DESIGN BUREAU COMPANY-CV

§ «»Strojprojekt LLC was founded in 2005 as “HitLine” group of companies project bureau functioned since 1999 seceded into the separate business (due to the owners reorganization). § We offer to our Clients the full specter of high qualified services in design and construction management area, General designer services, and also the full scope of project documentation development services for construction. § Leading specialists of our company has more than 20 years experience in the design and construction area. Knowledge of the leading specialists are not theoretical only, most of them has the real experience on the construction site, and that means we always offer the practical solutions. § Company consists of 26 specialists. The composition of our team enables us to develop by means of our own forces full scope of design works for all stages of the design, to manage the design process and initial documentation obtaining process, and also to control the realization of the design solution by means of the architectural supervision on site during construction. § Over10 3 projects implemented in since 1999 § Complex approach and licensed for a wide range of services according to the Russian Laws and regulations § Quality management according to ISO:9001 § Positive experience in project management of large multinational teams § Implementation of high-tech program products for buildings and structures design and calculations, 3D- modeling § Designing according with the LEED / BREEAM criteria § Town-planningdesign OUR MISSION

§ using the experience, knowledge and tools we have in the area of design and construction project management, we achieve solutions of our Client’s tasks within the stated terms, with an appropriate quality and not going beyond the stated budget. Client’s needs and tasks are always prevailed in our job. By proceeding from them we built the process in such a way that the result will satisfy or surpass our Partner’s expectations. KEY SECTORS

§ Industrial objects § Logistic centers and storages § Transportation § Water, sewage and waste removal § Hotels § Offices § Retail objects § Sport facilities § Shopping malls and multi-functional complexes § Residential buildings § Technical and ecological due diligence SERVICES

§ Project Management and Consulting § General Designer § Designing for all chapters and stages § Adaptation of foreign designs § Organizing and management of State commissioning procedures § 3D-modeling § Support in obtaining permits, approvals and handing over process § Technical Client Duties § Organizing tenders § Technical supervision § Author’s survey CONSTRUCTION PROJECT MANAGEMENT

§ EPCM (Engineering , procurement and § Feasibility study, approvals construction management) § Coordination of project participants in the § Construction and engineering tendering course of project implementation in arrangements accordance with the project budget and schedule § Contract negotiations and conclusion consultations § Solutions for construction problems § Project scheduling and budgeting § Construction site management ()including procurement cost evaluation § Construction control (Technical supervision) § Client’s Engineer functions (FIDIC) § Commissioning services - Management of handing over process - Supervision of maintenance staff training - Warranty period tasks DESIGN

§ General Designer’s services § Design and approvals management § All design sections and phases § Planning concepts of land plots and adjacent territories § Integrated design package( Basic and Detailed Engineering) required to get a conclusion of the Expertise Agency and for subsequent construction § Foreign designs adaptation § 3D-modeling § Architectural concept design § Author’s survey 3D-MODELING CONSULTING

§ Real estate and investment strategies § Situation analysis and options § Marketing research and investment substantiations § Due diligence & evaluations - Technical - Ecological - Commercial - Legislative (land plots) § Assistance in financial borrowing on favorable terms § Project planning and management § Risk management

§ Cost / Value project assessment § Project preparation and evaluations § Compilation of maintenance manuals and implementation of real estate information management systems § Real estate and project development (including assistance in search of tenants / ADVANTAGES FOR OUR CLIENTS

§ Local office network with in-depth knowledge of local environment and trained resources backed by unified quality system § Licensed in accordance with Russian laws and regulations § Modern management and engineering practices and systems § Wide range of experienced specialists to meet Client’s needs in diversified projects § Demonstrative and high quality visualization of solutions (photorealistic 3D rendering) § § Time and money saving Experienced management and complex approach reduces risks and § Optimization of design solutions, time enables achievement of set schedules and payments objectives § Guaranty of quality and compliance to the § Transparency – we always keep norms and project Client informed about project § Strong track record of successful projects achievements and problems OUR PARTNERS IN RUSSIA AND BEYOND OUR OBJECTS

§ For the years our company has work in projects with different difficulty level and different purpose, such as hotels, office and residential buildings, multifunctional complexes,торговые сооружения, different production buildings, storage complexes and terminals, cottage villages, boiler rooms, including internal and external engineering objects for such objects, whether it be new construction, reconstruction or planed repair. RESIDENTIAL AND ADMINISTRATIVE OBJECTS

Hotel «Scandinavia» Saint-Petersburg, Sestroretsk 2002-2003 Client «Peterburgskoye agentstvo nedvizhimosti»

Hypermarkets chain «K-Ruoka» Saint-Petersburg and Leningrad region 2013-2016 Client: «Kesko Real Estate»LLC

Business center «Sodruzhestvo» Saint-Petersburg, Kolomyazhsky pr., 27 2006-2007 Client: «Sodruzhestvo»CJSC RESIDENTIAL AND ADMINISTRATIVE OBJECTS

PERIOD PROJECT CLIENT

2002-2003 Hotel «Scandinavia» in Sestroretsk «Peterburgskoye agentsvo nedvizhimosti»

2003-2004 «Aquamarine» building of «Helios hotel» (Primosrkoye shosse, 50) «»Gelios Hotel

2003-2004 Service trading complex «A-LEN»LLC Saint-Petersburg, crossing of Bogatyrsky pr. and Polevaya Sabirovskaya st.

2003-2005 Business center «Klass»LLC Saint-Petersburg, Mitrofanyevskoye shosse, 2

2006-2007 Business center «Sodruzhestvo» «Sodruzhestvo»CJSC Saint-Petersburg, Kolomyazhsky pr., 27, stage 3

2007 «Karusel» hypermarket «Karusel»LLC Saint-Petersburg, Leninsky pr., 100/1

2010-2011 Administrative and trading complex for residential microdistrict for 2600 residents in «Karelia development»LLC, Mistolovo, of Leningrad region, stage P RBI, Petrostyle

2013 Reconstruction of the construction goods shop into the grocery store with non-food «Kesko Real Estate»LLC goods section K-Ruoka Saint-Petersburg, Urhov st., 7, lit. А General Designer, stages P and WD, project management PERIOD PROJECT CLIENT

2013-2014 K-Ruoka hypermarket in Pushkin «Kesko Real Estate»LLC General designer, stages P and WD, project management

2013-2014 K-ruoka hypermarket in Peterhof «Kesko Real Estate»LLC General designer, stages P and WD, project management

2014-2015 Reconstruction of the construction shop K-Rauta into the K-Ruoka hypermarket «Kesko Real Estate»LLC Saint-Petersburg, Shuvalovsky pr., 45, lit.А General Designer, stage P,project management

2014-2015 K-Ruoka hypermarket in «Kesko Real Estate»LLC Leningrad region, Kingisepp, Krikkovskoye shosse General Designer, stages P and WD, project management

2014-2015 Reconstruction of service center into the K-Ruoka hypermarket «Kesko Real Estate»LLC Saint-Petersburg, Simonova st, 13 b.2, lit.А General Designer, stages P and WD, project management

2014-2015 Reconstruction (extension) of multifunctional complex «Pearl Plaza» «SRV Development»LLC Saint-Petersburg, Peterhoskoye shosse, 51 lit. А Stage P

2015-2016 Reconstruction (extension) of multifunctional complex «Pearl Plaza» «Kesko Real Estate»LLC Saint-Petersburg, Peterhoskoye shosse, 51 lit. А

2016 K-Rauta trading complex at the address: Saint-Petersburg, Vyborgskoye shosse, «Kesko Real Estate»LLC 214 b.2

2016 Reconstruction of administrative and storage building with partial demolition at the «SRV Development»LLC address: Saint-Petersburg, Magnitogorskaya st., 11 lit. И Stage P ,,

PERIOD PROJECTS CLIENTS

2003-2005 «»Keys of Valday resort Real Estate Agency«» Rus Novgorod region

2005 Reconstruction of the«» Salut resort Private investor Pskov region

2005 «»Tzar fishing resort Grishko B.G. architectural studio

2005-2007 Village «Noviy Mir» Leningrad region «Osobnyak»LLC, LSR Group

2005-2007 Village «Malaya Gollandiya» («Ellegia») «Osobnyak»LLC, LSR Group Leningrad region

2005-2007 Village «Technopolis» «Osobnyak»LLC, LSR Group Leningrad region

2005-2007 Village «Park Perspektiv» «Osobnyak»LLC, LSR Group Leningrad region

2005-2007 Village «Country Club» «Osobnyak»LLC, LSR Group Leningrad region

2006 Sestroretsk, 38 km of Primorskoye shosse «Severny Gorod»CJSC, RBI

2010-2011 Sport complex in residential microdistrict for 2600 residents Leningrad region, «Karelia development»LLC, RBI, Vsevolozhsky district, Mistolovo Petrostyle Stage P

2014 Construction complex for 264 town-houses «StyleStroy»LLC Leningrad region, Vsevolozhsky district, Jukki, Leningrad shosse, 85 Stage sketch design RESIDENTIAL COMPLEXES

Residential microdistrict Mistola Hills Leningrad region, Mistolovo 2013-2015 Client: «Karelia development»LLC, RBI, Petrostyle

Residential Complex «Aleksandrit» Saint-Petersburg, Dachniy pr., 21 2013-2014 Client: “Konnolakhtinsky, 55”LLC

Residential Complex «Aleksandrit» Saint-Petersburg, Dachniy pr., 21 2013-2014 Client: “Konnolakhtinsky, 55”LLC RESIDENTIAL COMPLEXES

PERIOD PROJECT CLIENT

2003-2005 Residential complex «Orlovsky» Saint-Petersburg, Kolomyagi, microdistrict 14В, plot 6 «Sodruzhestvo»CJSC

2005-2006 Residential complex «Orlovsky-2» Saint-Petersburg, Kolomyagi, microdistrict 14В, plot 6 «Sodruzhestvo»CJSC

2004-2006 Residential buildings «GDSK»LLC, LSR Group Saint-Petersburg, Dolgoye lake, microdistrict 25А, building 45, building 49

2004-2005 Residential building «Vozrozhdeniye SPb»OJSC, LSR Saint-Petersburg, Bolshaya Morskaya st., 4 Group

2004-2005 Residential complex «Kalevala» Dom Lemkon Pavlovsk, crossing of the Berezovaya st. and Very Slutskoj st.

2004-2007 Residential complex «Pulkovskiy posad» Mityurev U.K. architectural studio Saint-Petersburg, Pulkovskoye shosse, 30 lit. К

2005 Residential building Mityurev U.K. architectural studio Saint-Petersburg, Vasilyevsky island, 10th line, 12

2005-2006 Residential complex «Grafsky prud-2» «Sodruzhestvo»CJSC Saint-Petersburg, Kolomyagi, Glavnaya st.

2006 Residential building «Reinderg&Sharov» Saint-Petersburg, Potemkinskaya st., 2 architectural studio

2006-2007 Residential complex «Dinastia» «NSK»LLC Leningrad region, Vsevologsk, Juzhniy microdistrict

2006-2009 Residential Complex «Oriental» «YIT-Lentek»LLC Saint-Petersburg, Baroshnaya st, 12/76

2007 Residential building «TST» architectural studio Leningrad region, Vsevologsk, crossing of Koltushskoye shosse and Vakhrusheva st. PERIOD PROJECT CLIENT

2008 Territory planning design Seven Hills, Scorpio Leningrad region, district, Tyarlevo

2007-2008 Low-rise residential complex for 1800 residents Seven Hills, Scorpio Leningrad region, Gatchina district, Tyarlevo

2010 Territory planning design 170ga Construction managing company Leningrad region, Lomonosov district, Ilyino village «Ilyino»

2010 Low-rise residential complex for 5500 residents (170ga) Construction managing company Leningrad region, Lomonosov district, Ilyino village «Ilyino» Architectual concept design

2008-2010 Leningrad region, Vsevologsk, Juzhniy microdistrict, quarter 12, stage 1-2 correction «Dopusk-0»CJSC

2009-2010 Leningrad region, Vsevologsk, Juzhniy microdistrict, stage 3 «Dopusk-0»CJSC

2009 Territory planning design «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle

2008-2010 Low-rise residential complex for 2600 residents «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle Stage P

2011-2013 Residential microdistrict Mistola Hills «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle Stages P and WD, 1st stage of contruction

2012-2015 Residential microdistrict Mistola Hills «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle Sketch design, stage P,2nd stage of construction

2012-2013 Residential building «GDSK»LLC, LSR Group Saint-Petersburg, Primorsky district, quarter 28А, plot 2 Sketch design

2012-2014 Residential Complex «Aleksandrit» with in-built underground parking «Konnolakhtinsky, 55» LLC Saint-Petersburg, Dachniy pr., 21 Stages P and WD PERIOD PROJECT CLIENT

2014-2015 Office building reconstruction «New office»CJSC Saint-Petersburg, Moika river embankment, 7 (Millionnaya, 8) Stage sketch design

2015-2016 Office building reconstruction «BPS»LLC Saint-Petersburg, Moika river embankment, 7 (Millionnaya, 8) Stage sketch design

PRIVATE RESIDENTIAL HOUSES

2002 Individual residential house Private investor Novgorod region

2002 Individual residential house Private investor Leningrad region

2005 Saint-Petersburg, Kolomyagi, 1stAlekseevskaya st., 3 Private investor

2004-2005 Individual residential house in Private investor

2005-2006 Model projects «Osobnyak» «Osobnyak»LLC, LSR Group

2007 Binding of the model projects in «Noviy mir» village «Osobnyak»LLC, LSR Group

2007-2008 Individual residential houses in «Noviy mir» village Private investors

2010 Individual residential house in Mikhailovka village in Lomonosov district of Leningrad region Private investor Car showroom Toyota Saint-Petersburg, Pulkovskoye shosse 2004 Client: «A-LEN»LLC

Sewage treatment facilities for Mistola Hills residential complex Leningrad region, Mistolovo 2010-2014 Client: «Karelia development»LLC, RBI, Petrostyle PRODUCTION AND TECHNICAL OBJECTS

PERIOD PROJECT CLIENT

2004 Car showroom Toyota Lexus «A-LEN»LLC Saint-Petersburg, Pulkovskoye shosse

2005 Production boiler room «Krionord»CJSC

2005 Production boiler room «OZON»

2007 Production building, Saint-Petersburg, Obvodny channel, 150 «Thermo»LLC

2008-2009 Administrative and production building «Thermo»LLC Saint-Petersburg, Volkhonskoye shosse, 115 build. 4 lit. А

2010-2012 Sewage treatment facilities for 2000 m3/day «Karelia development»LLC, RBI, Leningrad region, Vsevolozhsk district, Mistolovo Petrostyle stages concept design and P

2011-2012 Sewage treatment facilities for 1000 m3/day «Karelia development»LLC, RBI, Leningrad region, Vsevolozhsk district, Mistolovo Petrostyle stage concept design

2011-2012 1st stage pump station for water supply line Kuzmolovo-Mistolovo, for 3000m3/day «Karelia development»LLC, RBI, stage concept design Petrostyle

2012-2014 Sewage treatment facilities for 3200 m3/day «Karelia development»LLC, RBI, Leningrad region, Vsevolozhsk district, Mistolovo Petrostyle stages P and WD ENGINEERING NETWORKS

Gas supply networks for «K-Ruoka» hypermarkets Leningrad region, Kingisepp and Sosnovy Bor 2014-2015 Electric supply networks for the group Client: «Kesko Real Estate»LLC of villages «Alakul» 2006-2007 Client: «Osobnyak»LLC, LSR Group

Water supply and sewage networks, Leningrad region, Vsevologsk, Juzhniy microdistrict, quarters 11, 12 2006-2007 Client: «Dopusk-0»CJSC

Antifreezng system State complex«Congress palace» Saint-Petersburg, Strelna Heating networks for «Karusel»hypermarket 2002-2003 Saint-Petersburg, Leninsky pr., 100/1 Client: Direction for construction and reconstruction of objects in 2007 NWFD President’s Administration, OJSC«16th TREST» Client: «Karusel»LLC ELECTRIC SUPPLY NETWORKS

PERIOD PROJECT CLIENT 2006-2007 Antifreezng system «Osobnyak»LLC, LSR Group State complex«Congress palace»

2007 Complex for Saint-petersburg flooding safety complex: «LENHYDROPROJECT»OJSC networks to the fire station networks to the administration building networks to the ESF building

2008-2009 Administrative and production building «Thermo»LLC Saint-Petersburg, Volkhonskoye shosse, 115 build. 4 lit. А

2009-2011 Low-rise residential complex for 2600 residents «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle Stage P

2011 10kV electric line relocation from the residential construction site «Karelia development»LLC, RBI, for the low-rise residential complex for 2600 residents Petrostyle

2011 Low-rise residential complex for 2600 residents «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle Stage WD, 1st stage of construction

2014-2015 Low-rise residential complex for 2600 residents «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle Stage WD, 1st stage of construction WATER SUPPLY AND SEWAGE NETWORKS

PERIOD PROJECT CLIENT 2006-2007 Group of villages «Alakul» «Osobnyak»LLC, LSR Group Leningrad region

2006 Sestroretsk, 38km of Primorskoye shosse «Severny gorod»CJSC, RBI

2006-2007 Vsevolozhsk, microdistrict Juzhniy, quarter 12 «Dopusk-0»CJSC

2007 Water supply and sewage networks relocation «Petropol» Saint-Petersburg, Obukhovskoy Oborony pr., 110

2007 Vsevolozhsk, microdistrict Juzhniy, quarter 11 Architectural studio «TST»

2007 Complex for Saint-petersburg flooding safety complex: «LENHYDROPROJECT»OJSC networks to the fire station networks to the administration building networks to the ESF building

2008 Residential Complex «Oriental» «YIT-Lentek» CJSC Saint-Petersburg, Baroshnaya st, 12/76

2008-2009 Administrative and production building «Thermo»LLC Saint-Petersburg, Volkhonskoye shosse, 115 build. 4 lit. А

2009-2011 Low-rise residential complex for 2600 residents «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle Stage P

2010-2014 Water supply line Kuzmolovo-Mistolovo, for 3000m3/day «Karelia development»LLC, RBI, for the low-rise residential complex for 2600 residents Petrostyle Leningrad region, Vsevologsk district, Mistolovo Stages concept, project, working design

2010-2014 Storm sewage collector for 70 m3/hour for the low-rise residential complex for 2600 residents «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle Stages concept, project, working design PERIOD PROJECT CLIENT 2009-2011 Low-rise residential complex for 2600 residents «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle

2010-2011 Water supply line Kuzmolovo-Mistolovo, for 3000m3/day «Karelia development»LLC, RBI, for the low-rise residential complex for 2600 residents Petrostyle Leningrad region, Vsevologsk district, Mistolovo

2010-2011 Domestic sewage collector for 1 000 m3/day for the low-rise residential complex for 2600 «Karelia development»LLC, RBI, residents Petrostyle Leningrad region, Vsevologsk district, Mistolovo Stage concept

2010-2011 Storm sewage collector for 70 m3/hour for the low-rise residential complex for 2600 residents «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle Stage concept

2011 Low-rise residential complex for 2600 residents «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle 1st stage of construction, stage WD

2011-2012 Water supply line Kuzmolovo-Mistolovo, for 3000m3/day «Karelia development»LLC, RBI, stage P Petrostyle

2011-2012 Drinking water supply line Kuzmolovo-Mistolovo for 3200m3/day «Karelia development»LLC, RBI, stage P Petrostyle

2012-2013 Drinking water supply line for Mistolovo village for 3200m3/day «Karelia development»LLC, RBI, stage WD Petrostyle

2012-2013 Storm sewage collector for 70 m3/hour for the low-rise residential complex for 2600 residents «Karelia development»LLC, RBI, Mistola Hills, stage P Petrostyle

2012-2013 Domestic sewage collector for 1 000 m3/day for the low-rise residential complex for 2600 «Karelia development»LLC, RBI, residents Mistola Hills, stage P Petrostyle PERIOD PROJECT CLIENT 2013-2014 Drinking water supply line for Mistolovo village in Vsevolozhsk district for 3200m3/day «Karelia development»LLC, RBI, stage WD correction Petrostyle

2013-2014 Storm sewage collector for 70 m3/hour for the low-rise residential complex for 2600 residents «Karelia development»LLC, RBI, Mistola Hills, stage WD Petrostyle

2013-2014 Domestic sewage collector for 1 000 m3/day for the low-rise residential complex for 2600 «Karelia development»LLC, RBI, residents Mistola Hills, stage WD Petrostyle

2013-2014 Connection water supply line to the main water supply line for the residential complex Mistola «Karelia development»LLC, RBI, Hills for 1 000 m3/day, stage WD Petrostyle

2014-2015 Low-rise residential complex for 2600 residents «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle stage P,2nd stage of construction HEAT SUPPLY NETWORKS

PERIOD PROJECT CLIENT 2005-2006 Residential complex «Orlovsky-2» «Sodruzhestvo»CJSC Saint-Petersburg, Kolomyagi, 14В, plot 6

2007 «Karusel»hypermarket «Karusel»LLC Saint-Petersburg, Leninsky pr., 100/1

2007 Reconstruction of ТК-13 ofAvtovo avtomagistral-15 «RSU-103»CJSC

2007 Complex for Saint-petersburg flooding safety complex: «LENHYDROPROJECT»OJSC networks to the fire station networks to the administration building networks to the ESF building

2009 Administrative building «Avanta»LLC Saint-Petersburg, Serpokhovskaya st., 37

2013 Reconstruction of the construction goods shop into the grocery store with non-food goods «Kesko Real Estate»LLC section K-Ruoka Saint-Petersburg, Urhov st., 7, lit. А GAS SUPPLY NETWORKS

PERIOD PROJECT CLIENT

2005 Production boiler room «Krionord»CJSC

2006-2007 Group of villages «Alakul» «Osobnyak»LLC, LSR Group Leningrad region

2006-2007 Vsevolozhsk, microdistrict Juzhniy, quarter 12 «Dopusk-0»CJSC

2007 Gas supply networks relocation «Petropol» Saint-Petersburg, Obukhovskoy Oborony pr., 110

2008-2009 Administrative and production building «Thermo»LLC Saint-Petersburg, Volkhonskoye shosse, 115 build. 4 lit. А

2009-2011 Low-rise residential complex for 2600 residents «Karelia development»LLC, RBI, Leningrad region, Vsevologsk district, Mistolovo Petrostyle Stage P

2014 K-Ruoka hypermarket in Kingisepp «Kesko Real Estate»LLC General designer, P and WD stages

2015 K-Ruoka hypermarket in Sosnovy Bor «Kesko Real Estate»LLC General designer, P and WD stages ANTIFREEZING SYSTEMS

PERIOD PROJECT CLIENT

2002-2003 State complex «Congress palace» Direction for construction and Saint-Petersburg, Strelna reconstruction of objects in NWFD President’s Administration, OJSC«16th TREST»

2002-2003 State complex «Congress palace» Direction for construction and Counsil village reconstruction of objects in NWFD Saint-Petersburg, Strelna President’s Administration, OJSC«16th TREST»

2004 Residential house «Vozrozhdeniye SPb»OJSC, LSR Saint-Petersburg, Bolshaya Morskaya st., 4 Group

2004 Residential house «Vozrozhdeniye SPb»OJSC, LSR Saint-Petersburg, Shpalernaya st., 60 Group

2005 Residential house «Vozrozhdeniye SPb»OJSC, LSR Saint-Petersburg, Robespjera embankment, 4 Group

2006 Residential house «Vozrozhdeniye SPb»OJSC, LSR Saint-Petersburg, Kamennoostrovsky pr., 56-58 Group

2008-2009 Residential house «Vozrozhdeniye SPb»OJSC, LSR Saint-Petersburg, Kamennoostrovsky pr., 56-58 Group CONTACTS

«STROIPROJECT»LLC Saint-Petersburg

Design and project management services

192029, Russian Federation, Saint-Petersburg, Tkachey st., 5 lit. A Tel./Fax: +7 (812) 429-72-92 front_offi[email protected]

General Director: Alexey Efimov