Ministry of Tourism, Culture & Sport Ministère du Tourisme, de la Culture, et du Sport Culture Division Division de culture Culture Services Unit Unité des services culturels Programs and Services Branch Direction des programmes et des services 401 Bay Street, Suite 1700 401, rue Bay, Bureau 1700 Toronto, ON, M7A 0A7 Toronto, ON, M7A 0A7 Telephone: 416 314 7137 Téléphone: 416 314 7137 Facsimile: 416 314 7175 Télécopieur: 416 314 7175 Email :
[email protected] Email :
[email protected] February 24, 2012 Kelly Matheson Bow Lake Phase 1 Wind Farm Limited & Bow Lake Phase 2 Wind Farm Limited c/o Bluearth Renewables Inc. Suite 200, 4723-1st Street SW Calgary, AB T2G 4Y8 RE: Colloquial Name of Project: Bow Lake Wind Farm Phase 1 and Phase 2 Location: District of Algoma OPA Reference Numbers: FIT-FVXCPUV, FIT-F7JOC51, FIT-FYPJVV MTCS DPR file no.: PLAN-57EA031 Dear Ms. Matheson: This letter constitutes the Ministry of Tourism, Culture and Sport’s written comments as required by s. 23(3)(a) of O. Reg. 359/09 under the Environmental Protection Act regarding heritage assessments undertaken for the above projects. Based on the information contained in the revised report submitted for these projects, the Ministry is satisfied with the heritage assessment. Please note that the Ministry makes no representation or warranty as to the completeness, accuracy or quality of the heritage assessment report. * The revised Heritage and Tourism Impact Assessment for Bow Lake Wind Farm Phase 1 and Phase 2 (Feb. 22, 2012) recommends the following: 4.2 Mitigation Aboriginal Mitigation: 1.