Carrying Capacity Study of Saranda and Chaibasa Forest Divisions

Total Page:16

File Type:pdf, Size:1020Kb

Carrying Capacity Study of Saranda and Chaibasa Forest Divisions CARRYING CAPACITY STUDY OF SARANDA AND CHAIBASA FOREST DIVISIONS Porahat Forest Division Porahat Forest Division Kolahan Kolahan Forest Division Forest Division Chaibasa Forest Chaibasa Forest Divisions Divisions Saranda Saranda Forest Division Forest Division Location of Saranda and Porahat Forest Division Chaibasa Kolahan Forest Division Division Saranda Chaibasa Forest Division Forest Division A BIRD’s EYE VIEW OF BACKGROUND DEVELOPMENTS The MoEF&CC, in its ATR on the findings of Hon'ble Justice M. B. Shah Commission of Enquiry on the illegal mining in the Saranda forests, to address the concerns of Hon’ble Commission inter-alia submitted as under: Inviolate forest areas will be identified to ensure long term conservation of inviolate areas by notifying them as Conservation Reserve/ Corridors or Ecologically Sensitive Areas Decision Support System to facilitate informed decision on proposals will be put in place if required, commission a study by a multi-disciplinary team to prepare a plan for sustainable mining in the Saranda Forest without impairing long term survival of its rich flora and fauna. In case, any of the mining lease located in Saranda forest, for which approval under the FC Act has already been accorded, is identified as inviolate, MoEFCC will modify such approvals to prohibit use of these areas for mining and other allied activities. MoEFCC will commission a study to assess carrying capacity of Saranda Forests to suggest annual cap (for ore production) and till then the MoEFCC will not accept any new proposal for grant of approval under the FC Act for diversion of forest land for mining in Saranda Forest”. The ATR on observation of Hon’ble Shah commission, submitted by the M/o Mines, was considered and accepted by the Cabinet on 30.07.2014 A BIRD’s EYE VIEW OF BACKGROUND DEVELOPMENTS •MoEF & CC will •commission a study to assess carrying capacity of Saranda Forests to suggest annual cap for ore production. •not accept any new proposal for grant of approval under the FC Act for diversion of forest land for mining in Saranda Forest. •constitute a multi-disciplinary team to examine the recommendation of the expert committee constituted by Jharkhand State Government & Integrated Wildlife Management Plan prepared by the State Government and if required, commission a study by a multi-disciplinary team to prepare a plan for sustainable mining in the Saranda Forest without impairing long term survival of its rich flora and fauna. •The multi-disciplinary team will have the mandate to •identify critical wildlife habitats, corridors linking critical wildlife habitats, rich forests and such other inviolate forest areas in Saranda Forest which needs to be protected and conserved for posterity. •Such identified areas will be notified either as CR/corridors or ecologically sensitive area as per the WP Act or the EP Act. •In case whole or a part of forest land located in any of the mining lease located in Saranda forest, for which approval under the FC Act has already been accorded, is identified as inviolate, MoEFCC will modify such approvals to prohibit use of these areas for mining and other allied activities. •While execution of the study, the team will take into account the Wildlife Conservation Plan prepared by the Expert Committee constituted by the Government of Jharkhand. (page 19) BACKGROUND DEVELOPMENTS CONTD.. POST ATR DEVELOPMENTS MoEF&CC, on 26.08.2014, constituted a Multi-Disciplinary Expert Committee (MDEC) headed by Shri S. S.Bisht to examine the IWMP. MDEC submitted its report with certain observation inter-alia recommending for re-visit of the areas proposed for Conservation Reserve. Observations conveyed to the State Government to finalize IWMP accordingly. Carrying Capacity study (CCSR) was awarded on 23.09.2014 to suggest annual cap for iron ore production to ICFRE, Dehradun, in association with WII, Dehradun & CIMFR, Dhanbad with certain ToRs including incorporating the observation of MDEC in the CCSR. After receipt of observation of the MDEC and interim CCSR from the ICFRE, a meeting was held on 5.10.2015 to examine the observation of the MDEC wherein inter-alia it was decided to provide a map showing elephants movement paths to the MDEC to enable it submit its finalized comments on the IWMP. The State Government of Jharkhand on 14.03.2016 submitted the finalized IWMP, with a copy endorsed to the MDEC, after addressing the initial observation of the MDEC. Final comments of the MDEC are awaited. ICFRE submitted the draft final CCSR on 28.03.2016 MAJOR FINDINGS OF THE CARRYING CAPACITY STUDY S. No. Particulars Number of leases 1. Working mining lease in the Saranda Region 11 2. Infrastructure areas for ore processing stacking and 4 loading in Kiriburu & Meghataburu mines of SAIL 3. Non-working mines 29 (including 18 cancelled leases) 4. Proposed mining lease 18 (including 14 at advance stage, 3 PL and 1 surrendered lease) Total 63 Entire leases of the Saranda and Chaibasa South Forest Divisions were categories into 5 Clusters i.e. Cluster – I, II, III, IV & V which were comprised of 12, 6, 12, 13 and 20 mining leases, respectively. Entire study area was considered as single environmental unit owing to similar climatic facotrs. Mines are operated by open cast method and technologies adopted is broadly divided into three categories viz., mechanized mining, semi-mechanized mining and manual mining. MAJOR FINDINGS OF CCSR CONTD.... Waste generated against the reserves available in the area can be accommodated in the existing dumps or by backfilling in the excavated areas within the lease area. OB dumping is not systematic in the area. Results of existing level of contamination of air including noise, water due to mining activities and other related activities like ore transportation etc. in the study region were found satisfactory except few exceptions in certain areas. An account of floristics composition and life forms in the West Singhbhum District has been provided and among the 7 ranges, the Samta, West Sasangda and North east area of Koyna range have been reported to have rich floristic diversity 36 species of mammals (21 families), 148 species of birds and 92 species of butterflies have been reported in the area. A total of 2321 individuals of aquatic macrobenthic organisms belonging to 65 aquatic macro-invertebrate taxa of 56 families and 14 orders were recorded. MAJOR FINDINGS OF CCSR CONTD.... The elephant population was reported to be 371 during 2005 census that reduced to 253 during 2010 census. IWMP report (2016), has estimated 253 elephant population in 2011 and 200 in 2016. (The summer population estimate varied between 139 in 2011 and 154 in 2012). Three Critical Biological Hotspot areas (Hotspot – I in Sasangda range and Hotspot –II & III in in Koina range in the Saranda Division) have been suggested by the WII, Dehradun. However, ICFRE, in view of existing disturbances in Ankua due to mining operation, transportation of iron ore from SAIL, other biotic interventions recommended to drop Hotspot-III and accordingly, recommended two conservation areas in the West Singhbhum District The supportive iron ore capacity with the existing infrastructure has been recommended to be considered provisionally at 64 MTPA With the strengthening of existing infrastructure, proposed installation of conveyor, railway sidings and other mitigative measure, the supportive capacity may be enhanced to the proposed EC consent capacity of 99.9 MTPA with the required statutory clearances, strict regulation and monitoring mechanism. Assuming 90% efficiency, the same may be rounded off to 90 MTPA. Google map showing the location of the Mine Leases Major River in Saranda Forest Division Compact patches (> 1 Sq KM) of Very Dense Forest (Canopy density >70%) Wildlife presence in Saranda Forest Division (WII) Forest Cover Map (Data period 2013-14) CCSR vis-a-vis Decision Support System/inviolate areas S. No. Particulars Number of leases Number of leases observed as Inviolate as per DSS 1. Working mining lease in the Saranda Region 11 7+ (2-undecided*) 2. Infrastructure areas for ore processing 4 4 stacking and loading in Kiriburu & Meghataburu mines of SAIL 3. Non-working mines 29 (including 18 18 + cancelled leases) (8 undecided) 4. Proposed mining lease 18 (including 3 PL and 1 16 surrendered lease) Total 63 45+(10 undecided) . * DSS analysis can not be performed as the requirement of Decision Rule 2 were not fulfilled . Only 5 blocks were found Not-Inviolate Mapshowing the Hotspots, Conservation area and Elephant presence FURTHER COURSE OF ACTION VIS-À-VIS SUBMISSIONS MADE BY THE MOEF&CC IN THE ATR The Ministry has received CCSR and finalized IWMP from the State Government. Comments of the MEDC are awaited. Further , relevant comments of the MoEF&CC in the ATR are reproduced below: “ if required, commission a study by a multi-disciplinary team to prepare a plan for sustainable mining in the Saranda Forest without impairing long term survival of its rich flora and fauna The team consisting of leading institutions and experts in the field of Wildlife, Environment, Forests, Mining and Social Sciences will have the mandate to identify critical wildlife habitats, corridors linking critical wildlife habitats, rich forests and such other inviolate forest areas in Saranda Forest which needs to be protected and conserved for posterity”. Once the comments on IWMP are received from the MEDC and IWMP & CCSR is accepted by the MoEF&CC, in light of submission made in ATR following course of action will be required : “Constitution of a multi-disciplinary team to prepare a plan for sustainable mining in the Saranda Forest without impairing long term survival of its rich flora and fauna”. Thank You .
Recommended publications
  • SI No. File No. Name of the Proposal State Area (Ha) Category View
    11/01/2013 View Details PRO PO SALS TO BE DISCUSSED IN THE FO REST ADVISO RY CO MMITTEE MEETING PRO PO SED TO BE CO NVENED O N 21st & 22nd January 2013. Sr. AIGF(Sh. Shiv Pal Singh) SI View File no. Name of the proposal State Area (ha) Category No. Documents sdf 1 8- Diversion of 143.4928 ha of forest Sikkim 143.4928 Hydro Click On 65/2011- land for construction of 520 MW Electric FC Teesta Stage IV hydro electric project in North Distt. of Sikkim by NHPC. 2 8- Diversion of 110.46 ha of forest Arunachal 110.46 Road Click On 42/2012- land in favour of India Army (6th Pradesh FC Battalion Assam Regiment) for infrastructure Development at Naga-GC of Dirang Circle of West Kemeng District of Arunachal Pradesh. 3 8- Diversion of 344.13 ha of forest Arunachal 344.13 Road Click On 68/2012- land for Infrastructure Pradesh FC Development etc. at Mandala (Baisakhi) of West Kemeng District of Arunachal Pradesh in favour of Indian Army. 4 8- Diversion of 78.0131 ha forest Rajasthan 78.0131 Road Click On 88/2012- land for widening of Kishangarh- FC Udaipur-Ahmedabad Section of NH 79A, NH 79, NH 76 and NH 8 from existing 4 lane to 6 lane in the States of Rajasthan and Gujarat in favour of NHAI. 5 8- Diversion of 116.62 ha of forest Arunachal 116.62 Hydel Click On 99/2011- land (Surface forest land = 96.95 Pradesh FC ha and underground area = 19.67 ha) for construction of Tawang H.E.
    [Show full text]
  • Consultancy Project Detail
    Institute Name IIT KHARAGPUR India Ranking 2017 ID IR17-I-2-18630 Discipline OVERALL ENGG Consultancy Projects Name of faculty (Chief Amount received (in words) S.No. Financial Year Client Organization Title of Consultancy of projectAmount received (in Rupees) PARAMETER Consultant) [Rupees] SOFTLORE SOLUTION-SCIENCE & DEVELOPMENT OF Twenty Two Thousand Four Hundred RAJLAKSHMI 1 2015-16 TECHNOLOGY ENTREPRENEURS PARK, PSYCHOMETRIC 22456 Fifty Six Only GUHA(T0109,RM) 2D.FPPP IIT KHARAGPUR ALGORITHMS Twenty Seven Lakh Sixty Three WATER & SANITATION SUPPORT Thousand Nine Hundred Thirty Only ORGANISATION (WSSO)-DEPARTMENT RIVER WATER QUALITY OF PUBLIC HEALTH ENGINEERING, EVALUATION FOR RIVER 2 2015-16 JAYANTA BHATTACHARYYA(87019,MI), ABHIJIT MUKHERJEE(10018,GG) 2763930 GOVERNMENT OF WEST BENGAL, N.S. BASED PIPED WATER SUPPLY BUILDING, 7TH FLOOR, 1, K. S. ROY SCHEME ROAD, KOLKATA - 700 001 One Lakh Only SRIKRISHNA COLD STORAGE-VILL & P. PROBLEMS OF CULTIVATION O. - NONAKURI BAZAR (KAKTIA BAZAR), 3 2015-16 PROSHANTA GUHA(04016,AG) AND PRESERVATION OF 100000 DISTRICT - PURBA MEDINIPUR, WEST BETEL LEAVES BENGAL - 721172 SUPERINTENDING ENGINEER,- Seventeen Lakh Ten Thousand Only EVALUATION OF FLOOD WESTERN CIRCLE-II, I&W MANAGEMENT SCHEME FOR 4 2015-16 RAJIB MAITY(08039,CE) DIRECTORATE, DIST, PASCHIM 1710000 KELIAGHAI - KAPALESWARI - MEDINIPUR, GOVERNMENT OF WEST BAGHAI RIVER BASIN BENGAL, PIN-721101 ORIENTAL STRUCTURAL ENGINEERS WIDENING & Two Lakh Twenty Four Thousand PVT. LTD.-21, COMMERCIAL STRENGTHENING OF Seven Hundred Twenty Only 5 2015-16
    [Show full text]
  • Mission Saranda
    MISSION SARANDA MISSION SARANDA A War for Natural Resources in India GLADSON DUNGDUNG with a foreword by FELIX PADEL Published by Deshaj Prakashan Bihar-Jharkhand Bir Buru Ompay Media & Entertainment LLP Bariatu, Ranchi – 834009 © Gladson Dungdung 2015 First published in 2015 All rights reserved Cover Design : Shekhar Type setting : Khalid Jamil Akhter Cover Photo : Author ISBN 978-81-908959-8-9 Price ` 300 Printed at Kailash Paper Conversion (P) Ltd. Ranchi - 834001 Dedicated to the martyrs of Saranda Forest, who have sacrificed their lives to protect their ancestral land, territory and resources. CONTENTS Glossary ix Acknowledgements xi Foreword xvii Introduction 01 1. A Mission to Saranda Forest 23 2. Saranda Forest and Adivasi People 35 3. Mining in Saranda Forest 45 4. Is Mining a Curse for Adivasis? 59 5. Forest Movement and State Suppression 65 6. The Infamous Gua Incident 85 7. Naxal Movement in Saranda 91 8. Is Naxalism Taking Its Last Breath 101 in Saranda Forest? 9. Caught Among Three Sets of Guns 109 10. Corporate and Maoist Nexus in Saranda Forest 117 11. Crossfire in Saranda Forest 125 12. A War and Human Rights Violation 135 13. Where is the Right to Education? 143 14. Where to Heal? 149 15. Toothless Tiger Roars in Saranda Forest 153 16. Saranda Action Plan 163 Development Model or Roadmap for Mining? 17. What Do You Mean by Development? 185 18. Manufacturing the Consent 191 19. Don’t They Rule Anymore? 197 20. It’s Called a Public Hearing 203 21. Saranda Politics 213 22. Are We Indian Too? 219 23.
    [Show full text]
  • Conservation of the Asian Elephant in Central India
    Conserwotion of the Asiqn elephont in Centrql Indiq Sushant Chowdhury Introduction Forests lying in Orissa constitute the major habitats of In central India, elephants are found in the States of elephant in the central India and are distributed across Orissa, Jharkhand (pan of the erstwhile Bihar), and over 22 out of the 27 Forest Divisions. Total elephant southern part of \(est Bengal. In all three States elephants habitat extends over an area of neady 10,000km2, occupy a habitat of approximately 17,000km2 constituted which is about 2lo/o of 47,033km2 State Forest available, by Orissa (57'/), Jharkhand Q6o/o) and southern West assessed through satellite data (FSI 1999). Dense forest Bengal (7"/'). A large number of elephant habitats accounts for 26,073km2, open forest for 20,745km2 in this region are small, degraded and isolated. Land and mangrove for 215km2. \(/hile the nonhern part of fragmentation, encroachment, shifting cultivation and Orissa beyond the Mahanadi River is plagued by severe mining activities are the major threats to the habitats. The mining activities, the southern pan suffers from shifting small fragmented habitats, with interspersed agriculture cultivation. FSI (1999) data reports that the four Districts land use in and around, influence the range extension of of Orissa, namely, Sundergarh, Keonjhar, Jajpur and elephants during the wet season, and have become a cause Dhenkenal, have 154 mining leases of iron, manganese of concern for human-elephant conflicts. Long distance and chromate over 376.6km2 which inclu& 192.6km2 elephant excursions from Singhbhum and Dalbhum of forest. About 5,030km2 (or 8.8olo of total forest area) forests of the Jharkhand State to the adjoining States of is affected by shifting cultivation, most of which is on Chattisgarh (part of erstwhile Madhya Pradesh) and \fest the southern part.
    [Show full text]
  • 1. Name of the Proposal 2. Location I) State Jharkhand Ii) District West Singhbhum 3. Particulars of Forests A) Name of Forest
    FACT SHEET 1. Name of the Proposal Diversion of 998.70 ha of forest land in Ankua Reserve Forest for mining of iron and manganese ores in favour of M/s JSW Steel Limited in Saranda Forest Division in West Singhbhum district of Jharkhand. 2. Location i) State Jharkhand ii) District West Singhbhum 3. Particulars of Forests a) Name of Forest Division Saranda Forests Divisions b) Forest area involved Total area proposed is 1018.50 of which mining is proposed on 999.90 ha, 8 ha for widening of the road and 10.60 ha for conveyer belt. c) Legal Status/Sy. No Reserve forest and notified as core area of Singhbhum Elephant Reserve (P 56/c). d) Map Enclosed (p-540/c) 4. Topography of the area - 5. (i) Vegetation The forest area is mixed deciduous forest comprising of 50-55 % of quality Sal, the middle and lower canopy is of miscellaneous species. The proposed are is virgin and has vast floral and faunal diversity (P 56/c). (ii) No. of trees which will be Besides 20.43 ha of Safety zone, the number of affected trees of rest 979.47 ha forest land is 2,91,010 (P 556/c). (iii) Density 0.7 - 0.8 6. Whether area is significant from The entire forest of Saranda Forest Division wildlife point of view including the proposed mining lease area has been notified as Core Area of Singhbhum Elephant Reserve. The Saranda Forest is considered to be one of the finest habitats for elephants. The presence of elephants in and around the proposed area is evident through many of the indirect evidences seen at the time of field inspection.
    [Show full text]
  • Consulting Projects Details-2D
    Institute Name IIT KHARAGPUR India Ranking 2017 IDIR17-ENGG-2-18630 Discipline ENGG Consultancy Projects Name of faculty (Chief Title of Consultancy of Amount received (in Amount received (in words) S.No. Financial Year Client Organization PARAMETER Consultant) project Rupees) [Rupees] SOFTLORE SOLUTION-SCIENCE & Twenty Two Thousand Four RAJLAKSHMI DEVELOPMENT OF 1 2015-16 TECHNOLOGY ENTREPRENEURS PARK, 22456 GUHA(T0109,RM) PSYCHOMETRIC ALGORITHMS Hundred Fifty Six Only 2D.FPPP IIT KHARAGPUR Twenty Seven Lakh Sixty Three WATER & SANITATION SUPPORT ORGANISATION (WSSO)-DEPARTMENT RIVER WATER QUALITY Thousand Nine Hundred Thirty OF PUBLIC HEALTH ENGINEERING, EVALUATION FOR RIVER Only 2 2015-16 JAYANTA BHATTACHARYYA(87019,MI), ABHIJIT MUKHERJEE(10018,GG) 2763930 GOVERNMENT OF WEST BENGAL, N.S. BASED PIPED WATER SUPPLY BUILDING, 7TH FLOOR, 1, K. S. ROY SCHEME ROAD, KOLKATA - 700 001 One Lakh Only SRIKRISHNA COLD STORAGE-VILL & P. PROBLEMS OF CULTIVATION O. - NONAKURI BAZAR (KAKTIA BAZAR), 3 2015-16 PROSHANTA GUHA(04016,AG) AND PRESERVATION OF 100000 DISTRICT - PURBA MEDINIPUR, WEST BETEL LEAVES BENGAL - 721172 SUPERINTENDING ENGINEER,- Seventeen Lakh Ten Thousand EVALUATION OF FLOOD WESTERN CIRCLE-II, I&W MANAGEMENT SCHEME FOR Only 4 2015-16 RAJIB MAITY(08039,CE) DIRECTORATE, DIST, PASCHIM 1710000 KELIAGHAI - KAPALESWARI - MEDINIPUR, GOVERNMENT OF WEST BAGHAI RIVER BASIN BENGAL, PIN-721101 WIDENING & Two Lakh Twenty Four Thousand ORIENTAL STRUCTURAL ENGINEERS STRENGTHENING OF PVT. LTD.-21, COMMERCIAL COMPLEX, Seven Hundred Twenty Only 5 2015-16
    [Show full text]
  • Annual Report 2017-18(English Version)
    Annual Report 2017-2018 XX. KNOWLEDGE TO WISDOM 1. Executive Summary 1 - 10 2. Academic Activities 11 - 12 3. Development activities 13 4. Schools and Centres 14 - 190 5. Students Amenities and Activities 191 - 192 6. Central facilities 193 - 197 8. Outreach Activities 198 - 199 10. Universities Authorities and its meetings 200 - 202 11. Vice Chancellor Engagements 203 - 204 12. Abstract of the Financial Statements 205 CENTRAL UNIVERSITY OF JHARKHAND CENTRAL UNIVERSITY 1 Annual Report 2017-2018 KNOWLEDGE XX. TO WISDOM CENTRAL UNIVERSITY OF JHARKHAND CENTRAL UNIVERSITY 2 Annual Report 2017-2018 XX. KNOWLEDGE TO WISDOM Greetings from the Central University of Jharkhand! I am happy to present the Annual Report of the University for the year 2017- 18 with a sense of satisfaction. During the period under report, the University has made steady progress despite various hindrances and difficulties in terms of inadequacy of fund and lack of infrastructure. In the following lines, I have highlighted the progress made by the University. The University has continued its effort to settle the land issue of permanent campus, approach road, etc. the University with the help of State Government machinery has started the acquisition of additional land. The University is continuously liaisoning with State Government authorities to get the approach road and drinking water facilities and to settle the matter of compensation with private land owners. Some of our teachers got consultancy projects from Govt. of Jharkhand titled ‘Amazing Jharkhand’. A number of R&D projects were sanctioned to our faculty members from external agencies including UNICEF, DST, IUAC, DBT, ISRO, SERB, etc.
    [Show full text]
  • Jharkhand BSAP
    DRAFT REPORT BIODIVERSITY STRATEGY & ACTION PLAN FOR JHARKHAND MANDAR NATURE CLUB ANAND CHIKITSALAYA ROAD, BHAGALPUR, Bihar - 812002 Prepared & Edited by: Arvind Mishra Programme Coordinator Mandar Nature Club Phone: 0641-2423479, Fax- 2300055 (PP) E-mail: [email protected] & [email protected] Coordinating Agency : Mandar Nature Club (MNC) (Regd. Society No. 339/1992-93) Anand Chikitsalaya Road Bhagalpur, Bihar - 812002, India. Phone: 0641-2423479/ 2429663/2300754 Technical Advisors: 1. Dr. Tapan Kr. Ghosh, President, MNC & Reader, University Deptt. of Zoology, T.M.Bhagalpur University, Bhagalpur. 2. Dr. Sunil Agrawal, Secretary, MNC, and a prominent Social worker. 3. Dr. Amita Moitra, Vice President, MNC & Reader, University Deptt. of Zoology, T.M.Bhagalpur University, Bhagalpur. 4. Dr. Tapan Kr. Pan, University Deptt. of Botany, T.M.Bhagalpur University, Bhagalpur. 5. Dr. Gopal Ranjan Dutta, University Deptt. of Zoology, T.M.Bhagalpur University, Bhagalpur. 6. Dr. D.N.Choudhary, P. N. College, Dept. of Zoology, Parsa, Saran, Bihar Compiled by: Dr. Manish Kumar Mishra, Ph.D. (Geography), T.M.Bhagalpur University, Bhagalpur. CONTENTS PAGES INTRODUCTION 5 1. METHODOLOGY 5 2. HISTORY 5 - 6 3. GEOGRAPHY 7 -8 4. PROFILES 8- 20 5. ART & CULTURE 20-22 6. TOURISM IN JHARKHAND 22-25 7. TRADITION, RELIGION & BIODIVERSITY 25-26 8. AGRICULTURE 26-34 9. CENTRAL SPONSORED SCHEMES FOR RURAL DEVELOPMENT 34-36 10. FLORA 36-41 11. FAUNAL BIODIVERSITY 42-45 12. FOREST & WILDLIFE 45-54 13 PROBLEMS 55-64 14. ISSUES 64-71 15. EFFORTS 71-80 16. GAPS 80-82 17. SUGGESTIONS 82-89 18. KEY REFERENCES 90-91 19. ANNEXURE (Avifauna of Jharkhand) ACKNOWLEDGEMENT We express our gratitude to the Kalpvriksha, Biotech Consortium and Ministry of Environment & Forests, Govt.
    [Show full text]
  • Pre-Feasibility Report Page 1 of 14
    Jhillingburu - I Iron & Manganese Ore Mining Lease 1.0 EXECUTIVE SUMMARY: Jhillingburu-I Mine Lease forms a part of Gua Ore Mines, which was the captive mine of the erstwhile Indian Iron and Steel Company Ltd. (IISCO). Gua Ore Mines has been the captive source of iron ore for IISCO Steel Plant (ISP), Burnpur. Since the takeover of IISCO by SAIL, Gua Ore Mines is operated by the Raw Material Division of SAIL and supplies iron ore mainly to ISP, Burnpur. Initially the mining was carried out by the manual means, which was subsequently mechanized during 1958 by commissioning & erection of Ore Handling Plant. Gua Ore Mine is the first mechanized mine of the country. The mine has been developed under Duarguiburu Iron Ore Lease over an area of 1443.756 ha, the main & largest mining lease of the mine. The other three leases are Jhillingburu-I (210.526 ha), Jhillingburu-II (30.43 ha) and Topailore (14.16 ha). The Jhillingburu-I & Jhilingburu-II are the iron & manganese leases, while the Durgaiburu and Topailore are the iron ore leases. In addition there is also a Surface Right Area spread over 242.8 ha, where most of the infrastructure for the mines (township, railway siding etc.) is located. The Mining Lease for Jhillingburu - I was granted in favor of Indian Iron & Steel Company Ltd (IISCO) with effect from 12.5.1950 for 30 years. The renewal application was filed on 7.5.1979 for another 30 years period as per existing clauses of the lease deed. Presently the mine is under the control of the Raw Materials Division (RMD) of Steel Authority of India Limited (SAIL), which took over IISCO in 2006.
    [Show full text]
  • Initial Environmental Examination IND: Second Jharkhand State Road
    Initial Environmental Examination March 2015 IND: Second Jharkhand State Road Project Prepared by State Highways Authority of Jharkhand, Government of Jharkhand for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 03 December 2014) Currency unit – Indian rupee (INR) INR1.00 = $ 0.01616 $1.00 = INR 61.8760 ABBREVIATIONS AAQ - Ambient Air Quality AAQM - Ambient Air Quality Monitoring ADB - Asian Development Bank APHA - American Public Health Association BDL - Below Detection Limit BGL - Below Ground Level BOD - Biological Oxygen Demand BIS - Bureau of Indian Standard CO - carbon monoxide COD - chemical oxygen demand CPCB - Central Pollution Control Board CSC - Construction Supervision Consultant CWLW - Chief Wild Life Warden DO - Dissolved Oxygen DoE - Department of Environment DPR - Detailed Project Report DFO - Divisional Forest Officer EA - Executing Agency EIA - Environmental Impact Assessment EMP - Environmental Management Plan EMoP - Environmental Monitoring Plan EO - Environmental Officer GDP - Gross Domestic Product GHG - Green House Gas GIS - Geographic Information System GoI - Government of India GoJH - Government of Jharkhand GRC - Grievnce Redress Committee GRM - Grievance Redressal Mechanism HFL - Highest Flood Level IEE - Initial Environmental Examination IMD - Indian Meteorological Department IRC - Indian Road Congress IS - Indian Standard JSRP - Jharkhand State Roads Project LPG - Liquified Petroleum Gas Max - Maximum Min - Minimum MDRs - Major District Roads MoEFCC - Ministry of Environment, Forests and Climate Change
    [Show full text]
  • DETERMINATION of Tor for ENVIRONMENTAL STUDIES
    22001199 DDEETTEERRMMIINNAATTIIOONN OOFF TTooRR FFOORR EENNVVIIRROONNMMEENNTTAALL SSTTUUDDIIEESS BHANGAON IRON ORE OPENCAST PROJECT Lease Area – 111.00 Ha. Capacity – 2.00 MTPA PROPONENT M/s SOUTH WEST MINING LIMITED (SWML) B 13-14, RIICO Industrial Area, Opp. Rajasthan State Warehouse, Barmer - 344001 M/s Crystal Consultants Ranchi, Jharkhand Accredited by NABET as Environment Consultants www.crystalconsultants.org CCOONNTTEENNTTSS 1. Form ‐ I 2. Pre‐Feasibility Report CONTENTS CHAPTER PARTICULAR PAGE NO. Chapter – I EXECUTIVE SUMMARY 01‐05 Chapter – II PROJECT DESCRIPTION 06‐08 Chapter – III PROJECT DESCRIPTION 09‐29 Chapter – IV SITE ANALYSIS 30‐38 Chapter – V PLANING BRIEF 39‐42 Chapter – VI PROPOSED INFRASTRUCTURE 43‐45 Chapter – VII REHABILITATION & RESETTLEMENT PLAN 46‐46 Chapter – VIII PROJECT SCHEDULE & COST ESTIMATES 47‐49 Chapter – IX ANALYSIS OF PROPOSAL 50‐50 LIST OF PLATES Plate Plate No. Index Plan I Location Plan & Environmental Monitoring II Station Plan Surface Plan III Geological Plan IV Conceptual Plan V ANNEXURE Precise Area Map (Bounded Co‐Ordinate) Annexure ‐ I PRE-FEASIBILITY REPORT FOR BHANGAON IRON ORE OPENCAST PROJECT CHAPTER – I EXECUTIVE SUMMARY 1.0 Bhangaon Iron Ore Block has been vested to M/s South West Mining Limited (SWML) by Govt. of Jharkhand through auction process to excavate 2.0 MTPA of Iron Ore in village Bhangaon, Saranda Forest Division, West Singhbhum, Jharkhand. 2.0 The allotted mining block has an area of 111 Ha. but the proponent proposes to confine all project activities including quarry, external dump & infrastructure within an area of 62.78 Ha. in Karampada Reserve Forest of Saranda Forest Division, West Singhbhum, Jharkhand. 3.0 The block is bounded by following geodesic axes : Latitudes : 220 01’ 37.20720” to 220 02’ 38.28422” N Longitudes : 850 14’ 22.14298” to 830 15’ 21.02400” E 4.0 Based on detailed geological exploration, a Geological Report has been prepared by GoJ.
    [Show full text]
  • SAIL) at Manoharpur Block, West Singhbhum, Jharkhand
    Proposal for Amendment in Environmental Clearance for Continuation of Ore Transportation by Road applied under para 7 (ii) of EIA Notification, 2006 Dhobil Iron Ore Mining Project of M/s Steel Authority of India Limited (SAIL) At Manoharpur Block, West Singhbhum, Jharkhand Capacity : 0.75 million tonnes/year Mine Lease Area: 513.036 ha Enclosures: • Pre Feasibility Report • Environmental Study Report November, 2016 Project Proponent Environmental Consultant MECON LIMITED STEEL AUTHORITY OF INDIA LIMITED (A Govt. of India Enterprise) RAW MATERIAL DEVISION Vivekananda Path INDUSTRY HOUSE, 5TH FLOOR PO. Doranda 10, CAMAC STREET Dist – Ranchi, Jharkhand - 834002 KOLKATA – 700017 CERTIFICATE NO: NABET/EIA/1417/SA 007 Updated Pre-Feasibility Report for Amendment in Environmental Clearance for Continuation of Ore Transportation by Road Dhobil Iron Ore Mining Project of M/s Steel Authority of India Limited (SAIL) At Manoharpur Block, West Singhbhum, Jharkhand Capacity : 0.75 million tonnes/year Mine Lease Area: 513.036 ha Environmental Clearance granted vide letter no. J-11015/251/2009–IA.II (M) dated 24.01.2012 with subsequent modification dated 01.05.2012 November, 2016 Project Proponent Environmental Consultant MECON LIMITED STEEL AUTHORITY OF INDIA LIMITED (A Govt. of India Enterprise) RAW MATERIAL DEVISION Vivekananda Path INDUSTRY HOUSE, 5TH FLOOR PO. Doranda 10, CAMAC STREET Dist – Ranchi, Jharkhand - 834002 KOLKATA – 700017 CERTIFICATE NO: NABET/EIA/1417/SA 007 Pre-Feasibility Report for Dhobil Iron Ore Mining Project of M/s SAIL EXECUTIVE SUMMARY Steel Authority of India Limited (SAIL), a Maharatna public sector undertaking under Ministry of Steel, Government of India, is the leading steel maker in the country and is having Integrated Steel Plants at Bokaro, Durgapur, Rourkela, Bhilai & Burnpur; Special Steels Plants at Bhadrawati, Durgapur & Salem and a Ferro-alloys Plant at Chandrapur.
    [Show full text]