P-(1) OFFICE OF THE EXECUTIVE ENGINEER PUBLIC HEALTH ENGINEERING DIVISION, . Phone No.051-9290870 E-mail: [email protected]

No. 1092/S Dated 08-04-2021.

NOTICE INVITING TENDERS Sealed tenders based on item rate (as per DNIT) for the following works are hereby invited from the approved Contractors / firms which are enlisted / renewed with HUD & PHE Department for the year 2020-21 and fee have been deposited with the Department, and also having registration Certificate issued by the Engineer Council, (PEC) for the year 2020-21. The willing Contractors / firms in the relevant category of PEC with specified code CE09 CE10 will submit application for issuance of tender documents. Tender shall be issued upto 30-04-2021 and received on 03-05-2021 upto 11:45 AM and opened at 12:15 PM on the same date in office of the under signed (Public Health Engineering Division Said Pur Road near Sufaid Tanki Satellite Town Rawalpindi) on fixed date by the respective tenders opening committee in the presence of intending contractor or their representative. NOTE:-

1. The Contractor / Firm are required to produce the Original Registration Certificate issued by the Pakistan Engineering Council, (PEC) Islamabad for the year 2020-21. 2. The earnest money will be received 5% of estimate cost in the shape of CDR. 3. The intending Tenderers may get the tender documents issued from the Divisional Head Clerk PHED Rawalpindi during office hours up to 30-04-2021 on payment of tender fee / printing charges in the shape of CDR only (No Pay Order). 4. In case of total tendered amount is less than 5% of the approved estimate (DNIT) amount the lowest bidder will have to deposit additional performance security / quality guarantee equal to the tender amount below estimate cost within 15 days of issuance of notice for deposit of additional performance security / quality security as per Finance Department Notification No. RO (Tech) FD-1-2/83(VI)(P) dated 06-04-2005. If failure the tender will be cancelled with the forfeiture of Earnest money without any further notice. 5. Contractors should sign the every page of the bidding documents. Failing which the tender is considered as rejected. 6. All terms and conditions of tender / contract documents shall be strictly followed. 7. Conditional tenders / bids and tenders / bids received by post or through any other means shall not be accepted. 8. All the bidder shall produce original documents and registered power of attorney in case of absence of original contractor at the time of issuance of tenders. 9. Procuring Agency may reject all bids or proposal at any time prior to the acceptance of a bid or proposal as per PPRA rules. 10. The contractors / firms are required to produce registration certificate issued by the Punjab Revenue Authority (PRA), at the time of submission of application for issuance of tender form failing which tenders form will not be issued. 11. Application of work charge employee are also required.

Bid Bid Cost Security Tender Time S.# Name of Scheme T.S No. & Date (Rs. In 5% of Fee/Printing Limit Millions) estimated Charges cost SAP-III (2020-21) Construction of PCC Street in U.C Guff & E.E PHE 1 Ghazanabad, Tehsil Kallar Sayedan District No.387/S dated 5.555 0.270 10 Months Rs.5000/- Rawalpindi 29-03-2021 Construction of PCC Street in U.C Bishandot & 2 Balakhar Tehsil Kallar Sayedan District -do- 6.204 0.310 -do- Rs.5000/- Rawalpindi CDP-III (2020-21) 0.000 0.58 Improvement / Extension Of Water Supply S.E PHE Circle 3 Scheme Bhallar Top Tehsil District No.386/S dated 8.888 0.440 12 Months Rs.5000/- Rawalpindi 04-03-2021 Construction of streets, Drains and paths UC E.E PHE 4 Angoori and UC Tehsil District No.1045/S dated 7.870 0.390 -do- Rs.5000/- Rawalpindi. 03-04-2021 Construction of PCC Streets in UC & UC E.E PHE 5 Islam Pura (Jabbar) Tehsil District No.1048/S dated 8.518 0.420 -do- Rs.5000/- Rawalpindi 05-04-2021 Installation of Water Filtration Plants in all areas S.E PHE Circle 6 No.555/S dated 18.239 0.911 -do- Rs.5000/- of PP-11 Rawalpindi 07-04-2021 Provision of PCC, Sewerage ,Nullah, Drain in E.E PHE 7 Ward No.1 Wah Cantt: Tehsil Taxila District No.1047/S dated 12.037 0.600 -do- Rs.5000/- Rawalpindi 05-04-2021 Construction of PCC Street/Path in U.C E.E PHE 8 No.387/S dated 7.407 0.370 -do- Rs.5000/- Tehsil District Rawalpindi 29-03-2021 Construction of PCC Streets & Drains in Thatha Khalil, Main Rasta Commerce Housing E.E PHE 9 No.1088/S dated 12.037 0.600 -do- Rs.5000/- Society main road to Wanni Gujran Graveyard 07-04-2021 UC Thatha Khalil Tehsil Taxila District Rawalpindi

Continue P-(2)

P-(2) Laying of Water Supply pipe line in PP-15 S.E PHE Circle 10 No.555/S dated 18.518 0.920 12 Months Rs.5000/- Rawalpindi 07-04-2021 Construction of PCC Streets in UC Bishandot & E.E PHE 11 UC Noor Dulal Tehsil Gujar Khan District No.1048/S dated 8.333 0.410 -do- Rs.5000/- Rawalpindi 05-04-2021 Construction of streets, Drains and paths UC E.E PHE 12 Lathrar and UC Bhattian Tehsil Kotli Sattian No.1045/S dated 8.611 0.430 -do- Rs.5000/- District Rawalpindi 03-04-2021 Improvement / Extension Of Water Supply & S.E PHE Circle 13 Drainage Scheme Gari Sikandar Tehsil Taxila No.386/S dated 14.525 0.720 -do- Rs.5000/- District Rawalpindi 04-03-2021 Construction of streets, Drains and paths UC E.E PHE 14 Treat and UC Musyari Tehsil Murree District No.1045/S dated 8.704 0.430 -do- Rs.5000/- Rawalpindi 03-04-2021 Construction of PCC Streets in UC Tehsil E.E PHE 15 No.1048/S dated 13.889 0.690 -do- Rs.5000/- Gujar Khan District Rawalpindi 05-04-2021 Provision of water supply lines, Sewerage/ S.E PHE Circle 16 Drainage and PCC in all area of PP-11 No.555/S dated 12.963 0.640 -do- Rs.5000/- Rawalpindi. 07-04-2021 Provision of PCC, Sewerage, Nullah, Drain in E.E PHE 17 Ward No.2 Wah Cantt: Tehsil Taxila District No.1047/S dated 9.259 0.460 -do- Rs.5000/- Rawalpindi 05-04-2021 Construction of Sewerage/ Drainage Scheme in S.E PHE Circle 18 No.555/S dated 11.574 0.570 -do- Rs.5000/- ward#1 Rawalpindi 07-04-2021 Construction of PCC Street/Path in U.C E.E PHE 19 No.387/S dated 6.482 0.320 10 Months Rs.5000/- Tehsil Kahuta District Rawalpindi 29-03-2021 Construction of PCC, Main from Thatha Khalil E.E PHE 20 Road to Bassera Village and Abadies Streets UC No.1088/S dated 13.426 0.670 12 Months Rs.5000/- Thatha Khalil Tehsil Taxila District Rawalpindi 07-04-2021 Construction of PCC Streets in UC Kalyam & UC E.E PHE 21 No.1048/S dated 7.408 0.370 10 Months Rs.5000/- Mandra Tehsil Gujar Khan District Rawalpindi 05-04-2021 Construction of PCC Street/Path in U.C E.E PHE 22 Manayata Tehsil Kallar Sayedan District No.387/S dated 4.630 0.230 -do- Rs.5000/- Rawalpindi 29-03-2021 Construction of PCC Streets in UC Sui Cheemian E.E PHE 23 No.1048/S dated 8.519 0.420 12 Months Rs.5000/- Tehsil Gujar Khan District Rawalpindi 05-04-2021 Construction of Sewerage/ Drainage Scheme in S.E PHE Circle 24 No.555/S dated 11.574 0.570 -do- Rs.5000/- ward#2 Rawalpindi 07-04-2021 Improvement / Extension Of Water Supply & S.E PHE Circle Drainage Scheme Salar Gah Tehsil Taxila District 13.475 0.670 -do- Rs.5000/- 25 No.386/S dated Rawalpindi 04-03-2021 Construction of streets, Drains and paths UC E.E PHE 26 and UC Rawat Tehsil Murree District No.1045/S dated 7.407 0.370 12 Months Rs.5000/- Rawalpindi 03-04-2021 Installation of Tube well and Water Supply lines in S.E PHE Circle 27 No.555/S dated 5.064 0.250 10 Months Rs.5000/- UC-42 PP-11 Rawalpindi 07-04-2021 Provision of PCC, Sewerage, Nullah, Drain in E.E PHE 28 Ward No.5 Wah Cantt: Tehsil Taxila District No.1047/S dated 4.630 0.230 -do- Rs.5000/- Rawalpindi 05-04-2021 Construction of PCC Street/Path in U.C Nara E.E PHE 29 No.387/S dated 7.407 0.370 12 Months Rs.5000/- Tehsil Kahuta District Rawalpindi 29-03-2021 Construction of PCC Streets & Drains Sewerage, Nullah in Rehbar Colony UC Khurram Gujar in E.E PHE 30 No.1088/S dated 11.574 0.570 12 Months Rs.5000/- Malpur Sammon Ghari Afghana Tehsil Taxila 07-04-2021 District Rawalpindi Construction of PCC Streets in UC Ghungraila & E.E PHE 31 UC Kuri Dulal Tehsil Gujar Khan District No.1048/S dated 6.481 0.320 10 Months Rs.5000/- Rawalpindi 05-04-2021 Construction of PCC Street/Path in U.C Samote E.E PHE 32 No.387/S dated 3.703 0.180 -do- Rs.5000/- Tehsil Kallar Sayedan District Rawalpindi 29-03-2021 Improvement / Extension Of Water Supply & S.E PHE Circle 33 Drainage Scheme Usman Khattar Tehsil Taxila No.386/S dated 12.766 0.630 12 Months Rs.5000/- District Rawalpindi 04-03-2021 Construction of streets, Drains and paths UC E.E PHE 34 and UC Tehsil Murree No.1045/S dated 7.870 0.390 -do- Rs.5000/- District Rawalpindi 03-04-2021 Construction of PCC Streets in UC Changa E.E PHE 35 No.1048/S dated 8.519 0.420 -do- Rs.5000/- Bangial Tehsil Gujar Khan District Rawalpindi 05-04-2021

Continue P-(3)

P-(3) Construction of Sewerage/ Drainage Scheme in S.E PHE Circle 36 No.555/S dated 11.574 0.570 12 Months Rs.5000/- ward#9 Rawalpindi 07-04-2021 Provision of PCC, Sewerage, Nullah, Drain in 37 Ward No.6 Wah Cantt: Tehsil Taxila District -do- 13.889 0.690 -do- Rs.5000/- Rawalpindi Construction of PCC Street/Path in U.C Lehri E.E PHE 38 No.387/S dated 7.407 0.370 -do- Rs.5000/- Tehsil Kahuta District Rawalpindi 29-03-2021 Construction of PCC Streets in UC & UC E.E PHE 39 No.1048/S dated 7.407 0.370 12 Months Rs.5000/- Jhangi Jalal Tehsil Gujar Khan District Rawalpindi 05-04-2021 Construction of PCC Street/Path in U.C Nullah E.E PHE 40 Musalmana Tehsil Kallar Sayedan District No.387/S dated 4.630 0.230 10 Months Rs.5000/- Rawalpindi 29-03-2021 Construction of streets, Drains and paths UC E.E PHE 41 and UC Bun Tehsil Murree District No.1045/S dated 7.315 0.360 12 Months Rs.5000/- Rawalpindi 03-04-2021 Construction of PCC Streets in UC Kountrila & E.E PHE 42 Kaniat Khalil Tehsil Gujar Khan District No.1048/S dated 8.982 0.440 -do- Rs.5000/- Rawalpindi 05-04-2021 Construction of Sewerage/ Drainage Scheme in S.E PHE Circle 43 No.555/S dated 11.574 0.570 -do- Rs.5000/- ward#10 Rawalpindi 07-04-2021 Provision of PCC, Sewerage, Nullah, Drain in 44 Ward No.8 Wah Cantt: Tehsil Taxila District -do- 18.518 0.920 -do- Rs.5000/- Rawalpindi Construction of PCC Street/Path in U.C Hothla E.E PHE 45 No.387/S dated 6.482 0.320 10 Months Rs.5000/- Tehsil Kahuta District Rawalpindi 29-03-2021 Construction of PCC Streets & Drains Sewerage, E.E PHE 46 in Jalala Banian Dhoke Saudo Bn Bhola UC No.1088/S dated 9.259 0.460 12 Months Rs.5000/- Jalala Tehsil Taxila District Rawalpindi 07-04-2021 Construction of PCC Streets in UC Khuranb Ilyas E.E PHE 47 & UC Tehsil Gujar Khan District No.1048/S dated 6.944 0.340 10 Months Rs.5000/- Rawalpindi 05-04-2021 Construction of streets, Drains and paths UC E.E PHE 48 Seher Bagla and UC Tehsil Murree District No.1045/S dated 9.815 0.490 12 Months Rs.5000/- Rawalpindi 03-04-2021 Construction of PCC Streets in UC Jand Mehlo E.E PHE 49 No.1048/S dated 5.556 0.270 10 Months Rs.5000/- Tehsil Gujar Khan District Rawalpindi 05-04-2021 Construction of Sewerage/ Drainage Scheme in S.E PHE Circle 50 No.555/S dated 9.259 0.460 12 Months Rs.5000/- ward#3 & 8 Rawalpindi 07-04-2021 Provision of PCC, Sewerage, Nullah, Drain & E.E PHE 51 R/Wall in Ward No.9 Wah Cantt: Tehsil Taxila No.1047/S dated 11.111 0.550 -do- Rs.5000/- District Rawalpindi 05-04-2021 Construction of PCC Street/Path in U.C Khadiot E.E PHE 52 No.387/S dated 4.630 0.230 10 Months Rs.5000/- Tehsil Kahuta District Rawalpindi 29-03-2021 Construction of PCC Streets in UC Mangot & UC E.E PHE 53 No.1048/S dated 6.482 0.320 -do- Rs.5000/- Jhungle Tehsil Gujar Khan District Rawalpindi 05-04-2021 Construction of streets, Drains and paths and E.E PHE 54 water Bore UC Potha and UC Tehsil Murree No.1045/S dated 8.518 0.420 10 Months Rs.5000/- District Rawalpindi 03-04-2021 Construction of PCC Streets in UC Jero Ratial E.E PHE 55 No.1048/S dated 5.926 0.290 -do- Rs.5000/- Tehsil Gujar Khan District Rawalpindi 05-04-2021 Construction of PCC Street/Path in U.C E.E PHE 56 Dhoberan Khurd Tehsil Kahuta District No.387/S dated 4.630 0.230 -do- Rs.5000/- Rawalpindi 29-03-2021 Construction of PCC Streets in UC Syed & UC E.E PHE 57 No.1048/S dated 7.408 0.370 12 Months Rs.5000/- Raman Tehsil Gujar Khan District Rawalpindi 05-04-2021 Construction of streets, Drains and paths UC E.E PHE 58 Sanath Sarulah Tehsil Kotli Sattian District No.1045/S dated 6.296 0.310 10 Months Rs.5000/- Rawalpindi 03-04-2021 Construction of PCC Streets in UC , UC Devi E.E PHE 59 & UC Punjgran Tehsil Gujar Khan District No.1048/S dated 7.870 0.390 12 Months Rs.5000/- Rawalpindi 05-04-2021 Construction of PCC Street/Path in U.C E.E PHE 60 No.387/S dated 5.555 0.270 10 Months Rs.5000/- Tehsil Kahuta District Rawalpindi 29-03-2021 Construction of PCC Streets in UC Mohra Noori E.E PHE 61 No.1048/S dated 5.556 0.270 -do- Rs.5000/- Tehsil Gujar Khan District Rawalpindi 05-04-2021 Construction of PCC Street/Path in U.C Mawara E.E PHE 62 No.387/S dated 7.408 0.370 12 Months Rs.5000/- Tehsil Kahuta District Rawalpindi 29-03-2021

Continue P-(4)

P-(4) Construction of PCC Streets in UC Adhi, UC E.E PHE 63 & UC Mohra Noori Tehsil Gujar Khan No.1048/S dated 9.259 0.460 12 Months Rs.5000/- District Rawalpindi 05-04-2021 Construction of streets, Drains and paths UC E.E PHE 64 Maloot Sattian Tehsil Kotli Sattian District No.1045/S dated 5.185 0.250 10 Months Rs.5000/- Rawalpindi 03-04-2021 Construction of PCC Streets in UC Budhana & E.E PHE 65 No.1048/S dated 8.333 0.410 12 Months Rs.5000/- UC Tehsil Gujar Khan District Rawalpindi 05-04-2021 Construction of PCC Street/Path in U.C Doberan E.E PHE 66 No.387/S dated 4.629 0.230 10 Months Rs.5000/- Kallan Tehsil Kallar Sayedan District Rawalpindi 29-03-2021 Construction of PCC Streets in UC Doultala-I S.E PHE Circle 67 No.555/S dated 19.444 0.970 12 Months Rs.5000/- Tehsil Gujar Khan District Rawalpindi 07-04-2021 Construction of PCC Street/Path in U.C Dakhali E.E PHE 68 No.387/S dated 5.556 0.270 10 Months Rs.5000/- Tehsil Kahuta District Rawalpindi 29-03-2021 Construction of PCC Streets in UC E.E PHE 69 Muslim & UC Tehsil Gujar Khan District No.1048/S dated 9.722 0.480 12 Months Rs.5000/- Rawalpindi 05-04-2021 Construction of PCC Street/Path in U.C Kanoha E.E PHE 70 & Choa Khalsa Tehsil Kallar Sayedan District No.387/S dated 7.407 0.370 -do- Rs.5000/- Rawalpindi 29-03-2021 Construction of streets, Drains and paths UC E.E PHE 71 Karoor, UC Ayari and UC Deerkot Sattian Tehsil No.1045/S dated 10.370 0.510 -do- Rs.5000/- Kotli Sattian District Rawalpindi 03-04-2021 Construction of PCC Streets in UC & UC E.E PHE 72 Jarmoot Kalan Tehsil Gujar Khan District No.1048/S dated 9.074 0.450 -do- Rs.5000/- Rawalpindi 05-04-2021 Construction of PCC Street/Path in U.C Narrar E.E PHE 73 No.387/S dated 4.630 0.230 10 Months Rs.5000/- Tehsil Kahuta District Rawalpindi 29-03-2021 Construction of PCC Streets in UC Doultala-II E.E PHE 74 No.1048/S dated 5.556 0.270 -do- Rs.5000/- Tehsil Gujar Khan District Rawalpindi 05-04-2021 Construction of streets, Drains and paths UC E.E PHE 75 No.1045/S dated 4.630 0.230 -do- Rs.5000/- Waghal Tehsil Kotli Sattian District Rawalpindi 03-04-2021 TOTAL 657.862 30.28

Executive Engineer Public Health Engg: Division, Rawalpindi.