Second Science Education Sector Project

Total Page:16

File Type:pdf, Size:1020Kb

Second Science Education Sector Project Completion Report Project Number: 26326 Loan Number: 1534-PAK[SF] November 2007 PAKISTAN: Second Science Education Sector Project CURRENCY EQUIVALENTS Currency Unit – Pakistan rupee/s (PRe/PRs) At Appraisal At Project Completion (31 July 1997) (30 June 2007) PRe1.00 = $0.025 $0.017 $1.00 = PRs40.56 PRs60.00 ABBREVIATIONS ADB – Asian Development Bank BME – benefit monitoring and evaluation EA – executing agency ECNEC – Executive Committee of the National Economic Council FATA – Federally Administered Tribal Areas FCU – federal coordinating unit IPSET – Institute for the Promotion of Science Education and Training M&E – monitoring and evaluation MOE – Ministry of Education MPL – multipurpose laboratory MRR – mathematics resource room NEEC – National Education Equipment Center NISTE – National Institute for Science and Technical Education NSAC – National Scientific Advisory Committee NSC – National Steering Committee NWFP – North-West Frontier Province OECF – Overseas Economic Cooperation Fund PCC – provincial coordination committee PC-I – Planning Commission Proforma I PED – provincial education department PIU – project implementation unit RRP – report and recommendation of the President SAP – Social Action Programme SEC – science education center SHS – science high school NOTES (i) The fiscal year (FY) of the Government of Pakistan and its agencies ends on 30 June. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2007 ends on 30 June 2007. (ii) In this report, "$" refers to US dollars. (iii) “Government” refers to the Government of Pakistan. Vice President L. Jin, Operations 1 Director General J. Miranda, Central and West Asia Regional Department Director P. Fedon, Pakistan Resident Mission Team leader S. Abbas, Senior Project Implementation Officer, Pakistan Resident Mission Team member N. Islam, Associate Project Analyst, Pakistan Resident Mission CONTENTS Page BASIC DATA ii MAP vi I. PROJECT DESCRIPTION 1 II. EVALUATION OF DESIGN AND IMPLEMENTATION 1 A. Relevance of Design and Formulation 1 B. Project Outputs 3 C. Project Costs 7 D. Disbursements 8 E. Project Schedule 8 F. Implementation Arrangements 9 G. Conditions and Covenants 9 H. Consultant Recruitment and Procurement 10 I. Performance of Consultants, Contractors, and Suppliers 10 J. Performance of the Borrower and the Executing Agencies 11 K. Performance of the Asian Development Bank 11 III. EVALUATION OF PERFORMANCE 12 A. Relevance 12 B. Effectiveness in Achieving Outcome 12 C. Efficiency in Achieving Outcome and Outputs 13 D. Preliminary Assessment of Sustainability 13 E. Impact 13 IV. OVERALL ASSESSMENT AND RECOMMENDATIONS 13 A. Overall Assessment 13 B. Lessons 13 C. Recommendations 14 APPENDIXES 1. Project Framework 15 2. List of Facilities Upgraded 24 3. Staff Development Program 57 4. Project Costs 59 5. Disbursement Schedule 60 6. Project Implementation Schedule 62 7. Status of Compliance with Loan Covenants 65 8. Consulting Services 77 9. Project Rating 79 BASIC DATA A. Loan Identification 1. Country Pakistan 2. Loan Number 1534-PAK[SF] 3. Project Title Second Science Education Sector Project 4. Borrower Islamic Republic of Pakistan 5. Executing Agency (a) Ministry of Education, Federal (b) Department of Education, Balochistan (c) Department of Education, Federally Administered Tribal Areas (FATA) (d) Department of Education, North-West Frontier Province (NWFP) (e) Department of Education, Punjab 6. Amount of Loan SDR29,442,000 7. Project Completion Report PCR: PAK 1008 Number B. Loan Data 1. Appraisal – Date Started 3 April 1997 – Date Completed 28 April 1997 2. Loan Negotiations – Date Started 30 July 1997 – Date Completed 8 August 1997 3. Date of Board Approval 11 September 1997 4. Date of Loan Agreement 7 September 1998 5. Date of Loan Effectiveness – In Loan Agreement 6 December 1998 – Actual 1 March 1999 – Number of Extensions 1 6. Closing Date – In Loan Agreement 30 June 2004 – Actual 28 June 2007 – Number of Extensions 3 7. Terms of Loan – Interest Rate 1% – Maturity (years) 35 – Grace Period (years) 10 8. Disbursements a. Dates iii Initial Disbursement Final Disbursement Time Interval 6 August 1999 28 June 2007 94 months Effective Date Original Closing Date Time Interval 1 March 1999 30 June 2004 64 months b. Amount (SDR million) Last Net Original Revised Amount Amount Amount Undisbursed Category Allocation Allocation Canceled Available Disbursed Balance 01 7.64 7.84 (0.20) 7.84 7.84 0.00 02 5.68 3.96 1.72 3.96 3.96 0.00 03 5.17 3.41 1.76 3.41 3.41 0.00 04 0.49 0.27 0.22 0.27 0.27 0.00 05 5.48 0.79 4.69 0.79 0.79 0.00 06 3.87 0.94 2.94 0.94 0.94 0.00 07 1.11 0.56 0.55 0.56 0.56 0.00 Total 29.44 17.77 11.68 17.77 17.77 0.00 9. Local Costs (Financed) - Amount ($ million) 19.3 - Percent of Local Costs 61.5 - Percent of Total Cost 64.3 C. Project Data 1. Project Cost ($ million) Cost Appraisal Estimate Actual Foreign Exchange Cost 15.0 5.0 Local Currency Cost 60.0 25.0 Total 75.0 30.0 2. Financing Plan ($ million) Cost Appraisal Estimate Actual Implementation Costs Borrower Financed 15.0 5.7 ADB Financed 37.5 23.5 Other External Financing 20.0 0.0 Total 72.5 29.2 IDC Costs Borrower Financed 0.0 0.0 ADB Financed 2.5 0.8 Other External Financing 0.0 0.0 Total 75.0 30.0 ADB = Asian Development Bank, IDC = interest during construction. iv 3. Cost Breakdown by Project Component ($ million) Component Appraisal Estimate Actual Civil Works 26.0 11.4 Furniture, Equipment, and Vehicles 17.2 6.6 Staff Development 8.3 5.5 Consulting Services 1.3 0.4 Instructional Materials 11.8 1.1 Federal Areas 1.9 1.7 Project Implementation 3.5 1.4 Incremental Salary 2.5 1.1 Service Charge 2.5 0.8 Total 75.0 30.0 4. Project Schedule Item Appraisal Estimate Actual Date of Contract with Consultants 1 April 1998 1 September 2003 Completion of Engineering Designs Civil Works Contract Date of Award 1 January 1998 1 January 2000 Completion of Work 31 December 2002 30 December 2006 Equipment and Supplies Dates First Procurement 1 January 1999 15 November 2000 Last Procurement 30 June 2003 31 October 2006 Completion of Equipment Installation 31 December 2006 Start of Operations Completion of Tests and Commissioning Beginning of Start-Up Other Milestones 5. Project Performance Report Ratings Ratings Development Implementation Implementation Period Objectives Progress From 29 November 1998 to 31 December 2000 Satisfactory Satisfactory From 1 January 2001 to 28 February 2001 Satisfactory Highly Satisfactory From 1 March 2001 to 31 March 2001 Satisfactory Incomplete From 1 April 2001 to 31 December 2005 Satisfactory Satisfactory From 1 January 2005 to 30 April 2005 Satisfactory Unsatisfactory From 1 May 2005 to 31 December 2006 Satisfactory Satisfactory v D. Data on Asian Development Bank Missions No. of No. of Specialization Name of Mission Date Persons Person-Days of Membersa Appraisal 3–28 April 1997 5 67 a, b, c, d, g Inception 1–16 December 1999 2 32 c, e Review 19–29 September 2000 1 11 c Review 12 April–5 May 2001 2 8 e, f Midterm Review 29 April–20 May 2002 2 24 e, f Review 5–29 March 2003 2 18 e, f Review 17–18 March 2004 2 3 e, f Review 22 December 2005– 2 10 e, h 31 January 2006 Review 10–19 May 2006 2 12 e, h Project Completion Review 28 May–15 June 2007 2 25 e, h a a = counsel, b = economist, c = education specialist, d = project economist, e = project analyst, f = project implementation officer, g = senior personnel officer, h = senior project implementation officer. vi I. PROJECT DESCRIPTION 1. Pakistan’s social indicators are among the poorest in the world, reflecting low levels of investment in education and health. This situation deprives the country of the requisite human capital to sustain economic growth. Cognizant of the importance of education in improving basic employment skills and household welfare, the Government of Pakistan undertook initiatives to improve elementary education through the Social Action Programme (SAP). 1 It also sought to improve secondary education with a view to increasing the number of graduates capable of understanding problems related to the environment, technology, health, and population. One of these efforts was the Science Education for Secondary Schools Sector Project2 (the first project) financed by the Asian Development Bank (ADB). Following its successful completion, the Government requested ADB financing for a second project. 2. The rationale for the Second Science Education Sector Project (the Project) was to build on the achievements of its predecessor, which introduced a new science curriculum and textbooks, as well as teacher training in science, in about 20% of secondary schools with science programs. The Project was to introduce the science curriculum in all secondary schools with science programs, and extend the coverage of existing public secondary schools eligible for science facilities in the three participating provinces of Balochistan, North-West Frontier Province (NWFP), and Punjab, and in the Federally Administered Tribal Areas (FATA). 3. The Project’s objective was to increase the number of grade 10 graduates who have received better science training through the implementation of an improved and sustainable system of science and teaching for grades 6–10, especially for girls. This required linking the curriculum and textbook content with teaching practice and testing through a network of federal and provincial institutions and staff. The Project also intended to further refine policies in secondary education to emphasize general access to the new curriculum for girls, encourage quality improvements over expansion, promote public–private school partnerships via facility sharing, give recognition to master trainers, and strengthen monitoring and coordination.
Recommended publications
  • Annual Development Programme
    ANNUAL DEVELOPMENT PROGRAMME 16 - PROGRAMME 2015 PROGRAMME DEVELOPMENT ANNUAL GOVERNMENT OF KHYBER PAKHTUNKHWA PLANNING & DEVELOPMENT DEPARTMENT JUNE, 2015 www.khyberpakhtunkhwa.gov.pk FINAL ANNUAL DEVELOPMENT PROGRAMME 2015-16 GOVERNMENT OF KHYBER PAKHTUNKHWA PLANNING & DEVELOPMENT DEPARTMENT http://www.khyberpakhtunkhwa.gov.pk Annual Development Programme 2015-16 Table of Contents S.No. Sector/Sub Sector Page No. 1 Abstract-I i 2 Abstract-II ii 3 Abstract-III iii 4 Abstract-IV iv-vi 5 Abstract-V vii 6 Abstract-VI viii 7 Abstract-VII ix 8 Abstract-VIII x-xii 9 Agriculture 1-21 10 Auqaf, Hajj 22-25 11 Board of Revenue 26-27 12 Building 28-34 13 Districts ADP 35-35 14 DWSS 36-50 15 E&SE 51-60 16 Energy & Power 61-67 17 Environment 68-69 18 Excise, Taxation & NC 70-71 19 Finance 72-74 20 Food 75-76 21 Forestry 77-86 22 Health 87-106 23 Higher Education 107-118 24 Home 119-128 25 Housing 129-130 26 Industries 131-141 27 Information 142-143 28 Labour 144-145 29 Law & Justice 146-151 30 Local Government 152-159 31 Mines & Minerals 160-162 32 Multi Sectoral Dev. 163-171 33 Population Welfare 172-173 34 Relief and Rehab. 174-177 35 Roads 178-232 36 Social Welfare 233-238 37 Special Initiatives 239-240 38 Sports, Tourism 241-252 39 ST&IT 253-258 40 Transport 259-260 41 Water 261-289 Abstract-I Annual Development Programme 2015-16 Programme-wise summary (Million Rs.) S.# Programme # of Projects Cost Allocation %age 1 ADP 1553 589965 142000 81.2 Counterpart* 54 19097 1953 1.4 Ongoing 873 398162 74361 52.4 New 623 142431 35412 24.9 Devolved ADP 3 30274 30274 21.3 2 Foreign Aid* * 148170 32884 18.8 Grand total 1553 738135 174884 100.0 Sector-wise Throwforward (Million Rs.) S.# Sector Local Cost Exp.
    [Show full text]
  • Politics of Nawwab Gurmani
    Politics of Accession in the Undivided India: A Case Study of Nawwab Mushtaq Gurmani’s Role in the Accession of the Bahawalpur State to Pakistan Pir Bukhsh Soomro ∗ Before analyzing the role of Mushtaq Ahmad Gurmani in the affairs of Bahawalpur, it will be appropriate to briefly outline the origins of the state, one of the oldest in the region. After the death of Al-Mustansar Bi’llah, the caliph of Egypt, his descendants for four generations from Sultan Yasin to Shah Muzammil remained in Egypt. But Shah Muzammil’s son Sultan Ahmad II left the country between l366-70 in the reign of Abu al- Fath Mumtadid Bi’llah Abu Bakr, the sixth ‘Abbasid caliph of Egypt, 1 and came to Sind. 2 He was succeeded by his son, Abu Nasir, followed by Abu Qahir 3 and Amir Muhammad Channi. Channi was a very competent person. When Prince Murad Bakhsh, son of the Mughal emperor Akbar, came to Multan, 4 he appreciated his services, and awarded him the mansab of “Panj Hazari”5 and bestowed on him a large jagir . Channi was survived by his two sons, Muhammad Mahdi and Da’ud Khan. Mahdi died ∗ Lecturer in History, Government Post-Graduate College for Boys, Dera Ghazi Khan. 1 Punjab States Gazetteers , Vol. XXXVI, A. Bahawalpur State 1904 (Lahore: Civil Military Gazette, 1908), p.48. 2 Ibid . 3 Ibid . 4 Ibid ., p.49. 5 Ibid . 102 Pakistan Journal of History & Culture, Vol.XXV/2 (2004) after a short reign, and confusion and conflict followed. The two claimants to the jagir were Kalhora, son of Muhammad Mahdi Khan and Amir Da’ud Khan I.
    [Show full text]
  • National Assembly Polling Scheme
    ELECTION COMMISSION OF PAKISTAN FORM-28 [see rule 50] LIST OF POLLING STATIONS FOR A CONSTITUENCY OF Election to the National Assembly of the NA-66 JHELUM-I Number of voters assigned to In Case of Rural Areas In Case of Urban Areas Number of polling booths polling station S. No. of voters on the Sr. No. No. and Name of Polling Station electoral roll in case electoral Name of Census Block Name of Census Block area is bifurcated Male Female Total Male Female Total Electoral Areas Code Electoral Areas Code 1 2 3 4 5 6 7 8 9 10 11 12 13 Govt Cap. Hasnat Ali Khan High School Moh Eid Gah 1 - - 125050101 1716 0 1716 4 0 4 Sohawa (M) (P) Sohawa 1 Total - - - 1716 0 1716 4 0 4 Govt Cap. Hasnat Ali Khan Shaheed High Moh Eid Gah 2 - - 125050101 0 1593 1593 0 4 4 School Sohawa (F) (P) Sohawa 2 Total - - - 0 1593 1593 0 4 4 Hydri Mohallah Govt Cap. Hasnat Ali Khan High School 3 - - High School 125050103 696 676 1372 2 2 4 Sohawa (C) (P) Sohawa 3 Total - - - 696 676 1372 2 2 4 Mohra Pari - - 125050102 407 0 407 Sohawa Moh Madni - - 125050104 679 0 679 Sohawa Govt. Cap. Hasnat Ali Khan Shaheed High Khurakha 4 4 0 4 School Sohawa (M) (P) - - Khengran 125050105 472 0 472 Sohawa Khurakha - - Khengran 125050106 226 0 226 Sohawa 4 Total - - - 1784 0 1784 4 0 4 Mohra Pari - - 125050102 0 413 413 Sohawa Moh Madni - - 125050104 0 680 680 Sohawa Govt.
    [Show full text]
  • Public Notice Auction of Gold Ornament & Valuables
    PUBLIC NOTICE AUCTION OF GOLD ORNAMENT & VALUABLES Finance facilities were extended by JS Bank Limited to its customers mentioned below against the security of deposit and pledge of Gold ornaments/valuables. The customers have neglected and failed to repay the finances extended to them by JS Bank Limited along with the mark-up thereon. The current outstanding liability of such customers is mentioned below. Notice is hereby given to the under mentioned customers that if payment of the entire outstanding amount of finance along with mark-up is not made by them to JS Bank Limited within 15 days of the publication of this notice, JS Bank Limited shall auction the Gold ornaments/valuables after issuing public notice regarding the date and time of the public auction and the proceeds realized from such auction shall be applied towards the outstanding amount due and payable by the customers to JS Bank Limited. No further public notice shall be issued to call upon the customers to make payment of the outstanding amounts due and payable to JS Bank as mentioned hereunder: Customer ID Customer Name Address Amount as of 8th April 1038553 ZAHID HUSSAIN MUHALLA MASANDPURSHI KARPUR SHIKARPUR 343283.35 1012051 ZEESHAN ALI HYDERI MUHALLA SHIKA RPUR SHIKARPUR PK SHIKARPUR 409988.71 1008854 NANIK RAM VILLAGE JARWAR PSOT OFFICE JARWAR GHOTKI 65110 PAK SITAN GHOTKI 608446.89 999474 DARYA KHAN THENDA PO HABIB KOT TALUKA LAKHI DISTRICT SHIKARPU R 781000 SHIKARPUR PAKISTAN SHIKARPUR 361156.69 352105 ABDUL JABBAR FAZALEELAHI ESTATE S HOP NO C12 BLOCK 3 SAADI TOWN
    [Show full text]
  • Verb Agreement and Case Marking in Burushaski
    Work Papers of the Summer Institute of Linguistics, University of North Dakota Session Volume 40 Article 5 1996 Verb agreement and case marking in Burushaski Stephen R. Willson SIL-UND Follow this and additional works at: https://commons.und.edu/sil-work-papers Part of the Linguistics Commons Recommended Citation Willson, Stephen R. (1996) "Verb agreement and case marking in Burushaski," Work Papers of the Summer Institute of Linguistics, University of North Dakota Session: Vol. 40 , Article 5. DOI: 10.31356/silwp.vol40.05 Available at: https://commons.und.edu/sil-work-papers/vol40/iss1/5 This Thesis is brought to you for free and open access by UND Scholarly Commons. It has been accepted for inclusion in Work Papers of the Summer Institute of Linguistics, University of North Dakota Session by an authorized editor of UND Scholarly Commons. For more information, please contact [email protected]. Verb Agreement and Case Marking in Burushaski Stephen R. Willson 1 Burushaski verb agreement and case marking phenomena are complex and have not been described adequately by any current theory ofsyntax. In particular, no explanation has yet been given as to why a variety of nominals can trigger agreement in the verbal prefix. In some cases the apparent subject triggers this agreement, in others the direct object appears to do so, in others the indirect object, in others the possessor of the direct object, in others a benefactive or source nominal. Also, the constraints on the usage of ergative, absolutive and oblique case, and other indicators ofgrammatical relations on nominals, have been insufficiently characterized in the literature on Burushaski.
    [Show full text]
  • Flood Plain & Flood Risk Maps Jhelum River
    Damu Chak Ditta RDanaimanu Chak Dita Ghasitpur Pindi Gujran Kalas Dhaliala Rashidpur a Namajpur l a N r a t e k u Bhag S Nazar Khal al an C Khanpur um el Jh er Pind Ratwal pp Kalar U Tutian Kalar Khokhar Rahian Kharala Dhal Kolpur Tahlianwala Kakrot Bilal Town Nathia Aurangabad Kation Rajar Sarai Chhapar Alamgir Jhelum City Rajar h a ll a N s Mahe a d K Kalan n la Chak Jani u a B iw a n M Mahe o i t Khurd Thun c e Chak t o r Natha P y t i C m u l e h J Khanpur Khambi s Ka Jalilpur la wa Basti Idgah Sar Katia Faqir Bagga Jhlum River Kastla J a b b Bharot a K a s Chak Beli G Shakirpur u i Parwan d e B u Chak Nazar n Chak Chak d NazarNazar s Ka rot Narwal ha Pahirwal B Malo Naugran Bhawanjwala Kas Narial U p Khadriala p e r JHELUM, GUJRAT AND MANDI BAHAUDDIN DISTRICTS J h e Sheet 2 of 6 Kharka l PUNJAB PUNJAB. u m la Kas a C urhaw G a 3265000 975000 9700003270000 Sikandar n 965000 3275000 960000 3280000 955000 3285000 950000 a Chak l Pariala Gurha Jag Dev ± 9 Bhalwal 0 Gurha Salim 0 0 0 0 0 0 5 6 8 2 2 3 m 3 5.78 r = 22 , 50 y 2.6 m = 22 r 5 yr el fo r Lev e ater v Sanghoi 0 , W i JM-1 R m Dhok lu h Malah Sangh J Jahangirpura oi Kas Khohar Khahar s Ka la wa ar oh Kh Dhori Tur Sahiwal 2 m s 4.9 la Ka 22 toiwa yr = ang 50 K m, Fatehpur Gharbi 65 21.
    [Show full text]
  • Institution Wise Pass Percentage SSC 9Th Annual Examination 2017
    BOARD OF INTERMEDIATE & SECONDARY EDUCATION, MULTAN A-7 1 INSTITUTION WISE PASS PERCENTAGE AND GRADING 9TH EXAM 2017 Appeared Passed Pass% Appeared Passed Pass% 101001 Govt. Girls English Medium Model 101026 Govt. Girls High School 80/10-R High School, Khanewal Pirowal, Khanewal 787 514 65.31 103 63 61.17 101002 Govt. M.C .E/M Girls High School, 101028 GOVT. GIRLS HIGH SCHOOL BAGAR Khanewal SARGANA, Kabirwala 181 131 72.38 30 27 90.00 101003 Govt. Girls High School, 101029 Govt. Girls High School Nanakpur Kabirwala ,Khanewal 473 207 43.76 44 23 52.27 101004 Govt. Girls Model High School, 101030 Govt. Girls Hassan Model High Mian Channu School, Khanewal. 578 411 71.11 280 179 63.93 101005 Govt. Girls E/M High School, 101031 Govt. Girls High School 92/10.R, Jahanian Khanewal 425 229 53.88 34 25 73.53 101008 Govt. Methodist Girls High School 101032 Govt. Girls High School, 28/10-R 135/16-L, Khanewal ,Khanewal 118 42 35.59 36 33 91.67 101010 Govt. Girls High School 136/10-R, 101033 Govt. Girls High School 23/10-R, Khanewal Khanewal 106 64 60.38 70 40 57.14 101011 Govt. Girls E/M High School, 101034 Govt. Girls High School, 72/10-R 138/10-R, Jahanian ,Khanewal 119 104 87.39 45 13 28.89 101012 Govt. Girls High School, 12/A.H. 101035 Govt. Girls High School, 116/15-L ,Khanewal Mainchannu ,Khanewal 111 77 69.37 33 22 66.67 101013 Govt. Girls High School Sarai 101036 Govt.
    [Show full text]
  • World Bank Document
    Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No. 4380-PAK STAFF APPRAISAL REPORT Public Disclosure Authorized PAKISTAN FOURTH DRAINAGE PROJECT Public Disclosure Authorized April 27, 1983 Public Disclosure Authorized South Asia Projects Department Irrigation I Division This document has a restricted distribution and may be used by recipients only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. CURRENCY EQUIVALENTS US$1 = Rs 13.0 Rs 1 = US$0.08 WEIGHTS AND MEASURES English/US Units Metric Units 1 foot (ft) = 30.5 centimeters (cm) 1 yard (yd) = 0.915 meters (m) 1 mile (mi) = 1.609 kilometers (km) 1 acre (ac) = 0.405 hectare (ha) I square mile (sq mi) = 259 ha 1 pound (lb) = 0.454 kilograms (kg) i long ton (lg ton) = 1,016 kg (1.016 kg) (1.016 metric tons) Pakistani Units English Units Metric Units 1 maund = 82.3 lbs (0.0367 lg ton) = 37.32 kg (0.0373 m tons) 26.8 maunds = 2,205 lbs = 1.0 m tons 27.2 maunds = 1.0 lg ton (2240 lbs) = 1,016 kg ABBREVIATIONS AND ACRONYMS USED ac - Acre ADP - Annual Development Program AO - Agricultural Officer cca - Canal Commanded Area cusecs - cubic feet per second EC - Electric Conductivity (of water or other solutions) ECNEC - Executive Committee of the National Economic Council FA - Field Assistant FGW - Fresh Groundwater ga - Gross Area GOP - Government of Pakistan GOPunjab - Government of Punjab Province ICB - International Competitive Bidding LCB - Local Competitive Bidding m - Meter M -
    [Show full text]
  • Branches of Ubl to Collect Board's Dues
    BOARD OF INTERMEDIATE & SECONDARY EDUCATION FAISALABAD BRANCHES OF UBL TO COLLECT BOARD’S DUES (ACCOUNT # 010901016256) MUKAMMAL CURRENT ACCOUNT SR.# NAME OF BANK BRANCH CODE PHONE. # 1 UBL BOARD BOOTH - 041-2578833 2 UBL KOTWALI ROAD FSD 109 041-9200453 3 UBL GHULAM MUHAMMAD ABAD FSD 1287 041-2694655 4 UBL JINNAH COLONY FSD 1580 041-9200452/041-2615425 5 UBL RAILWAY ROAD FSD 472 041-9200662/0419200884 6 UBL DIJKOT ROAD FSD 531 041-9200451 7 UBL PEOPLES COLONY FSD 98 041-9220133 – 041-9220346 8 UBL SARGODHA ROAD FSD 581 041-9210344 – 35 9 UBL SAMAN ABAD FSD 1286 041-2661867 041-2660092 10 UBL DIJKOT 260 041-2670031 11 UBL JARANWALA 36 041-4312983/0414311126 12 UBL SAMUNDRI 326 041-3421585 041-3421657 13 UBL CHAK JHUMRA 99 041-8761131 14 UBL KHURRIANWALA 429 041-4360429/041-4364050 15 UBL SATANA BANGLA 1066 041-4600804 16 UBL TANDLIANWALA 518 041-3441548 17 UBL SALAR WALA 722 041-8742084 18 UBL MAMU KANJAN 37 041-3431452 19 UBL KHIDDAR WALA 1590 041-3413005 20 UBL THIKRIWALA 433 041-0255018 21 UBL MUREED WALA 1332 041-3472529 22 UBL SHAHEED ROAD JHANG 217 0477613829 23 UBL SHORKOT CANT 430 047-5500281 24 UBL GARH MAHA RAJA 359 047-5320506 25 UBL TOBA TEK SINGH 324 046-2511958 26 UBL GOJRA 404 046-35160062 27 UBL KAMALIA 970 046-3413830 28 UBL PIR MAHAL 545 046-3361272 29 UBL CHITIANA 668 046-2545363 30 UBL RAJANA 1093 046-2262201 – 2261588 31 UBL CHENAB NAGAR 153 047-6334576 32 UBL LALIAN 154 04533-610225 33 UBL CHINIOT 225 047-6213676 34 UBL BHOWANA 726 047-6201017 35 UBL WASU (18 HAZARI) 738 047-7645075 36 UBL SATELLITE TOWN JHANG 440 047-9200254 BOARD OF INTERMEDIATE & SECONDARY EDUCATION FAISALABAD BRANCHES OF MCB TO COLLECT BOARD’S DUES (ACCOUNT # (0485923691000100) PK 365 GOLD SR.# NAME OF BANK BRANCH CODE PHONE.
    [Show full text]
  • The Land of Five Rivers and Sindh by David Ross
    THE LAND OFOFOF THE FIVE RIVERS AND SINDH. BY DAVID ROSS, C.I.E., F.R.G.S. London 1883 Reproduced by: Sani Hussain Panhwar The land of the five rivers and Sindh; Copyright © www.panhwar.com 1 TO HIS EXCELLENCY THE MOST HONORABLE GEORGE FREDERICK SAMUEL MARQUIS OF RIPON, K.G., P.C., G.M.S.I., G.M.I.E., VICEROY AND GOVERNOR-GENERAL OF INDIA, THESE SKETCHES OF THE PUNJAB AND SINDH ARE With His Excellency’s Most Gracious Permission DEDICATED. The land of the five rivers and Sindh; Copyright © www.panhwar.com 2 PREFACE. My object in publishing these “Sketches” is to furnish travelers passing through Sindh and the Punjab with a short historical and descriptive account of the country and places of interest between Karachi, Multan, Lahore, Peshawar, and Delhi. I mainly confine my remarks to the more prominent cities and towns adjoining the railway system. Objects of antiquarian interest and the principal arts and manufactures in the different localities are briefly noticed. I have alluded to the independent adjoining States, and I have added outlines of the routes to Kashmir, the various hill sanitaria, and of the marches which may be made in the interior of the Western Himalayas. In order to give a distinct and definite idea as to the situation of the different localities mentioned, their position with reference to the various railway stations is given as far as possible. The names of the railway stations and principal places described head each article or paragraph, and in the margin are shown the minor places or objects of interest in the vicinity.
    [Show full text]
  • Overview of Wet Processing Facilities
    OVERVIEW OF WET PROCESSING FACILITIES Factories in Egypt Maccarpet 10th of Ramadan City, Zone B3-Ramadan City, Egypt. Sharqya Factories in Bangladesh Alim Knit (Bd) Ltd. Nayapara, Kashimpur, Gazipur, Bangladesh Chorka Textile Danga, Narshingdi, Dhaka, Bangladesh Dhaka Beijing Ltd. Savar, Dhaka, Bangladesh Divine Fabrics Ltd. Chandra Kaliakoir Gazipur, Bangladesh Fakhruddin Textile Mills Ltd. Kewa, Sreepur, Gazipur, Bangladesh Habiganj Textiles Ltd. Olipur, Habiganj, Sylhet, Bangladesh Impress-Newtex Composite Textiles Ltd. Gorai, Mirzapiur Tangail, Bangladesh Mahmud Denim Ltd. Shafipur, Kaliakoir, Gazipur, Bangladesh Mahmud Jeans Hartokitola, Chandra, Kaliakoir, Gazipur, Bangladesh Mega Yarn Dyeing Mills Ltd. Sardagonj, Kashimpur, Gazipur Mondol Screen Print 141 Vatulia, Turag, Uttra Dhaka 1230, Dhaka, Bangladesh NRG Composit Yarn Dyeing Jamirdia Master Bary, Vhaluka, Mymensingh, Bangladesh Orix Washing Project M/S Orix Washing Project, M/S Orix Washing Project, Ranavola, Nishatnagar, Turag, Dhaka-1230 Pioneer Knitwears (BD) Ltd. Jamirdia, Habirbari, Valuka Bangladesh Pretty Sweaters Ltd. Kuliarchar Tower, Chaydana, National University, Gazipur, Bangladesh Shadhin Garments Pvt. Ltd. Palli Biddut Road, Jarun, Konabari, Gazipur Snowtex Outerwear Ltd. B-65/3, Lakuriapara, Dhulivita, Dhamrai, Dhaka-1350, Bangladesh Unifill Group Ltd. Bhabanipur, Kashempur, Gazipur, Dhaka, Bangladesh Zaber & Zubair Fabrics Ltd. Pagar, Tongi, Gazipur Factories in Bosnia Dević-Tekstil Teslić Nova Industrijska Zona BB Teslic Factories in China Changzhou Kaili Textile Co., Ltd. Zhiqian Town, Jintan, Changzhou City, Jiangsu Province, China Fu Jian Li Hong Textile Co. Ltd. Opposite to Jin Zhang Square, Zhang Gang Street, Chang Le city, Fu Jian province, China (Duqiao Village Zhanggang Street) Fujian Fortunes Textile & Dyeing Co. Ltd. Donghaian Development Zone Shenhu Town Jinjiangcity, Fujian China Fujian Hongda Leather Co.
    [Show full text]
  • Final Report
    ISLAMIC REPUBLIC OF PAKISTAN WATER AND SANITATION AGENCY FAISALABAD (WASA-F) ISLAMIC REPUBLIC OF PAKISTAN THE PROJECT FOR WATER SUPPLY, SEWERAGE AND DRAINAGE MASTER PLAN OF FAISALABAD FINAL REPORT VOLUME I EXECUTIVE SUMMARY FEBRUARY 2019 JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) NIHON SUIDO CONSULTANTS CO., LTD. JAPAN TECHNO CO., LTD. YOKOHAMA WATER CO., LTD Foreign Exchange Rates: Master Plan US$ 1 = JPY 111.29 US$ 1 = PKR 104.85 (As of December 2017) FINAL REPORT ON THE PROJECT FOR WATER SUPPLY, SEWERAGE AND DRAINAGE MASTER PLAN OF FAISALABAD GENERAL TABLE OF CONTENTS [VOLUME I] EXECUTIVE SUMMARY [VOLUME II] MAIN REPORT PART A GENERAL STATEMENTS ON THE WATER SECTOR PART B WATER SUPPLY PART C SEWERAGE AND DRAINAGE [VOLUME III] SUPPORTING REPORT PART A GENERAL STATEMENTS ON THE WATER SECTOR PART B WATER SUPPLY PART C SEWERAGE AND DRAINAGE [VOLUME IV] DATA BOOK [VOLUME V] PRELIMINARY DESIGN FOR PRIORITY PROJECT (In addition to the above reports, a Completion Report summarizing the results, outcomes, and recommendations obtained from the pilot activities of this Project will be prepared in May 2019 as a supplemental report.) VOLUME I EXECUTIVE SUMMARY TABLE OF CONTENTS Table of Contents .................................................................................................................................... i List of Tables ......................................................................................................................................... ii List of Figures ......................................................................................................................................
    [Show full text]