Perunthenaruvi SHEP is a run of the river small Hydro Electric project proposed to be implemented by KSEB as a CDM project of UNFCCC. This document is published for the public and stakeholders to submit their doubts, suggestion etc. either to the Chief Engineer (Corporate Planning), Vydyuthi Bhavanam, Thiruvananthapuram or to the Chief Engineer (Civil Construction) South, Vydyuthi Bhavanam, Thiruvananthapuram in person or by post before 31.01.2012. The public/ stakeholders can also attend the stakeholder consultation meeting scheduled to be held at the Parish Hall, St. George Catholic Church, Edathikavu at 11.0 A.M. on 04.02.2012 to clarify their doubts, if any and to submit their suggestions. The important details of the scheme are as follows. PERUNTHENARUVI SMALL HYDRO ELECTRIC PROJECT

The Perunthenaruvi small hydro electric project is a run-off the river scheme in river Pampa (known as ‘Pampayar’) of Pampa basin. The Scheme envisages the utilisation of water from 442 Sq.km catchment of Pamba and Azhutha rivers for electricity generation under a net head of 18.00 m and Power house to be located on the left bank of Pamba river below Perunthenaruvi falls. The catchment area comprises of that of Azhutha river below the Azhutha diversion scheme at Peerumadu and the lower reaches below the dam sites of Pamba and Kakki of Sabarigiri H.E Project.

Average annual yield of the catchment computed on the basis of the data for 5 years from 1999-2003 comes to 1014 Mm 3. The utilisation with an installed capacity of 6 MW comes 626 Mm 3, the percentage of utilisation being 62%. Annual generation corresponding to the above utilisation comes to 25.77Mu.

The main components of the scheme are:-

1) A diversion weir of 6.0 m height and 200 m long.

2) A rectangular power channel of size 5.0mx4.5m, 480m long with upstream control gates and trash rack.

3) A R.C.C. circular forebay of dia 22m with penstock intake and trash rack

4) Penstock pipes, 2 nos ,35m long, 2.6m dia each

5) A Power house of 19 m x 18. m x 10.5 m size.

1 6) 2 Nos Tubular turbines and generator units

7) A tailrace channel to lead water to the Parent River.

The estimated cost of the project is 6100 lakhs. The project cost including the interest during construction is 6790 lakhs. The levelised tariff at discounting rate of 10% will Rs 3.170 per unit. LOCATION The scheme is in Pamba river basin at Taluk in district. The left bank is in Naranamoozhi Panchayat of Kollamula village and the right bank is in Vechuchira Panchayat of Kollamula village in . The scheme is located at latitude 90 24’20” North and Longitude 76 052’ 40” East. The weir site is proposed 460 m upstream of Perunthenaruvi falls and about 1.5kms downstream of Kurumpanmoozhi causeway. Power house is located below Perunthenaruvi falls. The nearest town is Ranni -21Km from the site.

SALIENT FEATURES

I LOCATION 1 State - 2 District - Pathanamthitta 3 Taluk - Ranni 4 Panchayat - Naranammoozhi & Vechuchira 5 Place - Perunthenaruvi 6 Access: - Road: - Eurumely to 8 Kms. From there is a jeep road for about 2 kms to the site Rail - Nearest railway station is at Chengannur 50kms. away Airport - Thiruvananthapuram, 140 kms. Away. Geographical co-ordinates -

2 1 Latitude - 9o 24’ 20’’ N 2 Longitude - 76 o 52’ 40’’ E

II RIVER/ CATCHMENTS 1 Basin - Pampa 2 River - Pampa River (Pampayar)

III HYDROLOGY 1 Catchment area - 442 Sq.kms 2 Average Annual Yield - 1093 Mm 3 3 Peak flood at the diversion weir - 395Cumecs

IV COMPONENT STRUCTURES (i) Diversion Weir Overflow section 1 Type - Concrete gravity un- gated ogee 2 Total length of weir - 200m 3 Length of overflow portion - 120m 4 Crest Level - +51.00 m 5 Height of overflow section 6.00 m 6 General bed level - +46.00 m 7 Rock Level - + 45.00m 8 Foundation Excavation - 0.2 to1m from bed level 9 U/S face - Vertical 10 D/s face - Ogee curve 11 Head over crest (design) - 1.50 m Non-Overflow section 1. Length - 80 m. i). Length at Right Bank - 30m ii). Length at L/B - 50m 2 Top level of weir - +55.00 3 Top width of weir - 3.0 m 4 Intake bottom level - +47.00

3 5 M.W.L - +52.5 6 U/s profile - vertical 7 D/s profile - Vertical down to + 52.50 and a slope of 0.7/1.0 8 Deepest foundation level - +45.00 (ii) Intake structure and trash rack arrangement 1 Location - Left bank 2 Size of intake gate - 3nos, 3m x 4m 3 Sill level of intake - +47.00m. (iii) Power channel 1 Size of Power channel - 5.00m x 4.5m 2 Length of power channel - 480m 3 Slope - 1 in 900 4 Maximum discharge - 44m 3/sec 5 Velocity - 2.5 m/sec 6 F.S.L Intake - +51.00m 7 Depth of flow - 3.5m 8 Sill level at Inlet - +47.50m 9 Over flow channel - 440m chainage 10 Over flow channel - 30m wide 11 Over flow- crest level - +50.50m (iv) Forebay 1 Type - R.C.C Circular 2 Inner diameter - 22m 3 Wall thickness - 0.50m 4 Full supply Level - +50.50m 5 M. D.D.L - +47.00m 6 Top level - +52.00m 7 Bottom level - +38.68m (v) Intake structure and trash rack arrangement at forebay 1 Type of intake structure - Bell mouth 2 Ht. of bell mouth entry - 5.2 m

4 3 Width of bell mouth entry - 3.75 m 4 Type of trash rack arrangement - Rectangular (vi) Penstock 1 Length - 35m 2 Diameter of Penstock. - 2 Nos, 2.6 m. 4 Thickness of the shell - 8 mm 5 Design discharge - 44.00 Cumecs 6 Design velocity - 4.5 m/sec (vii) Power House 1 Type - Over ground 2 Net Head - 18.00 m 3 Size of machine hall i Length - 19.00 m ii Width - 18.00 m iii Height - 10.5 m 4 Installed capacity - 6000 KW 5 Turbine - 2 nos. 3000kW horizontal tubular turbine 6 Type - Reaction 7 R.L. of C/L of turbine - +32.65 (viii) Tail race (TR) channel 1 No. of draft tubes - Two 2 Discharge in to T.R. Pool - 44.00 m 3/sec 3 Sill level of TR Pool - +29.60 4 Tail water level - +31.70 I Power 1 Energy/annum - 25.77Mu/Annum II Cost 1 Total cost - 6100 Lakhs. (Rs 6790 lakhs including IDC) 2 Levelised Tariff (at discounting rate of 10%) - Rs. 3.17/ kWh

5