2.0 INTRODUCTION

This Terms of Reference (TOR) is for the preparation of an Environmental Impact Assessment (EIA) for “Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II).

Hereinafter, it is referred to as the ‘Project’.

The TOR report is complemented and should be review with Environmental Scoping Information (ESI) which provides further elaboration and shall serve as evidence on how the Project Proponents are derives the TOR for the logging project.

2.1 LIST OF CONSULTANTS AND STUDY TEAM

The key personnel involved in this project are shown in Table 2.1, details of project proponent, while Table 2.2 is details of environmental consultants.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-1

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – EIA (Schedule II)

Table 2.1: Details of Project Proponents PROJECT PROPONENT PERSON IN-CHARGE

DATARAN WAJA SDN. BHD. 17A, Persiaran Muhibbah Jaya 1,

Taman Muhibbah Jaya, 31100 (U),

Perak Darul Ridzuan. PLOT A (BLOCK/ PLOT A)

MCGF Sdn. Bhd. MEWAH SUCI SDN. BHD. No. 206, Taman Okid, No.15-B, Kampung Suak Plang, 31100 Sungai Siput (U), 31100 Sungai Siput (U), Perak Darul Ridzuan. Perak Darul Ridzuan. PLOT B (BLOCK/ PLOT B) Person in-charge : Lim Chee Meng

TUNAS DERAS SDN. BHD. Tel. No.: 05 - 598 7226, NO.238-B, Kampung Baru Lasah, Fax. No.: 05 – 598 7226 31100 Sungai Siput (U), PLOT C Perak Darul Ridzuan. E-mail: (BLOCK/ PLOT C) [email protected]

SYARIKAT SRI BERSIA SDN. BHD. No.5, Kampung Simpang Temin, 31100 Sungai Siput (U), PLOT D Perak Darul Ridzuan. (BLOCK/ PLOT D)

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-2

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – EIA (Schedule II)

Table 2.2: Details of Environmental Consultants EIA CONSULTANT

NILAIMAS SERVICES No. 17, Level 2 & 3, Jalan Equine 10D, Taman Equine, 43300 Seri Kembangan, . Tel: 03-8940 9959, Fax:03-8940 9958

Contact Person: Mohd Nawahidudin Bin Mohd Isa Designation: Managing Director

EIA Team Members

Table 2.3 shows the EIA team members involved in EIA logging project.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-3

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – EIA (Schedule II)

Table 2.3: EIA Team Members Registration with DOE No Proposed Signature & Name Qualifications ID Valid . Category Area / Field Study Area Date No. Date A. EIA Study Team Leader

1. Mohd B. Sc Construction EIA Socio-Economic & C0350 30 Socio-Economic Nawahidudin Management (Anglia Consultant Traffic Impact August & Traffic Impact Bin Mahamad Polytechnic As Team Assessment 2021 Assessment Leader Isa University),

Diploma Town 31 July 2019 Planning (UiTM)

B. EIA Study Team Member

-Water Quality -Water Quality Mohd Zikri B. Eng. Chemical EIA 31 May -Air Quality 2. -Air Quality C0398 Bin Azmi (UPM) Consultant 2021 -Noise Level -Noise Level 31 July 2019

EIA 3. Mohd Afandy B. Sc. (Biology and Ecological Studies Consultant bin Baba@ Ecology), MSc (Terrestrial & 31 May Flora & C0359 Abdul Kadir (Aquatic Biology) Fauna), Fisheries 2021 Study 31 July 2019

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-4

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – EIA (Schedule II)

4. Ir Dr. Farid Ph.D. Research in Geotechnical SS1329 30 -Certified Bin Ahmad Ground Improvement Studies, Certified January Professional Erosion & Area (USM) CPESC 2020 Sediment Subject M.Sc Geotechnical Control Consultant Engineering (USM) (CPESC) B.Eng Civil 31 July 2019 (University of -Geotechnical Wollongong, Aus) Studies

5. En. BSc. (Civil EIA Hydrology C0748 31 May Hydrology Kamarul Engineering), M. Consultant 2022 Azlan Bin Civil Engineering (Hydraulics & Mohd Hydrology) 31 July 2019 Nasir

6. Fennyharty Bs. Tech EIA Solid and C0393 03 May Water Modelling Bt. Hazli Environemntal Consultant Scheduled Waste 2021 Techology Management 31 July 2019

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-5

CHAPTER 2: TERMS OF REFERENCE EIA Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

2.2 SCOPE OF PROJECT

The Project Proponents, Dataran Waja Sdn. Bhd., Mewah Suci Sdn. Bhd., Tunas Deras Sdn. Bhd. and Syarikat Sri Bersia Sdn. Bhd. intend to carry out the logging project on Block A, Block B, Blok C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) at Mukim Kenering, Hutan Simpan Bintang Hijau, Daerah Hulu Perak, Perak Darul Ridzuan.

The overall total acreage of the proposed site at Block A (101 ha), Block B (101 ha), Block C (100 ha) and Block D (115 ha) are 417 hectares (1,030.43 acres). This logging project site can be accessed through old logging road from the main road of Jalan Baling – (A173 – Jalan Negeri) also known as FT4 (Jalan Persekutuan Lama). There is existing three (3) meters width timber track with lead to the proposed project site and distance is about 13 km from the main road.

Almost 88% of the project site elevation is 300 meters above mean sea level. According to the subsection 34A of the Environmental Quality (Prescribed Activities) (Environmental Impacts Assessment) Order, 2015 the project falls under Schedule 2, Activity Forestry, 5(b)(i): Logging or conversion of forest to other land use within- a catchment area of reservoirs used for municipal water supply, irrigation or hydro power; and 5(c): Logging, or cutting or taking of timber from at 300 meters or more above mean sea level covering an area of 100 hectares or more, outside permanent reserved forest.

For the logging activity, the prime activities expected to generate potential environmental impacts which include the following: • Boundary demarcation and positioning; • Mobilization of workforce; • Transport of equipment and supplies; • Site Clearing; • Construction of haulage road and working platform; • Improvement to drainage system; • Construction of silt trap, and ESCP; • Managing wastes at the Project Site; • Clearing of site involving forest clearing; • Loading and transportation of logs; and • Stockpile.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-6

CHAPTER 2: TERMS OF REFERENCE EIA Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

2.3 ALTERNATIVES CONSIDERATIONS

This logging project will generate economic benefits by providing employment opportunities to the local community and will uplift the quality of life of the people in the surrounding area which is a key issue in the sustainability platform. The future potential of this activity is foreseen to be promising in view of market demands. The proposed project will follow all guidelines by Department of Environment (DOE) in order to give minimum impacts to the environment. The detail of alternative consideration is show in Chapter 3 of Environmental Scoping Information Report.

2.4 SIGNIFICANT ENVIRONMENTAL IMPACTS TO BE STUDIED

The details of environmental element are shown in Chapter 7 of ESI. Based on the projected activities, the significant environmental impacts that may potentially arise from this Project include the following. • Soil erosion and associated sediment pollution of the watercourses – due to the site clearing, construction of haulage road and preparation of working platform; • Loss of topsoil – loss of topsoil may be due to soil erosion and mixing with the overburden materials during the earthwork activities; • Air Pollution – in general; the activities are short-term in nature, and no burning of biomass is allowed. Biomass may be left on-site to biodegrade. Potential pollution may also be due to transportation activities, but the site is far from residential areas; • Loss of fauna, flora and habitats – may impact the habitat of existing fauna which may lead to migration to other undisturbed neighboring land ; • Noise Pollution – noise from heavy machinery and chain saws will be restricted to day time and the impact will be short-term and localized; • Generation of solid and liquid wastes – these includes biomass wastes, solid waste and liquid wastes are minimal as all workers shall be commuting daily to the site; • Aesthetics – due to the changes of the landscape. The modification of the existing topographical features shall be able to screen the visibility of this operation from adjacent interests; and • Socio-economic impacts – in terms of employment and business opportunities and upgrading of infrastructure in the area.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-7

CHAPTER 2: TERMS OF REFERENCE EIA Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

2.5 LAND USE AND VISUAL

Basically, the project site is within Hutan Simpan Bintang Hijau which is secondary forest surrounded with flora and fauna. The key plan of proposed project site is shown in Figure 2.1. There are no other activities noted within the project area. Existing land use of the proposed site is forest, hilly and agricultural areas. This project site at Mukim Kenering is under the administration of Majlis Daereh Gerik. The proposed site is located on land use Blok Perancangan Kecil (BPK) 5.1: Hutan Simpan Bintang Hijau. The zoning at the proposed project site has been approved by Pengarah Tanah dan Galian Negeri Perak on 17 May 2018 as an zone in accordance with the decision of the Perak State Government Council with letter reference number: No. (14) dlm PTG.PK 252 / 5-119 (E) on May 2017 and letter dated 13 June 2017, (see Appendix 6B).

The potential existing sensitive receptors that may be impacted by this project include the existing land use around the site, secondary forest area, agricultural area, water intakes, and several species of flora, fauna and avifauna. The boundaries of the project site are delineated by the coordinates listed in Table 2.4 and shown in Figure 2.2.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-8

CHAPTER 2: TERMS OF REFERENCE EIA Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

Table 2.4: Coordinates of Boundary Project Site. Point Latitude Longitude A 5° 23' 26.256" N 101° 1' 25.322" E B 5° 23' 25.122" N 101° 1' 22.267" E C 5° 23' 10.433" N 101° 1' 1.687" E D 5° 23' 6.690" N 101° 0' 58.676" E E 5° 22' 46.541" N 101° 0' 51.461" E F 5° 23' 2.296" N 101° 0' 47.445" E G 5° 23' 9.745" N 101° 0' 43.695" E H 5° 23' 16.887" N 101° 0' 40.954" E I 5° 23' 26.688" N 101° 0' 42.547" E J 5° 23' 29.900" N 101° 0' 42.234" E K 5° 23' 36.556" N 101° 0' 41.270" E L 5° 23' 44.613" N 101° 0' 33.640" E M 5° 23' 53.333" N 101° 0' 29.066" E N 5° 24' 23.913" N 101° 0' 15.267" E O 5° 24' 30.479" N 101° 0' 12.375" E P 5° 24' 50.211" N 101° 0' 8.580" E Q 5° 24' 52.769" N 101° 0' 6.709" E R 5° 25' 12.415" N 101° 0' 0.820" E S 5° 25' 22.747" N 101° 0' 1.003" E T 5° 25' 22.847" N 101° 0' 4.893" E U 5° 25' 18.977" N 101° 0' 9.561" E V 5° 24' 35.798" N 101° 0' 40.926" E W 5° 24' 24.003" N 101° 0' 48.622" E X 5° 24' 13.938" N 101° 0' 59.906" E Y 5° 24' 10.321" N 101° 1' 3.008" E Z 5° 24' 4.411" N 101° 1' 9.404" E AA 5° 23' 48.190" N 101° 1' 18.990" E

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-9

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, EIA Perak Darul Ridzuan – (Schedule II).

(Source: ECA Environmental Consultant Agencies) Figure 2.1: Key plan of the proposed project site

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-10

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II). EIA

REPRESENTATIVE OF PROJECT PROPONENT ENVIRONMENTAL CONSULTANT PROJECT TITLE

PROPOSED LOGGING PROJECT ON BLOCK A, BLOCK B, BLOCK C AND BLOCK D WITH AN AREA OF 417 HECTRAES AT MUKIM KENERING, DAERAH HULU PERAK, PERAK

Figure 2.2: Boundaries with coordinates of the project site

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-11

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

2.6 ASSESSMENT STANDARDS

Table 2.5 shows the guidelines and standards of parameters sampling.

Table 2.5: Guidelines and Standards of Parameters Sampling Environmental Parameters Sampling Method Guidelines / Standards Components • DOE Class II B (INWQS) Limit pH pH - 5.5—9.0 BOD BOD - not greater than 50 mg/l COD COD - not greater than 100 DO mg/l • Grab sample and in-situ AN DO - 5.0—7.0 Water Quality measurement (for O&G O&G - 10 temperature, pH, DO) TSS TSS - not greater than 100

E.coli mg/l Turbidity AN - not greater than 0.3 NO3 mg/l NH3-N E-coli - not greater than 400counts/100ml Turbidity - 100 NTU • Standard B under the Fifth Total • Grab samples and Schedule, Environmental Suspended Standard Method Quality (Sewage)

Solids Procedure. Regulation, 2009. (TSS) TSS - not greater than 100 mg/l • Using Integrated Sound • Recommended Noise Level Level Meter (ISLM) • Instantaneous sampling Day time - Leq ≤ 65dB(A) LAeq every 5 minutes for 30 Nighttime - Leq ≤ 55dB(A) Ambient Noise Lmax minutes (daytime &

L90 night) • Measurement is carried out at the sensitive receivers. • Using High Volume • Malaysian Recommended Sampler. Air • Measurement is carried Quality Guidelines

Particulate out in the morning, Air Quality PM10 - not greater than 150 Matter afternoon and evening. • Measurement is carried µg/m3/day (PM10) out for total duration 30 minutes within 5 minutes intervals.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-12

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

2.7 TIMELINE OF STUDIES

The environmental study for this project will be undertaken for the duration of approximately six (6) months. The detail of study timeline can be referred in Chapter 4 of Environmental Scoping Information (ESI).

2.8 CONSIDERATION OF CONCURRENT PROJECTS

No activities are noted within the proposed site. There are a few logging activities to the North of the site such as Budi Rimba Sdn. Bhd. and Sulaman Saluran Sdn. Bhd. site within radius five (5 km) from the project site.

2.9 MODELLING TOOLS, ASSESSMENT METHODOLOGIES

The key tools and methodologies that will be used for the EIA study are briefly described below. The details of assessment methodologies are shown in Chapter 6 of ESI.

Water Quality The study shall assess the status of water quality in the area where the Project is located, including all existing pollution sources and all affected tributaries flowing out of the project site. Water samples will be from surface water from nearby rivers and groundwater. Parameters expected to be monitored are temperature, DO, BOD, pH, TSS, dissolved solids, nitrogen, phosphorus, metals, ammonia, nitrate, oil & grease and E. coli.

Air Quality The EIA study shall assess the existing status of air quality in the area; identify potential sources of pollution that may collectively affect the local and regional air quality around the Project. The study will provide data for the Particulate Matter (PM10), Carbon Monoxide, Sulphur Dioxide

(SO2) and Nitrogen Dioxide (NO2) content generated from the surrounding areas at the selected points.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-13

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

Noise Quality The noise monitoring stations shall be selected based on the most sensitive receiver areas surrounding the Project site and selected proposed truck routes. The minimum and maximum noise levels, Lmin and Lmax, which defines the range of noise level data during measurement, will be recorded in dBA.

Soil and Erosion The Revised Universal Soil Loss Equation (RUSLE) will be employed to predict the annual rate of erosion on field slope. An existing soil loss during current condition will be predicted based on RUSLE estimation. Further soil loss during project implementation (with and without preservation) and during operation also could be estimated.

The calculation of soil loss and sediment yield will be prepared based on “Guidelines Document for Addressing Soil Erosion and Sediment Control Aspects in Environmental Impact Assessment (EIA) Report” prepared by the Department of Environment 2010, “Guideline for Erosion and Sediment Control in ” by the Department of Irrigation and Drainage 2010 and the “Urban Storm Water Management Manual for Malaysia” prepared by the Department of Irrigation and Drainage, 2011. ESCP study will be conducted and analyzed during this project. Guideline Jabatan Pengairan dan Saliran culvert are attached in Appendix 2A.

Geological terrain mapping shall be conducted which covers all the relevant aspects and impacts subjected to erosion risk. Geology and geomorphology study which discussed on the surface condition, subsurface condition, hydrological condition, and geological model to be conducted to be the basis information for geological terrain mapping. Table 2.6 shows slope analysis for logging activity at project site. The details of slope analysis are shown in Chapter 6 of Environmental Scoping Information (ESI) report.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-14

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

Table 2.6: Slope analysis for logging activity at this project site No. Slope Classification Area Percentage (Hectare) (%) 1 Class I (0° – 15°) 140.30 33.64 2 Class II (15° – 25°) 172.38 41.33 3 Class III (25° – 35°) 94.19 22.58 4 Class IV (35° above) 10.22 2.45

Flora The method will include the modified Rapid Botanical Survey (RBS) technique. A reconnaissance survey of the study site will be carrying out to collect information on the general landscape and ecology and to mark the distribution and extent of cover.

Fauna This aspect will be via the daily observations and surveys. Standard methods for measuring and monitoring biological diversity for avifauna will be employed. The 's survey will be carried out using random survey methods in the proposed site and all the secondary signs on the left and right of the paths.

Socio-economy The method will be including interview and questionnaire distribution in a region defined as the zone of influence which is a region circumscribed within one (1) km – five (5) km radius from the proposed project site.

2.10 POSSIBLE MITIGATION MEASURES

Several potential mitigation measures or best management practices from similar projects would be used to address the environmental impacts of this project (see Table 2.7, possible impact and mitigation measures). The details of possible impacts and mitigation measure are shown in Chapter 8 of ESI.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-15

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

Table 2.7: Possible Impact and Mitigation Measures Impact Project Impact of project Mitigation Measures Activity activity Air • Clearing During the clearing • Before work commences, Pollution activities period, CO, SO2, NO2 the contractor will prepare a • Transportation and CO2 are the most dust control strategy in of materials concerned gaseous as agreement with regulatory these are a typical requirements. criteria pollutants that • Dust control strategy such affect the ambient air as spraying water during the quality. dry period and haulage Airborne dust from this routes, and prepare proper activity can cause design by the contractor. damage and nuisance, the extent of which depends upon their composition and concentration. Water • Clearing The existing water • Redirect storm water around Quality activities quality will be project site using drains, • Waste deteriorating due to this collection, and diversion contamination activity which may ditches. involve earthwork • Minimize earthwork operation. Surface runoff operations during periods of of earth materials and high rainfall. waste contamination • Reduce site runoff by may be channeled into grassing and sealing soil existing waterways / and overburden mound and water bodies. by progressive restoration of logging areas. Noise • Logging The adverse effects of • Selection of ‘quiet’ plant and activities noise are interference work methods. • Transportation with communication, • Vehicles speed restriction activity hearing loss, shall be imposed. disturbance of sleep, • Silencers on equipment stress and annoyance. should be utilized and maintain regularly. Traffic • Transportation The mobilization of • The project proponent shall vehicles may cause develop specific transport/ minor disruption to the traffic safety plans to include existing traffic flow which vehicle routing, policy, laws is the main access road and regulations, briefings to the Project site. and training, vehicle maintenance and

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-16

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

operational procedures, training and safe driving techniques. Solid and • Land clearing During the operation, • All wastes are to be stored hazardous • Logging domestic and solid in appropriate designated waste activity wastes will be and marked areas and open generated. These shall burning shall be prohibited. never be disposed at the site; all wastes shall be disposed of in a landfill.

Flora • Land clearing Impacts from the site • Site clearing shall be clearing and earthworks conducted in stages to avoid during the site massive clearance at one preparation logging particular time; activity phase on the • Site clearing shall be limited flora component will be to the areas dedicated to the permanents with direct logging activities only. impact to the vegetation on the proposed development plan.

Fauna • Land Clearing During the site • Site clearing shall be preparation stage, there conducted in stages to will be an abrupt and avoid massive clearance at permanent loss of the one particular time also present animal habitat shall be limited to the areas for all wildlife species. dedicated to the logging activities only. Socio- • Logging Project development will • Project proponent should economic activity require manpower that formulate a long-term shall result in strategy concerning the employment training of workers by opportunities for the emphasizing the efficiency communities living in the and quality of productivity. surrounding areas. Slope • Land Clearing During site clearing and • Develop refine modelling protection • Flogging logging activity, the bare studies (Geological Terrain activity land is subjected to Mapping) to be conducted higher erosion which before logging activities may cause landslides. which cover the suitability of Siltation may occur in the proposed project area, the adjacent water geo-hazard and field bodies because of monitoring methods.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-17

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

higher surface runoff • Erosion and siltation control due to the bare land devices to be implemented which may cause besides streams before flooding in the nearby logging activity. area. • Changing the slope geometry to decrease the driving forces or increase the resisting force by reducing inclination, height and adding weight to the toe. • Ins Planting vegetation to control surface water infiltration to reduce seepage forces. • Providing retention to increase the resisting forces by implementing concrete pedestals, ground achors, soils nails and retaining walls. • Installing interceptor trench drain, blanket drains and sub-horizontal drains to control internal seepage by reducing the driving forces and increase material strength.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-18

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

2.11 CONDITIONS FOR ENDORSEMENT

The DOE Selangor endorsed the Terms of Reference of the EIA for the project, subject to the conditions expressed in the endorsement letter (Table 2.7). All the conditions and comments have been addressed accordingly in the EIA report.

Table 2.8: Terms of References Compliance Checklist No. Comments from Agencies Reference in the EIA Report Notes DOE’s Comment 1.0 JABATAN ALAM SEKITAR 1.1 Setiap sudut garisan dan Coordinates of See EIA Report, Chapter 2: Updated Boundary Project Site di atas peta hendaklah di -Figure 2.2, page 11. tambah koordinatnya. See ESI Report, -Table 2.3, page 7 & - Figure 2.2, page 10.

See TOR Report -Table 4, page 9. 1.2 Jadual kerja bagi penyediaan Laporan EIA dan See EIA Report, Chapter 5: Updated kelulusan Laporan EIA perlu di asingkan kerana -Table 5.12, page 5-33 tempoh penyediaannya adalah berbeza. See ESI Report, - Table 4.3: Estimation work program,page 24, - Table 4.4.: Schedule of work for EIA assessment, page 25.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-19

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

1.3 Kos anggaran LDP2M2 dan BMP’s perlu See EIA Report, Chapter 8: dijelaskan di dalam laporan TOR/ ESI -Table 8.6, page 8-70. terutamanya kos teknik mulching & turfing. Updated See ESI Report - Table 8.3: The estimation costing for ESCP & BMP`s, page 96. 1.4 Zon penampan sungai hendaklah dirizabkan See, EIA Report, Chapter 4: sebanyak 20 meter di mana pokok balak - Figure 4.1, page 4-3 berhampiran sungai dipelihara dan tidak di tebang/ diteroka. See ESI Report, - Table 6.8: River buffer zone, page 58. Updated 2.0 JABATAN PERHUTANAN NEGERI PERAK 2.1 Status tanah tidak jelas dinyatakan. See EIA Report: Updated -Item 1.4.2, page 1-11, -Appendix 6B.

See ESI Report, Appendix D. 3.0 LEMBAGA AIR NEGERI PERAK (SURAT ULASAN) 3.1 Untuk makluman tuan lokasi pembalakan di atas See EIA Report: Updated terletak di dalam kawasan tadahan bagi -Appendix 6E, The Loction of Catchment Area, beberapa buah loji rawatan air yang terletak di -Appendiz 6F, The location of water intake and sepanjang Sungai Perak iaitu Loji Rawatan Air water treatment plan, (LRA) Kota Lama Kiri, LRA Idris Shah II -Appendix 8B, The quality of water resources. , LRA Kg Paloh, LRA Kg Senin, LRA Tk. Kepayang dan LRA Kg Gajah. Sungai Perak Jarak lokasi tapak cadangan pembalakan merupakan sumber utama bagi bekalan air di dengan loji rawatan air di Negeri Perak dapat Negeri Perak. dirujuk di Laporan ESI di Appendix H.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-20

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

3.2 Sebarang pembangunan yang terletak di dalam See EIA Report; Updated kawasan tadahan Sungai Perak akan memberi Chapter 8, Page 8-18. kesan terhadap kualiti air Sungai Perak. Oleh itu, sebarang pelepasan air buangan dari kawasan See ESI Report, page 67. pembalakan di atas perlu mematuhi kualiti Standard A seperti yang ditetapkan. 3.3 Adalah disarankan supaya stesen percontohan See EIA report, air ditambah di tiga lokasi lagi iaitu di Sg. Kenayat Figure 6.13, Water Sampling Point, page 6-31; sebelum memasuki Sg Perak, Sg Perak sebelum Figure 6.14, The Additional Water Sampling bertemu Sg Kenayat dan Sg Perak selepas Stations, page 6-32; pertemuan Sg Kenayat dan Sg Perak. Lokasi – Figure 6.15, Visual and Location of Water lokasi persampelan ini dapat memberi gambaran Quality Sampling, page 6-33; tentang kesan pencemaran Sg Kenayat terhadap Figure 6.16, Visual and Location of Additional Sg Perak apabila kerja-kerja pembalakan Water Sampling, page 6-34. dilaksanakan kelak. ESI Report, page 42, Table 6.1(b).

3.4 Disamping itu, dalam Appendix H perlu See EIA Report, dimasukkan lokasi Stesen Janaelektrik Appendix 6F, The location of water intake and Chenderoh yang terletak di bahagian hilir Sg. water treatment plant. Perak yang akan terkesan secara langsung terhadap kerja-kerja pembalakan tersebut. See ESI Report, Appendix H. 3.5 Bersama-sama ini disertakan Lampiran 1 iaitu See EIA Report, senarai loji – loji dan kedudukan intake yang Appendix 6F, The location of water intake and terdapat di bahagian hilir Sungai Perak untuk water treatment plant. rujukan tuan.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-21

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

4.0 MAJLIS DAERAH GERIK (SURAT ULASAN) 4.0 Untuk makluman pihak tuan, Daerah Hulu Perak See EIA report; mengandungi 3 PBT iaitu Majlis Daerah Gerik, -Chapter 2, Item 2.5, page 2-8. Updated Majlis Daerah dan Majlis Daerah . Namun bagi projek pembangunan yang berada di dalam Mukim Kenering ,Gerik, Kerunai, Belum dan Temengor terletak di bawah pentadbiran Majlis Daerah Gerik.

5.0 JABATAN DAN GEOSAINS MALAYSIA, PERAK (SURAT ULASAN) 5.1 Dalam penyediaan CHAPTER 5.9 (Geology; See EIA Report: Updated page : 38), tidak hanya merujuk kepada peta -Appendix 6C, The Geological And Soil geologi yang dikeluarkan oleh Jabatan Mineral Investigation Report. dan Geosains Malaysia (JMG) semata – mata kerana laporan ini tidak memberi banyak maklumat geologi in-situ dan kerja-kerja pemetaan geologi bagi tapak cadangan perlu dibuat oleh ahli geologi yang bertauliah. 5.2 Chapter 5.9 (Geology) ini seharusnya hendaklah See EIA Report: Updated menyentuh mengenai singkapan taburan batuan -Appendix 6C, The Geological And Soil di lapangan, potensi bencana geologi dan konsep Investigation Report. mitigasi serta kemungkinan taburan potensi mineral (melebihi 200 hektar) yang terdapat di kawasan kajian.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-22

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

5.3 Ulasan geologi dalam CHAPTER 5.9 perlulah See EIA Report: disediakan oleh ahli geologi yang berdaftar -Appendix 6C, The Geological And Soil Updated dengan Lembaga Ahli Geologi Malaysia selaras Investigation Report. dengan Akta Ahli Geologi 2008 [689]. Sebarang peta berkaitan geologi hendaklah disahkan oleh ahli geologi bertauliah

6.0 JABATAN MINERAL DAN GEOSAINS MALAYSIA, PUTRAJAYA (SURAT ULASAN) 6.1 Dalam penyediaan CHAPTER 5.9 (Geology; See EIA Report: Updated page : 38), tidak hanya merujuk kepada peta -Appendix 6C, The Geological And Soil geologi yang dikeluarkan oleh Jabatan Mineral Investigation Report. dan Geosains Malaysia (JMG) semata – mata kerana laporan ini tidak memberi banyak maklumat geologi in-situ dan kerja-kerja pemetaan geologi bagi tapak cadangan.

6.2 Chapter 5.9 (Geology) ini seharusnya hendaklah See EIA Report: Updated menyentuh mengenai singkapan taburan batuan -Appendix 6C, The Geological And Soil di lapangan, potensi bencana geologi dan konsep Investigation Report. mitigasi serta kemungkinan taburan potensi mineral (melebihi 200 hektar) yang terdapat di kawasan kajian.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-23

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

6.3 Ulasan geologi dalam CHAPTER 5.9 perlulah See EIA Report: Updated disediakan oleh ahli geologi yang berdaftar -Appendix 6C, The Geological And Soil dengan Lembaga Ahli Geologi Malaysia selaras Investigation Report. dengan Akta Ahli Geologi 2008 [689]. Sebarang peta berkaitan geologi hendaklah disahkan oleh ahli geologi bertauliah.

7.0 JABATAN PERANCANG BANDAR DAN DESA NEGERI PERAK (SURAT ULASAN) 7.1 Lokasi Tapak: - Tapak cadangan terletak di kawasan See EIA Report, Update Hutan Simpan Bintang Hijau lebih kurang -Figure 6.3, page 6-4; 6.58km dari Lebuhraya Gerik-Kulim, lebih -Table 6.1, page 6-7; kurang 3.22km di tenggara Kg. Tera dan -Figure 6.36, page 6-129; lebih kurang 9.32km di barat Kg. Ulu Gerik. -Item 6.12.6.1, page 6-153; -Item 6.12.4.2, page 6-146 7.2 Topografi dan Guna Tanah: - Berdasarkan peta topografi dan guna See EIA Report, Update tanah semasa tapak cadangan merupakan -Figure 6.2, page 6-3.

kawasan berbukit dan kawasan hutan.

Guna Tanah Persekitaran: 7.3 - Persekitaran kawasan tapak cadangan See EIA Report, Update pada keseluruhannya adalah merangkumi -Item 6.12.1, page 6-128. kawasan Hutan Simpan Bintang Hijau.

Terdapat Hospital Gerik di sebelah

tenggara tapak, di sebelah timur terdapat

Kg. Orang Asli Ulu Gerik dan di sebelah selatan terdapat penempatan Felda Lawin Utara.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-24

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

7.4 Perancangan Semasa: See EIA Report, - Berdasarkan Rancangan Tempatan -Chapter 1, Item 1.4.2, page 1-11; Daerah Hulu Perak 2030 yang telah -Chapter 3, Item 3.3, page3-7; diwartakan pada 3 Ogos 2017 (No. -Figure 3.4, page 3-8; Warta ; 2106), tapak yang dimohon -Figure 3.5, page 3-9. terletak di dalam Blok Perancangan (BP) 5 : Kenering , Blok Perancangan Kecil (BPK) 5.1, Hutan Simpan Bintang Hijau yang dizonkan sebagai Hutan. Aktiviti yang Updated dibenarkan adalah hutan darat, hutan simpan kekal dan hutan simpan negeri. Aktiviti lain yang dibenarkan dengan syarat adalah eko pelancongan/rekreasi pasif,

kediaman (chalet) sokongan kepada pelancongan rekreasi hutan, penyelidikan dan pendidikan, laluan semulajadi hutan, tapak perkhemahan, pengkajian Flora dan Fauna, mendaki gunung/bukit, menara pandang panorama dan pusat pelawat. Sebarang aktiviti perlu mendapat kebenaran dan kelulusan Jabatan

Perhutanan dan Jabatan Pengairan dan Saliran, Perancangan aktiviti juga perlu mengikut keperluan piawaian perancangan, sebarang aktiviti perlu menyediakan EIA dan SIA terlebih dahulu serta pemantauan dan penilaian kegiatan pelancongan dari masa ke semasa.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-25

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

Terdapat Kg. Kaki Bukit dan Kg. Orang Asli di See EIA Report; sekitar kawasan tapak projek dan perlu -Item 6.12.4.2, page 6-146 Updated dimasukkan di dalam kajian SIA.

8.0 JABATAN PERHILITAN See EIA Report; 8.1 Bagi kajian Fauna di dalam kawasan tapak -Chapter6, page 6-108 Updated cadangan hendaklah menggunakan perangkap kamera dan tempoh perangkap kamera ini adalah selama 3 bulan.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-26

CHAPTER 2: TERMS OF REFERENCE Proposed Logging Project on Block A, Block B, Block C and Block D With An Area of 417.00 Hectares EIA (1,030.43 Acres) At Mukim Kenering, Daerah Hulu Perak, Perak Darul Ridzuan – (Schedule II)

2.12 CONCLUSION

This Terms of Reference (TOR) Report of the proposed logging activity is significant as it's governs the environmental implementation programs as well as blooming the development growth of Hutan Simpan Bintang Hijau, Mukim Gerik, Daerah Hulu Perak, Negeri Perak Darul Ridzuan and is served as an evidence and guidance to get approval from DOE before proceeding with EIA study.

NILAIMAS SERVICES – EIA & TRAFFIC CONSULTANT Page 2-27