TABLE OF CONTENTS CONTENTS PAGE • Table Of Contents 1 • About Riofil 2 • SEC Certificate 3 • BIR Certificate of Registration 5 • PCAB Contractor’s License 6 • ISO 9001:2015 Certificate 7 • Business Permit 8 • Bank References 9 • Board of Directors / Officers 10 • Organizational Chart 11 • List of Ongoing Projects 12 • List of Completed Projects 13 • Equipment 33 • Project Photos 42 • Safety Citations 103 • Recognitions 114 • Affiliated Organization 117 • Contact Us 118

Quality and Commitment 1 RIOFIL CORPORATION

ABOUT RIOFIL CORPORATION

RIOFIL CORPORATION was established in 1989 as the construction arm in the of Kawasaki Steel Corporation. In 2003, Kawasaki Steel Corporation merged with another steel-making company NKK, forming the present JFE Steel Corporation. JFE Civil Engineering and Construction Corporation, a subsidiary of JFE Steel Corporation, now collaborates with RIOFIL CORPORATION as its construction arm in the Philippines.

Working hand in hand with JFE CECC, or JFE, RIOFIL offers diverse fields of engineering and construction capabilities. RIOFIL has extensive experience in the design and construction of industrial plants/factories, buildings, ports, jetties and marine works. RIOFIL has also experience in bridges, mechanically stabilized earth (MSE) wall works and car parks.

Quality and Commitment 2 RIOFIL CORPORATION

SEC CERTIFICATE

Quality and Commitment 3 RIOFIL CORPORATION

SEC CERTIFICATE

Quality and Commitment 4 RIOFIL CORPORATION

BIR CERTIFICATE OF REGISTRATION

Quality and Commitment 5 RIOFIL CORPORATION PCAB CONTRACTOR’S LICENSE

Quality and Commitment 6 RIOFIL CORPORATION

ISO 9001:2015 CERTIFICATE

Quality and Commitment 7 RIOFIL CORPORATION

BUSINESS PERMIT

Quality and Commitment 8 RIOFIL CORPORATION

BANK REFERENCES

1. RIZAL COMMERCIAL BANKING CORPORATION Ortigas-Malayan Branch, Unit G3 & G4 Ground Floor Malayan Plaza, ADB Ave. cor. Opal Road, Ortigas, Pasig City Contact Person: Mr. J. Anthony Confesor Business Center Manager Contact No: (02) 8635 5164

2. BANK OF THE PHILIPPINE ISLANDS Ground Floor Antel Global Corporate Center, Doña Julia Vargas Ave., Ortigas Center, Pasig City Contact Person: Ms. Cherwyne Tupil Contact No: (02) 7577 8255

3. MIZUHO BANK, LTD. 26th Floor Citibank Tower, Valero cor. Villar Sts., Salcedo Village, City Contact Person: Ms. Jean Marie Baruelo ` Vice President Contact No: (02) 8860 3500

Quality and Commitment 9 RIOFIL CORPORATION

BOARD OF DIRECTORS

NICANOR S. BATERINA DIRECTOR HIROSHI MIYAKAWA DIRECTOR MICHITO OHTA DIRECTOR PETER M. BANTILAN DIRECTOR MIA CARISSA C. MARTIN DIRECTOR

OFFICERS

NICANOR S. BATERINA CHAIRMAN HIROSHI MIYAKAWA PRESIDENT TAKASHI MIZUMOTO VICE PRESIDENT AMANTE B. DE CASTRO VICE PRESIDENT NAOKI ASAI TREASURER ERNESTO M. NONAN CORPORATE SECRETARY / AVP RAQUEL L. MARQUEZ ASSISTANT VICE PRESIDENT

Quality and Commitment 10 RIOFIL CORPORATION ORGANIZATIONAL CHART

Quality and Commitment 11 RIOFIL CORPORATION LIST OF ONGOING PROJECTS

Contract Proponents T A R GET P R OJEC T C ON T R A C T D A T E SCOPE OF WORK Contract Amount COMPLETI IT EM NAME C LIEN T / N ature o f F LOOR DURATION STARTED LOCATION ON NO. OWNER B usiness AREA LAGUNA AREA APLUS - Civil Air Liquide and Pipeline Lot 8, 15 & 16 Blk. 2, Civil, Structural, Architectural Chemical M echanical Utilities Calamba, Premiere Works including M echanical, 1 M anufacturin P 168,000,000.00 M 12 months M ar-20 M ar-21 Works Services Industrial ParkBatino, Plumbing and Fire Protection g Package of the (ALPLUS), Calamba, Laguna Works TCN 8K and Inc. BATAAN AREA

Designa nd Build: Civil, Spring loaded Hermosa Ecopnomic Structural, Architectural New Factory Yokowo connector Industrial Park, Bgry. 2 16,409 sq.m. Works including M echanical, P M 13 months Nov-20 Dec-21 Building Corporation M anufacturin Culis, Hermosa, Electrical, Plumbing and Fire g Bataan Protection Works

Quality and Commitment 12 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Contract Proponents ITE P R OJEC T C ON TR A C T D A TE TA R GET M SCOPE OF WORK CONTRACT AMOUNT C LIEN T / N A T U R E OF C ON T A C T C ON T A C T DURATION STARTED COMPLETION NAME LOCATION NO. OWNER BUSINESS PERSON NUMBER

2021

Design and Build; Civil, Structural, Architectural IWSP Plant 6 International Luisita Industrial Park (LIP), Electronic Works including (Production and Wiring System Special Export Processing Zone M r. Ronald (+63) 1 M anufacturin M echanical, Electrical, P 655,009,809.00 M 21 months Aug-19 M ay-21 Employees (Philippines) (SPEZ), Barangay San M iguel, Canlas 9985932324 g Plumbing and Fire Building) Project Corporation Tarlac City, Philippines Protection Works including STP

Design and Build: Civil, Block G-1, Subic Techno Park Structural, Architectural Juken Sangyo along Argonaut Highway Boton Juken New Construction (+63) Works including 2 (Philippines) Area, Subic Bay Freeport Zone Jerry Ballais P 97,230,000.00 M 12 months Oct-20 Jun-21 Warehouse M aterials 09999926245 M echanical, Electrical, Corporation Olongapo City Zambales, Plumbing and Fire Philippines Protection Works

Quality and Commitment 13 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS Contract Proponents ITE P R OJEC T C ON TR A C T D A TE TA R GET M SCOPE OF WORK CONTRACT AMOUNT C LIEN T / N A T U R E OF C ON T A C T C ON T A C T DURATION STARTED COMPLETION NAME LOCATION NO. OWNER BUSINESS PERSON NUMBER

2019

Civil, Structural, Yokohama Tel: 045-599- YTPI - P3 Tire Architectural Works Tire IE 5, Clark Special Economic M r. Richard 3604 1 Restoration M anufacturin including M echanical, P 1,228,586,415.00 M 19 months Jan-18 Jul-19 Phillippines, Zone, Clarkfield Pampanga M analoto Fax: 045-599- Project g Electrical, Plumbing and Inc. 3613 Fire Protection Works

Building Works, YTPI - M ixing Yokohama Tel: 045-599- Tire M echnical and Electrical Building Tire IE 5, Clark Special Economic M r. Richard 3604 2 M anufacturin Works including P 255,906,957.00 M 9 months Aug-18 Apr-19 Expansion Phillippines, Zone, Clarkfield Pampanga M analoto Fax: 045-599- g Connecting Works and Project Inc. 3613 Demolition Works Yokohama Tel: 045-599- YTPI - Fire Tire Tire IE 5, Clark Special Economic M r. Richard 3604 3 Sprinkler System M anufacturin M echanical Works P 43,300,000.00 M 6 months Aug-18 Jan-19 Phillippines, Zone, Clarkfield Pampanga M analoto Fax: 045-599- for Phase III g Inc. 3613 PKI - Upgrading M r. Hisashi Tel:043-756- of Electrical Pilipinas Automotive Km.75 Laurel Highway, Inosluban, Sugawara 4 2111 / Fax:02- Electrical Works P 21,163,891.07 M 5 months Jan-19 M ay-19 System for Kyoritsu, Inc Wire Harness Lipa City (Vice 845-1062 Powerhouse 2 President) Petron Corporation / Gasoline / M r. Arturo Civil, Structural, PETRON LOBP M anila North Harbor, Tondo, 632 8766194 / 5 JGC General John Architectural, Electrical P 525,000,000.00 M 25 months M ar-17 M ay-19 Project M anila 0997-105-7653 Philippines, Contractor Estrada, Jr. & M echanical Works. Inc. Electric Wire Hewtech - New Hewtech and Calmelray Industrial Park II M r. Takuya (049)-508- 6 Warehouse Fit- Philippines Equipment/ Civil and Building Works P 35,000,000.00 M 3 months Feb-19 M ay-19 Calamba City, Laguna Takahashi 2299 to 2301 Out Project Corporation M edical Equipment PSC - M B Philippine M s. Diana Anchor Bolt & Iron Ore PSC Compound Katipunan, 088-890-1111 to 7 Sinter Rose K. Civil Works P 29,829,124.00 M 3 months M ar-19 Jun-19 Base Plate Sintering Villanueva, M isamis Oriental 1114 Corporation Cinco Replacement Quality and Commitment 14 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 15 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 16 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 17 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 18 RIOFIL CORPORATION RIOFIL CORPORATION LISTLIST OF OF COMPLETED COMPLETED PROJECTS PROJECTS

Quality and Commitment 19 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 20 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 21 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 22 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 23 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 24 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 25 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 26 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 27 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 28 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 29 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 30 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 31 RIOFIL CORPORATION LIST OF COMPLETED PROJECTS

Quality and Commitment 32 RIOFIL CORPORATION

EQUIPMENT

Quality and Commitment 33 RIOFIL CORPORATION

EQUIPMENT

Quality and Commitment 34 RIOFIL CORPORATION

EQUIPMENT

Quality and Commitment 35 RIOFIL CORPORATION

EQUIPMENT

Quality and Commitment 36 RIOFIL CORPORATION

EQUIPMENT

Quality and Commitment 37 RIOFIL CORPORATION

EQUIPMENT

Quality and Commitment 38 RIOFIL CORPORATION

EQUIPMENT

Quality and Commitment 39 RIOFIL CORPORATION

EQUIPMENT

Quality and Commitment 40 RIOFIL CORPORATION

EQUIPMENT

Quality and Commitment 41 RIOFIL CORPORATION

PROJECT PHOTOS

CATEGORY PAGE

• Plants and Factories 41 • Marine Facilities 71 • Bridges, Car Parks, and Terre Armee Walls 88 • Industrial Plants & Facilities 94 • Building and Civil Works 97 • Power Plants 101 • Infrastructures 102

Quality and Commitment 42 RIOFIL CORPORATION

PLANTS & FACTORIES

PKI PROJECT (PHASE 1 – PHASE 6)

PKI

OWNER / CLIENT : Pilipinas Kyohritsu, Inc. FLOOR AREA : 39,800 sqm. SCOPE OF WORK : Design and Construction of Factory Building Project LOCATION : Km 75 Brgy. Inosluban, Lipa City DURATION : July 1989 – continuing

Quality and Commitment 43 RIOFIL CORPORATION

PLANTS & FACTORIES

KINSHI PROJECT

OWNER / CLIENT : Pilipinas Kyohritsu, Inc. SCOPE OF WORK : Design and Construction of Factory Building LOCATION : Laguna Technopark, Sta. Rosa, Laguna DURATION : March 1994 – November 1994

Quality and Commitment 44 RIOFIL CORPORATION

PLANTS & FACTORIES

HICAP PROJECT (PHASE 1 – PHASE 4)

Quality and Commitment 45 RIOFIL CORPORATION

PLANTS & FACTORIES

TAMIYA (TOY FACXTORY PROJECT)

Quality and Commitment 46 RIOFIL CORPORATION

PLANTS & FACTORIES

TIP PROJECT

Quality and Commitment 47 RIOFIL CORPORATION

PLANTS & FACTORIES

OSATO BIO-NORMALIZER PROJECT

Quality and Commitment 48 RIOFIL CORPORATION

PLANTS & FACTORIES

WASHIN STEEL CENTER

Quality and Commitment 49 RIOFIL CORPORATION

PLANTS & FACTORIES

CORESTEEL PLANT PROJECT

Quality and Commitment 50 RIOFIL CORPORATION

PLANTS & FACTORIES

YOKOHAMA TIRE PLANT (PHASE 1 & 2)

Quality and Commitment 51 RIOFIL CORPORATION

PLANTS & FACTORIES

YOKOHAMA TIRE WEST PLANT PROJECT PHASE 1

Quality and Commitment 52 RIOFIL CORPORATION

PLANTS & FACTORIES

YOKOHAMA TIRE WEST PLANT PROJECT PHASE 2

Quality and Commitment 53 RIOFIL CORPORATION

PLANTS & FACTORIES

YTPI – P-3 RESTORATION PROJECT

Quality and Commitment 54 RIOFIL CORPORATION

PLANTS & FACTORIES

K&K MOLDING PLANT PROJECT

Quality and Commitment 55 RIOFIL CORPORATION

PLANTS & FACTORIES

RHEA PHARMACEUTICAL PLANT

Quality and Commitment 56 RIOFIL CORPORATION

PLANTS & FACTORIES

KAWASHO STEEL PLANT

Quality and Commitment 57 RIOFIL CORPORATION

PLANTS & FACTORIES

HADSYS PHILIPPINE CORPORATION

Quality and Commitment 58 RIOFIL CORPORATION

PLANTS & FACTORIES

KEIHIN FACTORY BUILDING PROJECT

Quality and Commitment 59 RIOFIL CORPORATION

PLANTS & FACTORIES

FEAP FACTORY

Quality and Commitment 60 RIOFIL CORPORATION

PLANTS & FACTORIES LAGUNA STANDARD FACTORY PLANT PROJECT

Quality and Commitment 61 RIOFIL CORPORATION

PLANTS & FACTORIES

MEINAN FACTORY PHASE 2 PROJECT

Quality and Commitment 62 RIOFIL CORPORATION

PLANTS & FACTORIES

RYONAN PHASE 2 PROJECT

Quality and Commitment 63 RIOFIL CORPORATION

PLANTS & FACTORIES

FCC (PHILIPPINES) CORP.

Quality and Commitment 64 RIOFIL CORPORATION

PLANTS & FACTORIES

WAKOREPCO NEW FACTORY (EXPANSION)

Quality and Commitment 65 RIOFIL CORPORATION

PLANTS & FACTORIES

KODO (PHILIPPINES) INC.

Quality and Commitment 66 RIOFIL CORPORATION

PLANTS & FACTORIES

CCL NEW FACTORY

Quality and Commitment 67 RIOFIL CORPORATION

PLANTS & FACTORIES

K2C FOOD EXPANSION PROJECT

Quality and Commitment 68 RIOFIL CORPORATION

PLANTS & FACTORIES

UNILEVER – PROJECT STRAITS NON-HALAL BUILDING

Quality and Commitment 69 RIOFIL CORPORATION

PLANTS & FACTORIES

PROJECT ARETE – NESTLE MALT EXTRACT PLANT

Quality and Commitment 70 RIOFIL CORPORATION

PLANTS & FACTORIES

RCI – NORTH HUB COLD STORAGE PROJECT

Quality and Commitment 71 RIOFIL CORPORATION

PLANTS & FACTORIES

PETRON LUBE OIL BLENDING PLANT PROJECT

72 Quality and Commitment RIOFIL CORPORATION

MARINE FACILITIES

SOUTH HARBOR PROJECT

Quality and Commitment 73 RIOFIL CORPORATION

MARINE FACILITIES

BAPE JETTY FACILITIES

Quality and Commitment 74 RIOFIL CORPORATION

MARINE FACILITIES

BIPC PORT FACILITY PROJECT

Quality and Commitment 75 RIOFIL CORPORATION

MARINE FACILITIES

BADOC LIMESTONE LOADING FACILITY

Quality and Commitment 76 RIOFIL CORPORATION

MARINE FACILITIES

MINDANAO CONTAINER TERMINAL PORT PROJECT

Quality and Commitment 77 RIOFIL CORPORATION

MARINE FACILITIES

MINDANAO 210MW NET COAL-FIRED POWER PLANT

Quality and Commitment 78 RIOFIL CORPORATION

MARINE FACILITIES

SUBIC BAY PORT DEVELOPMENT PROJECT

Quality and Commitment 79 RIOFIL CORPORATION

MARINE FACILITIES

PSC REFRESHMENT PROJECT

Quality and Commitment 80 RIOFIL CORPORATION

MARINE FACILITIES

CEBU POWER PLANT JETTY PROJECT

Quality and Commitment 81 RIOFIL CORPORATION

MARINE FACILITIES

MINDANAO JETTY PROJECT

Quality and Commitment 82 RIOFIL CORPORATION

MARINE FACILITIES

JGSPC – JETTY MODIFICATION WORKS

Quality and Commitment 83 RIOFIL CORPORATION

MARINE FACILITIES

JSOC – NEW JETTY CONSTRUCTION 80,000DWT

Quality and Commitment 84 RIOFIL CORPORATION

MARINE FACILITIES

EEI – FDC 3X135 MW COAL FIRED POWER PLANT (JETTY & TRESTLE PIER WORKS)

Quality and Commitment 85 RIOFIL CORPORATION

MARINE FACILITIES

RESTORATION OF PMSC BOHOL PLANT PORT FACILITIES PROJECT (55,000DWT)

Quality and Commitment 86 RIOFIL CORPORATION

MARINE FACILITIES

MDC – LIO JETTY PROJECT

Quality and Commitment 87 RIOFIL CORPORATION

MARINE FACILITIES

MINGLANILLA PORT UPGRADE PROJECT

Quality and Commitment 88 RIOFIL CORPORATION

MARINE FACILITIES

Pmsc – RENEWAL OF SHIPLOADER (CIVIL WORKS)

Quality and Commitment 89 RIOFIL CORPORATION

BRIDGE, CARPARK & TERRE ARMEE WALL

LTI BRIDGE PROJECT

Quality and Commitment 90 RIOFIL CORPORATION

BRIDGE, CARPARK & TERRE ARMEE WALL

AYALA CAR PARK PROJECT

Quality and Commitment 91 RIOFIL CORPORATION

BRIDGE, CARPARK & TERRE ARMEE WALL

EDSA-ESTRELLA FLYOVER PROJECT

Quality and Commitment 92 RIOFIL CORPORATION

BRIDGE, CARPARK & TERRE ARMEE WALL

EDSA TRAMO PROJECT

Quality and Commitment 93 RIOFIL CORPORATION

BRIDGE, CARPARK & TERRE ARMEE WALL

SCTEX MSE WALL

Quality and Commitment 94 RIOFIL CORPORATION

BRIDGE, CARPARK & TERRE ARMEE WALL

JG SUMMIT NEW BRIDGE PROJECT AT MAGELLAN PROPERTIES

Quality and Commitment 95 RIOFIL CORPORATION

INDUSTRIAL PLANTS & FACILITIES

TAGANITO HPAL PROJECT

Quality and Commitment 96 RIOFIL CORPORATION

INDUSTRIAL PLANTS & FACILITIES

BSII / EAF BARMILL PLANT PROJECT

Quality and Commitment 97 RIOFIL CORPORATION

INDUSTRIAL PLANTS & FACILITIES

JG SUMMIT PE CAPACITY EXPANSION

Quality and Commitment 98 RIOFIL CORPORATION

BUILDINGS & CIVIL WORKS

NBP 4 STOREY COMMERCIAL / RESIDENTIAL BUILDING PROJECT

Quality and Commitment 99 RIOFIL CORPORATION

BUILDINGS & CIVIL WORKS

PHYSICIAN CENTER BUILDING PROJECT

Quality and Commitment 100 RIOFIL CORPORATION

BUILDINGS & CIVIL WORKS

MINDANAO CONTAINER TERMINAL BUILDING PROJECT

Quality and Commitment 101 RIOFIL CORPORATION

BUILDINGS & CIVIL WORKS

C3 / C4 STORAGE AREA BOG COMPRESSOR

Quality and Commitment 102 RIOFIL CORPORATION

POWER PLANTS

PSC 7.0MW DIESEL POWER PLANT

OWNER / CLIENT : Philippine Sinter Corpoation SCOPE OF WORK : Civil, Building and Electro-Mechanical Works LOCATION : Cagayan de Oro DURATION : February – September 2012

Quality and Commitment 103 RIOFIL CORPORATION

INFRASTRUCTURE

CEBU SOUTH COASTAL ROAD PROJECT

Quality and Commitment 104 RIOFIL CORPORATION

SAFETY CITATIONS

Quality and Commitment 105 RIOFIL CORPORATION

SAFETY CITATIONS

Quality and Commitment 106 RIOFIL CORPORATION

SAFETY CITATIONS

Quality and Commitment 107 RIOFIL CORPORATION

SAFETY CITATIONS

Quality and Commitment 108 RIOFIL CORPORATION

SAFETY CITATIONS

Quality and Commitment 109 RIOFIL CORPORATION

SAFETY CITATIONS

Quality and Commitment 110 RIOFIL CORPORATION

SAFETY CITATIONS

Quality and Commitment 111 RIOFIL CORPORATION

SAFETY CITATIONS

Quality and Commitment 112 RIOFIL CORPORATION

SAFETY CITATIONS

Quality and Commitment 113 RIOFIL CORPORATION

RECOGNITIONS

Quality and Commitment 114 RIOFIL CORPORATION

RECOGNITIONS

Quality and Commitment 115 RIOFIL CORPORATION

RECOGNITIONS

Quality and Commitment 116 RIOFIL CORPORATION

AFFILIATED ORGANIZATION

Quality and Commitment 117 RIOFIL CORPORATION

CONTACT US

CENTRAL OFFICE: Unit 1704 – 1706, 1708 Hanston Square Building, 17 , Ortigas Center Pasig City, Philippines

TELEPHONE NO: EMAIL: (632) – 8 – 633-4053 [email protected]

FAX NO: WEBSITE (632) – 8 – 477-9902 www.riofilcorporation.com

Quality and Commitment 118