Draft Dacorum Infrastructure Delivery Plan

Total Page:16

File Type:pdf, Size:1020Kb

Draft Dacorum Infrastructure Delivery Plan Draft Dacorum Infrastructure Delivery Plan Contents 1. Introduction ................................................................................................................................ 2 2. Purpose of Infrastructure Delivery Plan ...................................................................................... 3 3. Structure of Infrastructure Delivery Plan .................................................................................... 4 4. Planning legislation ..................................................................................................................... 6 5. Policy and guidance context ....................................................................................................... 8 6. Methodology ............................................................................................................................. 22 7. Growth Context ......................................................................................................................... 27 8. Infrastructure Assessment for Dacorum Borough .................................................................... 37 9. Highways and Transportation ................................................................................................... 38 10. Education .............................................................................................................................. 51 11. Community Facilities ............................................................................................................. 60 12. Health and Wellbeing............................................................................................................ 73 13. Green Infrastructure ............................................................................................................. 83 14. Emergency Services .............................................................................................................. 95 15. Utilities ................................................................................................................................ 107 16. Flood Protection.................................................................................................................. 123 17. Settlement - Infrastructure Requirements for Dacorum Borough ..................................... 124 18. Hemel Hempstead Garden Communities ........................................................................... 125 19. Berkhamsted ....................................................................................................................... 143 20. Tring .................................................................................................................................... 153 21. Kings Langley ....................................................................................................................... 165 22. Bovingdon ........................................................................................................................... 172 23. Markyate ............................................................................................................................. 179 24. Rest of Borough .................................................................................................................. 186 25. Strategic Sites -Infrastructure Requirement ....................................................................... 187 26. Delivery and Funding Sources ............................................................................................. 188 27. Next Steps ........................................................................................................................... 193 28. Schedules ................................................................................. See Separate Appendix B 1 Draft Dacorum Infrastructure Delivery Plan 1. Introduction 1.1 The provision of Infrastructure is a key issue for communities when faced with new development. The delivery of infrastructure in a timely manner is essential to support growth and create sustainable communities. Infrastructure planning helps to give a shared understanding between infrastructure providers, developers, local communities, neighbouring authorities and the Borough Council as to what infrastructure is required and when. To understand what infrastructure is required to support new growth it is important to understand the current infrastructure situation and any planned investment. This document seeks to identify current infrastructure surpluses and deficits, planned investment by infrastructure providers and the impact of the planned level of growth on the infrastructure in the Borough. 1.2 Infrastructure planning is required to support and help shape the local plan. This plan sets out the legal and policy context for Infrastructure planning and funding mechanisms; the relevant existing infrastructure plans and how they relate to the Borough, including the Hertfordshire County Council (HCC) Local Transport Plan 4 to which the Borough must have regard in preparing the local plan; and the growth context and Council’s vision for Dacorum and its settlements. The current situation, investment proposals, impact of growth and mitigation measures for each of the key infrastructure categories will be set out for the Borough as a whole and the wider sub-region and/or County where it is relevant. The proposed growth for each settlement and the required infrastructure to mitigate the impact of new growth and meet the policy requirements will be set out for the settlement and in relation to the proposed site allocations. The infrastructure delivery lead, cost estimates and funding mechanism will be identified where possible. The funding gap between identified funding stream and total estimated cost of infrastructure to support growth will be identified. 1.3 The Infrastructure planning that is captured in this draft IDP has been developed with infrastructure partners and helped to inform and shape the policies and allocations in the local plan. A schedule of engagement and consultation is contained in appendix 1. 1.4 This draft Infrastructure Delivery Plan (IDP) has been developed by Gilian Macinnes BSc MBA MRTPI, Director of Gilian Macinnes Associates, in conjunction with officers of the Strategic Planning and Regeneration Department of Dacorum Borough Council. 1.5 This draft Infrastructure Delivery Plan is not at this stage a complete or comprehensive IDP. This Draft accompanies the Reg 18 Local plan and will be available for comment, it will continue to develop through the Reg 18 consultation and the completion of the next (Reg. 19) version of the Local plan. The next version of the IDP will include: further population of the infrastructure schedules; more information in relation to projects and interventions; further development of cost estimates; apportionment of costs; a prioritisation of infrastructure following further consultation with infrastructure providers; information on the timing and phasing of the delivery of infrastructure in relation to growth; and a schedule of all Infrastructure by type required to support the plan. 2 Draft Dacorum Infrastructure Delivery Plan 2. Purpose of Infrastructure Delivery Plan 2.1 The purpose of this document is to set out the infrastructure required to create quality sustainable places and support the delivery of the local plan growth (housing, employment etc.) in Dacorum Borough. 2.2 The Dacorum Infrastructure Delivery Plan (IDP) seeks to: a. understand the capacity (surplus and deficits) of existing infrastructure provision; b. identify planned investment in infrastructure c. determine infrastructure requirements to support planned levels of growth; d. set out the estimated costs of infrastructure, funding sources, and phasing of delivery (where known); e. identify the gap between committed, allocated and required investment in infrastructure and the potential means by which this gap could be bridged; f. Identify key bodies with responsibility for delivering infrastructure. 2.3 This document brings together data and the views of expert stakeholders, such as information on the current provision and infrastructure requirements, projected costs and funding mechanisms. Within the context of limited and diminishing Council funding, establishing an infrastructure delivery document will help to align investment decisions which have greatest effect and offer greater certainty to service providers, funders and developers. 2.4 The Borough Council’s engagement with the infrastructure providers and their responses have helped to shape the policies of the local plan. This Infrastructure delivery plan is part of the evidence base for the local plan and identifies the potential infrastructure costings to feed into the plan wide viability study. This IDP will also form the basis of the Council Infrastructure Funding Statement (IFS) and will aid the identification of key infrastructure and spending priorities. Disclaimer 2.5 This report takes into account the requirements and instructions of the client, Dacorum Borough Council. It is based on the information that was made available by the client, stakeholders and partners. It is not intended for, and should not be relied upon by, any third party and no responsibility is accepted to any third party. Acknowledgement 2.6 Many meetings, discussions, workshops and written consultations have been undertaken with a wide range of stakeholders in the production of this IDP. The collaborative approach
Recommended publications
  • Herts Valleys CCG PCN Mapping - Community Pharmacy Alignment
    Herts Valleys CCG PCN Mapping - Community Pharmacy alignment PCN and page numbers: Dacorum 1 Alliance - P.2 2 Alpha - P.2 3 Beta - P.2 4 Danais - P.3 5 Delta - P.3 Hertsmere 6 HertsmereFive - P.3 7 Potters Bar - P.4 St Albans and Harpenden 8 Abbey Health - P.4 9 Alban Healthcare - P.4 10 Harpenden - P.4 11 HLH - P.5 Watford and Three Rivers 12 Attenborough & Tudor Surgery - P.5 13 Central Watford and Oxhey - P.5 14 Grand Union - P.6 15 Manor View Pathfinder - P.6 16 North Watford - P.6 17 Rickmansworth & Chorleywood - P.7 1 Primary Care Networks (PCNs) and Practices Community Pharmacies aligned to the PCN (listed in alphabetical order) PCN Alliance Alliance Coleridge House Medical Centre Grovehill Pharmacy (FFE61) Practices involved in Colney Medical Centre (Verulam Medical Group) Lloyds Pharmacy Sainsburys London Colney (FDX05) PCN Grovehill Medical Centre Well Pharmacy London Colney (FP498) Theobald Medical Centre Woodhall Pharmacy (FLP62) Woodhall Farm Medical Centre CP Lead: tbc PCN Alpha Alpha Berkhamsted Group Practice Acorn Chemist (FFQ63) Practices involved in Gossoms End Surgery Boots Pharmacy Berkhamsted (FPJ31) PCN Manor Street HH Dickman Chemist (FGQ23) Rothschild House Group Hubert Figg Pharmacy (FLG84) Lloyds Pharmacy Chapel Street Tring (FGP13) Lloyds Pharmacy High Street Tring (FLH81) Markyate Pharmacy (FKG66) Rooneys Pharmacy (FQ171) CP Lead: Mitesh Assani, Acorn Pharmacy Berkhamsted PCN Beta (40,186) Beta (40,186) Fernville Surgery Boots Pharmacy Marlowes Hemel Hempstead (FG698) Practices involved in Highfield Surgery
    [Show full text]
  • Hertfordshire Archives and Local Studies
    GB 0046 D/EX 795 Hertfordshire Archives and Local Studies This catalogue was digitised by The National Archives as part of the National Register of Archives digitisation project NRA 36436 The National Archives HERTFORDSHIRE RECORD OFFICE D/EX795 Records of the Hatfield Labour Party, 1947-1966; Welwyn Garden City Labour Party Women's Sections, 1945-1964; and the Hatfield Trades Council, 1953­ 1980, deposited in the Record Office on indefinite loan in April 1987 by Dr Kingsford [Accession 2270] Catalogue completed June 1993 EG D/EX795 Hatfield Labour Party D/EX795/1 Executive Committee minute book Apr 1947-Dec 1960 D/EX795/2 Executive Committee attendance book 1963 - 1965 D/EX795/3 General Committee minute book Feb 1956-May 1963 D/EX795/4 General Committee attendance book Jun 1963-Feb 1965 D/EX795/5 Applications for membership of the nd (20th cent) party 10 items D/EX795/6 Treasurers correspondence 1959 - 1961 [Original bundle] D/EX795/7 General correspondence and circulars 1965 - 1967 D/EX795/8 Correspondence about property in Nov 1947-Apr 1952 Birchwood Avenue [Original bundle] D/EX795/9 General correspondence concerning 1966 the Party [Original bundle] D/EX795/10-12 Copies of the 1965 electoral register 1965 (qualifying date, 10 October 1964) for North Mimms C/D/E, Hatfield C/B/D and Northaw C/C/B Welwyn Garden City Labour Party D/EX795/13 Women's Section minute book Oct 1949-Mar 1958 D/EX795/14 Women's Section minute book Mar 1958-Sep 1964 D/EX795/15 Peartree Ward, Women's Section 1945 - 1959 income and expenditure account book D/EX795
    [Show full text]
  • The Construction of Northumberland House and the Patronage of Its Original Builder, Lord Henry Howard, 1603–14
    The Antiquaries Journal, 90, 2010,pp1 of 60 r The Society of Antiquaries of London, 2010 doi:10.1017⁄s0003581510000016 THE CONSTRUCTION OF NORTHUMBERLAND HOUSE AND THE PATRONAGE OF ITS ORIGINAL BUILDER, LORD HENRY HOWARD, 1603–14 Manolo Guerci Manolo Guerci, Kent School of Architecture, University of Kent, Marlowe Building, Canterbury CT27NR, UK. E-mail: [email protected] This paper affords a complete analysis of the construction of the original Northampton (later Northumberland) House in the Strand (demolished in 1874), which has never been fully investigated. It begins with an examination of the little-known architectural patronage of its builder, Lord Henry Howard, 1st Earl of Northampton from 1603, one of the most interesting figures of the early Stuart era. With reference to the building of the contemporary Salisbury House by Sir Robert Cecil, 1st Earl of Salisbury, the only other Strand palace to be built in the early seventeenth century, textual and visual evidence are closely investigated. A rediscovered eleva- tional drawing of the original front of Northampton House is also discussed. By associating it with other sources, such as the first inventory of the house (transcribed in the Appendix), the inside and outside of Northampton House as Henry Howard left it in 1614 are re-configured for the first time. Northumberland House was the greatest representative of the old aristocratic mansions on the Strand – the almost uninterrupted series of waterfront palaces and large gardens that stretched from Westminster to the City of London, the political and economic centres of the country, respectively. Northumberland House was also the only one to have survived into the age of photography.
    [Show full text]
  • Ray Payne Mob: 07748 920067 Chief Officer: Dr Elaine King Email: [email protected] Web
    Contact: Matt Thomson Chairman: Cllr Ian Reay Tel: 01844 355507 Vice Chairman: Ray Payne Mob: 07748 920067 Chief Officer: Dr Elaine King Email: [email protected] Web: www.chilternsaonb.org By email only to [email protected] My Ref.: F:\Planning\Responses\Plans\Herts\Dacorum BC\Dacorum Local Plan 2020-2038 Dacorum Local Plan Emerging Strategy for Growth (2020-2038) consultation Response from the Chilterns Conservation Board The Chilterns Conservation Board (CCB) is grateful to be consulted on the Dacorum Borough Council’s new local plan throughout its inception and the current consultation draft. Our response, which begins on the following page, starts with an overall summary of our position on the draft local plan, and then gives more detail with regard to particular sections, policies and proposals (referenced and in plan order). Each element indicates whether our statement is in support, objection or as a comment. We did not find either the online portal or the downloadable pro forma to be conducive to an effective response, and we trust that this will be acceptable. There is much to be commended about the plan, but we also have serious reservations. We are, however, strongly supportive of the council taking steps to continue progressing with consultation on the plan in these difficult times. It is essential to have an up-to-date plan in place at all times for the sustainable management of development in an area with such a potent combination of development pressures, regeneration aspirations and a sensitive environment. The council is to be commended for the steps it has taken to give stakeholders as much of an opportunity to comment on the current proposals as it can under the current circumstances.
    [Show full text]
  • Reporting Environmental Problems
    Keeping Dacorum clean, safe & green How and who to report environmental problems to Thank you for making A A A B your neighbourhood ABANDONED VEHICLES ANTI-SOCIAL BEHAVIOUR ASSISTED BIN COLLECTION BULKY ITEM COLLECTION cleaner, safer and Clean, safe and Green Anti-social behaviour Waste Services Customer Services www.dacorum.gov.uk/reporting www.dacorum.gov.uk/asb www.dacorum.gov.uk/reporting [email protected] greener. C D D D Every day, we are working to keep your neighbourhood clean, safe and green. We have a team of people who clean the streets, cut the grass CLINICAL/SHARPS WASTE DEAD ANIMALS DOG FOULING DRUG RELATED LITTER and look after open spaces such as parks and sports Waste Services Clean, safe and Green Clean, safe and Green Clean, Safe and Green [email protected] www.dacorum.gov.uk/reporting www.dacorum.gov.uk/reporting [email protected] pitches. They work with our Enforcement Officers and the Police to tackle problems such as fly tipping and graffiti. F F G G The environment is everyone’s responsibility. Littering and other anti-social behaviour that spoils the environment is against the law. Anyone who is caught FLY TIPPING FULL LITTER OR DOG BIN GRAFFITI GRASS CUTTING Environmental Health Clean, Safe and Green Clean, Safe and Green Clean, Safe and Green can be fined or taken to court. www.dacorum.gov.uk/reporting www.dacorum.gov.uk/reporting www.dacorum.gov.uk/reporting [email protected] You can report most issues to us, Hertfordshire County Council or Thames Water that may be affecting your L L M N area through the right organisations website.
    [Show full text]
  • Park Royal Transport Strategy LOCAL PLAN SUPPORTING STUDY
    Park Royal Transport Strategy LOCAL PLAN SUPPORTING STUDY 2017 34. Park Royal Transport Strategy Document Title Park Royal Transport Strategy Lead Author Steer Davies Gleave Purpose of the Study Strategic assessment of the existing transport provision in Park Royal, the impact of the planned future growth and identification of the transport interventions required to mitigate those impacts. Key outputs • A review of the existing performance of transport modes in Park Royal • Analysis of future demand in Park Royal and its impact on the transport modes • Identification of six packages of interventions required to improve existing performance and to mitigate the impact of future demand on transport modes. Key recommendations Emerging recommendations include providing transport networks that enhance the communities they serve and help local business to operate and grow sustainably, both now and in the future. Relations to other Emerging recommendations include providing transport networks that enhance the communities they serve and help studies local business to operate and grow sustainably, both now and in the future. Relevant Local Plan • Policy SP6 (Places and Destinations) and Policy SP7 (Connecting People and Places) Policies and Chapters • Place policies P4 (Park Royal West), P5 (Old Park Royal), P6 (Park Royal Centre), P7 (North Acton and Acton Wells), P8 (Old Oak Lane and Old Oak Common Lane) and P9 (Channel Gate) • All transport chapter policies Park Royal Transport Strategy Final Report January 2016 TfL and OPDC Our ref: 22857301 Client ref: Task 15 Current public realm in centre of Park Royal Prepared by: Prepared for: Park Royal Transport Strategy Steer Davies Gleave TfL and OPDC Final Report 28-32 Upper Ground Windsor House / Union Street - London January 2016 London SE1 9PD +44 20 7910 5000 TfL and OPDC www.steerdaviesgleave.com Our ref: 22857301 Client ref: Task 15 Steer Davies Gleave has prepared this material for TfL and OPDC.
    [Show full text]
  • Dacorum Borough Council
    case study Rocket® Dacorum Borough Council Finding and Capturing the Golden Thread Dacorum is an area of 212 square kilometers situated in West Hertfordshire that includes the towns of Hemel Hempstead, Berkhamsted, Tring, the villages of Bovingdon, Kings Langley, and Markyate, and 12 smaller settlements. 50% of the area is Green Belt and around 18% of the borough’s 60,000 homes are owned by the council. The Council is improving in key priority areas, and the overall rate of improvement is above average compared with other District Councils. Situation The challenge for the borough’s business improvement team was to be able to show the Dacorum community and council members that that their priorities were being met, and to demonstrate to auditors that the organization was managing its business and performance eectively. One of the biggest diculties was to show the linkages between the top-level priorities and the everyday activities of the council. This is commonly alluded to by the Audit Commission as “The Golden Thread.” In order to improve and move to a Portfolio Management approach, where all projects and programs clearly contribute to the Council’s strategic priorities, Dacorum Borough Council had to be able to demonstrate the golden thread process, which included: • setting clear priorities – what we all have to achieve • citizen needs – what our communities need and expect from us • sound nancial control – spending resources wisely and forecasting for the future • improving service delivery – better value for money for citizens • sta engagement and development – ensuring sta have the right skills and opportunities • tracking our progress – celebrating success and reacting quickly where necessary Solution One of the key outcomes to be delivered from this appointment was to improve performance planning and management.
    [Show full text]
  • ED142 : NHDC Final Response to Inspector's Actions Arising out of The
    ED142 : NHDC Final response to Inspector’s Actions arising out of the Hearing Sessions Matter 6 – Deliverability Action Date on which Examination Doc Action Completed Reference No. • NHDC to provide updated version of Table A of Matter Enclosed as ED142 Appendix M6-1 6 Hearing Statement (to include infrastructure for other allocated sites (i.e. not housing sites)) and the Housing Trajectory • NHDC to provide updated Infrastructure Delivery Plan 23/01/ 2018 ED73 • Infrastructure Delivery Plan Appendix A 23/02/2018 ED73a Enclosed As Appendix M6-2 • Hertfordshire County Council to provide suggested 21/02/2018 ED105 Enclosed as additional/amended wording in the Plan regarding Appendix M6-3 transport issues for consideration by NHDC MM028, MM031, MM032 and MM033. • NHDC to liaise with Stevenage Borough Council with Enclosed as ED142 Appendix M6-4 regard to additional/amended wording • NHDC to provide note clarifying transport position 08/02/2018 ED86 Enclosed as with regard to B656 between Codicote and Appendix M6-5 Knebworth as raised by Mr Bamber of Save Rural Codicote • NHDC to provide note clarifying whether or not 08/02/2018 ED85 Enclosed as transport modelling shows that there is a need for a Appendix M6-6 southern bypass for Hitchin during the Plan period Appendix M6 – 1 ED142 : Note on Matter 6 / Table A – Infrastructure provision NORTH HERTFORDSHIRE DISTRICT COUNCIL LOCAL PLAN EXAMINATION ED142: MATTER 6 Note to Inspector Matter 6 / Table A – Infrastructure provision 1. Following the hearing sessions for Matter 6 (Deliverability), the following action has been specified: • NHDC to provide updated version of Table A of Matter 6 Hearing Statement (to included infrastructure for other allocated sites (i.e.
    [Show full text]
  • Dacorum Borough Green Infrastructure Plan - Final Report
    DACORUM BOROUGH GREEN INFRASTRUCTURE PLAN - FINAL REPORT Prepared for Dacorum Borough Council by Land Use Consultants March 2011 www.landuse.co.uk LUC SERVICES Environmental Planning Landscape Design Landscape Management Masterplanning Landscape Planning Ecology Environmental Assessment Rural Futures Digital Design Urban Regeneration Urban Design 43 Chalton Street 14 Great George Street 37 Otago Street 28 Stafford Street London NW1 1JD Bristol BS1 5RH Glasgow G12 8JJ Edinburgh EH3 7BD Tel: 020 7383 5784 Tel: 0117 929 1997 Tel: 0141 334 9595 Tel: 0131 202 1616 Fax: 020 7383 4798 Fax: 0117 929 1998 Fax: 0141 334 7789 [email protected] [email protected] [email protected] [email protected] DOCUMENT CONTROL SHEET Version Issued by: Approved by: Andrew Tempany Kate Ahern Senior Landscape FINAL Principal-in-Charge Architect 24th March 2011 24th March 2011 CONTENTS 1 INTRODUCTION ...................................................................................................................................................................... 1 What is green infrastructure?..................................................................................................................................................................................................... 2 Benefits and relevance of the green infrastructure approach to Dacorum ..................................................................................................................................... 3 The green infrastructure planning process – a summary..............................................................................................................................................................
    [Show full text]
  • Maurice Pring
    Your Berkhamsted editorial From the Editor December 2011 The Parish Magazine of Contents St Peter's Great Berkhamsted Leader by Fr Michael Bowie 3 Welcome to the December issue of Your Berkhamsted. Around the town: local news 5 Another year draws to a close and looking Berkhamsted in the news 7 back through the 2011 issues of Your Berkhamsted I am reminded of the events Festival of Light 9 that have taken place in our community in the past 12 months. We've celebrated 30 Dangerous Days in Dacorum 11 years of the Petertide Fair and 60 years of Ashlyns school, and arrived well and truly Christmas Recipes 13 in the 21st century with our very own internet television channel. We said an Parish News 16 unexpected goodbye to a local landmark when Birtchnell's collapsed one dark night, Friends of Ashridge 20 and were equally surprised when we lost our Royal Mail sorting office. Despite the Local history: Maureen Pring 21 economic gloom we've welcomed new shops to the town, including two art Local music: St Peter’s Choir CD 25 galleries, showing that even the financial crisis cannot dampen Berkhamsted's Days out for children 27 enterprising spirit. Whatever 2012 brings, Your Berkhamsted will continue its aims to Local People: Christopher Morris 28 explore the past, reflect the present and look to the future of Berkhamsted and its The last word 31 residents. If you'd like to share your Berkhamsted memories or tell us about news of local events or organisations, we'd Photo credits: Front cover: Ashridge by be delighted to hear from you.
    [Show full text]
  • Park Plaza Area Development Options
    Broxbourne Local Plan Park Plaza Area Planning Policy Team Development Options April 2016 1 Contents Development Options Reports 1. Purpose of this report pg 2 Purpose of this report In preparing its new Local Plan the Council has considered a 2. The Park Plaza Area pg 3 number of Borough-wide options as set out in the Development Introduction to the Park Plaza area Options and Scenarios Report (April 2016). The Council has History and settlement pattern prepared five local area options studies in order to assess Previous local plans development potential in more detail. These studies have informed 3. Issues to consider for future development pg 7 the Borough-Wide Options and Scenarios Report and all six studies Landscape and character should be read together in order to understand the development Visual appraisal of the Park Plaza area strategy for the emerging Local Plan. Environmental designations In addition to this study for Park Plaza, Development Options Roads and rights of way Reports have been prepared for Bury Green, Brookfield, Goffs Public transport Oak, and West of Wormley. A further study had been proposed Facilities and utilities for West of Hoddesdon but this was overtaken by the granting of Employment evidence planning permission for strategic scale development at High Leigh in Protecting the green belt April 2015. Landownership and promotions 4. Development options pg 21 This report sets out and discusses potential development options for the area. Although the report concludes on the performance of 5. Green Belt Boundaries pg 37 each option within the area’s local context, it will be the Local Plan which decides on the preferred option in the context of overall 6.
    [Show full text]
  • Report on Core Areas of Work
    Formatted APPENDIX A - REPORT ON CORE AREAS OF WORK Carriageway Resurfacing Programme 1. Luton‟s highway network is an essential communication link that serves almost everyone everyday of the week and for a wide variety of reasons from simply visiting friends and relatives to vital business deliveries. Roads are an extremely valuable asset and in Luton their Gross Replacement Value is currently £470.25m. 2. In 2011/12 we delivered 33 resurfacing schemes and spent c. £1,500,000 of capital and revenue funding. However, with another severe winter in 2010/11 many roads had deteriorated further with the long period of freeze/thaw leading to the accelerated break- up of carriageway surfaces, with extensive cracking, crazing and potholes. 3. In addition in March 2011 the Department for Transport allocated £248,006 of Winter Pothole Funding to LBC following severe winter weather. This was used for large area road patching with over 28 roads treated. 4. Weather predictions for future years indicate an increasing trend for more exceptional weather conditions resulting in further pressure on already reducing maintenance budgets. Highway maintenance is increasingly a matter of managing the deterioration of assets. 5. The classified road (A, B & C roads) network is assessed annually using nationally developed criteria and the unclassified network is assessed every two years. Figures supplied to government show that we are currently only spending half of what would be required to maintain Luton‟s roads in their current condition. 361 resurfacing schemes have been identified following carriageway condition surveys of the road network. 6. Based upon results of the assessments, and referrals from area Highway Inspectors, Highway Services has developed a programme of work for carriageways which need immediate and significant improvement.
    [Show full text]