Chanon Piansema

Lead Pipeline Engineer

Resume

SUMMARY

Engaged as pipeline design engineer having extensive experience in Conceptual Study, FEED and Detail Design of onshore pipeline. Also have gained experience over five years working as civil/structural design engineer in the petrochemical industry. Areas of my expertise are designing, analyzing and construction. Seeking to continue to apply my experience in oil & gas industry especially in subsea/on-shore pipeline and structural engineering.

EXPERIENCE

2016 - Present Lead Pipeline Engineer, WorleyParsons (),

Detail Design of Provincial Gas Transmission Pipeline to Nakhon Ratchasima Extension Phase for PTT (Thailand)

Detail Design for gas pipeline length 48 km with diameter 28 inch which is the extension route from PTT-NM Phase I. There are 4 block valves along the route.

 Preparing Pipeline Specifications  Reviewing all pipeline drawings such as Alignment Sheet, Crossing Drawings etc.  Producing Pipeline Calculations  Attending the weekly meeting with client

2016 - 2016 Senior Pipeline Engineer, WorleyParsons (Thailand), Bangkok

Route Study of RA#6 to Ratchaburi Pipeline Project for PTT (Thailand)

Conceptual Route Study for gas pipeline length 120 km and diameter 30 inch from RA#6 to Ratchaburi. There are six block valves along the route.

 Prepared pipeline route map for three alternative routes  Provided drawings for presenting the government agency in order to get the construction permit  Produced alignment sheet and crossing drawings  Attended the weekly meeting with client

2015 - 2016 Pipeline Engineer, Hess Corporation (Exploration & Production), North Dakota, USA

PMC of Hawkeye Trunk lines Project, Tioga, North Dakota, USA A new 12 inch gas line and a new 12 inch oil line parallel in the same trench together with fiber optic cable along the route. The oil line starts from the Hawkeye Oil facility to RTF station. The gas line begins at Hawkeye compressor station and finish at Silurian Compressor Station. There are the new launchers and receivers are installed at each facility station. The total length of pipeline is about 40 km.

 Prepared construction daily report  Reviewed P&ID and piping arrangement at block valve stations  Attended the construction bi-weekly meeting  Provided the MTO for all pipeline valves and materials  Prepared the hydrotest procedure and packages  Prepared the documents and drawings for PHMSA permit  Reviewed the pipeline as-built drawings

Page 1

Chanon Piansema

Lead Pipeline Engineer

Resume

2014 - 2015 Senior Pipeline Engineer, WorleyParsons (Thailand), Bangkok

PMC of The Provincial Gas Transmission Pipeline to Nakhon Ratchasima for PTT (Thailand) Pipeline length 120 km with diameter 28 inch gas transmission pipeline from Saraburi to Nakorn Ratchasima

 Inspected the pipeline construction activities like as trenching, lowering, backfill  Reviewed pipeline shop drawings  Approved work pack for open cut, bored and HDD  Attended the weekly meeting with client and contractor  Participated the construction permit meeting with government agency  Reviewed the pipeline as-built drawings

Conceptual Study of Pipeline Project for Ministry of Energy, Thailand The new 12 inch – 24 inch multiproduct (oil) pipeline run from to North and North-East of Thailand. The total length of pipeline is about 1,100 km. There are the new five tanks terminals are constructed at potential location along the pipeline route.

 Prepared pipeline conceptual design basis manual (DBM)  Production of pipeline corridor and pipeline topographic map for desktop route study  Prepared the pipeline route selection assessment report  Acted as project coordinator  Attended the public participation meeting  Provided pipeline documents and drawings for support EIA  Site visited for selecting the tank farm location at North and North-East of Thailand

2013 - 2014 Pipeline Engineer, Hess Corporation (Exploration & Production), Houston, USA

Detail Design of Hawkeye Trunk lines Project, Tioga, North Dakota, USA A new 12 inch gas line and a new 12 inch oil line parallel in the same trench together with fiber optic cable along the route. The oil line starts from the Hawkeye Oil facility to RTF station. The gas line begins at Hawkeye compressor station and finish at Silurian Compressor Station. There are the new launchers and receivers are installed at each facility station. The total length of pipeline is about 40 km.

 Checked MTRs and ITPs of line pipe, coating and hot bend  Attended Pre-Production Meeting (PPM) for coating and hot bend  Reviewed P&IDs and isometric drawings of launcher/receiver  Checked pipeline design basis manual (DBM)  Reviewed and check all pipeline specifications and reports as per the relevant code and standard  Reviewed and commented all pipeline calculations  Checked pipeline route map, typical drawings, alignment sheets and crossing drawings  Reviewed material requisition packages and data sheets  Attended the hazard identification study (HAZID) and hazard and operability study (HAZOP)  Provide documents and drawings for get permit approval from government agency  Developed isometric drawings and MTO for pipeline tie-in location at Bakken formation area – Tioga, ND  Site visited at Bakken formation area, Tioga, ND for checking tie-in location

2011 - 2013 Pipeline Engineer, WorleyParsons (Thailand), Bangkok

Pipeline Route Selection and Feasibility Study of Dung Mun Field for APICO (Khorat) Limited 52 km, 12 inch gas transmission pipeline from GPP to Nam Pong Power plant

Page 2

Chanon Piansema

Lead Pipeline Engineer

Resume

 Performed pipeline desktop route study  Developed the Pipeline Design Basis and PEP  Conducted Risk Assessment of pipeline alternative route  Production of pipeline route map and alignment sheets

FEED of The Provincial Gas Transmission Pipeline to Nakhon Ratchasima for PTT (Thailand) 120 km, 28 inch gas transmission pipeline from Saraburi to Nakorn Ratchasima Station

 Production of alignment sheets and pipeline drawing packages  Verified topographic survey data prior proceed alignment sheet  Prepared pipeline specifications and datasheets  Produced pipeline calculations (wall thickness, flexibility, buoyancy control, bend analysis, crossing design, underground pipeline stress analysis, stress/strain based design)  Prepared pipeline MTOs

Detail Design of The Fourth Transmission Pipeline for PTT (Thailand) 294 km, 42 inch gas transmission pipeline from Rayong to Kaeng Khoi Tie-in Station

 Developed pipeline design basis  Prepared Technical specifications, mechanical calculations and datasheets for onshore pipeline in accordance with ASME B31.8  Production of alignment sheet and construction drawing packages  Provided Material requisition for long lead items  Prepared technical bid evaluation  Prepared pipeline MTOs  Interpreted geotechnical data  Prepared pipeline calculation (wall thickness, flexibility, buoyancy control, bend analysis, crossing design, underground pipeline stress analysis, stress/strain based design)  Performed squad check of vender data and drawings from other disciplines

2006 - 2011 Civil/Structural Engineer, CTCI (Thailand), Bangkok

EPC of BCP Product Quality Improvement Project for Bangchak Petroleum Public Company Limited

 Prepared preliminary/conceptual design, and performed material take-off either for bidding or control budget  Reviewed on detailed civil/structural drawings which produced by designer  Designed and analyzed the structures in petrochemical plant including steel and reinforced concrete such as steel structure for support equipment, pipe rack, machine foundations, bio pit, which are satisfy with standard specification ACI, API, AISC, ASCE  Prepared MTOs  Proceeded technical survey for checked and demolished underground obstruction before pilling work started  Supervised to assure that pilling work was being executed without any underground obstruction  Issued Field Design Change Notice  Issued Punch-List and distributed to sub-contractor  Prepared As-Built drawings

Detail Design of AN and MMA Project for PTT Asahi Chemical Company Limited (PTTAC)

 Designed and analyzed the structures including steel and reinforced concrete such as pipe rack, machine foundations, bio pit, which are satisfy with standard specification ACI, API, AISC, ASCE  Prepared MTOs

Page 3

Chanon Piansema

Lead Pipeline Engineer

Resume

EDUCATION

Bachelor's Degree in Civil Engineering, University, 2006

Bachelor's Degree in Survey Engineering, Chulalongkorn University, 2004

REGISTRATIONS/AFFILIATIONS

Council of Engineering, Thailand (COE)

Engineering Institute of Thailand (EIT)

SPECIFIC TECHNICAL EXPERTISE

PLATFORMS AND TOOL

 SOFTWARE: Pipeline Toolbox, ArcGIS 10.0, AutoCAD, MATLAB, SAP2000, STAAD Pro, Microsoft Office including, Word, Excel and Power Point  LANGUAGES: VBA in Microsoft Excel (Macro), PASCAL  OPERATING SYSTEMS: UNIX (FreeBSD), Microsoft Windows including 95, 98, NT, ME, 2000, XP, Windows 8

CODE AND STANDARD SPECIFICATIONS

 Have familiar with ASME B31.4, ASME B31.8, 49 CFR Part 192, 49 CFR Part 195, API RP 1102, API 5L, ACI, AISC, ASCE

SPECIALIST COURSES

 Trained “Offshore Pipelines” which the program’s primary objective is to provide participants with practical knowledge complementing their theoretical fundamentals. The course was organized by TOTAL E&P Thailand and Total Professors Associes (TPA).

Page 4