Swan

Ohio Total Maximum Daily Load Program Progress

Other tributaries Conneaut, Arcola, Euclid Maumee (lower) tributaries and Beaver Creeks and Lake Erie tributaries Ashtabula River St. Joseph Tenmile Creek (lower) Tiffin

River P

River Swan Grand y r Chagrin m d Creek ive River a an t R t Tiffin ms sain River (upper) u Cree, te s n e in S ou um a T Old i Ma ver M n e Ri Sandusky Bay Woman Cuyahoga g aiz

l C Aug Tributaries

Creek r Portage River e (upper) e

Sandusky Rocky k Powell River Black (lower) Creek River (lower) Huron River River Cuyahoga River Mahoning River Mahoning Auglaize River (middle) River (lower) River (upper) (lower) Blanchard River Sandusky Tuscarawas Beaver Creek River (upper) River Nimishillen Ottawa River Little and Grand Creek Lake St. Marys (Lima) Beaver Sandy Creek Olentangy Creek St. Marys Auglaize Sugar River River Scioto River River Killbuck Creek Yellow (upper) (upper) Conotton Wabash Kokosing Creek Creek Creek Bok River River (upper) es C ree k Stillwater Mill Creek Big Cross, Short Walhonding and Creek and Wheeling Great (Scioto River) Walnut Wakatomika Muskingum Creeks Miami Creek Creek Stillwater River Mad Big River Tributaries River Darby Licking River River Salt (middle) Creek Scioto Creek Wills River Captina and Moxahala (Muskingum Creek Twin (middle) Walnut McMahon Creek River) Creek Deer Creek Creeks Great Little Miami Creek Whitewater Miami River (upper) Hocking River Wolf, Olive Duck River River Monday Green,Meigs Creek (lower) Creek and Rainbow Sunday Salt Creeks Paint Creek Creek Little Miami Creek River (lower) (Scioto Raccoon River) Creek (upper) East Fork Little Muskingum River White Scioto Little Miami Oak River Leading River Mill Creek Creek (lower) Creek ( River) Scioto Brush Pine, Ice Bullskin, Twelvemile Creek and Little Raccoon and Muddy Creeks Scioto Creek Creeks Symmes (lower) Creek Little Hocking River, Shade River and Turkey, Straight Kyger Creek and Eagle Creeks

0 10 20 40 No data available Miles Approved by U.S. EPA Updated 7/19/2017 First cycle TMDL approved by U.S. EPA; second cycle TMDL under development First cycle TMDL approved by U.S. EPA; second cycle watershed assessment in progress TMDL under development Watershed assessment in progress ABC As of 7/19/17 the Biological and Water Quality Study Report is not final