proposed path for Full Title of the Project: Diversion of 0"0142 hec,of forest land M/s Shakti Food Oil (P) Ltd' On safi - road (SH-11), Between K.m 154-155 Stone L/ at Village Danoli, Tehsil , under Division & Distt' , .

File No. :

Date of Proposal :

CHECK LIST SERIAL NUMBER: 18 ..SCHEME FOR COMPENSATORY AFFORES oN"

of for forour proposed Path Name of the ForesuReach to be diverted: Dtversion of 0.0142 hec (P) On -Assnadh- for M/s Shakti Food Oil 1 Kaithal road (SF'l-11), Between 1154-155 Stone L/.Side at Village Danoli, Tehsil Assa pnder Divisron & Distt. , Haryana.

Forest Area = 0.0142 Hect. car Details of degraded forest land/non-forest land where C'A' is to be Put. Division ;- :- Karnal Tehsil:- Assandh Range:- Assandh C.A. Site name : Drain No.2, Nainpal Dera to Dadlana bridge L/Sid Area to be Afforested - 0.0500 (Yes or No):- a) whether the site selected for compensatory Afforestation bank No,thesitese|ectedforcompensatoryAfforestation a land bank. lt is a Degraded Forest Land. b) lf the CA site is other than the land bank, reasons be - There is no land Proteced available in the land bank in Karnal' Plantation will out in forest area. is the ce of CA site from the c) ln case of non-forest area identified for cA, then what Area. adjoining forest boundary :-:- C.A' will be carried out in forest i) SoiltyPe: SandY Loam. ii) Topograph y a. Hillyi Undulating/Plarn Plain b. SloPe:-SteeP/Medium/Gentle: iii)Whethertheareaisbearinganyrootstockofveg :l'& Plantation Model:' 9tr

Copy of the Compensatory Afforestation component wise physical and financial k up is as under:

1.

Detail of year break-up of requirements of funds as unde Rs. The plantation cost ts lated for Tall Plants norms at 4m x Yzm spact wage rate of 2241- per day as under:- Rate per Plant of afforestation Rs. 1721- Per Pla Rs, 64f Per Plant Rs. 321- Per Pl Rs. 251 Per Plant Rs. 264 Per Plan

6'n Yqar ma R; isl-*PeiP-tan Rs. 8f Per Plant Rs. 9l Per Plant Rs. 10/- Per Pl Rs. 111 Per Pl

Area to be Diverted :- 0,0142 ha. No. of trees to be felled NIL Plants to be damaged:- NiL, Plants to be planted (T time of the trees to be felled):N/A. pe Area to be Planted = ble area 0.0284 hect. @ 1000 plant Minimum Plants to be P nted: - 50 Plants RKM 50/250 = 0.200 M Additional C.A. in lieu plants to be damaged (Double the plant

Sr. TOTAL No. u9uNUB-il A

(1) l"tYear 50 Plants

1600 (4) 4'n Y (5) 5"'Yea Per Plant (6) 6'n Yea maintenance Rs. 1g Per Plant maintenance Rs. RI Pei Ptant peiPianf (8) 8'n Yea maintenance R. s;i \,

(9) 9'n Year rnaintenance 500 (10) 10"' Year maintenance Rs, '11f Per Plant 550 (1 1) Barbed wire fencing charge = 0.2 RKM Rs.76700/- Per RK I 5340 Total CA Charges 33940 SupervGory I overrrebo / Miscellaneous- l lbdt on the C 3394 Charges I charges | - sub f;tat lA;rotat c.A. charges Ad d itio na I Corn pensato ry Affo restation C ha rges (1 ) 1" Year cost of afforestation NiL Rs. 1721- Per Plant (2) 2no Year maintenance ns Oal- Per Ptani (3i--3'? Vea;-mtntenanc- Rs. 321 Per Plant (4) 4'n Year nnaintenance Rs. 25f Fer Plant (5) 5'n Year maintenance Rs. 26f Per Plant

(6 i--6mYea rrn a I nrte n a nCe ns'i sr P;i PTani* 0 (7) 7'n Year rnaintenance Rs. 8/- Per Plant 0 Rs. 9/- Per Ptint o Year rnaintenance Rs. 10f Per Plant 0

(1 0) 1 0' Year nnaintenance Rs. 11f Per Plant 0 Barbed wire fencing charge= 0 RKM Rs.767001 Per RKI 0

Sub Total (B)'lfotal Addl. C.A. Chargei 0 Penal C.A. Catchment Area Treatment Soil and Moir;ture Conservation ctraigbi 30% of the Total Sub Total (D)

Additional Gharges - -- o t *-oo

\.) -Present Vahre ;i Forest L;nd to be Rs. 887000/- per ha. 1t50s diverted 0.0142 Hect.

H Feilrng cnarges = u Rs.10001- per m3 0

I Plantation damage charges = 0 Nos. ns z36il pei pi;nf 0 Gnnruo rorAl (A+B+C+D+E+F+G+H+|) to be deposited 49929 CAMPA Fund At 2. Technicaldet

Technical details Compensatory Afforestation Scheme asf a) General Detail :- Compensatory Afforestation will ca (Drain No.2, Nainpal Dera to ide) b) Spacing.- 4x4mtr a Part

Species:- Neem & Shisham, Jamun/Jamoa etc d) Plantation method - Tall Plantation e) Soil and Moisture ation Works :- -Nil- 0 Protection (Fenci , Watch man, People's, participation Proposed s) Monitor Mechanism: - Checking of plantation will be RFO, DCF, CF & F (M&E) h) Any other infor Nil

Place:-Karnal Date:- 25.09.2017 8#J#r,r

Note :- CF (T) should cou rsign this C.A. scheme if area to be a n 5 hfctare