Notices of Determination - 2005
Total Page:16
File Type:pdf, Size:1020Kb
Notices of Determination - 2005 Frank Sartor MP, Minister for Planning has determined the following major development proposals: . DA-197-7-2005-i . Title: DA-197-7-2005-i – Warehouse and Distribution Facility, Fairfield East . Approved: 30 December 2005 . Description: The construction and operation of a warehouse and distribution facility. Location: 52-88 Lisbon Street, Fairfield East . LGA: Fairfield . Capital cost of development: $35 million . F/T Operational Positions: 180 . Further inquiries: Caitlin Bennett - (02) 9228 6471 . Details: Instrument of Consent . MOD No: 97-7-2005 DA No: 381-8-2003 . Title: 2 TO 8 STOREY MIXED USE RESIDENTIAL BUILDING . Approved: 28 December 2005 . Description: Construction of a two to eight storey mixed use residential apartment building comprised of 123 units, 17 commercial suites, 1 restaurant/café; parking for 232 spaces; 141 lot strata subdivision; plus landscaping, associated site works, associated amenities and facilities. Location: Lot 14 (DP 270113) „Bellagio‟ 9 Bayswater Drive, Homebush Bay. LGA: Auburn Council . Details: Conditions - Planning Report . MOD No: 72-05-2005 DA No: 234-05-2003 . Title:MOD 72-05-2005 to modify DA 234-05-2003 in the following manner: . Refused: 28 December 2005 . Description: Modification to the approved configuration and number of suites on Level 6. Location: Lot 5/1040822, Cnr Martin and Fawcett Streets, Ballina . LGA: Ballina Shire Council . Details: Determination Notification; Planning Report . MOD No: 98-7-2005 DA No: 513-12-2003 . Title: 4 INTERCONNECTED MIXED USE RESIDENTIAL BUILDINGS . Approved: 28 December 2005 . Description: Four (4) interconnected mixed use residential flat buildings ranging in height from 2 to 8 storeys comprising 170 residential apartments; 3 commercial / retail units; 288 car spaces; 1 car wash bay; landscaping, associated site works, associated amenities and site facilities; and; 173 lot strata subdivision and common property. Location: Lot 21 (subdivision of Lot 9 in DP 270320) „Valencia‟ 4 The Crescent, Homebush Bay. LGA: Auburn Council . Details: Conditions - Planning Report . DA No: 40-3-2005 . Title: DEMOLITION OF BUILDING 34, CONSTRUCTION OF NEW BUILDING TO CARRY OUT EXISTING WORKSHOP USES, FOX STUDIOS AUSTRALIA . Approved: 22 December 2005 . Description: 1. demolition of the existing Kurrajong Pavilion; 2. earthworks to level and compact materials on site; 3. construction of a new purpose built workshop comprising 3 separate tenancies with mezzanine levels in Units 1 and 3, terraces on the northern side, roller shutters and a large truck turning area on the north eastern side; 4. the building will have a maximum height of RL 61.50 and a total floor area of 3,335 square metres; 5. the building will comprise a steel workshop, paint/plaster workshop and construction workshop with purpose-built spray painting booths; 6. replacement of existing retaining wall to the west of the subject site with a new wall of identical height and construction of a balustrade for pedestrian safety; 7. stablisation of the rock face along the northeast perimeter wall of the Fox Studios Australia site; 8. removal of seven poplar trees along the northeast boundary and replacement with seven deciduous trees; 9. additional planting of two deciduous trees in the northern corner of the site; 10. planting of four new trees along the boundary with Aussie Stadium; 11. planting of four new trees along the rear of Building 33, on the upper terrace; 12. removal of four trees along the existing boundary between Building 34 and Building 33 to allow for the construction of the retaining wall, and replacement with new trees; and 13. planting of eleven new trees and under-storey shrubs on either side of the Burma Stair above the upper terrace of the Burma Gardens. Location: Lot 51 DP 1041134 Building 34, Working Studio Precinct, Fox Studios Australia . LGA: City of Sydney . Capital cost of development: $5,200,000 . F/T Construction Jobs: 40 . F/T Post Construction Jobs: 50 . Details: Final Conditions and Determination - Planning Report . Title: Tugun Bypass . Approved: 21 December 2005 . Description: construction and operation of a 7 km long, 4 lane restricted access motorway between Kennedy Drive, Tweed Heads (NSW) to Stewart Road interchange (Qld) and crossing through Commonwealth land (Gold Coast Airport). Two sections are located within NSW (total approximately 2.5 km) which are subject to this approval. Location: Tweed Heads (NSW) to Currumbin (QLD) . LGA: Tweed Shire . Capital cost of development: $360,000,000 . F/T Construction Jobs: up to 200 . Details: Instrument PDF Director General's Report PDF Dec 1 Dec 2 Department of Lands Department of Natural Resources Department of Primary Industries PDF Compensatory Habitat Package Instrument - Attachment 1 (SoC) . DA Number: DA-282-11-2004-i . Title: Australian Bay Lobster Aquaculture Facility . Approved: 21 December 2005 . Description: An application was made by Australian Bay Lobster Producers Pty Ltd for the construction and operation of a commercial bay lobster aquaculture facility and associated seawater supply works at Cudgen . LGA: Tweed . Capital Cost of Development: $18 million . F/T Construction Jobs: 200 operation, 25 construction . Details: Assessment Report - Conditions of Consent . DA 128-5-2005 . Title: Lynwood Quarry, Marulan . Approved: 21 December 2005 . Applicant: Readymix Holdings Pty Ltd . Description: The development of a hard rock quarry and associated processing and transportation facilities. Location: Hume Highway and Stoney Creek Road, Marulan – about 1 kilometre west of Marulan. LGA: Goulburn Mulwaree . Details: Development Consent; Assessment Report . DA-103-5-2005 . Title: Ulan Coal Mine - Alterations and Additions . Approved: 21 December 2005 . Description: Several alterations and additions to the Ulan coal mine, which include: . extending the existing open cut mine about 180 metres to the west of its approved limits; . relocating the approved but not constructed Ulan West surface infrastructure; . upgrading the coal handling, storage and train loading facilities; . constructing the Ulan West services corridor; and . extending the hub stockpile. Location: 45 kilometres north-east of Mudgee LGA:Mid-Western Regional Council Capital cost of development: $67 million F/T Construction Jobs: 96 full-time jobs for 2 years Details: Instrument of Consent, Assessment Report, Applicant's Response to Submissions DA No: 246-10-2004 Title: Staged Consent for four residential towers with mixed used at ground level. Approved: 21 December 2005 Description: 0. Four towers identified as: i. North Buildings (A and B) ii. Centre buildings (C and D) iii. Centre building (E) iv. South building (F) 1. land uses of "residential", "live work", "community facility", "childcare centre" and "retail", 2. land uses totalling no more than 685 units (inclusive of 673 residential units, 6 "live/work" units, 4 retail units (if all proposed retail uses are consistent with relevant provisions of the SOPA Masterplan), 1 childcare centre and 1 community facility) with, 3. a maximum number of 1360 bedrooms for residential development (including all "live/work" units), 4. a total Gross Floor Area of no more than 79 053 square metres with floor plates as described in condition A10, 5. car parking with a total number of vehicles not exceeding 930 spaces. Location: Lot 3 of unregistered plan, Australia Avenue, Sydney Olympic Park as identified in survey plan (drawing number 31462-23 dated 21.9.2004, prepared by Frank M Mason & Co Pty Limited) LGA: Auburn Council Capital cost of development: 190,000,000 Details: Consent; Planning Report DA No: 192-8-2004 Title: "The Dolphin", Harrington Waters Estate, Harrington Approved: 21 December 2005 Description: 3 x 4 storey serviced apartment buildings (Blocks A, B and C) comprising a total of 54 units, with basement car parking, landscaping and associated site works on land within the 'resort precinct' of the Harrington Waters Estate. Location: Lot 4146 in DP 1045068 and Part Lot 320 in DP 1045068 LGA: Greater Taree City Council Capital cost of development: $17.31 Million Details: Determination - Planning Report MPA 1-9-2004 Title: Amendment to Sydney Olympic Master Plan Approved: 21 December 2005 Applicant: Sydney Olympic Park Authority Description: Amendments made to the Sydney Olympic Park Master Plan as described in the Sydney Olympic Master Plan amendment 2, 2005. Location: Land identified within the Sydney Olympic Master Plan (may 2002). LGA: Auburn Details: Notice Of Determination & Planning Report DA 504-00 Title: Clarence Coal Mine Extension Approved: 19 December 2005 Description: The Development involves the expansion of the Clarence underground coal mine including: . extending the existing mine into a number of new mining lease areas to the south, west and east of the existing mine; . mining using two levels of extraction, namely first workings and partial extraction; . continuing to extract coal from the mine at a rate of up to 3 million tonnes per year; and . operating the mine extension for a period of 21 years. Location: Clarence Coal Mine, approximately 10km east of Lithgow, NSW LGA: Lithgow F/T Post Construction Jobs: approximately 80 people Details: Instrument of Consent - Assessment Report 77-3-2002 Title: 162 lot subdivision, clearing of vegetation, filling, construction of roads and associated infrastructure, conservation zones and open space; construction of a bridge. Approved: 17 December 2005 Description: 0. Torrens title subdivision comprising 159