Cadangan Projek Pembangunan Ladang Hutan

Total Page:16

File Type:pdf, Size:1020Kb

Cadangan Projek Pembangunan Ladang Hutan CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – EIA (Schedule II) Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II) 2.0 INTRODUCTION This Terms of Reference (TOR) is for the preparation of an Environmental Impact Assessment (EIA) for “Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II). Hereinafter, it is referred to as the ‘Project’. The TOR report is complemented and should be review with Environmental Scoping Information (ESI) which provides further elaboration and shall serve as evidence on how the Project Proponents are derives the TOR for the logging project. 2.1 LIST OF CONSULTANTS AND STUDY TEAM The key personnel involved in this project are shown in Table 2.1, details of project proponent, while Table 2.2 is details of environmental consultants. NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-1 CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – EIA (Schedule II) Table 2.1: Details of Project Proponents PROJECT PROPONENT PERSON IN-CHARGE DATARAN WAJA SDN. BHD. 17A, Persiaran Muhibbah Jaya 1, Taman Muhibbah Jaya, 31100 Sungai Siput (U), Perak Darul Ridzuan. PLOT A (BLOCK/ PLOT A) MCGF Sdn. Bhd. MEWAH SUCI SDN. BHD. No. 206, Taman Okid, No.15-B, Kampung Suak Plang, 31100 Sungai Siput (U), 31100 Sungai Siput (U), Perak Darul Ridzuan. Perak Darul Ridzuan. PLOT B (BLOCK/ PLOT B) Person in-charge : Lim Chee Meng TUNAS DERAS SDN. BHD. Tel. No.: 05 - 598 7226, NO.238-B, Kampung Baru Lasah, Fax. No.: 05 – 598 7226 31100 Sungai Siput (U), PLOT C Perak Darul Ridzuan. E-mail: (BLOCK/ PLOT C) [email protected] SYARIKAT SRI BERSIA SDN. BHD. No.5, Kampung Simpang Temin, 31100 Sungai Siput (U), PLOT D Perak Darul Ridzuan. (BLOCK/ PLOT D) NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-2 CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – EIA (Schedule II) Table 2.2: Details of Environmental Consultants EIA CONSULTANT NILAIMAS SERVICES No. 17, Level 2 & 3, Jalan Equine 10D, Taman Equine, 43300 Seri Kembangan, Selangor. Tel: 03-8940 9959, Fax:03-8940 9958 Contact Person: Mohd Nawahidudin Bin Mohd Isa Designation: Managing Director EIA Team Members Table 2.3 shows the EIA team members involved in EIA logging project. NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-3 CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – EIA (Schedule II) Table 2.3: EIA Team Members Registration with DOE No Proposed Signature & Name Qualifications ID Valid . Category Area / Field Study Area Date No. Date A. EIA Study Team Leader 1. Mohd B. Sc Construction EIA Socio-Economic & C0350 30 Socio-Economic Nawahidudin Management (Anglia Consultant Traffic Impact August & Traffic Impact Bin Mahamad Polytechnic As Team Assessment 2021 Assessment Leader Isa University), Diploma Town 31 July 2019 Planning (UiTM) B. EIA Study Team Member -Water Quality -Water Quality Mohd Zikri B. Eng. Chemical EIA 31 May -Air Quality 2. -Air Quality C0398 Bin Azmi (UPM) Consultant 2021 -Noise Level -Noise Level 31 July 2019 EIA 3. Mohd Afandy B. Sc. (Biology and Ecological Studies Consultant bin Baba@ Ecology), MSc (Terrestrial Flora & 31 May Flora & Fauna C0359 Abdul Kadir (Aquatic Biology) Fauna), Fisheries 2021 Study 31 July 2019 NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-4 CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – EIA (Schedule II) 4. Ir Dr. Farid Ph.D. Research in Geotechnical SS1329 30 -Certified Bin Ahmad Ground Improvement Studies, Certified January Professional Erosion & Area (USM) CPESC 2020 Sediment Subject M.Sc Geotechnical Control Consultant Engineering (USM) (CPESC) B.Eng Civil 31 July 2019 (University of -Geotechnical Wollongong, Aus) Studies 5. En. BSc. (Civil EIA Hydrology C0748 31 May Hydrology Kamarul Engineering), M. Consultant 2022 Azlan Bin Civil Engineering (Hydraulics & Mohd Hydrology) 31 July 2019 Nasir 6. Fennyharty Bs. Tech EIA Solid and C0393 03 May Water Modelling Bt. Hazli Environemntal Consultant Scheduled Waste 2021 Techology Management 31 July 2019 NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-5 CHAPTER 2: TERMS OF REFERENCE EIA Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II) 2.2 SCOPE OF PROJECT The Project Proponents, Dataran Waja Sdn. Bhd., Mewah Suci Sdn. Bhd., Tunas Deras Sdn. Bhd. and Syarikat Sri Bersia Sdn. Bhd. intend to carry out the logging project on Block A, Block B, Blok C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) at Mukim Kenering, Hutan Simpan Bintang Hijau, Daerah Hulu Perak, Perak Darul Ridzuan. The overall total acreage of the proposed site at Block A (101 ha), Block B (101 ha), Block C (100 ha) and Block D (115 ha) are 417 hectares (1,030.43 acres). This logging project site can be accessed through old logging road from the main road of Jalan Baling – Gerik (A173 – Jalan Negeri) also known as FT4 (Jalan Persekutuan Lama). There is existing three (3) meters width timber track with lead to the proposed project site and distance is about 13 km from the main road. Almost 88% of the project site elevation is 300 meters above mean sea level. According to the subsection 34A of the Environmental Quality (Prescribed Activities) (Environmental Impacts Assessment) Order, 2015 the project falls under Schedule 2, Activity Forestry, 5(b)(i): Logging or conversion of forest to other land use within- a catchment area of reservoirs used for municipal water supply, irrigation or hydro power; and 5(c): Logging, or cutting or taking of timber from at 300 meters or more above mean sea level covering an area of 100 hectares or more, outside permanent reserved forest. For the logging activity, the prime activities expected to generate potential environmental impacts which include the following: • Boundary demarcation and positioning; • Mobilization of workforce; • Transport of equipment and supplies; • Site Clearing; • Construction of haulage road and working platform; • Improvement to drainage system; • Construction of silt trap, and ESCP; • Managing wastes at the Project Site; • Clearing of site involving forest clearing; • Loading and transportation of logs; and • Stockpile. NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-6 CHAPTER 2: TERMS OF REFERENCE EIA Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II) 2.3 ALTERNATIVES CONSIDERATIONS This logging project will generate economic benefits by providing employment opportunities to the local community and will uplift the quality of life of the people in the surrounding area which is a key issue in the sustainability platform. The future potential of this activity is foreseen to be promising in view of market demands. The proposed project will follow all guidelines by Department of Environment (DOE) in order to give minimum impacts to the environment. The detail of alternative consideration is show in Chapter 3 of Environmental Scoping Information Report. 2.4 SIGNIFICANT ENVIRONMENTAL IMPACTS TO BE STUDIED The details of environmental element are shown in Chapter 7 of ESI. Based on the projected activities, the significant environmental impacts that may potentially arise from this Project include the following. • Soil erosion and associated sediment pollution of the watercourses – due to the site clearing, construction of haulage road and preparation of working platform; • Loss of topsoil – loss of topsoil may be due to soil erosion and mixing with the overburden materials during the earthwork activities; • Air Pollution – in general; the activities are short-term in nature, and no burning of biomass is allowed. Biomass may be left on-site to biodegrade. Potential pollution may also be due to transportation activities, but the site is far from residential areas; • Loss of fauna, flora and habitats – may impact the habitat of existing fauna which may lead to migration to other undisturbed neighboring land ; • Noise Pollution – noise from heavy machinery and chain saws will be restricted to day time and the impact will be short-term and localized; • Generation of solid and liquid wastes – these includes biomass wastes, solid waste and liquid wastes are minimal as all workers shall be commuting daily to the site; • Aesthetics – due to the changes of the landscape. The modification of the existing topographical features shall be able to screen the visibility of this operation from adjacent interests; and • Socio-economic impacts – in terms of employment and business opportunities and upgrading of infrastructure in the area. NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-7 CHAPTER 2: TERMS OF REFERENCE EIA Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II) 2.5 LAND USE AND VISUAL Basically, the project site is within Hutan Simpan Bintang Hijau which is secondary forest surrounded with flora and fauna.
Recommended publications
  • Perak Heads of State Department and Local Authority Directory 2020
    PERAK HEADS OF STATE DEPARTMENT AND LOCAL AUTHORITY DIRECTORY 2020 DISTRIBUTION LIST NO. DESIGNATION / ADDRESS NAME OF TELEPHONE / FAX HEAD OF DEPARTMENT 1. STATE FINANCIAL OFFICER, YB Dato’ Zulazlan Bin Abu 05-209 5000 (O) Perak State Finance Office, Hassan *5002 Level G, Bangunan Perak Darul Ridzuan, 05-2424488 (Fax) Jalan Panglima Bukit Gantang Wahab, [email protected] 30000 IPOH 2. PERAK MUFTI, Y.A.Bhg. Tan Sri Dato’ Seri Haji 05-2545332 (O) State Mufti’s Office, Harussani Bin Haji Zakaria 05-2419694 (Fax) Level 5, Kompleks Islam Darul Ridzuan, Jalan Panglima Bukit Gantang Wahab, [email protected] 30000 IPOH. 3. DIRECTOR, Y.A.A. Dato Haji Asa’ari Bin 05-5018400 (O) Perak Syariah Judiciary Department, Haji Mohd Yazid 05-5018540 (Fax) Level 5, Kompleks Mahkamah Syariah Perak, Jalan Pari, Off Jalan Tun Abdul Razak, [email protected] 30020 IPOH. 4. CHAIRMAN, Y.D.H Dato’ Pahlawan Hasnan 05-2540615 (O) Perak Public Service Commission, Bin Hassan 05-2422239 (Fax) E-5-2 & E-6-2, Menara SSI, SOHO 2, Jalan Sultan Idris Shah, [email protected] 30000 IPOH. 5. DIRECTOR, YBhg. Dato’ Mohamad Fariz 05-2419312 (D) Director of Land and Mines Office, Bin Mohamad Hanip 05-209 5000/5170 (O) Bangunan Sri Perak Darul Ridzuan, 05-2434451 (Fax) Jalan Panglima Bukit Gantang Wahab, [email protected] 30000 IPOH. 6. DIRECTOR, (Vacant) 05-2454008 (D) Perak Public Works Department, 05-2454041 (O) Jalan Panglima Bukit Gantang Wahab, 05-2537397 (Fax) 30000 IPOH. 7. DIRECTOR, TPr. Jasmiah Binti Ismail 05-209 5000 (O) PlanMalaysia@Perak, *5700 Town and Country Planning Department, [email protected] 05-2553022 (Fax) Level 7, Bangunan Kerajaan Negeri, Jalan Panglima Bukit Gantang Wahab, 30000 IPOH.
    [Show full text]
  • P.072 Tapah Bahagian Pilihan Raya Negeri : N.46 Chenderiang
    SENARAI PUSAT MENGUNDI (SEHINGGA DAFTAR PEMILIH INDUK 2009) BAHAGIAN PILIHAN RAYA PARLIMEN : P.072 TAPAH BAHAGIAN PILIHAN RAYA NEGERI : N.46 CHENDERIANG Bil. No. Kod Daerah Mengundi Pusat Mengundi 1 072/46/01 Kuala Dipang Sekolah Kebangsaan Kuala Dipang 2 072/46/02 Sungai Siput Selatan Sekolah Jenis Kebangsaan (Cina) Sin Min, Sungai Siput Selatan 3 072/46/03 Kampong Sahum Sekolah Kebangsaan Sahom 4 072/46/04 Kuala Woho Sekolah Kebangsaan Batu 14, Jalan Pahang Tapah 5 072/46/05 Kampong Kinjang Sekolah Kebangsaan Sri Kinjang 6 072/46/06 Temoh Sekolah Jenis Kebangsaan (Cina) Hwa Min, Temoh 7 072/46/07 Pekan Temoh 8 072/46/08 Kampong Lubok Mas Sekolah Jenis Kebangsaan (Cina) Chenderiang 9 072/46/09 Sungai Chenderiang 10 072/46/10 Pekan Chenderiang Sekolah Kebangsaan Chenderiang 11 072/46/11 Jalan Pahang Sekolah Kebangsaan Datuk Kelana, Jalan Pahang 12 072/46/12 Kampong Datoh Sekolah Agama Rakyat Al Rahmaniah, Kampong Datok 13 072/46/13 Temoh Road Sekolah Kebangsaan Satu Jalan Hospital, Tapah 14 072/46/14 Kampong Seberang 15 072/46/15 Lubok Katak Sekolah Kebangsaan Batu Melintang, Tapah 16 072/46/16 Kampong Batu Melintang 17 072/46/17 Bukit Pagar Sekolah Jenis Kebangsaan (Cina) Bukit Pagar 18 072/46/18 Tanah Mas Sekolah Jenis Kebangsaan (Cina) Tanah Mas SENARAI PUSAT MENGUNDI (SEHINGGA DAFTAR PEMILIH INDUK 2009) BAHAGIAN PILIHAN RAYA PARLIMEN : P.072 TAPAH BAHAGIAN PILIHAN RAYA NEGERI : N.47 AYER KUNING Bil. No. Kod Daerah Mengundi Pusat Mengundi 1 072/47/01 Temoh Stesyen Sekolah Kebangsaan Temoh 2 072/47/02 Sungai Lesong Sekolah Kebangsaan
    [Show full text]
  • No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Taiping 15 16 17 NEGERI PERAK
    NEGERI PERAK SENARAI TAPAK BEROPERASI : 17 TAPAK Tahap Tapak No Kawasan PBT Nama Tapak Alamat Tapak (Operasi) 1 Batu Gajah TP Batu Gajah Batu 3, Jln Tanjung Tualang, Batu Gajah Bukan Sanitari Jalan Air Ganda Gerik, Perak, 2 Gerik TP Jln Air Ganda Gerik Bukan Sanitari D/A MDG 33300 Gerik, Perak Batu. 8, Jalan Bercham, Tanjung 3 Ipoh TP Bercham Bukan Sanitari Rambutan, Ipoh, Perak Batu 21/2, Jln. Kuala Dipang, Sg. Siput 4 Kampar TP Sg Siput Selatan Bukan Sanitari (S), Kampar, Perak Lot 2720, Permatang Pasir, Alor Pongsu, 5 Kerian TP Bagan Serai Bukan Sanitari Beriah, Bagan Serai KM 8, Jalan Kuala Kangsar, Salak Utara, 6 Kuala Kangsar TP Jln Kuala Kangsar Bukan Sanitari Sungai Siput 7 Lenggong TP Ayer Kala Lot 7345 & 7350, Ayer Kala, Lenggong Bukan Sanitari Batu 1 1/2, Jalan Beruas - Sitiawan, 8 Manjung TP Sg Wangi Bukan Sanitari 32000 Sitiawan 9 Manjung TP Teluk Cempedak Teluk Cempedak, Pulau Pangkor Bukan Sanitari 10 Manjung TP Beruas Kg. Che Puteh, Jalan Beruas - Taiping Bukan Sanitari Bukit Buluh, Jalan Kelian Intan, 33100 11 Pengkalan Hulu TP Jln Gerik Bukan Sanitari Pengkalan Hulu 12 Perak Tengah TP Parit Jln Chopin Kanan, Parit Bukan Sanitari 13 Selama TP Jln Tmn Merdeka Kg. Lampin, Jln. Taman Merdeka, Selama Bukan Sanitari Lot 1706, Mukim Jebong, Daerah Larut 14 Taiping TP Jebong Bukan Sanitari Matang dan Selama Kampung Penderas, Slim River, Tanjung 15 Tanjung Malim TP Penderas Bukan Sanitari Malim 16 Tapah TP Bidor, Pekan Pasir Kampung Baru, Pekan Pasir, Bidor Bukan Sanitari 17 Teluk Intan TP Changkat Jong Batu 8, Jln.
    [Show full text]
  • The Perak Development Experience: the Way Forward
    International Journal of Academic Research in Business and Social Sciences December 2013, Vol. 3, No. 12 ISSN: 2222-6990 The Perak Development Experience: The Way Forward Azham Md. Ali Department of Accounting and Finance, Faculty of Management and Economics Universiti Pendidikan Sultan Idris DOI: 10.6007/IJARBSS/v3-i12/437 URL: http://dx.doi.org/10.6007/IJARBSS/v3-i12/437 Speech for the Menteri Besar of Perak the Right Honourable Dato’ Seri DiRaja Dr Zambry bin Abd Kadir to be delivered on the occasion of Pangkor International Development Dialogue (PIDD) 2012 I9-21 November 2012 at Impiana Hotel, Ipoh Perak Darul Ridzuan Brothers and Sisters, Allow me to briefly mention to you some of the more important stuff that we have implemented in the last couple of years before we move on to others areas including the one on “The Way Forward” which I think that you are most interested to hear about. Under the so called Perak Amanjaya Development Plan, some of the things that we have tried to do are the same things that I believe many others here are concerned about: first, balanced development and economic distribution between the urban and rural areas by focusing on developing small towns; second, poverty eradication regardless of race or religion so that no one remains on the fringes of society or is left behind economically; and, third, youth empowerment. Under the first one, the state identifies viable small- and medium-size companies which can operate from small towns. These companies are to be working closely with the state government to boost the economy of the respective areas.
    [Show full text]
  • Contamination of Soils with Toxocara Eggs in Several Playgrounds of Ipoh, Perak
    MALAYSIAN JOURNAL OF VETERINARY RESEARCH pages 74-82 • VOLUME 9 NO. 2 JULY 2018 CONTAMINATION OF SOILS WITH TOXOCARA EGGS IN SEVERAL PLAYGROUNDS OF IPOH, PERAK DEBBRA M.1, ZARY S.2, ERWANAS A. I.1, AZIMA LAILI H.1, NURULAINI R.1, ADNAN M.1 AND AZIZAH D.1 1 Parasitology and Haematology Section, Veterinary Research Institute, Jalan Sultan Azlan Shah, Ipoh, Perak, Malaysia. 2 Universiti Sains Malaysia, 11800 Pulau Pinang, Malaysia * Corresponding author: [email protected]. ABSTRACT. Toxocariasis is an important INTRODUCTION cosmopolitan zoonotic disease mainly caused by Toxocara spp., a type of soil- According to Taylor et al. (2016), Toxocara transmitted helminth (STH) on cats and spp. is a group of parasitic STH classified dogs. In this study, 80 soil samples were under the family of Ascarididae and genus of taken from four public playgrounds and six Toxocara. Ascaridoids are among the largest neighbourhood playgrounds in Ipoh, Perak nematodes that affects many vertebrates between October and December 2016 to (mostly the domestic animals) as the adult determine the status of soil contamination stage can cause intestinal unthriftiness to with the eggs of Toxocara spp. Results young animals while their migratory larval showed that 32.5% from the total soil stage can cause pathological consequences. samples were positive with Toxocara spp. Both stages have socio-economic and eggs. Overall, five out of ten of the sampling veterinary significance (Li et al., 2006; Taylor sites were contaminated with Toxocara spp. et al., 2016). eggs. Besides that, the relationship between Toxocariasis (Toxocara infection) is the soil condition and the occurrence of listed as one of the five neglected parasitic the Toxocara spp.
    [Show full text]
  • GGAM #KITAJAGAKITA Girl Guide Association Malaysia Covid-19 Responses Karling, Ejin, Sharrada, Jillian
    G G A M C O V I D R E S P O N S E S : P H A S E 1 P A G E 1 GGAM #KITAJAGAKITA Girl Guide Association Malaysia Covid-19 Responses Karling, Ejin, Sharrada, Jillian #KitaJagaKita which means we take care of each other, regardless of race, religion, beliefs and social status. SUPPORTING OUR FRONTLINERS Malaysia has entered its eighth week under the Movement Control Order (MCO). While some of us are able to stay at home comfortably in an effort to flatten the curve and break the chain, there are many others struggling to make ends meet as industries are put on hold by the MCO. Malaysians have come together as one holding on strongly to #KitaJagaKita. Recognising the need to reach out to those in need, the Girl Guides Association Malaysia (GGAM) has been doing its part to lessen the burden of the pandemic to our community. 200 units of foldable beds contributed by GGAM for doctors and nurses. G G A M C O V I D R E S P O N S E S : P H A S E 1 P A G E 2 FACE MASKS WERE GENEROUSLY DONATED BY KEDAH, NEGERI SEMBILAN BRANCH AND OPEN COMPANY KEDAH BRANCH SOURCED OUT HAND SANITIZERS INNOVATE AND IMPROVISE Hospitals were facing a shortage with their equipment and the markets were running low on stock as well. GGAM branches started venturing into manufacturing their own equipments for these hospitals. SABAH, SARAWAK AND PAHANG BRANCH STARTED TO MAKE AND DISTRIBUTE FACE SHIELDS TO KEEP UP WITH THE HOSPITALS DEMAND G G A M C O V I D R E S P O N S E S : P H A S E 1 P A G E 3 TERENGGANU BRANCH DONATED PPE SUITS TO HOSPITALS IN NEED PAHANG BRANCH WORKING ON THE SHOE COVER AND HEAD COVER AS PART OF THE PPE.
    [Show full text]
  • Royal Belum State Park
    Guide Book Royal Belum State Park For more information, please contact: Perak State Parks Corporation Tingkat 1, Kompleks Pejabat Kerajaan Negeri, Daerah Hulu Perak, JKR 341, Jalan Sultan Abd Aziz, 33300 Gerik, Perak Darul Ridzuan. T: 05-7914543 W: www.royalbelum.my Contents Author: Nik Mohd. Maseri bin Nik Mohamad Royal Belum - Location 03 Local Community 25 Editors: Roa’a Hagir | Shariff Wan Mohamad | Lau Ching Fong | Neda Ravichandran | Siti Zuraidah Abidin | Introduction 05 Interesting Sites and Activities Christopher Wong | Carell Cheong How To Get There 07 within Royal Belum 29 Design & layout: rekarekalab.com Local History 09 Sites and Activities 31 ISBN: Conservation History 11 Fees And Charges 32 Printed by: Percetakan Imprint (M) Sdn. Bhd. Organisation of Royal Belum State Park 13 Tourism Services and Accommodation in 33 Printed on: FSC paper Physical Environment 14 Belum-Temengor 35 Habitats 15 Useful contacts 36 Photo credits: WWF-Malaysia Biodiversity Temengor Lake Tour Operators Association 37 Tan Chun Feng | Shariff Wan Mohamad | Mark Rayan Darmaraj | Christopher Wong | Azlan Mohamed | – Flora 17 Conclusion 38 Lau Ching Fong | Umi A’zuhrah Abdul Rahman | Stephen Hog | Elangkumaran Sagtia Siwan | – Fauna 19 - 22 Further Reading Mohamad Allim Jamalludin | NCIA – Avifauna 23 Additional photos courtesy of: Perak State Parks Corporation 02 Royal Belum – Location Titiwangsa Range and selected National and State Parks in Peninsular Malaysia. KEDAH Hala Bala THAILAND Wildlife Sanctuary PERLIS Bang Lang STATE PARK National Park
    [Show full text]
  • Daerah Kerian 2035
    Ringkasan Eksekutif DRAF RANCANGAN TEMPATAN DAERAH KERIAN 2035 KANDUNGAN Ringkasan Eksekutif DRAF RANCANGAN TEMPATAN DAERAH KERIAN 2035 Keperluan Dan Proses Penyediaan Rancangan Tempatan Profil Daerah Kerian Penemuan Utama Guna Tanah Semasa Daerah Kerian 2018 Kerangka dan Teras Pembangunan Daerah Kerian Cadangan Konsep Pembangunan Daerah Kerian Guna Tanah Cadangan Daerah Kerian 2035 Teras 1: Pertumbuhan Ekonomi Dinamik dan Berdaya saing Teras 2: Pembangunan Fizikal Mampan dan Reka Bentuk Persekitaran Menarik Teras 3: Kelestarian Alam Sekitar dan Infrastruktur Efisien Teras 4: Pembangunan Komuniti Sejahtera Teras 5: Urus Tadbir Cekap dan Mesra Rakyat KEPERLUAN PENYEDIAAN RANCANGAN TEMPATAN Menggantikan Rancangan Tempatan Daerah Kerian 2020 Yang Akan Tamat Pada Menyelaraskan Tahun 2020 susun atur tanah- tanah yang terletak Menyelaraskan bersempadan perancangan di Daerah dengan lot-lot yang Kerian selaras dengan Draf telah dibangunkan 01 Rancangan Struktur Negeri Perak 2040 08 02 Memperincikan klasifikasi kegunaan tanah (Kelas Mengenal pasti kawasan Kegunaan Tanah) 07 yang sesuai untuk dan densiti dimajukan serta corak pembangunan serta pembangunan yang akan mengukuhkan dilaksanakan syarat-syarat 03 pembangunan 04 06 Merangka semula Membantu Pihak sistem perparitan bagi Berkuasa Perancang mengatasi isu banjir di Tempatan (PBPT) dalam kawasan potensi banjir 05 menyelaras di bawah pentadbiran pembangunan dan Majlis Daerah Kerian Meminda zon guna kawalan perancangan tanah berdasarkan kelulusan Tukar Syarat Tanah, Kebenaran Merancang dan pembangunan
    [Show full text]
  • Cadangan Surau-Surau Dalam Daerah Untuk Solat Jumaat Sepanjang Pkpp
    JAIPK/BPM/32/12 Jld.2 ( ) CADANGAN SURAU-SURAU DALAM DAERAH UNTUK SOLAT JUMAAT SEPANJANG PKPP Bil DAERAH BILANGAN SURAU SOLAT JUMAAT 1. PARIT BUNTAR 3 2. TAIPING 8 3. PENGKALAN HULU 2 4. GERIK 8 5. SELAMA 4 6. IPOH 25 7. BAGAN SERAI 2 8. KUALA KANGSAR 6 9. KAMPAR 4 10. TAPAH 6 11. LENGGONG 4 12. MANJUNG 3 13. SERI ISKANDAR 5 14. BATU GAJAH 2 15. BAGAN DATUK Tiada cadangan 16. KAMPUNG GAJAH 1 17. MUALLIM 4 18. TELUK INTAN 11 JUMLAH 98 JAIPK/BPM/32/12 Jld.2 ( ) SURAU-SURAU DALAM NEGERI PERAK UNTUK SOLAT JUMAAT SEPANJANG TEMPOH PKPP DAERAH : PARIT BUNTAR BIL NAMA DAN ALAMAT SURAU 1. Surau Al Amin, Parit Haji Amin, Jalan Baharu, 34200 Parit Buntar, Perak Surau Al Amin Taman Murni, 2. Kampung Kedah, 34200 Parit Buntar, Perak Surau Ar Raudah, 3 Taman Desa Aman, 34200, Parit Buntar, Perak DAERAH : TELUK INTAN BIL NAMA DAN ALAMAT SURAU 1. Surau Al Huda, Taman Pelangi, 36700 Langkap, Perak 2. Madrasah Al Ahmadiah, Perumaham Awam Padang Tembak, 36000 Teluk Intan, Perak 3. Surau Taman Saujana Bakti, Taman Saujana Bakti, Jalan Maharajalela, 36000 Teluk Intan, Perak 4. Surau Taman Bahagia, Kampung Bahagia, 36000 Teluk Intan, Perak. 5. Surau Al Khairiah, Lorong Jasa, Kampung Padang Tembak, 36000 Teluk Intan, Perak. 6. Surau Al Mujaddid, Taman Padang Tembak, 36000 Teluk Intan, Perak. 7. Surau Taufiqiah, Padang Tembak, 36000 Teluk Intan, Perak 8. Surau Tul Hidayah, Kampung Tersusun, Kampung Padang Tembak Dalam, 36000 Teluk Intan, Perak Surau Al Mudassir, 9. RPA 4, Karentina', Batu 3 1/2, Kampung Batak Rabit, 36000 Teluk Intan, Perak Surau Kolej Vokasional ( Pertanian ) Teluk Intan, 10.
    [Show full text]
  • PERAK P = Parlimen / Parliament N = Dewan Undangan Negeri (DUN) / State Constituencies
    PERAK P = Parlimen / Parliament N = Dewan Undangan Negeri (DUN) / State Constituencies KAWASAN / STATE PENYANDANG / INCUMBENT PARTI / PARTY P054 GERIK HASBULLAH BIN OSMAN BN N05401 - PENGKALAN HULU AZNEL BIN IBRAHIM BN N05402 – TEMENGGOR SALBIAH BINTI MOHAMED BN P055 LENGGONG SHAMSUL ANUAR BIN NASARAH BN N05503 – KENERING MOHD TARMIZI BIN IDRIS BN N05504 - KOTA TAMPAN SAARANI BIN MOHAMAD BN P056 LARUT HAMZAH BIN ZAINUDIN BN N05605 – SELAMA MOHAMAD DAUD BIN MOHD YUSOFF BN N05606 - KUBU GAJAH AHMAD HASBULLAH BIN ALIAS BN N05607 - BATU KURAU MUHAMMAD AMIN BIN ZAKARIA BN P057 PARIT BUNTAR MUJAHID BIN YUSOF PAS N05708 - TITI SERONG ABU BAKAR BIN HAJI HUSSIAN PAS N05709 - KUALA KURAU ABDUL YUNUS B JAMAHRI PAS P058 BAGAN SERAI NOOR AZMI BIN GHAZALI BN N05810 - ALOR PONGSU SHAM BIN MAT SAHAT BN N05811 - GUNONG MOHD ZAWAWI BIN ABU HASSAN PAS SEMANGGOL N05812 - SELINSING HUSIN BIN DIN PAS P059 BUKIT GANTANG IDRIS BIN AHMAD PAS N05913 - KUALA SAPETANG CHUA YEE LING PKR N05914 - CHANGKAT JERING MOHAMMAD NIZAR BIN JAMALUDDIN PAS N05915 - TRONG ZABRI BIN ABD. WAHID BN P060 TAIPING NGA KOR MING DAP N06016 – KAMUNTING MOHAMMAD ZAHIR BIN ABDUL KHALID BN N06017 - POKOK ASSAM TEH KOK LIM DAP N06018 – AULONG LEOW THYE YIH DAP P061 PADANG RENGAS MOHAMED NAZRI BIN ABDUL AZIZ BN N06119 – CHENDEROH ZAINUN BIN MAT NOOR BN N06120 - LUBOK MERBAU SITI SALMAH BINTI MAT JUSAK BN P062 SUNGAI SIPUT MICHAEL JEYAKUMAR DEVARAJ PKR N06221 – LINTANG MOHD ZOLKAFLY BIN HARUN BN N06222 - JALONG LOH SZE YEE DAP P063 TAMBUN AHMAD HUSNI BIN MOHAMAD HANADZLAH BN N06323 – MANJOI MOHAMAD ZIAD BIN MOHAMED ZAINAL ABIDIN BN N06324 - HULU KINTA AMINUDDIN BIN MD HANAFIAH BN P064 IPOH TIMOR SU KEONG SIONG DAP N06425 – CANNING WONG KAH WOH (DAP) DAP N06426 - TEBING TINGGI ONG BOON PIOW (DAP) DAP N06427 - PASIR PINJI LEE CHUAN HOW (DAP) DAP P065 IPOH BARAT M.
    [Show full text]
  • The Effect of Seasonal Changes on Freshwater Fish Assemblages and Environmental Factors in Bukit Merah Reservoir (Malaysia)
    Transylv. Rev. Syst. Ecol. Res. 16.1 (2014), "The Wetlands Diversity" 97 THE EFFECT OF SEASONAL CHANGES ON FRESHWATER FISH ASSEMBLAGES AND ENVIRONMENTAL FACTORS IN BUKIT MERAH RESERVOIR (MALAYSIA) Zakeyuddin MOHD SHAFIQ *, Md Sah AMIR SHAH RUDDIN *, Hazrin Hashim ZARUL *, Puteh KHALED *, Mohammad SYAIFUL ** and Wan Omar WAN MAZNAH * * University Sains Malaysia, School of Biological Sciences, Minden, Penang, Malaysia, MY-11800, [email protected], [email protected], [email protected], [email protected] ** Pulau Banding Rainforest Research Center, Pulau Banding, Gerik, Perak, Malaysia, MY-33300, [email protected] DOI: 10.1515/trser-2015-0005 KEYWORDS: Malaysia, Bukit Merah Reservoir, seasonal changes, freshwater fish, environmental factors. ABSTRACT Seasonal changes of freshwater fish assemblages and environmental factors in Bukit Merah Reservoir were carried out from January-February 2013 (dry season) to March-April 2013 (wet season) by measuring several physico-chemical parameters such as dissolved oxygen (DO), water temperature, pH, water conductivity, total dissolved solids (TDS) and water clarity. 19 fish species comprising of 10 families were collected by using experimental gill nets with different mesh sizes at four different sampling stations. Mean CPUE for total catch and biomass were significantly different between dry and wet season (p < 0.05). Based on a T-test analysis, water temperature, pH and conductivity were significantly different (p < 0.05) between seasons whereas a one-way ANOVA displayed a significant difference in TDS and water clarity between sampling stations (p < 0.05), implicating that those factors did not give major influence towards other parameters in a man-made reservoir. From all fish species studied, only mean CPUE for individuals (CPUEn) of Osteochilus vittatus and Oxygaster anomalura had a significant difference between seasons (p < 0.05); probably an indicator of their migration season.
    [Show full text]
  • Urban Sustainable Development in Tourism Industry Lead by Local Authority at Ipoh City, Perak, Malaysia
    ISSN 2349-7831 International Journal of Recent Research in Social Sciences and Humanities (IJRRSSH) Vol. 4, Issue 2, pp: (157-159), Month: April - June 2017, Available at: www.paperpublications.org Urban Sustainable Development in Tourism Industry Lead by Local Authority at Ipoh City, Perak, Malaysia Sharulnizam Jaafar1, Shamsul Anuar Mohamed Nor2, Shahrul Akmal Shah Minan3 Faculty of Management and Information Technology, Sultan Azlan Shah University, Kuala Kangsar, Perak, Malaysia Abstract: Dealing with urban sustainable development especially tourism industry needs proper planning and implementation by the local authorities. The aim of this article is to show that proper planning and good execution will achieve exponential growth of economy for the locals as well as the local authorities. The paper will explore the focal point in tourism taken by Ipoh City Council in relation to sustainable development. The findings reveal challenges and issues experienced by the local authorities with regards to setting the direction, development and management of tourism development. Conclusion is to ensure tourism development sustainability in the long term. Keywords: Sustainable development, tourism industry, planning, implementation, local authorities, Ipoh City Council. 1. INTRODUCTION A habitat city under the United Nation’s programme is to promote socially, and sustainable towns and cities with the main goal of providing adequate shelter for all. [1] The programme comprised of conception component of a liveable city, a sustainable city, a safe city, a healthy city and many others. Basically all these will help in making the city a better place to live, work and socialize. Many local governments have a strong, positive track record of promoting sustainable development.
    [Show full text]