LUCKNOW WATER SUPPLY – AN INSIGHT INTOAOSO THE THIRD WATER WORKS BRIEF HISTORY OF WATER SUPPLY

• Formation of Municipal Board year 1884 • Introduction of piped water supply year 1892. • Initial capacity of the system 2 lacs population • Major reorganization prepared in the year 1956-57 – 11 zones including Cantonment. – 8 Zonal Pumping Stations constructed till 1984 – Second Water Works at Balaganj commissioned by the year 1994 for 96 mld. Capacity. Two additional ZPS added. • Master Plan of Water Supply for Lucknow City prepared in the year 1976 dividing Lucknow into 5 water supply districtsviz.“A”,“B”,“C”, “D” and “E”. Distt. "E" is under the Administrative control of Cantonment Board. •Worksunder commenced in 2008. LUCKNOW WATER SUPPLY DISTRICTS

District Geographical Boundary Major Areas Main Source of Water ‘A’ Area between river Gomti & Old City Area – , Surface supply from river Northern Railway Line from Chowk, Aminabad, Hardoi Gomti. Hardoi to . Road etc. ‘B’ Area on the left of the river Khadra, Jankipuram, Aliganj, Ground water supply Gomti upto right of Kukrail Nishatganj etc. from tube wells. Nala. ‘C’ Area on the left of the river , Indira Nagar, Surface/ground water Gomti upto left of Kukrail Chinhat etc. supply from Sharda Nala. Feeder Canal & tube wells ‘D’ Area beyond the N.R. Line , Bangla Bazar, Ground water supply along & Raibareli South City, Sarojini Nagar, from tube wells. roads. Airport etc. ‘E’ Lucknow Cantt. Cantt. Area. Water Supply Ground water supply being looked after byy Lko. from tube wells. Cantt. Board. LUCKNOW CITY WATER SUPPLY DISTRICTS

4.79 82 7.37 127 6.97 120 11.60 217 10.85 187 14.96 275 11.12 191 18.80 341 17.45 361

4.68 80 8.98 154 Index Lucknow Nagar Nigam Population 2001 17.11 295 Census – 2185927 Year Population in Lacs) & Water demand (in mld) Anticipated Population 2040 – 6422000 has been shown thus No. of Municipal Wards - 110 2010 2025 2040

4 WATER SUPPLY STATUS

Two Water Supply Projects under are ongoing. Particulars ImplementationofJNNURMImplementation of J.N.N.U.R.M. Before After Present Status Availabilityy() of water(MLD) 458 719 619 (requirement: 500/748/1124)

Storage(ML) 157.15 195.85 179.65 Distribution System(Km.) 2250 2951.50 2884.00 Water Works based on surface 2/270 3/450 3/350 source(No./MLD)

Rate of W/S(LPCD) 114 150 150 FUTURE STRATEGY

Strategy is to shift water supply of entire ccyity from ggoudround to surface sour ce. With this strategy, Water Supply District ‘B’ and ‘D’ which are presently dependent on tube wells, are being planned for IV and V Water Works based on surface source. THIRD WATER WORKS CONSTRUCTED UNDER BRIEF SUMMARY

™ Benefited Area - Gomti Nagar & Indira Nagar (Wat er S upply l Di st ri ct 'C') ™ Propppposed population to be benefited/water requirement (mld) Year 2010- 4.79 Lacs/83 Year 2025-7.37 Lacs/127 Year 2040 - 10.85 Lacs/187 ™ Source of water - Sharda Sahayak Feeder Canal INDEX PLAN OF THIRD WATER WORKS

PROPOSED WORKS OF WATER SUPPLY IN CITY SERVICE DISTRICT -C

INTAKE WELL AT SHARDA SAHAYAK CANAL

KUKRAIL PICNIC SPOT L A

TAKROHI N ST AREA A

ESERVE FORE C R

K

A Y

K UKRAIL NALA A H

1300PSC/10.50 KM. A S

A D

FARIDI NAGAR R

A H

450DI/3130M S

1 AREA PROPOSED UNDER

2

-

9 6

1 1

R -

- III WATER WORKS

O O

R R R R

T

O O

C

T T

E

C C

S

E E S S 400DI/310M -28 INDIRA NAGAR H D N ABA AIZ 350DI/1500M F KUKRAIL NALA TOR-14 TO 450DI/570M SEC SEC.-20 S ECTOR-12 450DI/540M DISTRICT - C

B BLOC. OC. SECTOR-9 300DI/720M C BL 900DI/2060M 900DI/850M 600DI/560M Y NAGAR SERVODA B BLOC. 600DI/670M LIBERTY COLONY W/S CHINHAT A BLOC. D BLOC. D INDEX :- POLYTECHNIC 400DI/640M GOVT. 1000DI/1120M A VIKRANT KHAND STU KHAND B 1. NAGAR NIGAM BOUNDRY KHAND VA A TO SANJAY GANDHI VIBHUTI 2. W /S D ISTR ICT BOUNDRY V IK ALP KHAND CHINHAT IZ PURAM 350DI/360M A HAL INHAT BAZAR 3.W/W ZONE BOUNDRY 500DI/3285M ANT KHAND CH F VIJAY W/S SCHEME TO 4. EXISTING WATER WORKS AND 400DI L 5. EXISTING FEEDER MAIN VISHESH KH /231 E

M IN T AKE E 6. EX IS TING RA W W AT ER RISING MA IN

V ISHWAS K HAND H

J

600DI/250M 7 . PROP OS ED RAW W ATER RAISING MAIN VIVEK KHAND INARAMA KHAND A D V T N VIBHAW KHAN ELDICO GREE U 8. PROPOS ED W ORK IN W /W

700DI/600M A INEET KHAND 6 V H VIKALP KHAND 9.PROPOSED FEEDER MAIN III W/W T

P.S. GOM TI NAGAR A B UTTLER PALACE Z. 700 5M 10. PROPOSED WATER SUPPLY SCHEME DI/768 700DI/19 K AVE V IJAY K HAND VINAY K HAND KHAND M 300DI/941M NEHRU ENCL VIRAT 11. WORK UNDER EXCUTION

12. PROPOSED TUBE WELL L 4 A 50DI/487M 400DI/381M 13. ABONDONED LINE N D A /2841M VIRAJ KHAN 14. EXISTING O.H.T. 00DI C 5 700DI/2515M 15. PROPOSED O.H.T. VINEET KHAND 3 K A HAND VIRAM KHA ND Y VISHAL K A 1TO4 H A S VIKAS KHAND PEYJAL-II A U.P. JAL NIGAM, NIRALA NAGAR LUCKNOW D VIRAM KHAND 5 R A H VIPUL K HAND S

D/M A.P.E. P.E. P.M. G.M.

G OMTI RIVER COMPONENTS OF THIRD WATER WORKS AT A GLANCE

1. Head Works - At Sharda Sahayak Feeder Canal 2. Raw Water Rising Main - 10.50 Km. 3. Development of Chinhat Lake - 80 Acre Area 4. Water Treatment Plant - 80 MLD 5. Clear Water Feeder Main - 27.50 Km. 6. C.W.R. cum Z.P.S. - 12 Nos. 7. Clear Water Rising Main - 30.88 Km. HEAD WORKS & INTAKE AT SHARDA SAHAYAK

• Lining of Canals - 29.65 Km. • Head Works - 1 No. • Pre-Settling Units - 2 Nos.(50 Cusec cap. each) • Raw water sump cum pump house - 1N1 No. • Pumping Plant - 3 Nos.(38520 lpm/25 m head, 300 H.P. Capp). each) • Sub-Station - 1 No.

Raw Water Rising Main

• Total Length - 10.50 Km. (1300 mm dia PSCP.S.C. & &MS M.S. Pipe)

Development Work of Chinhat Lake

• Total Area - 80 Acres • Total Storage Capacity - 845 Million Ltr. DEVELOPED CHINHAT LAKE Water Treatment Plant(80 mld Capacity)

• Chin ha t La ke In ta ke Wor ks - 1N1 No. • Inlet Chamber - 1 No. • Clariflocculators - 2 Nos . (40 mld each) • Filter House - 1 No.(6 Nos. Filter Units) • Recirculation Tank - 2 Nos.

INLET CHAMBER CLARIFLOCCULATOR FILTER HOUSE RECIRCULATION TANKS • C.W.R. cum pumphouse - 1 No. (4600 Kl. Cap.) • Clear Water Pumping Plants - 9 Nos. • Chemical House - 1 No. • Administrative Block - 1 No. • Residential Quarters -24 Nos. CLEAR WATER PUMPS AT PUMPHOUSE Clear Water Feeder Main

Total Length - 27.50 Km. (300 – 1000 mm dia D.I. pppipe )

Clear Water Rising Main & Clear Water Reservoir Total Length - 30.88 Km. (200 – 500 mm dia D. I. pipe) C.W.R. cum pumping station - 12 Nos. GREEN & AESTHETIC VIEW OF WATER WORKS CAMPUS INSPECTION OF Mr. MANISH GARG,,, DIRECTOR, J.N.N.U.R.M., GoI ON 13.09.2011 VISIT BY PARTICIPANTS OF 37th ADVANCE PROFESSIONAL PROGRAMME IN PUBLIC ADMINISTRATION on 17.11.2011

FILTER HOUSE INLET CHAMBER

PLANTATION PRESENTATION AT ADMIN BLOCK INSPECTION OF Dr. SUDHIR KRISHNA, I.A.S., SECRETARY, MINISTRY OF URBAN DEVELOPMENT, GoI on 20.11.2011

PLANTATION nSfud tkxj.k] fnukad 13-07-2011 nSfud tkxj.k] fnukad 15-07-2011 jk"Vªh; lgkjk fnukad 24-07-2011 nSfud tkxj.k] fnukad 24-07-2011 nSfud tkxj.k] fnukad 08-09-2011 fgUnqLrku fnukad 22-07-2012 VISITORS REMARKS

IMPACT OF III WATER WORKS

™ RELIEF FROM WATER CRISIS • Increase in supply hours (by 4 to 5 hrs.) • Increase in pressure. • Increase in Rate of Water Supply.

™ ECO-FRIENDLY ENVIRONMENT • Preservation of Water Body . • Shifting Dependence from Ground to Surface Source. • Reducing Exploitation of Ground Water . • Aesthetically Beautifying surrounding area. • A step to maintain Eco-Balance.

™ ACADEMIC • Learning by students regarding treatment process of water. • SdiSpreading Awareness among stdtuden ts regarding importance of potable water.