Water Quality Response to the Spring 2009 Environmental Flow Release from Tantangara Dam to the Murrumbidgee River

Total Page:16

File Type:pdf, Size:1020Kb

Water Quality Response to the Spring 2009 Environmental Flow Release from Tantangara Dam to the Murrumbidgee River FACTSHEET March 2012 Water quality response to the spring 2009 environmental flow release from Tantangara Dam to the Murrumbidgee River Tantangara Dam, with a capacity of 252 gigalitres (GL), is located in northern Kosciuszko National Park, south eastern NSW. The dam diverts approximately 99 per cent of the upper Murrumbidgee River water to Lake Eucumbene and then to the lower Murrumbidgee River. This has had significant impacts on the ecology, water quality and geomorphology of the Murrumbidgee River downstream of the dam. (Figure 1) Figure 1. The Murrumbidgee River below Tantangara Dam showing channel contraction and sedimentation of the substrate. A minor spring environmental flow release of 4.23 GL was made in September and October 2009. The NSW Office of Water measured water quality in the Murrumbidgee River approximately 1.2 kms downstream of Tantangara Dam before and during the release. Hydrolab multiprobes were used to record hourly measurements for water temperature, pH, electrical conductivity, dissolved oxygen (percentage www.water.nsw.gov.au Water quality response to the spring 2009 environmental flow release from Tantangara Dam to the Murrumbidgee River saturation) and turbidity. Flow releases were increased in small increments from 0 MLd-1 to 240 MLd-1 and back to 0 MLd-1 over several weeks (Figure 2). Tantangara Dam has increased the diurnal water temperature range in the Murrumbidgee River (ie. higher than normal temperature range in a 24 hour period), with water temperature now driven by ambient air temperature, and reduced dissolved oxygen to levels below the guidelines for aquatic ecosystem health. The main effects of the 2009 spring flow release from Tantangara Dam on water quality in the Murrumbidgee River were as follows: reduced diurnal variability in water temperature when flows of 100-240 MLd-1 were released, with no significant improvement in water temperature which was still driven by air temperature at these flow volumes (Figure 2a) low dissolved oxygen levels in the Murrumbidgee River (median values around 80 per cent saturation) below Tantangara Dam may be limiting the health of the aquatic ecosystem (Figure 2b) short term decreases in dissolved oxygen and pH and increased electrical conductivity on the day that flows were first released on 21 October 2009 (Figures 2b and 2c) slightly decreased electrical conductivity and turbidity throughout most of the flow release (Figure 2c), however both generally within ANZECC guidelines some minor scouring of the substrate in the main channel. 18 o 260 96 260 Temperature ( C)(L) 240 94 240 16 Discharge (MLd-1)(R) 220 92 220 C) 200 90 200 o ) ) -1 14 180 -1 88 180 160 86 160 12 140 84 140 120 82 120 10 100 80 100 80 78 80 8 60 76 60 Discharge (MLd Discharge (MLd 40 74 DO (%sat)(L) 40 Water temperature ( 6 20 72 Discharge (MLd-1)(R) 20 0 70 0 4 -20 (% saturation) oxygen Dissolved 68 -20 4-Oct-09 4-Oct-09 3-Nov-09 3-Nov-09 14-Oct-09 24-Oct-09 14-Oct-09 24-Oct-09 14-Sep-09 24-Sep-09 14-Sep-09 24-Sep-09 Date Date a) b) 42 260 30 260 ) EC (uScm-1)(L) -1 40 240 Turbidity (NTU)(L) 240 38 Discharge (MLd-1)(R) 220 25 Discharge (MLd-1)(R) 220 200 36 ) 200 ) -1 180 -1 34 20 180 32 160 160 30 140 140 120 15 120 28 100 26 100 80 10 80 24 60 Turbidity (NTU) 22 Discharge (MLd 60 40 Discharge (MLd 20 20 5 40 18 20 Electrical Conductivity (uScm 0 16 -20 0 0 -20 4-Oct-09 3-Nov-09 14-Oct-09 24-Oct-09 14-Sep-09 24-Sep-09 4-Oct-09 3-Nov-09 14-Oct-09 24-Oct-09 Date 14-Sep-09 24-Sep-09 Date c) d) Figure 2. a) Water temperature, b) Dissolved oxygen, c) Electrical conductivity and d) Turbidity. 2 NSW Office of Water, March 2012 Water quality response to the spring 2009 environmental flow release from Tantangara Dam to the Murrumbidgee River Up until now, there has been a lack of information on the water quality impacts of Tantangara Dam on the Murrumbidgee River. This study provides valuable information for environmental flow management. Median water temperature reflects air temperature, so although the diurnal range of water temperature is reduced by flows of 100-240 MLd-1, the environmental flow release did not significantly improve the water temperature of the river. There was no improvement in the dissolved oxygen levels, which remain below the ANZECC guidelines for aquatic ecosystem health. The flow release slightly decreased turbidity and electrical conductivity, but only for the duration of the flow release. Whilst the improvements in water quality were short term, there was some scouring of the river bed evident after the environmental flow release, which may indicate benefits for the habitat and spawning requirements of the target species Macquarie Perch. The suitability of the flow release for Macquarie Perch migration is dependent on increase in water temperature to 16-18o C, which was not achieved during the flow release but only after low flows resumed on 31 October. Consequently, environmental flow requirements for Tantangara Dam have been altered to allow for a first peak flow of 1500 MLd-1 for three days in September, increased baseflows with variability in October and November, and a second flow peak of 350 MLd-1 of eight days duration in December. More information Robyn Bevitt or Simon Williams, ph (02) 4244 9728, email [email protected] Website: www.water.nsw.gov.au under Water management > Monitoring > Snowy River © State of New South Wales through Department of Trade and Investment, Regional Infrastructure and Services 2012. You may copy, distribute and otherwise freely deal with this publication for any purpose, provided that you attribute the Department of Trade and Investment, Regional Infrastructure and Services as the owner. Disclaimer: The information contained in this publication is based on knowledge and understanding at the time of writing (February 2012). However, because of advances in knowledge, users are reminded of the need to ensure that information upon which they rely is up to date and to check currency of the information with the appropriate officer of the Department of Primary Industries or the user’s independent adviser. Published by the NSW Department of Primary Industries, a division of the NSW Department of Trade and Investment, Regional Infrastructure and Services. 11_368 3 NSW Office of Water, March 2012 .
Recommended publications
  • Water Compliance Report
    WATER COMPLIANCE REPORT 2018 - 2019 Water Year Water Report 2018 - 2019 1 ABOUT THIS REPORT COMPLYING WITH Since the Snowy Scheme’s completion in 1974, Snowy Hydro Limited has carefully managed the water that flows through the Scheme’s dams, tunnels, aqueducts and power stations in accordance with our OUR LICENCE water licence. This report outlines how we are managing the water that flows through the Scheme. Snowy Hydro complied with all of the requirements imposed upon the company under the Snowy Hydro operates a complex hydro-electric scheme utilising the water captured by the Scheme Snowy Water Licence during the 2018 - 19 water year, including each water release target to generate energy to meet the market’s needs, while also moving water from east to west to support relating to: irrigation districts. ● The Required Annual Release to the River Murray catchment. Each year, we have to reach certain targets for downstream and environmental water releases. Snowy ● The Required Annual Release to the Murrumbidgee River catchment. Hydro has operational flexibility day-to-day to strategically manage our generation and water releases while at the same time giving long-term security to the downstream users around annual water releases. ● Environmental releases into the Snowy River from Jindabyne Dam. In the Snowy Scheme, water releases and electricity generation are inseparably linked. ● Environmental releases into the Murrumbidgee River from Tantangara Dam. ● Environmental releases into the Goodradigbee River from Goodradigbee Aqueduct. Snowy Hydro is operated under the Snowy Water Licence, issued to us by the NSW Government. The licence has many legally-binding and enforceable obligations on the company.
    [Show full text]
  • Synopis Sheets MURRAY DARLING UK
    Synopsis sheets Rivers of the World THE MURRAY- DARLING BASIN Initiatives pour l’Avenir des Grands Fleuves The Murray-Darling Basin Australia is the driest inhabited continent on the planet: deserts make up more than two thirds of the country. 90% of the population is concentrated in the southeast, around the Murray-Darling basin and on the coast. This basin is the country’s largest hydrographic network, with a surface area of 1,059,000 km² (14% of the Australian territory), stretching from the Australian Alps to the Indian Ocean. Although it harbours 70% of Australia’s irrigated land and 40% of its agricultural production, it is not spared from water shortages that now affect the rest of the country due to climate change and a lifestyle and economy that consume considerable volumes of water. A laboratory for adapting to water stress The origins The River Murray, called “Millewa” by the Aboriginal traditional owners, has been central to human livelihoods for over 40000 years. Its exploitation was then accelerated in the 19 th century, first as a navigable waterway and as a means for trading by European and other settlers. Development of the river basin quickly led to the degradation of an already fragile ecosystem. In addition to droughts, massive use of the rivers’ waters, firstly for irrigation, and the transformation of the land through grazing and deforestation contributed to the salinisation ot the land and waters. The basin has always seen great variability: severe droughts and floods, that are being accentuated with climate change. 2013, 2014, 2015, 2017 and 2018 have seen some areas in the basin with the hottest temperatures ever recorded.
    [Show full text]
  • MAS Response to Snowy 2.0
    1 Snowy Hydro 2.0 – Main Works Environmental Impact Statement The Monaro Acclimatisation Society Inc (MAS) of NSW is a voluntary organisation primarily concerned with the development and maintenance of freshwater fisheries in the south-eastern sector of NSW. The MAS is a primary stakeholder with the NSW Department of Fisheries. The MAS has been in existence for over 70 years and participates with NSW Fisheries in: the stocking of fresh water lakes and rivers with trout and native fish, maintenance of habitat, and policy and legislation development that affects fishing in NSW. The MAS is the pre-eminent organization concerned with angler access to rivers and lakes for the Snowy Mountains / Monaro Region of NSW. The MAS makes the following comments on the Snowy Hydro 2.0, Main Works Environmental Impact Statement. From the MAS perspective there are a number of key issues that cause us concern. These issues are: The transfer of redfin perch from Talbingo Reservoir into Tantangara Reservoir The transfer of EHN Virus from Talbingo Reservoir into Tantangara Reservoir The matter of blue green algae blooms in Tantangara Reservoir The drying of rivers due to the tunneling Access to Tantangara Reservoir during the construction phase. To provide clarity exerts from the EIS are in italics and relevant sections highlighted yellow. Appendix G - Mitigation Measures Table Table G.1 Mitigation measures Marine transport NAV01 The following measures will be implemented to manage interactions between marine transport and public boating activities during
    [Show full text]
  • Project Development, Options and Alternatives
    C PROJECT DEVELOPMENT, OPTIONS AND ALTERNATIVES Snowy 2.0 Main Works Project development, options and alternatives Snowy 2.0 Main Works Document Information Title Snowy 2.0 Main Works project development, options and alternatives Number Revision 1 Revision Information Revision Date Description Author Reviewer Approver 1 11/09/2019 Final Snowy Hydro Paul Smith Kieran Cusack SMEC EMM Consulting Snowy 2.0 Main Works Contents 1 Introduction ...................................................................................................................... 1 1.1 Background .............................................................................................................. 1 1.2 Purpose of this report ............................................................................................... 2 2 Developing Snowy 2.0 ..................................................................................................... 3 2.1 Snowy 2.0 inception ................................................................................................. 3 2.2 Key design phases ................................................................................................... 3 2.3.1 Historical investigations ..................................................................................... 4 2.3.2 Feasibility design ............................................................................................... 7 2.3.3 Reference design .............................................................................................. 7 2.3.4 Contractor
    [Show full text]
  • Concept Plan
    Monaro Acclimatisation Society Inc 9 Thompson Drive Tathra, NSW. 2550 Sustainable future fishing for trout and native fish SNOWY HYDRO 2.0 – MAS CONCEPT PLAN On 2 July 2020 MAS Secretary Rod Whiteway and I met with senior officers from NSW Fisheries to discuss the MAS Concept Plan for a trout grow-out facility as a recreational fishing offset for Snowy Hydro 2.0. Following that meeting NSW Fisheries have asked the MAS to formally enter into “Agreed Principles” arrangement. The MAS Executive is currently discussing this Agreement; however, we indicated we have four key priorities that we are committed to. On 7 July 2020 I met with senior staff from Snowy Hydro to discuss the MAS Concept Plan. Again, we explained our key priorities and Snowy Hydro did not express any negativity to our approach. Snowy Hydro indicated they are keen for a meeting between MAS, DPI and Snowy Hydro in the not too distant future to begin working formally on the plan. THE OVERALL CONCEPT Since the announcement of Snowy Hydro 2.0 the MAS has been concerned that redfin perch would be pumped from Talbingo Dam into Tantangara Dam and beyond. To help protect the Snowy Mountains trout fishery the MAS embarked on a process to identify how larger trout could be stocked to counter the expected redfin predation and to protect our trout fishing legacy and reassure the Snowy trout community that something was being done. The MAS soon realised that it was undertaking this process in a policy vacuum, so the MAS began negotiating directly with Snowy Hydro on mitigation measures.
    [Show full text]
  • Project Update Snowy 2.0 – Pumped-Hydro Project December 2018 CONTENTS
    Project Update Snowy 2.0 – pumped-hydro project December 2018 CONTENTS 4 THE MODERN SNOWY HYDRO 14 WORKFORCE AND BUSINESS OPPORTUNITIES 5 ABOUT SNOWY 2.0 15 ENVIRONMENTAL ASPECTS 6 WHY WE NEED SNOWY 2.0 16 SOCIAL ASPECTS 7 KEY BENEFITS 16 RECREATIONAL USE OF THE PARK 8 PROJECT ACTIVITY TO DATE AND ONGOING 17 TRANSMISSION 10 BUILDING SNOWY 2.0 18 SNOWY 2.0 EXPLORATORY WORKS PROPOSAL 12 PLANNING AND APPROVALS 18 COMMUNITY CONSULTATION 13 WATER AND DAM LEVELS AND PROJECT FEEDBACK Talbingo Reservoir 3 THE MODERN SNOWY HYDRO ABOUT SNOWY 2.0 Snowy Hydro is a dynamic energy company supplying We have a total generation capacity of 5,500 megawatts (MW) Snowy 2.0 is a pumped-hydro expansion of the existing Snowy The ability to store water and generate power on-demand electricity to more than one million homes and businesses. and offer energy insurance and other products that provide supply Scheme which will significantly add to our existing energy means Snowy 2.0 can be ‘switched on’ very quickly. Snowy 2.0 security and price certainty to customers in the energy market. generation and large-scale storage capabilities. will pump water using the excess electricity in the system at Since the days of our pioneering past, Snowy Hydro has grown times of low demand. Then, when energy is needed most, the into the fourth-largest retailer in the energy market. Snowy Hydro also owns the electricity and gas retail Snowy 2.0 will increase the Scheme’s generation capacity by stored water will be used to generate electricity within minutes.
    [Show full text]
  • NSW Recreational Freshwater Fishing Guide 2020-21
    NSW Recreational Freshwater Fishing Guide 2020–21 www.dpi.nsw.gov.au Report illegal fishing 1800 043 536 Check out the app:FishSmart NSW DPI has created an app Some data on this site is sourced from the Bureau of Meteorology. that provides recreational fishers with 24/7 access to essential information they need to know to fish in NSW, such as: ▢ a pictorial guide of common recreational species, bag & size limits, closed seasons and fishing gear rules ▢ record and keep your own catch log and opt to have your best fish pictures selected to feature in our in-app gallery ▢ real-time maps to locate nearest FADs (Fish Aggregation Devices), artificial reefs, Recreational Fishing Havens and Marine Park Zones ▢ DPI contact for reporting illegal fishing, fish kills, ▢ local weather, tide, moon phase and barometric pressure to help choose best time to fish pest species etc. and local Fisheries Offices ▢ guides on spearfishing, fishing safely, trout fishing, regional fishing ▢ DPI Facebook news. Welcome to FishSmart! See your location in Store all your Contact Fisheries – relation to FADs, Check the bag and size See featured fishing catches in your very Report illegal Marine Park Zones, limits for popular species photos RFHs & more own Catch Log fishing & more Contents i ■ NSW Recreational Fishing Fee . 1 ■ Where do my fishing fees go? .. 3 ■ Working with fishers . 7 ■ Fish hatcheries and fish stocking . 9 ■ Responsible fishing . 11 ■ Angler access . 14 ■ Converting fish lengths to weights. 15 ■ Fishing safely/safe boating . 17 ■ Food safety . 18 ■ Knots and rigs . 20 ■ Fish identification and measurement . 27 ■ Fish bag limits, size limits and closed seasons .
    [Show full text]
  • Snowy Water Inquiry Outcomes Implementation Deed
    SNOWY WATER INQUIRY OUTCOMES IMPLEMENTATION DEED Dated 3 June 2002 PARTIES THE COMMONWEALTH OF AUSTRALIA THE STATE OF NEW SOUTH WALES THE STATE OF VICTORIA CONFORMED EXECUTION VERSION Snowy Corporatisation Snowy Water Inquiry Outcomes Implementation Deed Document No. NWEWG 21 (Conformed Execution Version) TABLE OF CONTENTS 1. DEFINITIONS AND INTERPRETATION ............................................................................2 1.1 Definitions.............................................................................................................2 1.2 Interpretation ........................................................................................................8 PART ONE: INTRODUCTORY ...................................................................................................10 2. COMMENCEMENT AND TERMINATION.......................................................................10 2.1 Commencement Date .........................................................................................10 2.2 Termination.........................................................................................................10 3. INTENTION TO CREATE LEGAL RELATIONS ...............................................................10 3.1 Legally Binding ...................................................................................................10 4. REMEDIES.....................................................................................................................10 4.1 Damages Insufficient...........................................................................................10
    [Show full text]
  • JUNE 2021 INTO the STREAM Official Newsletter of the Australian Trout Foundation
    APRIL TO JUNE 2021 INTO THE STREAM Official Newsletter of the Australian Trout Foundation From our President ATF PRESIDENT TERRY GEORGE This issue: Covid-19 has derailed some plans of the ATF in the most recent lockdown. The ATF had joined forces with Fishcare and the Broken Goulburn Catchment Management Authority to plant out some From our President tree on a section of the Goulburn River below the Weir. However PAGE 01 with new restrictions imposed in early June this planting had to be postponed On a better note, this newsletter contains an article on the initial Nariel River Trees for Trout planting of 3,500 tree in the Nariel Valley. This project was a PAGE 02 partnership between the ATF, North East Catchment Management Authority, Corryong Angling Club and VFA. Ten thousand trees were planned to be planted but the number was restricted due to Spotted tree frog Project fencing issues. The planting was so successful that there is PAGE 03 clamour from farmers to finish the job in spring with another 6500 trees to be planted. The Monaro Acclimatization Society have an article in this WA News newsletter. The MAS has much in common with the ATF and we PAGE 03 share a vision for a sustainable trout fishery. Happy reading for this month. Monaro Acclimatization Society News PAGE 05 Photo: courtesy David Anderson Nariel Tree Planting Day 2021 INTO THE STREAM PAGE 01 Briggsy was a master of coordination and certainly managed to look busy all the time coming and Nariel River Trees for Trout going, setting up the lunchtime BBQ and sourcing vegetarian sausages for fussy eaters.
    [Show full text]
  • Strategy for the Snowy Montane Rivers Increased Flows 2014-15
    SNOWY RIVER RECOVERY: SNOWY FLOW RESPONSE MONITORING AND MODELLING PROGRAM Strategy for the Snowy Montane Rivers Increased Flows 2014-15 The Snowy Initiative is an agreement for water for environmental releases to be made, known recovery and environmental flows between the as the Snowy Montane Rivers Increased Flows NSW, Victorian and Australian Governments, (SMRIF). This value of 150 GWHrs is converted and is set out in the Snowy Water Inquiry into a volumetric allocation, but the conversion Outcomes Implementation Deed 2002 (SWIOID factor differs depending on the location of the 2002). The initiative provides three main releases in the Snowy Mountains Scheme. In environmental water programs as part of some locations water released can be re-used to rebalancing the impacts of the Snowy Hydro generate electricity so a smaller conversion Scheme on montane rivers. These three factor is applied (Table 1). programs are increased flows for: (i) Snowy River, (ii) Murray River, and (iii) Snowy Montane Table 1. Snowy Montane Rivers annual targets and the conversion factor of lost energy generation to Rivers (Figure 1). Five Snowy Montane Rivers water allocation. are identified to receive environmental SWIOID (Figure 1; Table 1). Snowy Montane Rivers Annual Conversion Increased Flows Target factor Figure 1. Location of the Snowy Montane River (GL) release points (indicated by green icons). Murrumbidgee River @ 27 1.94 Tantangara LAKE BURRINJUCK Goodradigbee River* 12 1.94 Geehi 12 1.85 Murrumbidgee Catchment New SouthSnowy Wales River- Island Bend 25 0.71 Snowy River- Perisher Range# 30 0.57 A.C.T GoodradigbeeRiver The water availability for SMRIFs is linked to the water availability for environmental flows to the Snowy River, which is determined by the water TANTANGARA DAM recovery in the western rivers and the climatic Murray River conditions.
    [Show full text]
  • The Battery That Loses 40% of Its Energy - $Billions Down the Drain
    The battery that loses 40% of its energy - $billions down the drain This Paper, prepared by the National Parks Association of NSW, contends that the claimed benefits for Snowy 2.0 do not stack up This Paper, focussing on the claimed benefits of Snowy 2.0, follows on from a previous NPA Paper ‘Snowy 2.0 doesn’t stack up’, published on 15 October 2019 (https://npansw.org/wp- content/uploads/2019/10/191014-Snowy-2.0-doesnt-stack-up-FINAL.pdf Copyright © 2020 National Parks Association of NSW Inc. 26 February 2020 All information contained within this Paper has been prepared by the National Parks Association of NSW from available public sources. NPA has endeavoured to ensure that all assertions are factually correct in the absence of key information including the Business Case and financial data. National Parks Association of NSW is a non-profit organisation that seeks to protect, connect and restore the integrity and diversity of natural systems in NSW ABN 67 694 961 955 Suite 1.07, 55 Miller Street, PYRMONT NSW 2009| PO Box 528, PYRMONT NSW 2009 Phone: 02 9299 0000 | Email: [email protected] | Website: www.npansw.org.au Page 2 of 52 CONTENTS A DIAGRAMATIC SNAPSHOT ................................................................................................................... 5 SUMMARY ............................................................................................................................................... 6 The claimed benefits of Snowy 2.0 ....................................................................................................
    [Show full text]
  • Trout Waters Recreational Fishing Guide (Southern)
    Trout waters recreational fishing guide (Southern) October 2014 Primefact 1037 Second edition Recreational and Indigenous Fisheries Unit Introduction The Snowy region offers excellent lake, river and Our State's fisheries are a community-owned boat fishing opportunities and anglers have the resource. We all have a responsibility to protect chance of catching a wide variety of trout species and safeguard this natural asset for present and including Rainbow Trout, Brown Trout, Brook future generations. Trout and Atlantic Salmon. Fishing regulations are in place to protect and NSW DPI Fisheries Officers regularly patrol conserve our fish stocks and aquatic habitats to waterways and impoundments ensuring ensure that fishing activities remain sustainable. compliance with NSW fishing regulations and The Snowy catchment provides many fishing distributing freshwater fishing guides and sticky opportunities for a variety of enthusiasts. This fish measuring rulers. guide will give you an idea of the fishing on offer Fishcare Volunteers can also be found at boat and the closures and restrictions that apply ramps and on the water in dedicated Fishcare across the Snowy Mountains region from Tumut vessels, advising anglers about responsible in the west, Bombala in the east, Crookwell in the fishing practices and distributing fisheries north and Khancoban in the south. advisory information. Figure 1. The Snowy Mountains region. Information on bag and size limits, fishing closures and legal fishing gear can also be obtained free of charge from the NSW DPI website www.dpi.nsw.gov.au/fisheries, or by visiting your local NSW DPI fisheries office. To report illegal fishing activity, call your local fisheries office or the Fishers Watch Phoneline on 1800 043 536.
    [Show full text]