World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document PROCUREMENT PLAN (Textual Part) Project information: Egypt Transforming Egypt's Healthcare System Project P167000 Project Implementation agency: Ministry of Health and Population Public Disclosure Authorized Date of the Procurement Plan: October 23, 2018 Period covered by this Procurement Plan: 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. Public Disclosure Authorized This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. Public Disclosure Authorized National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. Leased Assets: “Not Applicable” Procurement of Second Hand Goods: “Not Applicable” Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Goods: is applicable for those contracts identified in the Procurement Plan tables; Public Disclosure Authorized Other Relevant Procurement Information. NA PROCUREMENT Egypt, Arab Republic of : Transforming Egypt's Healthcare System Project PLAN General Information Country: Egypt, Arab Republic of Bank’s Approval Date of the Original Procurement Plan: 2018-10- Revised Plan Date(s): (comma delineated, leave blank if none)2021-02-23 Project ID: P167000 GPN Date: 2018-12-10 Project Name: Transforming Egypt's Healthcare System Project 16 Loan / Credit No: IBRD / 88950 Executing Agency(ies):Ministry of Health and Population WORKS Procure Bid Evaluation Activity Reference No. Actual Draft Pre- Draft Bidding Specific Proposal Loan / Credit Market Procurement Prequalificati High SEA/SH ment Process Prequalification Bidding Documents Report and Contract / Description Component Review Type Method Amount qualification Document / Procurement Notice Submission / Signed Contract No. Approach Process on (Y/N) Risk Docume Status Evaluation Report as Issued Recommendation Completion (US$) Documents Justification / Invitation Opening / Minutes nt Type for Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planne Actu d al GOODS Activity Reference No. Actual Draft Pre- Draft Bidding Specific Proposal Bid Evaluation Loan / Credit Market Procurement Prequalificati Process Prequalification Bidding Documents Contract / Description Component Review Type Method Amount qualification Document / Procurement Notice Submission / Report and Signed Contract No. Approach Process on (Y/N) Status Evaluation Report as Issued Completion (US$) Documents Justification / Invitation Opening / Minutes Recommendation Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Plannedfor AwardActual Planned Actual Planned Actual EG-MOHP-83194-GO-RFQ / Purchasing virus C drugs to kafr eldwar district . the currently used drugs Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- through the Egyptian IBRD / 88950 Post Limited 97,725.35 Signed Healthcare Quotations Envelope 28 06 09 11 08 national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83195-GO-RFQ / Purchasing virus C drugs to edko district. the currently used drugs Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- through the Egyptian IBRD / 88950 Post Limited 98,363.09 Signed Healthcare Quotations Envelope 28 06 06 12 05 national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83196-GO-RFQ / Purchasing virus C drugs to kwam hamada district. the currently used drugs Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- through the Egyptian IBRD / 88950 Post Limited 97,725.35 Signed Healthcare Quotations Envelope 28 06 06 11 05 national treatment program are combination of Sofosbuvir 400 mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83197-GO-RFQ / Purchasing virus C drugs to to el tahrir district. the currently used drugs Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- through the Egyptian IBRD / 88950 Post Limited 97,894.08 Signed Healthcare Quotations Envelope 28 06 06 11 05 national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83198-GO-RFQ / Purchasing virus C drugs to to Rashed district. the currently used drugs Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- through the Egyptian IBRD / 88950 Post Limited 97,140.56 Signed Healthcare Quotations Envelope 28 06 06 11 05 national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . purchased EG-MOHP-83199-GO-RFQ / Purchasing virus C drugs to to Abou Homas district. the currently used drugs Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- through the Egyptian IBRD / 88950 Post Limited 98,308.20 Signed Healthcare Quotations Envelope 28 06 06 12 05 national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83200-GO-RFQ / Purchasing virus C drugs to Gharb el nubarea district. Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- the currently used drugs IBRD / 88950 Post Limited 96,750.70 Signed Healthcare Quotations Envelope 28 06 06 11 05 through the Egyptian national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83201-GO-RFQ / purchasing virus C drugs to to Shabrakhet district. the currently used drugs Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- through the Egyptian IBRD / 88950 Post Limited 97,190.56 Signed Healthcare Quotations Envelope 28 06 06 11 05 national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83202-GO-RFQ / Purchasing virus C drugs to to Abou El Matamer district. Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- the currently used drugs IBRD / 88950 Post Limited 98,115.20 Signed Healthcare Quotations Envelope 28 06 06 11 05 through the Egyptian national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83205-GO-RFQ / Purrchasing virus C drugs to El mahmoudia district. the currently used drugs Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- through the Egyptian IBRD / 88950 Post Limited 97,581.41 Signed Healthcare Quotations Envelope 28 06 09 11 08 national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83206-GO-RFQ / Purchasing virus C drugs to El rahmanea district. the currently used drugs Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- through the Egyptian IBRD / 88950 Post Limited 96,995.14 Signed Healthcare Quotations Envelope 28 06 06 11 05 national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83207-GO-RFQ / Purchasing virus C drugs to to El delngat district. the currently used drugs Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- through the Egyptian IBRD / 88950 Post Limited 98,115.20 Signed Healthcare Quotations Envelope 28 06 06 11 05 national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83208-GO-RFQ / Purchasing virus C drugs to Etay El baroud district. the currently used drugs Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- through the Egyptian IBRD / 88950 Post Limited 98,363.09 Signed Healthcare Quotations Envelope 28 06 06 11 05 national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83209-GO-RFQ / Purchasing virus C drugs to to Wady El natroun district. Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- the currently used drugs IBRD / 88950 Post Limited 98,115.20 Signed Healthcare Quotations Envelope 28 06 06 11 05 through the Egyptian national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83210-GO-RFQ / Purchasing virus C drugs to Damnhour district. the currently used drugs Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- through the Egyptian IBRD / 88950 Post Limited 97,725.35 Signed Healthcare Quotations Envelope 28 06 09 11 08 national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83211-GO-RFQ / Purchasing virus C drugs to to Housh Aesa district. the currently used drugs Strengthen Secondary Level Request for Single Stage - One 2018-10- 2018-11- 2018-11- 2018-11- 2019-01- through the Egyptian IBRD / 88950 Post Limited 98,310.13 Signed Healthcare Quotations Envelope 28 06 06 11 05 national treatment program are combination of Sofosbuvir 400mg+ Daclatasvir 60 mg for 12 weeks . EG-MOHP-83212-GO-RFQ / Purchasing virus C drugs to to Port Said district.
Recommended publications
  • Chapter 4 Logistics-Related Facilities and Operation: Land Transport
    Chapter 4 Logistics-related Facilities and Operation: Land Transport THE STUDY ON MULTIMODAL TRANSPORT AND LOGISTICS SYSTEM OF THE EASTERN MEDITERRANEAN REGION AND MASTER PLAN FINAL REPORT Chapter 4 Logistics-related Facilities and Operation: Land Transport 4.1 Introduction This chapter explores the current conditions of land transportation modes and facilities. Transport modes including roads, railways, and inland waterways in Egypt are assessed, focusing on their roles in the logistics system. Inland transport facilities including dry ports (facilities adopted primarily to decongest sea ports from containers) and to less extent, border crossing ports, are also investigated based on the data available. In order to enhance the logistics system, the role of private stakeholders and the main governmental organizations whose functions have impact on logistics are considered. Finally, the bottlenecks are identified and countermeasures are recommended to realize an efficient logistics system. 4.1.1 Current Trend of Different Transport Modes Sharing The trends and developments shaping the freight transport industry have great impact on the assigned freight volumes carried on the different inland transport modes. A trend that can be commonly observed in several countries around the world is the continuous increase in the share of road freight transport rather than other modes. Such a trend creates tremendous pressure on the road network. Japan for instance faces a situation where road freight’s share is increasing while the share of the other
    [Show full text]
  • Justice Denied: Mass Trials and the Death Penalty in Egypt
    Justice Denied: Mass trials and the death penalty in Egypt November 2015 Executive Summary • 588 people have been sentenced to death in Egypt since 1 January 2014. • 72% of these sentences were handed down for involvement in political protests. • Executions are on the rise: between 2011 and 2013, only one execution was carried out. Since 2014 to date, at least 27 people have been executed. • At least 15 mass trials have taken place since March 2014. Reprieve has confirmed that at least 588 people have been sentenced to death in Egypt in less than two years. Our findings show that 72% of these people were sentenced to death for attending pro-democracy protests. The majority of the condemned have been sentenced in patently unjust mass trials, where tens, if not hundreds, of co-defendants are tried on near identical charges. The number of executions is also increasing, with at least 27 people having been executed by hanging in the last two years, compared to only one in the preceding three years. President Sisi has promised that the rate of executions will only increase as he aims to change the law to speed up executions1. Egypt’s system of mass trials defies international standards of due process and judicial independence. As part of a brutal crackdown on political opposition, thousands of people are being arrested. Many are then subjected to brutal prison conditions and torture, with scores of people dying in detention2. Reprieve calls on the Egyptian government to stop political mass trials and death sentences. Egypt’s policy of repressing those exercising their right to freedom of expression and assembly must end, and the rule of law must be upheld.
    [Show full text]
  • Identification of Terrestrial Gastropods Species in Sohag Governorate, Egypt
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by Archives of Agriculture and Environmental Science Archives of Agriculture and Environmental Science 3(1): 45-48 (2018) https://doi.org/10.26832/24566632.2018.030105 This content is available online at AESA Archives of Agriculture and Environmental Science Journal homepage: www.aesacademy.org e-ISSN: 2456-6632 ORIGINAL RESEARCH ARTICLE Identification of terrestrial gastropods species in Sohag Governorate, Egypt Abd El-Aleem Saad Soliman Desoky Department of Plant protection (Agriculture Zoology), Faculty of Agriculture, Sohag University, EGYPT E-mail: [email protected] ARTICLE HISTORY ABSTRACT Received: 15 January 2018 The study aims to identify of terrestrial gastropods species in Sohag Governorate during the Revised received: 10 February 2018 year 2016 and 2017. The present study was carried out for survey and identification for ran- Accepted: 21 February 2018 dom land snail in 11 districts, i.e. (Tema, Tahta, Gehyena, El-Maragha, Saqultah, Sohag, Akhmim, El-Monshah, Gerga, El-Balyana, and Dar El-Salam) at Sohag Governorate, Egypt. Samples were collected from 5 different locations in each district during 2016-2017 seasons. The monthly Keywords samples were taken from winter and summer crops (areas were cultivated with the field crops Egypt such as wheat, Egyptian clover, and vegetables crops. The results showed that found two spe- Eobania vermiculata cies of land snails, Monacha obstracta (Montagu) and Eobania vermiculata (Muller). It was
    [Show full text]
  • Construction Projects Sector - Q4 2018 Report
    Construction Projects Sector - Q4 2018 Report Construction Projects 4 (2018) Report American Chamber of Commerce in Egypt - Business Information Center 1 of 20 Construction Projects Sector - Q4 2018 Report Special Remarks The Construction Projects Q4 2018 report provides a comprehensive overview of the Construction Projects sector with List of sub-sectors focus on top tenders, big projects and important news. Administrative Buildings Bridges Tenders Section Earthmoving Works Hospitals - Integrated Jobs (Having a certain engineering component) - sorted by Hotels & Tourist Development - Generating Sector (the sector of the client who issued the tender and who would pay for the goods & services ordered) Integrated works - Client Parks & Landscaping Renovation, Concrete Treatment & Paints Residential Buildings - Supply Jobs River Ports - Generating Sector Roads Construction - Client Schools & Other Educational Buildings Sea Ports Non-Tenders Section Steel Structure, Possible Prefab - Business News - Projects Awards - Projects in Pre-Tendering Phase - Privatization and Investments - Published Co. Performance - Loans & Grants - Fairs and Exhibitions This report includes tenders with bid bond greater than L.E. 50,000 and valuable tenders without bid bond Tenders may be posted under more than one sub-sector Copyright Notice Copyright ©2018, American Chamber of Commerce in Egypt (AmCham). All rights reserved. Neither the content of the Tenders Alert Service (TAS) nor any part of it may be reproduced, sorted in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of the American Chamber of Commerce in Egypt. In no event shall AmCham be liable for any special, indirect or consequential damages or any damages whatsoever resulting from loss of use, data or profits.
    [Show full text]
  • Mints – MISR NATIONAL TRANSPORT STUDY
    No. TRANSPORT PLANNING AUTHORITY MINISTRY OF TRANSPORT THE ARAB REPUBLIC OF EGYPT MiNTS – MISR NATIONAL TRANSPORT STUDY THE COMPREHENSIVE STUDY ON THE MASTER PLAN FOR NATIONWIDE TRANSPORT SYSTEM IN THE ARAB REPUBLIC OF EGYPT FINAL REPORT TECHNICAL REPORT 11 TRANSPORT SURVEY FINDINGS March 2012 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS CO., LTD. ALMEC CORPORATION EID KATAHIRA & ENGINEERS INTERNATIONAL JR - 12 039 No. TRANSPORT PLANNING AUTHORITY MINISTRY OF TRANSPORT THE ARAB REPUBLIC OF EGYPT MiNTS – MISR NATIONAL TRANSPORT STUDY THE COMPREHENSIVE STUDY ON THE MASTER PLAN FOR NATIONWIDE TRANSPORT SYSTEM IN THE ARAB REPUBLIC OF EGYPT FINAL REPORT TECHNICAL REPORT 11 TRANSPORT SURVEY FINDINGS March 2012 JAPAN INTERNATIONAL COOPERATION AGENCY ORIENTAL CONSULTANTS CO., LTD. ALMEC CORPORATION EID KATAHIRA & ENGINEERS INTERNATIONAL JR - 12 039 USD1.00 = EGP5.96 USD1.00 = JPY77.91 (Exchange rate of January 2012) MiNTS: Misr National Transport Study Technical Report 11 TABLE OF CONTENTS Item Page CHAPTER 1: INTRODUCTION..........................................................................................................................1-1 1.1 BACKGROUND...................................................................................................................................1-1 1.2 THE MINTS FRAMEWORK ................................................................................................................1-1 1.2.1 Study Scope and Objectives .........................................................................................................1-1
    [Show full text]
  • Baby Friendly Multicenter Needs Assessment Survey
    MCH/MoHP-MCFC-UNICEF BFHI Muti-Center Needs Assessment Survey, 2016 BABY FRIENDLY HOSPITAL INITIATIVE MUTICENTER NEEDS ASSESSMENT SURVEY (BFHI-MAS) Breastfeeding Promotion, Protection and Support UNICEF/WHO BABY FRIENDLY HOSPITAL INITIATIVE Revised Updated and Expanded for Integrated Care General Department of Motherhood & Childhood Care in Ministry of Health & Population Mother Child Friendly Care Association (MCFC) UNICEF, Egypt - Cairo Office ∭∭∭ COLLABORATING PARTNERS: Alexandria Health Directorate Benha Faculty of Medicine & Qaluibiya Health Directorate Sohag Faculty of Medicine & Sohag Health Directorate Egyptian Medical Women Association (EMWA) with Gharbia MCH/MoHP EGYPT, 2016 Page 1 MCH/MoHP-MCFC-UNICEF BFHI Muti-Center Needs Assessment Survey, 2016 PREFACE This research was initially proposed by MCFC to the Department of MCH/MoHP and UNICEF, Cairo office, as an exercise to identify, through mock assessments, the hospitals and health centers that were ready for final assessment for designation as Baby Friendly as MCFC had a team of International Board Certified Lactation consultants some of whom were also designated national assessors. However it was the wish of the officials in MCH/MoH to identify the needs of hospitals and MCH centers to become Baby Friendly health facilities, as a follow-up of the survey conducted in 2008 (MCH- MoH/ELCA/UNICEF, 2010). The survey was inspired by UNICEF/ECO’s support, motivation and facilitation throughout the work. MCFC started off initially with three governorates: Qaluibiya, Alexandria and Sohag then added Gharbia governorate (only 4 hospitals and affiliated MCH units). We then formed partnerships with the universities in each governorate. We partnered with Benha University Faculty of Medicine in Qaluibiya and Sohag University Faculty of Medicine, community department in Sohag governorate, while utilized our own IBCLCs and national BFHI assessors in Alexandria and Gharbia governorates.
    [Show full text]
  • The Giant Projects.Pdf
    State Information Service Information Sector Contents Preface: Chapter One: The New Suez Canal 6 Chapter Two: Suez Canal Corridor Development Project 22 Chapter Three: 1.5 million Feddans Project 38 Chapter Four: The National Project for Developing Sinai 48 Chapter Five: National Roads Project 82 Chapter Six: The National Project for Developing Upper Egypt Governorates 94 Chapter Seven: Establishing New Generation of Inhabited Cities 104 Chapter Eight: National Social Housing Project 110 Chapter Nine: Other National Projects 126 First: National Project for Electricity 126 Second: Al-Galala Plateau Project 129 Third: The Golden Triangle Project 130 Fourth: The Northwest Coast Development Project 131 Fih: Logistics Center for Storage and Handling of Grains 134 Sixth: Toshka project 135 Seventh: Sharq al-Owaynat Project 136 Eighth: The National Project for Fish Culture 137 Ninth: National Program for Technological Incubators (Intilac) 149 Introduction The mega national projects are generally distinguished for being comprehensive and widespread all over the country, thus contributing to realizing economic balance, establishing basis of social justice, reducing unemployment, and redistributing population to several new cities nationwide. The mega national projects are considered the locomotive of the sustainable development. In this respect, the New Suez Canal, which was totally setup in one year (August 2015-August 2016), with 100% national finance, had a direct and indirect impact concerning increasing the GDP on the one hand, and activating the movement of trade and aracting foreign investments on the other hand, As regards the national project of developing the Suez Canal Corridor, this project mainly aims at increasing the job opportunities and turning the Suez Canal into a global center for maritime navigation and logistic services, an industrial center and a gate for the trade exchange between the east and the west.
    [Show full text]
  • Inventory of Municipal Wastewater Treatment Plants of Coastal Mediterranean Cities with More Than 2,000 Inhabitants (2010)
    UNEP(DEPI)/MED WG.357/Inf.7 29 March 2011 ENGLISH MEDITERRANEAN ACTION PLAN Meeting of MED POL Focal Points Rhodes (Greece), 25-27 May 2011 INVENTORY OF MUNICIPAL WASTEWATER TREATMENT PLANTS OF COASTAL MEDITERRANEAN CITIES WITH MORE THAN 2,000 INHABITANTS (2010) In cooperation with WHO UNEP/MAP Athens, 2011 TABLE OF CONTENTS PREFACE .........................................................................................................................1 PART I .........................................................................................................................3 1. ABOUT THE STUDY ..............................................................................................3 1.1 Historical Background of the Study..................................................................3 1.2 Report on the Municipal Wastewater Treatment Plants in the Mediterranean Coastal Cities: Methodology and Procedures .........................4 2. MUNICIPAL WASTEWATER IN THE MEDITERRANEAN ....................................6 2.1 Characteristics of Municipal Wastewater in the Mediterranean.......................6 2.2 Impact of Wastewater Discharges to the Marine Environment........................6 2.3 Municipal Wasteater Treatment.......................................................................9 3. RESULTS ACHIEVED ............................................................................................12 3.1 Brief Summary of Data Collection – Constraints and Assumptions.................12 3.2 General Considerations on the Contents
    [Show full text]
  • The Data on Periodical (Weekly) Market at the End of the 19Th Century in Egypt -The Cases of Qaliubiya, Sharqiya and Daqahliya Provinces
    The Data on Periodical (Weekly) Market at the End of the 19th Century in Egypt -The cases of Qaliubiya, Sharqiya and Daqahliya Provinces Hiroshi Kato Some geographers and historians are concerned with periodical market, which they define as the place of economic transactions peculiar to so called "peasant society. In Egypt, which is, as well known, a typical hydraulic society, periodical market, that is weekly market (α1- siiq al-usbu i) in the Islamic world, still has the important economic functions in rural areas at the present, as well as it had in the past. The author is now collecting the data on Egyptian weekly market from the 19th century to the present, based upon source materials on one hand, and field research on the other. The aim of this paper is to present some statistical and ge0- graphical data on Egyptian weekly market at the end of the 19th century to the researchers who are interested in periodical market in agrarian society, before the intensive study, which the author is planning in the future, on the economic functions of Egyptian weekly market and their transformation in the process of the modernization of Egyptian society. The source material from which the data are collected is A. Boinet, Geographie Econ0- mique et Administrative de I'Egypte, Basse-Egypte I, Le Caire, 1902. It is the results of the population census in 1897 and the agrarian census maybe took in 1898 and 1899, being annexed to the population census in the previous year. The data are arranged village by village, and contain the statistics on cultivated area, crops, planted trees, animals, industry, traffic by rail- road, and transportation by the Nile and canals, and the descriptive informations and remarks on school, canal, railroad, market, post office and so on.
    [Show full text]
  • Labor and Professional, and Social Protests During Jan 2019
    The Arabic Network for Human Rights Information ANHRI Program of freedom of expression of workers and social movements Labor and Social Protest Index during January 2019 Introduction January has witnessed no major protests, but in general we can say that the number of participants in the protests in most of the labor and professional protests was estimated by hundreds, or dozens, while individualism dominated the social mobility; at best the number of participants in the protests did not reach thousands, except in the case of solidarity with the Bar Association during the hearing to appeal the sentence of imprisonment for failure to implement a judicial ruling, and the failure to implement the provisions of registration of graduates of open education on the registration schedule of the union. In terms of the authorities' handling of the protests, labor protests were mostly dominated by negotiations, while social protests were mostly dominated by repression and intimidation, or even being ended automatically. The program monitored 47 protests during the month of January, including 11 labor and professional protests, and 36 social, summarized as follows: Labor and Professional, and Social protests during Jan 2019 23.40% 76.60% Labor and Professional 23.4% Social 76.6% I- Labor and Professional Protests: The program has monitored 11 labor and professional protests, distributed as follows: 1- Protests: 4 cases 2- Strike to work: 2 cases 3- Hunger strikes: 2 cases 4- Sit in: 2 cases 5- Threatening to protest: 1 case. Methods of Labor and Professional Protesting during Jan 2019 9.10%, 9% 18.20%, 18% 36.40%, 37% 18.20%, 18% 18.20%, 18% Protest 36.4% Strike to work 18.2% hunger strike 18.2% Sit in 18.2% Threats to protest 9.1% The details of such protests go as follows: A.
    [Show full text]
  • The Impact of Population Growth on Youth Employment and School Education in Egypt an Analytical Paper
    The Impact of Population Growth on Youth Employment and School Education in Egypt An Analytical Paper STATISTICS in FOCUS ISSUE 1/2017 Supported by Contents 1 Introduction 4 2 National Level Analysis 5 2.1 Population Trends (2001-2031) 5 2.2 Education 8 2.3 Employment 13 2.3.1 Youth Unemployment 13 2.3.2 Economic Dependency Ratios 14 2.3.3 Employment Market Projections 15 3 Regional Level Analysis 16 3.1 Population 16 3.2 Education 19 3.2.1 Literacy 19 3.2.2 Primary Education 19 3.2.3 Preparatory Education 22 3.3 Employment 24 3.3.1 Youth Unemployment 25 3.3.2 Economic Dependency Ratio 26 This ‘Statistics in Focus’ is jointly produced by researchers at CAPMAS with the technical support from UNICEF Egypt and 4 Recommendations 28 UNICEF Middle East and North Africa Regional Office. The opinions expressed are those of the authors and do not neces- 4.1 National Level 28 sarily reflect the views and the policies of CAPMAS or UNICEF. Readers are encouraged to quote and reproduce analysis 4.2 Upper Egypt 28 and figures from this Statistics in Focus; in return, CAPMAS and UNICEF request due acknowledgment and citation. Recommended citation: CAPMAS and UNICEF Egypt. The Impact of Population Growth on Youth Employment and School Education in Egypt: An Analytical Paper. Statistics in Focus 2017 (1). 1 2 Tables Figures Table 3.1: Population Estimates and Population Growth in Upper Egypt by Governorate (Millions) 2006-2014 17 Figure 2.1: Population Estimates and Projections (Millions), 2001-2031 5 Table 3.2: Total Population for Children Under 18
    [Show full text]
  • Food Loss Analysis for TOMATO Value Chains in Egypt
    Food loss analysis for TOMATO value chains in Egypt Food loss analysis for TOMATO value chains in Egypt Food and Agriculture Organization of the United Nations Cairo, 2021 Required citation: FAO. 2021. Food loss analysis for tomato value chains in Egypt. Cairo. https://doi.org/10.4060/cb4733en e designations employed and the presentation of material in this information product do not imply the expression of any opinion whatsoever on the part of the Food and Agriculture Organization of the United Nations (FAO) concerning the legal or development status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. e mention of specic companies or products of manufacturers, whether or not these have been patented, does not imply that these have been endorsed or recommended by FAO in preference to others of a similar nature that are not mentioned. e views expressed in this information product are those of the author(s) and do not necessarily reect the views or policies of FAO. ISBN 978-92-5-134417-0 © FAO, 2021 Some rights reserved. is work is made available under the Creative Commons Attribution-NonCommercial-ShareA- like 3.0 IGO licence (CC BY-NC-SA 3.0 IGO; https://creativecommons.org/licenses/by-nc-sa/3.0/igo/legalcode). Under the terms of this licence, this work may be copied, redistributed and adapted for non-commercial purposes, provid- ed that the work is appropriately cited. In any use of this work, there should be no suggestion that FAO endorses any specic organization, products or services.
    [Show full text]