8692.00 12291.00 3599.00 41.41 53 CAPACITY FROM 3MT TO 6.3MT (RINL) 67.5 MW TG-5 AUX. S'TEM 4 EMERGENCY POWER RINL 07/2007 01/2010 11/2013 202.00 343.58 141.58 70.09 46 REQUIREMENT EXP. UNIT 5 COKE OVEN BATTERY RINL 06/2006 09/2008 12/2013 108.00 216.68 108.68 100.63 63 NO. 4 PHASE-II 6 ADRIYALA SHAFT SCCL 12/2009 03/2013 10/2014 212.34 977.53 765.19 360.36 19 PROJECT Arunachal Pradesh KAMENG 7 HYDROELECTRIC NEEPCO 12/2004 12/2009 03/2017 2496.90 5139.00 2642.10 105.82 87 PROJECT (NEEPCO) 8 PARE HYDRO NEEPCO 12/2008 08/2013 09/2014 573.99 1117.92 543.93 94.76 13 ELECTRIC PROJECT 9 SUBANSIRI LOWER NHPC 09/2003 09/2010 06/2018 6285.33 10667.00 4381.67 69.71 93 H.E.P (NHPC) Assam

10 Assam gas Cracker project BCPL 04/2006 04/2012 12/2013 5460.61 8920.00 3459.39 63.35 20 BPUTRA BRIDGE AT 11 BOGIBIL AND LINK NEFR 09/1997 04/2008 12/2017 1000.00 4996.19 3996.19 399.62 116 LINES,NEFR Lumding-SILCHAR 12 Jiribam, Badarpur- NEFR 04/1996 03/2009 03/2017 1676.31 5000.00 3323.69 198.27 96 Baraigram Kumarghat national project MAIBANG TO LUNDING 13 (AS-25), NHAI 12/2003 04/2009 12/2014 199.81 382.02 182.21 91.19 68 KM.83.400 TO KM.111.000 14 HARANGAJO TO NHAI 12/2003 07/2009 04/2014 196.00 331.23 135.23 68.99 57 MAIBANG, NH-54 HARANGAJO TO 15 MAIBANG,km 164.08- NHAI 12/2003 09/2007 05/2014 212.00 333.83 121.83 57.47 80 190.587 NH-54 MAIBANG TO LUNDING 16 (AS-26), NHAI 12/2003 11/2008 12/2014 167.64 265.63 97.99 58.45 73 KM.60.500 TO KM.83.400, NH-54

SN PROJECT AGENCY DATE OF ORIGINAL ANTICIPATE DCOST COST COST COST TIME APPROVAL DATE OF DATE OF ORIGINAL ANTICIPAT OVERRUN OVERRUN OVERRUN COMMISSIO COMMISSIO (Rs. ED (Rs. (Rs. (%) IN MONTHS NING NING Crore) Crore) Crore) 17 BRAHMPUTRA NHAI 12/2003 04/2010 01/2015 217.61 309.56 91.95 42.25 57 BRIDGE,NH NO-31 MAIBANG TO 18 LUNDING (AS-24), NHAI 12/2003 11/2008 12/2014 155.04 241.28 86.24 55.62 73 KM.111.000 TO KM.126.450 HARANGAJO TO 19 MAIBANG (AS-23), NHAI 12/2003 02/2009 05/2014 280.00 361.00 81.00 28.93 63 KM.126.450 TO KM.140.700 MAIBANG TO 20 LUNDING (AS-27), NHAI 12/2003 04/2009 12/2014 200.00 247.43 47.43 23.72 68 KM.40.000 TO KM.60.500

21 Wax Project NRL 06/2010 12/2013 03/2014 576.60 676.05 99.45 17.25 3 CENTRAL GAS 22 GATHERING OIL 08/2008 06/2012 03/2014 144.02 204.29 60.27 41.85 21 STATION AND OFFTAKE POINT CONSTRUCTION 23 OF 2 FGS IN OIL 08/2008 06/2012 03/2014 126.18 159.54 33.36 26.44 21 CHABUA & BAGHJAN 24 IOR GELEKI ONGC 09/2001 03/2007 03/2017 390.09 1674.11 1284.02 329.16 120 (ONGCL) 25 IOR LAKWA - ONGC 09/2001 03/2007 03/2014 345.10 750.00 404.90 117.33 84 LAKHMANI (ONGCL) 26 IOR, RUDRASAGAR ONGC 09/2001 03/2006 12/2013 113.90 480.00 366.10 321.42 93 (ONGCL) Bihar 27 PATNA GANGA ECR 04/2001 10/2007 12/2015 624.47 2921.00 2296.53 367.76 98 BRIDGE (NL), ECR RAIL-CUM-ROAD 28 BRIDGE AT ECR 04/2002 03/2009 12/2014 921.00 2363.00 1442.00 156.57 69 MUNGER (NL), ECR 29 KATIHAR - NEFR 09/2001 12/2010 03/2015 100.00 1022.64 922.64 922.64 51 JOGBANI (GC)(NEFR) 30 BARH NTPC 12/2003 12/2009 03/2017 8692.97 8693.00 0.03 0.00 87 STPP(3X660MW) NTPC Chhatisgarh Bailadila Iron Ore 31 Project Deposit- 11B NMDC 01/2007 12/2011 03/2014 295.89 607.17 311.28 105.20 27 (NMDC) 32 MANIKPUR OC SECL 12/2009 03/2014 03/2016 321.42 321.50 0.08 0.02 24 EXPANSION (3.5 MTY) Goa Construction of New

33 International Terminal AAI 05/2010 05/2012 11/2013 335.61 388.53 52.92 15.77 18 Building(Goa) Himachal Pradesh 34 PARBATI HEP NHPC 09/2002 09/2009 07/2018 3919.59 5366.00 1446.41 36.90 106 (NHPC) II 35 PARBATI H.E.P. NHPC 10/2005 10/2010 03/2014 2304.56 2716.00 411.44 17.85 41 STAGE -III (NHPC) 36 KOLDAM HEP NTPC 10/2002 04/2009 09/2014 4527.15 6358.91 1831.76 40.46 65 (NTPC) 37 KISHANGANGA NHPC 07/2007 01/2016 11/2016 2238.67 3642.00 1403.33 62.69 10 HEP 38 URI H.E.P STAGE -II NHPC 08/2005 11/2009 12/2013 1729.29 2081.00 351.71 20.34 49 (NHPC)

SN PROJECT AGENCY DATE OF ORIGINAL ANTICIPATE COST COST COST COST TIME APPROVAL DATE OF D DATE OF ORIGINAL ANTICIPAT OVERRUN OVERRUN OVERRUN COMMISSIO COMMISSIO (Rs. ED (Rs. (Rs. (%) IN NING NING Crore) Crore) Crore) MONTHS UDHAMPUR-SRINAGAR- 39 BARAMULLA NR 03/1995 11/2002 12/2017 2500.00 20000.00 17500.00 700.00 181 (NL),NR Jharkhand 40 MAGADH OC 20 MTY CCL 08/2008 07/2012 03/2016 469.78 706.40 236.62 50.37 44 (CCL) 41 RANCHI- SER 04/1997 06/2004 12/2014 194.07 596.90 402.83 207.57 126 LOHARDAGA(GC),SER STRATEGIC CRUDE OIL 42 STORAGE ISPRL 01/2006 10/2011 10/2015 732.00 1227.00 495.00 67.62 48 PROJECT AT MANGALORE Ramanagram-Mysore 43 doubling with SWR 04/2007 03/2013 03/2014 482.00 482.70 0.70 0.15 12 electrification of Kengesii- Musore (SWR) Kerala

44 Strategic Crude oil storage ISPRL 01/2006 01/2012 10/2015 993.00 1693.00 700.00 70.49 45 project at Padur Madhya pradesh

45 BHOPAL BINA 3D LINE RVNL 09/2007 03/2010 12/2015 687.20 800.00 112.80 16.41 69 DOUBLING Maharashtra HYDROCRACKER REVAMP AND 46 SETTING UP A NEW CCR BPCL 04/2008 04/2013 11/2013 825.00 1827.00 1002.00 121.45 7 AT MUMBAI REFINERY PIPELINE FOR TRANSFER OF LPG 47 FROM BPCR/HPCR TO BPCL 08/2009 04/2012 03/2014 246.81 276.83 30.02 12.16 23 URAN LPG PLANT BELAPUR-SEAWOOD- 48 URAN MRTP 03/1996 03/2004 12/2014 401.81 1512.86 1111.05 276.51 129 ELECTRIFIED DOUBLE LINE(MTP) MUMBAI URBAN 49 TRANSPORT PROJECT MRTP 04/2008 03/2014 12/2016 5300.00 6220.15 920.15 17.36 33 PHASE-II MUMBAI CONST. & DEV. OF 2 PORT 50 OFFSHORE CONTAINER TRU 11/2007 12/2010 03/2015 1228.00 1429.10 201.10 16.38 51 BERTHS & TERMINAL MUMBAI HIGH SOUTH 51 REDEVELOPMENT PH-2 ONGC 10/2007 05/2010 03/2014 5713.03 8813.41 3100.38 54.27 46 DEVELOPMENT OF B-193 52 CLUSTER ONGC 06/2007 08/2010 05/2014 3248.78 5633.44 2384.66 73.40 45 FIELDS DEVELOPMENT OF B-22 53 CLUSTER ONGC 01/2007 09/2010 12/2015 2323.40 2920.82 597.42 25.71 63 FIELDS

SN ROJECT AGENCY DATE OF ORIGINAL ANTICIPATE COST COST COST COST TIME APPROVAL DATE OF D DATE OF ORIGINAL ANTICIPAT OVERRUN OVERRUN OVERRUN COMMISSIO COMMISSIO (Rs. ED (Rs. (Rs. (%) IN MONTHS NING NING Crore) Crore) Crore) 54 DEVELOPMENT OF C- ONGC 08/2006 12/2008 03/2014 3195.16 3690.37 495.21 15.50 63 SERIES FIELDS Manipur 55 JIRIBAM TO IMPHAL NEFR 04/2003 03/2011 03/2020 727.56 5995.65 5268.09 724.08 108 (TUPUI)(NL)(NEFR)

56 BHAIRABI SAIRONG, NEFR 04/2008 04/2014 03/2017 619.34 2384.34 1765.00 284.98 35 NL, NEFR Multi State FREIGHT 57 OPERATIONS FOIS 03/1984 03/1995 03/2015 520.00 835.04 315.04 60.58 240 INFORMATION SYSTEM (FOIS) GUNA-ETAWAH VIA 58 SHIVPURI- NCR 04/1986 03/1994 01/2014 158.77 580.83 422.06 265.83 238 GWALIOR -BHIND NL, (NCR) NEW MAYNAGURI TO 59 JOGIGHOPA VIA NEFR 04/2000 12/2008 03/2018 733.00 2350.00 1617.00 220.60 111 CHANGRABANDHA (NL),NEFR 60 Development of Cluster-7 ONGC 03/2010 03/2013 11/2014 3241.03 6638.94 3397.91 104.84 20 Fields 61 DEV OF G1 AND GS-15 ONGC 04/2003 04/2006 02/2014 429.82 2735.65 2305.83 536.46 94 (ONGCL) 62 ADDITIONAL DEV. OF ONGC 01/2010 06/2012 05/2014 2163.64 2331.62 167.98 7.76 23 D-1 FIELD SUPPLIMENTARY TRANSMISSION 63 ASSOCIATED WITH PGCIL 08/2008 08/2012 03/2014 2360.95 2580.90 219.95 9.32 19 DVC AND MAITHON RBC Nagaland New Line from Dimapur 64 to Zubza(Kohima) NEFR 04/2006 03/2015 03/2017 850.00 2441.48 1591.48 187.23 24 national project (NEFR) Odisha 65 LANJHIGARH- ECOR 04/1993 03/2002 12/2013 100.00 227.94 127.94 127.94 141 JUNAGARH NL(ECOR) 66 PARADIP REFINERY IOCL 02/2009 11/2012 12/2014 29777.00 32710.00 2933.00 9.85 25 PROJECT SUNAKHALA- 67 GANJAM (GQ) KM.338- NHAI 04/2000 04/2004 11/2013 225.00 241.53 16.53 7.35 115 KM.284 (NH-5) KHURDA ROAD -

68 BARANG 3RD LINE RVNL 04/2000 03/2009 08/2014 133.41 276.00 142.59 106.88 65 (DL) (ECOR) 69 RAJATGARH- RVNL 04/1999 02/2009 08/2014 166.16 288.00 121.84 73.33 66 BARANG(LD),ECOR Champajharan-Bimalgarh 70 Doubling SER 04/2010 03/2015 12/2015 149.90 177.38 27.48 18.33 9 extension Sikkim 71 SEVOK RANGPO, NEFR 04/2008 12/2015 03/2017 1339.48 3380.58 2041.10 152.38 15 NEFR

SN PROJECT AGENCY DATE OF ORIGINAL ANTICIPATE COST COST COST COST TIME APPROVAL DATE OF D DATE OF ORIGINAL ANTICIPAT OVERRUN OVERRUN OVERRUN COMMISSIO COMMISSIO (Rs. ED (Rs. (Rs. (%) IN MONTHS NING NING Crore) Crore) Crore) Tamil Nadu PROTOTYPE FAST 72 BREEDER REACTOR BHAVNI 09/2003 09/2010 03/2015 3492.00 5677.00 2185.00 62.57 54 (BHAVINI, 500 MWE) TUTICORIN 73 THERMAL POWER NLC 05/2008 03/2012 05/2014 4904.54 6602.74 1698.20 34.63 26 PROJECT- 2X500 MW TPS-II EXPANSION 74 (1470MW TO NLC 10/2004 06/2009 03/2014 2030.78 3027.59 996.81 49.09 57 1970MW) (NLC) 75 KUDANKULAM APP NPCIL 12/2001 12/2008 09/2014 13171.00 17270.00 4099.00 31.12 69 (NPCIL) ENNORE MANALI PORT 76 EXPRESS WAY,F/O TRUST 10/2002 03/2006 12/2013 150.00 600.00 450.00 300.00 93 SPECIAL PURPOSE VEHICLE (SPV) Tripura

77 TRIPURA GAS BASED NEEPCO 07/2009 07/2013 05/2014 421.01 960.79 539.78 128.21 10 POWER PROJECT 78 AGARTALA NEFR 04/2008 03/2014 03/2019 813.34 1741.00 927.66 114.06 60 SABROOM, NL, NEFR Construction of NL from 79 Kumarghat- NEFR 04/1999 03/2007 03/2017 895.00 1242.25 347.25 38.80 120

Agartala Uttar Pradesh AGRA-ETAWAH VIA 80 FATEHABAD AND NCR 04/1999 12/2009 03/2014 108.00 432.72 324.72 300.67 51 BAH (NL) NCR 81 ETAWAH-MAINPURI NCR 09/2001 12/2008 09/2014 120.00 245.39 125.39 104.49 69 (NL),NCR UTRATIA- 82 ZAFRABAD, NR (LINE NR 04/2006 03/2010 03/2017 325.00 1116.53 791.53 243.55 84 DOUBLING) ELECTRIFICATION OF KHURJA- 83 MEERUT- RE 02/2008 03/2012 03/2014 171.10 246.44 75.34 44.03 24 SAHARANPUR AND G'BAD- MEERUT TEHRI PUMPED 84 STORAGE THDCL 07/2006 07/2010 02/2017 1657.00 2978.86 1321.86 79.77 79 PLANT(1000MW) Uttarakhand

GSM EQUIPMENT OF 85 283000 LINES (2G) BSNL 01/2009 06/2009 12/2013 149.15 158.72 9.57 6.42 54 AND 75000 LINES (3G) IN UTTRANCHAL VISHNUGAD 86 PIPALKOTI HYDRO THDCL 08/2008 07/2014 09/2017 2491.58 3745.08 1253.50 50.31 38 ELECTRIC PROJECT

SN PROJECT AGENCY DATE OF ORIGINAL ANTICIPATE DCOST COST COST COST TIME APPROVAL DATE OF DATE OF ORIGINAL ANTICIPAT OVERRUN OVERRUN OVERRUN COMMISSIO COMMISSIO (Rs. ED (Rs. (Rs. (%) IN MONTHS NING NING Crore) Crore) Crore) West Bengal 87 Ghutiasharif-Canning ER 04/2009 12/2011 11/2013 189.97 611.03 421.06 221.65 23 (ER) TEESTA LOW DAM 88 HEP, STAGE-IV NHPC 09/2005 09/2009 04/2015 1061.38 1501.75 440.37 41.49 67 (NHPC) 89 EXPANSION OF SAIL 02/2008 12/2011 12/2013 14443.00 16408.00 1965.00 13.61 24

IISCO STEEL PLANT 90 BANKURA - SER 03/1998 03/2005 12/2016 111.90 1423.98 1312.08 1172.55 141 DAMODAR (GC) (SER) 91 TAMLUK SER 03/1984 06/2005 06/2016 293.97 1074.47 780.50 265.50 132 DIGHA,LINE DOUBLING (SER) HOWRAH-AMTA- 92 CHAMPADANGA SER 04/1974 03/2007 03/2015 31.42 535.40 503.98 1604.01 96 NL (SER) 93 Tamluk-Basulya- SER 04/2010 06/2013 06/2014 146.95 171.02 24.07 16.38 12 Sutahata Doubling