NDOT Risk Management and Risk-Based Cost Estimation

Total Page:16

File Type:pdf, Size:1020Kb

NDOT Risk Management and Risk-Based Cost Estimation RISK MANAGEMENT AND RISK-BASED COST ESTIMATION GUIDELINES August 2021 This page is left intentionally blank NEVADA DEPARTMENT OF TRANSPORTATION RISK MANAGEMENT AND RISK-BASED COST ESTIMATION GUIDELINES The goal of this manual is to provide guidance to NDOT personnel and consultants in best practice methods of risk management and risk-based cost estimation. It is recognized that guidelines cannot provide entirely complete and practical guidance applicable to all situations and cannot replace experience and sound judgment. As such, deviations from these guidelines may, in some cases, be unavoidable or otherwise justifiable. Procedure for Guideline Revisions The guideline will be periodically revised or updated. For edits or updates, contact the Project Management Division at (775) 888-7321. All updates will be available on the Project Management Division SharePoint Portal which should be visited regularly for updated information. Responsibility: The Project Management Division is responsible for edits and updates to this document. Temporary Revisions: Temporary revisions will be issued by the Project Management Division to reflect updated/revised procedures. These will be reflected on dated errata sheet(s) posted on the Project Management Division SharePoint Portal. Scheduled Revisions: As deemed necessary by the Project Management Chief, the Project Management Chief will assemble a Review Team for reviewing the guidelines and errata sheets to determine if a revised edition of the guidelines is required. The Project Management Division Chief will evaluate and approve the recommendations of the team for revisions to the guidelines. Risk Management and Page i Risk-Based Cost Estimation Guidelines August 2021 Foreword These guidelines address the first step in NDOT project management’s vision of achieving statewide uniformity and consistency of project cost estimates and department-wide priority on estimating, managing, and controlling costs. Risk-based cost estimation and risk management involves the use of resources, including personnel that have the necessary knowledge, skills, and abilities to accurately and consistently predict costs. The future is uncertain, but what is certain is there are two questions that will be asked about our transportation projects: “How much will it cost?” and “How long will it take?” Risk-based estimates of project cost and schedule provide an alternative to traditional deterministic estimates which typically contain lump sum contingencies based on overall costs. Risk-based estimates establish project-specific contingency amounts that are based on specific risk drivers. In addition, risk-based estimates allow the project team to communicate the degree of uncertainty associated with the estimates to decision makers and stakeholders. The risk-based estimates are developed by establishing base estimates founded on clear assumptions without contingencies for unknowns, quantifying and estimating uncertainties, and quantifying specific risks (threats and opportunities). The resulting probability distributions and sensitivity analyses can be used as tools to understand, communicate, and manage risk to improve project development and delivery. Risk Management and Page ii Risk-Based Cost Estimation Guidelines August 2021 Contents Foreword .................................................................................................................................. ii Definitions of Selected Terms ................................................................................................vii Manual Organization ...............................................................................................................xii The Purpose of these Guidelines .......................................................................................... xiv 1. Risk Management ............................................................................................................. 1 1.1 Accounting for Risk in Project Cost and Schedule ....................................................... 1 1.2 Project Risk Management and Risk-Based Cost Estimation ........................................ 4 2. Cost Estimating Process .................................................................................................. 7 2.1 Introduction .................................................................................................................. 7 2.2 Determine Estimate Basis ............................................................................................ 8 2.3 Prepare Base Cost Estimate ........................................................................................ 8 2.4 Review Base Cost Estimate ......................................................................................... 9 2.5 Determine Risks .......................................................................................................... 9 2.6 Determine Estimate Communication Approach ............................................................ 9 2.7 Conduct Independent Review and Obtain Management Endorsement .......................10 3. Base Cost Estimate Methodology ..................................................................................11 3.1 Introduction .................................................................................................................11 3.2 Base Cost Estimating Techniques ..............................................................................12 3.3 Uncertainty .................................................................................................................14 4. Base Cost Estimation and Project Development Level .................................................17 4.1 Overview .....................................................................................................................17 4.2 Planning Phase ...........................................................................................................18 4.3 Environmental Phase ..................................................................................................19 4.4 Final Design Phase .....................................................................................................21 5. Important Factors Impacting Base Cost Estimation .....................................................23 5.1 Geographic Considerations .........................................................................................23 5.2 Quantity Considerations ..............................................................................................23 5.3 Scheduling/Lead Time ................................................................................................24 5.4 Difficult Construction/Site Constraints .........................................................................24 5.5 Methods of Payment ...................................................................................................24 5.6 Timing of Advertisement .............................................................................................26 5.7 Specialty Work ............................................................................................................26 5.8 Standard Items vs. Non-Standard Items .....................................................................26 5.9 First Time Used ..........................................................................................................27 5.10 Geotechnical Conditions .............................................................................................27 5.11 Permit Conditions........................................................................................................27 5.12 Market Conditions .......................................................................................................28 5.13 Other Funding Sources/Agreement Work for Others ...................................................29 Risk Management and Page iii Risk-Based Cost Estimation Guidelines August 2021 5.14 Project Delivery Methods ............................................................................................29 6. Base Cost Estimation Markups .......................................................................................31 6.1 Mobilization .................................................................................................................31 6.2 Miscellaneous Item Allowance ....................................................................................31 6.3 Preliminary Engineering ..............................................................................................32 6.4 Construction Engineering ............................................................................................32 6.5 Construction Contingency ...........................................................................................33 6.6 Escalation ...................................................................................................................33 6.7 Application of Markups ................................................................................................35 7. Documentation/Basis of Estimate ..................................................................................37 7.1 Techniques .................................................................................................................37 7.2 Basis of Estimate (BOE) .............................................................................................37 8. Project Schedule ..............................................................................................................45
Recommended publications
  • SIMULATION of DIFFERENT INTERSECTION DESIGN for IMPROVING TRAFFIC FLOW with FACTORS CONSIDERING LOCATION, POPULATION and DRIVER EXPECTANCY Sourabh Kumar Singh Dr
    Science, Technology and Development ISSN : 0950-0707 SIMULATION OF DIFFERENT INTERSECTION DESIGN FOR IMPROVING TRAFFIC FLOW WITH FACTORS CONSIDERING LOCATION, POPULATION AND DRIVER EXPECTANCY Sourabh Kumar Singh Dr. Anil kunte Associate Professor, Research Scholar, Associate Professor, Department of Civil Department of Civil Department of Civil Engineering Engineering, Shri JJT Engineering, Shri JJT Noida International University University University Dr. Paritosh Srivastava Abstract: In today’s economic growth the vehicular traffic is increasing day by day, which leads to failure of intersections before their time period. To increase the efficiency of these failed intersections the engineers added lanes to the existing major and minor roads, but this method do not give results which it used to deliver in the past, hence other methods were adopted. So to increase the efficiency and fulfil the criteria for successful intersection ,to cape with it several intersection are designed which are unconventional in nature like jug handle, bow tie, continuous flow intersection and median u turn which are very effective in increasing green time on highway and minor roads. The software used in this study is Auto- cad for planning and drawing purpose which can be used in sim-traffic software which will be used for simulation purpose of the traffic flow on different designs of intersections. The factors which are considered in this study are -location of town centre, population of the zone and driver expectancy. The final conclusion of this study is that continuous flow intersection provides the best results when the traffic is increased. The construction cost is least in median u turn and giving maximum result than all other intersections.
    [Show full text]
  • Transportation Network Plan Middleton, WI
    Report Transportation Network Plan City of Middleton, WI December 2006 Report for City of Middleton, Wisconsin Transportation Network Plan Prepared by: Traffic Associates LLC and STRAND ASSOCIATES, INC.® 910 West Wingra Drive Madison, WI 53715 www.strand.com December 2006 Approved by Middleton City Council November 21, 2006 TABLE OF CONTENTS Page No. or Following SECTION 1–INTRODUCTION AND EXECUTIVE SUMMARY 1.01 Overview.................................................................................................... 1-1 1.02 Executive Summary................................................................................... 1-3 SECTION 2–EXISTING TRANSPORTATION SYSTEM 2.01 Existing Transportation System................................................................. 2-1 2.02 Traffic Data Collection................................................................................ 2-14 2.03 Existing Conditions Modeling..................................................................... 2-16 SECTION 3–FUTURE CONDITIONS 3.01 Future Traffic Forecasting.......................................................................... 3-1 3.02 Future Conditions Traffic Operations Modeling ......................................... 3-4 3.03 Prioritization of Future Motor Vehicle Needs ............................................. 3-6 SECTION 4–SOLUTION TYPES 4.01 Transportation Solutions............................................................................ 4-1 4.02 Traffic Management Perspective ..............................................................
    [Show full text]
  • Rural Expressway Intersection Synthesis of Practice and Crash Analysis
    RURAL EXPRESSWAY INTERSECTION SYNTHESIS OF PRACTICE AND CRASH ANALYSIS Sponsored by the Iowa Department of Transportation (CTRE Project 03-157) Final Report October 2004 Disclaimer Notice The opinions, fi ndings, and conclusions expressed in this publication are those of the authors and not necessarily those of the Iowa Department of Transportation. The sponsor(s) assume no liability for the contents or use of the information contained in this document. This report does not constitute a standard, specifi cation, or regulation. The sponsor(s) do not endorse products or manufacturers. About CTRE/ISU The mission of the Center for Transportation Research and Education (CTRE) at Iowa State Uni- versity is to develop and implement innovative methods, materials, and technologies for improv- ing transportation effi ciency, safety, and reliability while improving the learning environment of students, faculty, and staff in transportation-related fi elds. Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. CTRE Project 03-157 4. Title and Subtitle 5. Report Date Rural Expressway Intersection Synthesis of Practice and Crash Analysis October 2004 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. T. H. Maze, Neal R. Hawkins, and Garrett Burchett 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Center for Transportation Research and Education Iowa State University 11. Contract or Grant No. 2901 South Loop Drive, Suite 3100 Ames, IA 50010-8634 12. Sponsoring Organization Name and Address 13. Type of Report and Period Covered Iowa Department of Transportation Final Report 800 Lincoln Way 14. Sponsoring Agency Code Ames, IA 50010 15.
    [Show full text]
  • Supplementary Online Content Chahal HS, Marseille EA, Tice JA, Et Al
    Supplementary Online Content Chahal HS, Marseille EA, Tice JA, et al. Cost-effectiveness of early treatment of hepatitis C virus genotype 1 by stage of liver fibrosis in a US treatment-naive population. JAMA Intern Med. Published online November 23, 2015. doi:10.1001/jamainternmed.2015.6011. eMethods. eTable 1. METAVIR Fibrosis Score, Treatment Policies for Evaluation and Modeled Treatment Options eTable 2. Model Comparison Using Sim/Sof and Sof/R Treatment Regimens eTable 3. Distribution of Fibrosis Stages in Chronic Hepatitis C Population eTable 4. Chronic Hepatitis C Natural History Disease Progression, Post-SVR Progression, and Regression and Mortality eTable 5. Weekly Cost of Drugs for the Modeled Therapies eTable 6. Chronic Hepatitis C Health Care Costs by Disease State eTable 7. Other Health Care–Related Costs: Follow-up, Testing, and Management of Treatment eTable 8. Frequency, by Week, of Follow-up/Testing/Management of Each Treatment Modality eTable 9. Total Cost of Treatment-Associated Adverse Events eTable 10. Health State Utilities in Chronic Hepatitis C eTable 11. Utility Loss With Chronic Hepatitis C Treatment eTable 12. SVR and Treatment Discontinuation Rates of All Modeled Therapies, Based on Meta-analyses of Clinical Trials eTable 13. Base-Case Results: Treatment by Fibrosis Stage and Treat All vs Treat at F3/F4 Strategies, for All Treatment Options eTable 14. Long-term Health Outcomes With Treatment at an Earlier Fibrosis Stage (or Treat All) vs Treating at a Later Fibrosis Stage (or Treating at F3/F4): Number of Advanced Liver Disease Cases per 100 000 Treated Patients eTable 15. Budget Impact, in Total Drug and Health Care Costs, of Therapies: Treating All vs Treating at F3/F4 eTable 16.
    [Show full text]
  • Alternative Intersections Comparative Analysis
    Alternative Intersections Comparative Analysis Morgan State University The Pennsylvania State University University of Maryland University of Virginia Virginia Polytechnic Institute & State University West Virginia University The Pennsylvania State University The Thomas D. Larson Pennsylvania Transportation Institute Transportation Research Building University Park, PA 16802-4710 Phone: 814-865-1891 Fax: 814-863-3707 www.mautc.psu.edu OPERATIONAL ANALYSIS OF ALTERNATIVE INTERSECTIONS By: John Sangster and Hesham Rakha Mid-Atlantic University Transportation Center Final Report Department of Civil and Environment Engineering Virginia Polytechnic Institute and State University July 23, 2015 1 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. VT-2012-03 4. Title and Subtitle 5. Report Date Operational Analysis of Alternative Intersections July 21, 2015 6. Performing Organization Code Virginia Tech 7. Author(s) 8. Performing Organization Report No. John Sangster and Hesham Rakha 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Virginia Tech Transportation Institute 3500 Transportation Research Plaza 11. Contract or Grant No. Blacksburg, VA 24061 DTRT12-G-UTC03 12. Sponsoring Agency Name and Address 13. Type of Report US Department of Transportation Final Report Research & Innovative Technology Admin UTC Program, RDT-30 14. Sponsoring Agency Code 1200 New Jersey Ave., SE Washington, DC 20590 15. Supplementary Notes 16. Abstract Alternative intersections and interchanges, such as the diverging diamond interchange (DDI), the restricted crossing u-turn (RCUT), and the displaced left-turn intersection (DLT), have the potential to both improve safety and reduce delay. However, partially due to lingering questions about analysis methods and service measures for these designs, their rate of implementation remains low.
    [Show full text]
  • Geometric Design Strategic Research TRANSPORTATION RESEARCH BOARD 2006 EXECUTIVE COMMITTEE OFFICERS
    TRANSPORTATION RESEARCH Number E-C110 January 2007 Geometric Design Strategic Research TRANSPORTATION RESEARCH BOARD 2006 EXECUTIVE COMMITTEE OFFICERS Chair: Michael D. Meyer, Professor, School of Civil and Environmental Engineering, Georgia Institute of Technology, Atlanta Vice Chair: Linda S. Watson, Executive Director, LYNX–Central Florida Regional Transportation Authority, Orlando Division Chair for NRC Oversight: C. Michael Walton, Ernest H. Cockrell Centennial Chair in Engineering, University of Texas, Austin Executive Director: Robert E. Skinner, Jr., Transportation Research Board TRANSPORTATION RESEARCH BOARD 2006 TECHNICAL ACTIVITIES COUNCIL Chair: Neil J. Pedersen, State Highway Administrator, Maryland State Highway Administration, Baltimore Technical Activities Director: Mark R. Norman, Transportation Research Board Christopher P. L. Barkan, Associate Professor and Director, Railroad Engineering, University of Illinois at Urbana–Champaign, Rail Group Chair Shelly R. Brown, Principal, Shelly Brown Associates, Seattle, Washington, Legal Resources Group Chair Christina S. Casgar, Office of the Secretary of Transportation, Office of Intermodalism, Washington, D.C., Freight Systems Group Chair James M. Crites, Executive Vice President, Operations, Dallas–Fort Worth International Airport, Texas, Aviation Group Chair Arlene L. Dietz, C&A Dietz, LLC, Salem, Oregon, Marine Group Chair Robert C. Johns, Director, Center for Transportation Studies, University of Minnesota, Minneapolis, Policy and Organization Group Chair Patricia V. McLaughlin, Principal, Moore Iacofano Golstman, Inc., Pasadena, California, Public Transportation Group Chair Marcy S. Schwartz, Senior Vice President, CH2M HILL, Portland, Oregon, Planning and Environment Group Chair Leland D. Smithson, AASHTO SICOP Coordinator, Iowa Department of Transportation, Ames, Operations and Maintenance Group Chair L. David Suits, Executive Director, North American Geosynthetics Society, Albany, New York, Design and Construction Group Chair Barry M.
    [Show full text]
  • Effect of Spatial Variability of Soil Properties on the Seismic Response of Earth Dams
    Effect of Spatial Variability of Soil Properties on the Seismic Response of Earth Dams H. Sanchez Lizarraga EUCENTRE, European Centre for Training and Research in Earthquake Engineering, Italy C.G. Lai University of Pavia, and EUCENTRE, European Centre for Training and Research in Earthquake Engineering, Italy SUMMARY: Variability of soil properties is a major source of uncertainty in assessing the seismic response of geotechnical systems. This study presents a probabilistic methodology to evaluate the seismic response of earth dams. A sensitivity analysis is performed by means of Tornado diagrams. Two-dimensional, anisotropic, cross-correlated random fields are generated based on a specific marginal distribution function, auto-correlation, and cross- correlation coefficient. Nonlinear time-history analyses are then performed using an advanced finite difference software (FLAC 2D). The study is performed using Monte Carlo simulations that allowed to estimate the mean and the standard deviation of the maximum crest settlement. The statistical response is compared with results of a deterministic analysis in which the soil is assumed homogeneous. This research will provide insight into the implementation of stochastic analyses of geotechnical systems, illustrating the importance of considering the spatial variability of soil properties when analyzing earth dams subjected to earthquake loading. Keywords: Earth Dams, Spatial Variability, Cross Correlated Random Field, Seismic Response. 1. INTRODUCTION It is well known that soil properties vary in space even within otherwise homogeneous layers. This spatial variability is highly dependent on soil type or the method of soil deposition or geological formation. Nevertheless, many geotechnical analyses adopt a deterministic approach based on a single set of soil parameters applied to each distinct layer.
    [Show full text]
  • GAO-20-195G, Cost Estimating and Assessment Guide
    COST ESTIMATING AND ASSESSMENT GUIDE Best Practices for Developing and Managing Program Costs GAO-20-195G March 2020 Contents Preface 1 Introduction 3 Chapter 1 Why Government Programs Need Cost Estimates and the Challenges in Developing Them 8 Cost Estimating Challenges 9 Chapter 2 Cost Analysis and Cost Estimates 17 Types of Cost Estimates 17 Significance of Cost Estimates 22 Cost Estimates in Acquisition 22 The Importance of Cost Estimates in Establishing Budgets 24 Cost Estimates and Affordability 25 Chapter 3 The Characteristics of Credible Cost Estimates and a Reliable Process for Creating Them 31 The Four Characteristics of a Reliable Cost Estimate 31 Best Practices Related to Developing and Maintaining a Reliable Cost Estimate 32 Cost Estimating Best Practices and the Estimating Process 33 Chapter 4 Step 1: Define the Estimate’s Purpose 38 Scope 38 Including All Costs in a Life Cycle Cost Estimate 39 Survey of Step 1 40 Chapter 5 Step 2: Developing the Estimating Plan 41 Team Composition and Organization 41 Study Plan and Schedule 42 Cost Estimating Team 44 Certification and Training for Cost Estimating and EVM Analysis 46 Survey of Step 2 46 Chapter 6 Step 3: Define the Program - Technical Baseline Description 48 Definition and Purpose 48 Process 48 Contents 49 Page i GAO-20-195G Cost Estimating and Assessment Guide Key System Characteristics and Performance Parameters 52 Survey of Step 3 54 Chapter 7 Step 4: Determine the Estimating Structure - Work Breakdown Structure 56 WBS Concepts 56 Common WBS Elements 61 WBS Development
    [Show full text]
  • An Anatomy of Data Visualization
    IJCSNS International Journal of Computer Science and Network Security, VOL.16 No.2, February 2016 77 An Anatomy of Data Visualization Abhishek Kaushik† and Sudhanshu Naithani††, Kiel University of Applied Sciences† Kurukshetra University †† Summary As data is being generated each and every time in the world, the importance of data mining and visualization will always be on increase. Mining helps to extract significant insight from large volume of data. After that we need to present that data in such a way so that it can be understood by everyone and for that visualization is used. Most common way to visualize data is chart and table. Visualization is playing important role in decision making process for industry. Visualization makes better utilization of human eyes to assist his brain so that datasets can be analyzed and visual presentation can be prepared. Visualization and Data Mining works as complement for each other. Here in this paper we present anatomy of Visualization process. Key words: Information Visualization, Scientific Visualization, Decision Making, Graph, Chart, Xmdv tool. Fig.1. General steps in the process of Visualization. 1. Introduction a) Try to understand size and cardinality of the data In simple worlds Visualization is a process to form a given. picture in order to make it easily imaginable and b) Determine kind of information which is to understandable for other people. With Visualization, communicate. process of Data Mining and Human Computer Interaction c) Process visual information according to targeted provides better results for visual data analysis. Initially audience. visualization was of two types - Information Visualization d) Use the visual portraying best and easiest form of and Scientific Visualization.
    [Show full text]
  • Stochastic One-Way Sensitivity Analysis Christopher Mccabe1, Mike Paulden2, Isaac Awotwe3, Andrew Sutton1, Peter Hall4
    Stochastic One-Way Sensitivity Analysis Christopher McCabe1, Mike Paulden2, Isaac Awotwe3, Andrew Sutton1, Peter Hall4 1Institute of Health Economics, Alberta Canada 2Department of Emergency Medicine, University of Alberta, Canada 3School of Public Health, University of Alberta 4Department of Oncology, University of Edinburgh, United Kingdom Introduction •Using decision analytic modelling as part of cost effectiveness analysis allows us to: •Facilitate use of multiple sources of data •Go beyond scope of single-clinical trial in terms of: •Patient group •Interventions •Time horizon Introduction •Need to consider uncertainty in parameter values, how these impact on conclusions drawn from a modelling analysis •Sensitivity analysis: •is the process of varying model input values and recording the impact of those changes on the model outputs •A deterministic one-way sensitivity analysis - varies the value of the parameter of interest whilst holding all other parameters constant at their expected value. 1-Way Sensitivity Analysis Tornado Diagram -60000 -40000 -20000 0 20000 40000 60000 80000 100000 120000 Loco-regional recurrence Distant recurrence Mortality after distant recurrence Cost of Treatment Adverse Event on Chemotherapy Utility in Remission Utility in distant recurrent Cost in remission Cost of surgery Peri-surgical utility Issues with this approach: •Probability that parameter takes extreme values not considered •Correlation between parameters also not considered Stochastic One-Way Sensitivity Analysis • The analysis of the impact of varying the value of one parameter on the expected cost effectiveness that: – incorporates the probability that the parameter will take that value; – and – respects the correlation between that parameter and other parameters in the model Stochastic one-way sensitivity analysis Calculating SOWSA 1.
    [Show full text]
  • Risk Management for Engineers
    Risk Management for Engineers Course No: B02-013 Credit: 2 PDH Boris Shvartsberg, Ph.D., P.E., P.M.P. Continuing Education and Development, Inc. 22 Stonewall Court Woodcliff Lake, NJ 07677 P: (877) 322-5800 [email protected] Table of Contents 1. INTRODUCTION ................................................................................................................................... 2 2. DEFINITION OF RISK. RISK PLANNING ........................................................................................... 2 2.1. RISK IDENTIFICATION .................................................................................................................................. 3 2.2. RISK ANALYSIS ........................................................................................................................................... 3 2.3. RISK RESPONSE ........................................................................................................................................... 5 3. RISK BREAKDOWN STRUCTURE (RBS)............................................................................................ 6 4. DEALING WITH RISKS AT A PROJECT LEVEL ............................................................................... 8 5. RISKS SPECIFIC TO ELECTRICAL UTILITY COMPANIES ............................................................ 9 6. CASE STUDY - RENOVATION OF MAIN STREET SUBSTATION .................................................. 10 6.1. DESCRIPTION ............................................................................................................................................
    [Show full text]
  • Introduction to Estimating
    CHAPTER ONE INTRODUCTION TO ESTIMATING 1–1 GENERAL INTRODUCTION The estimator is responsible for including everything con- tained in the drawings and the project manual in the submit- Building construction estimating is the determination of ted bid. Because of the complexity of the drawings and the probable construction costs of any given project. Many items project manual, coupled with the potential cost of an error, influence and contribute to the cost of a project; each item the estimator must read everything thoroughly and recheck must be analyzed, quantified, and priced. Because the esti- all items. Initially, the plans and the project manual must be mate is prepared before the actual construction, much study checked to ensure that they are complete. Then the estimator and thought must be put into the construction documents. can begin the process of quantifying all of the materials pre- The estimator who can visualize the project and accurately sented. Every item included in the estimate must contain as determine its cost will become one of the most important much information as possible. The quantities determined for persons in any construction company. the estimate will ultimately be used to order and purchase For projects constructed with the design-bid-build de- the needed materials. The estimated quantities and their as- livery system, it is necessary for contractors to submit a sociated projected costs will become the basis of project competitive cost estimate for the project. The competition controls (e.g., budget and baseline schedule) in the field. in construction bidding is intense, with multiple firms vying Estimating the ultimate cost of a project requires the in- for a single project.
    [Show full text]