MARIA CATALINA E. CABRAL, PhD Undersecretary for Planning and PPP Department of Public Works and Highways
September 19, 2017 2017-2022 Philippine Development Plan Strategic Framework
Growth in gross domestic product (GDP) is expected to strengthen at 7 to 8 percent.
Growth will be more inclusive as manifested by a lower poverty from 21.6 percent in 2015 to 14.0 percent in 2022.
Unemployment rate will decline from the current 5.5 percent to 3-5 percent in 2022.
Greater trust in government and in society.
Individuals and communities will be more resilient.
Filipinos will have greater drive for innovation.
Source: pdp.neda.gov.ph 2017-2022 Philippine Development Plan Strategic Framework BOLDEST, MOST AMBITIOUS INFRASTRUCTURE PROGRAM IN HISTORY (% TO GDP)
AVERAGE FOR PAST 2.6 SIX (6) ADMINISTRATION IN 50 YEARS
DUTERTE YEAR 1 5.4 (2017 Budget)
0. 1.5 3. 4.5 6.
Source: Philippine Institute for Development Studies 2017 National Expenditure Program GOLDEN AGE OF INFRASTRUCTURE
P8-9 Trillion (FY 2017-FY 2022) Department of Public Works and Highways Luzon Spine Expressway Network From 385 km to 1,040 km High Standard Highways in Luzon. La Union to Bicol in 8 hours and 15 minutes. TPLEX Tarlac City to La Union in 1 hour
ON-GOING
START: 2010 COMPLETION: 2018
Actual Picture CLLEX-Phase I Tarlac City to Cabanatuan City in 1 hour
ON-GOING
START: 2016 COMPLETION: 2020 Plaridel By-Pass Balagtas to San Rafael, Bulacan in 24 minutes
ON-GOING
START: 2009 COMPLETION: 2018
Actual Picture Radial Road 10 Manila to Navotas in 30 minutes
COMPLETED
START: 2006 AFTER COMPLETION: 2017 NLEX Harbor Link-Seg. 10 Valenzuela City to Caloocan City in 5 minutes
ON-GOING
START: 2014 COMPLETION: 2018
Actual Picture SKYWAY Stage 3 Buendia to Balintawak in 20 minutes
ON-GOING
START: 2015 COMPLETION: 2019
Actual Picture NLEX-SLEX Connector Road NLEX to SLEX in 20 minutes
COMING SOON
START: 2019 COMPLETION: 2021 NAIA-X Skyway to NAIA Terminal 1 in 8 minutes
COMPLETED
START: 2014 COMPLETION: 2017
Actual Picture Laguna Lake Highway Taytay to Bicutan in 30 minutes
ON-GOING
START: 2013 COMPLETION: 2018
Actual Picture SMME-C6 Bicutan to Batasan in 26 minutes
ON-GOING
START: 2016 COMPLETION: 2020 Sample Picture Only CALA-X CAVITEX to SLEX in 45 minutes
ON-GOING
START: 2017 COMPLETION: 2020 SLEX-TR4 Sto. Tomas, Batangas to Lucena, Quezon in 1 hour
COMING SOON
START: 2017 COMPLETION: 2021
Sample Picture Only QUEBEX Pagbilao, Quezon to San Fernando Camarines Sur in 2 hours
COMING SOON
START: 2018 COMPLETION: 2022
Sample Picture Only Metro Manila Logistics Improvement Project From 26 bridges to 38 bridges crossing MARIKINA-VISTA REAL BR. Pasig River, Marikina River and Manggahan Floodway
J.P. RIZAL-LOPEZ JAENA BR.
J.P. RIZAL-ST. MARY BR.
PALANCA-VILLEGAS BR. MERCURY-EVANGELISTA BR.
EAST BANK-WEST BANK BR. 1 NORTH & SOUTH HARBOR BR.
LAMBINGAN BR.
BINONDO-INTRAMUROS BR. GUADALUPE BR. BEATA-MANALO BR.
BLUMENTRITT-ANTIPOLO BR.
ESTRELLA-PANTALEON BR.
STA. MONICA-LAWTON BR. EAST BANK-WEST BANK BR. 2 BONIFACIO GLOBAL CITY-ORTIGAS CENTER LINK ROAD PROJECT (Sta. Monica-Lawton Bridge and Lawton Ave.-Global City Viaduct) Bonifacio Global City to Ortigas Central Business District in 12 minutes.
COMING SOON
START: 2017 COMPLETION: 2020 BINONDO-INTRAMUROS BRIDGE
COMING SOON ESTRELLA-PANTALEON BRIDGE
COMING SOON METRO MANILA PRIORITY BRIDGES SEISMIC IMPROVEMENT PROJECT Guadalupe Bridge and Lambingan Bridge
COMING SOON
START: 2019 COMPLETION: 2021 NEW BACOLOD ECONOMIC HIGHWAY Bacolod City to Silay Airport in 15 minutes
ON-GOING
START: 2017 COMPLETION: 2022 METRO CEBU EXPRESSWAY Danao City to Naga City in 1 hour and 25 minutes
COMING SOON
START: 2018 COMPLETION: 2022 DAVAO CITY COASTAL ROAD Complements the proposed Mega Harbor Reclamation Project in Davao City
ON-GOING
START: 2017 COMPLETION: 2022 DAVAO CITY BY-PASS Reduce travel time from 1 hour and 44 minutes via Pan-Philippine Highway and Diversion Road to 49 minutes via Davao By –pass road.
ON-GOING
START: 2019 COMPLETION: 2022
Sample Picture Only Inter-Island Linkage
CAMARINES-CATANDUANES Project FRIENDSHIP BRIDGE, 10.7km
MINDORO-BATANGAS SUPER BRIDGE, 15km
PANAY-GUIMARAS-NEGROS LINK BRIDGE, 19.2 km
LUZON-SAMAR LINK BRIDGE, 25.4km
CEBU-BOHOL LINK BRIDGE, 27.5km CEBU-NEGROS LINK BRIDGE, 7km
PANGUIL BAY BRIDGE, 3.5km LEYTE-SURIGAO LINK BRIDGE, 23km
BOHOL-LEYTE LINK BRIDGE, 35km GUICAM BRIDGE, 0.4km PANGUIL BAY BRIDGE Tubod, Lanao Del Norte to Tangub, Misamis Occidental in 10 minutes
COMING SOON
START: 2018 COMPLETION: 2021 PANAY-GUIMARAS- NEGROS LINK BRIDGE PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT-PHASE III Decrease flood inundation by 18% and reduce flood damages by P14.3 billion
ON-GOING
START: 2014 COMPLETION: 2017 MANDALUYONG MAIN DRAINAGE PROJECT Decrease duration of flooding from 4 hours to 30 minutes
COMPLETED
START: 2013 COMPLETION: 2016 FLOOD RISK MANAGEMENT PROJECT FOR CAGAYAN, TAGOLOAN AND IMUS RIVERS
ON-GOING
START: 2016 COMPLETION: 2019 FLOOD RISK MANAGEMENT PROJECT IN CAGAYAN DE ORO Protects 290 ha. area and 18,100 structures
COMING SOON
START: 2018 COMPLETION: 2022 INTEGRATED DISASTER RISK REDUCTION AND CLIMATE CHANGE ADAPTATION MEASURES IN THE LOW LYING AREAS OF PAMPANGA BAY Shortens flood duration from 66 days to 17 days
COMING SOON
START: 2017 COMPLETION: 2020
Sample Picture Only LEYTE TIDE EMBANKMENT Protects 33,185 houses / buildings from Storm Surge
ON-GOING
START: 2016 COMPLETION: 2022 Department of Transportation PUERTO PRINCESA AIRPORT Designed to accommodate 1.9 Million passengers annually
COMPLETED
COMPLETION: 2017 NEW BOHOL (PANGLAO) AIRPORT Designed to accommodate 1.9 Million passengers annually
ON-GOING
COMPLETION: 2018 MACTAN CEBU INTERNATIONAL AIRPORT Designed to accommodate 12 Million passengers annually
ON-GOING
COMPLETION: 2018 BICOL INTERNATIONAL AIRPORT The BIA will decongest the crowded Legazpi airport, will boost tourist arrivals, and help make Albayan economic powerhouse.
ON-GOING
COMPLETION: 2018 PNR NORTH RAILWAY (MANILA-CLARK) It is designed to accommodate around 350,000 passengers per day on opening year.
COMING SOON
START: 2017 COMPLETION: 2021 PNR SOUTH RAILWAY (MANILA-BICOL) 653 km rail line designed to accommodate around 400,000 passengers per day on opening year.
COMING SOON
START: 2018 COMPLETION: 2021 MINDANAO RAILWAY (Phase I: Tagum-Davao-Digos) 105 km rail line designed to accommodate around 120,000 passengers per day on opening year.
COMING SOON
START: 2018 COMPLETION: 2022 MEGA MANILA SUBWAY (Phase I: Quezon City-Taguig) It allows consistent travel from QC - Taguig in just 31 minutes. 370,000 passengers per day on opening year.
COMING SOON
START: 2019 COMPLETION: 2024 MRT LINE 7 23 km mass transportation railway system connecting Quezon City to San Jose Del Monte, Bulacan. Can accommodate 420,000 passengers/day
ON-GOING
COMPLETION: 2020 LRT 1 CAVITE EXT. (Baclaran-Cavite) Can accommodate 410,000 passengers/day
ON-GOING
COMPLETION: 2021 LRT 2 EAST EXT. (Santolan-Antipolo) 13.8km line extending Santolan to Antipolo. Can accommodate 185,000 passengers/day
ON-GOING
COMPLETION: 2019 SOUTH WEST INTEGRATED TRANSPORT SYSTEM Intermodal facility that will provide seamless transfers for the passengers, fixed departure schedules and centralized ticketing system for provincial buses.
ON-GOING
START: 2017 COMPLETION: 2018 SOUTH ITS (FTI-TAGUIG) Intermodal terminal for provincial buses that will provide safe, and convenient transfer facilities to passengers in the Laguna and Batangas area.
COMING SOON
START: 2017 COMPLETION: 2019
CLARK INTERNATIONAL AIRPORT (New Terminal Building)
COMING SOON
START: 2017 COMPLETION: 2019 BGC-NAIA BUS RAPID TRANSIT
COMING SOON
START: 2017 COMPLETION: 2021 SUBIC-CLARK CARGO RAILWAY PROJECT
COMING SOON
START: 2017 COMPLETION: 2020 NEW CLARK CITY
ON-GOING
COMPLETION: 2022