Improving Access to Land Within the Settlements of Port Moresby*

Total Page:16

File Type:pdf, Size:1020Kb

Improving Access to Land Within the Settlements of Port Moresby* Crawford School of Economics and Government WORKING PAPERS H AUSTRALIAN NATIONAL UNIVERSITY International and Development Economics mproving access to land within settlements of Port I Moresby Satish Chand Charles Yala 07-04 Crawford School of Economics and Government THE AUSTRALIAN NATIONAL UNIVERSITY http://www.crawford.anu.edu.au Improving access to land within the settlements of Port Moresby* Satish Chand The Australian National University Canberra and Charles Yala The National Research Institute Port Moresby 28 November, 2006. Abstract Improving access to land in the Pacific remains a difficult problem. This paper presents results from a field survey conducted in 12 randomly selected settlements in Port Moresby, the capital of Papua New Guinea, to investigate how settlers acquire land for housing. The analysis shows that several means for land acquisition is used; ranging from outright occupation (that is, land invasion) to purchase of use-rights from the customary landowners. The security of tenure on land held under customary title is maintained using mechanisms ranging from group occupation by members of a clan/tribe to the use of the traditional systems of reciprocation and token-exchange. Security of tenure on land held by the state, in contrast, is maintained thorough political patronage. Settlers fear eviction more from the state than the customary owners suggesting that ownership rights are relatively more secure on land held under customary title. The length of occupation is viewed by the settlers as cementing their ownership-rights to the occupied land. Similarly, some of the settlers have over- capitalised into permanent housing with the understanding that the State would have to compensate them for the improvements should they be evicted. * Financial support for this research via a grant from the International Centre for Excellence in Asia Pacific Studies at the Australian National University and from the National Research Institute is gratefully acknowledged. 1 1. Introduction Improving secure and long-term access to land as a means to accelerating the pace of economic development is receiving widespread international attention. It has been repeatedly pointed out that the absence of formal title on land occupied by the millions of people living in urban squatter settlements has impeded development. The lack of secure title to land has dissuaded savings and investment by the settlers (Deininger, 2003). The lack of formal title has also raised the cost of credit to the poor (Feder et al, 1988) and taxed the transferability of their assets (Besley, 1995). The above-mentioned channels have sucked life out of often the only major asset of the poor, leading De Soto (2000) to label land without formal title as ‘dead capital’. The recognition of the drag insecure rights to property places on poverty reduction has led to land-titling programs in several developing and transition countries including Cambodia, Columbia, Egypt, Ghana, Honduras, the Philippines, South Africa, Turkey, and Vietnam (Galiani and Schargrodsky, 2006).1 This land-titling wave, however, has as yet to reach the Pacific island nations. The demand for land for housing within the urban centres of the Pacific islands has grown rapidly over the past half a century and this trend is likely to continue for the foreseeable future. In Papua New Guinea, for example, the population has been growing at an annual average of 2.7 percent for the decade to 2005. Some 87 percent of the population live within rural districts where access to basic services and employment opportunities remain poor. Settlements around the urban centres and the capital in particular, have grown rapidly over the past three decades (Koczberski et al, 2001). With only 3 percent of the total land area being alienated, the majority of the new settlements are on land held under customary title. While settlers without legal title on state land may be classified as squatters, those on land held under customary title have usufruct rights to their place of abode. The latter group have used 1 The Economist, however, warns that: “Giving land titles to the poor is no silver bullet” (Economist, 2006: 62). 2 a combination of the modern and the traditional institutions to secure their rights of access to land for settlement. The presence of a market in houses built on this land is evidence that these institutions do indeed provide some degree of transferability of assets and that the underlying title to land, albeit informal, is more secure than that for settlers on state land. The question posed here is as to whether the systems that have evolved thus far could be used, and possibly strengthened, to provide long term security for housing in these settlements. The diversity in the systems that have evolved between land owned by the state and that by customary owners, and that amongst the various customary owners themselves, is used to draw lessons on the feasible policy choices. On the former, a number of settlers claim their rights to state land on the basis of political patronage. This right, the settlers acknowledge, remains until their patrons remain in office. Settlers have, as a consequence, been far more active in national elections compared to the rest of the population. This was evident during the survey when the whole settlement of Erima was found to be away attending a political rally organised by the incumbent Governor for National Capital District (NCD) in the lead up to the by-elections in the district. A number of politicians continue to reward such participation including, through providing ‘free’ water, electricity and land. Systems that have evolved within settlements on land held under customary title have ranged from explicit arrangements on purchase, sale, and rental of land and properties built on this land to nil payments and overt occupation without any compensation. On the latter, one group of landowners, while being unable to evict those settled on their land, have refrained from accepting any payments in fear of legitimising the claims of the settlers. The systems that have developed to date are far from complete or efficient in rationing land for housing, but they do offer many lessons on what could be done to progress this agenda. We exploit these differences to draw policy lessons on improving access to land for settler-housing in Port Moresby. 3 This paper makes a number of original contributions. First, it documents how institutions have evolved to cater for the rising demand for land for housing in the settlements of Port Moresby. In sharp contrast to ongoing efforts at land registration, we investigate the evolution of institutions at the household level that have had some success in providing long- term and secure access to land for settlement. Our ‘bottoms-up’ approach complements, rather than acts as a substitute, to the ongoing ‘top-down’ efforts at land surveys and land registration. Second, the study draws on data collected via a purpose-designed survey conducted in 12 randomly selected settlements covering a total of 441 households. Analysis of this data offers several insights into the functioning of settlements in Port Moresby. Third, the analysis reveals that institutions have evolved, and continue to do so, to fill at least some of the void left by formal systems in enabling access to land for housing. The incentives to acquire security to land for housing are significant to the settler. Furthermore, the landowner has similar incentives in ensuring that the value from their assets is maximised. The transactions, however, takes place in conditions of imperfect information on several dimensions including the murky rights of the purported owner and the capacity of the buyer to enforce his/her rights of settlement. Transactors, however, learn over time as news on past deals is readily shared within the community. The rest of the paper is organised as follows. Section 2 provides a succinct summary on the linkages between property rights and development. Section 3 provides information on the settings for this analysis; namely, the settlements of Port Moresby, the capital of Papua New Guinea. Section 4 presents the methodology, data, and some of the preliminary findings from our analysis. Section 5 presents some of the policy implications while the conclusions brings the paper to a close. 4 2. Property rights and development The lack of security to land has long been considered an obstacle to economic development. De Soto (2000), for example, notes that a market economy is “inconceivable” (page 147) without an integrated formal property system. He attributes migration of the poor from rural to urban areas as being due to a lack of their rights to own land and thus their inability to improve on their wellbeing. De Soto sees migrants as a source of entrepreneurship, labelling them the ‘noble pioneers’, in contrast to the common stereotyping as trespassers on unoccupied property. Providing migrants with land titles has consequently been seen as a means of unleashing their entrepreneurial potential and propelling them down a path of poverty reduction. The broader literature attributes at least four distinct channels via which land-titling lowers poverty. First, having exclusive rights to a house has intrinsic value to the owner. This together with the ability to transfer it at will enable the householder to restrict those from family and clan to reside at their premises and feed off their income.2 Second, possession of exclusive rights to a property affects the incentives to save and invest. A house, absent perfect factor markets, provides the householder the instrument to save and invest such as through ongoing improvements that are undertaken through sacrificing leisure time. Most of the houses in the settlements of Port Moresby, for example, are under continuous upgrading, and often undertaken with family and clan labour. An individual, unsure of his/her ability to reap the benefits of any investment in a long-term lumpy-asset such as housing, thus, is likely to under-invest when security to the asset is lacking.
Recommended publications
  • Ncd-Enrolment-Places
    2017 National Election Electoral Roll Update Locations National Capital District Electorate: Moresby-South LOCATION ROLL UPDATE PLACE DURATION (Locations in the Ward) (Places in the Ward Locations) (For how long) WARD 1 Badihagwa Lohia Daroa’s Residence 14 Days Tatana 1 Heni Gagoa’s Residence 14 Days Hanuabada 1 Vahoi 1 14 Days Tatana 2 Araira Church Hall 14 Days Hanuabada 2 Vahoi 2 14 Days Baruni 1 Iboko Place 14 Days Baruni 2 Iboko Place 14 Days Hanuabada – Laurabada 1 Kwara Dubuna 1 14 Days Hanuabada – Laurabada 2 Kwara Dubuna 2 14 Days Idubada Idubada 14 Days Hanuabada – Lahara Mission Station 7 14 Days Kanudi Origin Place 14 Days Hanuabada – Lahara Kavari Mission Station 2 14 Days Koukou Settlement David Goroka 14 Days Elevala 1 Abisiri 1 14 Days Elevala 2 Abisiri 2 14 Days Kade Baruni Rev. Ganiga’s Residence 14 Days Borehoho Borehoho 14 Days Gabi Mango Fence – Open Air 14 Days WARD 2 Ela Beach SDA church – Open Air 14 Days Ela Makana Yet to Confirm 14 Days Lawes Road Mobile Team 14 Days Konedobu Aviat Club – Open Air 14 Days Newtown Volley Ball Court 14 Days Vanama Settlement Volley Ball Court 14 Days Paga Hill Town Police Station 14 Days Touaguba Hill Town Police Station 14 Days Town Town Police Station 14 Days Ranuguri Settlement Ranuguri - Open Air 14 Days Segani Settlement Ranuguri - Open Air 14 Days Gini Settlement Residential Area 14 Days Vainakomo Residential Area 14 Days Kaevaga Residential Area 14 Days Paga Settlement Moved to 6mile/Gerehu 14 Days WARD 3 Daugo Island Open Air 14 Days Koki Settlement Koki Primary School
    [Show full text]
  • Monier Quarry Location Operation Product
    MONIER QUARRY Monier Quarry Products is a leading aggregates 20mm, 14mm and 10mm Sealing and Asphalt producer supplying aggregates to large Civil aggregates to Department of Works (DOW) construction, Asphalt, Concrete suppliers, as specifications or Australian Standards (AS). well as smaller projects such as residential Concrete Aggregates to Department of Works landscaping. We strive to provide quality, cost- (DOW) specifications or Australian Standards efficiency, and sustainability in all we do, and (AS) our aggregates and production techniques are no exception. Along with a complete product Manufactured Sands and Fine Aggregates to selection, Monier Quarry offers services DOW or AS requirements for concrete and including product transport delivery, technical asphalt. support and specialist industry expertise. A range of Road bases including 20mm CBR80 and 40mm CBR60 road base to DOW LOCATION and National Airports Corporation (NAC) requirements. Ideally located at 10 Mile Nebiri, within the National Capital District of Port Moresby, Rock and Spall products. Monier’s quarry has a proven track record of providing consistent quality products for more Other specific rock products to meet project than 20 years. requirements are also manufactured upon request. These include; OPERATION Armour Rock and Gabion The complete quarry process is carried out through a state of the art comprehensive fixed Rock Spalls plant that is operated and maintained by highly Ballast Filter Rock skilled Operators. Drainage Aggregates Manufactured Sand PRODUCT
    [Show full text]
  • RAPID ASSESSMENT of AVOIDABLE BLINDNESS and DIABETIC RETINOPATHY REPORT Papua New Guinea 2017
    RAPID ASSESSMENT OF AVOIDABLE BLINDNESS AND DIABETIC RETINOPATHY REPORT Papua New Guinea 2017 RAPID ASSESSMENT OF AVOIDABLE BLINDNESS AND DIABETIC RETINOPATHY PAPUA NEW GUINEA, 2017 1 Acknowledgements The Rapid Assessment of Avoidable Blindness (RAAB) + Diabetic Retinopathy (DR) was a Brien Holden Vision Institute (the Institute) project, conducted in cooperation with the Institute’s partner in Papua New Guinea (PNG) – PNG Eye Care. We would like to sincerely thank the Fred Hollows Foundation, Australia for providing project funding, PNG Eye Care for managing the field work logistics, Fred Hollows New Zealand for providing expertise to the steering committee, Dr Hans Limburg and Dr Ana Cama for providing the RAAB training. We also wish to acknowledge the National Prevention of Blindness Committee in PNG and the following individuals for their tremendous contributions: Dr Jambi Garap – President of National Prevention of Blindness Committee PNG, Board President of PNG Eye Care Dr Simon Melengas – Chief Ophthalmologist PNG Dr Geoffrey Wabulembo - Paediatric ophthalmologist, University of PNG and CBM Mr Samuel Koim – General Manager, PNG Eye Care Dr Georgia Guldan – Professor of Public Health, Acting Head of Division of Public Health, School of Medical and Health Services, University of PNG Dr Apisai Kerek – Ophthalmologist, Port Moresby General Hospital Dr Robert Ko – Ophthalmologist, Port Moresby General Hospital Dr David Pahau – Ophthalmologist, Boram General Hospital Dr Waimbe Wahamu – Ophthalmologist, Mt Hagen Hospital Ms Theresa Gende
    [Show full text]
  • Paradise Breweries Limited 1-106277
    INDEPENDENT STATE OF PAPUA NEW GUINEA Companies Act 1997 Company Extract As at 18 September 2018 PARADISE BREWERIES LIMITED 1-106277 General Details Company Type: Local Company Status: Registered Incorporation Date: 15 April 2015 Cessation Date: Annual Return Filing Month: June Own Constitution?: No Previous Names Previous Name Name: TANNASET LIMITED From Date: 15 April 2015 To Date: 5 February 2018 Addresses Registered Office Address: Ground Floor, Investwell Building, Section 38, Allotment 30, Cameron Road, GORDONS, National Capital District, Papua New Guinea Address for Service: Ground Floor, Investwell Building, Section 38, Allotment 30, Cameron Road, GORDONS, National Capital District, Papua New Guinea Postal Address: Po Box 904, PORT MORESBY, National Capital District, Papua New Guinea Directors Page 1 of 4 Director Individual Name: John Donald BEATTIE Nationality: Australia Residential Address: Section 439, Allotment 33, Islander Village, Hohola, Port Moresby, National Capital District, Papua New Guinea Postal Address: C/- Po Box 904, Port Moresby, National Capital District, Papua New Guinea Appointment Date: 6 July 2018 Director Individual Name: Tiong Sii HUANG Nationality: Malaysia Residential Address: No. 7 & 9, Lorong 16, Jalan Deshon, Sibu, Sarawak, 96000, Malaysia Postal Address: No. 7 & 9, Lorong 16, Jalan Deshon, Sibu, Sarawak, 96000, Malaysia Appointment Date: 10 August 2018 Director Individual Name: Ian JEPSON Nationality: Papua New Guinea Residential Address: Section 51, Allotment 91, Davetari Drive, Port Moresby, National
    [Show full text]
  • Financial Inclusion and Financial Capability
    Financial Inclusion and Financial Capability in Morobe and Madang Provinces, Papua New Guinea Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized An initial report of the Papua New Guinea Public Disclosure Authorized National Financial Capability Survey Bank of Papua New Guinea Institute of National Affairs 9363_PNG FinancialCapacitySurvey_1601939_CVR.indd 1 11/19/15 8:17 AM Bank of Papua New Guinea Papua New Guinea Institute for National Affairs The World Bank Financial Inclusion and Financial Capability in Morobe and Madang Provinces Papua New Guinea An initial report of the Papua New Guinea National Financial Capability Survey This Project is financially supported by the Korean Poverty Reduction and Socio-Economic Development Trust Fund II 9363_PNG FinancialCapacitySurvey_1601939_CH00_FM.indd 1 11/18/15 10:15 AM Cataloguing-in-Publication Data ISBN 9980-77-182-8 National Library Service—Papua New Guinea First published: June 2015 Published by: Institute of National Affairs P.O. Box 1530 Port Moresby NCD Papua New Guinea Copyright: This report is a joint product of the project team composed of staff and consultants from Bank of Papua New Guinea, the Institute of National Affairs and The World Bank. The findings, interpretations, and conclusions expressed in this report are entirely those of the authors and should do not necessarily reflect the views of Board of the Bank of Papua New Guinea, the Executive Directors of The World Bank or the governments they represent, or the Board of Institute of National Affairs. The Bank of Papua New Guinea, Institute of National Affairs, and The World Bank do not guarantee the accuracy of the data included in this work.
    [Show full text]
  • Implementation Status & Results
    The World Bank Report No: ISR3280 Implementation Status & Results Papua New Guinea Urban Youth Employment Project (P114042) Operation Name: Urban Youth Employment Project (P114042) Project Stage: Implementation Seq.No: 1 Status: ARCHIVED Archive Date: Country: Papua New Guinea Approval FY: 2011 Public Disclosure Authorized Product Line:IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Specific Investment Loan Implementing Agency(ies): National Capital District Commission Key Dates Board Approval Date 11-Jan-2011 Original Closing Date 30-Apr-2016 Planned Mid Term Review Date 01-Jul-2013 Last Archived ISR Date Public Disclosure Copy Effectiveness Date Revised Closing Date 30-Apr-2016 Actual Mid Term Review Date Project Development Objectives Project Development Objective (from Project Appraisal Document) The Project's development objectives are to provide urban youth with income from temporary employment opportunities and to increase their employability. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Public Disclosure Authorized Component(s) Component Name Component Cost Youth Job Corps (YJC) 6.90 Skills Development and Employment Scheme (SDES) 5.40 Project Management 4.40 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Overall Risk Rating Substantial Public Disclosure Authorized Implementation Status Overview The project has not yet become effective. Public Disclosure Copy Locations Page 1 of 4 Public Disclosure Authorized The World Bank Report No: ISR3280 Country First Administrative Division Location Planned Actual Pap. New Guinea National Capital District Waigani Pap. New Guinea National Capital District Saraga Pap. New Guinea National Capital District Sabama Pap.
    [Show full text]
  • Priorities of the Poor in PAPUA NEW GUINEA
    Priorities of the Poor IN PAPUA NEW GUINEA September 2002 © Asian Development Bank All rights reserved This publication was prepared by consultants for the Asian Development Bank. The findings, interpretations, and conclusions expressed in it do not necessarily rep- resent the views of the Bank or those of its member governments. The Asian De- velopment Bank does not guarantee the accuracy of the data included in this publication and accepts no responsibility whatsoever for any consequences of their use. Asian Development Bank P.O. Box 789, 0980 Manila, Philippines Website: www.adb.org Contents Introduction 1 Is Poverty Really a Problem in PNG? 2 What is Poverty? 4 Who is Poor? 9 What Causes Poverty? 11 What Can be Done? 14 Contact Information 17 Acknowledgements 17 Introduction apua New Guinea (PNG), like many countries in the Pacific, is faced with a difficult economic situation that Phas caused a growing number of people to fall into poverty. Consultations The Government of PNG is committed to addressing and reducing poverty by ensuring the active involvement of the people were held in and communities most affected. As part of preparations for a new national development strategy, a series of community consulta- 18 communities tions, workshops, and interviews were held. This “Participatory Poverty Assessment” was done in 2001 in 18 communities. Twelve were located in the four provinces of Sandaun, Gulf, Madang, and East New Britain, and six were located in the National Capital District. The Department of National Planning and Monitoring (now the Department of National Planning and Rural Development) led the effort.
    [Show full text]
  • Improving Access to Land Within the Settlements of Port Moresby*
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE Crawford School of Economics and Government provided by The Australian National University WORKING PAPERS H AUSTRALIAN NATIONAL UNIVERSITY International and Development Economics mproving access to land within settlements of Port I Moresby Satish Chand Charles Yala 07-04 Crawford School of Economics and Government THE AUSTRALIAN NATIONAL UNIVERSITY http://www.crawford.anu.edu.au Improving access to land within the settlements of Port Moresby* Satish Chand The Australian National University Canberra and Charles Yala The National Research Institute Port Moresby 28 November, 2006. Abstract Improving access to land in the Pacific remains a difficult problem. This paper presents results from a field survey conducted in 12 randomly selected settlements in Port Moresby, the capital of Papua New Guinea, to investigate how settlers acquire land for housing. The analysis shows that several means for land acquisition is used; ranging from outright occupation (that is, land invasion) to purchase of use-rights from the customary landowners. The security of tenure on land held under customary title is maintained using mechanisms ranging from group occupation by members of a clan/tribe to the use of the traditional systems of reciprocation and token-exchange. Security of tenure on land held by the state, in contrast, is maintained thorough political patronage. Settlers fear eviction more from the state than the customary owners suggesting that ownership rights are relatively more secure on land held under customary title. The length of occupation is viewed by the settlers as cementing their ownership-rights to the occupied land.
    [Show full text]
  • A/HRC/16/52/Add.5 General Assembly
    United Nations A/HRC/16/52/Add.5 General Assembly Distr.: General 7 February 2011 Original: English Human Rights Council Sixteenth session Agenda item 3 Promotion and protection of all human rights, civil, political, economic, social and cultural rights, including the right to development Report of the Special Rapporteur on torture and other cruel, inhuman or degrading treatment or punishment Addendum Mission to Papua New Guinea* Summary The present report contains the findings and recommendations of the Special Rapporteur on torture and other cruel, inhuman or degrading treatment or punishment, Manfred Nowak, on his mission to Papua New Guinea, from 14 to 25 May 2010. On the basis of discussions with public officials, judges, lawyers and representatives of civil society, interviews with victims of violence and with persons deprived of their liberty, often supported by forensic medical evidence, the Special Rapporteur found isolated cases of torture in the classical sense of deliberately inflicting severe pain or suffering as a means of extracting a confession or information. He also found, however, a considerable number of cases where persons were subjected to different degrees of beatings by the police during arrest and as a form of punishment, which may also amount to torture. Impunity for torture and ill-treatment is fuelled by the lack of effective complaint mechanisms, independent investigations, monitoring and other similar safeguards. The Special Rapporteur found a general atmosphere of violence and neglect in places of detention. In police stations, detainees were locked up for long periods in overcrowded and filthy cells, without proper ventilation or natural light for periods of up to one year.
    [Show full text]
  • Civic Insecurity: Law, Order and HIV in Papua New Guinea
    Civic Insecurity: Law, Order and HIV in Papua New Guinea EditEd by Vicki LukEr and SincLair dinnEn Civic Insecurity: Law, Order and HIV in Papua New Guinea EditEd by Vicki LukEr and SincLair dinnEn State, Society and Governance in Melanesia Program Studies in State and Society in the Pacific, No. 6 THE AUSTRALIAN NATIONAL UNIVERSITY E PRESS E PRESS Published by ANU E Press The Australian National University Canberra ACT 0200, Australia Email: [email protected] This title is also available online at: http://epress.anu.edu.au/civic_insecurity_citation.html National Library of Australia Cataloguing-in-Publication entry Title: Civic insecurity : law, order and HIV in Papua New Guinea / edited by Vicki Luker and Sinclair Dinnen. ISBN: 9781921666605 (pbk.) 9781921666612 (eBook) Notes: Includes bibliographical references. Subjects: AIDS (Disease)--Papua New Guinea. AIDS (Disease)--Law and legislation--Papua New Guinea. AIDS (Disease)--Papua New Guinea--Prevention. HIV infections--Papua New Guinea. Law enforcement--Papua New Guinea. Crime--Papua New Guinea. Papua New Guinea--Social conditions. Papua New Guinea--Social life and customs. Papua New Guinea--Politics and government--1975- Other Authors/Contributors: Luker, Vicki. Dinnen, Sinclair. Dewey Number: 362.196979209953 All rights reserved. No part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means, electronic, mechanical, photocopying or otherwise, without the prior permission of the publisher. Cover design and layout by ANU E Press Cover image: Young boy at celebrations in Goroka for the 30th anniversary of Independence, 2005. Courtesy of photographer Kahunapule Michael Johnson, http://Kahunapule.org and http://worldoutreach.org Printed by Griffin Press This edition © 2010 ANU E Press Contents Cover and Section illustrations .
    [Show full text]
  • World Bank Document
    Public Disclosure Authorized PAPUA NEW GUINEA Public Disclosure Authorized (National Capital District Commission) ENVIRONMENTAL AND SOCIAL MANAGEMENT Public Disclosure Authorized FRAMEWORK Urban Youth Employment Project 31 February, 2010 Public Disclosure Authorized List of Acronyms Acronym Explanation DEC Department of Environment and Conservation EA Environment Assessment EMP Environment Management Plan EP Environment Plan EMF Environment Management Framework GoPNG Government of Papua New Guinea IDA International Development Agency KTF Korean Trust Fund MIS Management Information System MSF Medecins Sans Frontieres NCD National Capital District NCDC National Capital District Commission NGO Non Government Organization NSTB National Skills Testing Board PMU Project Management Unit PNG Papua New Guinea . PWC Public Works Coordinator OJT On the Job Training SDES Skills Development & Employment Scheme YJC Youth Job Corps 2 1.0 INTRODUCTION 1.1 Purpose of the Environmental Management Framework document. The Environmental Management Framework (EMF, this document) establishes the mechanism and processes for environmental management the UYEP that are to be followed when the sub project activities are being identified, appraised and implemented to ensure any potential adverse environmental impacts from these activities are identified, and then either avoided, reversed or effectively mitigated and monitored as part of each sub project activity, thereby complying with the governments own environmental requirements and that of the World Bank, and that the appropriate institutional measures to ensure these measures are in place in the Project Management Unit (PMU). 1.2 Project Description 1.2.1 Project Development Objective and Key Indicators The objectives are to provide urban youth with income from temporary employment opportunities and to increase their employability.
    [Show full text]
  • Village Court Jurisdiction - Summary Determination Cases
    IN THE DISTRICT COURT OF PAPUA NEW GUINEA HELD AT PORT MORESBY VILLAGE COURT JURISDICTION - SUMMARY DETERMINATION CASES Notice is hereby given to all parties listed below that your matter has been listed for Summary Determination by the District Court at Port Moresby on the dates and time as indicated. Please attend to Court if you wish to prosecute your matter or contact Mr. Tinut Kali, Deputy Clerk of Court-Port Moresby District Court on Mobile Ph: 70481376 or via email: [email protected] for any further queries. SUMMARY DETERMINATION LIST CORAM: DARO KEVAU FRANK COURT ROOM: THREE (3) DATE: 27th JUNE 2016 TIME: 09:30 am NO CASE # COMPLAINANT(S) / APPELLANT(S) DEFENDANT(S) / RESPONDENT(S) CURRENT STATUS 1. BEPI NAPAL 1 VCA:29/05 PHILIP SAWAN 2. THE CHAIRMAN - NINE (9) MILE Matter returned to the Registry VILLAGE COURT 2 VCD:03/06 NENEMO KOFAME FORE KASAWA Fresh Mention 3 VCD:04/06 KORRY JOHN JOHN GIRIMAI Sent back to the Registry 1. ALICE MALIGE 4 VCR:01/06 TIDAI LEMBO 2. THE CHAIRMAN - ERIMA VILLAGE Fresh Mention COURT 1. AKU KOMBA 5 VCA:20/06 PETER KOMBA 2. THE CHAIRMAN - SARAGA Matter returned to the Registry VILLAGE COURT 1. Mrs. AKU KOMBA 6 VCA:21/06 ROSA KOMBA 2. THE CHAIRMAN - SARAGA Mention VILLAGE COURT 1. SAPORE PAUL 7 VCA:25/06 DAVID IPO 2. THE CHAIRMAN - MORATA Matter sent back to the Registry VILLAGE COURT 1. ELLA MARK 8 VCA:33/06 FRANK KOURI 2. THE CHAIRMAN - GEREHU Matter sent back to the Registry VILLAGE COURT 1.
    [Show full text]