Hull City Council Flood Investigation Report
Total Page:16
File Type:pdf, Size:1020Kb

Load more
Recommended publications
-
The Humber Metro
The Humber Metro The Humber Metro is a very futuristic concept, depending, as it does, on the existence of the Humber tunnel between Goxhill and the approach to Paragon station, proposed as part of HS10 in the ‘HS Eastern Routes and Service Plans’ article. As noted there, although the tunnel will be built to GC gauge, it is intended from the outset to be shared with Regional Metro traffic between Cleethorpes and Hull, which will at least initially be of UK loading gauge. The Humber Metro covers the area from Selby and Goole in the west to Cleethorpes and Withernsea in the east, and from Grimsby in the south to Bridlington in the north. The core section, built to GC-gauge, as all new infrastructure should be, runs in tunnel under the centre of Hull between Paragon (LL) and Cannon St. (former H&B) stations, with a connection to the Hornsea / Withernsea lines just before Wilmington, and another to the Beverley line at Cottingham. Other than that (and the Humber tunnel, of course,) it takes over the routes of existing and former, long closed, branches. The proposed metro services fall into two groups, either cross-river or west-east along the north bank. The services of the first group are: 2tph Cleethorpes – New Clee – Grimsby Docks – Grimsby Town – West Marsh – Great Coates – Healing – Stallingborough – Habrough – Ulceby – Thornton Abbey – Goxhill – Hull Paragon (LL) – George St. – Cannon St. – Beverley Rd. – Jack Kaye Walk – Cottingham – Beverley – Arram – Lockington – Hutton Cranswick – Great Driffield – Nafferton – Lowthorpe – Burton Agnes – Carnaby – Bridlington 2tph Cleethorpes – New Clee – Grimsby Docks – Grimsby Town – West Marsh – Great Coates – Healing – Stallingborough – Habrough – Ulceby – Thornton Abbey – Goxhill – Hull Paragon (LL) – George St. -
Geography: Example Erosion
The Physical and Human Causes of Erosion The Holderness Coast By The British Geographer Situation The Holderness coast is located on the east coast of England and is part of the East Riding of Yorkshire; a lowland agricultural region of England that lies between the chalk hills of the Wolds and the North Sea. Figure 1 The Holderness Coast is one of Europe's fastest eroding coastlines. The average annual rate of erosion is around 2 metres per year but in some sections of the coast, rates of loss are as high as 10 metres per year. The reason for such high rates of coastal erosion can be attributed to both physical and human causes. Physical Causes The main reason for coastal erosion at Holderness is geological. The bedrock is made up of till. This material was deposited by glaciers around 12,000 years ago and is unconsolidated. It is made up of mixture of bulldozed clays and erratics, which are loose rocks of varying type. This boulder clay sits on layer of seaward sloping chalk. The geology and topography of the coastal plain and chalk hills can be seen in figure 2. Figure 2 The boulder clay with erratics can be seen in figure 3. As we can see in figures 2 and 3, the Holderness Coast is a lowland coastal plain deposited by glaciers. The boulder clay is experiencing more rapid rates of erosion compared to the chalk. An outcrop of chalk can be seen to the north and forms the headland, Flamborough Head. The section of coastline is a 60 kilometre stretch from Flamborough Head in the north to Spurn Point in the south. -
Hull's Flying High..!
9 Queen’s Gardens 11 City Walls & Citadel Hull Road, HU1 2AB Hull’s fortifications were established in the early 14th century, consisting of the city walls, four main gates and Hull’s flying high.. up to thirty towers. ! Demolished during The future’s bright! the 1860s, the lasting 13 Paragon Interchange segment of Hull’s Amy Johnson,Wow!! the first Civil engineers shape our world and we built this city... Ferensway, HU1 3UT female pilot to fly alone citadel - now to be seen from Britain to Australia, was improve lives. If you want to make born in Hull on Wow!! at Victoria Dock - is all 1st July 1903. a real difference, why not become a that remains of a vast triangular fort dating civil engineer? Photo courtesy of Hull Daily Mail back to 1681. This area - once known as Queen’s Dock - was the site of Which of these are examples Princes Quay Shopping Centre, Hull’s first enclosed dock - excavated between 1774 and 12 Q: of Civil Engineering? 1778. The dock was the first of its kind outside London and HU1 2PQ covers a total area of 11 acres. The original name of the Dams, reservoirs, drains and sewers; transport by road, rail, dock was ‘The Old Dock’ but it was re-named ‘Queen’s’ water and air; bridges for vehicles, trains and pedestrians; when Queen Victoria visited Hull in 1854. seaports, docks, airports, canals and aqueducts; power stations, renewable energy, pipelines and the structures that support towers and buildings. The Paragon Interchange, refurbished Queen Victoria Square 10 in 2000, links the bus station to the Hull, HU1 3RQ 150-year-old Victorian train station and Queen Victoria Square was now serves over 2.25 million people. -
Supplementary Planning Document (SPD) 10
Supplementary Planning Document (SPD) 10 Trees Adopted 7 January 2019 1 1. Introduction / summary 1.1 This Supplementary Planning Document (SPD) acts as guidance to policies in the Hull Local Plan 2016 to 2032, adopted in November 2017. The Local Plan is a 16 year document which sets out the vision for growth in Hull. It identifies the quantity and location for new housing, community facilities, shops and employment provision. 1.2 This document provides planning guidance on Policy 45 – ‘Trees’. It gives advice as to how future planting of trees and tree protection should be addressed via the planning process and the considerations that need to be taken into account before, during and after development. 1.3 Local Plan policy seeks to promote an increase in the provision and diversity of green infrastructure, particularly tree and woodland provision, for its benefits in urban cooling, health and well-being, and conserving and enhancing biodiversity. 1.4 The Supplementary Planning Document seeks to: • Provide clarity to developers, statutory consultees, local residents and other stakeholders; • Outline the national and local planning policy context that guides how trees should be considered in development. • Outline the broad benefits of trees and woodland to the city. • Explain what role trees have in contributing to the distinctive character of areas within the city ; • Explain how new planting of trees should be incorporated into future development, either on site or where this is not possible where future planting should be directed. This includes how planting can be directed to achieve objectives of increasing biodiversity and to support flood risk mitigation. -
HOLDERNESS COAST FISHERY LOCAL ACTION GROUP DRAFT STRATEGY May 2011
Sustainable Seas - Better Businesses - Closer Communities HOLDERNESS COAST FISHERY LOCAL ACTION GROUP DRAFT STRATEGY May 2011 1 Contents 1. Introduction Page 3 2. A Coastal Area with a Distinctive Identity Page 4 3. The Holderness Coast Fishery Page 11 4. SWOT Analysis Page 18 5. Key Issues Affecting the Fishing Industry and its Communities Page 20 6. The Role of the FLAG Page 22 7. Development of the Strategy Page 23 8. Strategic Objective Page 24 9. Priority Themes and Programmes Page 24 10. Delivery of the Strategy Page 36 11. Measuring Success Page 41 Appendix 1 Consultation List Appendix 2 Summary of Key Projects Appendix 3 FLAG Board Members Appendix 4 Partnership Agreement Appendix 5 FLAG Co-ordinator Job Description Appendix 6 Expression of Interest Form Appendix 7 Project Application Form Appendix 8 Application Process Appendix 9 Project Selection Criteria 2 1 Introduction The Holderness Coast Fishery Local Action Group (FLAG) area covers all of the coastal parishes in the East Riding of Yorkshire from Bempton and Flamborough in the north to Easington in the south. The area encompasses the main fishing communities and resort towns of Bridlington, Hornsea and Withernsea, together with smaller landings at Flamborough, Tunstall and Easington (see map 1). The area has a coastline of over 40 miles, from the chalk cliffs of Flamborough Head, by way of the brown sea-washed cliffs of Bridlington Bay to the sand and shingle banks of Spurn Point. The FLAG area has a population of 63,761, the largest settlement and principal fishing town being Bridlington which has a population of 35,192 while the remainder of this relatively remote coastal area has a low density of population. -
Hull Cycle Map and Guide
Hull Cycles M&G 14/03/2014 11:42 Page 1 Why Cycle? Cycle Across Britain Ride Smart, Lock it, Keep it Cycle Shops in the Hull Area Sustrans is the UK’s leading Bike-fix Mobile Repair Service 07722 N/A www.bike-fix.co.uk 567176 For Your Health Born from Yorkshire hosting the Tour de France Grand Départ, the sustainable transport charity, working z Regular cyclists are as fit as a legacy, Cycle Yorkshire, is a long-term initiative to encourage everyone on practical projects so people choose Repair2ride Mobile Repair Service 07957 N/A person 10 years younger. to cycle and cycle more often. Cycling is a fun, cheap, convenient and to travel in ways that benefit their health www.repair2ride.co.uk 026262 z Physically active people are less healthy way to get about. Try it for yourself and notice the difference. and the environment. EDITION 10th likely to suffer from heart disease Bob’s Bikes 327a Beverley Road 443277 H8 1 2014 Be a part of Cycle Yorkshire to make our region a better place to live www.bobs-bikes.co.uk or a stroke than an inactive and work for this and future generations to come. Saddle up!! The charity is behind many groundbreaking projects including the National Cycle Network, over twelve thousand miles of traffic-free, person. 2 Cliff Pratt Cycles 84 Spring Bank 228293 H9 z Cycling improves your strength, For more information visit www.cycleyorkshire.com quiet lanes and on-road walking and cycling routes around the UK. www.cliffprattcycles.co.uk stamina and aerobic fitness. -
Minutes of the Council Meeting 8 March 2017
Beswick Parish Council Meeting of the Council held at 7 pm on Wednesday, 8 March 2017 at Kilnwick Village Hall DRAFT MINUTES 1 Apologies for Absence: Apologies received from Cllr Plowman. Present: Parish Councillors Reid (Chair), Scaife, Feasby, Quinn, Julia Bugg (Clerk) and 2 members of the parish. 2 Declarations of pecuniary and non-pecuniary interests: None. 3 Minutes: Minutes of the meeting held on 11 January 2017 were approved as an accurate record. 4 Matters Arising from the Minutes: 4 Tuesday Club/Club for Retirees. Cllr Reid reported that attendance at the meetings on 31 January and 28 February were heartening (25 and 28 persons, respectively). At the next meeting (28 March), guest speakers Ron and Helen Chambers will be giving a presentation on Bees and Flowers. A trip to Lincoln Castle has been organised for 27 April. 4 Damage to Bench in Beswick. Cllr Scaife reported that the bench has been repaired and is now back in place. An invoice has been submitted and payment requested. Action: Clerk to inform ERYC that the repair has been carried out. Additionally, the Beswick South bus shelter guttering has been repaired and a request made for payment. 5 Proposed Storage Development at LKAB Minerals. Cllr Reid reported on correspondence with LKAB on possible contributions by LKAB to the Council for community projects. John Wallace has passed our request on to senior managers; awaiting decision. 9 Appointment of Internal Auditor. Cllr Quinn reported that Kate Johnson has once again agreed to act as IA. 10.1 Copy for Newsletter. Cllr Reid stated that, following the distribution of a draft version, the preparation was almost complete. -
Passionate for Hull
Drypool Parish, Hull October 2015 WANTED Drypool Team Rector / Vicar of St Columba’s Passionate for Hull Parish Profile for the Team Parish of Drypool, Hull 1/30 Drypool Parish, Hull October 2015 Thank you for taking the time to view our Parish profile. We hope that it will help you to learn about our community of faith and our home community; about our vision for the future, and how you might take a leading role in developing and taking forward that vision. If you would like to know more, or visit the Parish on an informal basis, then please contact any one of the following Revd Martyn Westby, Drypool Team Vicar, with special responsibility for St John’s T. 01482 781090, E. [email protected] Canon Richard Liversedge, Vice-chair of PCC & Parish Representative T. 01482 588357, E. [email protected] Mrs Liz Harrison Churchwarden, St Columba’s T. 01482 797110 E. [email protected] Mr John Saunderson Churchwarden, St Columba’s & Parish Representative T. 01482 784774 E. [email protected] 2/30 Drypool Parish, Hull October 2015 General statement of the qualities and attributes that the PCC would wish to see in a new Incumbent We are praying and looking for a priest to join us as Rector of Drypool Team Parish and vicar of St Columba’s Church. We seek someone to lead us on in our mission to grow the Kingdom of God in our community, and these are the qualities we are looking for. As Team Rector The ability to: Embrace a call to urban ministry and a desire to develop a pastoral heart for the people of the various communities in the Parish Be Strategic and Visionary Work in partnership with existing Team Vicar and Lay Leadership Developing and empowering Lay Leadership further Respect the uniqueness of each congregation and continue unlocking the sharing of each others strengths Be organised and promote good organisation and communication Someone who can grow to love this community as we love it. -
Initial Template
Planning Applications Week Ending 10 October 2008 Starred applications below will be determined by Planning Committee. To view planning applications on the website please use the number prefixed with “08”. Would Councillors please notify the Development Control Section in writing by 24 October 2008 if they require any of the other applications to be determined by Committee (and to indicate at this stage whether a site visit is required). Members of the public should make comments in writing (by letter or e-mail) before 31 October 2008. Any comments will be available for the public to see. Please contact the Development Control Section or the individual officer specified below to discuss any application or to find out its progress. CONTACT DETAILS: tel: (01482) 612345 e-mail: [email protected] address: Planning Services, Kingston House, Bond Street, Hull, HU1 3ER. Ref Number Location Proposal Ward Committee/ Applicant Agent Delegated Officer Contact 00003460B 356 James Reckitt Change of use from Holderness Heritage Mr Derek Wright Avenue doctor’s surgery to 6 Developments Wright Design (Hull) Ltd James Matchett Kingston Upon Hull flats. 17 Worthing Street. 102 Grosvenor House 612309 HU8 0JA Kingston Upon Hull Beverley Road 08/01027/FULL Kingston Upon Hull HU3 1YA 00016625L Land To The South Of Erection of building to Marfleet Europa Shipping Mr T W G Litten Hedon Road form storage building Supplies 30 West End Road Chris Peach South East Of Marfleet (phase 2 of 3). 1024 Hedon Road Cottingham 612734 Avenue Roundabout Hull HU16 5PN 08/01345/FULL (Europa Shipping) HU9 5QN Kingston Upon Hull 00030831 7 Antholme Close Erection of conservatory Holderness Mrs Bolton Mr P Flintoft Sutton-On-Hull to rear (3.94m long x 7 Antholme Close 31 Boothferry Road Simon Mounce Kingston Upon Hull 3.28m wide x 3.6m high; Sutton-On-Hull Kingston Upon Hull 612920 HU7 4XX 12'11'' x 10'9'' x 11'9''). -
Humber Area Local Aggregate Assessment
OCTOBER 2019 (Data up to 2018) HUMBER AREA LOCAL AGGREGATE ASSESSMENT CONTENTS EXECUTIVE SUMMARY 1 1. INTRODUCTION 3 Development Plans 4 Spatial Context 5 Environmental Constraints & Opportunities 6 2. GEOLOGY & AGGREGATE RESOURCES 8 Bedrock Geology 8 Superficial Geology 9 Aggregate Resources 10 Sand and Gravel 10 Chalk & Limestone 11 Ironstone 11 3. ASSESSMENT OF SUPPLY AND DEMAND 12 Sand & Gravel 12 Crushed Rock 14 4. AGGREGATE CONSUMPTION & MOVEMENTS 16 Consumption 16 Imports & Exports 18 Recycled & Secondary Aggregates 19 Marine Aggregates 23 Minerals Infrastructure 25 6. FUTURE AGGREGATE SUPPLY AND DEMAND 28 Managed Aggregate Supply System (MASS) 28 Approaches to Identifying Future Requirement 29 Potential Future Requirements 34 7 CONCLUSION 36 Monitoring and Reviewing the Local Aggregates Assessment 37 Consideration by the Yorkshire and Humber Aggregates Working Party 37 APPENDIX 1: YHAWP CONSULTATION RESPONSES TO A DRAFT VERSION OF THIS LAA, THE COUNCILS’ RESPONSE, AND ANY AMENDMENTS TO THE DOCUMENT AS A RESULT. 41 EXECUTIVE SUMMARY The requirement to produce an annual Local Aggregate Assessment (LAA) was introduced through the publication of the National Planning Policy Framework (NPPF) in March 2012 and is still a requirement set out in the revised NPPF (2019). The Government issued further guidance on planning for minerals in the National Planning Practice Guidance (NPPG), incorporating previous guidance on the Managed Aggregate Supply System (MASS). This report is the sixth LAA that aims to meet the requirements set out in both of these documents. It is based on sales information data covering the calendar years up to 2018. Landbank data is 2018-based. Sales and land bank information is sourced from annual surveys of aggregate producers in the Humber area (East Riding of Yorkshire, Kingston upon Hull, North East Lincolnshire & North Lincolnshire), alongside data from the Yorkshire & Humber Aggregates Working Party Annual Monitoring Reports, planning applications, the Crown Estate, and the Environment Agency. -
River Hull Integrated Catchment Strategy Strategy Document
River Hull Advisory Board River Hull Integrated Catchment Strategy April 2015 Strategy Document Draft report This Page is intentionally left blank 2 Inner Leaf TITLE PAGE 3 This page is intentionally left blank 4 Contents 1 This Document.............................................................................................................................17 2 Executive Summary ..............................................................................................................18 3 Introduction and background to the strategy ..................................20 3.1 Project Summary .................................................................................................................................... 20 3.2 Strategy Vision ........................................................................................................................................ 20 3.2.1 Links to other policies and strategies .......................................................................................21 3.3 Background .............................................................................................................................................. 22 3.3.1 Location ........................................................................................................................................... 22 3.3.2 Key characteristics and issues of the River Hull catchment ...............................................22 3.3.3 EA Draft River Hull Flood Risk Management Strategy .........................................................26 -
FID Sheet1__Di 0 Lonsdale Community Centre 1 4 Seasons 2 4
FID Sheet1__Di 0 Lonsdale Community Centre 1 4 Seasons 2 4 Seasons 3 Unity in Community 4 URBaN 5 Goodwin Development Trust 6 The Lemon Tree Children's Centre 7 Pickering and Newington Development Association 8 Job Centre Plus 9 The Freedom Centre 10 Marfleet Children's Centre 11 Sight Support Hull & East Yorkshire 12 Fenchurch Children's Centre 13 Parks Children's Centre 14 Priory Children's Centre 15 Avenue's Library 16 Bransholme Library 17 Fred Moore Library 18 Freedom Centre Library 19 Gipsyville Library 20 Greenwood Avenue Library 21 Ings Library 22 Longhill Library 23 Waudby Library 24 Western Library 25 East Park Library 26 Hull Central Library 27 Bransholme Customer Service Centre 28 Orchard Customer Service Centre 29 The Wilson Centre Customer Service Centre 30 Autism Plus Sheet1__F2 8 Lonsdale Street, Hull HU3 6PA HU9 3QB HU1 3SQ 501 Endike Lane, Hull, HU6 8AQ 9 Appin Close, North Bransholme, Hull HU7 5BB The Octagon, Walker Street, Hull, HU3 2RE Lothian Way, Hull, HU7 5DD Gipsyville Multi Purpose Centre, 729-730 Hessle Road, Hull HU4 6JA Britannia House, 2 Ferensway, Hull, HU2 8NF 97 Preston Road, Hull HU9 3QB Preston Road, Hull, HU9 5AN 466 Beverley Road, Hull HU5 1NF Fenchurch Street, Hull HU5 1JF Treehouse, Courtway Road, Hull HU6 9TA Priory Road, Hull HU5 5RU 76 Chanterlands Avenue, Hull HU5 3TD North Point Shopping Centre, Hull HU7 4EF Wold Road, Hull HU5 5UN 97 Preston Road, Hull HU9 3QB Gipsyville Multi-Purpose Centre, Hull, HU4 6JA 220 Greenwood Avenue, Hull HU6 9RU Savoy Road, Hull HU8 0TY St Margaret's Church, Shannon Road, Hull HU8 9PD Waudby Centre, Hull HU9 5LD 254 Boulevard, Hull HU3 3ED Central Pavilion, Holderness Road, Hull HU8 8JE Albion Street, Hull HU1 3TF The Bransholme Health Centre, Goodhart Road, Hull, HU7 4DW The Orchard Centre, Orchard Park Road, Hull, HU6 9BX Alfred Gelder Street, Hull, HU1 2AG Ings Plus, Savoy Road, Hull, HU8 0TX Sheet1__F3 Sheet1__F9 LLPG_FID LLPG_UPRN LLPG_Easti Newington & Gipsyville 010000201796 83783 010000201796 507290 Southcoates - Freedom Centre 010070551198 105068 010070551198 513190 St.