Barrow-In-Furness Borough Council

Total Page:16

File Type:pdf, Size:1020Kb

Barrow-In-Furness Borough Council Annual Monitoring Report 2014/2015 Barrow-in-Furness Borough Council Barrow-in-Furness Borough Council Annual Monitoring Report 2014/2015 Barrow-in-Furness Borough Council Annual Monitoring Report 2014/2015 Assistant Director of Regeneration & Built Environment Barrow-in-Furness Borough Council Town Hall Duke Street Barrow in Furness Cumbria LA14 2LD Contact: Planning Policy Team, Development Services Email: [email protected] Page 1 Barrow-in-Furness Borough Council Annual Monitoring Report 2014/2015 Contents 1. Introduction to the Annual Monitoring Report .......................................................................................4 Map ...........................................................................................................................................................4 1.1 The Planning System and the Local Development Framework (pre 2012) ..............................5 1.2 The Planning System, the Localism Act and the National Planning Policy Framework (post 2012) 5 1.3 The Development Plan ..............................................................................................................5 2. The Local Plan ......................................................................................................................................7 2.1 Background Studies ..................................................................................................................8 3. Local Planning Policies .........................................................................................................................9 3.1 The Local Plan & Supplementary Planning Guidance (SPG) ...................................................9 3.2 Local Development Framework (LDF) Policies ...................................................................... 10 3.2.1 The Barrow Port Area Action Plan DPD............................................................................. 10 3.3 Summary ................................................................................................................................ 10 4. Other Corporate Plans & Strategies................................................................................................... 11 4.1 Sustainable Community Strategy ........................................................................................... 11 4.2 Council Vision Statement ....................................................................................................... 11 4.2.1 Council Priorities 2013-16 .................................................................................................. 11 4.3 Housing Statement 2012 ........................................................................................................ 12 5. Sources of Data for Indicators............................................................................................................ 13 6. Housing .............................................................................................................................................. 14 6.1. Housing Profile ....................................................................................................................... 15 6.1.1 Housing Stock & Vacancy .................................................................................................. 15 6.1.2 Location of Approved Housing Development ..................................................................... 15 6.1.3 House Tenure ..................................................................................................................... 15 6.1.4 House Types ...................................................................................................................... 16 6.2 House Prices and Affordability ............................................................................................... 18 Affordability ......................................................................................................................................... 19 6.3 Net Additional Gypsy Pitches (Former Core Indicator H4) .................................................... 20 6.4 Housing Summary .................................................................................................................. 21 7. Demographic Structure ...................................................................................................................... 22 8. Economy ............................................................................................................................................ 23 8.1 The Borough’s Economy ........................................................................................................ 23 8.1.1 Employment Type .............................................................................................................. 23 Table 14: Employment by Type ......................................................................................................... 24 8.1.2 Earnings ............................................................................................................................. 25 8.2 Qualifications .......................................................................................................................... 27 8.3 Economic Activity & Unemployment ...................................................................................... 28 Page 2 Barrow-in-Furness Borough Council Annual Monitoring Report 2014/2015 8.4 Retail Vacancies..................................................................................................................... 30 9. Health & Deprivation .......................................................................................................................... 31 9.1 The Indices of Deprivation ..................................................................................................... 31 9.2 Health ..................................................................................................................................... 31 10. Crime .............................................................................................................................................. 33 11. The Natural Environment ............................................................................................................... 35 11.1 Landscape and Designations ................................................................................................. 35 11.1.1 Landscape and the Coast .................................................................................................. 35 11.1.2 International Designations .................................................................................................. 35 11.1.3 National Designations ........................................................................................................ 35 11.1.4 Regional and Local Designations ....................................................................................... 35 11.2 Environmental Protection ....................................................................................................... 36 11.2.1 Change in Areas of Biodiversity Importance (Former Core Indicator E2).......................... 36 11.2.2 Flood Protection and Water Quality ............................................................................... 37 11.3 Renewable Energy ................................................................................................................. 37 11.4 Waste Collection and Recycling ............................................................................................. 38 12. The Built Environment .................................................................................................................... 39 12.1 Scheduled Monuments .......................................................................................................... 40 12.3 Conservation Areas and Townscape ..................................................................................... 40 13. Cultural and Leisure Facilities ........................................................................................................ 40 13.1 Sports and Leisure Centres ................................................................................................... 41 13.2 Cultural Facilities & Attractions .............................................................................................. 41 13.2.1 Regeneration & Public Realm ............................................................................................ 41 13.3 Arts & Media ........................................................................................................................... 42 13.4 Open Spaces .......................................................................................................................... 42 14. Travel & Transport ......................................................................................................................... 44 14.1 Transport and Accessibility .................................................................................................... 44 14.2 Traffic and Casualties ............................................................................................................ 44 14.3 Accessibility ............................................................................................................................ 45 15. Community Involvement ................................................................................................................
Recommended publications
  • THE LOCAL GOVERNMENT BOUNDARY COMMISSION for ENGLAND Farm O P Violet Pit (Dis) Pond D
    SHEET 9, MAP 9 Proposed electoral division boundaries in Barrow-in-Furness borough Pond A Ethel Pit 5 9 (dis) 5 Sandscale Haws (Nature Reserve) Roanhead Housethwaite Peggy Pit Iron Mines Pond Hill (dis) South Lakes (disused) 90 Pond Wild Animal Park 5 k A c e B Chapel Hills a Sandscale k a THE LOCAL GOVERNMENT BOUNDARY COMMISSION FOR ENGLAND Farm o P Violet Pit (dis) Pond D i s DALTON NORTH ED nel m n ELECTORAL REVIEW OF CUMBRIA ll l Tu a Gi inda n Pit No 2 agg L t H l (17) e (dis) d Ponds Tip R a i l w ASKAM AND IRELETH CP Gill a Dub Nursery Final recommendations for electoral division y boundaries in DALTON NORTH WARD Maidenlands Elliscales P Rickett Quarry the county of Cumbria July 2012 Quarry o Hills a LINDAL AND MARTON CP Pond k (dis) (dis) a B e c Maidenlands Sheet 9 of 9 k Hawthwaite 'S N Farm House E Re L Elliscale Farm d Gutter E H T S Allotment Allotment HA Gardens Sports WTHWAITE Gardens LANE D Field D A A O O R R N O M T Our Lady of G A H This map is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of K George Romney G o S U The Rosary RC l d A Junior School O the Controller of Her Majesty's Stationery Office © Crown copyright. m R Primary School B i r Golf e T Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings.
    [Show full text]
  • Development Division Planning Committee 7
    DEVELOPMENT DIVISION PLANNING COMMITTEE 7th March, 2017 Delegated Decisions made between 4th January 2017 and 13th February 2017 For Information Ladies and Gentlemen, Town & Country Planning Act 1990 (As Amended) Town & Country Planning (Development Management Procedure) (England) Order 2010 Decisions made between 4th January 2017 and 13th February 2017 The applications in this report have been determined by the Director of Regeneration and Community Services under delegated authority (Minute No. 254, Planning Committee, 3rd September, 2002, confirmed by Council 24th September, 2002). The decisions are reported for your information. The Building Act 1984/The Building Regulations 2010 Decisions made between 4th January 2017 and 13th February 2017 The applications in this report have been determined by the Building Control Manager & Access Officer under delegated authority. The decisions are reported for your information and have been ACCEPTED, APPROVED, APPROVED WITH CONDITIONS, REFUSED OR REGULARISED. Assistant Director of Regeneration and Built Environment 1 PLANNING Reference Address Ward Number The Co-operative Food Island Road Barrow Island B22/2016/0846 Barrow-in-Furness Parish Decision Proposal None Approved with Consent to display two non illuminated fascia signs, Case Officer conditions one illuminated fascia sign, 2 illuminated logo signs Maureen Smith and 2 non illuminated wall mounted panels to front Decision Date 11-JAN-2017 and side elevations Reference Address Ward Number BAE Systems Bridge Road Barrow-in-Furness Barrow Island B28/2016/0513 Proposal Parish Decision Approval of details reserved by condition no. 5 None Approved by (Transport Assessment Update) and condition no. 6 Case Officer letter (Construction Traffic Management Plan) for Jason Hipkiss planning permision B08/2015/0417 (Paint facility Decision Date 06-JAN-2017 with associated construction compound, infrastructure and related works) Reference Address Ward Number BAE Systems Bridge Road Barrow-in-Furness Barrow Island B18/2016/0800 Proposal Parish Decision Erection of waste store.
    [Show full text]
  • PLANNING COMMITTEE 25 November 2008
    PLANNING COMMITTEE th 25 November 2008 PLAN NUMBER: APPLICANT: AGENT: 2008/1008 Atherton Development Mr M Gadsden M & P Gadsden Consulting Engineers WARD/PARISH: CASE OFFICER: DATE RECEIVED: Dalton North Ian Sim 28/10/2008 Askam & Ireleth Parish 01229 876384 STATUTORY DATE: Council 22/12/2008 LOCATION: Land off Lord Street, Askam-in-Furness PROPOSAL: Erection of 6 No. dwellings and a detached garage with new access road and improvement to existing road SAVED POLICIES OF THE FORMER LOCAL PLAN: POLICY B3 Applications for residential development on unallocated sites will be permitted where they accord with the sequential approach of the Structure Plan and also satisfy the following criteria: i) The site is located within the built up area of existing settlements or the development cordons identified in Policy B13; and ii) The siting, scale, layout and design (in the materials and form of the buildings) of the development is sensitive to the local environment, it promotes the principles of ‘Secure by Design’ and adequate parking provision is made; and iii) Adequate access arrangements can be provided, including servicing the site by the public transport and by cycle routes; and iv) The development is laid out in a way that maximises energy efficiency; and v) The development will not result in the loss of land which has a recognised or established nature conservation interest; and vi) The development must not cause an undue increase in traffic passing through existing residential areas such as to be detrimental to residential amenity or highway safety; and Page 1 of 35 PLANNING COMMITTEE th 25 November 2008 vii) Adequate water supplies, foul and surface water sewers and sewerage treatment facilities exist or can be provided; and viii) 'A risk-based approach will be adopted for development in or affecting flood risk areas to minimise the risk of flooding associated with the site and the potential effect development of the site might have elsewhere through increased run off or a reduction in the capacity of flood plains.
    [Show full text]
  • Paper for Wapug Autumn Meeting 15 November 2001 Barrow Uid Study
    Paper for WaPUG Autumn Meeting 15th November 2001 Barrow uID Study – Three for the Price of One Graham Squibbs B.Tech, C.Eng., MICE. Julian Barber M.Sc, B.Eng, C.Eng, MICE, MIWEM Modelling Team, Asset Management, Service Delivery, United Utilities Introduction This paper covers the work undertaken for the Barrow uID Study. This is part of the United Utilities overall AMP3 uID programme which requires the improvement of 914 uID’s by March 2005. The Barrow uID’s are programmed for resolution by March 2004. Brief description of the study area Barrow Location plan Barrow-in-Furness lies at the tip of the Furness peninsula in West Cumbria which is bounded by the Irish Sea on its south-west and west sides. Barrow Island was originally separated from the mainland by a narrow channel, which has been infilled by a string of docks. Walney Island lies 150m off shore to the west, separated from the mainland and Barrow Island by Walney Channel. There are designated bathing waters on the east and north-west coast of the Furness peninsula, and on the West Coast of Walney Island, and designated shellfish waters in Walney Channel. Combined sewer overflows discharge to the Poaka Beck/Mill Beck system which flows to the sea via Cavendish Dock (SSSI), whilst other overflows spill to Ormsgill Reservoir which has a recreational (non-contact) use. Total population is calculated as 67,400 based on census data. Overall the population of Barrow is projected to decrease within the next ten years. Wastewater System The study area is served by a combined sewer system with post 1960's development drained by separate systems.
    [Show full text]
  • Barrow Childcare Providers
    Barrow Childcare Providers Town for online form Setting Name Address Telephone number Barrow Island Community Primary School Barrow Island Community Primary Trinity Street Barrow In Furness 01229 820302 School Barrow In Furness LA14 2SJ Bram Longstaffe Nursery School Farm Street Barrow In Furness Bram Longstaffe Nursery School 01229 814900 Barrow-in-Furness LA14 2RX Chapel Street Infants & Nursery School Chapel Street Dalton in Furness Chapel Street Infant & Nursery School 01229 467465 Dalton In Furness LA15 8RX Barrow Childcare Providers Cheeky Monkeys Childcare Abbots Vale Community Centre Barrow In Furness Cheeky Monkeys Childcare Abbots Vale 01229 827722 Barrow-in-Furness LA13 9PA College House Day Nursery Howard Street 01229 837546 Barrow In Furness College House Day Nursery Barrow-in-Furness 0787 490 0388 LA14 1NB Dane Ghyll Pre-School Hawcoat Community Centre Barrow In Furness Dane Ghyll Pre-School Skelwith Drive 0795 132 9299 Barrow-in-Furness LA14 4SA Furness Childcare Ltd High Street Sawmills Barrow In Furness Furness Childcare Ltd High Street 01229 828444 Barrow-in-Furness LA14 1QY Barrow Childcare Providers Happy Tots Day Nursery Ltd Arndede Park Barrow In Furness Happy Tots Day Nursery Ltd Abbey Road 01229 877566 Barrow-in-Furness LA13 9JY Hindpool Nursery School Bath Street Barrow In Furness Hindpool Nursery School 01229 833120 Barrow-in-Furness LA14 5TS Hollingarth Day Nursery 1 Prospect Road Barrow In Furness Hollingarth Day Nursery 01229 836269 Barrow-in-Furness LA13 9AA Cambridge Primary School Hopscotch Class Cambridge
    [Show full text]
  • Leigh Centurions V ROCHDALE HORNETS
    Leigh Centurions SUvN DRAOY C17HTDH AMLAREC H O20R1N9 @ET 3S PM # LEYTHERS # OURTOWNOURCLUB# OURTOWNOURCLUB # LEYTHERS # OURTOWNOURCLUB# OURTOWNOURCLUB engage with the fans at games and to see the players acknowledged for their efforts at the Toronto game, despite the narrowness of the defeat, was something Welcome to Leigh Sports Village for day 48 years ago. With a new community that will linger long in the memory. this afternoon’s Betfred stadium in the offing for both the city’s Games are coming thick and fast at FChamRpionshOip gameM agains t oTur HfootbEall team s iTt could Oalso welPl also be present and the start of our involvement in friends from Rochdale Hornets. the last time Leigh play there. the Corals Challenge Cup and the newly- Carl Forster is to be commended for It’s great to see the Knights back on the instigated 1895 Cup and the prospect of taking on the dual role of player and coach up after years in the doldrums and to see playing at Wembley present great at such a young age and after cutting his interest in the professional game revived opportunities and goals for Duffs and his teeth in two years at Whitehaven, where under James Ford’s astute coaching. players. The immediate task though is to he built himself a good reputation, he now Watching York back at their much-loved carry on the good form in a tight and has the difficult task of preserving Wiggington Road ground was always one competitive Championship where every Hornets’ hard-won Championship status in of the best away days in the season and I win is hard-earned and valuable.
    [Show full text]
  • Building Better Opportunities
    Building Better Opportunities Project outline For use in England only Project title Project 3 of 3 – Barriers to Work (Barrow and South Lakeland) LEP area Cumbria Project reference number Cum/2/3 ESF Thematic Objective 9: Promoting social inclusion and combating poverty ESF Investment Priority 1.4: Active inclusion Funding available £1,368,400 Project start period July 2016 to November 2016 Latest date for completion December 2019 Date open for applications 8 October 2015 Deadline for stage one applications 12 noon on 30 November 2015 Important information about this project outline This project outline represents just one strand of the overall funding that is available through Building Better Opportunities. As this is a joint programme with the European Social Fund, we will only consider applications that clearly meet a project outline and meet the requirements set out in our programme guide. As you read this project outline, please note the following: This project outline is subject to any changes made by the European Commission or the Managing Authority to the rules governing ESF in England. The Big Lottery Fund will upload any updates to https://www.biglotteryfund.org.uk/esf. It is your responsibility to review the page regularly to keep abreast of any changes that may have an impact on your application. You must apply for the full amount of funding available shown, which we will award to just one applicant or partnership to deliver the project described in this outline. The project must be delivered in the LEP area(s) shown and within any specific project location we’ve identified within this outline.
    [Show full text]
  • Corporate Management Team
    DEVELOPMENT CONTROL AND REGULATION COMMITTEE Meeting date: 19 January 2021 From: Executive Director – Economy and Infrastructure SAFETY AT SPORTS GROUNDS 1.0 EXECUTIVE SUMMARY 1.1 This annual report is intended to update the Committee on the current situation at the seven Sports Grounds which require Certification, either wholly under the Safety of Sports Ground Act 1975 (as amended), or in part under the Fire Safety and Safety of Places of Sport Act 1987 (as amended). 1.2 This report informs the Committee of the work of the Safety of Sports Grounds Team carried out during 2020. It explains the County Council’s statutory obligations under the relevant legislation and outlines the activity carried out to ensure that these duties have been met. 2.0 POLICY POSITION, BUDGETARY AND EQUALITY IMPLICATIONS, AND LINKS TO COUNCIL PLAN 2.1 The County Council’s policy is for annual renewal of the General Safety Certificates following receipt of satisfactory reports from the Safety Advisory Group. Recommendations contained in this report adhere to the County Council’s policies regarding spectator safety at sports grounds. 2.2 There is no resource or value for money implications. 2.3 There are no equality implications arising from this report. Safe access and movement within venues, particularly in the event of an emergency for all users is considered as part of the safety team’s inspections. The Safety of Spectator inspections take into consideration the safety of all spectators, particularly those with disabilities, the elderly, families and children. 3.0 RECOMMENDATION 3.1 That the annual report be received and noted by Members.
    [Show full text]
  • 11C14 Walney Island
    Cumbria Coastal Strategy Technical Appraisal Report for Policy Area 11c14 Walney Island (Technical report by Jacobs) © Copyright 2020 Halcrow Group Limited, a CH2M Company. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This document has been prepared on behalf of, and for the exclusive use of Jacobs’ client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this document by any third party. CUMBRIA COASTAL STRATEGY ‐ POLICY AREA 11C14 WALNEY ISLAND Policy area: 11c14 Walney Island Figure 1 Sub Cell 11c Arnside to Hodbarrow Point Location Plan of policy units. Baseline mapping © Crown copyright and database rights, 2019. Ordnance Survey licence number: 1000019596. 1 CUMBRIA COASTAL STRATEGY ‐ POLICY AREA 11C14 WALNEY ISLAND Figure 2 Location of Policy Area 11c14: Walney Island. Baseline mapping © Crown copyright and database rights, 2019. Ordnance Survey licence number: 1000019596. 2 CUMBRIA COASTAL STRATEGY ‐ POLICY AREA 11C14 WALNEY ISLAND 1 Introduction 1.1 Location and site description Policy units: 11c14.1 South End Hawes to Biggar (east side) 11c14.2 Biggar to Lenny Hill (east side) 11c14.3 South End Hawes to Hare Hill (open coast) 11c14.4 Hare Hill to Hillock Whins 11c14.5 Hillock Whins to Nanny Point Scar 11c14.6 Nanny Point Scar to Mill Scar 11c14.7 Mill Scar to north of West Shore Park 11c14.8 North Walney – from north of West Shore Park to Lenny Hill (both coasts) Responsibilities: Barrow Council Cumbria Country Council Private landowners Location: The policy area covers the entire frontage of Walney Island, both open coast (west coast) and channel (east coast) shorelines.
    [Show full text]
  • The O Cial Magazine of Rugby League Cares January 2017
    The O cial Magazine of Rugby League Cares January 2017 elcome to the fi rst edition of One n ll n the ne name for Rugby League Cares’ W ne-look nesletter hich has gone through something of a transformation at the end of hat has been another busy year for the charity As you can see, we have rebranded and changed the format so that our members and supporters can get a clearer understanding of the breadth of work we do throughout the sport. In this edition we welcome a number of new partners who have recently joined the charity to assist our work, particularly the support we provide to former and current players in all levels of the game. All Sport Insurance and Purple Travel have come on board as members of the newly-formed Rugby League Cares Business Club which aims to provide a wide range of services that help players, particularly in areas where the nature of their occupation can put them at a disadvantage. 2016 proved to be a challenging year for the charity as we continued to play an important role in assisting players successfully transitioning from the sport by awarding education and welfare grants. We enjoyed a very successful partnership with Rugby AM and the Jane Tomlinson Appeal on the Ride to Rio challenge; and we secured grants from Curious Minds and Cape UK to support club foundations to deliver some life-affi rming experiences for young people in their communities via a Cultural Welcome Partnership programme. This culminated in which will deliver great outcomes for our Finally, I hope you enjoy this new version some terrifi c dance performances at maor benefi ciaries and which is easy for the public of the newsletter and catching up about all events during the year.
    [Show full text]
  • Barrow Map Leaflet 28728 11/1/07 12:06 Page 1
    Barrow Map Leaflet_28728 11/1/07 12:06 Page 1 Tel: 01229 474251. 01229 Tel: Tel: 01229 430600. 01229 Tel: WC u School. Riding Seaview specially trained owls/bird of prey. of owls/bird trained specially by the sea with sea the by horse a Ride Travelling to Barrow 835449. 01229 Tel: ASKAM from displays regular as well as diverse night life. life. night diverse - see a variety of owls of variety a see - owls Furness - IN - trails. waymarked BY CAR q and lively having for reputation countryside and seaside and countryside which adds further to the town’s the to further adds which From The M6 FURNESS 824334. 01229 Tel: the network of network the A595 Walk on board the Princess Selandia, Princess the board on Leave the Motorway at junction 36, then follow the A590 all the way to Barrow. restaurant. family and ROANHEAD LINDAL state of the art floating nightspot floating art the of state - indoor play area play indoor - BEACH Warehouse Wacky - IN - courses. excellent 3 Barrow’s is Barrow’s latest Barrow’s is From The Lakes Lagoon Blue The enthusiasts can play on play can enthusiasts Golf Take the A592 from Bowness along the Eastern shore of Lake Windermere. FURNESS A590 823823. 01229 Tel: Tel: 01229 823823 01229 Tel: Lazerzone. of Join the A590 which takes you straight to Barrow. t SOUTH LAKES WILD eatery. stylish and WC 470303. 01229 Tel: bar, childrens play area and venue and area play childrens bar, - indoor play area area play indoor - ANIMAL PARK Playzone West Kitesurfing. West - stylish eatery, stylish - BY TRAIN House Custom The railway and play areas.
    [Show full text]
  • SCHEMES for the RECLAMATION of LAND from the SEA in NORTH LANCASHIRE DURING the EIGHTEENTH and NINETEENTH CENTURIES Read 20 Febr
    SCHEMES FOR THE RECLAMATION OF LAND FROM THE SEA IN NORTH LANCASHIRE DURING THE EIGHTEENTH AND NINETEENTH CENTURIES BY WILLIAM ROLLINSON, M.A. Read 20 February 1964 OME of the earliest schemes for the reclamation of land S from the sea in North Lancashire were implemented by the monks of Furness Abbey in the thirteenth century. In the fervour of Cistercian colonisation and agricultural reclamation, several areas on Walney Island were reclaimed by the construction of embankments or dykes of beach pebbles. There is some evidence to suggest that several of these dykes were constructed on both the west and east coasts of the island, but only the great Biggar Dyke on the east coast remains today, the west coast embank­ ments having been destroyed by marine erosion. Extending for almost a mile north-west of the village of Biggar, the dyke protected part of the east coast of Walney and prevented inundation of low-lying ground during spring tides. During the medieval period it was maintained and repaired by the monastic tenants in Furness, but after the dissolution of the abbey in 1537 the responsibility was assumed by the Crown, and in 1564 by the inhabitants of Walney. In spite of such an early and promising beginning, the progress of land reclamation and agricultural development was retarded after the dissolution, and it was not until the eighteenth century and the period of the Agricultural Revolution that interest was again aroused. Under the stimulus of a rapidly growing urban market and a rise in the price of grain during the Napoleonic wars, the period between the mid-eighteenth and early nineteenth centuries was one of agricultural expansion and improvement.
    [Show full text]