Form 1 – Integrated Township Project at Usarghar and Sandap, Kalyan 1
Total Page:16
File Type:pdf, Size:1020Kb
APPENDIX - I (See paragraph - 6) FORM 1 (I) Basic Information No. Item Details 1. Name of the project/s Integrated Township Project at village Usarghar and Sandap, Dist- Thane. State- Maharashtra 2. S. No. in the schedule 8 (b) 3. Proposed Area as per 7/12 extract: 5, 36,430.00 Sq. mt. capacity/area/length/tonnage to Area as per proposed Subdivision: 4, 96,153.00 Sq. mt. be handled/command Area of plot as per triangulation: 4, 97,543.27 Sq. mt. area/lease area/number of Deduction: 31,732.28 Sq. mt. wells to be drilled Net Plot area: 4, 64,420.72 Sq. mt. Built-up area as per FSI: 8,43,853.94 Sq.mt. (Including Social Housing Component) Total Construction Built-up area: 16, 22,675.46 Sq.mt. Project Proposal: Phase Building Name & No. of floors Flats/Units No. (Nos.) Phase Residential: Sale Lower Stilt + Upper 1240 Flats 1 12 Buildings Stilt + 2 level podia + 1st to 23rd Floors Residential: Sale Lower Stilt + Upper 2012 Flats 17 Buildings Stilt + 2 level podia + 1st to 26th Floors Educational Stilt + 6 Floors Classrooms: Building (School) 115 Nos. Economically Ground + 7 Floors 448 Flats Weaker Section (EWS) 4 Buildings Mall 2 Basements + -- Ground + 6 Floors Sports Complex Ground + 1 Floor -- Phase Residential: Sale Basement + Lower 4712 Flats 2 37 Buildings Stilt + Upper Stilt + 2 Podia + 1st to 27th Floor EWS Ground + 7 Floors 784 Flats 7 Buildings Shopping 3 Basements + -- Complex (Town Ground + 4 Podia + Hall & 15 Floors Auditorium) Bus Station Stilt + 3 Floors -- Phase Basement + Lower 2828 Flats 3 Residential: Sale Stilt + Upper Stilt + 2 22 Buildings Podia + 1st to 27th Floor EWS: Ground + 7 Floors 448 Flats 4 Buildings Business Office 2 Basements + Offices Form 1 – Integrated Township Project at Usarghar and Sandap, Kalyan 1 No. Item Details Ground + 4 Podia + 8 Floors Market Ground + 1 Floor -- Basement + Ground + Beds: 50 Health Care 3 Floors nos. Fire Brigade Stilt + 3 Floors -- Police Station Ground + 2 Floors -- 4. New/Expansion/Modernization Expansion and Amendment 5. Existing Capacity/ Area etc. The project has received Environmental Clearance vide No. SEAC- 2013/CR-419/TC-1 dated 13.02.2017. Copy of EC letter is attached as Enclosure. As there is expansion and amendment in the proposal due to increase in FSI as per ITP Approval, hence reapplied for Environment Clearance Total Constructed area on site (FSI + NON FSI): 57499.77 Sq. mt. 6. Category of project i.e.’ A’ or B1 ‘B’ 7. Does it attract the general Not Applicable condition? If yes, please specify. 8. Does it attract the specific Not Applicable condition? If yes, please specify. 9. Location Village Usarghar and Village Sandap, Tal - Kalyan, Dist- Thane, State –Maharashtra. Plot/ Survey/ Khasra No. Village - Usarghar, S. no. 17/1, 17/2, 17/3/A, 17/3/B, 17/4, 17/5, 36/1/A, 36/1/B, 37/1, 37/2, 38/1, 38/2, 38/3, 38/4, 70/9, 70/10, 70/11, 71/1, 71/2, 71/3, 71/4, 71/8, 91/1, 91/2, 91/3, 91/4, 91/5, 92/1, 92/2, 93P, 103/2, 103/6/A, 103/6/B, 103/7, 103/8, 103/9, 103/10, 103/11, 103/12, 103/13, 103/14/B, 103/15, 103/16, 103/17, 103/18, 107/1,107/2/A,107/2/B, 107/3, 107/4, 107/5, 107/6, 107/7, 107/8, 107/9, 107/10, 107/11, 107/12, 107/13, 107/14, 107/15, 107/16, 107/17, 107/18, 107/19, 107/20, 108/1, 108/2, 108/3, 109P, 134/1, 134/2, Village-Sandap, S. No. 2, 21P, Taluka –Kalyan, Dist- Thane in Proposed Growth Center of Kalyan Villages Usarghar and Sandap Tehsil Kalyan District Thane State Maharashtra 10. Nearest railway station Nearest Dativali Railway Station: Within 2.50 km (Road Distance) airport Nilje Railway Station: Within 6.00 km (Road Distance) Chhatrapati Shivaji International Airport: Within 39.00 km (Road Distance) 11. Nearest Town, city, District Kalyan and Dombivali headquarters along with distance in kms. 12. Village Panchayats, Zilla Special Planning Authority: Mumbai Metropolitan Region Parishad, Municipal Development Authority (MMRDA) Corporation, Local body Municipal Corporation: Kalyan Dombivali Municipal Corporation (complete postal address with (K.D.M.C.) telephone nos. to be given) 13. Name of the applicant M/s. Horizon Projects Pvt. Ltd. Form 1 – Integrated Township Project at Usarghar and Sandap, Kalyan 2 No. Item Details 14. Registered Address Runwal & Omkar Esquare, 5th floor, Off Eastern Express Highway, Opp. Sion Chunabhatti Signal, Sion (E), Mumbai – 400 055 15. Address for correspondence Runwal & Omkar Esquare, 5th floor, Off Eastern Express Highway, Opp. Sion Chunabhatti Signal, Sion (E), Mumbai – 400 055 Name Ms. Pallavi Matkari Designation Chief Architect (Owner/Partner/CEO) Address Runwal & Omkar Esquare, 5th floor, Off Eastern Express Highway, Opp. Sion Chunabhatti Signal, Sion (E), Mumbai – 400 055 Pin Code 400 055 E-mail [email protected] Telephone No. 9769620211 Fax No. 022-61179003 16. Details of Alternative Sites Not Applicable examined, if any. Location of these sites should be shown on a topo-sheet. 17. Interlinked Projects No 18. Whether separate application Not Applicable of interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. a) The Forest (Conservation) Not applicable Act, 1980? b) The Wildlife (Protection) Not applicable Act, 1972? c) The C.R.Z Notification, Not applicable 1991? 22. Whether there is any Received Locational Clearance (LC) from Urban Development Government Order / Policy Department, Govt. of Maharashtra on date 21.08.2017 relevant/ relating to the site? Received Letter of Intent (LOI) from MMRDA on date 23.04.2018 Received Layout approval dated 23.04.2018 LOI, LC and Layout approval are attached as Enclosure 23. Forest land involved (hectares) Not applicable 24. Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? (a) Name of the Court (b) Case No. (c) Order /directions of the Court, if any and its relevance with the proposed project. Form 1 – Integrated Township Project at Usarghar and Sandap, Kalyan 3 (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities / Sr. Information/Checklist Yes / rates, wherever possible) with source of No. confirmation No information data 1.1 Permanent or temporary change in Yes Site was an open land and is being developed as land use, land cover or topography Integrated Township Project. including increase in intensity of The project site is partly in Residential zone and land use (with respect to local land partly in commercial zone along with reservations use plan) for Playground, Garden, Public Office and staff quarters as per DP remarks of MMRDA 1.2 Clearance of existing land, No -- vegetation and building? 1.3 Creation of new land uses? Yes Site was an open land and is being developed as Integrated Township Project. The project site is partly in Residential zone and partly in commercial zone along with reservations for Playground, Garden, Public Office and staff quarters as per DP remarks of MMRDA 1.4 Pre-construction investigation e.g. Yes Geotechnical Investigation has been carried out. bore houses, soil testing? Copy of report is attached as Enclosure. 1.5 Construction works? Yes Integrated Township Project 1.6 Demolition works? No -- 1.7 Temporary sites used for No Provision of temporary hutments with facilities like construction works or housing of drinking water, toilets etc. construction workers? 1.8 Above ground building, structures Yes Details shall be submitted or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No -- mining or Tunneling? 1.10 Reclamation works? No -- 1.11 Dredging? No -- 1.12 Offshore structures? No -- 1.13 Production and manufacturing No -- processes? 1.14 Facilities for storage of goods or Yes Temporary storage facilities on site to store the materials? construction raw material 1.15 Facilities for treatment or disposal Yes STP for Treatment of sewage of solid waste or liquid effluents? Solid waste will be segregated into non- biodegradable and biodegradable garbage Biodegradable waste will be treated on site and the non-biodegradable waste will be segregated into recyclable & non-recyclable. Recyclable waste shall be handed over to recyclers and non- recyclable waste will be handed over to local authority. Dried sludge from STP will be used as manure for gardening E – Waste: Will be stored separately and disposed through authorized recyclers. Bio-medical waste will be handled and disposed Form 1 – Integrated Township Project at Usarghar and Sandap, Kalyan 4 Details thereof (with approximate quantities / Sr. Information/Checklist Yes / rates, wherever possible) with source of No. confirmation No information data as per Bio-Medical Waste Management Rules, 2016 1.16 Facilities for long term housing of No -- operational workers? 1.17 New road, rail, or sea traffic during Yes Railway freight corridor shall be passing abutting construction or operation? the plot and also multi modal corridor shall be passing through the site in future which shall help to enhance accessibility to project site. 1.18 New road, rail, air waterborne or Yes Railway freight corridor shall be passing abutting other transport infrastructure the plot and also multi modal corridor shall be including new or altered routes and passing through the site in future which shall help to stations, ports, airports etc.? enhance accessibility to project site.