Service Works Request Form

Total Page:16

File Type:pdf, Size:1020Kb

Service Works Request Form Service Works Request Form Please complete the details in the table below for Energy Australia to process your work request. We strongly encourage you have this application completed by your electrician. Please note: NSW: Site Address Lot & DP number are a Mandatory Requirement for New Connections in the Endeavour Energy and Essential Energy Distribution zones. All States: Abolishment requests are only required to complete sections in Green. Work Request Type New Please Circle/Highlight Alteration Abolishment Connection Customer Details Customer Name Best Contact Number Mobile Preferred Postal Address Customer e-mail Premises Details Street Address Include Lot Number, & DP number if known Access Instructions If applicable Suburb & Post Code Premises Type (Residential/Commercial/Other) NMI MANDATORY for Ausgrid New Connections. Connection Details Connection Type Supply Phase (Temporary/Permanent) (1,2,3 or Other) Maximum Maximum Demand of Demand of total installation Site (Amps p/Phase) (Amps p/Phase) CT’s Solar/Embedde Installed/Required? d Generation? (Yes/No) (Yes/No) Installation Type Off-Peak Load (Overhead, Requirements Underground, Overhead If applicable. List to Underground) appliances REX ID – SA Only PV SEG – (MANDATORY for SA SA SOLAR Only Supply Alterations) (PV Seg. number) Existing Supply Details Description of Works Is this request in conjunction with other works? If Abolishment, please include date property is vacant from. Meter ID New Meter Phase If applicable New Supply Phase If applicable Electrical Contractor Details / Solar Installer Details ID/License Number Electrical Contractor Name Best Contact Number Mobile Preferred E-mail address - NSW Supply Alterations & New Connections Only - L2 ASP Name Best Contact Number Mobile Preferred L2 ASP License VectorAMS Accredited Number Yes / No Please send your completed form to us via: Email: [email protected] (Non-Solar) Email: [email protected] (Solar Requests) Post: EnergyAustralia Electricity New Connections, Locked Bag 14060, Melbourne City MC, VIC 8001, Australia Fax: 1800 654 295 If you have any questions, or need help with your application, please call us on 1800 818 378 and we’ll be happy to help. .
Recommended publications
  • NSW Infrastructure Capability Assessment: Energy Baseline Report
    NSW Infrastructure Capability Assessment Energy Baseline Report April 2012 This document is intended solely for the use and information of Infrastructure NSW Report Outline • Key Highlights • Introduction • Energy Industry Overview and Current Situation • Electricity • Gas 22 Key Highlights – Electricity • The majority of electricity generation and all transmission and distribution infrastructure assets in NSW are government owned • The NSW government recently privatised the retail electricity sector and announced plans to sell electricity generation assets • 82% (or 16,600MW) of electricity in NSW is generated by 4 key state owned corporations . Electricity is transmitted over a 12,000km transmission system and distributed over ~250,000km distribution system. The book value of this infrastructure is $34bn and the annual capital expenditure is around $4.5bn • Electricity infrastructure is planned through a number of national and operator network plans including the Electricity Statement of Opportunities, the National Transmission Network Development Plan, TransGrid's Annual Transmission Network Development Plan, the distributors Annual Network Development Plans and Performance Reports, and the 5-year Regulatory Proposals and Determinations by the Australian Energy Regulator • These reports provide evidence that, while a number of the state owned electricity distribution assets are beyond or approaching their standard design lives, electricity infrastructure appears to be in good condition and is capable of meeting demand • The performance of electricity generation, transmission and distribution infrastructure is monitored via a number of indicators. The NSW Government sets reliability and security standards through its Network licences. Key electricity operating licence performance indicators such as the average duration and frequency of interruptions have been improving over time • Electricity demand has been flat for the past 5 years partly due to slower economic growth, efficiency and in response to large price increases.
    [Show full text]
  • Power Factor Correction - Service Provider Register
    Power Factor Correction - Service Provider Register Ausgrid's Power Factor Correction Service Provider Register is a list of businesses that offer Power Factor Correction services across the Sydney, lower Hunter and Central Coast regions. We have gathered key contact and company information from those businesses to assist customers in the Ausgrid Network area to find a service provider. Please be advised that Ausgrid has not assessed the businesses listed on this Register and we rely on the NSW Codes of Practice that these businesses comply with appropriate Rules and Standards. We also rely on these businesses for the accuracy of the information they provide. We strongly advise that you carefully assess the experience and capability of service providers you engage to confirm they meet your business needs. The NSW Fair Trading website has useful information to assist with this. Glossary of Terms Term Definition Types of Service Accredited Service Provider Companies, Businesses or sole traders who have gained accreditation from NSW Department of Trade and Investment allowing (ASP) them to perform contestable work in accordance with the Electricity Supply Act 1995 Electrical Contracting A business or sole trader who holds an electrical contractor’s licence issued by the NSW Fair Trading and have an electrical contractor who installs Power Factor Correction equipment and provides installation services and installation tests. Energy Auditing or Energy A business that provides specialist advice and services in relation to other aspects of energy use (eg. energy efficiency) in Consulting conjunction with Power Factor Correction services Financial Services A business that provides financial advice and services in the field of Power Factor Correction and installations.
    [Show full text]
  • Tariff Structure Statement (27 November 2015)
    Tariff Structure Statement (27 November 2015) Supporting Documentation: Customer and Stakeholder Report TARIFF STRUCTURE STATEMENT CUSTOMER AND STAKEHOLDER REPORT NOVEMBER 2015 Further information contact: Kate McCue Manager Corporate Affairs, Endeavour Energy Ph: 02 9853 6141 Email: [email protected] Contents EXECUTIVE SUMMARY 3 OVERVIEW OF OUR TSS STAKEHOLDER ENGAGEMENT 6 TABLE 1 - PHASES ONE AND TWO: TSS STAKEHOLDER CONSULTATION AND ENGAGEMENT 2013-2015 6 TABLE 2 - WHAT STAKEHOLDERS SAID AND HOW WE RESPONDED 9 PHASES ONE AND TWO – HOW WE ENGAGED 17 TABLE 3 - PHASES ONE AND TWO - MODES OF TSS STAKEHOLDER ENGAGEMENT 2013 - 2015 17 TABLE 4 - PHASE TWO: INITIAL STAKEHOLDER ENGAGEMENT CONDUCTED BY ACIL ALLEN CONSULTING AROUND PREFERENCES ON ENGAGING THE NSW NETWORK BUSINESSES ON TSS ISSUES 20 TABLE 5 - PHASE TWO: INTERVIEWS (ONE-ON-ONE) OF UP TO ONE HOUR WITH TSS STAKEHOLDERS POST RELEASE OF THE NNSW TSS ISSUES PAPER 21 TABLE 6 - PHASE TWO: ENA AND NETWORKS NSW STAKEHOLDER WORKSHOP ON VULNERABLE CUSTOMER ISSUES AND FUTURE TARIFF STRUCTURES 21 TABLE 7 – PHASE TWO: NETWORKS NSW ELECTRICITY RETAILERS STAKEHOLDER ROUNDTABLE ON FUTURE TARIFF STRUCTURES 22 TABLE 8 - PHASE TWO: NETWORKS NSW FOOD AND FIBRE STAKEHOLDER ROUNDTABLE ON FUTURE TARIFF STRUCTURES 23 TABLE 9 - PHASE TWO: NETWORKS NSW ENVIRONMENT AND CONSUMER ADVOCATES ROUNDTABLE ON FUTURE TARIFF STRUCTURES 24 TABLE 10 - PHASE TWO: NETWORKS NSW ENVIRONMENT AND CONSUMER ADVOCATES SECOND ROUNDUNDTABLE ON FUTURE TARIFF OPTIONS 24 TABLE 11 - PHASE TWO: NETWORKS NSW ENVIRONMENTAL AND CONSUMER ADVOCATES THIRD ROUNDTABLE ON FUTURE TARIFF STRUCTURES 25 PHASE TWO: POST TSS ISSUES PAPER RELEASE INTERVIEWS WITH TIER ONE STAKEHOLDERS 26 1 TABLE 12 - ONE-ON-ONE STAKEHOLDER INTERVIEW QUESTIONS 27 1.
    [Show full text]
  • Distribution Loss Factor Calculation Methodology Paper 2021-22
    Distribution Loss Factor Calculation Methodology Paper March 2021 Distribution Loss Factor Calculation Methodology Paper March 2021 CONTENTS 1 INTRODUCTION .......................................................................................................................... 1 1.1 Requirements of the National Electricity Rules .................................................................. 1 1.2 Ausgrid’s general approach in deriving non-site specific DLFs ......................................... 2 1.3 Energy entering the distribution network ............................................................................ 4 1.4 Energy exiting the distribution network .............................................................................. 4 1.5 Proposed approach to loss estimation for financial year 2021-22 ..................................... 4 2 BREAKDOWN OF TECHNICAL LOSSES ................................................................................. 5 2.1 Calculation of site specific loss factors............................................................................... 5 2.2 Calculation of loss load factors .......................................................................................... 5 2.3 Sub-transmission network series losses ............................................................................ 5 2.4 Sub-transmission network shunt losses ............................................................................. 5 2.5 High voltage network series losses ...................................................................................
    [Show full text]
  • Clean Energy Fact Sheet We All Want Affordable, Reliable and Clean Energy So We Can Enjoy a Good Quality of Life
    Clean Energy fact sheet We all want affordable, reliable and clean energy so we can enjoy a good quality of life. This fact sheet sets out how we’re leading a transition from fossil fuels to cleaner forms of energy. Background Minimising or, where we can, avoiding financial EnergyAustralia is one of the country’s biggest hardship is part of the challenge as we transition generators of power from fossil fuels. Each to cleaner generation. We need to do this while preserving the reliability of supply. +800 MW year we produce around 20 million tonnes Rights to of greenhouse gases, mostly carbon dioxide Our approach involves supporting the renewable energy or CO₂, from burning coal and gas to supply development of clean energy while helping our electricity to our 2.4 million accounts across customers manage their own consumption so eastern Australia. they use less energy. Because when they do For around a century, coal-fired power plants that, they generate fewer emissions and they ~$3B have provided Australians with reliable and save money. Long term affordable power and supported jobs and renewable Supporting renewable energy agreements economic development. The world is changing with fossil fuel generation being replaced by Right now, EnergyAustralia has the rights to lower emissions technologies. more than 800 MW worth of renewable energy, combining solar and wind farm power purchase The way we generate, deliver and use energy agreements, and we half-own the Cathedral 7.5% has to change. As a big emitter of carbon, it’s Rocks wind farm. Of large-scale up to us to lead the transition to cleaner energy wind and solar in a way that maintains that same reliable and project in the NEM affordable access to energy for everyone.
    [Show full text]
  • Essential Energy 2019-24
    DRAFT DECISION Essential Energy Distribution Determination 2019 to 2024 Attachment 18 Tariff structure statement November 2018 18-0 Attachment 18 – Tariff structure statement | Draft decision - Essential Energy distribution determination 2019–24 © Commonwealth of Australia 2018 This work is copyright. In addition to any use permitted under the Copyright Act 1968, all material contained within this work is provided under a Creative Commons Attributions 3.0 Australia licence, with the exception of: • the Commonwealth Coat of Arms • the ACCC and AER logos • any illustration, diagram, photograph or graphic over which the Australian Competition and Consumer Commission does not hold copyright, but which may be part of or contained within this publication. The details of the relevant licence conditions are available on the Creative Commons website, as is the full legal code for the CC BY 3.0 AU licence. Requests and inquiries concerning reproduction and rights should be addressed to the: Director, Corporate Communications, Australian Competition and Consumer Commission, GPO Box 3131, Canberra ACT 2601 or [email protected]. Inquiries about this publication should be addressed to: Australian Energy Regulator GPO Box 520 Melbourne Vic 3001 Tel: 1300 585165 Email: [email protected] 18-1 Attachment 18 – Tariff structure statement | Draft decision - Essential Energy distribution determination 2019–24 Note This attachment forms part of the AER's draft decision on the distribution determination that will apply to Essential Energy for the
    [Show full text]
  • Stage3lessonbook Online 17J
    1 Acknowledgements This unit of work was developed by Ausgrid, Endeavour Energy and Essential Energy in collaboration with the NSW Department of Education. It has been developed to align with part of the NSW Science and Technology Syllabus and outcomes in other key learning areas. The following advisers have made a contribution to the development of these materials. Vicki Morante, Swansea Public School NSW Department of Education, Learning and Teaching Division The sections ‘How to use a Scitech journal’ and ‘How to organise a cooperative learning group’ are sourced from the Australian Academy of Science Primary Connections series, and are reproduced with permission. Electricity & Safety Unit Lesson Book for Stage 3 2 Contents Unit Overview 6 Unit Outcomes 8 1 What do we know about electricity? 14 Attachment: KWL Chart 16 Attachment: Word Wall Cards (enlarge for display on wall) 18 Attachment: How to Use a SciTech Journal 20 2 Electricity Safety 21 Attachment: Electricity Safety Quiz 23 3 What is Energy? 26 Attachment: Word Cards 28 STEM Design Challenge: Transferred Energy 29 Attachment: Planning Page 30 Attachment: Explanation Page 32 Attachment: Student Reflection Checklist 33 4 Transforming Energy 34 Attachment: How to organise a cooperative learning group 36 Attachment: Example of a Science Report 42 Attachment: Quiz – Types of Energy 43 Attachment: Cloze Passage – Types of Energy 45 STEM Design Challenge: Transformed Energy 46 Attachment: Planning Page 47 Attachment: Explanation Page 49 Attachment: Student Reflection Checklist 50
    [Show full text]
  • Hunter Investment Prospectus 2016 the Hunter Region, Nsw Invest in Australia’S Largest Regional Economy
    HUNTER INVESTMENT PROSPECTUS 2016 THE HUNTER REGION, NSW INVEST IN AUSTRALIA’S LARGEST REGIONAL ECONOMY Australia’s largest Regional economy - $38.5 billion Connected internationally - airport, seaport, national motorways,rail Skilled and flexible workforce Enviable lifestyle Contact: RDA Hunter Suite 3, 24 Beaumont Street, Hamilton NSW 2303 Phone: +61 2 4940 8355 Email: [email protected] Website: www.rdahunter.org.au AN INITIATIVE OF FEDERAL AND STATE GOVERNMENT WELCOMES CONTENTS Federal and State Government Welcomes 4 FEDERAL GOVERNMENT Australia’s future depends on the strength of our regions and their ability to Introducing the Hunter progress as centres of productivity and innovation, and as vibrant places to live. 7 History and strengths The Hunter Region has great natural endowments, and a community that has shown great skill and adaptability in overcoming challenges, and in reinventing and Economic Strength and Diversification diversifying its economy. RDA Hunter has made a great contribution to these efforts, and 12 the 2016 Hunter Investment Prospectus continues this fine work. The workforce, major industries and services The prospectus sets out a clear blueprint of the Hunter’s future direction as a place to invest, do business, and to live. Infrastructure and Development 42 Major projects, transport, port, airports, utilities, industrial areas and commercial develpoment I commend RDA Hunter for a further excellent contribution to the progress of its region. Education & Training 70 The Hon Warren Truss MP Covering the extensive services available in the Hunter Deputy Prime Minister and Minister for Infrastructure and Regional Development Innovation and Creativity 74 How the Hunter is growing it’s reputation as a centre of innovation and creativity Living in the Hunter 79 STATE GOVERNMENT Community and lifestyle in the Hunter The Hunter is the biggest contributor to the NSW economy outside of Sydney and a jewel in NSW’s rich Business Organisations regional crown.
    [Show full text]
  • Section 91 Licence Under the Threatened Species Conservation Act 1995 to Harm Or Pick a Threatened Species, Population Or Ecological Community' Or Damage Habitat
    Office of Application for a NSW Environment GOVERNMENT & Heritage Section 91 Licence under the Threatened Species Conservation Act 1995 to harm or pick a threatened species, population or ecological community' or damage habitat. 1. Applicant's Name A: Employees of Ausgrid undertaking or managing routine maintenance (if additional persons activities as specified in this licence applif~io~ require authorisation by this licence, please attach details of names and addresses) 2. Australian Business 67 505 337 385 Number (ABN): 3. Organisation name Ausgrid ·· 8 {:1,. and position of C/- James Hart- Manager, Environmental SeNic;f?;~.J applicant A: (if applicable) IIVLlv!U 4. Postal address A: 570 George Street Telephone: Sydney NSW 2000 B. H. 02 9394 6659 A.H. Ausgrid's Supply Area within the following 30 local government areas 5. Location of the action (including grid reference (LGAs): Ashfield, Auburn, Bankstown, Botany Bay, Burwood, and local government Canterbury, Canada Bay, Hornsby, Hunters Hill, Hurstville, Kogarah, area and delineated on Kur-ing-gai, Lane Cove, Leichhardt, Manly, Marrickville, Mosman, a map). Newcastle, North Sydney, Pittwater, Randwick, Rockdale, Ryde, Strathfield, SutherlandShire, SydneyCity, Warringah, Waverley, Willoughby, Woollahra. Please see attached Figures. 6. Full description of the The action covered by this application is Ausgrid's essential service action and its purpose and legal obligation to maintain minimum vegetation clearances from (e.g. environmental its network assets and associated.infrastructure. assessment, development, etc.) Ausgrid has an obligation under the Electricity Supply Act 1995 (ES Act) to maintain minimum vegetation clearances from its network assets and associated infrastructure. Under clause 22 of the Native A threatened species, population or ecological community means a species, population or ecological community identified in Schedule 1, 1A or Schedule 2 of the Threatened Species Conservation Act 1995.
    [Show full text]
  • Automate CP.Xlsm
    FCAS Causer Pays Settlement Factors Issued: 10/12/2020 Period of Application: 27/12/2020 to 23/01/2021 Sample Period: 12:05AM, 8/11/2020 to 12:00AM, 6/12/2020 Queensland, New South Wales, Victoria, South Australia and Tasmania Region Causer Pays Factors Scheduled and Semi-Scheduled Aggregations Factor AETV Pty Ltd 0.013562453 AGL Hydro Partnership 4.012190653 AGL Loy Yang Marketing Pty Ltd 0 AGL Macquarie Pty Limited 0 AGL PARF NSW Pty Ltd 2.310470219 AGL PARF QLD Pty Limited 0.46800389 AGL SA Generation Pty Limited 1.849553623 Alinta Energy Retail Sales Pty Ltd 0.449145117 Ararat Wind Farm Pty Ltd 0.875407241 Arrow Southern Generation Pty Ltd And Arrow Braemar 2 Pty Ltd 0.042579354 Boco Rock Wind Farm Pty Ltd 0.433630577 Bodangora Wind Farm Pty Limited 0.382480317 Bomen Solar Farm Pty Ltd As Trustee For Bomen SF Trust 0.556490672 Braemar Power Project Pty Ltd 0.706700821 Bulgana Wind Farm Pty Ltd 0.837111039 Callide Power Trading Pty Limited 0 Cherry Tree Wind Farm Pty Ltd As Trustee For The Cherry Tree Project Trust 0.156136526 Childers Solar Pty Ltd ATF The Childers Solar Trust 0.080755682 Clare Solar Farm Pty Ltd 0.651235137 CleanCo Queensland Limited 1.758098911 Clermont Asset Co Pty Ltd ATF Clermont Solar Unit Trust 0 Coleambally Solar Pty Ltd 1.111648664 Collector Wind Farm Pty Ltd 0.185651799 Crookwell Development Pty Ltd 0.401146682 CRWF Nominees Pty Ltd As Trustee For The CRWF Trust 0 CS Energy Limited 0 Darling Downs Solar Farm Pty Ltd 0.875202842 Darlington Point Solar Farm Pty Ltd 0.660040796 Daydream Solar Farm Pty Ltd As
    [Show full text]
  • Ausgrid's Regulatory Proposal
    Ausgrid’s Regulatory Proposal 1 JULY 2019 TO 30 JUNE 2024 b Ausgrid’s Regulatory Proposal 2019–2024 Table of contents 01 ABOUT THIS PROPOSAL 6 06 OPERATING EXPENDITURE 110 1.1 Overview 8 6.1 Overview 114 1.2 Our regulatory obligations 8 6.2 Performance in the 2014 to 2019 period 118 1.3 Feedback on this Proposal 9 6.3 Responding to customer feedback 126 1.4 How to read our Proposal 10 6.4 Forecasting methodology 129 6.5 Summary of operational expenditure forecast 137 02 AUSGRID AND OUR CUSTOMERS 14 6.6 National Energy Rules compliance 138 6.7 Material to support our opex proposal 139 2.1 Background 18 2.2 Consultation with our customers 07 RATE OF RETURN 140 and stakeholders 21 2.3 Key issues for customers and stakeholders 27 7.1 Our approach 144 7.2 Overall rate of return 145 03 OUR ROLE IN A CHANGING MARKET 36 7.3 Return on equity 148 7.4 Return on debt 153 3.1 The policy environment is changing 40 7.5 The value of imputation tax credits 156 3.2 The technology landscape is changing 40 7.6 Expected inflation 157 3.3 The way we manage the network is changing 42 08 ALTERNATIVE CONTROL SERVICES 158 3.4 Electricity Network Transformation Roadmap 44 8.1 Public lighting 162 3.5 Ausgrid’s innovation portfolio 45 8.2 Metering services 164 8.3 Ancillary network services 164 04 ANNUAL REVENUE REQUIREMENT 46 09 INCENTIVE SCHEMES AND PASS 4.1 Overview of our building block proposal 50 THROUGH 166 4.2 Regulatory asset base 52 4.3 Rate of return 54 9.1 Efficiency Benefit Sharing Scheme 170 4.4 Regulatory depreciation (return of capital) 55 9.2 Capital
    [Show full text]
  • SEQ Retail Electricity Market Monitoring: 2017–18
    Updated Market Monitoring Report SEQ retail electricity market monitoring: 2017–18 March 2019 We wish to acknowledge the contribution of the following staff to this report: Jennie Cooper, Karan Bhogale, Shannon Murphy, Thomas Gardiner & Thomas Höppli © Queensland Competition Authority 2019 The Queensland Competition Authority supports and encourages the dissemination and exchange of information. However, copyright protects this document. The Queensland Competition Authority has no objection to this material being reproduced, made available online or electronically but only if it is recognised as the owner of the copyright2 and this material remains unaltered. Queensland Competition Authority Contents Contents EXECUTIVE SUMMARY III THE ROLE OF THE QCA – TASK AND CONTACTS V 1 INTRODUCTION 1 1.1 Retail electricity market monitoring in south east Queensland 1 1.2 This report 1 1.3 Retailers operating in SEQ 1 2 PRICE MONITORING 3 2.1 Background 3 2.2 Minister's Direction 4 2.3 QCA methodology 4 2.4 QCA monitoring 6 2.5 Distribution non-network charges 45 2.6 Conclusion 47 3 DISCOUNTS, SAVINGS AND BENEFITS 48 3.1 Background 48 3.2 Minister's Direction 48 3.3 QCA methodology 48 3.4 QCA monitoring 49 3.5 Conclusion 96 4 RETAIL FEES 98 4.1 Background 98 4.2 Minister's Direction 98 4.3 QCA methodology 98 4.4 QCA monitoring 98 4.5 GST on fees 104 4.6 Fees that 'may' have applied 105 4.7 Additional fee information on Energy Made Easy 105 4.8 Conclusion 105 5 PRICE TRENDS 107 5.1 Minister's Direction 107 5.2 Data availability 107 5.3 QCA methodology
    [Show full text]