WBN2Public Resource

From: Hamill, Carol L [[email protected]] Sent: Thursday, June 02, 2011 11:37 AM To: Epperson, Dan; Poole, Justin; Raghavan, Rags; Milano, Patrick; Campbell, Stephen Cc: Crouch, William D Subject: Presentation package_Part 1 of 2 Attachments: image001.jpg; Presentation package_Part 1 of 2.pdf - Adobe Acrobat Professional.pdf

Gentlemen, Bill Crouch asked me to divide the presentation package into 2 smaller documents and send them to you separately, so you will have the complete presentation.

Attached is Part 1 of 2, pages 1-14.

Carol L. Hamill

Licensing/Quality Assurance WBN Unit 2 Project, EQB 1B‐ WBN 423‐365‐3177 423‐365‐3833 [email protected]

1 Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 409

Mail Envelope Properties (25547F570B005144A141ECCA95DA1AB212053950)

Subject: Presentation package_Part 1 of 2 Sent Date: 6/2/2011 11:36:31 AM Received Date: 6/2/2011 11:37:53 AM From: Hamill, Carol L

Created By: [email protected]

Recipients: "Crouch, William D" Tracking Status: None "Epperson, Dan" Tracking Status: None "Poole, Justin" Tracking Status: None "Raghavan, Rags" Tracking Status: None "Milano, Patrick" Tracking Status: None "Campbell, Stephen" Tracking Status: None

Post Office: TVACOCXVS2.main.tva.gov

Files Size Date & Time MESSAGE 384 6/2/2011 11:37:53 AM image001.jpg 1023 Presentation package_Part 1 of 2.pdf - Adobe Acrobat Professional.pdf 4138337

Options Priority: Standard Return Notification: No Reply Requested: Yes Sensitivity: Normal Expiration Date: Recipients Received:

Page 1 of 1

file://c:\EMailCapture\Watts_Bar_2_Operating_LA_Public\409\attch1.jpg 6/16/2011 PART 1 OF 2

ENCLOSURE 1

PRESENTATION PACKAGE “TEMPORARY ’ MODIFICATION PROJECT” Temporary Dams’ Modification Project

PtdtPresentedto The Nuclear Regulatory Commission

Tennessee Valley Authority Riv er Operations

Knoxville, TN May 11, 2011 Temporary Dams’ Modification Project Affected Dams Z Cherokee Z Tellico Z Z Watts Bar

Z Modifications of the Dams consisted of:  Raising the Embankment Dams by Using HESCO Sand Baskets

2 Temporary Dams’ Modifications (R1) Husein Hasan/TVA Temporary Dams’ Modification Project

Geotextile A heavy-duty, non-woven, permeable, polypropylene fabric Welded Wire Mesh,,, coil, and p ins Alu-Zinc coated Steel, wire diameter of 0.16 inch. With spacing of 3" xx3 3"

Size: 3’X3’X3’ or 3’X3’X4’ Capacity : 1.6 – 2.2 tons

Temporary Dams’ Modifications (R1) 3 Husein Hasan/TVA Temporary Dams’ Modification Project

Temporary Dams’ Modifications (R0) 4 Husein Hasan/TVA Temporary Dams’ Modification Project Cherokee

6783 feet

Temporary Dams’ Modifications (R0) 5 Husein Hasan/TVA Temporary Dams’ Modification Project Embankment

Temporary Dams’ Modifications (R0) 6 Husein Hasan/TVA Temporary Dams’ Modification Project

Cherokee Dam Z Dam's length raised by 3'= 6783 feet Z HESCO baskets used = 2261; Size (3’X3’X3’) Z Sand used = 8.2 million pounds

Temporary Dams’ Modifications (R0) 7 Husein Hasan/TVA Temporary Dams’ Modification Project

Tellico Dam

Saddle Dam #2

Saddle Dam #3 6011 feet

Tellico Dam

Temporary Dams’ Modifications (R1) 8 Husein Hasan/TVA Temporary Dams’ Modification Project

Tellico Dam Embankment

Tellico Pedestrian Walkway Temporary Dams’ Modifications (R0) 9 Husein Hasan/TVA Temporary Dams’ Modification Project Tellico Dam – Saddle Dams

Saddle Dam #2 (525 feet)

Saddle Dam #3 (291 feet)

Temporary Dams’ Modifications (R0) 10 Husein Hasan/TVA Temporary Dams’ Modification Project Affected Dams Z Cherokee Z Tellico Z Fort Loudoun Z Watts Bar

Z Modifications of the Dams consisted of:  Raising the Embankment Dams by Using HESCO Sand Baskets

2 Temporary Dams’ Modifications (R1) Husein Hasan/TVA Temporary Dams’ Modification Project

Geotextile A heavy-duty, non-woven, permeable, polypropylene fabric Welded Wire Mesh,,, coil, and p ins Alu-Zinc coated Steel, wire diameter of 0.16 inch. With spacing of 3" xx3 3"

Size: 3’X3’X3’ or 3’X3’X4’ Capacity : 1.6 – 2.2 tons

Temporary Dams’ Modifications (R1) 3 Husein Hasan/TVA Temporary Dams’ Modification Project

Temporary Dams’ Modifications (R0) 4 Husein Hasan/TVA Temporary Dams’ Modification Project Cherokee Dam

6783 feet

Temporary Dams’ Modifications (R0) 5 Husein Hasan/TVA Temporary Dams’ Modification Project Cherokee Dam Embankment

Temporary Dams’ Modifications (R0) 6 Husein Hasan/TVA Temporary Dams’ Modification Project

Cherokee Dam Z Dam's length raised by 3'= 6783 feet Z HESCO baskets used = 2261; Size (3’X3’X3’) Z Sand used = 8.2 million pounds

Temporary Dams’ Modifications (R0) 7 Husein Hasan/TVA Temporary Dams’ Modification Project

Tellico Dam

Saddle Dam #2

Saddle Dam #3 6011 feet

Tellico Dam

Temporary Dams’ Modifications (R1) 8 Husein Hasan/TVA Temporary Dams’ Modification Project

Tellico Dam Embankment

Tellico Pedestrian Walkway Temporary Dams’ Modifications (R0) 9 Husein Hasan/TVA Temporary Dams’ Modification Project Tellico Dam – Saddle Dams

Saddle Dam #2 (525 feet)

Saddle Dam #3 (291 feet)

Temporary Dams’ Modifications (R0) 10 Husein Hasan/TVA Temporary Dams’ Modification Project

Tellico Dam Z Dam's length raised by 4' = 6011 feet Z HESCO baskets used = 1993;;( Size (3’X3’X4’ ) Z Sand used = 10.8 million pounds

Temporary Dams’ Modifications (R0) 11 Husein Hasan/TVA Temporary Dams’ Modification Project

Tellico Dam Z Dam's length raised by 4' = 6011 feet Z HESCO baskets used = 1993;;( Size (3’X3’X4’ ) Z Sand used = 10.8 million pounds

Temporary Dams’ Modifications (R0) 11 Husein Hasan/TVA Temporary Dams’ Modification Project Fort Loudoun Dam Embankment

3785 feet

Temporary Dams’ Modifications (R0) 12 Husein Hasan/TVA Temporary Dams’ Modification Project Fort Loudoun Dam Embankment

Temporary Dams’ Modifications (R0) 13 Husein Hasan/TVA Temporary Dams’ Modification Project Fort Loudoun Dam Embankment

Temporary Dams’ Modifications (R0) 14 Husein Hasan/TVA