Buxton Cycling Club / Sett Valley Cycles Promoted for and on Behalf of Cycling Time Trials Under Their Rules and Regulations

Total Page:16

File Type:pdf, Size:1020Kb

Buxton Cycling Club / Sett Valley Cycles Promoted for and on Behalf of Cycling Time Trials Under Their Rules and Regulations Buxton Cycling Club / Sett Valley Cycles Promoted for and on behalf of Cycling Time Trials under their Rules and Regulations 2014 '10' MILE TT - J10/1 (CHAPEL BY-PASS) Incorporating Buxton CC/Sett Valley Cycles '10' Mile Club Championship SATURDAY 21ST JUNE 2014 Course HQ -Dog and PaBRIDGEMONT VILLAGE HALL,BRIDGEMONT,WHALEY BRIDGE,HIGH PEAK, SK23 7PB Timekeepers - Judith Soden & Tony Millington Prize List (One Man, One Prize, except for Teams) FASTEST MALE 1st £25 FASTEST FEMALE 1st £25 2nd £15 2nd £15.00 3rd £10 3rd £10.00 4th £10.00 FASTEST VET 1st £25 FASTEST TEAM (2 RIDERS) £10 EACH In the interest of safety, Cycling Time Trials and the event promoters STRONGLY advise you to wear a HARD SHELL HELMET that meets with an internationally accepted standard. In accordance with Regulation 15, ALL JUNIOR competitors must wear protective HARD SHELL HELMETS. It is recommended that a working rear light, either flashing or constant is fitted to the machine in a position visible to following road users and is active whilst the machine is in use. Course : J10/1 - 10 Miles Start in the lay-by on the A6 approximately 2.5 miles from the HQ heading towards Buxton. Proceed east to Boden Lane island (Chapel roundabout) Turn and retrace, heading west along the A6 to Bridgemont island (Whaley Bridge roundabout) Turn and head east back to Boden Lane island. Turn and return west along the A6. Finish at a point where the road bridge (Brookside) goes over the carriageway near Buxworth. Further course details - http://www.gmap-pedometer.com/?r=4501884/ Please ensure you leave sufficient time to reach the start line from HQ Numbers and Results Board at HQ There is NOWHERE to turn back until you reach the Chapel roundabout so please ensure you are ready to race when you enter the A6. To the HQ when finished - Please refrain fron stopping when crossed the finishline. Carry on to the Whaley Bridge roundabout, and retrace back to HQ. Care at both roundabouts Riders must negotiate both islands in a safe & sensible manner in accordance with CTT Regulation 20 & the rules of the road. Riders must be able to brake & stop at the islands if traffic conditions require this. Riders MUST NOT approach the islands using tri-bars. Remember, traffic on the islands will have priority over traffic entering the islands (Inc Riders) No Name Club/Team STD Time Start Time 1 MRS CAROLE SHERRIN WESTMEAD 88 18.01 2 DR RUTH MARSDEN OMENS CYCLING SHEFFIELD RT 18.02 3 MISS ALEX DECK LANGSETT CYCLES RT 18.03 4 MISS DANI KING WIGGLE HONDA 18.04 5 6 MR JOHN QUIMBY COALVILLE WHEELERS 18.06 7 MR KEVIN CORDEN STONE WHEELERS 18.07 8 MR THOMAS THORNELY BUXTON CC 18.08 9 MR SEAN CALDWELL GLOSSOP KINDER VELO 18.09 10 MR JACK GREEN VC ST RAPHAEL 18.10 11 MR ANDREW NEWBY NONNA LA SQUADRA 18.11 12 MR NIKALAS COOK CHINLEY CHURNERS CC 18.12 13 MR STEPHEN GLENWRIGHT VTTA 18.13 14 MR CHRIS BAINES BUXTON CC 18.14 15 MR JERRY CROSS MANCHESTER WHEELERS 18.15 16 MR JAMES DOWELL MANCHESTER WHEELERS 18.16 17 MR SAM MANSFIELD BUXTON CC 18.17 18 MR STEPHEN I' ANSON BUXTON CC 18.18 19 MR TREVOR BRACEGIRDLE STRETFORD WHEELERS 18.19 20 MR DAVID MCGAW CAMBRIDGE CC 18.20 21 MR JON BATT BUXTON CC 18.21 22 MR PAUL WARRENER ROSSENDALE RC 18.22 23 MR CHRIS LEA BUXTON CC 18.23 24 MR WILLIAM CAMPBELL WEAVER VALLEY 18.24 25 MR MOSTYN BULLOCK BUXTON CC 18.25 26 MR MARTYN BOWERS STONE WHEELERS 18.26 27 MR WILL MANSFIELD BUXTON CC 18.27 28 MR SIMON BAINES BUXTON CC 18.28 29 MR SAM CLARK BUXTON CC 18.29 30 MR CHARLES McCULLOCH DRAG2ZERO 18.30.
Recommended publications
  • 2011 '10' Mile TT - J10/1 (Chapel By-Pass)
    Sett Valley Cycles is the High Peaks premier lightweight stockist 9 Union Road, New Mills, High Peak, Telephone (01663) 742 629 [email protected] Promoted for and on behalf of Cycling Time Trials under their Rules and Regulations 2011 '10' Mile TT - J10/1 (Chapel by-pass) Sunday 26th June 2011 Course HQ -Dog and Partridge Pub, Bridgemont, Whaley Bridge, High Peak, Derbyshire, SK23 7PB Event Promoter – Cian O’Leary, c/o Sett Valley Cycles, 9 Union Road, New Mills, SK22 3EL – 07594 845473 Timekeepers - Judith Soden & Tony Millington Prize List: (Prizes have been kindly donated by Sam Clark at Sett Valley Cycles) 1st - £18 plus - pair of Bio Racer Gloves 4th - £5.00 – Retro Mavic Cap 2nd - £12 plus - pair of BBB Winter Gloves 3rd - £10 plus a pair of BBB Winter Gloves Lantern Rouge – Bio Racer Cap In the interest of safety, Cycling Time Trials and the event promoters STRONGLY advise you to wear a HARD SHELL HELMET that meets with an internationally accepted standard. In accordance with Regulation 15, ALL JUNIOR competitors must wear protective HARD SHELL HELMETS. It is recommended that a working rear light, either flashing or constant is fitted to the machine in a position visible to following road users and is active whilst the machine is in use Course : J10/1 - 10 Miles Start in the lay-by on the A6 approximately 2.5 miles from the HQ heading towards Buxton. Proceed east to Boden Lane island (Chapel roundabout) Turn and retrace, heading west along the A6 to Bridgemont island (Whaley Bridge roundabout) Turn and head east back to Boden Lane island.
    [Show full text]
  • Block Roads/ Pavings 110/115 Conventional Concrete Block Paving Overlay
    The product information below is from the NBS Plus library of product clauses offered in NBS specification products. It has been created by NBS for Acheson & Glover Ltd. The clause is authored in NBS format and is intended for inclusion in project specifications. The clause can be copied and pasted into your project specification document. Please note that NBS product guidance is not a replacement for the manufacturer's literature and it is recommended that Acheson & Glover Ltd be consulted before specifying SPECIFICATION FOR SLAB/BRICK/SETT/COBBLE PAVINGS SECTION Q24/Q25 Q24 INTERLOCKING BRICK/ BLOCK ROADS/ PAVINGS 110/115 CONVENTIONAL CONCRETE BLOCK PAVING OVERLAY To be read with Preliminaries/General conditions. GENERALLY 120 UN-BOUND SUB BASE DETAIL (To be considered in event of services etc. requiring access) Granular sub-base: Highways Agency Specification for Highway Works Type 1. - Thickness: 120mm to 150mm. Base/ bedding: 3mm bedding grit or to engineers detail - Thickness: 50mm. Paving units: As detailed below 120 BOUND SUB BASE DETAIL (Pedestrian, Vehicular traffic and Services allowed for) CBM sub-base: Highways Agency Specification for Highway Works. - Thickness: 120mm to 150mm reinforced concrete slab Base/ bedding: BS 7533 recommended pure hydraulic bedding mortar which must include up to 70% crushed igneous rock, free of polymer & resin. Flexural strength 7N/mm2 - Thickness: 40mm. (can be 30mm to 70mm depending on engineer detail) Refer to Alan Smyth Consultancy 00353 86 1730156 Design Standard: BS 7533-1:2001 (Heavy Traffic) or BS 7533-2:2001 (Light Traffic) Laying Standard: BS 7533-3:2005 390 UNBOUND PAVING JOINTING MATERIAL Standard: To BS 7533-4, Kiln dried jointing material brushed to joints of paving.
    [Show full text]
  • Courtenay House 16 Esplanade Road, Pentire Headland, Newquay, Cornwall
    COURTENAY HOUSE 16 ESPLANADE ROAD, PENTIRE HEADLAND, NEWQUAY, CORNWALL COURTENAY HOUSE 16 ESPLANADE ROAD, PENTIRE HEADLAND, NEWQUAY, CORNWALL Located directly beside the internationally renowned Fistral surfing beach. A truly exceptional, contemporary coastal residence with over 5,000sq.ft. of beautifully proportioned accommodation. Commanding sensational unobstructed and unobstructable panoramic views encompassing Fistral Beach and across Fistral Bay to Towan Head and far along the north Cornish coastline to Trevose Head, a truly remarkable and everchanging vista. Having undergone a comprehensive schedule of remodelling/refurbishment, the property boasts excellent eco- credentials and includes 5 bedroomed, 5 reception roomed accommodation plus integral double garage and private gated access to its large garden plot of just over ½ an acre. One of Cornwall’s finest beachside homes. SUMMARY OF ACCOMMODATION Ground Floor: entrance hall, boot room, wc, triple aspect lounge (23’8” x 20’3”), kitchen/dining room (24’9” x 20’2”), full width balcony, music room, office, steps to lower ground floor. First Floor: landing, master bedroom with en-suite bath/shower room plus private sea facing balcony. Bedroom 2 with en-suite shower room, bedroom 3 with private sea view balcony, 4th double bedroom, family bathroom. Second Floor: bedroom (29’6” x 20’7”) with incredible apex window en-suite shower room, eaves storage cupboards. Lower Ground Floor: games room, boiler room, utility room, surfers shower room, wc. Integral double garage. Outside: electrically operated gated entrance with winding tarmacadam driveway with parking for numerous vehicles, sheltered granite sett terrace, lawned gardens and terrace, sunken trampoline. In all 0.55 of an acre.
    [Show full text]
  • SCHEDULE 3 Reserves
    SCHEDULE 3 Reserves Wairoa District Council Reserve Map Reference Name Legal Description and Location Underlying Zone Number Number Erepeti Road, Ruakituri. R1 8 Erepeti Road, Reserve. Conservation & Reserves. Sec 7 Blk XI Tuaha SD. Ruakituri Road, Te Reinga. R2 12 Local Purpose Reserve. Conservation & Reserves. Lots 20 & 21 DP 8660. Tiniroto Road. R3 17 Reserve. Conservation & Reserves. Lot 4 DP 6071. Wairoa. R4 47 Esplanade Reserve. Conservation & Reserves. Lot 5 DP 17077. Nuhaka-Opoutama Road, Nuhaka. R5 24/56 Cemetery. Conservation & Reserves. Pt Lot 1 DP 2000 Blk IX Nuhaka SD. Nuhaka-Opoutama Road, Nuhaka. R6 24 Esplanade Reserve. Conservation & Reserves. Lot 2 DP 17392 Blk X Nuhaka SD. Nuhaka. R7 55 Nuhaka Domain. Conservation & Reserves. Sec 16S Omana Sett. Mahia. R8 28/29 Esplanade Reserve. Conservation & Reserves. Lot 7 DP 23976. Village Road, Piripaua. R9 31 Reserve. Conservation & Reserves. Lots 11 & 12 DP 7768. Onepoto Road, Onepoto. R10 32 Reserve. Conservation & Reserves. Secs 26 & 27 Blk III Waiau SD. Spur Road, Tuai. R11 33 Recreation Reserve. Conservation & Reserves. Lot 47 & 49 DP 7990. Tuai Main Road, Tuai. R12 33 Esplanade Reserve. Conservation & Reserves. Lots 100-103 DP 7990. Reserve Map Reference Name Legal Description and Location Underlying Zone Number Number Waikaretaheke Street, Tuai. R13 33 Esplanade Reserve. Conservation & Reserves. Lot 91 DP 7991. Ruakituri Road, Te Reinga. R14 35 Esplanade Reserve. Conservation & Reserves. Lot 5 DP 8075. Mangapoike Road, Frasertown. R15 37 Cemetery Reserve. Conservation & Reserves. Paeroa 2F3B. Russell Parade North, Frasertown. R16 38 Frasertown Cemetery. Conservation & Reserves. Sec 151 Tn of Frasertown. Stout Street, Frasertown. R17 38 Frasertown Recreation Reserve.
    [Show full text]
  • Canterra-Spec.Pdf
    The product information below is from the NBS Plus library of product clauses offered in NBS specification products. It has been created by NBS for Acheson & Glover Ltd. The clause is authored in NBS format and is intended for inclusion in project specifications. The clause can be copied and pasted into your project specification document. Please note that NBS product guidance is not a replacement for the manufacturer's literature and it is recommended that Acheson & Glover Ltd be consulted before specifying SPECIFICATION FOR SLAB/BRICK/SETT/COBBLE PAVINGS SECTION Q25/ Q24 INTERLOCKING BRICK/ BLOCK ROADS/ PAVINGS To be read with Preliminaries/General conditions. GENERALLY 120 UN-BOUND SUB BASE DETAIL (To be considered in event of services etc. requiring access) Granular sub-base: Highways Agency Specification for Highway Works Type 1. - Thickness: 120mm to 150mm. Base/ bedding: 3mm bedding grit or to engineers detail - Thickness: 50mm. Paving units: As detailed below 120 BOUND SUB BASE DETAIL (Pedestrian, Vehicular traffic and Services allowed for) CBM sub-base: Highways Agency Specification for Highway Works. - Thickness: 120mm to 150mm reinforced concrete slab Base/ bedding: BS 7533 recommended pure hydraulic bedding mortar which must include up to 70% crushed igneous rock, free of polymer & resin. Flexural strength 7N/mm2 - Thickness: 40mm. (can be 30mm to 70mm depending on engineer detail) Refer to Alan Smyth Consultancy 00353 86 1730156 Design Standard: BS 7533-1:2001 (Heavy Traffic) or BS 7533-2:2001 (Light Traffic) Laying Standard: BS 7533-3:2005 390 UNBOUND PAVING JOINTING MATERIAL Standard: To BS 7533-4, Kiln dried jointing material brushed to joints of paving.
    [Show full text]
  • 05/00723/Ful New Vehicular and Pedestrian Entrance
    05/00723/FUL NEW VEHICULAR AND PEDESTRIAN ENTRANCE FROM SHERWOOD DRIVE TO SERVE BLETCHLEY PARK INCLUDING DETAILS OF SITING, LAYOUT AND ASSOCIATED LANDSCAPE WORKS 05/00584/TPO TREE PRESERVATION ORDER CONSENT TO FELL AND REMOVE ONE POPULUS ALBA TREE, ONE CEDRUS ATLANTICA GLAUCA, TWELVE ACER PSEUDOPLANTANUS TREES, ONE POPULUS NIGRA TREE AND SIX FRAXINUS EXCELSIOR TREES AT Bletchley Park, Wilton Avenue, Bletchley FOR English Partnerships INTRODUCTION The current access to Bletchley Park is from Wilton Avenue, a residential street, but the plans to develop the site for a museum and heritage centre, together with employment and residential uses, requires a new vehicular access from Sherwood Drive. A separate application for the upgrading of internal roads was received on 26 May 2005, ref 05/00840/FUL. CURRENT APPLICATIONS Application 05/00723/FUL proposes a new vehicular and pedestrian entrance from Sherwood Drive. Application 05/00/584/TPO seeks Tree Preservation Order consent to fell 21 trees within the site, in order for the access road to be laid out. The proposed new access would be a 35 metre stretch of road, with a footway on one side, and a verge on the other. Sherwood Drive would need to be widened to accommodate traffic islands in the centre of the road, and this will require relocation of the footpath on the railway side of Sherwood Drive. The position of the new access road is influenced by two main factors: (i) the requirement for a single access to serve both the Bletchley Park Museum and development land to the south; (ii) the presence of a badger sett.
    [Show full text]
  • FHA604S01 Dover Court
    FHA604S01 Dover Court NBS Landscape Specification - Issue C5 07 August 2017 This document includes: Code Section Revision Dated B91 Buildings in the landscape C3 20 Apr 2017 F10 Brick/ block walling C5 7 Aug 2017 L37 External stair, ramps, handrail and balustrades 0 10 Sep 2015 systems Q10 Kerbs/ edgings/ channels/ paving accessories C3 20 Apr 2017 Q22 Asphalt roads/ pavings 1 7 Sep 2015 Q23 Gravel/ Hoggin/ Woodchip/ Resin bound roads/ 2 20 Apr 2017 paving/ overlays Q25 Slab/brick/sett/cobble pavings C5 27 Jul 2017 Q26 Special surfacings/ pavings for sport/ general 1 20 Apr 2017 amenity Q28 Topsoil and soil ameliorants 1 10 Sep 2015 Q30 Seeding/turfing 1 7 Sep 2015 Q31 External planting C3 20 Apr 2017 Q35 Landscape maintenance C5 7 Aug 2017 Q37 Green roofs 0 10 Sep 2015 Q40 Fencing C5 7 Aug 2017 Q50 Site/street furniture/equipment C5 7 Aug 2017 Q52 Play and sports equipment C3 20 Apr 2017 Q55 External decks, boardwalks and bridges 0 10 Sep 2015 R13 Land drainage 0 10 Sep 2015 V91 Electrical systems - landscape C5 27 Jul 2017 Z10 Purpose made joinery 0 10 Sep 2015 Z11 Purpose made metalwork 0 10 Sep 2015 Z12 Preservative/ fire retardant treatment 0 10 Sep 2015 Z20 Fixings and adhesives 0 10 Sep 2015 Z21 Mortars 0 10 Sep 2015 Z31 Powder coatings 0 10 Sep 2015 Table of Contents Title Page B91 Buildings in the landscape 4 F10 Brick/ block walling 7 L37 External stair, ramps, handrail and balustrades systems 11 Q10 Kerbs/ edgings/ channels/ paving accessories 14 Q22 Asphalt roads/ pavings 20 Q23 Gravel/ Hoggin/ Woodchip/ Resin bound roads/
    [Show full text]
  • Street Name Addressing Guide Tallahassee
    TALLAHASSEE - LEON COUNTY STREET NAME ADDRESSING GUIDE Monday, June 14, 2021 ** Denotes Duplicate / Soundalike Street Name 6/14/2021Street Name Address Guide (SNAG) Page 1 of 245 ** Denotes Duplicate / Soundalike Street Name 6/14/2021Street Name Address Guide (SNAG) Page 2 of 245 STREET NAME SEGMENT LOW HIGH PAGE LOCATIO MAINT SUBDIVISION YEAR COMMENTS 10TH AVE M L KING - RICH ST 427 726 2125 CITY PUBLIC HIGHLAND HILLS 1ST AVE E BRONOUGH ST - MONROE ST 100 112 2125 CITY PUBLIC LONG GROVE 1ST AVE W BRONOUGH ST - DUVAL ST 206 227 2125 CITY PUBLIC LONG GROVE W 2ND AVE BRONOUGH ST - DUVAL ST 205 228 2125 CITY PUBLIC LONG GROVE 3RD AVE E DUVAL ST - THOMASVILLE R 104 221 2125 CITY PUBLIC LONG GROVE 3RD AVE W DUVAL ST - THOMASVILLE R 102 210 2125 CITY PUBLIC LONG GROVE E 4TH AVE WEST OFF ADAMS STREET T 704 742 2126 CITY PUBLIC LONG GROVE EAST BREAKS ON ADAMS S W 4TH AVE MONROE ST- ADAMS ST 102 677 2125 CITY PUBLIC CAPITAL HEIGHTS W 5TH AVE OLD BAINBRIDGE - MAGNOLI 102 686 2125 CITY PUBLIC NA E/ W RD BREAKS AT ADAM E 6TH AVE MITCHELL ST - TERRACE ST 404 1335 1130 CITY PUBLIC NA W 6TH AVE DEAD END - MAGNOLIA DR 110 689 2125 CITY PUBLIC NA W 6TH AVE TERRACE ST - THOMASVILLE 718 761 2126 CITY PUBLIC NA E 7TH AVE M.L. KING BLVD - MONROE S 413 1319 1130 CITY PUBLIC FOREST HILL W 7TH AVE OLD BAINBRIDGE - MAGNOLI 106 772 2125 CITY PUBLIC BETTON HILL E 8TH AVE GADSDEN ST - TERRACE ST 416 604 1130 CITY PUBLIC HIGHWAY PARK W 8TH AVE GIBBS DR - MONROE ST 104 651 2125 CITY PUBLIC HIGHWAY PARK E 9TH AVE BRANCH ST - DEAD END 401 749 1130 CITY PUBLIC HIGHWAY
    [Show full text]
  • Appendix 4 Schedule of Proposed Esplanade Reserves and Strips
    Appendix 4 Schedule of Proposed Esplanade Reserves and Strips Note: The true left or right bank refers to the respective bank of the stream or river when facing downstream. 1. An esplanade strip of 10m in width or 20m in width where topography dictates a wider strip is necessary to provide public access shall be set aside along the rivers and streams identified in the District Plan namely: (i) the true right bank of the Waiau River downstream from Waiau Road to Steele Road; (ii) Wairoa Stream above the confluence with the Waitengaue Stream, Woodlands Road; (iii) the true right bank of the Tuapiro Stream from the western end of Woodlands Road to the Tauranga Harbour and the true left bank upstream of MacMillan Road for a distance of approximately 350m; (iv) both banks of the Uretara Stream downstream of Wharawhara Road to the closed railway line, the true left bank upstream of the State Highway to the proposed Katikati bypass and the true left bank upstream of Wharawhara Road to the Wharawhara Water Treatment Plant; (v) the true right bank of the Te Rereatukahia Stream upstream of the Sapphire Springs Holiday Park to the Kaimai Mamaku Conservation Park and the true left bank downstream of State Highway 2 to the Tauranga Harbour; (vi) the true right bank of Aongatete Stream downstream of Hume Lane to the unformed roadline off Wrights Road north of Pine Ridge Lane; (vii) the true left bank of the Aongatete Stream downstream of Hume Lane to the confluence of the Kauritatahi Stream then up the true left bank of the Kauritatahi Stream to the
    [Show full text]
  • PAVING REVOLUTION Innovative Natural Stone Solution Get in Touch 01
    The PietraPave range is exclusively distributed throughout the UK by Bannister Hall, a dedicated and fully integrated supplier of nursery stock and landscaping materials. For additional information on how we can support your project, please call or email our sales team on: 01772 877087 [email protected] [email protected] Bannister Hall Landscape Supplies, Potter Lane, Higher Walton, Preston, Lancashire PR5 4EN Opening times: Mon – Fri 7am – 5.30pm www.pietrapave.co.uk PAVING REVOLUTION Innovative natural stone solution Get in touch 01 PietraPave is a revolutionary paving solution that opens boundless opportunities when embarking on a new paving project. We harness the beauty and durability of natural stone and present a simple process that empowers endless creativity. The whole concept enables a new state of mind, a completely fresh approach to pavement design. Contents 01 Introduction 02 Overview 04 The benefits of PietraPave 06 Permeable Paving 08 Linear Designs 12 Fan Designs 14 Circular Designs 16 Bespoke Design 18 Field Place Manor 20 St. Andrews Church 22 The Flower Bowl 24 Studio City 25 Residential 26 Paving Made Easy 28 Specification 29 PietraPoint 02 03 OVERVIEW “ PietraPave brings four distinctive benefits to many categories of Bespoke design pavement. It has a large palette of vibrant bespoke design opportunities, For more ambitious design projects, our bespoke CAD service allows you to its prefabricated nature leads to rapid low-cost installation and being take paving design to the limits of your natural stone it can accommodate a vast range of use and abuse. It is imagination. The PietraPave system accompanied with full pavement section design guidance that boasts can translate even the most intricate a permeable option for a small element natural stone surface.
    [Show full text]
  • DS.601 Structural Design of Pavement Upper Layers
    DS.601 Structural design of pavement upper layers Rev. Status Created by Date Approved by Date A Final D.Farnham/J.Howe 23.03.12 D.Waters 27.03.12 B Final D.Farnham 04.04.12 D.Waters 10.04.12 C Final D.Farnham 01.11.12 M.Hill 07.11.12 D Final D.Farnham 07.02.13 D.Waters 08.02.13 E Final D.Farnham 03.05.13 D.Waters 08.05.13 F Final D.Farnham 06.11.13 D.Waters 14.11.13 G Final D.Farnham 08.01.14 M.Hill 31.01.14 H Final G Lake 11.02.21 D Foden 01.07.19 Southwark Streetscape Design Manual SSDM/DSR Standard DS.601 1 Table of Contents 5.1.1 Conventional pavements............................ 17 5.1.2 Pervious pavements.................................. 18 1 Introduction....................................... 3 5.2 Design requirements............................ 19 1.1 Notes.................................................... 3 5.2.1 Conventional pavements........................... 19 5.2.2 Pervious pavements.................................. 21 2 General requirements for pavements of all types..................... 3 6 Precast concrete block, clay paver 2.1 Pavement Design Statements............. 3 or natural stone sett surfaced 2.2 Surface landscaping of modular unit pavements (bound surface).............. 23 pavements............................................ 3 6.1 Use requirements................................. 22 2.3 Commuted sums.................................. 4 6.2 Design requirements ............................ 24 2.3.1 Method of design ……............................... 4 2.3.2 Responsibility for maintaining pavements 7 Natural stone sett surfaced within serviceability limits………………… 4 pavements (unbound surface).......... 26 2.3.3 Increased maintenance liabilities………..... 4 7.1 Use requirements................................. 26 2.3.4 Sustainable urban drainage ………………….
    [Show full text]
  • P Ro Tected S P Ecies P Lan / R E P O Rt Fo R R O Th E R V a Lle Y R a Ilw a Y L Td
    Rother Valley Railway / Protected Species Plan / Report for Rother Valley Railway Ltd Request for for Request boat bat Railway Valley Rother / Rother Valley Railway (Track Reinstatement Protected Species between Austen’s Bridge and Junction Road) Protected Species Plan Report for Rother Valley Railway Ltd Plan Plan / Report Report for Rother Rother Valley Railway Ltd Version Author Checked by Approved by Date Type Rosanna Marston Sasha Dodsworth Wendy McFarlane MA 1.0 25..05.2018 Final ACIEEM BSc MSc BSc MSc MCIEEM MSc MCIEEM Charlie Dwight Rosanna Marston 2.0 BSc CEcol, Giles Coe 20.12.2018 Final ACIEEM BSc MSc MCIEEM Rosanna Marston Rosanna Marston 3.0 19.02.2019 Final ACIEEM BSc MSc ACIEEM BSc MSc The Ecology Consultancy, 3 Upper Stalls, Iford, Lewes, East Sussex, BN7 3EJ. T. 01273 813739 E. [email protected] W. www.ecologyconsultancy.co.uk Railway Valley Rother Contents 1 Introduction 1 2 Ecological Mitigation Strategy 3 3 Design and/or Working Methods 6 Appendix 1: Mitigation Map 17 Appendix 2: Compensation and Enhancements Plan 20 Appendix 3: Timetable of Ecological Works 22 / Protected Species Plan Plan / Report Report for Rother Rother Valley Railway Ltd LIABILITY The Ecology Consultancy has prepared this report for the sole use of the commissioning party in accordance with the agreement under which our services were performed. No warranty, express or implied, is made as to the advice in this report or any other service provided by us. This report may not be relied upon by any other party without the prior written permission of The Ecology Consultancy.
    [Show full text]