Furr Title of the Project: Diversion olforest land for laying oFC by reliance Jio infocom Ltd from Forest Boundry Jhajjar to Dh-arauli, Kosri, Nathera, Nahar Lukhi to Forest Boundary area 1'0845 ha rorest Fire No. |'ffiliSif,::i;1Tli"r;Tt rand is required Date of proposat: 09-02-20Ig

CHIICK LIST' SERIAL NUMBER: -18 ATI

Name ol'the fbrest/reach to be diverted lbr layi'g of'oF:c fiom . Nathcra. N,rrarr-.

Lul

l--orest Area: 1.0845 ha.

Details of degraded forest land / nolr_forest land:_ Divisiorr : District Rewari Range: .Rewari Tehsil : Rewari Village Maseet Site cA Nanre: Maseet Section 4 & 5 ofplpA lg00 (216g plants) (]I'S: N28 17'30.3426' 876 2s's4.033" N2g 2g 17,6.6042 [j76 2s,4s.g0g4 't1l l)cscription of Area:-

i- Whether the site selected for Compensatory Aftbrestation is a land bank or. Not No

ll If the CA site is other than the land barrl<, reasons be given :- I)lantation r.r,ill bc carried out in Maseet Section 4 & 5 of pLpA 1900. il In case o1'non-forest area identified for CA, therr what is the distance of CA site fl'om the adjoirrirlg forest boundary:- CA will be carried out in Maseet Section 4 & 5 ofPLPA 1900. iv, Soiltype :- &ady Ioam v. Topoglaphy :- A. Hilly/ Undularing/ptain ll. Slope:- Steep/Mediunr/Gentlc whether the area is bearing any root stocl< of vegetatiorr :- No 2- Plarratation Mo

Sclredulc of Plantation Program mc:-

Detail of year wise break up of reqLri'enrent of funds is as under: full Title of the Proiect: Diversion of forest land [or laying OFC by r-eliance Jio infocorl I-td front Forcst Boundry Jhajjar to Dharauli, l(osli, Nathera, Nahar Lukhi to Fot'est Boundary Mahendergarh Total forest area 1.0845 ha. forest land is required. File No. FPlHR/Othe rs / 31460 / 2078 Date of Proposal: 09-02-2018

The Plarrtation cost is calculated for Plantation as per Tall Plants. at 4m X 2t/zm spacing and it is approved by the PCC letter no.6693-6713 dt. l5-02-2016 at the

wage rate of Rs. 318.461- per day as under:-

Sr.No Year Rate Per Plant lst Year Plantation 2441- Per Planr 2 Ilnd Yeat Plantatiorr 83/- Per Plant J lllrdYear Plantat on 33/- Per Plant 4 IVth Year Plantation 251- Per P art

Vth Ycar Plantation 261- Per I i'l rt

6 VItlr Year Plantatiorr I 5/- Per P art 7 VIlth Year Plantation 09/- Per P ant 8 Vlllth Year Plantation 09/- Per Plant 9 IXth Year Plantation l0/- Per Plant 10 Xth Year Plantation I l/- Per Plant Total Rs. 465i-

Area to be diverted 1.0845 Area to be planted [Two time diverted area= 2.169 No. of tree to be felled= 0 No, of plants to be damaged= 0 No, of plants to be planted @ 1000 plants per Ila. 2169

The cost norms @ wage rate of Rs. 318.46/- will be as under:- Sr,N DESCRIPTION Rate Per Plant Amount o A Net present Value o[ forest land to be diverted B.B7 lac/ha. 961.952 No. of afforestation charges B Compernsatory Plants

Lst Year cost ofafforestation 2169 2441- Per Plant 529236

2nd year maintenance 21,69 83/- Per Plant 180027

3rd year tnaintenance 2169 33/- Per Plant 71577

4 th year maintenance 2169 25l- Per Plant 54225

5 th vear maintenance 2169 26t Pcr Plarrt 56394

6 th Year maintettance 2169 Per Plant 32535

7 th Year maintenance 2r69 09t Per Plant L9521 /' Full Title of the Proiect: Diversion of forest land for laying 0FC by reliance jio infoconl Ltd frorn Forest Boundry Jhajjar to Dharauli, Kosli, Nathera, Nahar Lukhi to Forest Boundary Mal.rendergarh Total forest area 1,0845 ha, forest land is required. File No. F'P/ I-l R/ othe r s I 3 I 460 I 20 I8 Date of Prolrosal: 09-02-2018

B th Year Plantation 21.69 09/- Pcr Plant 19521

9 th Year Plantation 2169 l0/- Pcr Plant 2r690

10 th Year Plantation 21.69 ll/- Per Plant 23859

B.6B Rs. 160000/- per 6 Barbed wire fencing charge 1388160 RI(M RKM

Total CA charges (1 to 6) 2396745

10 % on the total cA C S sory ov erhead charges 239675 upervi / lmisc. charges.

Total (A+B+C) to be deposit in 3598372 CAMI'A fund

D 1 Felling charges volume m3 Rs. 1200/- per cum tl

E. plantati on damage charges 0 Rs,600/- per planLs 0

Total (D+E) 0

G. Total (A+13+C+D+E) 3598372

Exigency Charges 30/o of the Total F 3% on the total CA t07951 Cost of (A+B+C+D+E J G. Total (A+B+C+D+E+F) 3706323

Tcclrnical details: - .l'echnical cletails ol'Colrpensatory Afforestation Scheme are as follows: - (a). General Details:. - Compensatory al'fbrestation will be carried oLlt alolrg with Mascct Section 4 & 5 of Pl-PA 1900 in , (b) 4rn x 4nt

(c) Neem , papri, Shisharn etc. (d) Plantation Method: TalI Plantation. (el Soil and Moisture Cottservation worl

(s) Ptoposed Monitorng Mechanism:- lnspection by Officers' (h) Any other irrfortnation :- None