To Construct Bye-Pass 82. SH. LAKSHMAN NAPA, M.L.A.: Will the Deputy Chief Minister be pleased to state:- a) whether it is a fact that the traffic is a big problem in Ratia city due to which traffic remain Jammed in the city all the time; and b) whether there is any proposal under consideration of the Government to construct a bye pass in Ratia city if so, the details thereof ? ____________________________________________________________________ DUSHYANT CHAUTALA, DEPUTY CHIEF MINISTER, HARYANA _________ (a) & (b) No, sir. UNSTARRED ASSEMBLY QUESTION NO. 82 RAISED BY LAKSHMAN NAPA, M.L.A, RATIA CONSTITUENCY NOTE FOR PAD Regarding traffic congestion in the city portion Ratia, it is brought out that there is already 4-lanned existing road i.e Budhada- Ratia- Fatehabad Road (SH-21) and 4- lanned Tohana- Ratia Road (MDR-101). It is also brought out that in the remaining portion of ROW on both side, interlocking paver blocks have been provided. The total land width of these roads is 82’-6”. However, a bye-pass for Ratia city was proposed in the detailed project report (DPR) for Fatehabad-Ratia-Budhlada Mandi road. It is brought out that Fatehabad-Ratia-Budhlada Mandi was declared as “In Principle” National Highway vide Ministry of Road, Transport & Highways (MoRT&H) letter No. NH-14012/30/2015-P&M dt. 08/02/2016 and MoRT&H directed to prepare DPR of this road stretch. Subsequently, work of preparation of DPR was awarded to M/s ARKITECHNO Consultants (India) Pvt. Ltd. The consultant submitted alignment report for the Fatehabad-Ratia-Budhlada Mandi road which included Ratia Bypass. This alignment was submitted to MoRT&H for approval vide office of EIC PWD B&R letter No. 188418/NH dated 11.11.2017 after approval from Government of Haryana. The alignment was subsequently, discussed in the meeting held under chairmanship of Secretary, Road, Transport & Highway, Government of India on 20.08.2018 and during the meeting, it was opined that declaration of Fatehabad-Ratia-Budhlada Mandi road as National Highway will only create a parallel artery to the already existing NH-703 and NH-148B and would not be beneficial for NH traffic. Accordingly, it was decided in the meeting that the proposal for declaration of “Fatehabad-Ratia-Budhlada Mandi road” as National Highway is not recommended. Since, Fatehabad-Ratia-Budhlada Mandi road could not be declared as National Highway, the proposed Ratia bypass could not be taken up with MoRT&H for execution. In view of above, it is intimated that there is no proposal under consideration of the Government to construct bye pass in Ratia City. (A) Total road Length in Ratia Constituency is as under:- Road Length i) State Highway (SH) -- 33.45 km ii) Major District roads (MDR) -- 33.98 km iii) Other District roads (ODR) -- 438.83 km iv) Recently transferred from HSAMB -- 98.81 Km Total:- -- 605.07 km (B) Condition of road in Ratia Constituency i) Road length in very good condition -- 382.02 Km. ii) Road Length in good condition -- 25.76 Km. iii) Road length which require treatment -- 208.81 Km. iv) Road Length in which work is in progress -- 040.00 Km. Total -- 605.07 Km. (C) Patch work/pot holes repair/surface dressing done from 1st September, 2019 to 30th November, 2019. (i) Pot hole repairs carried out = 0.00 Km. (ii) Surface dressing done = 0.00 Km (D) Target of patch work Pothole repair/Surface dressing from 1st February, 2020 to 30th April, 2020. (i) Pot hole repair = 0.00 Km. (ii) Surface dressing = 0.00 Km. (E) Length of roads constructed / repaired in Ratia Constituency from 01.04.2015 to 31.01.2020: Sr. Item 2015-16 2016-17 2017-18 2018-19 2019-2020 Total No. (01/2020) 1 Construction 7.10 - 10.75 18.538 7.872 44.26 of new roads 2 Widening/ 97.07 73.44 34.53 120.29 - 325.33 Strengthening/ Raising etc. 3 Improvement 35.30 33.09 20.00 80.32 10.20 178.91 of Road Total 139.47 106.53 65.28 219.148 18.072 548.50 (Length in km) (F) In Ratia Constituency year wise expenditure incurred on various road activities is as under:- i) 01.04.2015 to 31.01.2020 –Ratia Constituency Expenditure-Roads Sr. Item 2015-16 2016-17 2017-18 2018-19 2019-2020 Total No. (01/2020) 1 Construction 308.19 71.81 564.97 397.70 906.89 2249.56 of new roads 2 Widening/ 206.09 814.66 755.31 87.86 417.39 2281.31 Strengthening/ Raising etc. 3 Cement 0.00 43.00 43.37 0.00 - 86.37 Concrete/ Block pavement 4 Annual 100 0 0.00 0.00 - 100.00 surfacing/pre mix carpet of roads. 5 Annual 134.59 34.37 0.00 27.59 30.39 226.94 maintenance of roads 6 Special Repair 288.37 318.75 142.31 973.15 205.65 1928.23 7 PMGSY 0 0 0.00 0.00 - 0 Total 1037.24 1282.59 1505.96 1486.30 1560.32 6872.41 (G) Details of year wise expenditure incurred on the building works falling under Ratia constituency for the period from 01.04.2015 to 31.01.2020 2015-16 2016-17 2017-18 2018-19 2019-2020 Total (01/2020) 485.44 372.62 0.00 264.05 170.81 1292.92 (Rs. in lacs) (H) Details of year wise expenditure incurred on the bridge works falling under Ratia constituency for the period from 31.10.2014 to up to date (i.e. 31.01.2019) 2015-16 2016-17 2017-18 2018-19 2019-2020 Total (01/2020) 0.00 0.00 83.49 146.70 - 230.19 (Rs. in lacs) (H) Since 01.04.2015 to till date, following works have been completed. (a) Road Work (i) Work Programme for the year 2013-14 under SCSP Components in Provincial Sub Division No. 1, PWD B&R Br., Fatehabad. (14 Nos. Road) (5516, 5478, 5506, 5521, 5625, 5499, 5518, 5533, 5536, 5537, 5627, 5496, 5514, 5509) in Fatehabad District (C. M. Announcement Code No. 9763 on dated 30.12.2014) with an estimated cost of Rs. 4.11 crore Under SCSP Scheme. Date of completion 31.03.2016. (ii) Constructing a Road from Village Bahamanwala to Reyond Up to Punjab Border in Fatehabad District (C. M. Announcement Code No. 9763 on dated 30.12.2014) with an estimated cost of Rs. 1.51 crore under head 5054-R&B (P). Date of completion 31.03.2016. (iii) Special Repair of Tohana Dharsul Ratia to State Border Km 25.00 to 34.15 (Road ID 5468) (G-6) in Fatehabad District with an estimated cost of Rs. 2.19 crore under head 3054 R&B (NP). Date of completion 31.03.2016. (iv) Special Repair of various Road :- (i) Bhuna Ratia Road to Digoh (ID 5595), (ii) Aherwan to Dhani Ruriwali (ID 5538), (iii) Fatehabad Hanspur road to Rattatibba (ID 5539), (iv) DHS road to Khairati Khera (ID 5633) and; (v) Alipur Barota road (5529) with an estimate cost on Rs. 1.88 Crore under Head 3054 R&B (NP) in Fatehabad District Date of completion of this work is 04-08-2016. (v) Constructing a Road from Village Nagpur to Nakta in Fatehabad District (C. M. Announcement Code No. 9763 on dated 30.12.2014) with an estimated cost of Rs. 1.59 Crore under Head 5054 R&B (P). Date of completion 30.09.2016. (vi) Tohana Dharsul Ratia to State Border road (Ratia to State Border) (MDR-101) (ID No. 5468) Km 34.15 to 36.00, 39.00 to 50.00 & 52.00 to 57.98 in Fatehabad District (C. M. Announcement Code No. 9763 on dated 30.12.2014) with an estimated cost of Rs. 12.39 crore under head 5054-R&B (P) Date of completion 31.01.2017. (vii) Special Repair of Ratia Fatehabad Road to Dhani Dadi Jakhan (Road ID 5543) in Fatehabad District with an estimate cost on Rs. 0.50 Crore under Head 5054 R&B (P). Date of Completion of this work is 09/2016. (viii) Providing & Laying Premix Carpet with seal coat on Ratia Fatehabad road to Sheikhpur Sottar Km. 5.70 to 6.81 (Road ID 5551) under Head 5054 ODR (Group-3) with an estimate cost on Rs. 0.86 Crore in Fatehabad District Date of Completion of this work is 09/2016. (ix) Improvement of Ratia Rori road to Rattakhera Km. 0 to 0.55 Work Programme 2016-2017 in Ratia Constituency (Road ID 5488) with an estimate cost on Rs. 19.08 Lacs.under Head 3054 R&B (NP) in Fatehabad District Date of Completion of this work is 01/2017. (x) Improvement of various roads under head 5054 ODR SCSP scheme Work Programme 2016-2017 in Ratia Constituency (Road ID 5500, 5504, 5516 & 5483). (Group-21) (Tender No. 18621) with an estimate cost on Rs. 350.00 Lacs in Fatehabad District Date of Completion of this work is 12/2016. (xi) Improvement of road from Rattangarh to Pilchiyan Km. 0 to 16.00 under Head 5054 ODR Work Programme 2016-2017 in Ratia Constituency (Road ID 5476) (Group-19) with an estimate cost on Rs. 527.65 Lacs under Head 5054 R&B (P) in Fatehabad District Date of Completion of this work is 05/2017. (xii) Providing & Laying Premix Carpet with Seal Coat on various roads under Head 3054 R&B (NP) ODR for the year 2017-18 (Road ID 5441, 5389, 5648, 5649, 5492, 5420, 5624, 5552, 5554, 5568, 5497, 5512, 5350, 5544, 5503, 10179, 5519, 9111, 5576, 5614, 9072, 5556, 5379, 5579, 5603, 5610 & 5365) with an estimate cost on Rs.