TTC Streetcar
Total Page:16
File Type:pdf, Size:1020Kb

Load more
Recommended publications
-
EX18.7 Appendix a Part 3
INTRODUCTION EXPO ANALYSIS SITE ANALYSISEX18.7EXPO MASTERPLAN AppendixTRANSPORT INFRASTRUCTURE A Part & OVERLAY 3 IMPLEMENTATION SCHEDULE LEGACY 1 8 3 1 2 8 2 3 6 2 1 5 5 8 6 5 5 6 5 5 Fig. 4.2: Expo Site - Illustrative Masterplan TORONTO EXPO 2025 Site Analysis, Masterplan, Transport and Infrastructure - October 2016 - Final 45 INSERT NEW IMAGE BY PER Fig. 4.3: © September 2016 - ARUP - Expo 25 Toronto - Rights Reserved TORONTO EXPO 2025 46 Site Analysis, Masterplan, Transport and Infrastructure - October 2016 - Final TORONTO EXPO 2025 Site Analysis, Masterplan, Transport and Infrastructure - October 2016 - Final INTRODUCTION EXPO ANALYSIS SITE ANALYSIS EXPO MASTERPLAN TRANSPORT INFRASTRUCTURE & OVERLAY IMPLEMENTATION SCHEDULE LEGACY PLOT AREA FOOTPRINT PLOT EFFICIENCY BUILDING ESTIMATED NUMBER DESCRIPTION TOTAL PLOT AREA FOOTPRINT (m2) GFA (m2) PER UNIT (m2) (PLOT BUILDABILITY) FOOTPRINT (m2) OF FLOORS EXPO SITE AREA 3 Plaza Entrances approx. 16,500 50,000 100% N/A N/A 50,000 1 Expo Center 25,000 25,000 80% 20,000 2.0 40,000 1 Theatre 15,000 15,000 80% 12,000 1.0 12,000 1 Educational Center 10,000 10,000 70% 7,000 2.0 14,000 1 Media Center 20,000 20,000 80% 16,000 1.0 14,000 EXHIBITION PAVILIONS – COUNTRIES (55 COUNTRIES) 18 Small 500 9,000 60% 5,400 TBD TBD 22 Medium 2,500 55,000 60% 33,000 TBD TBD 15 Large 4,500 67,500 60% 40,500 TBD TBD EXHIBITION PAVILIONS – HOST COUNTRY AND CITY 1 Host Country 15,000 15,000 70% 10,500 3.0 31,500 4 Host City / Province (Toronto & Ottawa-Ontario, approx. -
TTC Subway and Streetcar Map – May 2019
501 502 503 504 505 Subway and 900 506 509 510 511 512 Express bus to Subway lines Streetcar routes Streetcar Map Pearson Airport Connections to: Interchange station GO Transit Züm (Brampton Transit) Vaughan Metropolitan Centre Accessible station York Region Transit/Viva Union Pearson Express Highway 407 Washroom MiWay VIA Rail Pioneer Village York University Finch Finch West North York Centre Downsview Park Bayview Leslie Sheppard-Yonge Don Mills Midland Sheppard West Bessarion McCowan Scarborough Wilson York Mills Ellesmere Centre Yorkdale Pearson Airport Lawrence West Lawrence Lawrence East Glencairn Kennedy Eglinton West Eglinton Davisville Gunns Loop St Clair Ave W St Clair West 900 512 512 St Clair Airport Express (Keele) Warden Summerhill Dupont West Rosedale Victoria Park St George IslingtonRoyal YorkOld MillJane RunnymedeHigh ParkKeele DundasLansdowneDufferinOssingtonChristieBathurst Bay Castle FrankBroadviewChesterPape DonlandsGreenwoodCoxwellWoodbine Kipling Main Street Spadina Bloor- Sherbourne Main St Yonge 504A 505 505 504B 511 510 Wellesley 506 Dundas Museum Broadview Ave Broadview Parliament St Parliament Howard St W Gerrard St E High Park Loop College St College St Carlton St Park Ave 506 Coxwell Ave Queen’s College Gerrard St E Bingham Loop Dundas Park (Victoria Park) Bathurst St St W Ave Spadina Dundas St W Dundas St E 505 502 St Patrick Dundas 503 Roncesvalles Ave Roncesvalles McCaul Loop Osgoode Queen Queen St E 502 Kingston Rd The Queensway Queen St W 501 501 501 Neville Park Loop Humber Loop 503 504A King St E King St W St Andrew King 504 501 StChurch 504B 511 510 Wellington St W 504A Dufferin Distillery Long Branch Gate Loop Sumach St Loop Loop Union Lake Shore Blvd W Fleet St Lake Ontario 510 509 Bay St Dufferin St Exhibition / Loop Cherry St 509 Queens Quay W Billy Bishop Airport ©2019 Toronto Transit Commission 05/19 – Map not to scale. -
STAFF REPORT ACTION REQUIRED Lake Shore Boulevard West
STAFF REPORT ACTION REQUIRED Lake Shore Boulevard West - Speed Limit Reduction Date: March 29, 2007 To: Etobicoke York Community Council From: Director, Transportation Services - Etobicoke York District Wards: Ward 6 – Etobicoke-Lakeshore Reference eycc070058-to - 4757 Number: SUMMARY The purpose of this report is to obtain approval to reduce the speed limit on Lake Shore Boulevard West, between Mimico Creek and Palace Pier Court, from 60 km/h to 50 km/h. Given the existence of Toronto Transit Commission’s (TTC) streetcar tracks on the majority of this section of Lake Shore Boulevard West and the curved road alignment east of the F.G. Gardiner Expressway on-ramp/Brookers Lane, a lower (50 km/h) speed limit is justified and recommended. In addition, the proposed 50 km/h speed limit on Lake Shore Boulevard West between Mimico Creek and Palace Pier Court will provide for a consistent speed limit on this road in the Etobicoke York Community. RECOMMENDATIONS Transportation Services recommends that: 1. City Council approve the reduction of the speed limit on Lake Shore Boulevard West between Mimico Creek and Palace Pier Court from 60 km/h to 50 km/h. Financial Impact Type of Funding Source of Funds Amount Available within current budget Transportation Services Operating Budget $700.00 ISSUE BACKGROUND Transportation Services, in meetings with Councillor Mark Grimes and residents of the Humber Bay Shores community, have received requests to determine the appropriateness of the 60 km/h speed limit on Lake Shore Boulevard West between Mimico Creek and Palace Pier Court. A map of the area is Attachment No. -
Service Changes Effective Sunday, April 1, 2018 Route Period / Service M-F Saturday Sunday Headway R.T.T
Service Changes Effective Sunday, April 1, 2018 Route Period / Service M-F Saturday Sunday Headway R.T.T. Vehicles Headway R.T.T. Vehicles Headway R.T.T. Veh Old New Old New Old New Old New Old New Old New Old New Old New Old New Where running times are shown as "A+B", the first part is the scheduled driving time and the second part is the scheduled "recovery" time (layover) usually provided to round out the trip time as a multiple of the headway. Vehicle Types: C: CLRV A: ALRV F: Flexity B: Bus AB: Artic Bus Reconstruction of The Queensway, Humber Loop and Lake Shore Boulevard 501 Queen The schedule for 501 Queen was modified in mid-February in anticipation of the re-opening of Humber Loop depending on construction progress. No change is required for April 2018. The schedules taking effect on Sunday, May 13, 2018 will reflect a resumption of streetcar service through to Long Branch Loop. Actual implementation depends on construction status. 501L buses from Long Branch will loop via Humber Loop if a workable route can be devised, but otherwise they will loop at Windermere and connect with streetcar service there. (This is subject to confirmation.) 66 Prince Edward Schedules revert to May 2017 versions. AM Peak / Sat-Sun Early Morning 66A Old Mill Stn to Qsy/Windermere 12' 38+4 3.5B 24' 34+2' 1.5B 66A Old Mill Stn to Humber 12' 26+4' 2.5B 30' 22+8' 1B 66B Old Mill Stn to Lake Shore 12' 12' 40+2 40+2' 3.5B 3.5B 24' 30' 28+2' 28+2' 1.5B 1B Combined 6' 6' 7B 6B 12' 15' 3B 2B M-F Midday / Sat-Sun Late Morning 66A Old Mill Stn to Qsy/Windermere -
Dedicated Streetcar Lanes on the 504 King Route
MEETING DATE: April 11, 2001 SUBJECT: Dedicated Streetcar Lanes On The 504 King Route RECOMMENDATIONS It is recommended that the Commission: 1. Receive this report for information, noting that: • TTC staff are working with Toronto Transportation Services and City Planning to identify the best way of creating effective, dedicated streetcar lanes on King Street, while fully respecting the needs of the adjacent businesses; • two of the options under consideration at this time are: i) banning all traffic, except streetcars, taxis, and commercial vehicles, from King Street during the busiest traffic hours; and ii) a full-time, permanent solution, with physical modifications to the street, whereby through traffic would be banned at all times, but vehicles would still be able to access each block; and 1. Forward this report to Toronto Transportation Services and City Planning. FUNDING This report has no impact on the Commission’s operating or capital budgets. BACKGROUND At its meeting on February 16, 2001, the Commission considered the TTC's 2001 Operating Budget and approved Commissioner Miller's motion which included, …that staff be requested to report to the Commission regarding… significant transit priority measures for the surface system, in particular streetcars. This report provides a preliminary and partial response only, to that request, and summarizes the status of staff's efforts to provide greater priority for streetcars on King Street. The results of this work are expected to be generally applicable to other streetcar routes. DISCUSSION TTC staff are developing a comprehensive plan to improve transit operations throughout Toronto, identifying ways to make transit faster, more reliable and, ultimately, more competitive with the private automobile. -
Smarttrack Ridership Analysis: Project Final Report
SMARTTRACK Research Report RIDERSHIP ANALYSIS Project Final Report Eric J. Miller, James Vaughan, Monika Nasterska June 2016 SMARTTRACK RIDERSHIP ANALYSIS PROJECT FINAL REPORT Prepared for the City Manager, City of Toronto by: Eric J. Miller, Ph.D. Professor, Department of Civil Engineering Director, Transportation Research Institute Research Director, Travel Modelling Group University of Toronto James Vaughan & Monika Nasterska Travel Modelling Group, University of Toronto Transportation Research Institute June, 2016 i Executive Summary Project Objectives On December 11, 2014, City Council directed the City Manager in consultation with the Province/Metrolinx to develop a work plan to undertake an accelerated review of the SmartTrack and RER plans. Council also directed the City Manager to retain the specialized services of the University of Toronto Transportation Research Institute (UTTRI) to support the planning analysis and required transit ridership modelling as a component of the overall review.1 On February 10, 2015, City Council considered the report EX2.2 SmartTrack Work Plan (2015- 2016), and approved the accelerated work plan for the review of SmartTrack.2 The UTTRI component of this work was to provide transit ridership estimates and other key network performance measures using the City’s new Regional Travel Demand Model (GTAModel Version 4.0) developed at the University of Toronto by UTTRI. As detailed in the final Terms of Reference for the UTTRI work, this work included: • Confirming the integrated RER and SmartTrack Service Concept to be modelled. • Completion and validation of a new travel demand model system to be used by the City of Toronto in this and similar studies of transit ridership and travel demand. -
Exhibition Place Master Plan – Phase 1 Proposals Report
Acknowledgments The site of Exhibition Place has had a long tradition as a gathering place. Given its location on the water, these lands would have attracted Indigenous populations before recorded history. We acknowledge that the land occupied by Exhibition Place is the traditional territory of many nations including the Mississaugas of the Credit, the Anishnabeg, the Chippewa, the Haudenosaunee and the Wendat peoples and is now home to many diverse First Nations, Inuit and Metis peoples. We also acknowledge that Toronto is covered by Treaty 13 with the Mississaugas of the Credit, and the Williams Treaties signed with multiple Mississaugas and Chippewa bands. Figure 1. Moccasin Identifier engraving at Toronto Trillium Park The study team would like to thank City Planning Division Study Team Exhibition Place Lynda Macdonald, Director Don Boyle, Chief Executive Officer Nasim Adab Gilles Bouchard Tamara Anson-Cartwright Catherine de Nobriga Juliana Azem Ribeiro de Almeida Mark Goss Bryan Bowen Hardat Persaud David Brutto Tony Porter Brent Fairbairn Laura Purdy Christian Giles Debbie Sanderson Kevin Lee Kelvin Seow Liz McFarland Svetlana Lavrentieva Board of Governors Melanie Melnyk Tenants, Clients and Operators Dan Nicholson James Parakh David Stonehouse Brad Sunderland Nigel Tahair Alison Torrie-Lapaire 4 - PHASE 1 PROPOSALS REPORT FOR EXHIBITION PLACE Local Advisory Committee Technical Advisory Committee Bathurst Quay Neighbourhood Association Michelle Berquist - Transportation Planning The Bentway Swinzle Chauhan – Transportation Services -
Improving Transit Service Options to Major Music Festivals
Attachment 1 For Action Improving Transit Service to Major Music Festivals Date: May 8, 2018 To: TTC Board From: Chief Operating Officer Summary The purpose of this report is to respond to the Board’s request to report on how the TTC plans and co-ordinates service to special events, including major music festivals. Recommendations It is recommended that the Board: 1. Receive the report for information; and 2. Direct staff to forward this report to Councillor Mike Layton, City of Toronto Transportation Services, Toronto Music Advisory Council, Exhibition Place, Ontario Place and Metrolinx for information. Financial Summary This report has no financial impact. The Chief Financial Officer has reviewed this report and agrees with the financial impact information. Equity/Accessibility Matters The TTC has made significant progress in providing barrier-free, accessible transit services for all customers. Presently, all TTC bus services are operated using accessible, low-floor buses. New low-floor streetcars are currently being deployed and all routes will have accessible streetcars by 2019. All subway stations will be accessible by 2025. By providing public transit services to special events the TTC encourages and supports more spontaneous trip-making, which is an important part of making the conventional system attractive to potential new customers, such as Wheel-Trans registrants who are taking advantage of the TTC’s Family of Services, and to all travellers in Toronto. This Improving Transit Service to Major Music Festivals Page 1 of 5 supports the Accessibility for Ontarians with Disabilities Act (AODA) objectives of more- spontaneous travel options for customers with disabilities, and the City’s Poverty Reduction Strategy of making transit more accessible and attractive to everyone. -
Recent Achievements - (June 2013 to September 2013)
To: Metrolinx Board of Directors From: Robert Hollis Managing Director & Executive Vice President PRESTO Date: September 10th, 2013 Re: PRESTO Quarterly Report Recent Achievements - (June 2013 to September 2013) • Through the summer months, transit riders continued to embrace PRESTO and, as of August 26th, 2013, the system had reached more than 750,000 activated cards in circulation. On average, we’re welcoming 35,000 new PRESTO customers each month in the GTHA. o 75% of GO Transit riders are using PRESTO, making up the largest portion of the PRESTO customer base. • Ottawa’s OC Transpo continues its public deployment of PRESTO, with an average of more than 1,000 cards being distributed daily and over 167,000 total customers currently tapping on to an easier commute. The roll out program will run through October 2013, as 200,000 total cards will have been distributed to customers and the OC Transpo rollout will officially be complete. st o OC Transpo began offering a reduced rate fare on PRESTO as of July 1 . This reduced price is an incentive for customers to convert to PRESTO. th o As of Aug 15 , OC Transpo began charging the full $6 issuance fee for PRESTO cards. • PRESTO has also completed and launched The PRESTO Panel, a versatile and dynamic online market research tool. PRESTO began recruitment in August 2013, with a test group of registered customers who completed the 2012 Customer Satisfaction Survey. 130 Adelaide Street West, Suite 1500 130, rue Adelaide ouest, bureau 1500 Toronto, Ontario, Canada M5H 3P5 Toronto, Ontario, Canada M5H 3P5 o The PRESTO Panel provides customer feedback that can be used to generate a wealth of insights into the system, and drive improvements in a variety of areas. -
Attachment 4 – Assessment of Ontario Line
EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively. -
Service Changes Effective Sunday, September 3, 2017 Route Period / Service M-F Saturday Sunday Headway R.T.T
Service Changes Effective Sunday, September 3, 2017 Route Period / Service M-F Saturday Sunday Headway R.T.T. Veh Headway R.T.T. Veh Headway R.T.T. Veh Old New Old New Old New Old New Old New Old New Miscellaneous Changes Wheel Trans Wheel Trans will now serve bus bay 3 at Coxwell Station, and bus bay 2 at Woodbine Station. 6 Bay and 63 Ossington Scheduled travel time for dead-head trips from Mount Dennis garage to the route will be increased in the PM peak. 22/322 Coxwell Two earlier Sunday morning trips will be operated by 22 Coxwell to correct a scheduling error in May 2017 that created a gap between night and day services. 44 Kipling South Late night service will be cut after 1:00 am to match demand with service on Monday-Saturday now running every 30 minutes in place of every 10. Last trips will be NB from Lake Shore at 2:15 am and SB from Kipling Stn at 2:30 am. 188 Kipling S Rocket AM peak service will be improved to operate every 10 minutes SB from Kipling Stn from 6:30 am, then at 7'30" (the current headway) from 7:00 am. The 7:28 PM peak NB trip will be dropped so that the last trip now operates at 7:20 pm. 50 Burnhamthorpe The following AM peak trips will be eliminated due to low ridership. Times of nearby trips will be adjusted to fill the gaps. EB from Mill Rd: 6:15 am WB from Islington Stn: 6:35 and 9:25 am 310/317 Spadina Night The route number will be changed to 310 to match the daytime 510. -
Transit Notice April 18, 2018
Transit Notice April 18, 2018 Harbourfront streetcar tunnel General maintenance Date: April 21 to April 23, 2018 Content/timeline accurate at time of printing Work description and purpose During the April 21 weekend, TTC staff will be working inside the Harbourfront streetcar tunnel to conduct rail and overhead inspections/maintenance and cleaning debris/sand along the tracks. TTC crews will be working at the Spadina/Queens Quay Loop to upgrade cables in the substation. City crews will be working in the streetcar right of way on Queens Quay to inspect underground hydro vaults. The City is also planning maintenance work on the Gardiner Expressway. Transit service changes (from 2 a.m. April 21 to 5 a.m. April 23) Temporary changes will be made to the 510/310 Spadina and 509 Harbourfront streetcar services and replacement buses will be employed to accommodate these work activities. 509 Harbourfront Replacement buses will operate over entire 509 Harbourfront route. 510/310 Spadina Streetcar 510/310 Streetcars will operate on Spadina Avenue from Spadina Station (at Bloor) to the Charlotte Loop. Some streetcars will operate to the King / Church intersection via King Street. 510/310 Spadina Buses See map for route details or visit ttc.ca for more information. 510 Spadina bus service will operate from Charlotte Loop to Spadina Loop via Bremner Boulevard and Rees Street. 310 Spadina bus service will operate from Charlotte Loop to King/Yonge intersection via Bay Street. Work hours Work will be around-the-clock to ensure the resumption of transit service on Monday morning. Efforts will be made to keep noise level to a minimum; noise will be evident when some equipment is in full operation.