Analysis of Land Use Around Nevada Airports- a Framework for Action
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
For Lease Delivering Q1 2022 W
® WEST BROOKS AVENUE CLAYTON STREET FOR LEASE DELIVERING Q1 2022 W. CHEYENNE AVENUE & CLAYTON STREET, NORTH LAS VEGAS, NV 89032 ±17,000 SF THRU ±237,776 SF PROJECT HIGHLIGHTS • Situated on ±39.33 Acres • Six buildings WEST • ±730,771 total SF • M-2 (existing) zoning A six-building industrial • Drive-in and dock loading park totaling ±730,771 SF of • Concrete tilt-up construction • ±28’ & ±32’ clear height warehouse distribution and • ESFR fire suppression system manufacturing space in TOTAL PROJECT SIZE: North Las Vegas. ±730,771 SF DELIVERING Q1 2022 ® 215 CENTENNIAL HILLS WEST TROPICAL PKWY PHASE II 15 AND CLAYTON NORTH LAS STREET, CHEYENNE AVENUE VEGAS,W. NV 89032 NORTH 604 CONNECTIVITY CRAIG ROAD LAS VEGAS Conveniently located in the CHEYENNE AVE 599 SUNRISE MANOR heart of the North Las Vegas NORTH LAS VEGAS N LAS VEGAS BLVD AIRPORT submarket, this project provides SUMMERLIN LAS VEGAS excellent connectivity to the I-15 via 95 Cheyenne Avenue Interchange. Y PKW AVE D N R TE LAS VEGAS STRIP SPRING VALLEY YLAN R AS E MA 515 582 TROPICANA AVE RUSSEL RD MCCARRAN HENDERSON ±2.5 MILES TO THE INTERSTATE-15 INTERNATIONAL AIRPORT PARADISE SUNSET RD UNION PACIFIC RR 15 215 WARM SPRINGS AVE 215 ±8 MILES TO THE LAS VEGAS STRIP TOTAL PROJECT SIZE: ±10 MILES TO KEY DISTANCES MCCARRAN INTERNATIONAL AIRPORT ±730,771 SF For illustration purposes only. Not to scale. WAREHOUSE & DISTRIBUTION SPACE Dock high doors Dock high door with K.O. Drive-in doors WEST Cheyenne Avenue S Building 1: Building 4: ±237,776 SF FOUR ±67,595 SF 2225 W Cheyenne Ave, ONE 2025 W Cheyenne Ave, North Las Vegas, NV 89032 North Las Vegas, NV 89032 Coleman Street Coleman Clayton Street Building 2: ±170,314 SF TWO 2255 W Cheyenne Ave, North Las Vegas, NV 89032 Building 5: FIVE Building 3: ±138,356 SF LEASED 2125 W Cheyenne Ave, ±55,165 SF North Las Vegas, NV 89032Drawings Not To Scale. -
Minutes City of North Las Vegas Planning Commission
MINUTES CITY OF NORTH LAS VEGAS PLANNING COMMISSION February 9, 2005 Website - http:// www.cityofnorthlasvegas.com BRIEFING: 6:30 pm., Conference Room, North Las Vegas City Hall, 2200 Civic Center Drive CALL TO ORDER: 7:00 pm., Council Chambers, North Las Vegas City Hall, 2200 Civic Center Drive ROLL CALL: Chairman Jay Aston - Present Vice-Chairman Jo Cato - Present Commissioner Dean Leavitt - Absent Commissioner Harry Shull - Present Commissioner Steve Brown - Present Commissioner Dilip Trivedi - Present Commissioner Angelo Carvalho - Present STAFF PRESENT: Jory Stewart, Planning and Development Director Marc Jordan, Planning Manager Robert Eastman, Principal Planner Ned Thomas, Planner James Lewis, Sr. Deputy City Attorney Lenny Badger, Manager, Development & Flood Control Kevin Futch, PW, Transportation Jimmy Johnson, Fire Department Tony Taylor, Parks Planner VERIFICATION: Jo Ann Lawrence, Recording Secretary PLEDGE OF ALLEGIANCE: Chairman Jay Aston City of North Las Vegas Planning Commission Minutes Page 2 February 9, 2005 MINUTES • APPROVAL OF THE MINUTES FOR THE PLANNING COMMISSION MEETING OF JANUARY 12, 2005. ACTION: APPROVED MOTION: Commissioner Shull SECOND: Commissioner Cato AYES: Chairman Aston, Vice-Chairman Cato, Commissioners Shull, Brown, Trivedi and Carvalho NAYS: None ABSTAIN: None CONSENT AGENDA A. PW-19-05 (19203) WASHBURN CREEK: APPROVE THE SUBDIVISION OFF- SITE IMPROVEMENTS AGREEMENT BY RICHMOND AMERICAN HOMES OF NEVADA, INC. AND ACCEPT THE SUBDIVISION BOND IN THE AMOUNT OF $1,154,745.94. ACTION: APPROVED MOTION: Commissioner Shull SECOND: Commissioner Cato AYES: Chairman Aston, Vice-Chairman Cato, Commissioners Shull, Brown, Trivedi and Carvalho NAYS: None ABSTAIN: None B. PW-20-05 (19204) ALEXANDER STATION 3: ACCEPT THE OFF-SITE- IMPROVEMENTS FOR MAINTENANCE AND ADVISE THE DIRECTOR OF PUBLIC WORKS TO NOTIFY SAFECO INSURANCE COMPANY OF AMERICA TO RELEASE THE SUBDIVISION BOND IN THE AMOUNT OF $598,900.78. -
A Market Rent Study of 28 General Aviation Hangars Owned By
A Market Rent Study of 28 General Aviation Hangars Owned by: City of Boulder City Located at: Boulder City Municipal Airport, 1201 Airport Road, Boulder City, Clark County, Nevada 89005 For the Purpose of: Developing an Opinion of a Market Rental Rate, as of June 2, Anderson Valuation Group, LLC 2020 P.O. Box 82197 Las Vegas, Nevada 89180 Date of Appraisal Report: (702) 307-0888 June 5, 2020 [email protected] File Number: 103-20 June 5, 2020 Mr. Brok Armantrout Contracts Real Estate Manager City of Boulder, Nevada 401 California Avenue Boulder City, NV 89005 Dear Mr. Armantrout: In compliance with your request and authorization, we have inspected the 28 general aviation hangars located within the Boulder City Airport at 1201 Airport Road, Boulder City, Nevada. The purpose of this report is to provide an estimate of an annual market rental rate for each of the individual hangars on a per square foot basis. The subject property can be identified as a portion of Parcel Number 186-201-01-007. This is a location in Zip Code 89005 and Census Tract Number 5501. Briefly, the general aviation hangars are located on Boulder City owned land and in a portion of the Boulder City Municipal Airport used primarily for private aircraft storage. Approximately 138 hangars have been constructed in this area and the location provides private aircraft with access and use of the main runways. The existing hangars are generally identified as pre-engineered metal buildings with sliding doors. Underground utilities have been extended to the units and the hangars are developed on reinforced concrete slabs. -
Request for Qualifications Rfq No. 17-002 Runway Incursion Mitigation Study, Airfield Geometry Analysis & Airport Layout Plan Update
McCARRAN INTERNATIONAL AIRPORT CLARK COUNTY, NEVADA PO Box 11005 Las Vegas NV 89111-1005 (702) 261-5013 FAX (702) 261-3647 CLARK COUNTY DEPARTMENT OF AVIATION FINANCE PURCHASING & CONTRACTS REQUEST FOR QUALIFICATIONS RFQ NO. 17-002 RUNWAY INCURSION MITIGATION STUDY, AIRFIELD GEOMETRY ANALYSIS & AIRPORT LAYOUT PLAN UPDATE THE RFQ PACKAGE IS AVAILABLE AS FOLLOWS: Clark County Department of Aviation Administration Building rd 3 Floor, Purchasing and Contracts 1845 East Russell Road Las Vegas, NV 89119 (702) 261-5013 RFQ DEADLINE: SOQs will be accepted at Clark County Department of Aviation, Administration Building, located at 3rd Floor, Purchasing, 1845 East Russell Road, Las Vegas, NV 89119, and must be submitted and date/time stamped before 2:00:00 p.m. on, or before, December 02, 2016. Submissions time stamped at 2:00:00 p.m. or after will not be considered. Hearing impaired customers may obtain information by calling TT/TDD: Relay Nevada toll-free (800) 326-6868. Published: LVRJ, 11/2/2016 thru 11/8/2016 www.mccarran.com Airport Consultants Council American Associates of Airport El Tiempo Airports Council Int’l- North America Executives Clark County Board of Commissioners Steve Sisolak, Chairman Larry Brown, Vice Chairman Susan Brager Marilyn Kirkpatrick Chris Giunchigliani Mary Beth Scow Lawrence Weekly HELPFUL RFQ INFORMATION DID YOU KNOW IMPORTANT INFORMATION RELATED TO THE PURCHASING PROCESS AT CLARK COUNTY MCCARRAN INTERNATIONAL AIRPORT IS AVAILABLE 24-HOURS A DAY, 7 DAYS A WEEK? HERE’S WHERE YOU CAN FIND THIS VALUABLE INFORMATION: OPPORTUNITIES You may access any of Purchasing’s business opportunities via McCarran’s website. -
Reno – Stead Airport
Reno-Tahoe Airport Authority FY 2017-18 ANNUAL BUDGET Table of Contents SECTION 1 – Introduction and Summary Airport System Overview. ......................................................................................... 1-2 National and Regional Economic Outlook. ............................................................. 2-13 Air Service Market Update. ................................................................................... 13-17 Air Cargo Update. .................................................................................................. 17-19 Operating Environment. ........................................................................................ 19-29 Budget Process. ..................................................................................................... 29-30 Revenue Bond Resolution .......................................................................................... 30 Planning for the Future .......................................................................................... 30-32 Budget Document Structure ....................................................................................... 32 Conclusion ............................................................................................................. 32-33 Acknowledgments ...................................................................................................... 33 Distinguished Budget Presentation Award ................................................................. 34 SECTION 2 – Executive Summary -
Confidential Position Specification Reno-Tahoe Airport Authority
CONFIDENTIAL DRAFT Confidential Position Specification Reno-Tahoe Airport Authority President & Chief Executive Officer March 2020 CONFIDENTIAL POSITION SPECIFICATION Position President & Chief Executive Officer Company Reno-Tahoe Airport Authority Location Reno, Nevada Reporting Relationship Reports to the Board of Trustees Website https://www.renoairport.com COMPANY BACKGROUND The Reno-Tahoe Airport Authority (“the Authority”, “RTAA”, or “the airport”) is the owner and operator of Reno-Tahoe International Airport (RNO) and Reno-Stead Airport (RTS), a general aviation facility. The RTAA is an independent entity that is not part of any other unit of local government and does not use local property or sales tax revenue to fund its operation. The Authority is governed by a nine-member Board of Trustees, operates as a business, and receives no local tax dollars. The Reno-Tahoe International Airport is a very important asset to the region, with the 4.4 million passengers going through the airport in 2019 (66th busiest in the United States), bringing $3.2 billion in economic impact to the region. The Authority employs approximately 280 direct airport staff and over 2,400 other staff work on airport premises for various tenants and other companies. RNO is located just five minutes from downtown Reno, therefore, it is literally and figuratively at the heart of the community and only 40 minutes from some of the finest ski resorts and outdoor recreation in the world. The airport makes the all-important first and last impression on passengers coming and going from the region. The Airport truly plays a vital role for the hotel casinos, ski resorts, golf courses, the University of Nevada, and a growing restaurant scene and high-tech business district. -
Las Vegas, Nevada LAS VEGAS MSA ACTUAL SITE EXCLUSIVELY PRESENTED BY
BRAND NEW CONSTRUCTION Absolute NNN Investment Opportunity Operated by Opening Fall 2020 - Tenant Currently Paying Rent During Fixturization Period 3875 W. Craig Road | North Las Vegas, Nevada LAS VEGAS MSA ACTUAL SITE EXCLUSIVELY PRESENTED BY PATRICK R. LUTHER, CCIM Managing Principal SRS National Net Lease Group [email protected] D: 949.698.1115 | M: 480.221.4221 610 Newport Center Drive, Suite 1500 Newport Beach, CA 92660 NV License No. S.0169792 Corporate Broker: Tammy Lord, SRS Real Estate Partners | NV License No. 1001815 2 ACTUAL SITE SRS REAL ESTATE PARTNERS, LLC TABLE OF CONTENTS INVESTMENT SUMMARY Offering Summary 5 Investment Highlights PROPERTY OVERVIEW Aerials Site Plan 9 Location Map AREA OVERVIEW 14 Demographics FINANCIALS Rent Roll 22 Brand Profile 3 ACTUAL SITE SRS REAL ESTATE PARTNERS, LLC PROPERTY PHOTO 4 ACTUAL SITE SRS REAL ESTATE PARTNERS, LLC INVESTMENT SUMMARY SRS Real Estate Partners, LLC is pleased to offer the opportunity to acquire the fee simple interest (land & building ownership) in an absolute NNN, freestanding, newly constructed, Red Dragon investment property located in North Las Vegas, NV (Las Vegas MSA). The tenant, Nevada Restaurant Services, Inc., recently executed a brand new 10-year lease with 4 (5-year) options to extend, demonstrating their commitment to the site. The lease features a 10% rental increase in July 2025 and at the beginning of each option period, growing NOI and hedging against inflation. The lease is corporate guaranteed by Nevada Restaurant Services, Inc., and is absolute NNN with zero landlord responsibilities, making it an ideal, management-free investment opportunity for a passive investor. -
TEMPLATE for REGIONAL PLAN ANNUAL REPORTING (Reporting Period: January – December, 2019)
TEMPLATE FOR REGIONAL PLAN ANNUAL REPORTING (Reporting Period: January – December, 2019) The following items are general themes found in the 2019 Truckee Meadows Regional Plan, adopted on October 10, 2019. The Plan can be found on our website at tmrpa.org by clicking the “Regional Plan” link on the homepage. If you need any assistance accessing or acquiring the 2019 Truckee Meadows Regional Plan), please contact us at 775-321-8385. Please address the following topics as they pertain to the entity that the Annual Report is being provided for: A. POPULATION GROWTH (PG) Chapter 3 of the Regional Plan, Section 1: Population Growth includes policies that address population forecasting, the use of TMRPA forecasts by local jurisdictions and affected entities for planning, and strategies by local government jurisdictions to support affordable housing. Please provide information regarding how your local government or entity has affected, impacted, or implemented the policies found in Chapter 3, Section 1 of the Regional Plan (policies PG 1 – 4). The Reno-Tahoe Airport Authority (RTAA) owns and operates the Reno-Tahoe International Airport (RNO) and the Reno-Stead Airport (RTS). RTAA is a quasi-municipal corporation that was created by the Nevada State Legislature and began operation on July 1, 1978. The RTAA is an independent entity that is not part of any other unit of local government and does not use local property or sales tax revenue to fund its operation. The mission of the RTAA is to maintain and grow aviation services and facilities, as part of the global transportation system, to transport people and goods to benefit the region, while also being financially self-sufficient. -
Panoctober 2008
Police Aviation News 150 October 2008 ©Police Aviation Research Number 150 October 2008 IPAR Police Aviation News October 2008 2 PAN – POLICE AVIATION NEWS is published monthly by INTERNATIONAL POLICE AVIATION RESEARCH 7 Windmill Close, Honey Lane, Waltham Abbey, Essex EN9 3BQ UK Main: +44 1992 714162 Cell: +44 7778 296650 Skype: Bryn.Elliott Bryn Elliott E-mail: [email protected] Bob Crowe www.bobcroweaircraft.com Digital Downlink www.bms-inc.com L3 Wescam www.wescam.com Innovative Downlink Solutions www.mrcsecurity.com Power in a box www.powervamp.com Turning the blades www.turbomeca.com Airborne Law Enforcement Association www.alea.org European Law Enforcement Association www.pacenet.info Sindacato Personale Aeronavigante Della Polizia www.uppolizia.it EDITORIAL Police Aviation News 150. I guess no-one including myself was ever ex- pecting that and yet here we are 150 monthly issues and over 12 years down the road [and that discounts the special issues], millions of words and a handful of typewriters, printers and computers later. And I hope that it has been a worthwhile service for a good many people. It has been a journey where many, many friends have been made and a few of the opposite persuasion encountered—they of course will not be reading these words, or will they! The experience has been a real pleasure but although I somehow doubt that any of us will be around for another 150 I will not be giving up soon! Bryn Elliott LAW ENFORCEMENT AUSTRALIA VICTORIA: The future of the airport at Essendon, currently the home for police, fire and air ambulance aircraft is in danger. -
302 East Carson Avenue • Las Vegas, Nevada 89101
302 EAST CARSON AVENUE • LAS VEGAS, NEVADA 89101 WHY TOP-OF-BUILDING MAKEMAKE YOURYOUR MARKMARK SIGNAGESIGNAGE CREATE YOUR OWN IDENTITY FOR FULL FLOOR USE FULL FLOORS WALKWWALKALK TOTO ALLALL FIVE AVAILABLE COURTHOUSESCOURTHOUSES LESS THAN .3 MILES CONNECTIVITYCONNECTIVITY MULTIPLE FIBER PROVIDERS OPERATIONALOPERATIONAL SAVINGSSAVINGS LEED GOLD BUILDING FOR LEASING INFORMATION PLEASE CONTACT: David Scherer Michael Hsu [email protected] [email protected] 702.733.7500 702.733.7500 Revitalizing an iconic Downtown staple. Strategic exterior, parking garage, and interior capital enhancements are currently in their final phase at 302 East Carson Avenue, an 11-story, 161,924 square foot LEED-Gold certified creative office tower in the vibrant Downtown Las Vegas submarket. The 11-story office tower was built in 1965 and first renovated in 2010 / 2011. In 2010, it was awarded the LEED-Gold certification by the U.S. Green Building Council. The renovation was the State of Nevada’s first LEED Gold- Certified class A office building retrofit. In 2017, the project has undergone key architectural and cosmetic upgrades intended to revitalize the asset and make it a priority option for creative, tech, and service firms seeking elevated creative space in a walkable Downtown location. These enhancements include the addition of tenant amenity spaces, refreshed lobby and common area upgrades, architectural and project signage upgrades and an improved arrival experience. FOR LEASING INFORMATION PLEASE CONTACT: David Scherer Michael Hsu [email protected] [email protected] 702.733.7500 702.733.7500 Central location in Downtown Vegas. One block from the Fremont Street Experience and within walking distance from three downtown courthouses: Lloyd D. -
Future Role of Hillsboro Airport Chapter Two Port of Portland
PORT OF PORTLAND Chapter Two FUTURE ROLE OF HILLSBORO AIRPORT CHAPTER TWO PORT OF PORTLAND FUTUREFUTURE ROLEROLE OFOF HILLSBOROHILLSBORO AIRPORTAIRPORT The purpose of this chapter of the Airport Master Plan is to analyze the feasibility of alternative roles for Hillsboro Airport within the context of the Portland metropolitan system of airports and State of Oregon system of airports. This analysis provides a foundation for the Port of Portland to determine, specifically and ideally, what Hillsboro Airport's role should be through 2025. This involves considering the probability and viability of supporting scheduled commercial air service and/or air cargo activity at Hillsboro Airport. HILLSBORO AIRPORT'S EXISTING ROLE The role for Hillsboro Airport is defined within both state and federal aviation plans. At the national level, Hillsboro Airport is defined as a reliever airport in the Federal Aviation Administration's (FAA) National Plan of Integrated Airport Systems (NPIAS). Reliever airports are specially designated general aviation airports intended to reduce congestion at large commercial service airports. This reliever role is usually accomplished, not by accommodating commercial flights, but by providing an attractive option for the myriad of non-commercial, general aviation aircraft operations that urban areas generate. Hillsboro Airport is classified as a reliever for Portland International Airport (PDX). In this role, Hillsboro Airport is intended to preserve capacity at PDX by offering an alternative operating area for general -
AGENDA Regional Planning Commission Wednesday, May 9, 2018 6:00 P.M
AGENDA Regional Planning Commission Wednesday, May 9, 2018 6:00 p.m. Washoe County Commission Chambers 1001 East Ninth Street, Reno, Nevada 1. Roll Call* 2. Salute to the Flag* 3. [For possible action] Approval of the Agenda 4. Approval of the Minutes A. [For possible action] March 14, 2018 Regional Planning Commission (RPC) Meeting [ Pg. 1 – 4 ] B. [For possible action] March 26, 2018 RPC Meeting [ Pg. 5 – 8 ] 5. Public Comment* 6. Consent Agenda A. [For possible action] – Consideration and possible acceptance of individual annual reports submitted by local governments and affected entities pursuant to subsection 1 of NRS 278.0286 [ Pg. 9 – 104 ] 7. Business of the day A. [For possible action] PUBLIC HEARING – Regional Plan Amendment (RPA18-001) – Consideration and possible action to adopt RPC Resolution 18-01 providing a recommendation to the Regional Planning Governing Board (RPGB) regarding a mapping amendment to Maps 9-11 of the 2012 Truckee Meadows Regional Plan adding a new regional utility site and a new regional utility corridor in the East Truckee River Canyon at 2505 State Route 447 [ Pg. 105 – 112 ] B. [For possible action] PUBLIC HEARING – Regional Plan Conformance Review – Project of Regional Significance, Dodge Flat Solar (CR18-004) – A project of regional significance (PRS) for the request to construct a new 200 Megawatt (MW) solar energy sub-station, ancillary facilities including two 90-foot private communication antennas and to connect the project to an existing 345 kilovolt (kV) transmission line in the East Truckee