“Stone Mine” Project at Khata No: 78, 58, 36, 66 ,27, 54, 40, 3, 17, Plot No
Total Page:16
File Type:pdf, Size:1020Kb
Proposed “Stone Mine” Project at Khata No: 78, 58, 36, 66 ,27, 54, 40, 3, 17, Plot No: 761, 764 , 808, 810, 815, 820, 803(P), 832(P), 834(P), 813, 822 Mauza: -Hathigarh , Thana: Litipara District: Pakur, Jharkhand. PRE-FEASIBILITY REPORT PROJECT PROPONENT- MR. HAKIM MOMIN Appendix- B PRE-FEASIBILITY REPORT EXECUTIVE SUMMARY 1. INTRODUCTION This is the new lease for stone mining in the name of Mr. Hakim Momin Lease for stone mining located in Mauza: Hathigarh, Thana: Litipara Plot 761, 764, 808, 810, 815, 820, 803(P), 832(P), 834(P), 822, 813 having area comprising of 4.14 Hectare (10.23 acres) for a period of 10 years from 18/10/2016. The applicant is intending to obtain Environmental Clearance for this stone mine as per direction of Honorable Supreme Court. The lease is located in the Hathigarh village having Proposal for the production capacity of 194000 Tonnes per annum. The applicant is a proprietor and entrepreneur and engages in mineral trading. The estimated project cost is Rs.56.40 Lakh. The expected life of stone mine is 5 years. This Stone mining project falls under the category “B2” Project or activity 1(a) as Per EIA Notification 2006, 2009 and 2011. 1.1 Silent features of the project Project Name M/s Hathigarh Stone Mine of Mr. Hakim Momin Location of Mine Plot No. 761, 764, 808, 810, 815, 820, 803(P), 832(P), 834(P), 822, 813 Area 4.14 Hectare (10.23 acres) at Mouza- Hathigarh, P.S..- Litipara, District – Pakur (JHK) Latitude/longitude Village Co-ordinate Hathigarh 24°43'48.92"N To 24°43'57.88"N” (4.14HECT.) 87°42'7.20"E To 87°42'19.13"E”. Topo Sheet number 72P/10&09 Land use 10.23 acres (4.14ha ) Minerals of mine Stone Total Mineable reserves 1920643Tonnes (proved ) Life of mine 10 years Proposed production of 194000 Tonnes minerals per year Method of mining Open Cast Semi mechanized method No. of working days 300 days Water demand Total Water requirement is about 5.72 to 6 KLD (Drinking & Domestic +Dust Suppression & other) Source of water Nearby water source (Surface Source, bore well of wells of nearby village ) © 2016 PECS all rights reserved Page 1 of 23 Project Feasibility Report(PFR) Proposed “Stone Mine” Project at Khata No: 78, 58, 36, 66 ,27, 54, 40, 3, 17, Plot No: 761, 764 , 808, 810, 815, 820, 803(P), 832(P), 834(P), 813, 822 Mauza: -Hathigarh , Thana: Litipara District: Pakur, Jharkhand. PRE-FEASIBILITY REPORT PROJECT PROPONENT- MR. HAKIM MOMIN Man power 36 (approx.) Nearest railways Station Pakur Railway Station ~ 20.5 km S/E, Nearest Airport Netaji Subhash Chandra Boss Airport, Kolkata ~ 306 Km (SE) Seismic Zone Zone II 2. The Present Land Use Pattern (part of the Land already degraded due to mining activity) Present and Future land Use Pattern Existing At the end of Pattern of Land Use plan Period At Conceptual period (Acre) Utilization (Acre) (Acre) Excavation 0.01 4.62 6.47(water Preserver) Backfilled & 0.0 0.0 1.42 Plantain area 0.0 Waste Dump 0.60 0.0 0.0 Stack Yard 0.15 0.0 0.20 Road 0.20 0.0 Infrastructure & 0.0 0.20 0.0 Crushing unit Plantation Within 0.0 safety Zone (Green 2.11 2.34 Belt) 0.0 Water Harvest 0.00 0.00 Unused area 10.02 2.35 0.0 Total 10.23 10.23 10.23 1.3 Proposed Planning: - Mining Method – Open Cast semi mechanized method shall be used for extraction of stone minerals Project Cost - Rs.56.4Lakh Production–194000Tonnes per annum 1.4 Conclusion: - India is going to become developed country in the coming years therefore India is focused on infrastructure development. Jharkhand possesses a leading role for production of Stone chips from stone mines. Stone is backbone of infrastructure such as road, rail, building etc. © 2016 PECS all rights reserved Page 2 of 23 Project Feasibility Report(PFR) Proposed “Stone Mine” Project at Khata No: 78, 58, 36, 66 ,27, 54, 40, 3, 17, Plot No: 761, 764 , 808, 810, 815, 820, 803(P), 832(P), 834(P), 813, 822 Mauza: -Hathigarh , Thana: Litipara District: Pakur, Jharkhand. PRE-FEASIBILITY REPORT PROJECT PROPONENT- MR. HAKIM MOMIN 2. INTRODUCTION OF THE PROJECT /BACKGROUNDINFORMATION 2.1 The Project: 2.1.1 Name of the Project This stone mining project is for mineral Stone. The project is located at Mouza- Hathigarh , P.S.- Litipara, District – Pakur (Jharkhand). The project falls in B2 category as per EIA Notification 2006. 2.1.2 Nature of Project: It is a new stone mining project and the process of obtaining environmental clearance is under process for New mining lease which was originally accorded for 10 years since 18/10/2016. The method of mining will be OTFM method. Stone will be crushed in order to transform them into suitable size as per as the demand and then is being directly dispatch to market. 2.1.3 Need for the Project: The stone mining project falls in Mouza- Hathigarh, P.S.- Litipara, District – Pakur in Jharkhand and area devoid of sufficient agricultural activities and other industrial activities. The earning/employment sources are limited. Most of the people are dependent on agriculture and this kind of mining activities. The mineral wealth of State of Jharkhand provides the employment opportunity to the people of state as well as region. Mining is one of the core sectors of industries, which play the crucial role in the process of regional economic development. 2.1.4 Demand & Supply Gap: The stone is an important component of the construction, Road, and Railway activities. Any thrust in these areas increase the demand as whole for stone minerals. During the last few years’ sudden increase in real estate, Road and Railway activities in the region enhanced the high demand of the stone. 2.2 Identification of project and project proponent Hakim Momin has been allocated the Plot No. 761, 764 , 808, 810, 815, 820, 803(P), 832(P), 834(P), 822, 813at for an area 10.23 acre (4.14) at Mouza- Hathigarh, P.S- Litipara, Dist. – Pakur (Jharkhand) for stone mining.The proposed rate of production of stone shall be 194000 Tonnes/Annum. The lease area comprises of non-forest in nature. The estimated project cost is Rs.56.4 Lakh. The expected life of mine is 5years from now onward. © 2016 PECS all rights reserved Page 3 of 23 Project Feasibility Report(PFR) Proposed “Stone Mine” Project at Khata No: 78, 58, 36, 66 ,27, 54, 40, 3, 17, Plot No: 761, 764 , 808, 810, 815, 820, 803(P), 832(P), 834(P), 813, 822 Mauza: -Hathigarh , Thana: Litipara District: Pakur, Jharkhand. PRE-FEASIBILITY REPORT PROJECT PROPONENT- MR. HAKIM MOMIN 2.3 Brief Information about the project The New project has proposed for mining of stone by OTFM method. The New lease area is 10.23 acres. The expected life of mine is 5 years now onward with rated capacity. Water requirement for the project for drinking use, dust suppression and green belt development will be 5.720KLD, which will be taken from nearby surface water sources. Purpose Required Water Quantity,(KLD) Dust suppression on roads 2.00 KLD Plantation in safety zone and road side 3.00 KLD Domestic use @ 20 liters per person 0.720 KLD Total Water Requirement 5.720 KLD 2.4 Export Possibility There is no proposal to export the stone minerals at this moment of time. 2.5 Domestic / Export Markets Domestic demand is one of the chief reasons for the rapid growth of stone mining in India. Thus, domestic market for stone as building material, Road construction and Railway demand is well established. 2.6 Employment Generation (Direct and Indirect) due to the project This project would generate employment for around 30 to 36 people. Local persons would be employed in the project when operation begins after lease proposal and EC. © 2016 PECS all rights reserved Page 4 of 23 Project Feasibility Report(PFR) Proposed “Stone Mine” Project at Khata No: 78, 58, 36, 66 ,27, 54, 40, 3, 17, Plot No: 761, 764 , 808, 810, 815, 820, 803(P), 832(P), 834(P), 813, 822 Mauza: -Hathigarh , Thana: Litipara District: Pakur, Jharkhand. PRE-FEASIBILITY REPORT PROJECT PROPONENT- MR. HAKIM MOMIN 3. PROJECT DESCRIPTION 3.1 Type of project including interlinked and interdependent projects, if any The New stone mining lease area of 4.14 ha located at the village Hathigarh. The estimated production of stone shall be 194000 Tonnes per annum. The mining of stone would be carried out by OTFM method. At present there is no interlinked project. The project falls under category “B2” Project or activity 1(a) as per EIA Notifications 2006, 2009, and 2011. 3.2 Location The New stone mining lease is located in Village – Hathigarh, P.S.- Litipara, District- Pakur, Jharkhand. The project is located at a distance of 20.5 Km from Pakur Railway Station. The coordinates of the Applied Mine lease area are given below: Village Co-ordinate(Bounded by) HATHIGARH 24°43'48.92"N To 24°43'57.88"N” (8.34 ACRES) 87°42'7.20"E To 87°42'19.13"E”. Nearest Highway is (SH) 9.2 km in West and is well connected through a village road and usable in all weather. The area is under the control of District Mining officer, Pakur District and Administrated by DC, Pakur. The GPS coordinate as observed for the New lease boundary pillars are given below: Topo sheet no 72P(G45V)/ 10 & 09 © 2016 PECS all rights reserved Page 5 of 23 Project Feasibility Report(PFR) Proposed “Stone Mine” Project at Khata No: 78, 58, 36, 66 ,27, 54, 40, 3, 17, Plot No: 761, 764 , 808, 810, 815, 820, 803(P), 832(P), 834(P), 813, 822 Mauza: -Hathigarh , Thana: Litipara District: Pakur, Jharkhand.