42052 Federal Register / Vol. 70, No. 139 / Thursday, July 21, 2005 / Notices

Federal Energy Regulatory Commission, l. The project is located on the SD may be viewed on the Web at 888 First Street, NE., Washington, DC Holyoke System on the http://www.ferc.gov using the ‘‘FERRIS’’ 20426. in Hampden County, link. Enter the docket number excluding .1 The Holyoke Canal Linda Mitry, the last three digits in the docket System consists of three levels, and the number field to access the document. Deputy Secretary. project facilities are located between the For assistance, call 1–866–208–3676 or [FR Doc. E5–3879 Filed 7–20–05; 8:45 am] first and second canal level. The project for TTY, (202) 502–8659. BILLING CODE 6717–01–P is one of nine FERC-licensed projects on the Holyoke Canal System. The Holyoke Linda Mitry, No. 4 Hydro Project has an installed Deputy Secretary. DEPARTMENT OF ENERGY generating capacity of 750 kilowatts [FR Doc. E5–3880 Filed 7–20–05; 8:45 am] Federal Energy Regulatory (kW), and generates about 3,148,000 BILLING CODE 6717–01–P Commission kilowatt-hours (kWh) of energy annually. Flows into the Canal System Notice Soliciting Scoping Comments are regulated by HG&E through DEPARTMENT OF ENERGY operation of the Holyoke Project No. July 14, 2005. 2004 according to the Comprehensive Federal Energy Regulatory Take notice that the following Canal Operations Plan (CCOP) and the Commission hydroelectric application has been filed Comprehensive Operations and Flow with the Commission and is available 2 Plan (COFP). The project does not [Docket No. CP05–360–000] for public inspection. occupy any Federal lands. a. Type of Application: New major m. A copy of the application is Creole Trail LNG Terminal, L.P.; Notice license. available for review at the Commission of Technical Conference b. Project No.: P–7758–004. in the Public Reference Room or may be c. Date Filed: February 5, 2005. viewed on the Commission’s Web site at July 14, 2005. d. Applicant: Holyoke Gas & Electric http://www.ferc.gov using the ‘‘FERRIS’’ On Wednesday, August 10, 2005, at Department. link. Enter the docket number excluding e. Name of Project: Holyoke No. 4 8:30 a.m. (CDT), staff of the Office of the last three digits in the docket Hydroelectric Project. Energy Projects will convene a number field to access the document. f. Location: On the Holyoke Canal cryogenic design and technical For assistance, contact FERC Online System on the Connecticut River in conference regarding the proposed Support at Hampden County, Massachusetts. Creole Trail LNG import terminal. The g. Filed Pursuant to: Federal Power [email protected] or toll- free at 1–866–208–3676, or for TTY, cryogenic conference will be held in the Act 16 U.S.C. 791(a)–825(r). Holiday Inn Express Hotel & Suites in h. Applicant Contact: Mr. Paul (202) 502–8659. A copy is also available for inspection and reproduction at the Sulphur, Louisiana. The hotel is located Ducheney, Superintendent-Hydro, at 102 Mallard St, Sulphur, Louisiana Holyoke Gas & Electric Department, One address in item h above. 70665. For hotel details call 337–625– Canal Street, Holyoke, MA 01040, (413) n. You may also register online at 2500. 536–9340 or [email protected]. http://www.ferc.gov.esubscribenow.htm i. FERC Contact: Jack Hannula, (202) to be notified via e-mail of new filings In view of the nature of critical energy 502–8917, [email protected]. and issuances related to this or other infrastructure information and security j. Deadline for Filing Scoping pending projects. For assistance, contact issues to be explored, the cryogenic Comments: August 19, 2005. FERC Online Support. conference will not be open to the All documents (original and eight o. Scoping Process: public. Attendance at this conference copies) should be filed with: Magalie R. The Commission staff intends to will be limited to existing parties to the Salas, Secretary, Federal Energy prepare an Environmental Assessment proceeding (anyone who has Regulatory Commission, 888 First (EA) for the Holyoke No. 4 specifically requested to intervene as a Street, NE., Washington, DC 20426. Hydroelectric Project in accordance party) and to representatives of The Commission’s Rules of Practice with the National Environmental Policy interested Federal, state, and local require all intervenors filing documents Act. The EA will consider both site- agencies. Any person planning to attend with the Commission to serve a copy of specific and cumulative environmental the August 10th cryogenic conference that document on each person on the impacts and reasonable alternatives to must register by close of business on official service list for the project. the proposed action. Friday, August 5, 2005. Registrations Further, if an intervenor files comments Commission staff does not propose to or documents with the Commission conduct any on-site scoping meetings at may be submitted either online at relating to the merits of an issue that this time. Instead, we will solicit https://www.ferc.gov/whats-new/ may affect the responsibilities of a comments, recommendations, registration/cryo-conf-form.asp or by particular resource agency, they must information, and alternatives in the faxing a copy of the form (found at the also serve a copy of the document on Scoping Document (SD). referenced online link) to 202–208– that resource agency. Copies of the SD outlining the subject 0353. All attendees must sign a non- Scoping comments may be filed areas to be addressed in the EA were disclosure statement prior to entering electronically via the Internet in lieu of distributed to the parties on the the conference. For additional paper. The Commission strongly Commission’s mailing list. Copies of the information regarding the cryogenic encourages electronic filings. See 18 conference, please contact Kareem M. CFR 385.2001(a)(1)(iii) and the 1 The Holyoke Canal System is licensed under the Monib at 202–502–6265. instructions on the Commission’s Web Holyoke Project No. 2004. 88 FERC ¶ 61,186 (1999). 2 Linda Mitry, site (http://www.ferc.gov) under the ‘‘e- The CCOP and COEP are part of a Settlement Agreement (filed with the Commission on March Deputy Secretary. Filing’’ link. 12, 2004) as part of the licensing of the Holyoke k. This application is not ready for Project No. 2004. These plans address canal flows, [FR Doc. E5–3876 Filed 7–20–05; 8:45 am] environmental analysis at this time. water quality, fish, and other habitat species. BILLING CODE 6717–01–P

VerDate jul<14>2003 19:42 Jul 20, 2005 Jkt 205001 PO 00000 Frm 00029 Fmt 4703 Sfmt 4703 E:\FR\FM\21JYN1.SGM 21JYN1