The New Waste Management System of Georgia

Total Page:16

File Type:pdf, Size:1020Kb

The New Waste Management System of Georgia Integrated Solid Waste Management Kutaisi - Project Newsletter # 3- April 2018 Focus Topic Municipal Waste Management Plans - Implications, Challenges and Opportu- Municipal Waste nities on the way to implementation from 2018 onwards Management Plans Improve services, reduce waste and get citizens to pay 1. Improvement of services they will have to pay directly need to This includes the need for additional be reduced. Treating also green waste containers to improve the service separately has therefore attracted range, extend waste collection to particular attention from a number of remoter settlements, and separate municipalities. Partly has a centralized certain waste materials in the future. composting been envisaged but also First and foremost, paper and plastics promoting such practices and waste should be in the foreground for a separation in settlements with dicult separate collection. access to regular collection services is 2. Reduction of waste delivered to the considered. landll 3. Convincing citizens to pay for waste The municipalities have also realized management services that the amounts they handover to One of the biggest challenges for the landlling in the future and for which municipalities lies in the fact that every Final training of municipal waste management plans On 13-14 September 2017, the nal municipalities to convince the popula- training for waste management plan tion to actively contribute and support "I highly appreciate my involvement in the training, for the municipalities of the project the implementation of the new waste after the rst training details region was held in Kutaisi. The project management system. were revealed which are experts reviewed the progress to date Following this nal training most of useful not only for this plan but for general public of the plans during the nal training the municipalities submitted the draft relations, information and PR. We can now seminar, showing that some of the versions of the Waste Management make concrete steps for further implementa- municipalities have already completed Plans to the project experts for nal tion of this Action Plan, which we want to implement as quickly and accurately as the draft plans to a very good stage, consideration and consultation. possible." but also highlighting some problem- By the end of 2017, thirteen out of the Ketevan Macharashvili, Sachkhere atic issues related to determination of taris. In addition attention was drawn "The training was very impor- tant. Here we learned new to the subject of public relations and things and approaches how communication, which will be in the to best §cope with the upcom- medium and long run a key factor for ing challenges in waste management of the future. As far as our work is on the paper, foreign experts correct, make comments and give comments, which will result in the nal option. This plan leads us to nally clean up our city and clean the village. This is our goal." The Waste Management Code of Georgia is obliging municipalities to develop Iuri Lartsuliani, Tsageri waste management plans in 2017, covering the period by 2018-2022. There- "Until now we have been fore, in the framework of "Kutaisi Solid Waste Integrated Integrated Manage- cleaning up with municipal ment Project", experts of the project have conducted 8 training sessions during sta. Implementation of this the 10 months period from November 2016 until September 2017. In addition, plan will raise awareness of more than 25 consultation visits to the waste management plan have been citizens in the municipality and conducted in individual municipalities. After the last training session the Samtredia will be one of the cleanest cities in the municipalities." project experts provided continuous support to the municipalities for nalizing the plans. Lika Darjania, Samtredia Page 2 Integrated Solid Waste Management Kutaisi - Project Newsletter # 3 - October 2018 The new regional landll - who is doing what? Construction and operation Solid Waste Management Company of Georgia / Ministry of Infrastructure and Regional Development The solid waste management company of Georgia is the beneciary. • Beneficiary of the project The company has since 2013 in property and operation 53 former • Contracting consulting companies municipal landlls in Georgia. The mandate for the future is, to • Contracting construction companies construct and operate up to 9 regional landlls and to close down all • Supervision of construction works former municipal landlls. The landll for Imereti and Racha • Final approval and reception of Lechkhumi/Kvemo Svaneti is the FIRST regional landll that will be construction constructed. • Owner and operator of the new landfill • Design of the sanitary landfill • Environmental Impact Assessment The consulting company ERM (Environmental Resources Management) study (EIA) delivers consulting services for planning, tendering and supervising • Prepare tender dossiers for construc- tion works and equipment • Supervise construction works • Support and improve organisation and management • Support and improve financial man- agement and technical competences • Strengthen PR, communication and public awareness activities. Project implemented by consortium Project nanced by EU NIF, KfW and Government of Georgia leaders PEM Consult and ERM Builder and Operator of landll "This document has been produced with the nancial assistance of the European Union. The views expressed herein can in no way be taken to reect the ocial opinion of the European Union." Page 4.
Recommended publications
  • 14 July 2015 Assessment of Wood and Agricultural Residue Biomass
    ASSESSMENT OF WOOD AND AGRICULTURAL RESIDUE BIOMASS ENERGY POTENTIAL IN GEORGIA Prepared for UNDP under Micro-Capital Grant Agreement for Non-Credit Related Activities of 26.06.14 WORLD EXPERIENCE FOR GEORGIA TBIILISI 2014 Table of Contents Introduction .................................................................................................................................................... 2 Acronyms ........................................................................................................................................................ 4 Summary ......................................................................................................................................................... 5 Assessment of Agricultural Residue Availability from Perennial Crops in Georgia ...................................... 13 Introduction .............................................................................................................................................. 13 Methodology for Perennial Crops ............................................................................................................ 15 Vineyards’ Pruning Residue ...................................................................................................................... 17 Fruit orchards’ Pruning Residue................................................................................................................ 23 Apple, pear, peach ...................................................................................................................................
    [Show full text]
  • Understanding the Need for Good Planning Project Newsletter #2
    Integrated Solid Waste Management Kutaisi - Project Newsletter # 2- May 2017 News ევროკავშირი საქართველოსთვის The European Union for Georgia SOLID WASTE MANAGEMENT Ministry of Regional Development and COMPANY OF GEORGIA Infrastructure of Georgia Project nanced by KfW and Government of Georgia and supported with funding by Project implemented by consortium leaders PEM Consult and ERM Landll Operators the European Union Understanding the need for good planning Project Newsletter #2 Starting from November 2016, the team of the project “Inte- Imereti region journalists and media grated Solid Waste Management Kutasisi – Accompanying learn about the new regional waste management system Page 2 Measures Consulting (AMC) Services” is hosting a series of training courses for all municipalities in Imereti and Racha- Safer and healthier working Lechkhumi and Kvemo Svaneti Regions. In our interview with conditions for over 200 Mr. René Boesten, the team leader of the project, explains the landll sta Page 2 training programme Municipal Waste Manage- ment Plan Training - mid Mr. Boesten, what is the main landll. A third priority is to set up fair term review Page 3 purpose and reason for this training and manageable systems for the OHS and EMS commitment programme? waste service charge that citizens (and of SWMCG Page 4 In accordance with the Waste Code of hotels etc.) have to pay for the collection The waste management Georgia, the municipalities have to and safe disposal of waste. system in Georgia - Main develop municipal waste management Separate collection and recycling will responsibilities of the involved plans in order to better manage and become obligatory in 2019. Are the parties Page 4 control municipal waste collection, and municipalities prepared? SWMCG website in future also recycling.
    [Show full text]
  • Economic Prosperity Initiative
    USAID/GEORGIA DO2: Inclusive and Sustainable Economic Growth October 1, 2011 – September 31, 2012 Gagra Municipal (regional) Infrastructure Development (MID) ABKHAZIA # Municipality Region Project Title Gudauta Rehabilitation of Roads 1 Mtskheta 3.852 km; 11 streets : Mtskheta- : Mtanee Rehabilitation of Roads SOKHUMI : : 1$Mestia : 2 Dushet 2.240 km; 7 streets :: : ::: Rehabilitation of Pushkin Gulripshi : 3 Gori street 0.92 km : Chazhashi B l a c k S e a :%, Rehabilitaion of Gorijvari : 4 Gori Shida Kartli road 1.45 km : Lentekhi Rehabilitation of Nationwide Projects: Ochamchire SAMEGRELO- 5 Kareli Sagholasheni-Dvani 12 km : Highway - DCA Basisbank ZEMO SVANETI RACHA-LECHKHUMI rehabilitaiosn Roads in Oni Etseri - DCA Bank Republic Lia*#*# 6 Oni 2.452 km, 5 streets *#Sachino : KVEMO SVANETI Stepantsminda - DCA Alliance Group 1$ Gali *#Mukhuri Tsageri Shatili %, Racha- *#1$ Tsalenjikha Abari Rehabilitation of Headwork Khvanchkara #0#0 Lechkhumi - DCA Crystal Obuji*#*# *#Khabume # 7 Oni of Drinking Water on Oni for Nakipu 0 Likheti 3 400 individuals - Black Sea Regional Transmission ZUGDIDI1$ *# Chkhorotsku1$*# ]^!( Oni Planning Project (Phase 2) Chitatskaro 1$!( Letsurtsume Bareuli #0 - Georgia Education Management Project (EMP) Akhalkhibula AMBROLAURI %,Tsaishi ]^!( *#Lesichine Martvili - Georgia Primary Education Project (G-Pried) MTSKHETA- Khamiskuri%, Kheta Shua*#Zana 1$ - GNEWRC Partnership Program %, Khorshi Perevi SOUTH MTIANETI Khobi *# *#Eki Khoni Tskaltubo Khresili Tkibuli#0 #0 - HICD Plus #0 ]^1$ OSSETIA 1$ 1$!( Menji *#Dzveli
    [Show full text]
  • A Short Report on the Advisory Service for the Local Self-Government of Imereti and Guria Conducted by the Fund “Sukhumi” In
    A short report on the Advisory Service for the local self-government of Imereti and Guria conducted by the Fund “Sukhumi” in frames of the project "Experience of the Visegrad countries to advocate the equal, inclusive and democratic governance" From February to July 2018, the consultative group of the Fund "Sukhumi", consisting of 5 staff members, worked with 15 municipalities (12 municipalities of Imereti 3 municipalities of Guria) on the issues of gender policy of self-government, organization of work of local gender equality councils. The "Guide" of the Fund "Sukhumi" - "Introduction of Gender Mainstreaming in Local Authorities" was actively used in the work. A short review of the current situation: local governments gradually master the essence of gender policy and issues related to them. This is facilitated by the instructions of higher authorities, especially the Ministry of Regional Management and Infrastructure, on the recommendation of which, since January 2018, all the municipalities of Imereti and Guria have created gender equality councils, approved the provision of the councils (the remaining municipality – Sakrebulo of Vani, plans to approve the provision of the Gender Council within the next few days). Part of the Municipalities of Imereti and Guria, with the help of partner NGOs, began to work on local action plans for gender equality. In spite of the fact that the instructions indicated that this is not a plan of gender council, but of a municipality, several municipalities developed and approved an action plan of Gender Council (Kutaisi, Tskaltubo). At this stage development of an action plan for Gender Equality of the municipality is carried out.
    [Show full text]
  • Georgia Environmental Performance Reviews Third Review
    UNECE Georgia Environmental Performance Reviews Third Review UNITED NATIONS ECE/CEP/177 UNITED NATIONS ECONOMIC COMMISSION FOR EUROPE ENVIRONMENTAL PERFORMANCE REVIEWS GEORGIA Third Review UNITED NATIONS New York and Geneva, 2016 Environmental Performance Reviews Series No. 43 NOTE Symbols of United Nations documents are composed of capital letters combined with figures. Mention of such a symbol indicates a reference to a United Nations document. The designations employed and the presentation of the material in this publication do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country, territory, city or area, or of its authorities, or concerning the delimitation of its frontiers or boundaries. In particular, the boundaries shown on the maps do not imply official endorsement or acceptance by the United Nations. The United Nations issued the second Environmental Performance Review of Georgia (Environmental Performance Reviews Series No. 30) in 2010. This volume is issued in English only. ECE/CEP/177 UNITED NATIONS PUBLICATION Sales E.16.II.E.3 ISBN 978-92-1-117101-3 e-ISBN 978-92-1-057683-3 ISSN 1020-4563 iii Foreword It is essential to monitor progress towards environmental sustainability and to evaluate how countries reconcile environmental and economic targets and meet their international environmental commitments. Through regular monitoring and evaluation, countries may more effectively stay ahead of emerging environmental issues, improve their environmental performance and be accountable to their citizens. The ECE Environmental Performance Review Programme provides valuable assistance to member States by regularly assessing their environmental performance so that they can take steps to improve their environmental management, integrate environmental considerations into economic sectors, increase the availability of information to the public and promote information exchange with other countries on policies and experiences.
    [Show full text]
  • 6. Imereti – Historical-Cultural Overview
    SFG2110 SECOND REGIONAL DEVELOPMETN PROJECT IMERETI REGIONAL DEVELOPMENT PROGRAM IMERETI TOURISM DEVELOPMENT STRATEGY Public Disclosure Authorized STRATEGIC ENVIRONMENTAL, CULTURAL HERITAGE AND SOCIAL ASSESSMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Tbilisi, December, 2014 ABBREVIATIONS GNTA Georgia National Tourism Administration EIA Environnemental Impact Assessment EMP Environmental Management Plan EMS Environmental Management System IFI International Financial Institution IRDS Imereti Regional Development Strategy ITDS Imereti Tourism Development Strategy MDF Municipal Development Fund of Georgia MoA Ministry of Agriculture MoENRP Ministry of Environment and Natural Resources Protection of Georgia MoIA Ministry of Internal Affairs MoCMP Ministry of Culture and Monument Protection MoJ Ministry of Justice MoESD Ministry of Economic and Sustaineble Developmnet NACHP National Agency for Cultural Heritage Protection PIU Project Implementation Unit PPE Personal protective equipment RDP Regional Development Project SECHSA Strategic Environmental, Cultural Heritage and Social Assessment WB World Bank Contents EXECUTIVE SUMMARY ........................................................................................................................................... 0 1. INTRODUCTION ........................................................................................................................................... 14 1.1 PROJECT CONTEXT ...............................................................................................................................
    [Show full text]
  • Current EPF Grants
    Current EPF Grants The Georgian Union of Mountain Activists $17.868 Georgia (Tbilisi) 08/25/2009 - 01/10/2010 To attract tourists to Upper and Lower Svaneti by establishing four new tourist routes of different length and difficulty that meet international standards and requirements. The project envisages covering those areas of Svaneti that have not been involved in tourism development activities. The Georgian Union of Mountain Activists (GUMA) will implement a three-month long project to map and mark four tourist routes and conduct a promotional campaign. With this aim, GUMA will prepare and print special booklets on new routes that will be disseminated among all stakeholders. In addition, the relevant information will be placed on www.svanetitrekking.ge. In the long run, the project will contribute to improving the socio-economic situation of the local population through their involvement in income generating activities. Human Rights Priority $19.995 Georgia (Tbilisi) 09/05/2009 - 09/04/2010 To develop and strengthen a method of strategic litigation as an effective mean for protection of human rights by using the method for protection of rights of the citizens affected by 2008 August war. The project is the first in Georgia attempt to apply method of strategic litigation to the national courts with respect to victims of war. The project will use the method of exhaustion of domestic remedies in protection of rights of the civilians -IDPs affected by the Russo-Georgian war in August 2008 and then file their cases to the European Court for Human Rights. Thereby the project will establish precedent of strategic litigation in the local legal practice and will provide vitally important legal assistant to the IDPs- victims of the war to reinstate them in their rights.
    [Show full text]
  • 46375-002: Secondary Road Improvement Project
    Semi-annual Social Safeguards Monitoring Report (January- June 2020) Geo: Secondary Road Improvement Project Land Acquisition and Resettlement Plan (LARP) for Dzirula – Kharagauli – Moliti (Section 1) Km 0.000 to Km 24.620 Land Acquisition and Resettlement Plan (LARP) for Section 2 (Moliti-Chumateleti) Km 24.620 to Km 50.244 Project Number-: 46375-002 Loan Number: 3524-GEO Prepared: October 2020 Prepared by Construction Supervision Consultant for the Road Department of the Ministry of Regional Development and Infrastructure and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Semi-Annual Monitoring Report (January-June 2020): Secondary Road Improvement Project Abbreviations ADB Asian Development Bank AIDS Acquired Immune Deficiency Syndrome AIIB Asian Infrastructure Investment Bank AP Affected Person AIDS Acquired Immune Deficiency Syndrome CR Compliance Report CSC Construction Supervision Consultant DP Displaced Person EBRD European Bank for Reconstruction and Development EMC External Monitoring Consultant ETCIC Eurasian Transport Corridor Investment Center
    [Show full text]
  • Attachment A
    PLANT EXPLORATION IN THE REPUBLIC OF GEORGIA TO COLLECT GERMPLASM FOR CROP IMPROVEMENT August 26- September 14, 2007 Participants: Joe-Ann H. McCoy, USDA/ ARS/ NPGS, Medicinal Plant Curator North Central Regional Plant Introduction Station G212 Agronomy Hall, Iowa State University, Ames, IA 50011-1170 Phone: 515-294-2297 Fax: 515-294-1903 Email: [email protected] / [email protected] Barbara Hellier, USDA/ ARS/ NPGS, Horticulture Crops Curator Western Regional Plant Introduction Station 59 Johnson Hall, WSU, PO Box 646402, Pullman, WA 99164-6402 Phone: 509-335-3763 Fax: 509-335-6654 Email: [email protected] Georgian Participants: Ana Gulbani Georgian Plant Genetic Resource Centre, Research Institute of Farming Tserovani, Mtskheta, 3300 Georgia. www.cac-biodiversity.org Phone: 995 99 96 7071 Fax: 995 32 26 5256 Email: [email protected] Marina Mosulishvili, Senior Scientist, Institute of Botany Georgian National Museum 3, Rustaveli Ave., Tbilisi 0105 GEORGIA Phone: 995 32 29 4492 / 995 99 55 5089 Email: [email protected] / [email protected] Sandro Okropiridze Mosulishvili, Driver Sandro [email protected] (From Left – Marina Mosulishvili, Sandro Okropiridze, Joe-Ann McCoy, Barbara Hellier, Ana Gulbani below Mt. Kazbegi) 2 Acknowledgements: ¾ The expedition was funded by the USDA/ARS Plant Exchange Office, Beltsville, Maryland ¾ Representatives from the Georgia National Museum and the Georgian Plant Genetic Resources Center planned the itinerary and made all transportation, lodging and guide arrangements ¾ Special thanks
    [Show full text]
  • Biodiversity Assessment for Georgia
    Biodiversity Assessment for Georgia Task Order under the Biodiversity & Sustainable Forestry IQC (BIOFOR) USAID C ONTRACT NUMBER: LAG-I-00-99-00014-00 SUBMITTED TO: USAID WASHINGTON E&E BUREAU, ENVIRONMENT & NATURAL RESOURCES DIVISION SUBMITTED BY: CHEMONICS INTERNATIONAL INC. WASHINGTON, D.C. FEBRUARY 2000 TABLE OF CONTENTS SECTION I INTRODUCTION I-1 SECTION II STATUS OF BIODIVERSITY II-1 A. Overview II-1 B. Main Landscape Zones II-2 C. Species Diversity II-4 SECTION III STATUS OF BIODIVERSITY CONSERVATION III-1 A. Protected Areas III-1 B. Conservation Outside Protected Areas III-2 SECTION IV STRATEGIC AND POLICY FRAMEWORK IV-1 A. Policy Framework IV-1 B. Legislative Framework IV-1 C. Institutional Framework IV-4 D. Internationally Supported Projects IV-7 SECTION V SUMMARY OF FINDINGS V-1 SECTION VI RECOMMENDATIONS FOR IMPROVED BIODIVERSITY CONSERVATION VI-1 SECTION VII USAID/GEORGIA VII-1 A. Impact of the Program VII-1 B. Recommendations for USAID/Georgia VII-2 ANNEX A SECTIONS 117 AND 119 OF THE FOREIGN ASSISTANCE ACT A-1 ANNEX B SCOPE OF WORK B-1 ANNEX C LIST OF PERSONS CONTACTED C-1 ANNEX D LISTS OF RARE AND ENDANGERED SPECIES OF GEORGIA D-1 ANNEX E MAP OF LANDSCAPE ZONES (BIOMES) OF GEORGIA E-1 ANNEX F MAP OF PROTECTED AREAS OF GEORGIA F-1 ANNEX G PROTECTED AREAS IN GEORGIA G-1 ANNEX H GEORGIA PROTECTED AREAS DEVELOPMENT PROJECT DESIGN SUMMARY H-1 ANNEX I AGROBIODIVERSITY CONSERVATION IN GEORGIA (FROM GEF PDF GRANT PROPOSAL) I-1 SECTION I Introduction This biodiversity assessment for the Republic of Georgia has three interlinked objectives: · Summarizes the status of biodiversity and its conservation in Georgia; analyzes threats, identifies opportunities, and makes recommendations for the improved conservation of biodiversity.
    [Show full text]
  • GEORGIA Second Edition March 2010
    WHO DOES WHAT WHERE IN DISASTER RISK REDUCTION IN GEORGIA Second edition March 2010 Georgian National Committee of Disaster Risk Reduction & Environment Sustainable Development FOREWORD Georgia is a highly disaster-prone country, which frequently experiences natural hazards (e.g. earthquakes, floods, landslides, mudflows, avalanches, and drought) as well as man-made emergencies (e.g. industrial accidents and traffic accidents). Compounding factors such as demographic change, unplanned urbanization, poorly maintained infrastructure, lax enforcement of safety standards, socio-economic inequities, epidemics, environmental degradation and climate variability amplify the frequency and intensity of disasters and call for a proactive and multi-hazard approach. Disaster risk reduction is a cross-cutting and complex development issue. It requires political and legal commitment, public understanding, scientific knowledge, careful development planning, responsible enforcement of policies and legislation, people-centred early warning systems, and effective disaster preparedness and response mechanisms. Close collaboration of policy-makers, scientists, urban planners, engineers, architects, development workers and civil society representatives is a precondition for adopting a comprehensive approach and inventing adequate solutions. Multi-stakeholder and inter-agency platforms can help provide and mobilize knowledge, skills and resources required for mainstreaming disaster risk reduction into development policies, for coordination of planning and programmes,
    [Show full text]
  • Realizing the Urban Potential in Georgia: National Urban Assessment
    REALIZING THE URBAN POTENTIAL IN GEORGIA National Urban Assessment ASIAN DEVELOPMENT BANK REALIZING THE URBAN POTENTIAL IN GEORGIA NATIONAL URBAN ASSESSMENT ASIAN DEVELOPMENT BANK Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) © 2016 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2444 www.adb.org Some rights reserved. Published in 2016. Printed in the Philippines. ISBN 978-92-9257-352-2 (Print), 978-92-9257-353-9 (e-ISBN) Publication Stock No. RPT168254 Cataloging-In-Publication Data Asian Development Bank. Realizing the urban potential in Georgia—National urban assessment. Mandaluyong City, Philippines: Asian Development Bank, 2016. 1. Urban development.2. Georgia.3. National urban assessment, strategy, and road maps. I. Asian Development Bank. The views expressed in this publication are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Governors or the governments they represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. This publication was finalized in November 2015 and statistical data used was from the National Statistics Office of Georgia as available at the time on http://www.geostat.ge The mention of specific companies or products of manufacturers does not imply that they are endorsed or recommended by ADB in preference to others of a similar nature that are not mentioned. By making any designation of or reference to a particular territory or geographic area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]