CNS/SG/2 - WP/26 INTERNATIONAL CIVIL AVIATION ORGANIZATION

AFI PLANNING AND IMPLEMENTATION REGIONAL GROUP COMMUNICATIONS, NAVIGATION AND SURVEILLANCE SUB-GROUP SECOND MEETING CNS/SG/2

(Dakar, , 22-25 May 2007)

(Presented by ASECNA)

SUMMARY ThepresentWorkingPapergivesaprogressreportontheimplementationofrationalizedAFSProjectsin ASECNAarea.AfterAPIRG15meeting,ASECNAhasplannedtoovercomeAFSandisinvolvedinregional projects.TheinteroperabilitybetweenAFSsystemsrequiresclosecooperativeactionsbetweenANSP.

Agenda Item 4: AeronauticalFixedService 1. Improvement of the Aeronautical Fixed Service SincethelastCNS/SG/1meetingthefollowingAFIplannedcircuitshavebeenimplementedor improvedthroughAFISNETsatellitelinks: LinksandCircuits SupportedAFS Dateof LinkEquipments Servicestatus Services implementation Alger– AFTNATS/DS) April2006 AFISNETStationinALGER Ok Alger–Dakar ATS/DS April2006 AFISNETStationinALGER Ok Dakar– AFTNATS/DS) January2006 AFISNETStationinBissau Ok Dakar– AFTNATS/DS) January2007 AFISNETStationinBanjul Ok AFTNATS/DS March2007 Interconnectionofexisting Ok AFISNETstationsinACC& OUA AccraBoboDioulasso ATS/DS March2007 Interconnection ofexisting Ok AFISNETstationsinACC& BOY –SaoTome AFTNATS/DS March2007 AFISNETStationinSao Ok Tome –SaoTome ATS/DS March2007 AFISNETStationinSao Ok Tome –SaoTome ATS/DS March2007 AFISNETStationinSao Ok Tome 2. Near future projects to solve the deficiencies

2.1 Modernization of Automatic Message Switching Systems TherenewaloftheAutomaticMessagesSwitchingsysteminprogressinthefollowingcentres (,,Malabo,,Libreville,Niamey,DakarandBrazzaville)tobecompletedby September2007willimprovenotablytheAFTNoperation. TheseequipmentsaredesignedwithanoptiontocomplyAMHSfunctionalities. 2.2 Implementation of AFI planned AFS circuits

2.2.1 On going Projects ASECNA is involved in regional projects (NAFISAT/SADC 2, CAFSAT) to implement the remainingAFScircuits. Coordinating meetings have been held in one side with ATNS & ICAO and the other side with AENA,ONDA,ENNAinordertobuildanharmonizedbalancedinterconnectingprocessbetween AFISNET and the above networks. on the and one can hope that by the end of year 2007 the followingAFScircuitswillbeachieved: AFS Service Terminal I Terminal II Actions in progress AFTN ATS/DS Brazzaville x x Abidjan Luanda x Brazzaville x Brazzaville x Within the framework of the AFISNET and NAFISAT SADC/2 networks interoperability, N’djamena Khartoum x planned for the July, 2007. N’Djamena x Niamey Tripoli x Niamey Addis x Antannarivo x Bata Douala x Implementation of an AFISNET node in progress Bata SaoTome x in Bata Bata Libreville x Implementation of a CAFSAT node in progress in LasPalmas x x Nouakchott Nouadhibou Implementation of a AFISNET node in progress in LasPalmas x Mopti x x Implementation of an AFISNET node in progress Mopti Gao x x in Mopti

2 2.2.2 Future Projects to be planned Onecanhopethatbytheendofyear2007theaboveAFScircuitswillbeachieved: ItremainsthefollowingAFScircuitstobeimplementedinacooperativeapproach: AFS Service Terminal I Terminal II Actions in progress AFTN ATS/DS Bangui Gbadolite x ASECNAandRVAtocoordinate Bissau Banjul x ASECNAandGCAAtocoordinate Bissau x ASECNAandRobertsFIRtocoordinate Banjul Conakry x

3. Other technical disposals to solve the deficiencies InadditiontoitseffortsfortheimplementationoftheAFTNandATS/DScircuits,ASECNAcarried outimprovementactionsin: • UpgradingthetransmissionrateofthemostAFTNcircuitsinaccordancewith APIRG/12conclusion12/13— • ImplementingaFramerelaynetworkinaccordancewithAPIRG/13conclusion 13/10; • ImplementingSATPHONEasATS/DSbackupinallitscentres; • ConductingatechnicalandoperationalinternalevaluationofAFSanditsrelated equipments; • Upgradingcontinuallythebackboneofitsnetworktosuitthetechnologyevolution. 4. Conclusion

Themeetingisinvited: • Tonotetheinformationgivenabove • To encourage the cooperative actions regarding the AFS circuits implementation/improvement