Of the Proposal I- Full Title of the Project !- Tauhak SHP (4.50 MW)
Total Page:16
File Type:pdf, Size:1020Kb
State Serial No. of the Proposal i- Full Title of the Project !- Tauhak SHP (4.50 MW). File No, :- FP/HPIHYD/3772o/20LA. Check List Serial No.3. APPENDIX (See Rule 6) FORM . 'A' Form for seeking prior approval under section 2 of the proposals by the State Government and other authorlties PART-I (Filled up by user agency) DIVERSION OF FORESTLAND FOR THE CONSTRUCTION OF Taqhak SHP , WITHIN THE JURISDICTION OF KASOL FOREST R,ANGE, PARVATI FOREST DIVISION, DISTRICT KULLU, HIMACHAL PRADESH. 1 PROJECT DETAILS (i) Short narratlve of the Tauhak SHP is a run-of-river scheme, ano allotted by the Government of Himachal project/scheme for which Pradesh in the name of HI[4URJA (H.P. the forest land is required. Govt. Energy Development Agency) Kasumpti, Shimla-171009 (H.P.) for harnessing the power potential of Dudhikhol Nallah (a tributary of River Parvati) on dated 23'" lanuarv, 2009 which is situated in the left bank of River Parvati in the opposite direction of Village Tahuk within the jurisdiction of Kasol Forest Range, Parvati Forest Divlsion at Shamshi, District Kullu, Himachal Pradesh. ImDlementation Agreement (I.A.) has also been got signed with GoHP on 8r'September, 2015. The water shall be diverted from Dudhikhol Nallah and Power House sjte is proposed in the Ieft bank of Dudhi Nallah near bridge over Parvati River on the road from Tahuk to village shillah. This project site is accessed through lvlandi- Bhuntar-Manikaran-Barshaini Road. The generated power of this proposed project shall be evacuated in the 33 KV HPSEBL Transmission Line whlch is passing near the proposed project, (ii) I\4ap showing the required l.4ap attached at Page No. _ forest land, boundary of adjoining forest on a 1:50000 scale map. ( iii) Cost of the project, Rs.2860.36 Lacs (iv) Justification for locating the Other alternatives were studied in detail, Droiect in forest area. keeDinq in view the cost effectiveness, ecological disturbances, stability of strata and barest minimum forest land with least numbers of trees getting affected. Alternate No-z has been recommended out of three alternates, which is cost effective, economically viable, socially equitable, culturally acceptable, ecologjcally compatible and environmentally sustajnable. As per this proposal, there is no loss to the environment and ecological degradation. Keeplng in view the aspects of geologically and environmentally, we nave proposed all the components at safe locations on the surface and there are no any underground components where major blastinq work is required. (v) Cost-benefit analysis Living standard of the people will be improved considerably by gettjng employment opportunity during the construction activities as well as after commissioning of the project which wjll help in uplifting the poor economy of the area, vi). Employment likely to be generated. During Construction Period:- Period Professional/ Allied Skilled Unskilled Total Technical Staff Labour Labour 1" Year 5 8 40 68 2' 8 10 30 50 9B Yea r b). I During Operation and [4aintenance Period;- Period Professional Allied Skilled Un-skilled Total / Technical Staff Labour Labour Upto 40 Yrs. 7 3 2 2 74 From COD. 2. I Purpose wise break-uD of the total land reouiredt- S.No Name of Component Forest Non-Forest Total Land Land Land (In Hectares) 1. Diversion Structure. 0.015 6 0.0156 2. Open Water Conductor Svstem, 0.1188 0.1188 3. Desiltinq Tank. 0.0510 0.0510 4. Silt Flushinq Channel. 0.0061 0.0061 5. Aquaduct. 0.0109 0.0109 6. Surqe Shaft. 0.045s 0.0455 7. Penstock Line, 0.3030 0.303 0 B. Power Hou se-cu m - Switchvard. 0.1700 0.1700 9. Tail Race. 0.0085 0.008s 10. Approach road to Power House 0.0285 0.0285 and Store / Stockvard No-2. 11. Store / Stockvard No-1 & 2. o.o574 o.o574 1) 14uck Dumping Sites / Protection 0.1435 0.143 5 Wall (No. 1to 7). Construction of 33 KV 0.0040 0.0040 underground armored cable from proposed power plant upto interfacino Doint. TOTAL LAND o.9628 Nil o.9628 3_ Details of displacement of people due to the proiect, if anv. ri) Number of families, None ( ii) Number of Scheduled Castes/ Scheduled None Tribe families. (iii) Rehabilitation olan, (to be enclosed). Not Required. 4 Whether clearance under Environment No. (Protection) Act, 1986 required? (Yes/No). 5 Undertaking to bear the cost of raising Copy of undertaking and maintenance of compensatory attached at Page No. afforestation and/ or penal compensatory afforestation as well as cost for protection and regeneration of Safety Zone, etc. as per the scheme prepared by the State Government (undertaking to be enclosed). 5. Details of Certificates/ documents enclosed as required under the instructions:- i) Demand Letter (as per Check List No-2). ii) Detailed Note on the Project (as per Check List No. 4). iii) Location lYap on Toposheet alonqwith DGPS Map (Check List No. 5). iv) Layout plan of the project site (Check List No. 6). Statement showing detail of forest land (Check Llst No. 7). vi) Statement Showinq detail of non-forest land (Check List No. B). vii) Non Availability of non-forest land certificate obtained from D,C. Kullu (Check List No. 9). viii) Justiflcation for locating the project in forest area (Check List No.10). ix) Certificate for minimum use of forest land (Check List No. 11). x) Undertaking to bear the cost of Compensatory Afforestation (Check List No. 12) xi) Undertaking to pay the Net Present Value and additional amount of NPV of forest area (Check LiSt No. 13. ) xii) Undertaking by User Agency regarding FRA, 2006 certificate (Check List No. 14. ) xiii) Component-wise detail of land (Check List No. 32 a.) XiV) Copy of Techno-Economic Clearance (Check List No. 32 c.) XV) Copy of Implementation Aqreement (Check List No. 32 d.) XVi) NOC obtained from lPH Department (Check List No. 32 e.) XVii) NOC obtained ffom Fisheries Department (Check Ltst No. 32 f.) xviii) Authority Letter (Check List No. 32 q.) XiX) NOC obtained from HPPWD. Check Llst No. 35-Afi). XXI) Distance certificate obtained from Wildlife. Check List No. 35-A(iii xxii) NOC obtained from Gram Panchayat Barshaini. Check List No. 35-A(iv). XXiV) Joint Inspection Report. Check List No. 35-A(vi). XXV) Undertaking/certificate. Check List No. 35-B(i). XXVi) Reclamation plan of muck dumping sites, detail of muck generated and its disposal. Check List No. 35-C(i) to 35-C(vi). xxvii) Bill of Net Present Value. Check List No. 35-D. xxviii) Details regarding construction of proposed 33 KV underground armored cable from evacuation point. Check List No. 35-E. xxix) Revenue papers. Dated: Place : \<. r^-( €r^* *rrmnd$fficer,-,M uuJrrl|rftft),, Distt. Kullu (H.P. )..