Mandya Lok Sabha Constituency Presently Comprises the Following
Total Page:16
File Type:pdf, Size:1020Kb
MANDYA LOKSABHA CONSTITUENCY. Mandya Lok Sabha constituency presently comprises the following eight Legislative Assembly which are Malavalli, Maddur, Melukote, Mandya, Srirangapatna, Nagamangala, Krishnarajpet and Krishnarajanagara. Important railway stations coming under Mandya Lok Sabha constituency are Mandya, Maddur, Mandagere, Srirangapatna, Pandavapura and Krishnarajanagara. New Line / Doubling Works / Projects Cost in Crores • New Line of 35 Kms from Nelamangala to Shravanabelagola ₹. 378 commissioned in March 2017. • Doubling of 29 Kms between Maddur to srirangapatna, part of ₹. 305 Mysuru to Ramanagaram is completed. • New line of 140 Kms between Hejjala and Chamarajanagar is ₹. 1382 planned. New Trains/ Stoppage • T. No. 17325/ 17326 Hubballi – Mysuru - Hubballi, Vishwamanava baily Express via KSR Bengaluru. Introduced on 23.05.2017 and regular service commenced from 24.05.2017, stoppage in Srirangapatna, Pandavapura, Mandya and Maddur station. • T. No. 16229/ 16230 Mysuru – Varanasi - Mysuru bi-weekly Express. Introduced on 25.12.2014 Stoppage at Mandya station. Passenger Amenities Works / Projects Completed Cost in Lakhs • Provision of Foot Over Bridge completed at Mandagere station. ₹. 74.9 • Provision of Low cost platform Shelter on platform No-2 done at ₹. 26.1 Krishnarajanagar station. • Provision of Low Level Platform shelter done at Akkihebbalu, Belagula, ₹. 12.5 Sagarakatte and Hosaagrahara stations. • Provision on of Toilets at platform pay use toilet done at ₹. 4.3 Krishnarajanagar station. • Auto announcement system provided at Krishnarajanagar station. ₹. 3.6 • Granite platform benches provided at Krishnarajanagar station. ₹. 1.1 • Provision of Water Coolers at stations Krishnarajanagar. ₹. 1.0 Works / Projects In Progress Cost in Lakhs • Provision of bituminous approach road at Sagarakatte and Biralli stations ₹. 20.4 under progress. • Providing facilities for differently abled persons at Krishnarajanagar ₹. 20.3 station is under progress. • Provision of Bituminous approach road at Hosaagrahara and ₹. 7.0 Akkihebbalu stations is under progress. MANDYA LOKSABHA CONSTITUENCY. Works / Projects Planned Cost in Lakhs • Extension Passenger platforms at 11 station for augmentation of various ₹. 47.5 trains to 24 coaches planned. • Provision of Solar street light system at approach roads of ₹. 3.5 Krishnarajanagar station is planned. Traffic Facilities Works/ Projects Completed Cost in Lakhs • Road Over Bridge in lieu of Level gate no.95 at Pandavapura completed. ₹. 1700 • Road under Bridge in lieu of Level Crossing gate no.101 at Srirangapatna ₹. 1600 completed. • Proposed construction of Low cost subway in lieu of Level Crossing No ₹. 396.1 60, 61 in Mysuru-Arsikere section, between Akkihebal and Mandagere stations. • Road Over Bridge in lieu of Manned Level crossing No. 15 between ₹. 240.0 Belagola and Sagarakatte stations. • Subway in lieu of Manned Level crossing No. 20 at Sagarakatte station. ₹. 221.5 • Subway in lieu of Manned Level Crossing No. 70 at Mandagere station. ₹. 221.5 • Low Height Subway in lieu of Level Crossing No.09 between Belagola and ₹. 52.3 Sagarakatte stations. • Low Height Subway in lieu of Level Crossing No.14 between Belagola and ₹. 52.3 Sagarakatter Stations. • Low Height Subway in lieu of Level Crossing No.25 between Sagarakatte ₹. 52.3 and Krishnarajanagara stations. • Low Height Subway in lieu of Level Crossing No.26 between ₹. 52.3 Krishrajanagara and Sagarakatter stations. • Low Height Subway in lieu of Level Crossing No.29 between ₹. 52.3 Krishnarajanagara and Hosaagrahara stations. • Low Height Subway in lieu of Level Crossing No.45 between ₹. 52.3 Hosaagrahara and Akkihebal stations. • Low Height Subway in lieu of Level Crossing No.48 between ₹. 52.3 Hosaagrahara and Akkihebbal stations. • Low Height Subway in lieu of Level Crossing No.56 between Akkihebbal ₹. 52.3 and Mandagere stations. • Low Height Subway in lieu of No.73 between Mandagere to ₹. 52.3 Holenarasipura stations. • Low Height Subway in lieu of Level Crossing No.67 at between ₹. 52.3 Mandagere to Holenarasipura stations. • Low Height Subway for Level Crossing No. 50 between Akkihebbal to ₹. 52.3 Mandagere stations. • Low Height Subway in lieu of Level Crossing No.64 between Mandagere ₹. 41.6 and Holenarasipura stations. • Low Height Subway in lieu of Level Crossing No.38 between ₹. 40.9 Krishnarajanagara and Hosaagrahara station. • MANDYA LOKSABHA CONSTITUENCY. Works/ Projects in Progress Cost in Lakhs • Road over Bridge in lieu of Level Crossing Gate Number 12 at Km 15, ₹. 229.3 between Belagola and Sagarakatte station under progress. • Ancillary works at subway location at km 17, between Belagola and ₹. 25.6 Sagarakatte Stations is under progress. • Ancillary works at subway location at km 50, between Hosaagrahara to ₹. 25.6 Akkihebbal stations is under progress. Works/ Projects Planned Cost in Lakhs • Road Over Bridge in lieu of Level Crossing Gate No. 51 between ₹. 1600 Akkihebbalu and Mandagere stations is planned. Additional Facilities Works/ Projects Planned Cost in Lakhs • Replacement of existing stone slab with RCC slab in 13 Bridges between ₹. 61.9 Mysuru and Arsikere section is planned. List of Projects / works commissioned at various Railway stations coming under Mandya Lok Sabha Constituency (Assembly Constituencies – Malavalli, Maddur, Melkote, Mandya, Shrirangapatna, Nagamangala, Krishnarajapet and K R Nagar) Bengaluru – Mysuru Doubling with electrification duly shifting the Tippu Armory in Shrirangapatna by 80 feet BG Nagar station and Adichunchanagiri Halt station on the Newly Commissioned Nelamangala – Shravanabelagola New Line as a part of KSR Bengaluru - Hassan New Line Road Under Bridge at Shrirangapatna Infrastructure Improvements Commissioned New Line between Nelamangala – Shravanabelagola Rs. 378 Crores as a part of KSR Bengaluru – Hassan New Line Completed Doubling between Maddur – Shrirangapatna as a part of Rs. 305 Crores Ramanagaram – Mysuru doubling project Completed Electrification between Maddur – Yeliyur Rs. 28 Crores Introduction of New Trains Hubballi - Mysuru – Hubballi Vishwamanava Express via KSR Daily Express Bengaluru New Stoppages Provided Train Stoppage at Mysuru – KSR Bengaluru Passenger Yeliyur and Byadarahalli Hubballi – Mysuru – Hubballi Vishwamanava Daily Express Shrirangapatna Pandavapura Mandya Tirupati - Chamarajanagar Express Hanakere Mysuru – KSR Bengaluru - Mysuru Passenger Palahalli Halt Varanasi - Mysuru – Varanasi Bi-Weekly Express Mandya Amenities at Stations Station Amenities Cost (Rs.) Mandya Improved Circulating area 47 Lakhs Improved platforms 29 Lakhs Improved Circulating Area flooring 76 Lakhs Provided Online Train Arrival / Departure Display 5 Lakhs on TV Srirangapatna Provided Public Announcement System 0.8 Lakhs Other Works Road Over Bridge in lieu of Level Crossing No. 95 at Pandavapura Rs. 17 Crores Road Under Bridge in lieu of Level Crossing No. 101 at Srirangapatna Rs. 16 Crores Road Under Bridge near Srirangapatna Rs. 70 Lakhs .