Consultancy SN Title Sponsoring Agency Role Faculty Name Status TECHNICAL ADVICE/GUIDANCE FOR THE DEVELOPMENT OF DUDU- 1 RSRDC Investigator In Progress JINENDRA KUMAR JAIN MALPURA CHHAN ROAD 2 Training programs of PHED engineers WSSO, PHED Rajathan - PHED Rajasthan Co-Investigator In Progress Urmila Brighu Agarwal Metal works Pvt. Ltd. - Sp-144 RICCO 3 Technical study for reviewing Pickling and effluent treatment process Co-Investigator In Progress Urmila Brighu Industrial Area, phase-1 Bhiwadi-3010 4 ROAD SAFETY AUDIT OF ROADS CONSTRUCTION BY RSRDC RSRDC JAIPUR Investigator In Progress JINENDRA KUMAR JAIN Conducting feasibilty study for the work of Multi level Fly over proposed Chief executive officer Smart City ltd. 5 Co-Investigator In Progress Ramesh Chandra Gupta under the smart City project Ajmer ajmer YOGESH PRAKASH 6 ALL DETAILS GIVEN IN FORM FOR HAG . Investigator Completed MATHUR Proof checking of design of construction of elevated road from sodala tri Executive Engineer, Project 1,JDA - Jaipur 7 Co-Investigator In Progress RAJESH GUPTA junction to LIC office near Ambedkar circle,Jaipur Development Authority Mix design (M50) for construction of elevated road from sodhala 8 Simplex Infrastructures Limited Investigator Completed Sandeep Shrivastava trijunction to LIC office Mix design M25 qnd M30 for LnT project 9 M/S Larsen and Toubro Limited Investigator Completed Sandeep Shrivastava

10 safety audit of Jaiselmer Barmer Section G R I L Co-Investigator In Progress ARUN GAUR Design of Cement concrete road from Railway station Road to Deeg 11 UIT, Bharatpur Investigator Completed ARUN GAUR byepass Road VETTING OF FLOW MEASUREMENT ON NALLAHDISCHARGE TO 12 UIT KOTA Co-Investigator Completed JINENDRA KUMAR JAIN CHAMABAL 13 quality assessment on various ongoing projects UIT Bhiwadi Investigator In Progress ARUN GAUR Mix Design (M35) for RWSS Ganhedi, Ajeetpura, Sabalpura under The Executive Engineer, PHED, Division-Dholpur. 14 Co-Investigator Completed Ramesh Chandra Gupta division Dholpur c/o M/s Balaji Construction Company, jaipur Conducted a series of 33 orientation training programs for the newly Akhilendra Bhushan 15 PHED Rajasthan Investigator In Progress inducted junior/ assistant engineers of PHED Rajasthan of 2 days each Gupta 3rd Party Quality Control/Assurance in projects being executed by 16 CPWD, Indore Co-Investigator In Progress Nivedita Kaul CPWD under Indore Central Division-I CPWD Indore RAJASTHAN STATE POLLUTION CONTROL BOARD, 17 STUDY OF GROUND WATER QUALITY FOR BHIWADI AREA Investigator In Progress ROHIT GOYAL JAIPUR 18 DOSE OF POLY ALUMINUM CHLORIDE IN RAW WATER AT WTP PHED, BIKANER Co-Investigator In Progress ROHIT GOYAL Third Party Quality Control/Assurance in projects being executed by 19 CPWD Investigator In Progress Sumit Khandelwal CPWD under Indore Central Division-I CPWD Indore Technical evaluation work of other Eklavya Model Residential School 20 RSRDC, TADA Co-Investigator Completed GUNWANT - SHARMA approved to RSRDC Consultancy SN Title Sponsoring Agency Role Faculty Name Status Technical evaluation work of Other Eklavya Model Residential Schools 21 Tribal Area Development Department, Udaipur Co-Investigator Completed Nivedita Kaul approved to RSRDC 1000109239;Rahabilitation of Vigyan Bhawan, Geology Dept and 22 Govt. Co-Investigator Completed PV Ramana Register Bungalow Technical advice/guidance for the development of Dudu-Malpura chhan RSRDC,Jaipur - Setu Bhawan, Jaipur - Agra 23 Co-Investigator In Progress Pawan Kalla Road Bypass, Jaipur 24 Review and analysis of inspection reports of PWD (QC) and CEG,Jaipur RIICO Ltd. Ghiloth - Ghiloth Dist., Co-Investigator Completed Pawan Kalla Mix Design (M30) including Proof Checking of Design & Drawing of RCC 25 M/s Shree Shyam Construction Company Co-Investigator Completed Ramesh Chandra Gupta SR 125kL at Medical College Campus, Bhilwara C/O Central Detective Training 26 Svarrnim Infrastructure P ltd Investigator Completed Sandeep Shrivastava School Dhami Kalan Jaipur(Mix Proof checking of design of c/o elevated road from Sodala tri-junction to 27 The Executive Engineer, Pr.-1, , JDA, Jaipur Co-Investigator In Progress VINAY AGRAWAL LIC office near Ambedkar Circle, Jaipur Proof Checking and certification of Structure design of commercial 28 finetech parkcon (P) ltd. Investigator Completed Ravindra Nagar complex at nalla at Ashok Marg C-Scheme jaipur Pioneer Infra Consultants Pvt. Ltd. - B-307, 10-B SURESH KUMAR 29 CBR tests on the 3 samples of soil. Investigator Completed scheme, Gopalpura Bypas, Jaipur TIWARI YOGESH PRAKASH 30 VETTING OF DESIGN AND DRAWING OF PEC BUILDING TATA TPL SUCG CONSORTIUM JAIPUR Investigator Completed MATHUR REVIEW AND ANALYSIS OF INSPECTION REPORTS OF PWD(QC) AND CEG 31 RIICO LTD. GHILOTH Investigator Completed JINENDRA KUMAR JAIN JAIPUR 32 Structural Audit of ESI Office Building at Sawai Madhopur, Rajasthan Deputy Director ESIC Co-Investigator Completed Nivedita Kaul

33 proof checking of structural drawings and designs for STPI Sitapura central public works department Co-Investigator Completed Ramesh Chandra Gupta

34 VETTING OF DESIGN AND DRAWING OF OVER HEAD TANKS AND WTP MANEESH PIPES PVT. LTD. Co-Investigator Completed JINENDRA KUMAR JAIN Proof Checking of Drawings of Proposed Retaining Walls to be 35 The Sr. Regional Manager, RIICO lImited Co-Investigator Completed Ramesh Chandra Gupta constructed at different locations at Industrial Area Kolila Joga, RIICO Ltd. Jaipur (South) - Malviya Industrial 36 Strengthening & Re-Carpeting of roads at I/A Mansarovar,Jaipur. Co-Investigator Completed Pawan Kalla area,Jaipur short-term course on Recent Namotech Consultancy Services Ltd. 113/2, SURESH KUMAR 37 Investigator Completed Trends in Civil Engineering Vishvesariya Nagar, Triveni Nagar Mode, TIWARI Namotech Consultancy Services Ltd. 113/2, SURESH KUMAR 38 short-term course on Recent Trends in Civil Engineering Investigator Completed Vishvesariya Nagar, Triveni Nagar Mode, TIWARI STRENGTHENING & RE-CARPETING OF ROADS AT I/A 39 RIICO LTD. JAIPUR (SOUTH) Investigator Completed JINENDRA KUMAR JAIN MANSAROVAR JAIPUR Training program for WRD Rajasthan Engineers under National Water Resources Department, Government of 40 Co-Investigator Completed Sumit Khandelwal Hydrology Project Rajasthan Consultancy SN Title Sponsoring Agency Role Faculty Name Status Mix Design (M35) including Proof 41 M/s Balaji Construction Company Co-Investigator Completed Sandeep Shrivastava Checking of Design & roof checking of Pump house, Master control centre and Consumer care Offshore Infrastructures Limited - Offshore 42 Co-Investigator Completed Pawan Kalla centre Infrastructures Limited 43 Vetting of pipe designs Shree Nakoda cement Projects Co-Investigator Completed ARUN GAUR YOGESH PRAKASH 44 VETTING OF PIPE DESIGN SHREE NAKODA CEMENT PROJECTS NIMBAHERA Investigator Completed MATHUR Structural stability/technical feasibility for the building damaged due to 45 Ram Dal Industries, VKIA, Jaipur Co-Investigator Completed GUNWANT - SHARMA fire (Plot No. E-168, Road No. 9-J, VKIA, Jaipur Proof checking of structural drawings for the work "Construction of 46 The Executive Engineer, ROB-RUB-II, JDA, Jaipur Investigator Completed VINAY AGRAWAL Underpass to Connect SMS Hospital and Trauma centre (ITO) on Tonk Quality control tests and inspection of c/o New Medical College The Principal & Controller, Govt. Medical 47 Investigator Completed VINAY AGRAWAL Bharatpur&Upgradation of District Hospital into Teaching Hospital, College, Bharatpur 48 Testing of water samples CCS-NAIM Investigator Completed Sanjay Mathur Proof Checking of Various Design and Drawings of Over Head Water 49 Larsen & Toubro Co-Investigator Completed Sumit Khandelwal Tanks under Rajasthan Rural Water Supply and Fluorsis Mitigation DESIGN OF OVERLAY CRUST OF ROADS AT I/A JHOTWARA(T.A.) BY 50 RIICO LTD VKI JAIPUR Investigator Completed JINENDRA KUMAR JAIN BANKLEMAN BEAM METHOD RSRDC, Jaipur - Setu Bhawan, Jaipur - Agra 51 Road safety audit of roads construction by RSRDC Co-Investigator In Progress Pawan Kalla Bypass, Jaipur Design of overlay crust of Roads at I/A Jhotwara (T.A.) by Banklemen RIICO Ltd. VKIA Jaipur - Sr. DGM, RIICO Ltd. VKIA 52 Co-Investigator Completed Pawan Kalla Beam Method Jaipur RIICO LTD. NAGAUR - RIICO LTD. BASNI ROAD 53 Design of overlay thickness of roads at Industrial Area IID centre Nagaur Co-Investigator Completed Pawan Kalla NAGAUR Resident Engineer, Div. V RHB, Jaipur - Resident 54 Job Mix for GSB/ WBM/ WMM Co-Investigator Completed Pawan Kalla Engineer, Div. V YOGESH PRAKASH 55 PROOF CHECKING OF STP AT SURATGARH AND BHADARA MONTECARLO LIMITED Investigator Completed MATHUR 56 BBD Test for Indore Kalghat of NH-3 Oriental Path Ways Co-Investigator Completed ARUN GAUR BBD TEST FOR INDORE-KHALGHAT OF NH-3 FROM KM. 12.600 TO KM. SH. AJITABH JHA, DY. GENERAL MANAGER 57 Co-Investigator Completed JINENDRA KUMAR JAIN 84.700 IN THE STATE OF M.P. ORIENTAL PATHWAYS (AGRA) PVT. LTD. Mix design for elevated road from Sodala tri junction to LIC office near 58 Simplex Infrastructure Limited Investigator Completed Sandeep Shrivastava ambedekar circle jaipur Vetting of Structural Design & Drawing, Shree Vatika, Affordable Home Ajmer Aashiyana Pvt Ltd Office No.2, 4th Floor 59 Investigator Completed Shiv Dayal Bharti Project Ajmer Miraj(Shrinath) Mall Ajmer DESIGN OF OVERLAY THICKNESS OF ROADS AT I/A IID CENTRE NAGAUR 60 RIICO LTD NAGAUR Investigator Completed JINENDRA KUMAR JAIN TYPE-I Consultancy SN Title Sponsoring Agency Role Faculty Name Status Mix Design (M35) including Proof Checking of Design & Drawing of RCC M/s Yadav Construction Company, , Kishangarh 61 Co-Investigator Completed Ramesh Chandra Gupta SR 250,500&700kL & RCC CWR 5000kL at Churu Renwal, Dist. Jaipur 62 DESIGN OF JOB MIX FORMULA RIICO LTD. BHILWARA Investigator Completed JINENDRA KUMAR JAIN

63 Vetting of DPR for main sewer line and STP Geo Planet Solutions Investigator Completed Sanjay Mathur proof checking of Pump house, Master control centre and Consumer Offshore Infrastructures Limited - Offshore SURESH KUMAR 64 Investigator Completed care centre Infrastructures Limited, Mumbai TIWARI Office of Assistant Engineer, PHED, P & D 65 Dose of Poly Aluminum Chloride in raw water at WTP Bikaner Investigator Completed Urmila Brighu Sub Division V, Bikaner Proof Checking of Proposed Cement Concrete Road from Railway 66 UIT, Bharatpur Investigator Completed ARUN GAUR station Road to Deeg Baipass in Bharatpur consultancy for proof checking of Design and Drawing of ESR Offshore Offshore Infrastructures Limited - Radhakrishnan 67 Co-Investigator Completed Pawan Kalla Infrastructures Limited K.N. Deputy General Manager Offshore YOGESH PRAKASH 68 VETTING OF DRAWING AND DESIGN OF MANHOLES SHREE NAKODA CEMENT PROJECT Investigator Completed MATHUR Mix Design for M-25 grade concrete Solar Photo Voltaic Power 69 AGE B/R (P) AF Nal Investigator Completed Sandeep Shrivastava Generation Plant at AF STN NAL 70 Concrete Mix Design Assistant Engineer, bamanwas, PHED, Bamanbas Investigator Completed Ramesh Chandra Gupta

71 Proof Checking of DPR Vistaar Infratech Investigator Completed Sanjay Mathur

72 1000110963;Vetting of ESR,CWR,PH,SITC and PLJTC of WTP Govt. Co-Investigator Completed PV Ramana Vetting of Structural drawings of Mahatama Gandhi Hospital-Patient Mr. R.R. Soni, Member, Board of Management, 73 Investigator Completed VINAY AGRAWAL Attendant Accomodation Mahatma Gandhi University of Medical Sciences 74 Safety Audit for Jodhpur Pokharan Project G R I L Co-Investigator Completed ARUN GAUR Mix Design for M-25 grade Concrete for DSC, NCs (E) and MES Civilians 75 AGE B/R (P) AF Nal Bikaner Investigator Completed Sandeep Shrivastava at AF STN NAL 1000110878;Proof Checking of Structural Design of Library Building at 76 Industry Co-Investigator Completed PV Ramana RU 77 IWRM PLAN FOR KBNIR IN RAJASTHAN CHEM HILL (INDIA) PVT. LTD. Investigator Completed ROHIT GOYAL

78 RECRUITMENT EXAMINATION PWD, DAMAN Investigator Completed ROHIT GOYAL proof checking of design and drawings of R.E. wall for construction of Landmark Material testing and Research SURESH KUMAR 79 Investigator Completed ROB on DFC alignment At LC No. 72 on Shahpura-Chirwa road (SH-13). Laboratory Pvt. Ltd. - Landmark Material testing TIWARI Proof checking of design and drawing of reinforced earth wall for Landmark Material testing and Research SURESH KUMAR 80 Investigator Completed construction of ROB at LC No. 5 on Dudu and Naraina-Sambhar Road Laboratory Pvt. Ltd. - Landmark Material testing TIWARI Consultancy SN Title Sponsoring Agency Role Faculty Name Status IWRM Plan for KBNIR in 81 CH2M Hill (India) Pvt. Ltd. Co-Investigator Completed Sandeep Shrivastava Rajasthan Mr. Zakir Ahmed Siddiqui, Chief Project 82 Testing of Bitumen VG-30 Co-Investigator Completed Pawan Kalla Manager, G M/S Padmawati Enterprises , Jaipur C/O RIICO 83 Mix Design of concrete Co-Investigator Completed Pawan Kalla Ltd. Bais Godam , Jaipur - M/S Padmawati 84 1000110962;Proof Checking of RoB at Piran Kaliyar, Haridwar Industry Co-Investigator Completed PV Ramana M/S PADMAWATI ENTERPRISES JAIPUR C/O 85 MIX DESIGN OF CONCRETE Investigator Completed JINENDRA KUMAR JAIN RIICO LTD BAIS GODAM JAIPUR Proof Checking the Design and Drawings of Underpass at Manipal 86 Manipal University Jaipur Investigator Completed Ravindra Nagar University Jaipur 1000110879;Proof Checking of Structural Design of Hospital Building at 87 Industry Co-Investigator Completed PV Ramana Bharatpur and Bhilwara; The Assistant Engineer (I) PHED Project Division 88 Dose of PAC in raw water at WTP Kekri Investigator Completed Urmila Brighu Baghera Road, Filer Plant, Kekri Ajmer - 305 004 Testing of materials for construction of ROB at Shahpura Chirawa Road Executive Engineer, Public Work Deopartment, 89 Investigator Completed Ramesh Chandra Gupta (SH-13), Neemka Thana, Sikar Division Neemka Thana Sikar 1000111139;Proof Checking of two RoBs on Khimel-Falna Section at 90 Industry Co-Investigator Completed PV Ramana Madhar Palanpur Ajmer section 91 Proposed RCC Drainage Work at Industrial Area Prahladpura, Jaipur The Sr. Regional Manager, RIICO, EPIP, Sitapura Co-Investigator Completed GUNWANT - SHARMA Vetting of structural drawing of “Construction of drain along Runway 09- 92 M/s KhairatiLal, Co-Investigator Completed GUNWANT - SHARMA 27 and disused Runway 15-23 in Operational Area at CA Jaipur" 93 1000111102;proof checking of bridge widening at Bambala Industry Co-Investigator Completed PV Ramana Testing of Reinforcement Bars-ELECTRO TMT 500 (Grade Fe500) Consulting Engineer’s Group Ltd. (in 94 Investigator Completed VINAY AGRAWAL 8,10,12,16,20&25mm dia bars [Ultimate Stress, Proof Stress, % association with ShriKushalsuri Engineering 95 B I Test for NH-11 Oriental Path ways P limited Co-Investigator Completed ARUN GAUR

96 Mix design of M15, M35 and M40 with cement of two types Simplex Infrastructures Limited Investigator Completed Sandeep Chaudhary Testing of compressive strength for (3+6=)9 core samples (M40) for C.C. The Executive Engineer, PWD, Division- 97 Co-Investigator Completed GUNWANT - SHARMA pavement for the work of strengthening & widening of Jhalawar- Chaumahla (Jhalawar) 98 RECRUITMENT EXAM FOR ENGINEERS/SCIENTISTS POSTS RAJASTHAN STATE POLLUTION CONTROL BOARD Investigator Completed ROHIT GOYAL Testing of compressive strength for (3+6=)9 core samples (M40) for C.C. The Executive Engineer, PWD, Division- 99 Investigator Completed VINAY AGRAWAL pavement for the work of strengthening & widening of Jhalawar- Chaumahla (Jhalawar) Addl. Chief Engineer (Proc) RVPN Jaipur - Addl. 100 Analysis of 220kV/132kV tower material failure reports. Co-Investigator Completed Pawan Kalla Chief Engineer (Proc) RVPN Jaipur Consultancy SN Title Sponsoring Agency Role Faculty Name Status 101 1000111216;Proof Checking of RoB at Dantli Industry Co-Investigator Completed PV Ramana Mix Design (M35) including Proof Checking of Design & Drawing of RCC M/s Namotech Consultancy Services LLP, 102 Co-Investigator Completed Ramesh Chandra Gupta CWR 75kL & GLSR 150kL at Kutina Gopalpura Byepass, JAIPUR. , JAIPUR Evaluation of Cement Concrete Road at Village Gawda Meena, Dist Tribal Area Devlopment - Tribal Area Devlopment 103 Co-Investigator Completed Pawan Kalla Karouli Udaipur Stability monitoring of proper laying of PSCC pipelines in the Chambal 104 PHED, Rajasthan Investigator Completed Sanjay Mathur Sawai Madhopur water supply project Municipal Council Hanumangarh - Municipal 105 Vetting of drawings of STP at Hanumangarh Co-Investigator Completed GUNWANT - SHARMA Council Hanumangarh YOGESH PRAKASH 106 VETTING OF DRAWINGS OF STP AT HANUMANGARGH MUNICIPAL COUNCIL HANUMANGARGH Investigator Completed MATHUR Technical evaluation of Cement Concrete Road connecting village Gawda 107 Tribal Area Devlopment Department Investigator Completed ARUN GAUR Meena 0/00 km to 1/800 km distt Karouli 108 Mix design of M25 and M30 grades AGE B/R - 1 (P) Jaipur Investigator Completed Sandeep Shrivastava Vetting of structural design and drawing for providing cover over Nallah 109 Airport Authority of India Investigator Completed Sandeep Chaudhary at Jaipur Airport The Project Director, J.R. Toll Road Private 110 Unevenness Index for Km. 246 + 300 to 293 + 075 (52 Km.) on NH-11 Co-Investigator Completed ARUN GAUR Limited 1000111227;Proof Checking of Box Culverts across IOC pipe Line at 111 Govt Co-Investigator Completed PV Ramana PratapNagar Jaipur Proof Checking of Various Design and Drawings of Over Head Water 112 Larsen & Toubro Investigator Completed Sandeep Chaudhary Tanks under Rajasthan Rural Water Supply and Fluorsis Mitigation Appraisal of DPRs of Alwar and Bharatpur water supply and sewerage Excel Tech Consultancy and Projects Pvt. Ltd. - 113 Co-Investigator Completed GUNWANT - SHARMA projects ExcelTech PConsultancy and Projects APPRAISAL OF DPR OF ALWAR AND BHARATPUR WATER SUPPLY EXCEL TECH CONSULTANCY AND PROJECTS PVT. YOGESH PRAKASH 114 Investigator Completed SEWERAGE PROJECTS LTD. MATHUR 115 1000110931;Revised proff checking of bottling plant Govt. Co-Investigator Completed PV Ramana

116 Quality Assessment of ongoing/completed works. RHB DIV-1,Jaipur - RHB DIV - 1 JAIPUR Co-Investigator Completed Pawan Kalla Proof checking of structural design and drawings of Thapara Bridge on Executive Engineer, P.W.D. Dn – Garhi 117 Investigator Completed RAJESH GUPTA Anas River in Banswara on Chordi Choraha Kuba Anandpuri Road Banswara Testing of Coarse Aggregates and Fine Aggregates for Petrographic 118 PNC Rajasthan Highway Projects Limited Investigator Completed Sandeep Chaudhary Analysis (05 types of samples) Proof Checking and Vetting the consultancy of restoration of exsisting 119 Executive Engineer 5, JDA Jaipur Investigator Completed Sandeep Chaudhary bridge approaches at Ganda Nala, Gopal Pura Bye Pass, Jaipur 120 DESIGN OF OVERLAY THICKNESS FOR ROADS OF I/A PPMP AJMER RIICO LTD. AJMER Investigator Completed JINENDRA KUMAR JAIN Consultancy SN Title Sponsoring Agency Role Faculty Name Status 121 1000111345;feasibility study of ESRs at Pali Industry Co-Investigator Completed PV Ramana Tata Projects Limited - TPL SUGC Consortium 122 Vetting of drawing and design of check dam and profile wall Co-Investigator Completed GUNWANT - SHARMA Jaipur YOGESH PRAKASH 123 VETTING OF DRAWING AND DESIGN OF CHECK DAM AND FROFILE WALL TPL SUGC CONSORTIUM Investigator Completed MATHUR 124 1000111373;Proof Checking of Building RSETI-Dausa Govt. Co-Investigator Completed PV Ramana job Mix Formula for GSB and WMM from BOP Paharpur to Bobiya (BP 125 CPWD, Jammu Investigator Completed ARUN GAUR 01 to BP 106) 126 Job mix for DBM & BC RIICO Ltd. Bhilwara - Pur Road Bhilwara Co-Investigator Completed Pawan Kalla M/s. Ganpati Pipe Industries, Ajmer - Gagwana 127 Testing of box culvert at site Co-Investigator Completed Pawan Kalla Ajmer Design and drawing of Panchayat Samiti Bhawan: Project No. 128 Panchayat Samiti Lavana - Lavana, Dist. Dausa Investigator Completed Mahesh Kumar Jat 1000111324 Panchayat Samiti Pahari, Bharatpur - Office of 129 Design Drawing of Panchayat Samiti Bhawan: Project No. 1000111323 Investigator Completed Mahesh Kumar Jat Panchayat Samiti, Pahari, Dist. Bharatpur Consultancy monitoring and stage verification for work of planning Managing Director Rajasthan State Warehousing 130 Co-Investigator Completed RAJESH GUPTA designing and execution of modren warehouseing facility at Corporation - Rajasthan State warehousing 131 QUALITY ASSESSMENT OF ONGOING/COMPLETED WORKS RHB DIV-1 JAIPUR Investigator Completed JINENDRA KUMAR JAIN

132 TECHNICAL ADVICE FOR QUALITY ASSESSMENT RHB DIV-V JAIPUR Investigator Completed JINENDRA KUMAR JAIN

133 Benkel beam deflection study, Bump Integrator and axle load test Ms/ VARAHA INFRA LTD., Co-Investigator Completed ARUN GAUR

134 JOB MIX FOR DBM &LE BC RIICO LTD. BHILWARA Investigator Completed JINENDRA KUMAR JAIN Job Mix design for GSB and WMM 135 XEN, CPWD, Jammu Co-Investigator Completed Sandeep Shrivastava

136 TESTING OF BOX CULVERT AT SITE M/S GANPATI PIPE INDUSTRIES AJMER Investigator Completed JINENDRA KUMAR JAIN Consultancy and Mix design of various works at Balotara 137 RIICO Co-Investigator Completed Sandeep Shrivastava VBE Projects PVT. LTD. - VBE Projects PVT. LTD. 138 Twi STP projects 3 MLD at Bhiwadi Co-Investigator Completed GUNWANT - SHARMA Mumbai YOGESH PRAKASH 139 STP PROJECT 3 MLD AT BHIWADI VBE PROJECTS Investigator Completed MATHUR 140 Design of Road from Phoolbagh Chowk to Harchandpur T Junction RIICO Investigator Completed ARUN GAUR Consultancy SN Title Sponsoring Agency Role Faculty Name Status 141 12.3 MLD STP Vetting of drawings and design Advent Envirocare Technology - Ahmaddabad Co-Investigator Completed GUNWANT - SHARMA PROOF CHECKING OF STRUCTURAL DESIGN AND DRAWING OF 142 PROJECT DIRECTOR MHK AT PVT (JV) Co-Investigator Completed JINENDRA KUMAR JAIN SUBSTRUCTURES AND FOUNDATIONS OF RGS DETOUR IN CONNECTION YOGESH PRAKASH 143 12.3 MLD STP VETTING OF DRAWING AND DESIGN ADVENT ENVIROCARE TECHNOLOGY Investigator Completed MATHUR 144 Concrete Mix Design for M15, M35, M45 and M50 grade Simplex Infrastructures Limited New Delhi Investigator Completed Sandeep Chaudhary Consultancy monitoring and stage verification for work of planning 145 rajasthan state warehousing corporation Investigator Completed Ravindra Nagar designing and execution of modren warehouseing facility at 1000111374;Proof checking of academic block at Agriculture college 146 Industry Co-Investigator Completed PV Ramana Jobner & Kumher Technical evaluation work of Eklavya Model Residential School at Bassi 147 Tribal Area Development Department, Udaipur Co-Investigator Completed Nivedita Kaul district Jaipur Vetting of Structural Design of 1.5 MLD STP of Bagrana Kacchi Basti M/s R4 Systems C-106, Gokul Path, Vaishali 148 Investigator Completed Shiv Dayal Bharti under Rajiv Avas Yojana, Agra Road, Jaipur Nagar Jaipur-302021 149 Design of main roads at I/A Ramchandrapura (Sitapura Ext.), Jaipur RIICO Co-Investigator Completed ARUN GAUR DESIGN OF MAIN ROADS AT I/A RAMCHANDRAPURA (SITAPURA ETX.) THE REGIONAL MANAGER RIICO SITAPURA I/A 150 Co-Investigator Completed JINENDRA KUMAR JAIN JAIPUR JAIPUR 151 Road safety audit of sign boards and hoardings at Sri Ganganagar Nagar Vikas Nyas, Sri Ganganagar Co-Investigator Completed ARUN GAUR technical report of inspection and quality assessment of damage PSC rajasthan urban drinking water sewerage and 152 Investigator Completed Ravindra Nagar Girder at LC 165 Saran Nagar Jodhpur infrastructure corporation limited 153 Consultancy for Mix Design of CC and other works at Balotara RIICO ltd Investigator Completed ARUN GAUR

154 Vetting of drawing and design 1.5 MLD STP Bhiwadi L&T Jaipur - Jaipur Co-Investigator Completed GUNWANT - SHARMA YOGESH PRAKASH 155 VETTING OF DRAWING AND DESIGN OF 1.5 MLD STP BHIWADI L & T JAIPUR Investigator Completed MATHUR 156 Safety Audit of Bagundi-Barmer highway GR Infra Projects Ltd. Co-Investigator Completed ARUN GAUR

157 Proof checking of ESRs, CWRs, Pump House, Inspection Bunglow SPML Infra Limited - SPML House Co-Investigator Completed GUNWANT - SHARMA M.L Singhi Director Shree Gautam Construction SURESH KUMAR 158 Proof checking of design and drawings of R.E. wall Investigator Completed Co. Ltd - M.L Singhi Director Shree Gautam TIWARI YOGESH PRAKASH 159 VETTING OF DRAWING AND DESIGN OF STP AT ALWAR MALVIKA TECHNICAL SERVICES Investigator Completed MATHUR YOGESH PRAKASH 160 PROOF CHECKING OF ESR, CWR PUMP HOUSE INSPECTION BUNGLOW SPML INFRA LIITED Investigator Completed MATHUR Consultancy SN Title Sponsoring Agency Role Faculty Name Status Proof checking of design and drawing of ROB at CH. 149.900 of NH-758 Design Director, M/s Zignego Company Inc. & 161 Investigator Completed RAJESH GUPTA of NH-758 (Railway Km 99/02-03) between Shyampura – GHV(India) Pvt. Ltd. (JV), B.O. : 13-A-13, Bapu Inspection for quality control during the execution of works related to Mr. K.K. Kothari, Sr. Regional Manager, RIICO, 162 Co-Investigator Completed GUNWANT - SHARMA water supply scheme and rain water harvesting (04 Nos. visits) at site for Bhiwadi Proof checking of structural design and drawing of ROB at Rangpur, Kota M/s Pioneer Infra Consultant Pvt. Ltd. Opposite 163 Investigator Completed RAJESH GUPTA on LC No. 1-X Narayan Niwas, Gopalpura Bypass, Jaipur Testing of construction material and design of mix cement concrete M- M/s Dayanand Contractor VPO Khranti Distt. SURESH KUMAR 164 Investigator Completed 15 and M-35 grade Rohtak Haryana - M/s Dayanand Contractor VPO TIWARI Consultancy for proof checking of drawing and design of office building, SURESH KUMAR 165 RAO CONSTRUCTION COMPANY , Haryana Investigator Completed masonry structure ground floor TIWARI YOGESH PRAKASH 166 PROOF CHECKING OF DRAWINGS OF PRECAST MANHOLES GRG INFRASTRUCTURE Investigator Completed MATHUR RIICO Alwar - RIICO Mothi Dungar Road Alwar - 167 Oen drain Matsya Industrial Area Marble Mandi, Alwar Co-Investigator Completed GUNWANT - SHARMA 301001 YOGESH PRAKASH 168 OPEN DRAIN AT MATSYA INDUSTRIAL AREA ALWAR RIICO ALWAR Investigator Completed MATHUR 169 Consultancy for 3rd party inspection of BRTS-IIIA & IIIB works Executive Engineer (Project-1) JDA Co-Investigator Completed ARUN GAUR proof checking of Design and Drawing of over head water tank cap. 200 SGB Infra Ltd Ganga colony Sikar Raod, SURESH KUMAR 170 Investigator Completed KL/26 m staging at Kishangarh Airport, Kishangarh Laxmangarh - SGB Infra Ltd Ganga colony Sikar TIWARI proof checking of Design and Drawing of over head water tank cap. 200 SGB Infra Ltd Ganga colony Sikar Raod, SURESH KUMAR 171 Investigator Completed KL/26 m staging at Kishangarh Airport, Kishangarh. Laxmangarh - SGB Infra Ltd Ganga colony Sikar TIWARI 172 1000111252; Proof checking of RoB (Bassi) LC-200 Govt. Co-Investigator Completed PV Ramana Consulting Engineers Group Ltd. - 6 B 3,Jai 173 Testing of Soil, GSB and WMM samples Co-Investigator Completed Pawan Kalla Narayan Vyas Colony, 174 1000111372 Proof checking of RoBs at LC18,30,39,53 Govt. Co-Investigator Completed PV Ramana

175 TESTING OF SOIL, GSB AND WMM SAMPLES CONSULTING ENGINEERS GROUP LTD. Investigator Completed JINENDRA KUMAR JAIN

176 PROOF CHECKING FOR D&D OF ROBs AND HFL BRIDGES THOUGHTS CONSULTANTS JAIPUR PVT LTD Co-Investigator Completed ARUN GAUR Technical examination of clear water reservoir at Sector 2, Malviya The Executive Engineer, PHED, City Dn-III(S) 177 Investigator Completed RAJESH GUPTA Nagar, Jaipur Pratap Nagar, Jaipur YOGESH PRAKASH 178 VETTING OF STORAGE YARD DESIGN TPL SUGC CONSORTIUM Investigator Completed MATHUR 179 Safety audit of Suratgarh Sriganganagar NH-62 total Km. 68.55 G.R. Infra Projects Ltd. Co-Investigator Completed ARUN GAUR Proof Checking of Structural Design and Drawing of High Level Bridge on M/s Brahm Prakash Modi, PWD Contractor C/0 180 Investigator Completed Sandeep Chaudhary Rive Chandrawati in km51 Executive Engineer, PWD Div. Khetri Consultancy SN Title Sponsoring Agency Role Faculty Name Status Consultancy for design and drawing of 750 kL CWR and Pump House M/S. Yadav Construction Company Dantra SURESH KUMAR 181 Investigator Completed Room and geotechnical investigation (SBC test) in MNIT Campus Jaipur Ramgarh (Sikar) Raj. - M/S. Yadav Construction TIWARI Concrete Mix Design (M35 and M40) and other relevant tests for 182 Simplex Infrastructures Limited, Jaipur Investigator Completed Sandeep Chaudhary construction of elevated road from soadala ti junction to LIC Office near Consultancy charges for testing of GSB, WMM,DBM-II, M-40 Grade Mix 183 PWD Investigator Completed ARUN GAUR design, and Bituminous Concrete for Dausa to Kuchaman (SH-02) 184 Consultancy for Civil Works (Road and Drainage) at Industrial Area Silora RIICO Investigator Completed ARUN GAUR

185 DESIGN OF OVERLAY THICKNESS FOR ROAD WORK RIICO JAIPUR Investigator Completed JINENDRA KUMAR JAIN NHAI, PIU, Chittorgarh - Site Office, 6-A-1, RC 186 Testing of BC, DBM, Core & Aggregate Samples Co-Investigator Completed Pawan Kalla Vyas Colony 187 Stability and serviceability issues at MIDB hostel at MGD Girls School MGD Girls School Co-Investigator Completed Nivedita Kaul

188 Structural Audit of ESIC Dispensary, Bhilwara Dy. Director (PMD), ESIC, Jaipur Co-Investigator Completed Nivedita Kaul Vetting of RE wall for construction of ROB with approaches in Lieu of LC Landmark MTRL Pvt. Ltd. Mansarover Jaipur - SURESH KUMAR 189 Investigator Completed No.195-B on Nadoti-Shree Mahaveer Ji- Hindaun Road MDR-67. Landmark MTRL Pvt. Ltd. Mansarover Jaipur TIWARI Proof checking of FWD test and witnessing for Chhapra-Gopalganj 190 GR Infra Projects Ltd. Co-Investigator Completed ARUN GAUR section of NH-85 & Chhapra-Rewaghat-Muzzafarpur of NH- 102 191 INSPECTION OF ROB AT HINDAUN AT LC No 201 ircon international limited Investigator Completed Ravindra Nagar Nagarpalika Neemkathana Sikar - Nagapalika 192 Vetting of DPR for wastewater treatment plant at Neemkathana Co-Investigator Completed GUNWANT - SHARMA Neemkathana Sika Proof checking of designs and drawings of ROB at Km. 23/11-12 Chief Project Coordinator, Sadbhav Engineering 193 Investigator Completed RAJESH GUPTA (Shahdra-Shamli Section), at RLY Km 33.750(EPE Ch. 44+975), at RLY Km Ahmedabad-380006 Proof checking of Structural Drawings and Design of RCC 18 m span Shri Ajay Gupta Sr. Regional Manager, RIICO Ltd., 194 Investigator Completed RAJESH GUPTA Bridge at Ghiloth Ghiolth Soil Investigations for ESR/CWR at Bonli, Sawai Madhopur and proof M/s Balaji Construction Co., Anand Palace, 195 Investigator Completed RAJESH GUPTA checking of structural designs and drawings of ESR and CWR Narnadi, Jodhpur Proof checking of design and drawings of ROB at km 23/11-12 (shahdra- 196 Sadbhav Engineering Limited Co-Investigator Completed VINAY AGRAWAL shamli section) at Rly km 33.750 (EPE Ch. 44+975) at Rly km 33.750 & at Mix Design (M20 to M35) and Proof Checking of Design & Drawings of M/s Deem Construction Company Pvt. Ltd., 197 Investigator Completed VINAY AGRAWAL OHSR CWR 150,300,350,450,550,600,770,900,1210,1650,1850 KL at Jaipur Strength (Rebound hammer testing of about 800 columns) /stability Mr. R.R. Soni, Member, Board of Management, 198 Co-Investigator Completed RAJESH GUPTA analysis of RCC structure [Superspeciality Hospital at MGH, Jaipur] Mahatama Gandhi University of Medical Sciences Application of Geo-spatial Techniques for Watershed Development and Department of Watershed Development and Soil 199 Investigator Completed Mahesh Kumar Jat Management; Project No. 1000110928 Conservation, Govt. of Rajasthan - Pant Kishi Preparation of Structural Drawings for Construction of Incubation Centre The Executive Engineer, MNIT Project Division, 200 Investigator Completed VINAY AGRAWAL at MNIT, JLN Marg, Jaipur CPWD, Jaipur Consultancy SN Title Sponsoring Agency Role Faculty Name Status A B Enterprises Pvt. Ltd. J.V - Kaveri Path, 201 Testing of materials Co-Investigator Completed GUNWANT - SHARMA Mansharobar 202 Mix Designs for Ultratech Cement Site at Kotputli KBM Construction Pvt. Ltd., Ahmedabad Investigator Completed Sandeep Chaudhary

203 TESTING OF BC,DBM,CORE & AGGREGATE SAMPLES NHAI,PIU,CHITTORGARH Investigator Completed JINENDRA KUMAR JAIN

204 TESTING OF BC& DBM CORE SAMPLES & BITUMEN FRICHMANN PRABHU INDIA PVT. LTD. BHILWARA Investigator Completed JINENDRA KUMAR JAIN

205 Inspection of three damaged OHSR and one CWR in Alwar City Executive Engineer, PHED, Divsion, Alwar Investigator Completed Sandeep Chaudhary Proof checking of design and drawing of water filtration plant of M/S Shri Mohangarh Construction Company 55, SURESH KUMAR 206 Investigator Completed capacity 1000 m3/day at Jaisalmer under Commander Work Engineer 56-Shanti Nagar DCM, Ajmer Road Jaipur - M/S TIWARI Proof Checking of two RoBs on Khimel-Falna Section at Madhar Palanpur Mahendra Kumar 207 Ajay Chetan (JV) Investigator Completed Ajmer section Shrimali Proof checking of design and drawing of ROB at CH. 1+440 of Northern Design Director, Ravi Infrabuild Projects Pvt. Ltd., 208 Investigator Completed RAJESH GUPTA Kota Bypass (Railway Km 9/16-17) both side nearest railway station 95, Hiran Magri, Sector 11, Udaipur Consultancy charges for the Road Safety of Mega Highways for Phase-I, 209 IL&FS Transportation Networks Ltd. Jaipur Co-Investigator Completed ARUN GAUR II, and III. Widening and strengthening of Dausa to Kuchman via Lawan-Tunga- 210 Executive Engineer PWD Co-Investigator Completed ARUN GAUR Chaksu-Phagi-Dudu-Sambhar (SH-02) Km. 25/0 to 54/0 Design of Head Regulator and X-regulator at Fakirwali and Sulemanki Executive Engineer, RWSRP Div.Sriganganagar, 211 Investigator Completed Mahender Choudhary Head Govt. of Rajasthan design of head regulator and cross regulator at fakirwali and sulemaanki 212 XEN RWSRP Sriganganagar Co-Investigator Completed SUDHIR KUMAR head stability analysis of RCC structures as mentioned in the letter for WPIL- WPIL-SMS JV 84/1A, Topsia Road (South), 3rd 213 Investigator Completed VINAY AGRAWAL SMS JV at Bhiwadi Floor, Trinity Plaza, KOLKATA-700046 Geotechnical Investigation report for construction of proposed Executive Engineer, M.N.I.T Pariyojna Madal SURESH KUMAR 214 Investigator Completed Incubation Centre near Civil Engineering Department CPWD, Jaipur - Executive Engineer, M.N.I.T TIWARI eotechnical Investigation report for construction of proposed Incubation Executive Engineer, M.N.I.T Pariyojna Madal SURESH KUMAR 215 Investigator Completed Centre near Civil Engineering Department CPWD, Jaipur - Executive Engineer, M.N.I.T TIWARI Training cum Orientation Programme on DPR 216 DWDSC, Govt. of Rajasthan - Pant Krashi Bhawan, Jaipur Investigator Completed Mahesh Kumar Jat Preparation, Estimation and Geo-hydrology 217 Appraisal of Technical Estimate for Municipal Council Building Bhiwadi Commissioner, Municipal Council, Bhiwadi Co-Investigator Completed Nivedita Kaul Mix Design (M30), Proof checking of Structural Drawing of RCC SR 500kL 218 M/s Hari Mohan Meena Contractor, Dausa Investigator Completed VINAY AGRAWAL and SPT at UWSS Jamdoli, Jaipur Proof Checking of design and drawing of structures of work of regional 219 L & T Construction Investigator Completed Sandeep Chaudhary water supply scheme of 334 villages of Banswara and Pratapgarh district 220 Quality assessment and Inspection of ongoing works Rajashthan Housing Board Investigator Completed ARUN GAUR Consultancy SN Title Sponsoring Agency Role Faculty Name Status Designing, and drawing of Cross Regulator at RD 583.250 of Indira M/s Daya Nand Contractor VPO Kairainti Distt SURESH KUMAR 221 Investigator Completed Gandhi Feeder Rohtak - M/s Daya Nand Contractor VPO TIWARI A B Enterprises & Deem Construction Co. 222 Consultancy for work of Rajgarh water supply project Co-Investigator Completed GUNWANT - SHARMA Pvt. Ltd. JV - 21/80, MLA Quarter, Kaveri Path A B ENTERPRISES & DEEM CONSTRUCTION CO. YOGESH PRAKASH 223 CONSULTANCY FOR WORK OF RAJGARH WATER SUPPLY PROJECT Investigator Completed PVT. LTD. JAIPUR MATHUR Consultancy charges for design of overlay thickness for roads of I/A 224 RIICO Ltd. Co-Investigator Completed ARUN GAUR Sardarsahar, Proof checking of structural design and drawings for different structures STS (P) Ltd. Jaipur. - Shri Gopal Lal Sharma SURESH KUMAR 225 Investigator Completed under RWSS of 283 villages of Deed & Nagar, Tehsil Deeg & Nagar to Authorised Signatory STS TIWARI PROOF CHECKING OF STRUCTURAL DESIGN AND DESIGN OF RCC 18 SHRI AJAY GUPTA, SR. REGIONAL MANAGER 226 Co-Investigator Completed JINENDRA KUMAR JAIN METER SPAN BRIDGE AT GHILOTH RIICO LTD. GHILOTH Proof checking of designs and drawings of ROB at Km. 23/11-12 227 Chief Project Coordinator Sadbhav Engineering Co-Investigator Completed Sandeep Chaudhary (Shahdra-Shamli Section), at RLY Km 33.750(EPE Ch. 44+975), at RLY Km KUNAL STRUCTURES(I) PVT. LTD. C/O GM (TECH) 228 TESTING OF DENSITY AND BITUMEN CONTENT Investigator Completed JINENDRA KUMAR JAIN PROJECT DIRECTOR NHAI RHB,DIV-5,Jaipur - RHB, DIV V, Pratap Nagar, 229 Job Mix for GSB,WMM Co-Investigator Completed Pawan Kalla Sanganer, Jaipur RIICO Bais Godam, Jaipur (Rural) - RIICO Bais 230 Design of CC Pavement Co-Investigator Completed Pawan Kalla Godam, Jaipur (Rural) 231 Technical advice for road work. RIICO,BHILWARA - RIICO,BHILWARA Co-Investigator Completed Pawan Kalla Montecarlo Limited - 706, Shop Building, Near 232 Proof checking of STP and SPS at Suratgarh and Bhadara Co-Investigator Completed GUNWANT - SHARMA Municipal Market 233 TECHNICAL GUIDANCE FOR CIVIL WORKS RIICO SIKAR Investigator Completed JINENDRA KUMAR JAIN Montecarlo Limited, 706-Ship Building, Near 234 Proof checking of STP and SPS at Suratgarh and Bhadra Co-Investigator Completed VINAY AGRAWAL Municipal Market Proof checking of design and drawing of high level bridge from Hisampur 235 Executive Engineer, PWD, Division-Todaraisingh Investigator Completed Sandeep Chaudhary to Baghera on Dai river TECHNICAL ADVICE FOR IMPROVEMENT OF HALDIGHATI MARG PRATAP 236 RAJASTHAN HOUSING BOARD DIVISION-V Investigator Completed JINENDRA KUMAR JAIN NAGAR SANGANER JAIPUR 237 1000111375 Proof Checking of CWR Govt. Co-Investigator Completed PV Ramana THOUGHTS CONSULTANTS JAIPUR PVT LTD - SURESH KUMAR 238 PROOF CHECKING FOR D&D OF ROBs AND HFL BRIDGES Investigator Completed JAIPUR TIWARI THOUGHTS CONSULTANTS JAIPUR PVT LTD - SURESH KUMAR 239 PROOF CHECKING FOR D&D OF ROBs AND HFL BRIDGES Investigator Completed JAIPUR Comments: TIWARI Consultancy for testing and verification of the work related with area Executive Engineer Ajmer Kendriya Mandal 240 Co-Investigator Completed GUNWANT - SHARMA development of SAIL Warehouse Kota executed by CPWD under Ajmer CPWD Ajmer Consultancy SN Title Sponsoring Agency Role Faculty Name Status 241 DESIGN OF CC PAVEMENT RIICO BAIS GODAM JAIPUR Investigator Completed JINENDRA KUMAR JAIN

242 JOB MIX FOR GSB WMM RHB DIV-5 JAIPUR Investigator Completed JINENDRA KUMAR JAIN Proof checking of Structural Design and Drawings of Intake well, 11.6 Milind Manohar Gunde DGM (Proj) Besco 243 Investigator Completed RAJESH GUPTA MLD WTP and OHSR to be constructed at Morena, MP Limited (wagon division) Joura (MP) Proof checking of structural design and drawings of intake well 11.6MLD 244 BESCO limited Co-Investigator Completed VINAY AGRAWAL WTP and OHSR to be constructed at Morena, MP 245 TECHNICAL ADVICE FOR ROAD WORK RIICO BHILWARA Investigator Completed JINENDRA KUMAR JAIN Nagar Parishad, Churu - Commissioner, Nagar 246 Vetting of DPR of sewerage project Phase I under Amrut Co-Investigator Completed GUNWANT - SHARMA Parishad Testing of Coarse Aggregates from five different sources, fine aggregate 247 TPL SUCG Consortium Investigator Completed Sandeep Chaudhary and design mix (M25) YOGESH PRAKASH 248 VETTING OF DPR OF SEWERAGE PROJECT PHASE 1 UNDER AMRUT NAGAR PARISHAD CHURU Investigator Completed MATHUR REHABILITAION AND UPGRADATION OF BAHRAICH TO RUPAIDHA 249 GR INFRAPROJECTS LTD Co-Investigator Completed ARUN GAUR SECTION OF NH-28C 99.000 TO 150.200 250 JOB MIX FOR GSB/WBM/WMM RESIDENT ENGINEER DIV-V RHB JAIPUR Investigator Completed JINENDRA KUMAR JAIN

251 TESTING OF PRECAST RCC BOX CULVERTS RIICO UDAIPUR Investigator Completed JINENDRA KUMAR JAIN PROJECT DIRECTOR NHAI C/O KUNAL STRUCTURE 252 TESTING OF DBM GRADE-II AND BC GRADE-II CORES Investigator Completed JINENDRA KUMAR JAIN INDIA P LTD. 253 DESIGN OF JOB MIX FORMULA FOR BM AND SDBC RIICO BHILWARA Investigator Completed JINENDRA KUMAR JAIN Proof checking of revised foundation design and drawings of ROB at Project Coordinator, Sadbhav Engineering JV 254 Investigator Completed RAJESH GUPTA Railway Level crossing no. A-117-A/2 at Km. 142/2-3 between Rampura Patel Infrastructure Pvt. Ltd Testing of Steel Bars of six number of dia 255 Executive Engineer, PHED, Project Divsion, Bassi JaipurCo-Investigator Completed Sandeep Shrivastava P C SNEHAL Construction Company Stadium 256 Vetting of design and drawing under package I and III Co-Investigator Completed GUNWANT - SHARMA Road AMDAWAD P C Snehal Construction Company, Stadium 257 Vetting of Design and Drawing under Package-I and III Co-Investigator Completed VINAY AGRAWAL Road, Amdavad consultancy report on collapse of RCC slab of Bridge on Kharka River department of mines and geology, govt. of 258 Investigator Completed Ravindra Nagar ,Salumber Khir ki choki Road rajasthan, udaipur Vetting of design and drawing of work under package IV for Nimbhera, DRA - BIPL Joint Venture - C- 1, Ugati Lakeview, 259 Co-Investigator Completed GUNWANT - SHARMA Bari-Sadri, -Sanwar and Kushalgarh Science City Road VETTING OF DESIGN AND DRAWING OF WORK UNDER PACKAGE IV YOGESH PRAKASH 260 DRA-BIPL Investigator Completed NIMBAHERA ETC. MATHUR Consultancy SN Title Sponsoring Agency Role Faculty Name Status YOGESH PRAKASH 261 PROOF CHECKING OF ESR GAMMON INDIA LTD. Investigator Completed MATHUR 262 Vetting of drawing and design of 100 KL OH Tank at Dehradun N K Construction - Prem Puri Muzzafar Nagar Co-Investigator Completed GUNWANT - SHARMA VETTING OF DRAWING AND DESIGN OF 100 KL OH TANK AT YOGESH PRAKASH 263 N K CONSTRUCTIONS MUZAFFAR NAGAR Investigator Completed DEHARADUN MATHUR Testing of Paver Sample for Compressive Strength, Water Absorption 264 Bharat Petroleum Co-Investigator Completed Sandeep Shrivastava and Abrasion resistance Vetting of design and drawing of work under package-IV for Nimbahera, DRA-BIPL Joint Venture- C-1, Ugati Lakeview, 265 Co-Investigator Completed VINAY AGRAWAL Badi-sadri, Fatehnagar-Sanwar and Kushalgarh Science City Road SR. REGIONAL MANAGER, VAISHALI NAGAR. 266 DESIGN OF C.C. ROADS AT I/A BEAWAR PHASE 1 & 3 Co-Investigator Completed JINENDRA KUMAR JAIN RIICO LTD. AJMER 305001 proof check for design and drawings of foot over bridges at kosli and 267 rail vikash nigam limited Investigator Completed Ravindra Nagar chakrani dadri railway stations Nagaur Parishad Nagaur - Nagaur Parishad 268 Appraisal of DPR of Sewerage/Water supply of Nagaur under Amrut Co-Investigator Completed GUNWANT - SHARMA Nagaur YOGESH PRAKASH 269 APPRAISAL OF DPR OF SEWERAGE/WATER SUPPLY OF NAGAUR NAAR PARISHAD NAGAUR Investigator Completed MATHUR Saurabh Construction - Frirnds Colony Rajeev 270 Appraisal of DPR of CETP at Kartpura Co-Investigator Completed GUNWANT - SHARMA Nagar, Dabwali Saurabh Construction, Friends Colony, Rajeev 271 Appraisal of DPR of CETP at Kartarpura Co-Investigator Completed VINAY AGRAWAL Nagar, Dabwali YOGESH PRAKASH 272 APPRAISAL OF DPR OF CETP KATARPURA SAURABH CONSTRUCTION Investigator Completed MATHUR 273 Appraisal of DPR Unsewered Area of Jaipur Jaipur Development Authority-JDA, Jaipur Co-Investigator Completed GUNWANT - SHARMA Commissioner Sawai Madhopur PWD Sawai 274 Appraisal of DPR Ranthambore Amrut Yojana Co-Investigator Completed GUNWANT - SHARMA madhopur - Commissioner Sawai Madhopur YOGESH PRAKASH 275 APPRAISAL OF DPR RANTHAMBORE AMRUT COMMISSIONER SAWAI MADHOPUR Investigator Completed MATHUR Design and Drawing for Modernisation of Pahari Dam; Project No. Irrigation Construction Division, Mauranipur 276 Investigator Completed Mahesh Kumar Jat 1000110677 Jhansi, UP Testing of Steel Bars of seven sizes 277 Melodia Co-Investigator Completed Sandeep Shrivastava DEVELOPMENT OF INFRASTRUCTURAL AT PROPOSED IND AREA KAROLI 278 KUNAL STRUCTURE INDIA PVT. LTD. Co-Investigator Completed JINENDRA KUMAR JAIN BHIWADI ALWAR 279 load testing of Ridhhi siddhi High Level Bridge jaipur Development Authority - JDA, Jaipur Co-Investigator Completed RAJESH GUPTA Appraisal of Technical Estimate 280 Office of the Municipal Council Bhiwadi (Alwar) Co-Investigator Completed Sandeep Shrivastava for Municipal Council Building Consultancy SN Title Sponsoring Agency Role Faculty Name Status Appraisal of Technical Estimate for Municipal Council Building Bhiwadi 281 Office of the Municipal Council Bhiwadi (Alwar) Co-Investigator Completed Sandeep Shrivastava Suitability of site for construction of OHSR, proof checking of design & The Executive Engineer, PHED, City Dn. 282 Investigator Completed RAJESH GUPTA drawing of ESR of capacity 1000kL at Ayappa Mandir, Mahaveer Nagar, – III(S), Pratap Nagar vetting of Structural Design & Drawing of a Modern School building 283 Executive Engineer Public Works Division. Aklera Investigator Completed Shiv Dayal Bharti at Manohar Thana (Jhalawar) Proof Checking of structural design and drawings of infrastructure for SU- 284 PASCI INFRA CONSULTANTS (P) LTD Investigator Completed Sandeep Chaudhary 30 MKI SQNS AF, ASF HALWARA (Tender IV) Proof Checking of Various designs and drawings of Rajasthan Rural Larsen & Toubro Limited. Ltd., Chennai 285 Investigator Completed Sandeep Chaudhary Water Supply and Mitigation Project (India) Consultancy for inspection of construction of wastewater treatment Municipal Council, Chittorgarh - Commissioner, 286 Co-Investigator Completed GUNWANT - SHARMA plant in Chittorgarh Municipal Council, Chittorgarh YOGESH PRAKASH 287 WASTEWATER TREATMENT PLANT CHITTORGARGH MUNICIPAL COUNCIL CHITTORGARGH Investigator Completed MATHUR Vetting of Structural Drawings of Precast Box Culverts (600x600, M/s Kunal Structure (India) Pvt. Ltd., Ganga Park, 288 Investigator Completed VINAY AGRAWAL 1000x1000, 1250x1250, 1500x1500 & 2000x2000) and Drains (450x450, Street No.-2, OppSanskruti Apartment, Near Proof Checking of Rejuvenation / Renovation of Different Units of Canal 289 Degremont Pvt. Ltd. Co-Investigator Completed Nivedita Kaul based Rural Water Supply schemes of Districts Hanumangarh, Sri Compressive strength of concrete mix in specified ratio 290 Design Inc Co-Investigator Completed Sandeep Shrivastava

291 Load Testing of Durgapura Elevated Road Executive Engineer,Project-1,JDA - JDA, Jaipur Co-Investigator Completed RAJESH GUPTA Consultancy for soil testing (Geotechnical Investigation) at Sanchore for SPML Infra Limited - SPML Infra Limited Plot No. SURESH KUMAR 292 Investigator Completed construction of RWR 65, Sector-32, Institu TIWARI Consultancy for soil testing (Geotechnical Investigation) at Sanchore for SPML Infra Limited - SPML Infra Limited Plot No. SURESH KUMAR 293 Investigator Completed construction of RWR 65, Sector-32, Institu TIWARI Appraisal of sewage works in 3 Project town namely Makrana, 294 RUIFD Corp. Lalkothi Jaipur - Jaipur Co-Investigator Completed GUNWANT - SHARMA Deedwana and Fatehpur shekawati YOGESH PRAKASH 295 SEWAGE WORKS MAKARANA DEEDWANA FATEHPUR RUIFDCO JAIPUR Investigator Completed MATHUR 296 overlay design of 60.0 m wide main road of I.G.Nagar Jagatpura Jaipur Rajasthan Housing Board Investigator Completed ARUN GAUR

297 Design of Cement Concrete Road, Kishangarh RIICO Investigator Completed ARUN GAUR

298 stability analysis of RCC structures as mentioned in the letter The Executive Engineer, IPIU, RUSDIP, - CHURU Co-Investigator Completed GUNWANT - SHARMA Proof checking of structural drawings of faculty staff qtrs. T-IV (24 Nos.) Executive Engineer Central University of Haryana 299 Co-Investigator Completed Sumit Khandelwal and T-II (48 Nos.) Project Division C.P.W.D. Executive Engineer, Water Resources Div. North, 300 Drawing & Design of X and Head Regulator at Netewali Head RD 82.700 Investigator Completed Mahender Choudhary Sriganganagar, Govt. of Rajasthan Consultancy SN Title Sponsoring Agency Role Faculty Name Status 301 design of cross and head regulator at natewali head XEN,WRD north,sriganganagar Co-Investigator Completed SUDHIR KUMAR Appraisal of Steel Structures erected at Fourth Floor of IPD Block for Santokba Durlabhji Memorial Hospital cum 302 Co-Investigator Completed Nivedita Kaul ICUs Medical Research Institute Concrete Mix designs of M-15, M-25, M-30 and M-35 and Testing of M/s PL Raju Construction Ltd, - Babra Road, 303 Co-Investigator Completed Urmila Brighu water Beawar, Distt. Ajmer Executive Engineer, Water Resources Div. South 304 Drawing and Design of Dabla Head, PS head and RD 116.700 Investigator Completed Mahender Choudhary Sriganganagar, Govt. of Rajasthan 305 drawinmg and design of dabala head PS HEAD and RD116 XEN,WRD,SOUTH SRIGANGANAGAR Co-Investigator Completed SUDHIR KUMAR

306 Design of Ganda Nallah from Karatarpura to Amanishah Nallah Jaipur Developemnt Authority - JDA, Jaipur Co-Investigator Completed GUNWANT - SHARMA Vetting of Structural design of group housing project Mahima Elanza at M/S hare Krishna Buildhome Developers Pvt. Ltd. 307 Co-Investigator Completed RAJESH GUPTA Khasra no 22,22/1,23,23/1,24/1 Gram F-1,Govind marg, Opposite petrol Pump Jaipur - F- Consultancy for proof checking of RCC SR capacity 150 KL /18 m at SURESH KUMAR 308 M/s Lucky Constructions Investigator Completed industrial area, Pilani (Raj) and mix design M 25 TIWARI 309 Design of Ganda Nallah from Kartarpura to Amanishah Nallah Jaipur Development Authority-JDA, Jaipur Co-Investigator Completed VINAY AGRAWAL YOGESH PRAKASH 310 DESIGN OF GANDA NALLAH FROM KARTARPUR TO AMANISHAH NALLAH JDA JAIPUR Investigator Completed MATHUR Proof checking of design and drawing of repair of ESI Hospital Building at Executive Engineer Ajmer Kendriya Mandal SURESH KUMAR 311 Investigator Completed Kota and design of CPWD Ajmer - Executive Engineer Ajmer TIWARI Proof checking of design and drawing of repair of ESI Hospital Building Executive Engineer Ajmer Kendriya Mandal SURESH KUMAR 312 Investigator Completed at Kota and design of M-35 and design of Rigid pavement related with CPWD Ajmer - Executive Engineer Ajmer TIWARI Vetting of Structural Design & Drawing (Project: Veer Hanuman Ji Tourist Executive Engineer 12A/12-B, Jaipur 313 Investigator Completed Shiv Dayal Bharti Centre (G+2) Building) Development Authority (JDA) Jaipur Water Resources Department, Govt. of 314 Design of Escape channel at RD 239.700 of Gang Canal Feeder Investigator Completed Mahender Choudhary Rajasthan, SriGanganagar 315 DESIGN OF ESCAPE AT RD2-39 XEN WRD,SRIGANGANAGAR Co-Investigator Completed SUDHIR KUMAR

316 Technical advice on DPR of Bhiwadi- Neemrana Road in Alwar UIT Bhiwadi Investigator Completed ARUN GAUR

317 Proof Checking of design of MW Poles 6m and 12m height MRIC engineers india pvt. ltd. Investigator Completed Ravindra Nagar Executive Engineer, PHED, Project Div., 318 Testing of CC Tiles of Raw Water Reservoir Lining as per IS Code 1237 Investigator Completed RAJESH GUPTA Mandrayal Rajendra Singh Bhamboo Infra Private Limited, 319 Mix Design/Job Mix Formula for GSB, WMM, DBM & BC Co-Investigator Completed Pawan Kalla Jaipur - Gandhi Path, Vaishali Nagar, Jaipur Proof checking of designs & drawings of box culverts of different 320 SKM Products Investigator Completed Sandeep Chaudhary sizes & mix design of M-40 Consultancy SN Title Sponsoring Agency Role Faculty Name Status Proof checking of structural designs and drawings of 05 no. Pump Mr. Pankaj Agarwal Asst. General Manager, NCC 321 Investigator Completed RAJESH GUPTA Houses under RWSS of 210 villages of Tehsil Bassi and their NRVs & Limited,Dayal Colony, Bassi, Distt. Jaipur Proof checking of structural design and drawings of 05 Nos. pump 322 NCC Limited Co-Investigator Completed VINAY AGRAWAL houses under RWSS of 210 villages of tehsil bassi and their NRVs and Testing of CC Tiles of Raw Water Reservoir Lining as per IS Code 1237 323 Executive Engineer, PHED, Project Div., MandrayalCo-Investigator Completed Sandeep Shrivastava Consultancy regarding Mix Design Concrete Grade M-30 and testing of M/S Girdharilal Yadav Ahiro Ka Bas, Bannora SURESH KUMAR 324 Investigator Completed steel for construction of RCCSR Capacity (Sikar) - Consultancy regarding Mix Design TIWARI Consultancy regarding Mix Design Concrete Grade M-30 and testing of M/S Girdharilal Yadav Ahiro Ka Bas, Bannora SURESH KUMAR 325 Investigator Completed steel for construction of RCCSR Capacity 150 kL/18mat Dantru, Teshil- (Sikar) - Consultancy regarding Mix Design TIWARI 326 Vetting of 5 MLD STP at Hanumangarh MTS - EIEPL - 5/2 Malviya Nagar Jaipur Co-Investigator Completed GUNWANT - SHARMA YOGESH PRAKASH 327 VETTING OF 5 MLD STP AT HANUMANGARGH MTS EIEPLJAIPUR Investigator Completed MATHUR RAJENDRA SINGH BHAMBOO INFRA PRIVATE 328 MIX DESIGN/JOB MIX FORMULA FOR GSB WMM DBM & BC Investigator Completed JINENDRA KUMAR JAIN LIMITED JAIPUR Proof Checking of drawings for substructure and superstructure of high 329 Hurcules Structural Systems Pvt. Ltd Investigator Completed Sandeep Chaudhary level Kharka bridge on km 62, Salumber Keer ki Chowki Road, Rajasthan MUNICIPAL COUNCIL SIKAR COMMISSIONER 330 Vetting of sewerage DPR of Sikar Co-Investigator Completed GUNWANT - SHARMA MUNICIPAL COUNCIL Sr Nigam Bharatpur YOGESH PRAKASH 331 VETTING OF SEWERAGE DPR SIKAR MUNICIPAL COUNCIL SIKAR Investigator Completed MATHUR Bharatpur Nagar Nigam - Commissioner 332 Appraisal for solid waste management DPR Co-Investigator Completed GUNWANT - SHARMA Bharatpur Nagar Nigam, Bharatpur YOGESH PRAKASH 333 APPRAISAL OF SOLID WASTE DPR BHARATPUR NAGAR NIGAM Investigator Completed MATHUR Executive Engineer Nagar Nigam Jaipur - Jaipur 334 Appraisal of DPR for remodeling of Ghat Gate Bazar and Ranganj Bazar Co-Investigator Completed GUNWANT - SHARMA Nagar Nagam Lal Kothi Jaipur Regional Manager, RIICO LTD. SRIGANGANAGAR - 335 Technical advice/ guidance for construction of road, drainage etc. Co-Investigator Completed Pawan Kalla Regional Manager, RIICO LTD. SRIGANGANAGAR Proof checking of design and drawings of ROB at Railway Level Crossing 336 Sadbhav-PIPL Joint Venture Co-Investigator Completed VINAY AGRAWAL No. A-117-A/2 at km 142/2-3 between Rampura Phul-Bhuchchu sections APPRAISAL OF DPR OF REMODELING OF GHAT GATE BAZAR AND YOGESH PRAKASH 337 NAGAR NIGAM JAIPUR Investigator Completed RAMGANJ BAZAR MATHUR Proof checking of design and drawings of ROB at Railway Level crossing Mr. Vinay Shah, Project Coordinator, Sadbhav 338 Investigator Completed RAJESH GUPTA no. A-117-A/2 at Km. 142/2-3 between Rampura Phul – Engineering JV Patel Infrastructure Pvt. Ltd. Executive Engineer, Water Resources Deptt., 339 Design/drawing of Structure at RD 165.5 Investigator Completed Mahender Choudhary Sriganganagar, Govt. of Rajasthan 340 DESIGN /DRAWING OF STRUCTURE AT RD165.5 XEN ,SRIGANGANAR Co-Investigator Completed SUDHIR KUMAR Consultancy SN Title Sponsoring Agency Role Faculty Name Status TECHNICAL ADVICE/GUIDANCE FOR CONSTRUCTION OF ROAD REGIONAL MANAGER RIICO LTD. 341 Investigator Completed JINENDRA KUMAR JAIN DRAINAGE ETC. SRIGANGANAGAR for M-35 concrete core test of CC road from LC no. 200 to K.U.M.S. 342 JDA jaipur Investigator Completed Sandeep Shrivastava Tunga Road in Bassi Zone -13 B JDA Jaipur as asked in JDA/Asstt. Er.- 343 TECHNICAL ADVICE ON DPR OF BHIWADI-NEEMRANA ROAD IN ALWAR UIT BHIWADI Co-Investigator Completed JINENDRA KUMAR JAIN Proof Check for structural design of HQ SWC Command Office Building 344 Lt. Col., SO-1 (Design) Investigator Completed Sumit Khandelwal at Jaipur 345 STUDY OF SEDIMENTS AND WATER AT BISALPUR DEGREMONTH LTD., NEW DELHI Co-Investigator Completed ROHIT GOYAL DESIGNING OF REMETALING AND CARPETING WORK AT SECTOR 07 I.G. 346 RESIDENT ENGINEER RBH DN. II JAIPUR Investigator Completed JINENDRA KUMAR JAIN NAGAR JAIPUR Proof checking of Process, Design, and Drawing of 74 MLD Water The Project Manager Bisalpur Tonk Uniyara 347 Co-Investigator Completed Urmila Brighu treatment Plant. Water Proof Checking of Design & Drawings of for reconstruction of ROB on 348 The Team Leader (i/c), IPMC Co-Investigator Completed Ramesh Chandra Gupta Bharatpur Mathura Road at Bharatpur M/s Apeksha Consultants & Construction 349 Vetting of Structural Drawings for CPWD Buildings Co-Investigator Completed Ramesh Chandra Gupta Services, Jaipur 350 Vetting of Structural Drawings of MIG-B (S+6) Flats at Kunhari, KOTA The Resident Engineer, RHB , Division-KOTA Co-Investigator Completed Ramesh Chandra Gupta

351 Vetting of Structural Drawings of Terminal Building of Airport at Ajme Ranjeet Singh Choudhary Co-Investigator Completed Sumit Khandelwal

352 Design of CC pavement in Industrial Area Deoli RIICO Investigator Completed ARUN GAUR

353 Independent Quality Monitoring of CC Road RIICO Investigator Completed ARUN GAUR

354 stability analysis of RCC structures as mentioned in the letter (Enclosure) The Executive Engineer, IPIU, RUSDIP, - CHURU Co-Investigator Completed RAJESH GUPTA stability analysis of RCC structures as mentioned in the letter 355 The Executive Engineer, IPIU, RUSDIP, CHURU Investigator Completed VINAY AGRAWAL (Enclosure), CHURU 356 Proof Checking the design of sushilpura pulia on Ajmer road Jaipur Development Authority Investigator Completed Ravindra Nagar Proof checking of design and drawing of ROB at CH. 149.900 of NH-758 Design Director, Zignego Company Inc. & 357 Investigator Completed RAJESH GUPTA (Railway Km 99/02-03) between Shyampura Madanganj Railway Stations GHV(India) Pvt. Ltd., B.O. :8-A-2, Bapu Nagar, Proof checking of structural design and drawings of CWR and SR (eleven 358 M/s Maheshwari Contractors Pvt. Ltd. Investigator Completed Sandeep Chaudhary in number); mix design (02 in number); and SBC (06 in number) for Proof checking of design and drawing of ROBs at CH. 1+440 of Northern Design Director, Ravi Infrabuild Projects Pvt. Ltd., 359 Investigator Completed RAJESH GUPTA Kota Bypass (Railway Km 9/16-17) & CH. 13+631 of Northern Kota 95, Hiran Magri, Sector 11, Udaipur 360 Inspection and Investigation of Wall of PG School of Commerce University of Rajasthan Investigator Completed Sandeep Chaudhary Consultancy SN Title Sponsoring Agency Role Faculty Name Status Vetting of Hydraulic design and drawings of distribution main, clear VP & Head - Engg, JITF Water Infrastructure Ltd., 361 Investigator Completed RAJESH GUPTA water feeder main, raw water rising main etc for Narhela multi village Jindal ITF Centre, 28 Shivaji Marg, New Delhi Vetting of hydraulic design and drawings of distribution main, clear 362 JITF Infrastructure limited Co-Investigator Completed VINAY AGRAWAL water feeder main, raw water rising main etc. for Narhela multi village Mr. H.R. Kapoor, VP M/s PL Raju Construction 363 Concrete Mix design and Testing of water Investigator Completed RAJESH GUPTA Ltd, Babra Road, Beawar, Distt. Ajmer. STRENGTHENING AND DESIGN OF OVERLAY THICKNESS FOR LINK ROAD THE SR. REGIONAL MANAGER RIICO LTD. 364 Investigator Completed JINENDRA KUMAR JAIN I/A AND BICHHWAL BIKANER 365 Design of CC Road for Gaurav Path Public works Department Investigator Completed ARUN GAUR Akhilendra Bhushan 366 Bisalpur water supply quality issues PHED Rajasthan Co-Investigator Completed Gupta Checking of strength, structural safety and quality of community center 367 Ex.En.-8 Jaipur Development Authority Co-Investigator Completed Sandeep Chaudhary (under construction ) at Saypura Consultancy for design drainage system of water at Samie-Khedi to Executive Engineer Water Resources Division/ 368 Co-Investigator Completed GUNWANT - SHARMA Goverdhan Drain Circle, Bharatpur-Bharatpur YOGESH PRAKASH 369 DESIGN OF DRAINAGE SYSTEM SAMIE-KHEDI EXECUTIVVE ENGINEER WRD BHARATPUR Investigator Completed MATHUR Condition assesment, determination of cement in mortar, structural 370 Hindustan Salt Limited Investigator Completed Sandeep Chaudhary safety and stability of HSL R&D lab cum office building at Sitapura Proof checking of structural design and drawing of bridge at Gambhiri 371 Project Director, RSRDC Ltd., Unit-DAUSA Investigator Completed Sandeep Chaudhary river and ROB at Hindaun Bypass Drawing & Design of X and Head Regulator at Netewali Head RD 82.700: 372 Water Resources Department, Govt. of Rajasthan Co-Investigator Completed Mahesh Kumar Jat Project No. 1000110233 Design of Head Regulator and X-regulator at Fakirwali and Sulemanki 373 Water Resources Department, Govt. of Rajasthan Co-Investigator Completed Mahesh Kumar Jat Head: Project No. 1000110124 Drawing and Design of Dabla Head, PS head and RD 116.700: Project No. 374 Water Resources Department, Govt. of Rajasthan Co-Investigator Completed Mahesh Kumar Jat 1000110123 375 RCC DRAINS WITH APPROACH CULVERTS AT I/A BARAN M/S KARUNA ENTERPRISES JAIPUR Investigator Completed JINENDRA KUMAR JAIN Proof checking of Design of Viaduct and opinion regarding 376 Jaipur Development Authority Investigator Completed Ravindra Nagar reinforcement couplers Mix Design (M30) and Proof Checking of Design & Drawings of RCC 377 M/s Yadav Construction Company Co-Investigator Completed Sandeep Shrivastava SR 150KL at RWSS Dhani Nagan, Tehsil Phulera, Dist. Jaipur Tands Organcs (INDIA) Pvt. Ltd. - 67 B Maharaja 378 Arnia Bahadur Group Water supply scheme of MP Jal Nigam Co-Investigator Completed GUNWANT - SHARMA Tagore Road Kolkata Short Term Training Course on Water Audit in Urban/Rural and 379 CCDU, WSSO, PHED, Government of Rajasthan Investigator Completed Urmila Brighu Operation and Maintenance of water supply systems YOGESH PRAKASH 380 ARNIA BAHADUR WATER SUPPLY MP JAL NIGAM TRANS ORGANICS Investigator Completed MATHUR Consultancy SN Title Sponsoring Agency Role Faculty Name Status Vetting of Structural Drawings of EWS/LIG buildings at Rohini Nagar and 381 M/s Janak Nandini Realtors Pvt. Ltd. - Jaipur Co-Investigator Completed RAJESH GUPTA Goverdhan Vihar, Dist. Jaipur Design job mix formula for M-30 grade controlled C.C. pavement for 382 Executive Engineer, PWD Division Mahwa - PWD DivisionCo-Investigator Mahwa Completed Sandeep Shrivastava construction of Gramin Gaurav Path in Division Mahwa. Package No. RJ- Investigation of the reasons of failure of bridge on Subhash Nagar during 383 Jaipur Development Authority Investigator Completed Sandeep Chaudhary widening 384 Improving traffic movement at critical point in Jaipur City Jaipur Devlopment Authority Investigator Completed ARUN GAUR Vetting of structural designs & drawings of CEDAR EWS Project to Mr. Anish Raj Sethi, M/s Grandiose Buildtech Pvt. 385 Investigator Completed RAJESH GUPTA be constructed at Plot No. 139, Goverdhan Vihar, H-Block, Nahariya Ka Ltd., Vaibhav Multiplex, Vaishali Nagar, Jaipur SR. REGIONAL MANAGER RIICO ROAD NO. 5 VKIA 386 DESIGN OF OVERLAY THICKNESS OF ROAD Investigator Completed JINENDRA KUMAR JAIN JAIPUR SR. REGIONAL MANAGER RIICO BAIS GODAM I/A 387 OVERLAY THICKNESS DESIGN OF APPROACH ROAD Investigator Completed JINENDRA KUMAR JAIN ESTATE JAIPUR Proof checking of the design and drawing of two rapid gravity filter 388 Larsen & Tubro Limited Investigator Completed Sandeep Chaudhary water treatment plants (9.84 MLD and 18.6 MLD) and RCC framed Remedial measures and repair procedure for the deterioration of RAJASTHAN RAJYA VIDHYUT PRASARAN NIGAM 389 Investigator Completed Sandeep Chaudhary surface, formation of cracks and damage of RCC foundation at 220 kV LMITED consultancy for testing of construction material and design mix of Offshore Infrastructures Limited - Mr. Radha SURESH KUMAR 390 Investigator Completed concrete M-25 and M-30 grade Krishnan K.N Offshore Infrastructures Ltd. TIWARI Vetting of Structural design of group housing project Mahima Elanza at 391 hare krishna buildhome developers pvt ltd Investigator Completed Ravindra Nagar Khasra no 22,22/1,23,23/1,24/1 Gram manpur Devri urf Golyawas Testing of steel (Reinforcement) for work, the construction of Bridge and 392 approach road near Village Khod on Rewa River, Dist. Jhalawar The Executive Engineer, PWD Division-Bhawanimandi.Co-Investigator Completed Sandeep Shrivastava

393 Carry out mix design for M-30 grade of concrete Lahoty Buildcon Limited - Gopalpura Byepass Co-Investigator Completed Pawan Kalla

394 Consultancy for Cement , Bituminous road and other ongoing works UIT, Bhiwadi - UIT, Bhiwadi, Alwar Co-Investigator Completed Pawan Kalla Testing of Materials for the composite works of CNG Station Kukas, 395 SLR CONSTRUCTION PVT. LTD. Co-Investigator Completed Sandeep Shrivastava Jaipur including Mix Design (M25) Proof Checking of the Design and Drawing of RCC Framed CWPH at five Larsen & Toubro Limited, L & T 396 Investigator Completed Sandeep Chaudhary locations (Jhunjhunu, Narsingpura, Wahidpura, Bagar and Charawas) Construction, Water & Reenwable Eenrgy 397 Proof Checking of Structural Drawings of Pump Houses L&T Construction Investigator Completed VINAY AGRAWAL EXECUTIVE ENGINEER ZONE -15 JAIPUR 398 MATERIAL TESTING FOR DBM/BC MATERIAL Investigator Completed JINENDRA KUMAR JAIN DEVELOPMENT AUTHORITY JAIPUR X.en PWD Division Dausa - X.en PWD Division 399 Design of Job Mix for M-30 Mix Co-Investigator Completed Pawan Kalla Dausa vetting of structural design of office building for marketting and service executive engineer central division 1 cpwd jaipur - 400 Co-Investigator Completed RAJESH GUPTA extension center and craft museum at plot no g 76-77, epip executive engineer,central division 1,cpwd,jaipur Consultancy SN Title Sponsoring Agency Role Faculty Name Status 401 TESTING OF STEEL BARS IVRCL Ltd. , Asind Project Investigator Completed Sandeep Chaudhary DESIGN OF CC PAVEMENT UNDER GRAMIN GAURAV PATH SCHEME EXECUTIVE ENGINEER PWD DIV. RAJGARH 402 Investigator Completed JINENDRA KUMAR JAIN DISTRICT ALWAR Training programme on Water Demand Management : Potential and 403 CCDU, PHED, Govt. of Rajasthan Investigator Completed Mahesh Kumar Jat Options; Project No. 1000110022; Consultancy for geotechnical investigation (SBC test) for construction of Assistant Engineer PHED ,Sub Div Rajgarh - SURESH KUMAR 404 Investigator Completed RCCSR ( Cap Assistant Engineer PHED ,Sub Div Rajgarh TIWARI Consultancy for geotechnical investigation (SBC test) for construction of Assistant Engineer PHED ,Sub Div Rajgarh - SURESH KUMAR 405 Investigator Completed RCCSR ( Cap 250 kL at Rajpur Bada and 250 kL at RWSS Khoh ) in teh- Assistant Engineer PHED ,Sub Div Rajgarh TIWARI TECHNICAL CONSULTANCY ON IMPROVING TRAFFIC MOVEMENT AT 406 JDA JAIPUR Co-Investigator Completed JINENDRA KUMAR JAIN CRITICAL POINT IN CITY Vetting of drawing and design of 1 mld SBR Based STP at Central Park Eco Paryavaran Engineers and Consultants Pvt. 407 Co-Investigator Completed GUNWANT - SHARMA Jaipur Ltd Mohali- Eco Paryavaran Engineers and VETTING OF DRAWING ND DESIGN OF 1 MLD SBR BASED STP AT YOGESH PRAKASH 408 ECO PARYAVARAN ENGINEERS Investigator Completed CENTRAL PARK JAIPUR MATHUR Mix Design (M-25 & 30), Material testing-steel bars and cube test for Mahendra Kumar 409 Vishnu Prakash R Punglia Investigator Completed project Hindaun Kaurali Project Shrimali Mix Design (M-25 &30), Material testing-steel bars and cube test Mahendra Kumar 410 Vishnu Prakash R Punglia Investigator Completed for project Hindaun Kaurali Project Shrimali Proof checking the drawings and designs of HIG-72 flats at Dwarka path 411 rajasthan housing board, division VI, jaipur Investigator Completed Ravindra Nagar mansarowar ,Jaipur Proof checking of designs and drawings of HIG-72 flats at Dwarka Path, 412 The Resident Engineer, Div-VI, RHB, Jaipur Co-Investigator Completed VINAY AGRAWAL Mansarovar, Jaipur THE SR. REGIONAL MANAGER RIICO VKI AREA 413 JOB MIX FORMULA FOR DBM & BC Investigator Completed JINENDRA KUMAR JAIN JAIPUR Technical consultancy on improving traffic movement at critical point in 414 JDA Jaipur - Executive Engineer South, JDA Jaipur Co-Investigator Completed Pawan Kalla city Mix Design (M30) and Proof Checking of Design & Drawings of RCC SRs 415 M/s Vinayal Enterprises, , Dist. Jaipur Co-Investigator Completed Ramesh Chandra Gupta 125,175,1800&300 KL at Dist. Jaipur Proof Checking of Design & Drawings of RCC Box (underpass) and The Team Leader (i/c), IPMC , The Team Leader 416 Co-Investigator Completed Ramesh Chandra Gupta retaining walls, Dist. Bharatpur (i/c), IPMC vetting of Structural Design & Drawing of RC Framed Residential 417 Goldline Infractures Pvt Ltd. Investigator Completed Shiv Dayal Bharti Building, G+6, under affordable housing scheme at Ajmer Mix design of M-30 418 OFFICE EXECUTIVE ENGINEER PWD PARBATSAR Investigator Completed Sandeep Shrivastava Remedial measures and repair procedure for the deterioration of 419 RAJASTHAN RAJYA VIDHYUT PRASARAN NIGAM LMITEDCo-Investigator Completed Sandeep Shrivastava surface, formation of cracks and damage of RCC foundation at 220 kV THE EXECUTIVE ENGINEER PWD DISTRICT 420 DESIGN OF CC ROAD Investigator Completed JINENDRA KUMAR JAIN DIVISION -I JAIPUR Consultancy SN Title Sponsoring Agency Role Faculty Name Status THE EXECUTIVE ENGINEER PWD DISTRICT 421 DESIGN OF CC ROAD Investigator Completed JINENDRA KUMAR JAIN DIVISION II JAIPUR Design of CC Road 422 The Executive Engineer PWD, District Division - I JaipurCo-Investigator Completed Sandeep Shrivastava Proof Checking of Structural Design/Drawings for C/o 500 Bedded Boys Executive Engineer, Jaipur Central Division-II, 423 Co-Investigator Completed RAJESH GUPTA Hostel and 210 Bedded Girls Hostel with CPWD, Jaipur - Jaipur Consultancy for Inspection / rehabilitation of old RCC OHSR at Beri, The Ex. En., PHED, Div- Sikar - The Ex. En., PHED, SURESH KUMAR 424 Investigator Completed Tarpur and Gokulpura (Capacity 150KL,100 Div- Sikar TIWARI Consultancy for Inspection / rehabilitation of old RCC OHSR at Beri, The Ex. En., PHED, Div- Sikar - The Ex. En., PHED, SURESH KUMAR 425 Investigator Completed Tarpur and Gokulpura (Capacity 150KL,100 KL & 120KL) District-Sikar Div- Sikar TIWARI Proof Checking of Structural Drawings for development of Bagrana Kachi 426 The Executive Engineer (Housing-III), JDA, Jaipur Investigator Completed VINAY AGRAWAL Basti under Rajeev Awas Yojana, Agra Road, Jaipur Mix Design for M25 (SRC) and M30 (OPC 43) for work of execution of 427 Executive Engineer, PHED, Project Div. II, BharatpurCo-Investigator Completed Sandeep Shrivastava Reg. Water supply scheme of 283 villages and the 428 Testing of DBM core cutter RSRDC, - Co-Investigator Completed Pawan Kalla Consultancy for geotechnical investigation for classification of strata at Wadia Techno Engineering Services Ltd. SURESH KUMAR 429 Investigator Completed Karauli. Rajasthan Urban Infrastructure Development TIWARI Mix Design (M30) and Proof Checking of Design & Drawings of RCC 430 M/s Kumawat Construction, Co-Investigator Completed Sandeep Shrivastava SR 200kl at Tehsil Dudu, Dist. Jaipur Proof Checking of Structural Drawings of HIG (B+S+11) Flats at Sector-8, 431 The Resident Engineer, RHB, Division-IX, Jaipur Investigator Completed VINAY AGRAWAL Pratap Nagar, New Sanganer road, Mansarovar, Jaipur Nagar Parishad Chittorgarh-Nagar Parishad 432 Appraisal of DPR for Wastewater Treatment Co-Investigator Completed GUNWANT - SHARMA Chittorgarh Rajashan YOGESH PRAKASH 433 APPRAISAL OF DPR FOR WASTEWATER TREATMENT NAGAR PARISHAD Investigator Completed MATHUR Consultancy for geotechnical investigation (SBC test of soil) at Bhilwara The Manager (projects) Rajasthan Co-operative SURESH KUMAR 434 Investigator Completed dairy. Diary Federation Ltd. “Saras TIWARI Technical Examination of existing ESR at Village Tasai and Roneejathan 435 The Executive Engineer, PHED, Div-Rajgarh Investigator Completed VINAY AGRAWAL under Sub Div , Dist. Alwar M/S Parul Construction Company, Jaipur-M/S 436 Sewage pumping station design at Tulsi Nagar Jaipur Co-Investigator Completed GUNWANT - SHARMA Parul Constriction Company Mix Design (M30) and vetting of structural Drawings of RCC SR 1000 437 M/s Yadav Construction Company, Co-Investigator Completed Sandeep Shrivastava & 2000KL at Sanganer, Dist. Jaipur SPATIAL ANALYSIS TECHNIQUES & CREATION OF GIS DATABASE FOR DEPT. OF WATERSHED DEVELOPMENT AND SOIL 438 Co-Investigator Completed ROHIT GOYAL WATERSHED APPLICATIONS CONSERVATION, JAIPUR THE PROJECT DIRECTOR UNIT I RSRDC LTD 439 TESTING OF DBM MOULDS Investigator Completed JINENDRA KUMAR JAIN BHAWANI MANDI Proof checking of the design and drawing of two Intake Well Structures 440 Larsen & Tubro Limited Investigator Completed Sandeep Chaudhary Approach Bridges under the Regional Water Supply Scheme of 334 Consultancy SN Title Sponsoring Agency Role Faculty Name Status Proof checking of the design and drawing of 10.56 MLD output capacity 441 Larsen & Tubro Limited Investigator Completed Sandeep Chaudhary rapid gravity filter water treatment plant and RCC framed structure of Testing of Bhaskar Mark Steel Reinforcement TMT 500 442 Rajasthan Avas Vikas and Infrastructure Limited Co-Investigator Completed Sandeep Shrivastava Proof Checking of Structural Design and Drawing of Holiday Home at 443 CPWD Investigator Completed Sandeep Chaudhary Ajmer YOGESH PRAKASH 444 FCI GODOWN AT BANSWARA AND DUNGARPUR NAV INFRASTRUCTURE Investigator Completed MATHUR Testing of Steel Bars (25 mm, 20mm, 16mm, 12mm, 10mm, 8mm) for 445 SPML Infra Ltd. Co-Investigator Completed Sandeep Shrivastava Work of RWSS of 72 Villages and 24 NRVS & thier Dahnies of Tehsil Concrete Mix Design for Grade M-25 and M-30 for project Ananta Jagat 446 renaissance buildhome pvt ltd Investigator Completed Ravindra Nagar Bhiwadi, Alwar Proof Checking of design and drawings of bridge including geotechnical SURESH KUMAR 447 Theme Engineering Services Pvt. Ltd. - Investigator Completed investigation report TIWARI Proof Checking of design and drawings of bridge including geotechnical SURESH KUMAR 448 Theme Engineering Services Pvt. Ltd. - Investigator Completed investigation report TIWARI 449 Concrete Mix Design (M-25) for Affordable Housing at Goner, Jaipur renaissance buildhome pvt ltd Investigator Completed Ravindra Nagar Vetting of structural design of project Affordable Housing at goner Renaissance Build Home Pvt Ltd (Ashadeep 450 Co-Investigator Completed RAJESH GUPTA Jaipur Group) - 6 D corporate tower,A-2.Jawahar Vetting of Structural Design of Project Vasant Kunj (affordable) at 451 renaissance buildhome pvt ltd Investigator Completed Ravindra Nagar Ralawta (Jaipur) Vetting of Structural design of project Vasant Kunj Affordable at M/s Renaissance Buildhome Pvt. Ltd., JLN Marg, 452 Co-Investigator Completed VINAY AGRAWAL Ralawata, Jaipur Jaipur 453 Quality monitoring & stage verification for Modern Warehousing Rajasthan State warehouse Corporation, Jaipur Co-Investigator Completed Ramesh Chandra Gupta Proof Checking of Structural Design/Drawings for C/o 500 Bedded Boys 454 CPWD, Jaipur Investigator Completed Sandeep Chaudhary Hostel and 210 Bedded Girls Hostel with provision for future vertical 455 Concrete Mix Designs shree cement limited Investigator Completed Ravindra Nagar Vetting/Proof checking of Design & Drawings of lift pit for office building 456 CPWD jaipur central division I Investigator Completed Ravindra Nagar of Custom & Central Excise at Sector-10, Vidyadhar Nagar, Jaipur SURESH KUMAR 457 Consultancy for Bridge pile foundation work Executive Engineer(Project-1), JDA Jaipur - Investigator Completed TIWARI Geotechnical investigation at KATHOOMAR, BAHRAMPUR- RAMPUR for M/S Kailash chand Chaudhary MANDOR teh. SURESH KUMAR 458 Investigator Completed R.C.C SR phagi ,Jaipur - TIWARI M/s J.P.Yadav Contractor, Pachar Road, SURESH KUMAR 459 Geotech investigation at RWSS Harsana, Tehsil Laxmangarh, Dist. Alwar Investigator Completed Kishangarh, Renwal Teh. Phulera Dist. Jaipur - TIWARI Geotechnical investigation at Indira Colony(200 kL SR), Mandir Mataji SURESH KUMAR 460 Executive Engineer, PHED, Rural Division, JAIPUR Investigator Completed Chowk(250kL) at Sanbhar, Dist. JAIPUR TIWARI Consultancy SN Title Sponsoring Agency Role Faculty Name Status SURESH KUMAR 461 Geotech investigation Executive engineer PHED Division Ajmer - Investigator Completed TIWARI YOGESH PRAKASH 462 APPROAL OF DESIGN AND DRAWING OF CROSS REGULATOR EXECUTIVE ENGINEER WRD RAWATSR Investigator Completed Geotechnical investigation for at MATHUR Jaipur Metro Dairy, Govindgarh SURESH KUMAR 463 The Manager (Projects) RCDF LTD. Jaipur - Jaipur Investigator Completed TIWARI Consultancy of Proof checking of Design, Drawings of RCC SRS for RWSS M/S. SHISHUPAL SINGH PARIHAR Govt SURESH KUMAR 464 Investigator Completed 226 villages and their NRVs & Dhanies of Roopwas, Bharatpur & Contractor & Suppliers, Jaipur - Jaipur TIWARI Consultancy of Proof checking of Design, Drawings of RCC SRS for RWSS M/S. SHISHUPAL SINGH PARIHAR Govt SURESH KUMAR 465 Investigator Completed 226 villages and their NRVs & Dhanies of Roopwas, Bharatpur & Contractor & Suppliers, Jaipur - Jaipur TIWARI SURESH KUMAR 466 Geotechnical investigation for at Jaipur Metro Dairy, Govindgarh The Manager (Projects) RCDF LTD. Jaipur - Jaipur Investigator Completed TIWARI Geotechnical investigation at swej farm Roop vihar Jaipur For R.C.C SR SURESH KUMAR 467 Ex.En. PHED City Div. II south Jaipur - Investigator Completed (2200 KL/23 M) TIWARI 468 Proof checking of Design & Drawing of MJB for RSRDC Project varha infra ltd., kota Investigator Completed Ravindra Nagar Proof Checking of Structural Drawings of MIG-B (B+S+11) Flats at Sector- 469 The Resident Engineer, RHB, Div-V, Jaipur Co-Investigator Completed Ramesh Chandra Gupta 8, Pratap Nagar, Jaipur Expert opinion and suggest solution for various repairing and 470 Assistant Engineer, PHED City Sub Dn_IV( Co-Investigator Completed Nivedita Kaul rehabilitation works at PHED Amanishah Head Works 471 Job Mix design of GSB,WMM,DBM and BC Job Mix design of GSB,WMM,DBM and BC Co-Investigator Completed Pawan Kalla

472 DPR Appraisal of sewerage project Gangapur city Nagar Parishad Gangapur City Sawai Madhopur Co-Investigator Completed GUNWANT - SHARMA

473 Proof checking of Launching Girder Design & Drawing Jaipur Development Authority Investigator Completed Ravindra Nagar

474 Proof checking of Launching Girder Design and Drawing The Executive Engineer, Pr.-1, , JDA, Jaipur Co-Investigator Completed VINAY AGRAWAL Condition Assessment of approach wall of Masonary wall of RoB 252 B - Project Director, RSRDC Ltd. Jaipur Unit- Mahendra Kumar 475 Investigator Completed Bharatpur - Mathura Road Dist Bharatpur Bhusawar-II Shrimali Vetting of Structural Design & Drawing of PSS Bridge Girder at Salde at Managing Director, Strength Engineering services Mahendra Kumar 476 Investigator Completed Ramnagar dist Nainital Ltd. Pvt. Ltd. Jaipur Shrimali Vetting of Structural Design & Drawing of PSS Brighe Girder at rawasan Managing Director, Strength Engineering Service Mahendra Kumar 477 Investigator Completed at Lal Dhang dist meethiberi Ltd. Pvt. Ltd. Jaipur Shrimali Proof checking of one RCC OHSR and Concrete Mix Design for grade M- 478 Executive Engineer, PHED, City Division Dholpur Co-Investigator Completed Sandeep Shrivastava 30 YOGESH PRAKASH 479 VETTING OF DESIN OF HDPE PIPE LINE H M PIPES JAIPUR Investigator Completed MATHUR Rajasthan Avas Vikas & Infrastructure Limited, 480 Vetting of Structural Design of Mini Secretariat at Alwar Co-Investigator Completed Ramesh Chandra Gupta Uni, Consultancy SN Title Sponsoring Agency Role Faculty Name Status Consultancy for quality monitoring & stage verification for work of Rajasthan State Warehousing Coorporation 481 Co-Investigator Completed Ramesh Chandra Gupta planning, designing & execution of modern warehousing facilities in Bhawani , The Executive Engineer, IPIU, RUSDIP (RUIDP- 482 Mr. Zakir Ahmed Siddiqui, Chief Project Manager, G Co-Investigator Completed Pawan Kalla Phase 483 Vetting of Structural Drawings of LIG/EWS Flats (G+2) at Hanumangarh The Resident Engineer, RHB, Div-Hanumangarh Co-Investigator Completed Ramesh Chandra Gupta

484 Consultancy for design of rainwater harvesting at Soniyana RIICO BHILWADA Co-Investigator Completed GUNWANT - SHARMA YOGESH PRAKASH 485 DESIGN OF RAINWATER HARVESING AT SONIYANA RIICO BHILWADA Investigator Completed MATHUR Concrete mix design of four types using upto 80 mm aggragate 486 executive engineer water resources division , sawaCo-Investigator Completed Sandeep Shrivastava Proof checking of process, design, and drawing of 74 MLD water 487 Project Manager, L&T Co-Investigator Completed Sanjay Mathur treatment plant SURESH KUMAR 488 Geotech investigation at site Executive engineer WRE Dholpur Raj. Investigator Completed TIWARI Mix Design of Concrete M30 grade concrete 489 Sub Division Office ADEN/DNA Degana Railway StationCo-Investigator Completed Sandeep Shrivastava

490 Material Testing for CBR Parul Construction Co.,Jaipur Co-Investigator Completed Pawan Kalla Review of Design and Drawing, Cause of Failure of Road and Remedies 491 VARAHA INFRA LTD. Co-Investigator Completed Pawan Kalla from Merta City to Lambia Section Satish Malpani A Class Contractor Sirsi Road 492 Mix Design M-25 and M-35 Co-Investigator Completed Pawan Kalla Jaipur Executive Engineer,CDBP, Project Div-III PHED 493 Mix Design of concrete grade M-25 and M-30 Co-Investigator Completed Pawan Kalla Deeg - 494 Planning and Designing of construction of link road at I/A Kolila Joga RIICO, NEEMRANA Co-Investigator Completed Pawan Kalla Proof Checking of Design & Drawing of office building and 04 Nos. (Type- 495 CPWD jaipur central division I Investigator Completed Ravindra Nagar V) officer quarter for ITAT at G-4, C-scheme, Jaipur Proof checking of design and drawing of office building and 04 Nos. 496 The Executive Engineer, JCD-I, CPWD, Jaipur Co-Investigator Completed VINAY AGRAWAL (type-V) office quarters for ITAT at G-4, C-scheme, Jaipur Proof Checking of Structural Design & Drawings, Design Mix and 497 Pratibha Industries Lmited Mumbai Investigator Completed Sandeep Chaudhary Test of Steel for work of RWSS of 161 villages of Phagi Tehsil Proof Checking of Structural Design of Multistoried residential 498 Apeksha Infrastructures Pvt. Ltd., Jaipur Investigator Completed Sandeep Chaudhary apartment located at Sun-City, Jaipur-Bikaner Highway, Jaipur Vetting of Structural Design & Drawing of Tourist Facility Centre (RC Executive Engineer (Housing-II) Jaipur 499 Investigator Completed Shiv Dayal Bharti Frame Building, G+3) at Chaura Rasta Development Authority Jaipur Structural Drawings of Proposed Rajasthan International Centre at The Executive Engineer-Pr.-7(RIC), Jaipur 500 Co-Investigator Completed RAJESH GUPTA Jhalana Doongri (ESTI Campus), Jaipur Development Authority Consultancy SN Title Sponsoring Agency Role Faculty Name Status Structural Drawings of Proposed Rajasthan International Center at 501 Jaipur Development Authority Investigator Completed Ravindra Nagar Jhalana Doongri (ESTI Campus), Jaipur Proof checking of structural drawings of proposed Rajasthan 502 The Executive Engineer, Pr.-7, (RIC), JDA, Jaipur Co-Investigator Completed VINAY AGRAWAL International Centre at Jhalana Doongri (ESTI campus), Jaipur Vetting of Structural Design & Drawing of ITI (RC Frame Building) at at Swastik Constructions, D-12, Dev Nagar, Tonk 503 Investigator Completed Shiv Dayal Bharti Kho-Nagorian (Jaipur) Road, Proof Checking of Iconic Gateway 40m high (Monumental Structure) and Miraj Developers Ltd. 1st Floor, “Miraj 504 Co-Investigator Completed Ramesh Chandra Gupta Bus Stand (G+2) at Nathdwara House―, Proof Checking of Design and Drawing of Major Bridge at KM 79+840 of 505 varaha infra ltd., kota Investigator Completed Ravindra Nagar Kota-Dhanrwada Road (SH-51) for Km 71/000 to 111/000 package 2 Proof Checking of Design and Drawing of Minor Bridge at KM 35+250 of 506 varaha infra ltd., kota Investigator Completed Ravindra Nagar ---Kotputli road from km 27/500 to Approval of engineering drawing and documents for 10, 15 and 10 mld 507 SN Environ-Tech Pvt. Ltd. New Delhi. Co-Investigator Completed GUNWANT - SHARMA sewage treatment plants at sriganganagar, Rajasthan Checking of Design & Drawings of RCC ESRs 100,200,250,300,350,400, 508 L&T Construction, Investigator Completed Ramesh Chandra Gupta 450,500,550&800 kL and CWRs 18000,3000,700,600kl capacity for Proof checking of design of MW Tower for wind speeds of 39, 47 & 509 MRIC engineers india pvt. ltd. Investigator Completed Ravindra Nagar 50m/s Proof Checkning of mStructural Design for commercial Tax, Excise, Chief Engg. Naya Raipur Development Authority, 510 Co-Investigator Completed Shiv Dayal Bharti Registration and tribunal Departments Building at Naya raipur Raipur (CG) vetting of Structural Design & Drawing, of Steel Bridge for Pipe line from vetting of Structural Design & Drawing, of Steel 511 Investigator Completed Shiv Dayal Bharti Intake Well to Head works at River Bank at Kalisindh Dam, Jhalawar Bridge for Pipe line from Intake Well to Head Structural Audit of ESIC Dispensary Bhilwara Jodhpur and Branch Office Director, Regional Office, ESIC, Panchdeep 512 Investigator Completed Sandeep Chaudhary Bikaner & Bharatpur Bhavan Proof Checking of Design of Cross Regulator at Rd 109.00 of I.G. Main Executive Engineer, Water Resources Divsion, 513 Co-Investigator Completed Ramesh Chandra Gupta Canal Rawat Vetting of structural design & drawing of 3 blocks of BD agrawal Medical 514 PNT Designs Pvt. Ltd. 27/1, Kalaati Market, Kota Co-Investigator Completed Shiv Dayal Bharti college Sriganganer Vetting of Structural Design & Drawing, of four lanes ROB in lieu of RUB R.R. Mohanty Vice President, India International 515 Investigator Completed Shiv Dayal Bharti B-72 at Jodhpur Infrastructure engineering limited Vetting of Structural design of Cup-lock shuttering meant for lecture S K Construction, 30 Mahaveer Nagar II 516 Investigator Completed Shiv Dayal Bharti theatre complex Durgapura, Jaipur 517 Appraisal of sewerage DPR RUIFDCO Limited Jaipur Co-Investigator Completed GUNWANT - SHARMA YOGESH PRAKASH 518 APPRAISAL OF SEWERAGE DPRS RUIFDCO JAIPUR Investigator Completed MATHUR Proof checking of structural drawings of upper and lower basement of 519 Horizon Infradesigns Pvt. Ltd. Investigator Completed Sandeep Chaudhary approx 1.25 Lac sq ft. built-up areas of proposed building within High 520 Proof Checking of box section and drain for RSRDC Projects varaha infra ltd., kota Investigator Completed Ravindra Nagar Consultancy SN Title Sponsoring Agency Role Faculty Name Status Vetting of Structural Design & Drawing, EWS Duplex Dwelling Units- Executive Engineer (Rajeev Avas Yojana) Jaipur 521 Investigator Completed Shiv Dayal Bharti Package-1(G+1) Muncipal corporation Jaipur Vetting of Structural Design & Drawing of STP at Haryana Police Housing Crystal Chemical and Engineers B-25-26, RIICO 522 Investigator Completed Shiv Dayal Bharti Corporation, Panchukala House Geotechnical Investigation, Proof Checking of DesIgn and Drawing of 523 Executive Engineer, PHED Investigator Completed Sandeep Chaudhary RCC ESRS and Concrete Mix Design Proof checking of RCC SRs of 200KL/20m, 200KL/18m, 275KL/18m and 524 Executive Engineer, PHED Division, KHETRI Investigator Completed Ramesh Chandra Gupta 240KL/18m at RWSS Madhogarh, Madhogarh, Hardia and Chichroli Vetting of Structural Design & Drawing, of RCC ESR and CWR (Package-II Executive Engineer (PDC-II) Jaipur Development 525 Investigator Completed Shiv Dayal Bharti Slum relocation) Authotiry Proof Checking of Design & Drawing of RCC SR 100 kL Village Bathoth, 526 M/s Sheikh Construction Co., Khetri Co-Investigator Completed Ramesh Chandra Gupta Dist, Sikar Proof checking of structural design and drawing of three ROB at Multi Media Consultants Pvt. Ltd., Ahemdabad- 527 Investigator Completed Sandeep Chaudhary Makrana, Kishangarh and Ajmer in Rajasthan 380006 Vetting of Structural Design & Drawing of EWS, LIG and MIG houses SNG Real Estate Pvt. Ltd 707, Paris Point, 528 Investigator Completed Shiv Dayal Bharti (Affordable Housing Scheme) Churu Collectorat circle, Banipark Proof checking of design and drawings of OHSRs, & CWR of Nagaur Lift Saraswati Technical Services (P) Ltd., Mangal 529 Investigator Completed Sandeep Chaudhary Project (Twenty nine structures) and one Mix Design (M30 Grade Marg Proof Checking of Design of RCC Structures under Nagaur Lift Package - SPML INFRA LTD. F-27/2, Okhla Industrial Area, 530 Investigator Completed Sandeep Chaudhary III (Eight CWR, Seven Pump House, Fifteen ESR) Gurgaon-12001, Haryana YOGESH PRAKASH 531 REVIEW OF DPR FLOOD CONTRO; SHILLONG IDFC FOUNDATION Investigator Completed MATHUR Review of DPR unflood control on flash flood along the river of IDFC Foundation, The Caital Court, 2nd Floor, 532 Co-Investigator Completed GUNWANT - SHARMA Wahumkhrah and Umshyrpi, Shillong Olof Palme Marg, Munirka, New Delhi Vetting of Structural Design & Drawing of OTM Accommodation for SW Chief Engineer (HQ), Jaipur Zone, Military 533 Investigator Completed Shiv Dayal Bharti Command (PH-1) at Jaipur Engineer Service Power House Road, Bani Park,