Import/Export Paths: Summary of Transmission Issues and Implications
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Strategic Transmission Discussion
Section 1:4: ExecutiveStrategic SummaryTransmission Discussion Strategic Discussion Section 4 SECTION 4: NEAC STRATEGIC TRANSMISSION DISCUSSION 4.1 SECTION PURPOSE The purpose of this section is to describe and discuss the methodology, rationale, and technical assessments utilized to determine the transmission export projects presented in this report. In order to provide an overall view of the process, this section summarizes the chronological process that was completed to reach the conclusion of the three proposed export transmission routes. 4.2 BACKGROUND 4.2.1 Transmission Historical Development The existing transmission grid in the state of Nevada has generally been planned, designed, constructed, and operated to transport energy from generators located in neighboring states and generators located in rural locations to serve electric loads principally in urban centers within the state. Historically generators were sized to serve the electric loads for single concentrated urban areas and/or industrial electric customers. It was recognized over time that economies could be obtained by constructing large generation facilities. This required constructing transmission lines for interconnecting the generators with multiple concentrated electric loads (“load centers”). Further development of the transmission grid resulted from interconnecting multiple generation facilities to enhance reliability in the event of outages on the generators. The state of Nevada does not have indigenous coal, oil, or natural gas to fuel conventional generators. As a result, Nevada must rely on the import of fuels and electrical energy to supply the electric load centers throughout the State. To support this, the existing transmission grid has been constructed to a large extent to import electric energy resources. -
Amended and Restated Victorville-Lugo Interconnection Agreement
DWP No. 10343 AMENDED AND RESTATED VICTORVILLE-LUGO INTERCONNECTION AGREEMENT BETWEEN DEPARTMENT OF WATER AND POWER OF THE CITY OF LOS ANGELES AND SOUTHERN CALIFORNIA EDISON COMPANY -l- Table of Contents SECTION TITLE PAGE 1. Parties 4 2. Recitals ,4 3. Agreement, .5 4. Effective Date Filing and Term 5 5. Definitions .6 6. Ownership of the Victorville-Lugo Transmission Lines .9 I 7. Victorville-Lugo Transmission Line .9 i 8. LADWP Facilities ,9 9. SCE Facilities 9 10. Operation and Maintenance of Transmission System 10 11. Transmission System, 11 12. Balancing Authority 12 13. Metering and Line Losses ,12 14. Scheduling of Power Deliveries 12 15. Adverse Determination or Expansion of Obligations 12 16. Successors and Assigns 13 17. Dispute Resolution ...14 18. Liability 14 29. Willful Action 15 20. No Dedication of Facilities 16 21. No Obligation to Offer Same Service to others 16 22. No Precedent. 16 -2- 23. Notices 16 24. Severability 17 25. Right of the Parties upon Termination 17 26. Force Majeure 17 27. Waivers and Remedies 18 28. Authorizations and Approvals 18 29. Relationship of Parties 18 30. No Third Party Rights or Obligation 18 31. Warranty of Authority 18 s \ 32. Assignment of Agreement 19 33. Conflicting Provisions 19 34. Governing Law 19 35. Signature Clause .20 Exhibit A Transmission Lines & Transmission System. ,21 Exhibit B Diagram. .26 “3- AMENDED AND RESTATED VICTORVILLE-LUGO INTERCONNECTION AGREEMENT 1. Parties: The parties to this Victorville-Lugo Interconnection Agreement are the DEPARTMENT OF WATER AND POWER OF THE CITY OF LOS ANGELES (“LADWP”), a department organized and existing under the Charter of the City of Los Angeles, a municipal corporation of the State of California, and SOUTHERN CALIFORNIA EDISON COMPANY (“SCE”), a California corporation, hereinafter referred to individually as "Party" and collectively as "Parties". -
Geothermal Power and Interconnection: the Economics of Getting to Market David Hurlbut
Geothermal Power and Interconnection: The Economics of Getting to Market David Hurlbut NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Technical Report NREL/TP-6A20-54192 April 2012 Contract No. DE-AC36-08GO28308 Geothermal Power and Interconnection: The Economics of Getting to Market David Hurlbut Prepared under Task No. WE11.0815 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory Technical Report 15013 Denver West Parkway NREL/TP-6A20-54192 Golden, Colorado 80401 April 2012 303-275-3000 • www.nrel.gov Contract No. DE-AC36-08GO28308 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof. Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. -
Tenth Biennial Electric Transmission Final Assessment Report
FINAL DRAFT Tenth Biennial Transmission Assessment 2018-2027 Staff Report Docket No. E-00000D-17-0001 December 31, 2018 Prepared by Arizona Corporation Commission Staff And ESTA International, LLC 2214 Rock Hill Road, Suite 180 Herndon, Virginia, 20170-4234 Decision No. 76975 [This page intentionally blank for formatting purposes] Biennial Transmission Assessment for 2018-2027 Docket No. E-00000D-17-0001 December 31, 2018 Decision No. 76975 Foreword The Arizona Corporation Commission (“ACC” or “Commission”) performs a biennial review of the ten-year transmission plans filed by parties who are responsible for transmission facilities in Arizona and issues a written decision regarding the adequacy of the existing and planned transmission facilities to reliably meet the present and future transmission system needs of Arizona.1 This report by the Staff of the Commission’s Utilities Division (“ACC Staff” or “Staff”) is the Tenth Biennial Transmission Assessment (“BTA” or “Tenth BTA”) and has been prepared in accordance with a contract agreement between ESTA International, LLC (“ESTA”) and the Commission. It is considered a public document. Use of the report by other parties shall be at their own risk. Neither ESTA nor the Commission accept any duty of care to such third parties. Arizona’s Tenth BTA is based upon the Ten-Year Plans filed with the Commission by parties in January 2018. It also incorporates information and comments provided by participants and attendees in the BTA workshops and report review process. ACC Staff and ESTA appreciate the contributions, cooperation, and support of industry participants throughout the Tenth BTA process. 1 Arizona Revised Statute §40-360.02 Biennial Transmission Assessment for 2018-2027 Docket No. -
Senate Senate Committee on Commerce, Labor and Energy-May
MINUTES OF THE SENATE COMMITTEE ON COMMERCE, LABOR AND ENERGY Seventy-ninth Session May 26, 2017 The Senate Committee on Commerce, Labor and Energy was called to order by Chair Kelvin Atkinson at 8:34 a.m. on Friday, May 26, 2017, in Room 2135 of the Legislative Building, Carson City, Nevada. The meeting was videoconferenced to Room 4412E of the Grant Sawyer State Office Building, 555 East Washington Avenue, Las Vegas, Nevada. Exhibit A is the Agenda. Exhibit B is the Attendance Roster. All exhibits are available and on file in the Research Library of the Legislative Counsel Bureau. COMMITTEE MEMBERS PRESENT: Senator Kelvin Atkinson, Chair Senator Pat Spearman, Vice Chair Senator Nicole J. Cannizzaro Senator Yvanna D. Cancela Senator Joseph P. Hardy Senator James A. Settelmeyer Senator Heidi S. Gansert GUEST LEGISLATORS PRESENT: Assemblyman Chris Brooks, Assembly District No. 10 STAFF MEMBERS PRESENT: Marji Paslov Thomas, Policy Analyst Bryan Fernley, Counsel Lynn Hendricks, Committee Secretary OTHERS PRESENT: Robert G. Johnston, Western Resource Advocates Dylan Sullivan, Natural Resources Defense Council Ernie Adler, International Brotherhood of Electrical Workers Local 1245 Tom Polikalas Joe Greco, Senior Vice President, Terra-Gen Operating Company, LLC Senate Committee on Commerce, Labor and Energy May 26, 2017 Page 2 Leonard B. Jackson, Director, Faith Organizing Alliance; Associate Minister, First African Methodist Episcopal Church Jennifer Taylor, Clean Energy Project Adam Green, Director of Development, SolarReserve Linda Bullen, Eolus North America, Inc. Rhonda Mills, Geothermal Energy Association Judy Treichel, Executive Director, Nevada Nuclear Waste Task Force Louise Helton, 1 Sun Solar Electric, LLC Linda Nerstad Rose McKinney-James, Bombard Electric, LLC; Valley Electric Association, Inc. -
ISO 2013-2014 Transmission Planning Process Supplemental Assessment: Harry Allen-Eldorado 500 Kv Transmission Project Economic
2013-2014 ISO Transmission Plan December 15, 2014 ISO 2013-2014 Transmission Planning Process Supplemental Assessment: Harry Allen-Eldorado 500 kV Transmission Project Economic Need California ISO/MID 1 2013-2014 ISO Transmission Plan December 15, 2014 Introduction On March 20, 2014, the ISO Board of Governors approved the ISO’s 2013-2014 Transmission Plan. The economic benefit analysis of the Harry Allen-Eldorado 500 kV transmission project documented in that transmission plan indicated that the line would result in net benefits for ISO ratepayers.1 However, the ISO acknowledged that NV Energy’s recent announcement of its intention to join the ISO’s energy imbalance market could affect the results of that analysis and that further study was required. Further, responding to a stakeholder comment in the transmission planning process, the ISO investigated the WECC production simulation model of a transmission facility outside of the ISO footprint with the owners of that facility. This investigation led to a modeling correction of the Westwing-Mead 500 kV transmission line parameters by the owners of the transmission line. This correction was not reflected in the previous analysis. Therefore, the previous economic assessment was considered preliminary. This supplemental study evaluated the project using an updated production simulation model that included the NVE energy imbalance market modeling and the correct Westwing-Mead 500 kV transmission line parameters. The ISO’s original analysis was documented in the ISO’s 2013-2014 Transmission Plan. The updated analysis in this supplemental report will be considered as a supplement to the ISO’s 2013-2014 Transmission Plan. -
Renewable Energy Transmission Initiative V2.0
Renewable Energy Transmission Initiative v2.0 Brian Turner RETI 2.0 Project Director California Natural Resources Agency Western Regional Partnership June 9, 2016 California Public California Energy Utilities Commission Commission 1 Agenda 1. RETI 2.0 Background 2. Planning Goals summary 3. Resource Values summary 4. Focus Areas summary 5. Current Activities California Public California Energy Utilities Commission Commission 2 RETI 2.0 Background California Public California Energy Utilities Commission Commission 3 Renewable Energy Transmission Initiative v2.0 • Cooperative project of four state and one federal agency • Statewide, non-regulatory planning effort to help meet statewide GHG and renewable energy goals. • Explore combinations of renewable generation resources in California and throughout the West that can best meet goals • Build understanding of transmission implications of renewable scenarios, and identify common transmission elements • Identify land use and environmental opportunities and constraints to accessing these resources • Accelerated, agency-driven, high-level assessment to inform future planning and regulatory proceedings California Public California Energy Utilities Commission Commission 4 RETI 2.0 Policy Context Executive Order B-30-15 • Established 40% GHG reduction goal by 2030 • Mandates state agencies to pursue with all statutory authority • New California Air Resources Board Scoping Plan SB 350 • CPUC and CEC increase Renewable Requirements from 33% by 2020 to 50% by 2030 • Require resource optimization -
EB-2011-0140 in the MATTER of Sections 70
EB-2011-0140 IN THE MATTER OF sections 70 and 78 of the Ontario Energy Board Act 1998, S.O. 1998, c. 15 (Schedule B); AND IN THE MATTER OF a Board-initiated proceeding to designate an electricity transmitter to undertake development work for a new electricity transmission line between Northeast and Northwest Ontario: the East-West Tie line. INTERROGATORIES OF RES CANADA TRANSMISSION LP to EWT L.P. January 30, 2013 12115001_5|TORDOCS EB-2011-0140 Interrogatories of RES Canada Transmission LP to EWT L.P. Filed: January 30, 2013 Page 2 of 24 Interrogatory #1 Project Schedules Reference: a. AltaLink: Part B, Section 7 b. EWT: Part B, Exhibit 7 c. CNPI: Part B, Section 7 d. Iccon/TPT: Volume 1, Section 7 e. UCT: Section B, Section 7 f. RES: Exhibit N Preamble: Each applicant has prepared development and construction cost estimates that are dependent, inter alia, upon underpinning project schedule assumptions. Some applicants have assumed aggressive project schedules. For example, both UCT and EWT assume that the leave to construct process – from application to decision – can be completed in less than one year. The generalized phase-by-phase project schedule of each applicant is shown in the table below. The questions below are intended to test the reasonableness of the scheduling assumption and the sensitivity of development and construction cost estimates to changes in the project schedule that underpins each such estimate. Table 1: Project Schedules Questions: a. What evidence can EWT offer that a nine month leave-to-construct phase – from application to decision – is reasonable and achievable? 12115001_5|TORDOCS EB-2011-0140 Interrogatories of RES Canada Transmission LP to EWT L.P. -
Executive Summary
Section 1: Executive Summary Executive Summary Section 1 SECTION 1: EXECUTIVE SUMMARY 1.1 SECTION PURPOSE This report has been prepared for the Nevada Energy Assistance Corporation (NEAC), a 501(c)(3) non-profit agency; in support of the Nevada State Office of Energy’s (NSOE) mission to ensure a strategically planned development of energy resources in the State of Nevada. Working for NEAC and in direct concert with the NSOE, the partnered team of Tri Sage Consulting has conducted extensive evaluation of viable projects for high voltage transmission lines for the benefit of renewable energy development and export out of Nevada. This report provides the process and details associated with this routing and evaluation effort, and it summarizes the conclusions of proposed projects to enhance renewable export for Nevada. The team of Tri Sage Consulting, Energy Source, LLC and US Geomatics (referenced throughout this report as the “Tri Sage team”) has recommended herein three preferred high voltage transmission line projects that will support the export of renewable energy transport out of the state of Nevada. The details of how the planning and routing was completed, along with assumptions, key stakeholder meetings and technical aspects are all detailed in the following sections. Presented in this section is the summary of the findings. 1.2 EXPORT OPPORTUNITY SUMMARY The transmission system in Nevada is primarily owned and operated by NV Energy. This system can currently accommodate renewable energy export, however, the current transmission infrastructure is fully utilized by generators in and outside of Nevada to export or transmit resources through of the state Nevada. -
Nevada Energy Markets and Planning (E-MAP) Baseline Assessment
Nevada Energy Markets and Planning (E-MAP) Baseline Assessment Overview: ....................................................................................................................................................... 1 State Energy Landscape (Electric Sector)................................................................................................... 1 A. Electric Utility Providers .................................................................................................................. 2 B. Delivery Systems ................................................................................................................................ 5 C. Generation (in-state, out of state, and imports) ............................................................................ 13 D. Markets ............................................................................................................................................ 25 E. Existing Policies (Laws/Regulations) ............................................................................................. 27 F. Challenges ........................................................................................................................................ 36 G. Trends ............................................................................................................................................... 41 Governor Sandoval’s Energy Policy Goals ............................................................................................... 44 A. Executive Order.............................................................................................................................. -
2019 ENDTF Reliability Assessment Report
System Resilience Under Extreme Natural Disaster January 8, 2020 System Resilience Under Extreme Natural Disaster Executive Summary The purpose of this assessment is to evaluate the impact of an extreme natural disaster on the reliability of the Bulk Electric System (BES) in the Western Interconnection (WI). Given that the WI experiences extreme disasters somewhat regularly, such as yearly wild fires and occasional extreme earthquakes, this assessment is designed to identify challenges to the resilience of the WI and to help transmission providers plan accordingly. The scope of this assessment includes studying the impact on WI system adequacy and system stability within a Year 10 future in an Extreme Event caused by California wild fires. This case study was inspired by California’s Tucker Wild Fire in July 2019. The assessment used WECC’s 2028 Anchor Data Set (ADS) planning cases to model a Production Cost Model (PCM) analysis using ABB’s GridView software and a Power Flow (PF) Model analysis using GE’s PSLF software. To identify a highly stressed system condition, the assessment started with the ADS 2028 PCM Phase 1 V2.2, and identified August 7, 2028, Hour 20 (08/07/2018 Hr. 20) as the hour when Path 66 (COI) and Path 65 (PDCI) were most heavily loaded, and the danger of fire was highest. The generation dispatch and load for the 08/07/2028 Hr. 20 were extracted from the 2028 ADS PCM Phase 1 V2.2 and used as input for the 2028 Heavy Summer 1 base case to create a PF case for the assessment. -
2019 Transmission Plan
BONNEVILLE POWER ADMINISTRATION OPEN ACCESS TRANSMISSION TARIFF – ATTACHMENT K TRANSMISSION PLAN Prepared by Transmission Planning December 2019 2019 Table of Contents 1. Executive Summary .............................................................................................................................................................................. 6 2. Transmission Services ........................................................................................................................................................................... 8 2.1 Transmission Business Model .................................................................................................................................................. 8 2.2 Planning & Asset Management Organization ................................................................................................................... 8 2.3 Attachment K Planning Process ........................................................................................................................................... 9 2.4 FERC Order 845 ....................................................................................................................................................................... 9 3. Transmission Planning Activities ........................................................................................................................................................ 10 3.1 Area Planning and System Assessment ............................................................................................................................