<<

8.1 KNOWLEDGE PLAN especially in relation to the and on the early medieval techniques used for decorations sequences, bringing important and plaster sculpture; contributions to the reconstruction 8.1.1 INTRODUCTION – NETWORK · Better define development of the passage phases from the late phases of the Gastaldaga and ancient period to the in The aims of the plan are to create the monastery; a neuralgic area of the town and in better coordination of research and · Enhancing knowledge on the direct relation with the royal power study activities into aspects of Episcolal complex, with special expressed by the monastery. Longobard heritage and culture that reference to the origin and In terms of the Territory, the characterise the various places in the shape of the basilica and the numerous recent discoveries of network, as well as the other baptistery; Longobard settlements and Longobard contexts in · Acquiring further information necropolises demand coordination of (Extended Network) and on the Early Middle Ages urban the research projects started and to (European Geocultural Corridor), layout; be started, in order to guarantee a partly thanks to the involvement of proper and unequivocal the leading cultural institutions As for the territory of the Duchy of methodological approach, the working in this sector (CISAM- , along with the systematization possibility of comparing data and Italian Centre for Studies of the Early of already known data, the joint promotion of the research. Middle Ages, and the Centre of strengthening of research aimed at Thanks to the stakeholders Micealican and Garganic Studies). the identification of the Longobard distributed around the Territory it is This can be achieved by: settlement layout – concerning both also possible to experiment an necropolis and military buildings – is interdisciplinary study approach, · Constant distribution of the envisaged. capable of guaranteeing specific results of studies and research analyses and innovative research carried out. Moreover, further research will be projects. · Exchanging data obtained from conducted on Longobard artistic various experiences. production and evergetism by élites, · Creating coordinated which will help find parallels with the 8.1.4 CASTELSEPRIO-TORBA programmes for increasing ongoing studies on places of Site, buffer zone and Territory knowledge about general worship and monasteries, in aspects of Longobard culture or particular the Abbey of Sesto al There are many elements of on specific topics that unite the Reghena. knowledge that concern various locations. Castelseprio-Torba and the district of · Creating common databases. Giudicaria of Seprio. In order to 8.1.3 obtain a view of the whole, able to Site, buffer zone and Territory reconstruct the life of the castle, the 8.1.2 places of cult, the monastery and the Site, buffer zone and Territory The results of numerous studies whole Territory in the Longobard specially conducted over the years era, the following is foreseen: In addition to its rich heritage on the San Salvatore-Santa Giulia already discovered, the potential still complex are today an important · Activation of collecting and present in Cividale and on the whole point of reference for knowledge of memorising all data emerging Territory of the Duchy of Friuli – Early middle ages construction and from research carried out up to revealed also by most recent decorations, particularly with regard now by means of the complete research – leads to plan a series of to stuccoes, frescoes and sculpture. cataloguing of the structures projects aiming at the enhancement The main objective is to spread and remains of the material and improvement of knowledge on understanding of the studies on the culture, organised in a GIS the Longobard period. complex, and then look further into based databank which permits specific aspects, such as those easy consultation and constant The first objective concerns the related to Longobard skilled and implementation of topical collection and the systematization of craft production, organising and archives. already known data (and data to be arranging the numerous existing · Start-up of diagnostic and ni - acquired), by using a system of data. depth surveys on the main implementable databases connected monuments and their to GIS, which enables the rapid In order to raise knowledge with decorative apparatus and on management of archives and easy regard to the phases prior to the some findings; consultation. Early middle ages, the proposal is to · Start-up of an extensive As for the properties in the site investigate, study and valorise the research programme on the applying for the site and the buffer other Roman domus in the area. Territory; zone, actions aim at: The archaeological surveys envisaged in the monumental area · Enhancing knowledge on the will contribute to enrich the Longobard Tempietto, knowledge both on ancient buildings 1 8.1.5 · investigating the Clitunno 8.1.8 MONTE SANT’ANGELO Site, buffer zone and Territory Tempietto, particularly with Site, buffer zone and Territory regard to the execution The present state of knowledge on techniques of decorations and Despite the rich panorama that has the town of Spoleto in Longobard stucco sculptures; already emerged, the potential of the times leads to plan a series of · acquiring information on the testimonials still existent in Monte projects for the accomplishment of Early middle ages urban layout Sant’Angelo and the entire Territory, some main objectives, related to the and consequent identification of demonstrated by the more recent basilica of San Salvatore and to its Longobard settlement design; research, induce to plan a set of territory of reference. · carrying out research and projects which lead to the studies to gain further improvement of knowledge of the For what concerns the site: understanding of the Longobard period, finalised above all Longobard artistic production at creating a wider awareness of the · Re-organize and systemize all within the Territory. cultural heritage and contribute to its information already known on preservation and use. San Salvatore: bibliographic, 8.1.7 Priority is given to the careful documentary and graphic Site, buffer zone and Territory gathering and memorisation of data resources, to let converge into already known and that to be the future Documentation Organisation and uniformity of acquired in relation to a databank Centre of the Basilica information and knowledge on local system connected to a GIS which · Increase the presently available heritage is the first objective to allows rapid management and data through new investigations pursue. It represents the necessary implementation of archives and easy and excavations . basis to develop a project for consultation. enhancing and promoting the town The promotion of new cognitive For what concerns the Territory: and its territory. activities will be articulated mainly: On other hand, involving local · Re-organize and systemize all stakeholders provides a very · On the Longobard Sanctuary information already known, to important opportunity to take shared where in-depth examinations update the existing phase maps decisions on local sustainable are possible (thanks to new and plan investigation and development. surveys and wall stratigraphic study widening. analysis) on the development of · Continue the urban excavation The quest for knowledge will pursue the structural phases and the campaign, to increase existing these main objectives: aspects of internal decoration, data and identify the necropolis particularly the epigraphs; areas. · Increasing knowledge about the · Explanations on the evolution of · Boost and increase the Santa Sofia complex. the most ancient building archaeological researches in the · Increasing knowledge about phases are foreseen with the Territory. archaeology and local heritage realisation of new in general. archaeological surveys and 8.1.6 · Increasing knowledge about the analysis of the wall structures Site, buffer zone and Territory Territory. in the area to the north of the sanctuary. Despite the rich panorama that has These objectives will be pursued by already emerged, the potential of the means of actions taken at three In the buffer zone, the examination testimonies that still exist within the different territorial levels: site, buffer of knowledge on the walls will have Territory has led to the planning of a zone, and territory. In addition, there particular attention, this can be series of project aimed at will be network action. increased by constant control of investigating and improving The expected result of these actions building in relation to the planning understanding of the Longobard is the creation of a unique and running of previous urban period. management system for knowledge archaeology. The first objective concerns the and information about local cultural collection and computerization of heritage and that this local system In the Territory of Monte known data (and data that will be will be part of the general “Territorial Sant’Angelo, apart from the acquired), using and database Information System” relating to the memorisation of known data, the system, which allows rapid “Italia Langobardorum” site. optimisation of research aimed at the management of archives and easy A virtual library will be included in identification of Longobard consultation. the system to create a national fund settlement networks is foreseen, of knowledge on Longobard culture through examination of the analysis In terms of the property entered on and heritage. of the testimonials of the Longobard the site for which inscription is era in the other urban centres of the requested and the buffer zone region and the planning and actions will target: realisation of new research in field. 2 8.1 – KNOWLEDGE PLAN DETAILED SCHEDULES FIELDS OBJECTIVES PROJECTS

NETWORK 1 1.1 EXTENDING KNOWLEDGE Constant updating of the development AND CULTURAL TIES of knowledge and valorisation of Longobard BETWEEN LOCATIONS heritage and culture IN THE NETWORK 1.2 Upgrading of studies and publications on subjects related to Longobard culture and traditions 2 2.1 COORDINATING ACTIVITIES Implementation of a multimedia FOR DOCUMENTING SITES / LOCATIONS IN computerised platform and a database THE NETWORK on the Network, based on a GIS 2.2 Creation of an online bulletin 3 3.1 EXTENDING KNOWLEDGE Drawing up and running a coordinated ABOUT ARCHITECTURE programme to update the findings AND ARTISTIC PRODUCTION on architecture, with analysis IN THE LONGOBARD ERA of construction phases IN THE LOCATIONS 3.2 OF THE NETWORK Creating and running a common program for analysing the characteristics of style, materials, and techniques used in works of artistic value 3.3 Coordination of diagnostic activities on monuments and heritage works 4 4.1 EXTENDING KNOWLEDGE Creation of a database ABOUT LONGOBARD CULTURE on Italian Longobard sites IN RELATION TO THE EXTENT 4.2 OF THE NETWORK TO OTHER ITALIAN Promoting research and studies SITES WITH PARTICULAR EVIDENCE OF into Longobard culture in Italy (Publishing, THE LONGOBARD ERA Conventions, Seminars, etc.) 5 5.1 EXTENDING KNOWLEDGE Creation of a database at European level ABOUT LONGOBARD CULTURE on aspects of Longobard culture IN RELATION TO THE 5.2 GEO-CULTURAL CORRIDOR OF MIGRATION Promoting research and studies FROM NORTHERN EUROPE TO ITALY on Longobard culture in Europe CIVIDALE DEL FRIULI 6 6.1 SITE, BUFFER ZONE ENHANCEMENT OF KNOWLEDGE ON Launch of further survey campaigns AND TERRITORY CIVIDALE’S HERITAGE in order to implement the knowledge on the site’s heritage 6.2 Analysis and study of existing archaeological and historical documentation on Cividale 6.3 Enhancement of historical research on the Longobard Tempietto 6.4 Census on structures and existing data on walls, definition of remains’ properties 7 7.1 CONTINUATION Planning and implementation OF ARCHAEOLOGICAL of archaeological surveys RESEARCH IN THE SITE in the Monastery of Santa Maria in Valle AND IN THE TERRITORY 7.2 Planning and implementation of research in the Duomo

3 8.1 – KNOWLEDGE PLAN DETAILED SCHEDULES FIELDS OBJECTIVES PROJECTS

7.3 Planning and implementation of research on the ancient walls belt 7.4 Planning and implementation of archeaological surveys in the Duchy of Friuli 8 8.1 ENHANCEMENT OF KNOWLEDGE ON THE Analysis and study of existing archaeological TERRITORY DURING LONGOBARD ERA documentation on the territory 8.2 Continuation of archaeological research in rural sites and Longobard necropolis 8.3 Enhancement of research on middle ages churches and monasteries 8.4 Enhancement of research on Early middle ages fortified sites 9 9.1 ENHANCEMENT OF KNOWLEDGE Enhancement of analysis and study ON THE LONGOBARD ABBEY on the Urn of Sant’Anastasia OF SESTO AL REGHENA 9.2 Enhancement of analysis of the Abbey of Santa Maria during Early middle ages and Medieval times 9.3 Carrying out of archaeological researches 10 10.1 SYSTEMATIZATION OF DATA Creation of the Archaeological Card Map of Cividale and the Duchy of Friuli 10.2 Creation of an online database based on GIS BRESCIA 11 11.1 SITE RAISING THE LEVEL Study and monograph publication AND BUFFER ZONE OF KNOWLEFGE of the Longobard phases ON THE EARLY MIDDLE AGES of San Salvatore-Santa Giulia PHASES OF THE MONASTERY 11.2 Study of the craft productions documented archaeologically at the monastery structures 12 12.1 INVESTIGATION INTO Study of the network of monastery properties SAN SALVATORE-SANTA GIULIA of Santa Giulia within AS THE CENTRAL NUCLEUS the Via Carolingia national project OF THE BRESCIA AND NORTHERN ITALIAN MONASTERY SYSTEM 13 13.1 INVESTIGATION INTO Scientific publication of the Ortaglia domus THE HISTORICAL AND MONUMENT PHASES PRECEDING THE LONGOBARD MONASTERY 14 14.1 INVESTIGATION INTO THE STATE OF Scientific Publication of the Republican KNOWLEDGE OF THE URBAN CAPITOLINE Roman sanctuary AREA 14.2 Start of studies on other monuments in the area BRESCIA 15 15.1 TERRITORY SORTING OF TERRITORIAL DATA ON THE Definition of the “Network of Longobard sites” EARLY MIDDLE AGES whose significant nodes are

4 8.1 – KNOWLEDGE PLAN DETAILED SCHEDULES FIELDS OBJECTIVES PROJECTS

AND INCREASE IN THE STATE the settlements of , Leno, , OF KNOWLEDGE and 15.2 Analysis, study and research applied to the findings and funeral objects from the settlements and necropolises of the municipalities in the “Network of longobard sites” 15.3 Foundation and organization of the CISL Centro Italiano di Studi Longobardi (Italian Centre for Longobard Studies) 15.4 Knowledge, safeguard and enhancement of Archaeological Areas and Parks 16 16.1 INVESTIGATION INTO KNOWN Interdisciplinary study into the cultivations INFORMATION and food customs of the Early Middle Ages ON THE LONGOBARDS’ CULTIVATIONS AND FOOD CUSTOMS CASTELSEPRIO-TORBA 17 17.1 SITE REORGANISATION Review of the existing documentation AND BUFFER ZONE AND RECORDING on research carried out within the castrum OF KNOWLEDGE 17.2 Review of existing documentation on Santa Maria foris portas 17.3 In-depth the analysis on the complex of Torba 17.4 Data memorisation 18 18.1 IN-DEPTH EXAMINATION Realisation of archaeometric analysis OF KNOWLEDGE on findings 18.2 Diagnostic analysis on the constructive structures and system 18.3 Analysis of the constructive sequence of the Torba tower 18.4 Diagnostic analysis of the frescoes of Santa Maria foris portas 18.5 Completion of diagnostic surveys on the of Torba 19 19.1 CONTINUATION Planning and execution of archaeological OF ARCHAEOLOGICAL RESEARCH surveys in the castrum 19.2 Completion of the dig in the Basilica of San Giovanni 19.3 Recognition of archaeological presences in the village area 19.4 Completion of archaeological surveys at Santa Maria foris portas 19.5 Planning and execution of archaeological surveys on section of arched walls

5 8.1 – KNOWLEDGE PLAN DETAILED SCHEDULES FIELDS OBJECTIVES PROJECTS

towards Torba 19.6 Planning and execution of new surveys in relation to the Torba Complex CASTELSEPRIO-TORBA 20 20.1 TERRITORY IN-DEPTH EXAMINATION Censoring of Longobard findings OF KNOWLEDGE and creation of an archaeological document ON GIUDICARIA OF SEPRIO on the Giudicaria in Early middle ages 20.2 Promotion of research on the Early middle ages settlement system of the Giudicaria 20.3 Promotion of research on monuments and artistic productions in the Giudicaria SPOLETO 21 21.1 SITE RISE THE BASILICA’S Gathering and systemizing the existing AND BUFFER ZONE KNOWLEDGE LEVEL documentation on the basilica of San Salvatore 21.2 New archaeological investigations on the basilica of San Salvatore SPOLETO 22 22.1 TERRITORY RISE THE LEVEL OF KNOWLEDGE OF THE Prosecution and development DUCHY’S CAPITAL of the urban excavation campaigns AND OF ITS TERRITORY 22.2 Realization of a study on the spolia, re-used materials in Early middle ages buildings 23 23.1 RISE THE ARCHAEOLOGICAL KNOWLEDGE Creation of the archaeological map OF THE TERRITORY of the territory of Spoleto CAMPELLO SUL CLITUNNO 24 24.1 SITE, INVESTIGATION Further investigation campaigns BUFFER ZONE ON THE HERITAGE OF CAMPELLO to implement knowledge AND TERRITORY of the site's heritage 24.2 Analysis and study of existing archaeological and historical documentation 24.3 Further historical research on the Clitunno Tempietto 25 25.1 INVESTIGATION Analysis and study of existing archaeological ON THE TERRITORY documentation DURING THE LONGOBARD ERA on the territory 25.2 Further research into Early middle ages churches 25.3 Further research into Early middle ages fortified sites 26 26.1 COMPUTERISATION OF DATA Creation of an online database BENEVENTO 27 27.1 SITE TO INCREASE THE KNOWLEDGE ABOUT Launch an in-depth study of the Longobard AND BUFFER ZONE THE SANTA SOFIA COMPLEX phase of cloisters 28 28.1 TO INCREASE THE KNOWLEDGE ON Finishing and increasing ARCHAEOLOGY urban archaeological excavations AND LOCAL HERITAGE 28.2 Start a census and study of the “spolia” re-used in buildings in the old city

6 8.1 – KNOWLEDGE PLAN DETAILED SCHEDULES FIELDS OBJECTIVES PROJECTS

28.3 Gather and organise all existing data and documentation on the GIS 28.4 Create an inventory of documentation on Longobard cultural heritage in the Benevento State Archives 28.5 Complete the study of the stucco fragments coming from Sant’Ilario in Port’Aura

BENEVENTO 29 29.1 TERRITORY TO INCREASE THE KNOWLEDGE Gather and organise all existing data ABOUT THE TERRITORY and documentation on the GIS 29.2 Plan systematic analysis and research in the territory MONTE SANT’ANGELO 30 30.1 SITE, IN-DEPTH EXAMINATION Realisation of other survey campaigns BUFFER ZONE OF KNOWLEDGE 30.2 AND TERRITORY OF THE LONGOBARD HERITAGE In-depth examination of historical research on the Longobard Sanctuary 30.3 Censoring of the structures and existing data on the walls, with definition of the property of the remains 30.4 Planning and realisation of new archaeological research in the area to the north of the Longobard Sanctuary 30.5 Planning and realisation of research on the ancient wall belt 31 31. 1 IN-DEPTH EXAMINATION OF KNOWLEDGE Analysis and study of archaeological OF THE TERRITORY documentation in the territory IN THE LONGOBARD ERA 31.2 Continuation of archaeological research in the cult locations situated along la Via Sacra Langobardorum 32 32. 1 MEMORISATION OF COGNITIVE DATA ON Realisation of an archaeological map THE SITE of Monte Sant’Angelo and the Gargano AND ON THE TERRITORY 32.2 Implementation of the regional GIS

7

8 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Network Objective 1 EXTENDING KNOWLEDGE AND CULTURAL TIES BETWEEN LOCATIONS IN THE NETWORK

Project 1.1 Constant updating of the development of knowledge and valorisation of Longobard heritage and culture Description Constant updating of research on the Longobards and the sites in the network can come about as the result of joint reflection on specific topics that are intended to solve knowledge problems relating to the Longobards. The drawing up of a multi-year plan is intended, which establishes annual works to be carried out in the various locations from time to time. This programme will be defined at a meeting already set for May 2008 at the Italian Centre for Studies on the Dark Ages in Spoleto (CISAM). An international convention is planned in 2008 on the characteristics of the 8th century, which is currently being organised in Cividale del Friuli by Prof Valentino Pace from University. Actions 1. Set up a scientific committee 2. Draw up a multi-year programme for topics to be studied in greater detail. 3. Hold conventions on specific topics. 4. Hold a conference in 2008 in Cividale: “The 8th century: A turbulent century”. Parties involved Stakeholders; CISAM; Centro Internazionale di Ricerca e Documentazione sull’Arte e l’Architettura Altomedievale; Centro di Studi Micaelici; Istituto Italiano dei Castelli; Superintendencies; Universities Phases and timescales As from 2008 Financial resources To be found. For the 2008 Cividale Convention the costs will be borne by: Udine University (MIUR funds, research project of the Ministry of Universities and Scientific Research); Municipality of Cividale del Friuli; F.V.G. Regional Authority: Udine Provincial Authority; University Consortium; Private sponsors (Banca Popolare di Cividale; Fondazione Claricini Dornpacher; Fondazione CRUP) Expected results Improved knowledge about Longobard heritage and culture. Facilitating of distribution of knowledge on the topics dealt with. Result indicators Number of meetings held. Number of people attending the meetings. Number of institutions and countries represented at the various meetings.

KNOWLEDGE PLAN Network Objective 1 EXTENDING KNOWLEDGE AND CULTURAL TIES BETWEEN LOCATIONS IN THE NETWORK

Project 1.2 Upgrading of studies and publications on subjects related to Longobard culture and traditions Description Progress in knowledge about Longobard culture can come about by means of setting up specific in-depth actions peculiar to each individual location in the network, and by carrying out research into more general topics that involve all or some of these locations. The intention is therefore to draw up a programme for combined in-depth studies on various topics. Some of these, already identified, include: a) St Micheal in religion and in the history of the Longobards. b) Longobard epigraphs c) Defend and dominate: Fortifications in the Dark Ages between Cividale, Castelseprio, and Benevento. Actions 1. Define a selection of common topics on which to concentrate research. 2. Launch studies on the topics identified. 3. Promote publications Parties involved Stakeholders; CISAM; Centro Internazionale di Ricerca e Documentazione sull’Arte e l’Architettura Altomedievale; Centro di Studi Micaelici; Istituto Italiano dei Castelli; Superintendencies; Universities Phases and timescales Definition of the programme by the end of 2008 Start of studies and research from 2009. Financial resources To be found. Expected results Improved knowledge about Longobard heritage and culture. Facilitating of distribution of knowledge on the topics dealt with. Result indicators Number of research projects carried out Number of players involved in the research Number of publications produced

9 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Network Objective 2 COORDINATING ACTIVITIES FOR DOCUMENTING SITES/LOCATIONS IN THE NETWORK

Project 2.1 Implementation of a multimedia computerised platform and a database on the Network, based on a GIS Description The coordination activities for gathering and managing existing data and fact-finding activities that will be launched will be able to take place thanks to a dedicated computer platform, which will become a database for the network system and act as a collector for the various specific databases, facilitating consultation. A basic computer platform is already in place in Cividale. Management of the computer platform will be linked to that for the Website. Actions 1. Planning and defining common protocols for gathering and managing data. 2. Acquisition and entering of data 3. Implementation of the network GIS. Parties involved Stakeholders; Udine University; Centro Internazionale di Ricerca e Documentazione sull’Arte e l’Architettura Altomedievale – Committee for Promoting the Project for the Aquilea Patriarchate; CISAM; Centro di Studi Micaelici Phases and timescales 1) As from 2008 2-3) As from 2009 Financial resources To be found. Expected results Establish coordination of gathering, management, and distribution of knowledge data on Longobard heritage and culture. Result indicators Quantity of data handled and correlations created with the databases. Number of consultations.

KNOWLEDGE PLAN Network Objective 2 COORDINATING ACTIVITIES FOR DOCUMENTING SITES/LOCATIONS IN THE NETWORK

Project 2.2 Creation of an online bulletin Description Increased knowledge may easily come about as a result of quick distribution of results obtained – albeit partial – and the circulation of news. To do this, the creation of an online bulletin is envisaged, connected to the Website, which can periodically (at least once a year) act as a means of information and connection between the locations in the site and the various initiatives in progress, as well as a for discussing ideas and programmes. It will be an excellent means of informing and spreading the activities promoted by the “Italia Langobardorum” site more widely. Actions 1. Set up an editing committee 2. Design and create the structure of the bulletin 3. Create the bulletin 4. Periodic publishing of the bulletin (once or twice a year) Parties involved Stakeholders; Centro Internazionale di Ricerca e Documentazione sull’Arte e l’Architettura Altomedievale Phases and timescales As from 2009 Financial resources To be found. Expected results Spread of knowledge Result indicators Number of editions of the Bulletin Number of players involved in creating it Extent of distribution of the bulletin

10 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Network Objective 3 EXTENDING KNOWLEDGE ABOUT ARCHITECTURE AND ARTISTIC PRODUCTION IN THE LONGOBARD ERA IN THE LOCATIONS OF THE NETWORK

Project 3.1 Drawing up and running a programme to update the findings on architecture, with analysis of construction phases Description The locations in the network conserve the major Italian architectural evidence of the Longobard period, which in some cases constitutes a unique heritage for reconstructing the construction concepts of the time. Studies of these monuments is already widespread by very often they differ in terms of method and degree of detail, partly due to the time lapse between the various investigations carried out. New surveying and documentation techniques for structures now make it possible to think about a coordinated, homogenous programme of analysis that is able to produce data that can be compared and new elements for establishing the background of the monuments. These provide materials for creating three-dimensional reconstruction models, used to set up multi-media systems that will constitute elements of a database, connected with a computer platform on the Website. Actions 1. Check the status of documentation on every monument 2. Gather the data available 3. Draw up analysis programmes 4. Update findings and run new survey campaigns 5. Stratigraphic analysis of the structures and definition of the phases of evolution 6. Create three-dimensional reconstruction models of the various phases 7. Organise the data 8. Create and implement databases 9. Create multi-media editions on the various monuments Parties involved Stakeholders; Centro Internazionale di Ricerca e Documentazione sull’Arte e l’Architettura Altomedievale; Istituto Italiano dei Castelli; Centro di Studi Micaelici; CISAM; Superintendencies; Universities Phases and timescales 1-3) As from 2008-2009 4-9) As from 2009-2010 Financial resources To be found. Expected results Improved knowledge about Heritage Improved chronological understanding of monuments Result indicators Number of monuments surveyed Number of three-dimensional reconstructions created Quantity of data organised Frequency of consultation of the databases Quantity of multi-media materials produced

KNOWLEDGE PLAN Network Objective 3 EXTENDING KNOWLEDGE ABOUT ARCHITECTURE AND ARTISTIC PRODUCTION IN THE LONGOBARD ERA IN THE LOCATIONS OF THE NETWORK

Project 3.2 Creating and running common programmes for analysing the characteristics of style, materials, and techniques used in works of artistic value Description The heritage in the network includes some of the most relevant works done not only in the Longobard realm, but in all artistic works of the Dark Ages. There are many links to be formed between the artefacts found in the various locations in the network, which is a sign of a common cultural matrix that can only be better understood by more wide-ranging analysis and comparison. For this reason, although these is an extensive series of studies in place, the plan is to promote new research to improve knowledge about art work in the period, in order to better understand not only the formal or aesthetic aspects but also, thanks to new survey methods, the material and technical characteristics of the works by means of adequate diagnostic investigation (see project 3.3 below), and new techniques for documentation that are also in able to provide materials for wider distribution. Some of the general topics to be studied in greater depth include: a) Stucco from the dark ages from Cividale, Brescia, and Spoleto, between East and West. The art of fresco painting in the Longobard age: Techniques and skills. b) Sculpture in the Longobard era: Artistic influences, materials, and execution techniques. c) Writing and producing codes.

11 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

d) Longobard goldsmith’s art – traditional items and new forms of expression Actions 1. Drawing up a coordinated research programme for works of art from the period 2. Gathering and organising existing data. 3. Creating a database 4. Promoting new surveys 5. Implementing the database 6. Creating multi-media publications on the results of the research Parties involved Stakeholders; Centro e Laboratorio di Diagnostica della Rocca Albornoziana di Spoleto; Centro Internazionale di Ricerca e Documentazione sull’Arte e l’Architettura Altomedievale; CISAM; Centro di Studi Micaelici; Superintendencies; Universities Phases and timescales 1-3) As from 2008-2009 4-6) As from 2009-2010 Financial resources To be found. Expected results Improved knowledge about works of art Result indicators Number of items surveyed Quantity of data organised Frequency of consultation of the databases Quantity of multi-media materials produced

KNOWLEDGE PLAN Network Objective 3 EXTENDING KNOWLEDGE ABOUT ARCHITECTURE AND ARTISTIC PRODUCTION IN THE LONGOBARD ERA IN THE LOCATIONS OF THE NETWORK

Project 3.3 Coordination of diagnostic activities on monuments and heritage works Description A cognitive aspect closely related to the previous projects (3.1 and 3.2) is that related to the diagnosis methods for structures and material elements that make up the monuments and works of art from the Longobard period. The drawing up of common or coordinated diagnosis programmes for locations in the network will therefore make it possible to have homogenous data that can provide an accurate reconstruction of the methods used to produce the major works in the period, as well as to have an accurate picture of their state of conservation. This will also make it possible to create a database that can become a reference for all studies into art and architecture in the dark ages. These in-depth programmes will be able to count on organisational support from the Rocca Albornoziana Centre and Diagnostic Laboratory in Spoleto. Actions 1. Define a coordinate diagnosis programme for the heritage items in the network 2. Define data acquisition and organisation protocols. 3. Create a database 4. Promote new coordinated Heritage diagnostic programmes. Parties involved Stakeholders; Centro e Laboratorio di Diagnostica della Rocca Albornoziana di Spoleto; Centro Internazionale di Ricerca e Documentazione sull’Arte e l’Architettura Altomedievale; Superintendencies; Universities Phases and timescales 1-2) As from 2008-2009 3-4) As from 2009-2010 Financial resources To be found. Expected results Extension and coordination of Heritage diagnostic surveys. Increase of knowledge on heritage items and their state of conservation. Result indicators Extent of the database Number of items involved in coordinated fact-finding surveys Number of fact-finding surveys promoted Frequency of consultation of the databases

KNOWLEDGE PLAN Network Objective 4 EXTENDING KNOWLEDGE ABOUT LONGOBARD CULTURE IN RELATION TO THE EXTENT OF THE NETWORK TO OTHER ITALIAN SITES WITH PARTICULAR EVIDENCE OF THE LONGOBARD ERA

Project 4.1 Creation of a database on Italian Longobard sites Description While the Heritage in the network includes the Highest expression of Longobard culture, further aspects of the culture and civilisation of this people is also to be found in other settings in Italy, where less auspicious traces were left, but of equal importance for

12 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

understanding the effect the Longobards had on the destiny of the entire peninsula. Gathering and organising data on the Longobards’ presence in Italy will help to better understand these phases of history and to have an overall picture for each in-depth study. Actions 1. Censusing and analysing Longobard sites and finds. 2. Censusing and analysing funerary finds from the Longobard era. 3. Creating a database 4. Implementing the database thanks to research being carried out Parties involved Stakeholders; CISAM; Centro di Studi Micaelici; Centro Internazionale di Ricerca e Documentazione sull’Arte e l’Architettura Altomedievale; Superintendencies; Universities, Regional and Provincial Authorities, and Municipalities of the areas involved. Phases and timescales As from 2009 Financial resources To be found. Expected results Increased knowledge about the Longobard presence in Italy Result indicators Extent of area involved and number of sites involved Quantity of data acquired and analysed Frequency of use of the database

KNOWLEDGE PLAN Network Objective 4 EXTENDING KNOWLEDGE ABOUT LONGOBARD CULTURE IN RELATION TO THE EXTENT OF THE NETWORK TO OTHER ITALIAN SITES WITH PARTICULAR EVIDENCE OF THE LONGOBARD ERA

Project 4.2 Promoting research and studies into Longobard culture in Italy (Publishing, Conventions, Seminars, etc.) Description Despite the great amount of data available, gathered in research carried out in the last thirty years, many problematic aspects still exist in relation to the Longobard presence in the peninsula, which deserves studying in greater depth. Some general topics include: a) The evolution of urban settlements and the social structure among the inhabitants. b) Carrying out of research into fortification systems in the dark ages. c) Extending research into Longobard necropolises, aimed not only at analysing the single tomb contexts but the construction characteristics and evolution of cemeteries, in order to better anthropologically characterise the dead, and the development of the funeral rite. d) Carrying out research into the customs and society, but analysing cultural material and settlement systems e) Extending research into the evolution of rural areas in the Longobard era, but more in-depth territorial surveys on a large scale and the identification and excavation of the most significant settlements. Actions 1. Identification and involvement of the cultural institutions and experts that work in this field 2. Definition of a multi-year research programme 3. Activation of protocols and agreements for carrying out specific research 4. Publication of results Parties involved Stakeholders; CISAM; Centro di Studi Micaelici; Centro Internazionale di Ricerca e Documentazione sull’Arte e l’Architettura Altomedievale; Superintendencies; Universities, Regional and Provincial Authorities, and Municipalities of the areas involved. Phases and timescales 1-2) As from 2008 3-4) Long term, as from 2009-2010 Financial resources To be found. Expected results Increased knowledge about the Longobard presence in Italy Result indicators Extent of area involved and number of sites involved Number of research projects carried out Number of publications produced

KNOWLEDGE PLAN Network Objective 5 EXTENDING KNOWLEDGE ABOUT LONGOBARD CULTURE IN RELATION TO THE GEO-CULTURAL CORRIDOR OF MIGRATION FROM NORTHERN EUROPE TO ITALY

Project 5.1 Creation of a database at European level on aspects of Longobard culture Description The characteristics of Longobard civilisation and culture can be better understood only by

13 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

following the route that over the centuries took them from Scandinavia to Italy. There is a lot of data about the Longobard presence in the central-northern European settlements, and also those immediately the other side of the and along the Danube, in the ancient territories of Norico and Pannonia (which stretched over , Hungary, and ), where they stayed in the decades immediately prior to their descent into Italy. Reconstructing this long route and their socio-cultural evolution, which can be done by analysing the material relics and existing documentation, is an essential opportunity for knowing about this people. Organising and checking the data gathered thus far, a lot of which related to research completed a number of years ago and which was not widely distributed beyond a limited group of specialists, may provide a very important basis for directing the activities of looking in greater detail and valorising the Longobard civilisation. Running such a project involves establishing agreements with institutions and operators in the various European countries involved, that deal with aspects related to research into the Longobards. Actions 1. Creating relations for European institutions and researchers for the areas involved 2. Drawing up a common research programme and activating requests for financing 3. Censusing and analysing Longobard sites and finds in the various European countries. 4. Censusing and analysing funerary finds from the Longobard era in Europe. 5. Creating a database 6. Implementing the database thanks to research being carried out Parties involved Stakeholders; CISAM; Centro di Studi Micaelici;; Centro Internazionale di Ricerca e Documentazione sull’Arte e l’Architettura Altomedievale; Superintendencies; Universities, European Institutions in the areas involved. Phases and timescales 1-2) As from 2008-2009 3-6) Long term, as from 2009-2010 Financial resources To be found among financing from the European Community for cultural cooperation (Cultural Programme 2007-2013; Interreg …). Expected results Improved knowledge of Longobard culture and civilisation Result indicators Extent of area involved and number of sites involved Quantity of data acquired and analysed Frequency of use of the database

KNOWLEDGE PLAN Network Objective 5 EXTENDING KNOWLEDGE ABOUT LONGOBARD CULTURE IN RELATION TO THE GEO-CULTURAL CORRIDOR OF MIGRATION FROM NORTHERN EUROPE TO ITALY

Project 5.2 Promoting research and studies on Longobard culture in Europe Description The intention is to create a system for collaboration with the Institutions affected by the Geo- Cultural Corridor, for more in-depth studies of the Longobard culture in order to develop and run a programme to analyse the Longobard socio-cultural traditions in the territories affected by their migration. Some general topics to be looked at in-depth include: a. Research and studies on pilgrims, sites, and itineraries from the Byzantine Mediterranean region to the Longobard and Germanic world. b. Research into Longobard funeral rites and customs. The large necropolises from Panninia to Italy. c. Research and study of the Longobard routes from Northern Europe to Italy. d. Research and studies into traditional Longobard customs and social evolution e. Research and studies of alimentation in the Longobard era f. Longobard art before arriving in Italy. Actions 1. Creating relations for European institutions and researchers for the areas involved 2. Drawing up a common research programme, setting up bilateral or multi-party agreements and programmes, and activating requests for financing 3. Carrying out research 4. Publication of results Parties involved Stakeholders; CISAM; Centro di Studi Micaelici;; Centro Internazionale di Ricerca e Documentazione sull’Arte e l’Architettura Altomedievale; Superintendencies; Universities, European Institutions in the areas involved.

14 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Phases and timescales 1-2) As from 2008-2009 3-4) Long term, as from 2009-2010 Financial resources To be found among financing from the European Community for cultural cooperation (Cultural Programme 2007-2013; Interreg …). Expected results Improved knowledge of Longobard culture and civilisation Result indicators Extent of area involved and number of sites involved Number of research projects carried out Number of publications produced

15

16 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Cividale del Friuli site and buffer zone Objective 6 ENHANCEMENT OF KNOWLEDGE ON CIVIDALE’S HERITAGE

Project 6.1 Launch of further survey campaigns in order to implement knowledge on the site’s heritage Description An enhanced knowledge – also of the relative documentation – on the exceptionality of the architectural and artistic heritage of Cividale is fundamental to improve its use. The promotion of new cognitive surveys aimed at the improvement of existing data – sometimes incomplete or based on past analyses conducted with non-updated techniques – seems to be of paramount importance. In particular, further studies on building and decorative techniques and development phases of monuments are extremely interesting. In this context, new digital precision organic surveys, acting as a basis for the implementation of knowledge and enabling the planning and implementation of further analytical studies are planned. Surveys can be conducted through photogrammetric or laser-Scanning methods, or through vector and digital rendering. As to the Monastery, it is necessary to start from the survey of wall and plaster stratification (through targeted surveys) of the surfaces facing the cloister. This phase is needed to plan an overall systematic survey. The following actions are scheduled: a) Metric survey of the building stratification, descriptive survey of material of the Tempietto and the Monastery of Santa Maria in Valle (See Conservation Plan, Project 2.2; Enhancement Plan, Project 1.2, 1.7) b) Georeferenced metric survey and survey of the building stratification of the ancient Patriarchal Palace and other ruins discovered at the Provveditori Veneti Palace (Archaeological Museum) (See Conservation Plan, Project 5.1) c) Survey of the Font of Callisto and the Altar (See Conservation Plan) Actions 1. Survey project 2. Implementation of campaigns for georeferenced metric and descriptive surveys 3. Analysis of building stratification of monuments 4. Data rendering 5. Creation of three-dimensional rendering models for actual conditions 6. Creation of three-dimensional rendering models for transformation phases Parties involved Municipality of Cividale del Friuli; Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage of ; Parish of Santa Maria; Region Friuli Venezia Giulia; International Centre for Research and Documentation on Early Medieval Art and Architecture Phases and timescales Short-medium term, starting from 2009 Financial resources Funds to be raised by: Municipality of Cividale del Friuli; State (Ministry for Cultural Heritage and Activities); Region Friuli Venezia Giulia The survey of the Ratchis Altar, within the diagnostic project (€ 71,000) has already been funded by the Region Friuli Venezia Giulia and BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) (See Conservation Plan) Expected results Obtaining precision georeferenced surveys on existing material, in order to define the historical evolution of the property (analysis of transformation phases) Surveys will be the basis for: - planning the maintenance project of the Tempietto and the restoration project of the Monastery - planning and carrying out of further targeted analyses on building elements - creating a GIS (database) - providing material for dissemination activities Result indicators Number of collected and systematized data Frequency of use of results in other project concerning the conservation, enhancement and use of the properties.

KNOWLEDGE PLAN Cividale del Friuli site, buffer zone and territory Objective 6 ENHANCEMENT OF KNOWLEDGE ON CIVIDALE’S HERITAGE

Project 6.2 Analysis and study of existing archaeological and historical documentation on Cividale Description There are numerous research and archaeological finds in Cividale. Not only there are investigations which date back to the 18th and 19th century, but also, especially in recent years, excavations have been carried out with modern methods. All documents and finds are

17 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES therefore kept. Unfortunately, data have been analysed only partially or at preliminary phase. Their close examination is an important element for the reconstruction of the vicissitudes of the Site and for the improvement of enhancement and dissemination prospects. The objective is therefore to activate a new study on finds and excavation results carried out in the past in Cividale. In particular: in the area of the Duomo and the Patriarchal Palace (Provveditori Palace); in Piazza Paolo Diacono and near the Pietà Mount; in the Fornasaro estate; in the Roman Court; in the Forum; in the San Francesco court; near the Craigher Canussio estate (ancient walls and towers). In addition to this, the census and analysis of the data concerning churches and monasteries of the city and surroundings are also planned. A cognitive in-depth study will provide material for the monographic publications on different topics in the context of the series “Archaeology in Cividale. Studies and research” , which will initially envisage the following topics: a) The area of the Episcopal complex from Roman to Modern times; summary of information and results of ancient and recent surveys in the area which includes the complex of the cathedral, the ruins of the Patriarchal Palace and some houses, dating from Roman and Medieval times which are now visible near the basement of the Provveditori Palace.

Remaines near Patriarchal Palace

b) The excavation of Piazza Paolo Diacono; results of old and recent excavations in the area of the Late-Antique palatium and the ” Tomb of Gisulf” (layers from Roman to Medieval times).

View of the excavations near the so-called “Tomba di Gisulfo”

c) The excavation of Julius Caesar Forum and the Roman Court Residence. Excavation conducted from 2003 to 2006 in two key area of Forum Iulii (layers from Roman times to the )

View of the roman building and Early middle ages burial in the area of Corte Romana

18 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

d) The southern necropolis of Forum Iulii e) The necropolis of San Giovanni and Cella from Roman to Early Medieval times Actions 1. Research and recovery of documentation. 2. Study and systematization of excavation data. 3. Cataloguing and study of finds 4. Issue of publications Parties involved Superintendence for Archaeological Heritage; Municipality of Cividale del Friuli; University of Udine; University of Trieste; International Centre for Research and Documentation on Early Medieval Art and Architecture Phases and timescales Medium term starting from 2009 Financial resources Funds to be raised by: State (Ministry for Cultural Heritage and Activities); Region Friuli Venezia Giulia; ; private and bank sponsorship Expected results Scientific release on excavations and dissemination of archaeological aspects on the history of Cividale This will be necessary to: - create the Archaeological Card of Cividale. - create a GIS (database) - issue information material Result indicators Number of obtained data Number of analyzed contexts Number of issued publications

KNOWLEDGE PLAN Cividale del Friuli site Objective 6 ENHANCEMENT OF KNOWLEDGE ON CIVIDALE’S HERITAGE

Project 6.3 Enhancement of historical research on the Longobard Tempietto Description a) Many studies have been conducted on the Longobard Tempietto since the beginning of last century. Documentation on these interventions went missing or lack cohesion. Some surveys – like, for example, those conducted under Austrian rule at the beginning of the 20th century – haven’t even been documented. The census and collection of all known data and the search for new data in the archives will be essential to get a complete idea of the vicissitudes of the Longobard Tempietto Actions 1. Acquisition and systematization of archive data on already conducted researches 2. Research in the historical archive of Vienna on the activity of the Isonzo Armèe Parties involved Municipality of Cividale del Friuli; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of Friuli Venia Giulia; University di Udine; International Centre for Research and Documentation on Early Medieval Art and Architecture Phases and timescales Medium term, starting from 2009 Financial resources Funds to be raised by: Municipality of Cividale del Friuli; State (financing for research); European Union Expected results Improvement of knowledge on the Tempietto Longobardo Creation of an updated and complete database Result indicators Number of collected data Frequency of use of the database

KNOWLEDGE PLAN Cividale del Friuli site and buffer zone Objective 6 ENHANCEMENT OF KNOWLEDGE ON CIVIDALE’S HERITAGE

Project 6.4 Census on structures and existing data on walls, definition of remains’ properties Description The walls are a monumental element of the ancient urban area of Cividale. They have been subject to changes in use and the modern urban development of the town over time. The knowledge of the features which still remain today is therefore a fundamental aspect to understand some urban development trends and to achieve a better protection and conservation level for the remains. Up to now, some in-depth studies have been conducted on Cividale’s urban walls, yet with no systematic approach. It is therefore necessary to plan and systematically complete the census and the documentation of existing wall sections, through cataloguing and surveys to verify their belonging (See Conservation Plan). In this

19 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

way, a database which could be used for conservation and enhancement of walls and to favour dissemination of historical aspects among the general public will be created. Actions 1. Census of existing features or features found in the past 2. Cataloguing of existing wall sections 3. Verification of ownership 4. Verification and recovery of the documentation 5. Promotion of geometric surveys (orthophoto map or photogrammetric surveys) of remaining areas 6. Stratigraphic analysis 7. Systematization of data and transfer into archives 8. Issue of information and scientific material Parties involved Municipality of Cividale del Friuli; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) and Superintendence for Archaeological Heritage; International Centre for Research and Documentation on Early Medieval Art and Architecture; Italian Castle Institute (section Friuli Venezia Giulia). Phases and timescales Short-medium term starting from 2009 Financial resources Funds to be raised by: Municipality of Cividale del Friuli; Region Friuli Venezia Giulia R. L. 10/2000 Expected results Improvement of knowledge on walls Production of material for the implementation of GIS and archives on Cividale’s Heritage Result indicators Number of data obtained Frequency of use of data in other projects concerning the conservation, enhancement and use of the property Number of publications issued on the subject

KNOWLEDGE PLAN Cividale del Friuli site Objective 7 CONTINUATION OF ARCHAEOLOGICAL RESEARCH IN THE SITE AND IN THE TERRITORY

Project 7.1 Planning and implementation of archaeological surveys in the Monastery of Santa Maria in Valle Description The area of Valle where the Monastery is located is one of the most important areas of Longobard Cividale: here the royal court was located, as well as the Gastaldo. The Church of San Giovanni and the Tempietto were founded in this context as buildings related to the royal court. Besides the Tempietto Longobardo, some sculptures of the 6th-7th century and some aristocratic tombs found in the 18th century in the Church of San Giovanni, there are no other data on the monumental development of the area and the Monastery during Longobard times. Only archaeological surveys will provide new elements so as to reconstruct and present to the general public the history of this crucial area of the town. Several archaeological surveys are directly linked to the interventions concerning the programme to enhance the monastery and to increase attendance to the Tempietto (see Enhancement Plan).

Drawing of Della archaeological findings in the Santa Maria in Valle Monastery

20 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Plan of the future archaeological research

Actions 1. Archaeological surveys in relation to the enhancement of the use and layout of the monument and the rearrangement of the route in the Monastery: to be moved to the southern courtyard of the Tempietto, to the external area of the northern wall, to the south wing of the cloister which leads to the narthex and the façade (See Enhancement Plan) 2. Archaeological surveys in the sacristy in relation to the rearrangement of the access to the Tempietto and the redefinition of spaces (See Enhancement Plan) 3. Excavation surveys to verify the archaeological deposit in the cloister and in the courtyard of the Monastery (See Enhancement Plan, Project 1.2, phase 3) 4. Non-destructive preliminary diagnostic surveys (electromagnetism, georadar) in San Giovanni 5. Preliminary diagnostic surveys (electromagnetism, georadar, investigations) to identify other areas of archaeological value in the Monastery 6. Planning and implementation of archaeological extended excavations 7. Study of results 8. Publication of data Parties involved Municipality of Cividale del Friuli; Superintendence for Archaeological Heritage of Friuli Venezia Giulia; University; International Centre for Research and Documentation on Early Medieval Art and Architecture Phases and timescales 1 e 2 Short term 3-8 Medium term Financial resources 1-2 Funds of the Municipality of Cividale del Friuli in the context of the appropriations for the first phase for the restoration of the Monastery of Santa Maria in Valle (see Enhancement Plan) 3-8 Funds to be raised by: Municipality of Cividale del Friuli; Region Friuli Venezia Giulia Expected results Defining the historical evolution of the area and obtaining elements to enhance the cultural offer for the visit to the Tempietto and the Monastery This will contribute to: a) The planning of conservation and enhancement interventions b) The creation of the Archaeological Card of Cividale c) Implementation of GIS (database) d) Issue of information material Result indicators Width of the area to be surveyed Number of data obtained Frequency of use in other enhancement and conservation projects Quantity of information and scientific material produced

KNOWLEDGE PLAN Cividale del Friuli site Objective 7 CONTINUATION OF ARCHAEOLOGICAL RESEARCH IN THE SITE AND IN THE TERRITORY

Project 7.2 Planning and implementation of research in the Duomo Description Since there are no data on the original basilica, nor results of excavation conducted at the beginning of the 20th century on the church square, non-destructive cognitive interventions

21 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

will be carried out inside the cathedral in order to verify the existence of ancient structures and possibly their development in plan view. Actions Planning of non-invasive surveys according to different methods: georadar, electromagnetism, etc. Carryon out of surveys Processing of result and drawing up of interpretation plans Parties involved Parish of Santa Maria; Superintendence for Archaeological Heritage and BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of Friuli Venezia Giulia; International Centre for Research and Documentation on Early Medieval Art and Architecture Phases and timescales Medium term Financial resources Funds to be raised by: Region Friuli Venezia Giulia; private citizens and bodies. Expected results Improvement of knowledge on the ancient layout of the Duomo Result indicators Width of the area to be surveyed Number of data obtained Frequency of use of data in other enhancement and research projects.

22 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Cividale del Friuli site and buffer zone Objective 7 CONTINUATION OF ARCHAEOLOGICAL RESEARCH IN THE SITE AND IN THE TERRITORY

Project 7.3 Planning and implementation of research on the ancient wall belt Description The walls enclosing the Roman town and later the Longobard town mark the limits of the urban area. Discovered especially thanks to the research of Stucchi, during the half of the 20th century, they have been subject to recent excavations only in two sections: near Craigher Canussio Palace (Table no. 3) and near Via Mulinuss (Table no. 5). Another significant section containing a tower and the Late-Antique and Early Medieval strengthening structures of the walls is the Blockhouse area (Table no. 2) which could provide further data on the evolution and chronology of structures and represent a significant element in the route connected especially to the walls at the Craigher Canussio Palace.

Map of the city walls with the main areas for the archaeological research

The area n. 1

The area n. 2 Actions 1. Cleaning of the area subject to intervention 2. Survey of existing structures 3. Planning and implementation of archaeological excavations 4. Study and publication of results 5. Dissemination and preparation of visits (see Conservation Plan, Enhancement Plan) Parties involved Municipality of Cividale del Friuli; Superintendence for Archaeological Heritage and BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage); International Centre for Research and Documentation on Early Medieval Art and Architecture; Italian Castle Institute (section Friuli Venezia Giulia).

23 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Phases and timescales Short-medium term, can be scheduled starting from 2009 Financial resources Funds to be raised by: Municipality of Cividale del Friuli; Region Friuli Venezia Giulia, (funds in compliance with the Regional Law 10/2000) Expected results Improvement of knowledge on the development phases and the chronology of the walls Production of material for conservation and enhancement interventions Result indicators Width of the area to be surveyed Number of data obtained Frequency of use of data for other conservation, enhancement and dissemination projects Number of dissemination activities carried out

KNOWLEDGE PLAN Cividale del Friuli territory Objective 8 ENHANCEMENT OF KNOWLEDGE ON THE TERRITORY DURING LONGOBARD ERA

Project 8.1 Analysis and study of existing archaeological documentation on the territory Description Throughout the territory, extended evidence of the Longobard presence has been found. The improvement of knowledge must be based on new acquisitions, as well as on the verification and collection of all data available in order to create a wide documentation ground which could become a fundamental tool for the preservation of the heritage and the launch of new research projects. Actions 1. Census of existing data relative to the site included in the Longobard routes (see Enhancement Plan) 2. Census of the data on the Longobard period in other urban site of the Duchy (, Concordia) 3. Systematization of data and transfer into archives for the creation of a Data Base 4. Study of evidence, data and launch of in-depth analysis of specific topics 5. Publication and dissemination of results Parties involved Superintendence for Archaeological Heritage and BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of Friuli Venezia Giulia; University; International Centre for Research and Documentation on Early Medieval Art and Architecture; Regional Centre for Cataloguing and Restoration of di Passariano; Italian Castle Institute (section Friuli Venezia Giulia); City Museums of History and Art; Friuli Archaeological Association. Phases and timescales Short-medium term, starting from 2009 Financial resources Funds to be raised by: Region Friuli Venezia Giulia; European Union Expected results Acquisition of existing data and in-depth studies Result indicators Quality and quantity of data obtained Number of dissemination activities promoted and size of target groups

24 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Cividale del Friuli territory Objective 8 ENHANCEMENT OF KNOWLEDGE ON THE TERRITORY DURING LONGOBARD ERA

Project 8.2 Continuation of archaeological research in rural sites and Longobard necropolis Description The continuation of excavation surveys on the territory on the most significant sites, like those already subject to partial surveys or those discovered again thanks to territorial analyses is essential to allow the enhancement of knowledge on the culture and the settlement of the Longobards. This is true also for Longobard necropolises: finding funerary accoutrements is fundamental to know the traditions, culture and habits of the Longobards and to measure their level of acculturation, also through anthropological analyses of skeleton remains. In Friuli many isolated tombs have been discovered. Since the place where they have been found is know, it would be important to reconstruct the cemeteries to which they belonged.

Map with the burials found of Longobards in Friuli Venezia Giulia

Actions 1. Identification of areas of interest 2. Launch of territorial analyses on wide scale with surveys and satellite image analysis 3. Planning of interventions and preliminary surveys to verify archaeological potential of the sites 4. Conduct of extended excavations 5. Launch of anthropological analyses on preserved skeleton remains 6. Systematization and transfer into archive of data 7. Dissemination and publication of data obtained Parties involved Superintendence for Archaeological Heritage; City Museums of History and Art; Friuli Archaeological Association. Phases and timescales Medium term, starting from 2010 Financial resources Funds to be raised by: State; Region Friuli Venezia Giulia; European Union Expected results Increase in the numbers of findings and evidence of the Longobards Result indicators Number of data Width of the area to be surveyed Frequency of use of acquired data

25 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Number of the dissemination activities promoted and size of target groups

KNOWLEDGE PLAN Cividale del Friuli territory Objective 8 ENHANCEMENT OF KNOWLEDGE ON THE TERRITORY DURING LONGOBARD ERA

Project 8.3 Enhancement of research on Early middle ages churches and monasteries Description The churches and monasteries were the main institutions and the most important monuments of Friuli during Longobard times and usually preserve artistic works or evidence of the period. The evergetism of the ruling élites is focused – especially during the 7th and 8th century – on the foundation, embellishment and furnishing of these structures which were usually subject to a long process of evolution and transformation over time. A systematic analysis of these structures is planned in order to collect more data which will allow to improve knowledge on the development of the Early-Medieval presence of the Longobards on the territory and the characteristics of their artistic and architectural production, thus enabling further enhancement of the properties (see Enhancement Plan, Project 9.1) The improvement of knowledge on material and building techniques used for sculpture works of art found in the territory is also planned.

Map of the Early middle ages Monasteries in Friuli Venezia Giulia

Actions 1. Enhancement of research for the identification of the Longobard Monastery of Salt, through territorial surveys (surveys and satellite image analysis) 2. Census of the data and enhancement of research on other Early-Medieval monasteries (Aquileia, Cervignano, San Canzian d’Isonzo) 3. Census and analysis of data about Early-Medieval churches 4. Territorial and toponymic research aimed at identifying the areas where ancient churches which went missing were located 5. Census and study of artistic and architectural evidence linked to places of worship and monasteries 6. Analyses aimed at knowing the material and building techniques of sculptures 7. Systematization and transfer into archive of data 8. Dissemination and publication of the data obtained Parties involved Superintendence for Archaeological Heritage and BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage); University of Udine; National Research Centre; International Centre for Research and Documentation on Early Medieval Art and Architecture; City Museums of History and Art; Friuli Archaeological

26 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Association. Phases and timescales Short-medium term starting from 2009 Financial resources Funds to be raised by: Region Friuli Venezia Giulia; private and bank sponsorship As to the Municipality of San Canzian d’Isonzo, a regional contribution of € 40,000 has already been allocated for 2008 in order to launch the first phase for the restoration of the Antiquarium annexed to the church, through previous excavation campaigns. Further funds amounting to € 40,000 are expected to be donated by a bank to continue operations. Expected results Enhancement of knowledge on churches, monasteries and works of art of the territory during Longobard times; acquisition of updated data and creation of archives open to consultation Result indicators Number of data collected Width of the area subject to intervention Frequency of consultation of collected data Number of dissemination activities promoted and size of target groups

27 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Cividale del Friuli territory Objective 8 ENHANCEMENT OF KNOWLEDGE ON THE TERRITORY DURING LONGOBARD ERA

Project 8.4 Enhancement of research on Early middle ages fortified sites Description are the main settlements on the territory dating back from Early-Medieval times. Research conducted up to now, in particular in the sites mentioned by Paolo Diacono (Cormons, , , , , Gemona, Invillino) revealed their potential for the reconstruction of the vicissitudes of the Duchy. Research will be continued systematically, starting from a complete census of the areas where fortified settlements are located, by implementing the database on Late-Antique Early-Medieval fortifications created in Artegna (International Centre for Research and Documentation on Late-Antique and Early- Medieval Fortifications -CIRDOFTA), so as to improve knowledge and documentation of each centre, thus identifying characteristics and specificities also thanks to specific archaeological surveys. In some sites researches have already started and are under way: a. Artegna, San Martino Hill b. Osoppo, Fortezza Hill c. Ragogna, San Pietro Hill d. Gemona, Castle Hill e. Buia, Castle Hill f. Cormons, Quarin Hill g. Illeggio h. , Cuel di Ciaste e Pra di Got In Invillino new interventions are scheduled for 2007 and 2008, in the context of a programme for the enhancement of archaeological areas of Santino Hill, where the castrum is located, and Zuca Hill, where the Early-Christian and Early Medieval cultural complex is located.

Map of the main Early middle ages castles in Friuli Venezia Giulia

Actions 1. Census of the sites and fortified structures 2. Acquisition, Systematization of data 3. Promotion of survey campaigns of fortified centres 4. Completion of archaeological researches and promotion of new surveys 5. Enhancement of the website dedicated to Early-Medieval fortifications (CIRDoFTA)

28 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

6. Study and publication of results Parties involved Municipalities; Province of Udine; Region Friuli Venezia Giulia; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) and Superintendence for Archaeological Heritage; CIRDOFTA (International Centre for Research and Documentation on Late-Antique and Early- Medieval Fortifications); Italian Castle Institute (section Friuli Venezia Giulia); City Museums of History and Art; Friuli Archaeological Association. Phases and timescales Short-medium term, starting from 2008 Financial resources · Artegna: for 2007-2008 EU funds and funds of the Municipality of Artegna have been allocated and amount to € 85,000 for the continuation of research in the castrum, for the launch and activity of CIRDOFTA and dissemination activities; funds in the context of appropriations in compliance with the R.L. 10/2000 for the restoration of the castle (€ 2,200,000) · Osoppo; municipal funds, already allocated in the budget, amounting to € 5,000, for archaeological research in 2008; funds in the context of appropriations in compliance with the R.L. 10/2000 for the restoration of the fort’s structures (€ 60,000) · Ragogna; funds in the context of appropriations in compliance with the R.L. 10/2000 for the restoration of fortifies structures (1st lot € 150,000; 2nd lot € 120,000; 3rd lot € 190,000; completion of project € 82,410) · Gemona; funds in the context of the appropriation for the restoration of the castle (€ 000000) · Buia ; funds in the context of appropriations in compliance with the R.L. 10/2000 for the restoration of fortifies structures (€ 0000) · Forni di Sopra, funds in the context of appropriations in compliance with the R.L.. 10/2000 (€ 100,000) · Invillino; funds of the Municipality of already allocated in the budget amounting to € 10,000 for the continuation of research and new surveys Expected results Improvement of knowledge on Early-Medieval castra of the Duchy of Friuli. Increase in the enhancement levels with extension of the museum network “The castra of Paolo Diacono and Longobard Friuli” (See Enhancement Plan) Result indicators Number of data acquired Number of sites involved Width of the area subject to intervention Number of dissemination activities promoted and size of target groups

29 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Cividale del Friuli territory Objective 9 ENHANCEMENT OF KNOWLEDGE ON THE LONGOBARD ABBEY OF SESTO AL REGHENA

Project 9.1 Enhancement of analysis and study on the Urn of Sant’Anastasia Description The Urn of Sant’Anastasia, which consists of a lectern for the exhibition of holy books, is one of the most interesting sculptural artefacts of the 7th century. Subject to controversial historical-artistic analyses, it has never undergone precise cognitive surveys which could outline sculpture techniques. Therefore, in-depth analyses using the most recent techniques, starting from digital technological surveys are planned in order to better enhance the property. (See Enhancement Plan)

The so called “Urna di Sant’Anastasia”

Actions 1. Census and acquisition of existing data 2. Laser scanning survey 3. Creation of three-dimensional models 4. Analysis of style and technical features of the property 5. Publication of results 6. Creation of multimedia publications Parties involved Municipality of Sesto al Reghena; Parish; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of Friuli Venezia Giulia; International Centre for Research and Documentation on Early Medieval Art and Architecture

30 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Phases and timescales Short term, starting from 2008 Financial resources € 10,000 entered in the budget 2008 by the Municipality of Sesto al Reghena € 35,000 appropriation requested by the Region Friuli Venezia Giulia R.L. no. 68/81 Par. IV Expected results Improvement of the knowledge on the Urn of Sant’Anastasia and on sculpture production during Longobard times Issue of material to improve dissemination and use Result indicators Number of dissemination activities promoted and side of target groups

KNOWLEDGE PLAN Cividale del Friuli territory Objective 9 ENHANCEMENT OF KNOWLEDGE ON THE LONGOBARD ABBEY OF SESTO AL REGHENA

Project 9.2 Enhancement of analysis of the Abbey of Santa Maria during Early middle ages and Medieval times Description The Abbey of Sesto al Reghena is a single and unique complex, although it contains structures used for different functions. The whole architectural body speaks of all the changes the building went through. There are some elements which date back to the original plan and the phases of monumentalisation during Roman times which concerned the Abbey and other buildings, among which the bell tower. Other Medieval and post-Medieval structures enrich the central core. The knowledge on the various architectural phases will be improved thanks to the recovery of existing data and the promotion of new surveys with digital technology which stand as a basis for the stratigraphic reading of structural layers and for the creation of interpretation and reconstruction three-dimensional models aimed at the enhancement of the place (See Enhancement Plan).

Plan of the main buildings known of the Monastery

Actions 1. Census and study of existing documentation 2. Census and analysis of works of artistic value preserved in the Abbey 3. Analysis of data on old excavations 4. Recovery of graphic documentation and surveys of the structures of the Abbey 5. Carrying out of new surveys 6. Stratigraphic analysis of the structures of the basilica 7. Creation of three-dimensional models of the monastic complex Parties involved Municipality of Sesto al Reghena; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) and Superintendence for Archaeological Heritage of Friuli Venezia Giulia; International Centre for Research and Documentation on Early Medieval Art and Architecture Phases and timescales Medium term, starting from 2009 Financial resources Funds to be raised by: Municipality of Sesto al Reghena; Region Friuli Venezia Giulia; Province of ; Fondazione Cassa di Risparmio of Udine and Pordenone Expected results Improvement of knowledge on the various phases of the Abbey Production of material for the improvement of dissemination and use Result indicators Number of data acquired Number of dissemination activities promoted and size of target groups

31 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Cividale del Friuli territory Objective 9 ENHANCEMENT OF KNOWLEDGE ON THE LONGOBARD ABBEY OF SESTO AL REGHENA

Project 9.3 Carrying out of archaeological researches Description The ancient origin of the Abbey, founded in the Longobard period on pre-existing structures and its long history bequeathed an archaeological stratification of particular interest. Surveys which have been conducted up to now in the southern area of the abbey brought to light a secondary place of worship dating from Early-Medieval times. In the park, north of the abbey, where the cloister was located, some surveys proved the existence of a warehouse of great potential, relative to pre-existing structures. Supposedly, service facilities of the Abbey were located in this area. New archaeological surveys which will allow the recovery of more data to reconstruct the vicissitudes of the complex will be scheduled. Building and restoration interventions on the structures will be used to conduct preliminary surveys.

Excavation plan of the Early Medieval Chappel founded at the South of the Abbey Church

The Park of Monastery, from north: an area whit ancient remains, where are important carry on new archaeological research Actions 1. Planning of archaeological surveys 2. Carrying out of preliminary non-invasive surveys in the Abbey and in the hall 3. Carrying out of preliminary surveys 4. Carrying out of extended excavations 5. Analysis of data 6. Production of material for the dissemination of results Parties involved Municipality of Sesto al Reghena; Parish; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) and Superintendence for Archaeological Heritage of Friuli Venezia Giulia; International Centre for Research and Documentation on Early Medieval Art and Architecture; University Phases and timescales Medium term, starting from 2009-2010 Financial resources Funds to be raised by: Municipality of Sesto al Reghena; Region Friuli Venezia Giulia; Already entered in the budget for archaeological research (€ 15,000) in the context of the

32 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

appropriation for the renovation of the bell tower (€ 550,000) Expected results Improvement of knowledge on the historical and structural development of the Abbey Production of scientific and information material Result indicators Number of data acquired Width of the territory subject to intervention Number of dissemination activities promoted and size of target groups

KNOWLEDGE PLAN Cividale del Friuli territory Objective 10 SYSTEMATIZATION OF DATA

Project 10.1 Creation of the Archaeological Card Map of Cividale and the Duchy of Friuli Description Existing data on the Longobard period both in Cividale and throughout Friuli are numerous and are an essential ground for improving knowledge on the Longobard people and its settlements in Italy. Data are heterogeneous and this makes it complicated to use and disseminate them, thus diminishing their potential. For this reason, it is necessary to create an overall systematic collection of this evidence so as to make data available in a single database which will later become a real Card on archaeological evidence. Actions 1. Census of documentation 2. Filing and cataloguing of findings 3. Study and systematization of data with creation of a digital archive 4. Creation of the Card 5. Publication and dissemination of the Card Parties involved Region Friuli Venezia Giulia; Municipality of Cividale del Friuli; Superintendence for Archaeological Heritage and BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of Friuli Venezia Giulia; University of Udine and Trieste; International Centre for Research and Documentation on Early Medieval Art and Architecture; Project Promoting Committee of the Patriarchy of Aquileia; City Museums of History and Art; Friuli Archaeological Association. Phases and timescales Short - medium term, starting from 2009 Financial resources Funds to be raised by: Region Friuli Venezia Giulia Expected results Collection and reorganization of all archaeological data; all data must be available for consultation. This will contribute to the implementation of a territorial GIS on evidence and to draw up archaeological risk maps Result indicators Number of collected data Width of the territory concerned Frequency of consultation and use of data in other projects Number of dissemination activities promoted and size of target groups

KNOWLEDGE PLAN Cividale del Friuli territory Objective 10 SYSTEMATIZATION OF DATA

Project 10.2 Creation of an online database based on GIS Description The management of knowledge on Cividale and Friuli during Longobard times can be facilitated if the systematization of data will become part of a wider knowledge system available to everybody. This will be made possible also thanks to the implementation of the regional GIS system and the addition of the pat concerning archaeological and historical- artistic aspects and in particular those related to the Longobard period. This cartographic database will be created on a web application so that it will be available for on line consultation on the website of Cividale and the Longobard network. Actions 1. Systematization of collected data 2. Implementation of existing regional GIS 3. Insertion in the IT platform 4. Activation of online consultation Parties involved Region Friuli Venezia Giulia; Municipality of Cividale del Friuli; Superintendence for Archaeological Heritage and BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of Friuli Venezia Giulia; University of Udine and Trieste; International Centre for Research and Documentation on Early Medieval Art and Architecture; Project Promoting Committee of the Patriarchy of Aquileia; Italian Castle

33 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Institute (section Friuli Venezia Giulia); City Museums of History and Art; Friuli Archaeological Association. Phases and timescales Medium term, starting from 2010 Financial resources Funds to be raised by: Region Friuli Venezia Giulia Expected results Broaden the computerized database based on GIS Increasing dissemination and consultation potential of data on Longobard culture Result indicators Number of collected and inserted data Width of the territory concerned Frequency of consultation and use of data in other projects

34 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Brescia site Objective 11 RAISING THE LEVEL OF KNOWLEDGE ON THE EARLY MIDDLE AGES PHASES OF THE MONASTERY

Project 11.1 Study and monograph publication of the Longobard phases of San Salvatore-Santa Giulia

Description Two volumes have been dedicated to the more ancient phases of the area in which the monastery of San Salvatore-Santa Giulia was built. These present a complete study of the items found in the area (ceramics, glass, metal, coins) and analysis of the settlement structures (the domus from the Roman era and the Longobard era huts) (S. Giulia di Brescia gli scavi dal 1980 al 1992, Reperti preromani, romani e alto medievali, edited by G. P. Brogiolo, ; Dalle domus alla Corte Regia. Santa Giulia di Brescia. Gli scavi dal 1980 al 1992, edited by G. P. Brogiolo, F. Rossi, F. Morandini, Florence). A series of research and study projects are nearing completion dedicated more specifically to the Longobard phase of the crypt in the church of San Salvatore, the frescoes, stuccoes and furnishings. Further comparative investigations and research is underway or are about to be started whose objective is to fill in the gaps regarding the late mediaeval phase of the monastery. The results of all these studies are then to be published in a special volume dedicated exclusively to this topic.

Actions Reviews of previous partial editions; 1. Start and/or completion of new studies (dedicated particularly to the crypt, furnishings and stuccoes of San Salvatore); 2. Analysis project with correct mapping of finds and crossed analysis coordinated with analyses of similar monuments (e.g. Cividale del Friuli) 3. Publication of study results (print) Parties involved Brescia City Council; Regional Department of Ministry of Cultural Heritage; Archaeology Office of Regional Council; Amici dei Musei and/or CAB Foundation Planned phases and timing By end 2009 Financial resources Still to be found Expected results Filling in existing gaps in knowledge; acquisition of data regarding: phase sequence, chronology, techniques, workers, iconographic interpretations Objective data regarding the characterization materials, analogies and differences with other late mediaeval sites Result indicators Study of 2000 finds (ceramic fragments, stuccoes and frescoes) Review of 50 documents about the late Middle Ages

KNOWLEDGE PLAN Brescia site Objective 11 RAISING THE LEVEL OF KNOWLEDGE ON THE EARLY MIDDLE AGES PHASES OF THE MONASTERY

Project 11.2 Study of the craft productions documented archaeologically at the monastery structures Description During archaeological investigations conducted in the courtyards/cloisters of the monastery and below the structures of the Longobard church numerous metal and bone scraps were found, which demonstrate significant craft activity related to royal commissions.

35 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Multidisciplinary analysis and comparison with other similar finds from other sites might lead to interesting insights with regards to the late mediaeval crafts.

Actions 1. Review of finds 2. Sampling for material characterisation and diagnostic investigations 3. Study of traces of craft activity 4. Comparison with finds from other contexts (e.g. Montichiari) 5. Publication of results 6. Temporary exhibition to present research Parties involved Brescia City Council; Regional Department for Cultural Heritage; Archaeology Office of Lombardy Regional Council; University of Brescia; Bresciamusei Foundation Planned phases and timing January-May 2008 review of sampling and exhibition of finds June–December 2008 start of analysis 2009 study of results and publication Financial resources To be met by Brescia City Council-Museum Department; Archaeology Office of Lombardy Regional Council; Bresciamusei Foundation Expected results Acquisition of new information on craft production Result indicators Review and study of approx. 300 finds

KNOWLEDGE PLAN Brescia site Objective 12 INVESTIGATION INTO SAN SALVATORE-SANTA GIULIA AS THE CENTRAL NUCLEUS OF THE BRESCIA AND NORTHERN ITALIAN MONASTERY SYSTEM

Project 12.1 Study of the network of monastery properties of Santa Giulia within the Via Carolingia national project Description The city of Brescia was included in the Via Carolingia project, which was set up by the Ministry of Culture and Heritage and coordinated by the Regional Departments. The Via Carolingia project includes the study of the late Roman and mediaeval road axes as means of cultural transmission and valorisation of the historical and artistic testimonies along these routes of communication. The research is also aimed at architecture, settlement in the territory and the lifestyles of the late mediaeval populations. The territory involved in the project covers the provinces of , Brescia, , Lecco and Como. Great importance has been given within the project to the larger metropolitan areas, and in particular, those that played a primary role in the power games (and economic) of those times, such as Brescia and Bergamo. Brescia in particular, with San Salvatore-Santa Giulia and its vast properties, must be considered a trade hub between the flatlands and the

36 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

valleys. For the city of Brescia, at the centre of the project is the monastery of San Salvatore- Santa Giulia. Through the properties linked to the monastery and the other monastery estates of and Valle Camonica, investigations will look into the main aspects relating to the monastery foundations in the territory and the public and private buildings of worship will be analysed according to construction type, their function and role carried out within the reference community, construction techniques, relationships with the main and secondary road networks, the landscape and natural resources, production assets, place names, worship of particular saints and how this was spread across the territory and, where possible, the extent of their properties, relations with imperial and papal power, with the city and with other regions, with centres for procurement of raw materials.

Actions 1. Data collection and new research and studies on lifestyles in late mediaeval Longobard 2. Comparison of date and results of the investigations against the European late mediaeval scale, emphasising the relations with the previous and subsequent periods. 3. International conference for the valorisation of the research and for a comparison of the research methods and the contexts investigated according to the data acquired 4. Publication of Conference minutes, historical, archive and iconographic research Parties involved Directorate General of the Ministry of Cultural Heritage, Archaeology Office of Lombardy Regional Council, Brescia City Council-Art and History Museums Department, the CAB Foundation and the University of Padua Planned phases and timing 2008-2010

Financial resources Total cost of the Brescia segment of the project: €154,000, of which €20,500 to be met by the Regional Directorate of the Ministry of Cultural Heritage. The rest is to be found Expected results Reconstruction of the lifestyle of late mediaeval Longobard and the rest of late mediaeval Europe Result indicators Events and promotional materials for distribution of the research results

37 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Brescia site Objective 13 INVESTIGATION INTO THE HISTORICAL AND MONUMENT PHASES PRECEDING THE LONGOBARD MONASTERY

Project 13.1 Scientific publication of the Ortaglia domus Description Over the years, digs beneath the monastery structures have uncovered large part of a large Roman residential district; the so-called domus of Ortaglia, are today part of the itinerary of the City Museum, and are the latest to be unearthed and valorised. Since 2003 there has been a series of studies on the structures, the decorations and furniture finds, but there still lacks a scientific publication containing the results of all completed and ongoing research projects.

Actions 1. Assignment of study of various aspects and finds of the domus 2. Critical comparison between scholars 3. Integration of existing graphic and photographic campaigns 4. Drawing up of new stratigraphic documents 5. Publication of results Parties involved Brescia city council; Archaeology Office of Lombardy Regional Council; University of Padua; University of Pisa; Bresciamusei Foundation; CAB Foundation. Planned phases and timing 2008-2009 assignment of studies and start of works 2010 publication Financial resources Still to be found Expected results Investigation of these two Roman dwellings Result indicators Study of 500 finds, several thousand fragments of painted plaster; review of 200 pieces of documentation

KNOWLEDGE PLAN Brescia site Objective 14 INVESTIGATION INTO THE STATE OF KNOWLEDGE ON THE URBAN CAPITOLINE AREA

Project 14.1 Scientific Publication of the Republican Roman sanctuary

Description Over the years, parallel to the conservation interventions on the structures and decorations, there has been a series of specialist studies on the Republican Roman sanctuary below the structures of the imperial Capitolium. These studies have led to important results for the field

38 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

of religious buildings of the 1st century BC of , so much that the data collected can be a fundamental point of reference for information on ancient architecture, painting and mosaics. It is therefore necessary to publish the research results.

Actions 1. Comparison between scholars on the data collected and the state of the research 2. Drafting of study report 3. Publication Parties involved Archaeology Office of Longobardy Regional Council; Brescia City Council Museums- Department ; University of ; Central Institute for Restoration Planned phases and timing 2008 comparison and studies and collecting of contributions 2009 publication Financial resources Still to be found Expected results Investigation into the sanctuary and the history of the area Result indicators Study of 100 finds from the monument (architectural elements, sculptures, fragments of painted plaster)

KNOWLEDGE PLAN Brescia site Objective 14 INVESTIGATION INTO THE STATE OF KNOWLEDGE ON THE URBAN CAPITOLINE AREA

Project 14.2 Start of studies on other monuments in the area Description As the excavation, conservation and valorisation work continues in the Capitolium area of the imperial era, it is necessary to refer to the data of studies conducted in the past and integrate them into recent investigations, in order to gain an overall understanding that is as exhaustive as possible of individual archaeological monuments (Theatre, Capitolium, decumanus maximus) and of the historical buildings that have been placed over ancient structures over the centuries (Palazzo Pallaveri and Palazzo Maggi ). These studies are fundamental for guiding the museum work in the area and providing information about the heart of the ancient city.

39 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Actions 1. Assignment of studies 2. Start of research 3. Integration of graphic and photographic documentation 4. Comparison of study data 5. Publication Parties involved Brescia City Council-Museums Department Archaeology Office of Lombardy Regional Council Bresciamusei Foundation CAB Foundation Planned phases and timing 2008-2009 study phase and preparation of documentation 2010 publication Financial resources Still to be found Expected results Greater understanding of the buildings and their interrelations and functions Result indicators Study of around 700 finds from the area; execution of at least 3 specific archaeological investigations; 1 publication

KNOWLEDGE PLAN Brescia buffer zone and territory Objective 15 SORTING OF TERRITORIAL DATA ON THE EARLY MIDDLE AGES AND INCREASE IN THE STATE OF KNOWLEDGE

Project 15.1 Definition of the "Network of Longobard sites" whose significant nodes are the settlements of Manerbio, Leno, Calvisano, Montichiari and Sirmione. Description Monitoring of the territory, excavation of other settlements and necropolises carried out over the last three decades by volunteers from archaeological groups operating in the central eastern Brescia plain, coordinated by the Archaeology Office of Lombardy Regional Council, are activities that have enabled: the outlining of a map of 25 sites of initial settlement sites and subsequent stabilization by the Longobards in the Brescia territory; the recovery of funeral objects and a large quantity of objects; the start of the restoration and valorisation, ensuring safeguard and conservation. The activity carried out has also enabled the outlining of a map of the early Christian and late mediaeval ecclesiastical buildings in the plain. The project involves completing reconnaissance on the territory of the main Longobard sites in the network and bordering municipalities. Actions 1. Historical-archaeological reconnaissance of the territories of the municipalities within the "Network of Longobard sites" and bordering municipalities.

40 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

2. Identification of Longobard sites, Highlighted by settlements, necropolises, buildings and artistic and monument finds. 3. Identification and publication of archive sources, needed to reconstruct the history of the territories and the communities of the five nodes in the network. 4. Archaeological investigation of the settlements, of the necropolises and the monuments identified. 5. Planning of analysis, study, restoration and valorisation of known finds and monuments and of those recently identified 6. Development and implementation of valorisation programmes of settlements, recovered finds and identified monuments (c.f. Enhancement plan). Parties involved Ministry of Cultural Heritage Regione Brescia Provincial Council Brescia City Council Municipalities within the "Network of Longobard sites" and bordering municipalities Lombardy Regional Directorate for Cultural and Landscape Heritage Archaeology Office of Lombardy Regional Council CAB Foundation Dominato Leonense Foundation Civiltà Bresciana Foundation Planned phases and timing 1. Start of historical-archaeological reconnaissance 2. Development and set-up of analysis and study projects of the settlements, finds and monuments. 3. Digging campaigns 4. set-up of exhibition 5. organization of a study conference with publication of the results 6. Publication of archive sources 2008-2013 five-year period Financial resources To be definite and found Result indicators Investigation of at least 5 late mediaeval sites; review of at least 300 archaeological finds; organization of 1 study convention; 1 publication of data acquired.

KNOWLEDGE PLAN Brescia buffer zone and territory Objective 15 SORTING OF TERRITORIAL DATA ON THE EARLY MIDDLE AGES AND INCREASE IN THE STATE OF KNOWLEDGE Project 15.2 Analysis, study and research applied to the finds and funeral objects from the settlements and necropolises of the municipalities in the "Network of Longobard sites". Description The various excavation and recovery works of the objects from the numerous necropolises to emerge of the last thirty years in the central eastern Brescia flatland, to survive construction works and intensive farming, have often been carried out using the criteria of urgency. The rescued finds and map of the sites identified need to be re-read together, which is only possible through a careful analysis of the finds, an in-dept examination of the data collected, laboratory investigations, collection and sorting of published and unpublished archive material. The plan is to reconstruct settlement areas and the forms that these took, the cultural, judicial-institutional and socio-economic transformations induced by the integration led by Longobard generations subsequent to their arrival from Pannonia, involved in the dynamics of the Christianization process.

41 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Actions 1. Analysis and study of settlements and necropolises located in the territories of the musicality’s within the "Network of Longobard sites" and bordering municipalities 2. Analysis and study of archaeological finds located in the collections stored at the historical and archaeological museums of Manerbio, Leno, and at the National Archaeological Museum of Sirmione, in addition to those kept by the Archaeology Office. 3. Analysis and study of the monument testimonies of San Pietro in Mavino, San Giorgio in Montichiari and San Nazzaro and San Celso in Leno. 4. Analysis, critical publication and study of the mediaeval archive sources for the territory included in the network of Longobard sites in Brescia. Parties involved Ministry of Cultural Heritage Regione Lombardia Brescia Provincial Council Brescia City Council Municipalities within the "Network of Longobard sites" and bordering municipalities Lombardy Regional Directorate for Cultural and Landscape Heritage Archaeology Office of Lombardy Regional Council CAB Foundation Dominato Leonense Foundation Civiltà Bresciana Foundation Planned phases and timing 2008-2013 five-year period Financial resources To be quantified and procured Expected results Increase in understanding of the material characteristics of late mediaeval finds and monuments; greater awareness of late mediaeval production techniques. Result indicators Review of at least 500 archaeological finds; execution of at least 30 specific analyses.

KNOWLEDGE PLAN Brescia buffer zone and territory Objective 15 SORTING OF TERRITORIAL DATA ON THE EARLY MIDDLE AGES AND INCREASE IN THE STATE OF KNOWLEDGE Project 15.3 Foundation and organization of the CISL Centro Italiano di Studi Longobardi (Italian Centre for Longobard Studies) Description To coordinate and direct the research and study activities of Longobard heritage in Italy, a Study Centre has been set up with the aim of organizing the activities for distribution of information of the Longobard civilization in Italy, using a multidisciplinary approach. The Centre for specialist analyses will use the applied study and research activities of the Centre for Archaeometry Studies, set up by the Faculty of Engineering of the University of Brescia, and the Archeo Media Lab set up at the Dominato Leonense Foundation in Leno and will work in collaboration with existing study centres in across the Italian territory and abroad. Actions 1. Seeking scientific partners to set up the centre

42 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

2. Foundation, with memorandum of association, of the Study Centre 3. Set-up of the Study Centre at Palazzo Martinengo Colleoni in Pianezza, today Bargnani, in Brescia, where the Civiltà Bresciana Foundation is also planned to be moved 4. Organization and implementation of a database of Longobard sites in Longobard, linked to national databases. 5. Set-up of a specialist online library, 6. Virtual reconstruction of the more significant settlements and necropolises Parties involved Ministry of Cultural Heritage Regione Lombardia Brescia Provincial Council Brescia City Council Municipalities within the "Network of Longobard sites" and bordering municipalities Lombardy Regional Directorate for Cultural and Landscape Heritage Archaeology Office of Lombardy Regional Council CAB Foundation Dominato Leonense Foundation Civiltà Bresciana Foundation University of Brescia Sacro Cuore University of Milan University of Pavia University of Salerno And all the stakeholders in the Italian site involved in the project Planned phases and timing 2008-2013 five-year period

Financial resources To be quantified and procured Expected results Acquisition of new instruments to gain new understanding of Longobard people Result indicators Entry of at least 70 records in database; virtual reconstruction of 5 settlements

KNOWLEDGE PLAN Brescia buffer zone and territory Objective 15 SORTING OF TERRITORIAL DATA ON THE EARLY MIDDLE AGES AND INCREASE IN THE STATE OF KNOWLEDGE

Project 15.4 Knowledge, safeguard and enhancement of Archaeological Areas and Parks Description Regione Lombardia, with the involvement of three different Directorate Generals (Culture, Identity and Autonomy of Lombardy; Territory and Urban Planning; Environmental Quality) and the Regional Directorate for Cultural and Landscape Heritage of Lombardy Regional Council, Archaeology Office of Lombardy Regional Council have shared the design and set up of the awareness and valorisation project for the archaeological parks and areas in the regional territory. The project includes cataloguing all existing properties in the regional territory with the characteristics of an archaeological park or area. Many of the archaeological areas in Lombardy are located within the territories identified as natural parks. The first phase of the project involves promotion by the Region of the study and cataloguing of the archaeological areas located within natural areas, while the Ministry's structures promote the study of territories outside the protected areas.

43 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Actions 1. Investigation into the characteristics of the cultural locations examined 2. In-depth monitoring of valorisation activities in the areas 3. Evaluation of the state of safeguard and valorisation of the archaeological parks and areas in close relation to the environmental and landscape contexts in which the properties are located Parties involved Ministry of Cultural Heritage Regione Lombardia Brescia Provincial Council Brescia City Council Municipalities within the "Network of Longobard sites" and bordering municipalities Lombardy Regional Directorate for Cultural and Landscape Heritage Archaeology Office of Lombardy Regional Council Planned phases and timing 2008-2013 five-year period Financial resources To be quantified and procured Expected results Acquisition of new instruments to gain new understanding of Longobard sites in the territory Result indicators Cataloguing and monitoring of around 200 contexts diversified according to type, extension, property, level of enhancement

KNOWLEDGE PLAN Brescia buffer zone and territory Objective 16 INVESTIGATION INTO KNOWN INFORMATION ON THE LONGOBARDS' CULTIVATIONS AND FOOD CUSTOMS

Project 16.1 Interdisciplinary study into the cultivations and food customs of the Late Middle Ages Description The numerous data available for the study of late mediaeval cultivations and food customs acquired over the years in towns and across the territory following stratigraphic digs and paleobotanical studies, today make it possible to systematically deal with the study of this important aspect of late mediaeval life, thanks to the evolution of specialist analysis techniques applied in this sector. Integration of archaeological data and written sources, and a comparison with similar research at European level, are proposed to rebuild the food customs of the Longobards and find continuities and discontinuities with today's diet. Actions 1. Seeking European partners already involved in similar research 2. Applying to the European Culture 2000 programme 3. Starting study of the more significant contexts 4. Starting common analyses 5. Comparison of data 6. Distribution of data at different levels (specialist conferences, conference minutes, children's publications, recipe books)

44 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Parties involved Brescia City Council CAB Foundation Brescia Musei Foundation Palcogiovani onlus Pianura Bresciana Foundation Brescia Provincial Council Lombardy Regional Directorate for Cultural and Landscape Heritage Archaeology Office of Lombardy Regional Council University of Brescia European partners as yet to be found Planned phases and timing 2008 seeking partners and presentation of bid for Culture 2000 2009 start of research activities 2011 end of activities Financial resources European Union with Culture 2000 funds; Bresciamusei Foundations; partners involved Expected results Increase in ability to work in a network; increased understanding of specific aspects of late mediaeval society Result indicators Organization of 1 conference; 1 scientific publication of data, publication of 1 children's book; publication of 1 recipe book

45

46 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 17 REORGANISATION AND RECORDING OF KNOWLEDGE

Project 17.1 Review of the existing documentation on research carried out within the castrum

Description Research carried out up to now on Castelseprio has not been the subject of careful analysis which could valorise the results. A re-examination of all the documentation on the dig and the relative stratigraphic phases is therefore foreseen in order to initiate systematic studies, also on the discovered material. A complex and punctual study is then foreseen on the matters of the castrum and its monuments, on the basis of the evidence which emerges The main contexts to be analysed are: a) Digs by the Poles at the wall and the middle tower b) Digs at the fortified belt (wall, towers, entrance) c) Research at the basilica complex of San Giovanni and the relative burial ground d) Dig of building VI e) Digs at the monastery of San Giovanni f) Dig of a building at run by A. Piccoli g) - Dig of a medieval house carried out by the Universita’ Cattolica of Milan Actions 1. Censoring and collection of existing documents 2. Study and analysis of the data on the various contexts 3. Study and analysis of findings 4. Realisation of scientific editions Parties involved Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy FAI – Fondo per l’Ambiente Italiano (Italian National Trust) Province of Varese Region of Lombardy University Phases and time frame Starting from 2008-2009 Financial resources To be found Expected results Widen knowledge on the castrum Result indicators Number of data and contexts analysed Number of publications realised

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 17 REORGANISATION AND RECORDING OF KNOWLEDGE

Project 17.2 Analysis of existing documentation on Santa Maria foris portas

Description Archaeological research carried out at Santa Maria, particularly in the eighties of the twentieth century, has never been the subject of a definitive analysis. The numerous studies and evidence gathered over time deserve a review in relation to an overall approach able to pinpoint not only historical artistic values of the monument and its but to rebuild the formulated constructive aspects and the transformations of the building. A re-examination of all the existing documentation and analysis of the findings. Actions 1. Censoring and collection of existing documents 2. Study and analysis of contexts 3. Study and analysis of findings 4. Realisation of scientific editions Parties involved Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy FAI – Fondo per l’Ambiente Italiano Province of Varese Region of Lombardy University Phases and time frame Starting from 2008-2009 Financial resources To be found Expected results Heighten knowledge on the Church of Santa Maria foris portas Result indicators Quantity of data analysed Number of publications realised

47 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 17 REORGANISATION AND RECORDING OF KNOWLEDGE

Project 17.3 In-deepth of the analysis on the complex of Torba

Description Concerns research for publication on the asset and historical and artistic links with the territory. The study and research project proposes as its objective the maximum valorisation of the complex of the Monastery of Torba through the constitution of a complete documentary heritage by means of historic, artistic and monumental matters of the asset and its link with the territory to which it pertains. Existing studies on the asset are not such as to offer a complete historic and scientific examination as well as not completely answering the request for information on the part of the public. Until now critical luck has only concerned important fresocs conserved in the while few studies tackle the complex of the monastery of Torba and the Church of S. Maria in a scientific manner and the historical-artistic links with the reality of Castelseprio. Also missing is an analysis of the evidence which emerged from investigations carried out at the entrance to the tower, the church of Santa Maria and the porch of the fourth century church at the back of the tower. Actions 1. Analysis of the documentation and remains of the digs 2. Historical-artistic research 3. Archive investigations 4. Compilation of text for publication Parties involved FAI – Fondo per l’Ambiente Italiano Region of Lombardy Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy International Centre of Research and Documentation of Art and Early Medieval Architecture Phases and time frame Starting from 2008 Financial resources Co-financing FAI and Region of Lombardy - Lombard archaeological heritage group – year 2007 regional laws no. 39/84and no. 39/91 Expected results Improvement of knowledge and use of the asset Result indicators quantity of data and contexts analysed Number of publications produced

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 17 REORGANISATION AND RECORDING OF KNOWLEDGE

Project 17.4 Data memorisation

Description The large mole of existing data appears scarcely homogeneous and disorganised; sometimes it is difficult to find items and to consult it. Collection and memorisation of evidence is therefore foreseen in order to prepare the tools necessary for easy consultation on a GIS basis finalised both to widening knowledge and the preparation of an archaeological document and databank which is able to help the conservation of the heritage and the planning activities of future interventions. Actions 1. Recovery and memorisation of data 2. Compilation of an archaeological map of the Archaeological Complex of Castelseprio and the neighbouring areas 3. Preparation of a databank with catalogued summaries of buildings and manufactured items 4. Screening of restoration and diagnostic summaries on the materials 5. Realisation and implementation of a GIS Parties involved FAI – Fondo per l’Ambiente Italiano Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy International Centre of Research and Documentation of Art and Early Medieval Architecture Diagnostic Centre and Laboratory of Rocca Albornoziana di Spoleto Phases and time frame Starting from 2009 Financial resources to be found

48 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Expected results Widening of consultable knowledge and evidence regarding the Archaeological Complex of Castelseprio Result indicators Quantity of data memorised Widening and detail of the archaeological document Number and frequency of consultations

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 18 IN-DEPTH EXAMINATION OF KNOWLEDGE

Project 18.1 Realisation of archeometric analysis on findings

Description The project foresees the reconstruction of aspects of the material culture of the castrum and the social economic character of the inhabitants thanks to careful analysis of manufactured items found in the digs and the bone remains both of the remains of food and the sample of population that emerged from burial grounds investigated in San Giovanni, Santa Maria foris portas and Santa Maria di Torba Apart from chrono-typological studies, this analysis also foresees examinations using archeometric analysis Analysis of the metals a) The integral edition of the diagnostic digs of Castelseprio carried out in 1962 and 1963 reported some material analysis on certain manufactured items that are interesting from the history of the so-called “material culture” of the Early medieval period. Recently there was the project for the recovery of intrinsic data of some material recovered from various digs was resumed, among which: shapeless blocks of lead originating from a dwelling perhaps in a part used as a workshop; glass and iron waste from wells. It is thereby interesting to continue with this nature of research with the purpose of understanding how much domestic handcraft activity was not realised inside the castrum. Analysis of ceramic production b) Most of the remains in the dig were ceramics. In particular these were of communal production, linked to the social area in which analysis should be tackled both from the point of view of a formal and chronological serialisation and concerning the determination of the productive techniques and the area of origin and chronology through archeometric investigations Technical and stylistic analysis of the painted fragments in the castle area c) Among the remains conserved in the warehouse there are some fragments of fresco relative to the decoration of the particularly important areas of the settlement, probably the churches of the castrum, the study of which began at the time of the setting up works for the Antiquarium and it should be continued. Actions 1. Collection and memorisation of data on the material 2. Drafting of a programme of queries to be solved 3. Planning and realisation of archeometric analysis 4. Planning and realisation of osteological and archeozoological analysis 5. Editing of data Parties involved Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy Phases and time frame By 2008-2010 Financial resources MIBAC funds in relation to setting up the Antiquarium and planning 2007: € 37,200. Further analysis will be realised with Mibac Funds, planning 2008-2010 Expected results Improvement of knowledge on heritage, the daily life of the castle, material culture and handcraft production in the Longobard and medieval eras Result indicators Quantity of material analysed Number of investigations made Quantity of data obtained Frequency of use in other valorisation and conservation projects Increase in divulgative and scientific material

49 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 18 IN-DEPTH EXAMINATION OF KNOWLEDGE

Project 18.2 Diagnostic analysis on the constructive structures and system Description The project foresees the analytical study of the building characteristics of the monuments, materials and technique used in the structures of the castrum. These analyses allow the examination of the development of building techniques and architectural typologies from the late antique period to1600 and to add new data on historical, artistic and social economic knowledge of the castrum and the territory to which it refers. They will then permit the clarification of the evolutionary phases of some monuments and specify their peculiarities. Foreseen is the realisation of: a) Diagnostic research and analysis on building materials, continuing with the sampling of building materials (mortar, plaster, paving, bricks and stones) and the analysis of the origin of the materials in progress for over twenty years and unedited in part. b) Analysis of the structural characteristics and building phases of the monuments c) Dendochronological analysis of some building apparatus of the main monuments of the castrum, (Santa Maria foris portas and the Torba tower) which preserve the original remains of wooden elements used as beams for the roof or door supports, the allocation of which could be very useful for defining time schedules and building phases d) Analysis of thermoluminiscence finalised at dating clay brick material from the walls of the monuments of the castrum Actions 1. Collection and memorisation of data on the material 2. Drafting of a programme of queries to be solved 3. Verification and adaptation of surveys or realisation of new surveys 4. Stratigraphic analysis of the structures of the main monuments and the wall belt (structures and coating) 5. Determination of evolutionary phases and graphic reconstruction of the monuments 6. Planning and realisation of sampling and archeometric analysis of building material (mortar, plaster, paving, bricks and stones) 7. Identification of the origin of the material (quarries, Roman dwellings in the area) 8. Preparation of a data bank of the building material, binders and building techniques 9. Realisation of surveys on re-use and compilation of a catalogue of re-usages and their typologies 10. Data and research editing Parties involved Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy International Centre of Research and Documentation of Art and Early Medieval Architecture Diagnostic Centre and Laboratory of Rocca Albornoziana di Spoleto University Phases and time frame Starting from 2008-2009 Financial resources MIBAC funds in relation to setting up the Antiquarium and planning 2007: € 28,000. Further analysis will be realised with Mibac Funds, planning 2008-2010 Expected results Improvement of knowledge on the heritage and building systems Result indicators Number of investigations carried out Number of monuments and analysed structures Frequency of use in other projects of valorisation and conservation Increase in divulgative and scientific material

50 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 18 IN-DEPTH EXAMINATION OF KNOWLEDGE

Project 18.3 Analysis of the constructive sequence of the Torba tower

Description The tower of Torba represents one of the most important testimonials conserved in the Langobardia maior of the late antique-Early medieval period. Its phases of transformation into a monastery represent a paradigmatic element of reuse of antique structures in the Early medieval. Analyses carried out on the monument have favoured the study of the Early medieval decorative apparatus which enrich it. However, still lacking are in-depth examinations of the Tower and on its building system, able to Highlight the technical characteristics and evaluative phases. Its time scale allocation is the fruit of hypotheses of interpretation and not based on certain data. For this reason a campaign of in-depth analysis is foreseen on the monument in order to reconstruct its story, integrating the existing documentation, surveys in particular, thanks to the use of the most innovative techniques (e.g. Laser scanning). It will then be useful also to start further archaeological surveys in the underground floor and near to the structure to define building techniques and specify its time schedule. Sampling and diagnostic survey of an archeometric nature on the binders and material will allow further knowledge of the building characteristics. Actions 1. Collection and memorisation of existing documentation 2. Verification and completion of surveys 3. Realisation of new photographic documentation (air photos and details) 4. Surveys on the ground floor and outside the tower with dig surveys 5. Planning and realisation of sampling and archaeological analysis of building material (mortar, plaster, paving, bricks and stones) 6. Stratographic analysis of the monument (of the structures and coating) 7. Definition of the evolutionary phases and graphic reconstructions of the monument 8. Publication of results 9. Realisation of didactic-divulgative multimedia material Parties involved FAI – Fondo per l’Ambiente Italiano Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy International Centre of Research and Documentation of Art and Early Medieval Architecture Phases and time frame Starting from 2008-2009 Financial resources to be found Expected results Widening of knowledge and possibilities of use for the monument Result indicators Quantity of data gathered Quantity of material produced

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 18 IN-DEPTH EXAMINATION OF KNOWLEDGE

Project 18.4 Diagnostic analysis of the frescoes of Santa Maria foris portas

Description The great importance of the cycle of frescos of Santa Maria has lead to numerous studies for their allocation which have mainly concerned the stylistic and formal analysis of the paintings. Still lacking is an in-depth technical examination of the building characteristics of the frescos and their mapping. Foreseen, therefore, is the deepening of knowledge of this work of unequalled value by means of suitable diagnostic investigations and new documentation using the most innovative techniques. Actions 1. Collection and memorisation of existing data 2. Realisation of new photographic and graphic documentation (surveys) 3. Planning and realisation of new surveys and examinations 4. Implementation of data banks 5. Publication of results Parties involved Province of Varese Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy International Centre of Research and Documentation of Art and Early Medieval Architecture Diagnostic Centre and Laboratory of Rocca Albornoziana di Spoleto

51 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Phases and time frame Starting from 2009 Financial resources To be found Expected results Widening of knowledge on the asset and artistic production in the Early medieval period Result indicators Quantity of data gathered Number of surveys carried out Quantity of edited material

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 18 IN-DEPTH EXAMINATION OF KNOWLEDGE

Project 18.5 Completion of diagnostic surveys on the frescoes of Torba

Description As in the case of Santa Maria foris portas the studies for the allocation of the frescos of Torba have also mainly concerned stylistic and formal analysis of the paintings. Only in relation to the recent campaign for conserving the frescos on the second floor of the tower has there been mapping and diagnostic investigation. There will therefore be the continuation of diagnostic examination also on the other paintings in the tower and the church of Santa Maria or the other fragments found in the digs. Furthermore, it would also be opportune to foresee a new documentation using the most innovative techniques. Actions 1. Collection and memorisation of existing data 2. Realisation of new photographic and graphic documentation (surveys) 3. Planning and realisation of new investigations and examinations 4. Implementation of data banks 5. Publication of results Parties involved FAI – Fondo per l’Ambiente Italiano Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy International Centre of Research and Documentation of Art and Early Medieval Architecture Diagnostic Centre and Laboratory of Rocca Albornoziana di Spoleto Phases and time frame Starting from 2009 Financial resources To be found Expected results Widening of knowledge of the asset and artistic production in the Early medieval and medieval periods Result indicators Quantity of data gathered Number of surveys carried out Quantity of edited material

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 19 CONTINUATION OF ARCHAEOLOGICAL RESEARCH

Project 19.1 Planning and execution of archaeological surveys in the castrum

Description Castelseprio was only dug in a minimum part and until now the digs have been of a truly limited nature, it is therefore considered necessary to foresee a research programme on a wide scale able to clarify the true extension and characteristics of the castrum habitation, the fortifications and its monuments, verify the function of each building and heightening knowledge of material culture, economy and the society in the site. Of extreme importance will be the archaeological research to be actuated inside the fortified area to identify the relationship between dwelling, monument and necropolis. It will be opportune to define a research programme following the analysis of existing documentation. Some contexts on which to develop research have already been identified

- Dig in the area accessing the castrum (access bridge and Castrum door) The elements relative to the access bridge and castrum door were Highlighted in the fifties of the last century. Partial dig essays, run in the early seventies have identified protostoric, late antique and medieval stratigraphies. Continuation of the surveys in particular between the pier of the bridge and the access door with expansion to the north side in the direction of the north-western section of the all could furnish further details on fortifying interventions of the Byzantine, Longobard eras and beyond.

52 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

-The realisation of interventions on different sections to better expand knowledge on the fortifications of Castelseprio is foreseen; in particular: o In correspondence to towers 2 and 3 o On the still unknown northern section of the belt o On wall sections relative to the eastern wall documented preliminarily o In correspondence of the section towards the south-east and relative to the extension towards Torba -Dig of the Building or House of the Canonici The Building, already the subject of a Conservation Plan (Project 3.1), requires better knowledge of the structural characteristics and for further details on its foundation in relation to the use of a dig inside its rooms and along the external perimeter. - The fort on the southern plain Investigated and restored in the past, still lacking is data for its correct allocation and for the confirmation of interpretation as a noble nucleus of the castrum Actions 1. Collection and analysis of existing data 2. Definition of a multiyear research programme 3. Planning and realisation of interventions 4. Data editing Parties involved Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy Phases and time frame by 2008-2010 Financial resources MIBAC Funds: funds requested from Planning 2008-2010 Expected results Improvement of knowledge on the castrum and optimisation of eh possibilities of use of the heritage Result indicators Quantity of research carried out Expansion of the investigated areas Quantity of data obtained Frequency of use of other projects of valorisation and conservation Increase in divulgative and scientific material

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 19 CONTINUATION OF ARCHAEOLOGICAL RESEARCH

Project 19.2 Completion of the dig in the basilica of San Giovanni

Description The complex of the basilica of San Giovanni with the annexed baptistery, cistern and the bell tower constitutes the main monumental nucleus of the castrum. Uncovered and investigated in the past, there are still interpretative doubts on its chronological allocation, the original architectural structure and the evolutionary phases. A recent investigation in the central apse confirmed the existence of a deposit and elements relative to the original, polygonal, apse. Deemed important is the completion of the dig in the entire area of the apse and the aforesaid presbytery and also the area of the adjacent southern apse, formerly the subject of an essay in the sixties of last century, to better understand the subsequent constructive transformations of the basilica. Actions 1. Analysis of old findings 2. Completion of the dig in the main apse and the presbytery 3. Planning and realisation of other surveys in the aula 4. Planning and realisation of investigations in the Baptistery 5. Analysis of the stratification of the wall structures and coatings 6. Verification of the building phase of the basilica complex 7. Updating of documentation and surveys 8. Realisation of reconstructive models 9. Editing of results 10. Realisation of multimedia divulgative material Parties involved Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy Phases and time frame by 2008-2009 Financial resources MIBAC funds: funds requested from Planning 2008-2010 Expected results Improvement of the knowledge on the castrum and optimisation of the possibilities of use for the heritage Result indicators Expansion of the investigated area

53 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Quantity of obtained data Frequency of use in other projects of valorisation and conservation Increase in divulgative and scientific

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 19 CONTINUATION OF ARCHAEOLOGICAL RESEARCH

Project 19.3 Recognition of archaeological presences in the village area

Description The first topographic sketch of the overall area of Castelseprio (Castrum and Village) dates back to 1948. Apart from the digs involving the church of S. Maria foris portas only little archaeological research relative to technological installations for the operation of the area was carried out at the end of the eighties. Also realised were some reconnaissance and detailed surveys confirming what found in the forties. It would be extremely important to be able to carry out capillary reconnaissance on the entire area of the Village formerly enclosed in confirmation of that which was indicated and topographically recorded. Actions 1. Removal of shrubbery 2. Photographic and video recordings of the emergences; surveys on the overall sizes of the identified structures and their placement in the general cartography Parties involved Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy territorial authorities Phases and time frame by 2009-2013 Financial resources MIBAC Funds: funds to be found Funds of Territorial Bodies: to be found Expected results Knowledge of the width of the Village Use of data in comparison with that known and with the other similar realities Use of data for a better knowledge of the life of the Village which rose outside the walls of the Castrum Editing of data at the divulgative and scientific level Result indicators Increase in analysed material Quantity of data obtained Frequency of use in other projects of valorisation and conservation Increase in divulgative and scientific material

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 19 CONTINUATION OF ARCHAEOLOGICAL RESEARCH

Project 19.4 Completion of archaeological surveys at Santa Maria foris portas

Description Investigations carried out up to this point at the church have not completely clarified the origin and context in which it is inserted. In 1982-83 an ample set of surveys was realised outside of the building form which a necropolis and interesting data emerged (the existence of a trench and structures perhaps dwellings towards west and north) which should be examined further with the continuation of the research. Actions 1. Collection, memorisation and verification of existing data 2. Planning and realisation of digs 3. Editing of the results 4. Realisation of divulgative multimedia material Parties involved Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy Province of Varese Phases and time frame Starting from 2010 Financial resources to be found Expected results Improvement of knowledge of the castrum and optimisation of the possibilities of use of the heritage Result indicators Increase in analysed material Quantity of data obtained Frequency of use in other projects of valorisation and conservation Increase in divulgative and scientific material

54 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 19 CONTINUATION OF ARCHAEOLOGICAL RESEARCH

Project 19.5 Planning and execution of archaeological surveys on section of arched walls towards Torba Description The section of arched wall with a tower of the northern belt which runs towards Torba, formerly subject of investigations in the seventies of the last century represent one of the most important traces of fortified architecture in the castrum. Past research has had the merit of uncovering and documenting these structures which have not however ever been the subject of a dig. The realisation of the path which connects the upper castrum and the complex at the foot of the valley will now permit not only the continuation of the research but also to making these structures, hidden in the wood until now, usable. Actions 1. Collection, memorisation and verification of existing data 2. Documentation on the structures and updating of the surveys on the structures 3. Technical constructive analysis 4. Editing of the results 5. Realisation of divulgative multimedia material Parties involved FAI – Fondo per l’Ambiente Italiano Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy International Centre of Research and Documentation of Art and Early Medieval Architecture Phases and time frame Starting from 2008 Financial resources Co-financing FAI and Region of Lombardy from the Lombard archaeological heritage Group – year 2007 regional laws no. 84 and no. 39/91: € 50,000 Expected results Improvement of knowledge on the castrum and optimisation of the possibilities of use of the heritage Result indicators Increase in analysed material Quantity of data obtained Frequency of use in other projects of valorisation and conservation Increase in divulgative and scientific material

KNOWLEDGE PLAN Castelseprio-Torba site and buffer zone Objective 19 CONTINUATION OF ARCHAEOLOGICAL RESEARCH

Project 19.6 Planning and execution of new surveys in relation to the Torba Complex

Description The project foresees the examination of the stories of the complex and its structure through the review of archaeological data already acquired and the planning of new archaeological investigations of research in extension which may concern: a) the crypt of the church of Santa Maria b) the external area of the church towards north and west c) the underground area of the restaurant d) the porch to identify the wall belt. e) the southern sector at the entrance road to the complex f) the section of wall of the southern belt, in the woods on the slope Actions 1. Collection, memorisation and verification of existing data 2. Planning and realisation of digs 3. Documentation on the structures and updating of structure surveys 4. Technical constructive analysis 5. Editing of results 6. Realisation of divulgative multimedia material Parties involved FAI – Fondo per l’Ambiente Italiano Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy Phases and time frame starting from 2010 Financial resources To be found Expected results increase of knowledge on the complex of Torba and optimisation of the possibilities of use for the heritage Result indicators Number of surveys carried out Size of the investigated area Quantity of obtained data

55 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Frequency of use in other projects of valorisation and conservation Increase in divulgative and scientific material

KNOWLEDGE PLAN Castelseprio-Torba territory Objective 20 IN-DEPTH EXAMINATION OF KNOWLEDGE ON GIUDICARIA OF SEPRIO

Project 20.1 Censoring of Longobard findings and creation of an archaeological document on the Giudicaria in Early middle ages Description The territory pertaining to Castelseprio is rich in evidence relative to the Longobard presence and Early medieval period. A systematic collection of the evidence and their organisation in a data bank that is easily consultable and connected to a GIS platform is foreseen. Actions 1. Censoring and analysis of data 2. Memorisation of the evidence and creation of the data bank and the archaeological document 3. Implementation of the GIS base Parties involved Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy Region of Lombardy Province of Varese Province of Como Province of Milan Municipalities of the area involved FAI – Fondo per l’Ambiente Italiano Swiss State and other institutions in the areas involved in Canton Ticino Phases and time frame Starting from 2010 Financial resources To be found Expected results Improve knowledge on the Longobard period Result indicators Quantity of data collected Size of the data bank Number and frequency of consultation

KNOWLEDGE PLAN Castelseprio-Torba territory Objective 20 IN-DEPTH EXAMINATION OF KNOWLEDGE ON GIUDICARIA OF SEPRIO

Project 20.2 Promotion of research on the Early middle ages settlement system of the Giudicaria Description The data acquired on the territory up to now allow a good view of the population in the medieval era but leave some questions unanswered which could be solved only with the continuation of archaeological research. Some of the themes to be examined concern: a. The other Flavian cities in the territory b. The network of castra and castles c. Characteristics and typologies of rural settlements d. Connection between necropoli, cult places and settlements Actions 1. Collection, memorisation and verification of existing data 2. Definition of a research programme 3. Planning and realisation of digs 4. Editing of results Parties involved Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy Region of Lombardy Province of Varese Province of Como Province of Milan Municipalities of the involved areas FAI – Fondo per l’Ambiente Italiano Swiss State and other institutions in the areas involved in Canton Ticino Phases and time frame starting from 2010 Financial resources to be found Expected results Improve knowledge on the Longobard period Result indicators Quantity of data gathered

56 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Number of surveys carried out Size of the investigated areas Quantity of obtained data Number of editions realised

KNOWLEDGE PLAN Castelseprio-Torba territory Objective 20 IN-DEPTH EXAMINATION OF KNOWLEDGE ON GIUDICARIA OF SEPRIO

Project 20.3 Promotion of research on monuments and artistic production in the Giudicaria Description An important aspect of the Early medieval period in the territory, apart from that relative to the frequency and distribution of the presences, concerns the analysis of artistic and architectural production which has left unequalled traces in Castelseprio. In order to better understand these elements in relation to the cultural climate of the period, knowledge of the evidence will be examined also in the area of the Giudicaria, proceeding with censoring, cataloguing and study of the conserved heritage which mainly concerns: a) Cult places and monasteries b) Sculptural apparatus c) Sainted decorations d) Goldsmith Actions 1. Censoring, analysis and memorisation of data 2. Censoring, cataloguing and analysis of cult places 3. Censoring, cataloguing and analysis of sculpture production 4. Censoring, cataloguing and analysis of pictorial production 5. Updating of graphic and photographic documentation of the different contexts 6. Creation of a data bank 7. Implementation of the GIS 8. Editing of divulgative and scientific material on themes subject to research of specific contexts Parties involved Regional Management of Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy Region of Lombardy Province of Varese Province of Como Province of Milan municipalities of involved areas FAI – Fondo per l’Ambiente Italiano Swiss State and other institutions in the areas involved in Canton Ticino Phases and time frame starting from 2010 Financial resources to be found Expected results Improve knowledge of the Longobard period Result indicators Quantity of data gathered Number of surveys carried out Size of the investigated areas Quantity of obtained data Number of editions realised

57

58 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Spoleto site and buffer zone Objective 21 RISE THE BASILICA’S KNOWLEDGE LEVEL

Project 21.1 Gathering and systemizing the existing documentation on the basilica of San Salvatore Description On the Basilica of San Salvatore there are studies, surveys and descriptions that date back to the 19th century, as well as archival papers, illustrations and surveys realized in various periods, starting from those performed by the great Renaissance architects. Besides, in the past some test excavations were done, that led the scholars to suggest more phases in the construction of the presently conserved building. The project therefore includes the gathering of all existing data and documents, their organization and systemizing, essential to the future widening investigations on the building. It is also planned to establish an appropriate Documentation Centre in the convent spaces next to the Basilica, in order to make them available to scholars and to the public in general. Such Centre will be able to be the Collect Point of the information on the presence of the Longobards in the town and in the territory, keeping also the relative documentation.

San Salvatore, the presbytery

Action 1. Research, identification and gathering of the bibliographic sources 2. Research and reproduction of archival sources 3. Reproduction of graphic and photographic sources, their computerization 4. Establishment of the Documentation Centre Parties involved Municipality of Spoleto Umbria Archival Superintendency Perugia State Archives – Spoleto Section University of Perugia Private subjects Phases and time frame First data gathering and organization phase: from 2008 Creation of the Centre upon fulfilment of the conservation works on the former convent Financial resources Funds of the Municipality of Spoleto

59 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Expected results To get a full picture of the present knowledge to finalise future investigations To realize computerized archives, to be implemented through time

Result indicators Quantity of gathered and systemized data Number of data consultation requests

KNOWLEDGE PLAN Spoleto site and buffer zone Objective 21 RISE THE BASILICA’S KNOWLEDGE LEVEL

Project 21.2 New archaeological investigations on the basilica of San Salvatore Description The project includes the realization of new archaeological investigations underneath the basilica’s floor level, inside the basilica and in the area around the façade. Actions In particular, the plan includes interventions on: 1. The presbytery area, to verify the presence of a pre-Longobard structure- maybe the martyr Concordio is a hint- that can be inferred on the basis of Perkins’ excavations and from Montiroli’s planimetry (1875) 2. In the area around the church’s façade, to clarify the original existence of an exonarthex, inferable from Perkins’ excavations. Parties involved Municipality of Spoleto University of Perugia Phases and time frame Upon completion of project 1.1, gathering and reorganization of existing information Financial resources Funds of the Municipality of Spoleto University of Perugia Expected results Definition of chronology, function and original morphology of the building

60 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Spoleto territory Objective 22 RAISE THE LEVEL OF KNOWLEDGE OF THE DUCHY’S CAPITAL AND OF ITS TERRITORY

Project 22.1 Prosecution and development of the urban excavation campaigns Description The project has the objective of raising the level of knowledge on the presence of the Longobards in Spoleto, on the structure of the city in the period of the Dukedom and on the main city structures built in that epoch. In detail, on one hand it is necessary to continue and widen the urban excavation planned by the Public Works Dept, like those one which brought back to light the mosaics from the Longobard times in Palazzo Mauri and Palazzo Pianciani, on the other hand it is necessary to ensure the prosecution of running excavations and to start new investigations. The results of the excavations will be able to converge into the Documentation Centre to be realised inside the convent next to the basilica of San Salvatore, that will become the cognitive pole of reference for the whole territory.

Palazzo Mauri, the mosaic

61 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Area of the Rocca Albornoziana, excavations on top of Colle Sant’Elia

Actions 1. Prosecution of excavations in the spaces that date back to the Longobard times, discovered under Palazzo Mauri – study of the results 2. Widening of the investigations on the Early middle ages structure discovered under Palazzo Pianciani 3. Prosecution of excavations on top of Colle Sant’Elia (area of the Rocca Albornoziana), where a big cult building is being brought back to light, whose oldest phase seems to date back to the Early Middle Ages 4. Planning and performance of targeted archaeological tests to identify the areas of the Longobard necropolises of the town, and planning of future in-depth investigation campaigns 5. Execution of new excavation campaign in the territory of Spoleto, especially on the hermitages and monasteries, to retrace their Longobard phases.. 6. Planning of investigations on High-ground sites, to deepen the knowledge on Longobard defensive structures 7. Systemizing of the results of the excavation campaigns, gathering of information emerged (see Documentation Centre) and its computerization. 8. Spreading of the new knowledge data, both at scientific and divulging level. Parties involved Municipality of Spoleto. Soprintendenza per i beni archeologici dell’Umbria. University of Perugia CISAM Study Centre on Early Middle Ages. Other public and private subjects. Phases and time frame From 2008 Financial resources Funds to be raised from the Town’s budget and from other subjects. Expected results Implementation of data on the Longobard presence in Spoleto and its territory. Result indicators Number of performed interventions and investigations Publications realized to spread the knowledge

62 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Spoleto territory Objective 22 RAISE THE LEVEL OF KNOWLEDGE OF THE DUCHY’S CAPITAL AND OF ITS TERRITORY

Project 22.2 Realization of a study on the spolia, re-used materials in Early middle ages buildings Description The project’s aim is to review and study the very numerous spolia, re-used in Middle Ages buildings, both civil and religious, in the territory. The project obviously involves the two most significant emergences from the Longobard epoch, the Clitunno Tempietto and the Basilica of San Salvatore, included in the candidacy. Parties involved University of Perugia Ministry for University and Scientific Research Phases and time frame From 2008 Financial resources In October 2007, an instance has been proposed by the University of Perugia, to the Ministry for University and Scientific Research, for the co-financing of the Research Project of National Interest Expected results Widening of the knowledge on methods of re-use in Longobard times, and on the Roman structures from which the spolia were taken Result indicators Quantity of assessed and studied information

KNOWLEDGE PLAN Spoleto territory Objective 23 RAISE THE ARCHAEOLOGICAL KNOWLEDGE OF THE TERRITORY

Project 23.1 Creation of the archaeological map of the territory of Spoleto Description The project’s aim is to catalogue and survey all archaeological structures in the territory of Spoleto, in order to draft an archaeological map that may be of support to the study on the various development phases of the town and the territory. On the basis of this work, it will be possible to elaborate specific phase plants that will guide to better address the planning of future investigation and study interventions. The plan is included in POR Programma Operativo Regionale OB 3 2000/2006 MISURA D4, RISORSE CIPE, a public grant of research funds, finalised at the improvement of human resources in the field of research and technological development. Parties involved University of Perugia – Philosophy, linguistics and literatures – late-ancient and Middle Ages palaeochristian study section Region Umbria Phases and time frame From 2008 Financial resources CIPE Funds Interdepartmental Committee for Economic Programming Expected results Mapping of archaeological emergences Result indicators Number of listed and studied structures

63

64 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Campello sul Clitunno site and buffer zone Objective 24 INVESTIGATION INTO THE HERITAGE OF CAMPELLO

Project 24.1 Further investigation campaigns to implement knowledge of the site's heritage Description Clitunno has a wonderful architectural and artistic heritage, which can only be fully enjoyed if there is greater understanding of its background and documentation. Promotion of new investigations aimed at improving existing data, which is often incomplete or based on analyses carried out in the past using outdated techniques, is of extreme importance. Of particular interest are the possible investigations into the construction and decoration techniques and the development phases of the monuments. In this scenario, there will be new digital format surveys to be used as a basis for implementing awareness and planning and achieving further analytical investigations. These surveys can be carried out using photogrametric or laser scanning methods, and presented in vector or digital format. First of all, the following are planned: a) Geo-referenced and stratification metric survey, descriptive survey of the materials in the Clitunno Tempietto. Actions 1. Surveying project 2. Geo-referenced and descriptive metric surveying campaigns 3. Analysis of the monument’s constructional stratification 4. Restitution of data 5. Three-dimensional restitution models of the actual state

Parties involved Campello Municipal Council Office for Architectural, Landscape, Historical, Art and Local Heritage, Perugia; Regione Umbria; Phases and time frame Short to medium term, from 2009 Financial resources Funds to be procured by: Campello sul Clitunno Municipal Council; Ministry for Cultural Heritage; Regione Umbria Expected results Obtaining precision, geo-referenced surveys of the existing structure, to define the sequence of historical evolution of the properties (analysis of the transformation phases) The surveys will also become the basis for: a) defining the maintenance project for the Clitunno Tempietto b) designing and creating further analyses for the constructional elements c) creating a database d) supplying material for the distribution and publication activities Result indicators Amount of data collected and computerized Frequency with which results are used for other conservation, valorisation and utilization projects

KNOWLEDGE PLAN Campello sul Clitunno site and buffer zone Objective 24 INVESTIGATION ON THE HERITAGE OF CAMPELLO Project 24.2 Analysis and study of existing archaeological and historical documentation Description There are various historical and artistic testimonies in Campello Unfortunately, analysis of these properties has been only partial or preliminary. Their examination, however, is an important element to reconstruct the background of the territory and improve prospects for valorisation and distributions. This involves activating a new study of the finds and the results of the excavations carried out in the past at Campello. In addition to this, there will be a survey and analysis of the data regarding the churches across the municipal territory. The investigation will also provide material for the publication of a monograph concerning various aspects. Actions 1. Research and recovery of documentation 2. Study and computerization of excavation data 3. Cataloguing and study of finds 4. Publication of material Parties involved Umbria Archaeology Office University of Perugia Campello sul Clitunno Municipal Council; Phases and time frame Medium term from 2009

65 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Financial resources Funds to be procured by: Italian State (Ministry for Cultural Heritage); Regione Umbria; Perugia Provincial Council; private and bank sponsors Expected results Investigation into the cultural finds at Campello Creation of a usable database Publication of new material Result indicators Quantity of data obtained quantity of contexts analysed Number of published volumes

KNOWLEDGE PLAN Campello sul Clitunno site and buffer zone Objective 24 INVESTIGATION INTO THE HERITAGE OF CAMPELLO (SITE AND BUFFER ZONE) Project 24.3 Historical investigative research onf the Clitunno Tempietto Description The Tempietto has been involved in many research projects since the start of the last century. The documentation regarding these projects is fragmentary. Investigation and research into all known data and the search for new data in the archives will be fundamental for a complete picture of the building's background. Actions 1. Acquisition and computerization of data regarding research already done 2. Collection and organization of new archive data Parties involved Campello Municipal Council Office for Architectural, Landscape, Historical, Art and Local Heritage, Perugia; University of Perugia Phases and time frame Medium term from 2009 Financial resources Funds to be procured by: Campello sul Clitunno Municipal Council; Italian State (research funding); European Union Expected results Increased knowledge of Clitunno Tempietto Creation of up-to-data, complete database Result indicators Quantity of data collected Frequency with which database is used

KNOWLEDGE PLAN Campello sul Clitunno territory Objective 25 INVESTIGATION ON THE TERRITORY DURING THE LONGOBARD ERA Project 25.1 Analysis and study of existing archaeological documentation on the territory Description There have been numerous finds and testimonies available from the Longobard era scattered across the territory. An improvement in awareness must be based not only on new finds, but also on checking and collecting all available data in order to create a wide documentary base that can become a fundamental instrument for the preservation of heritage and cultural awareness and to act as a stimulus and guide for the creation of new techniques Actions 1. Investigation into existing data regarding the sites on the Longobard itineraries 2. Investigation into data on the Longobard era in the other urban sites of the Duchy 3. Organization of data and archiving to create a database 4. Study of testimonies of data and start of investigations into specific themes 5. Publication and distribution of results Parties involved Office for Architectural, Landscape, Historical, Art and Local Heritage, Perugia; University; Phases and time frame Short to medium term, from 2009 Financial resources Funds to be procured by: Regione Umbria; European Union Expected results Acquisition of all existing data and investigation Result indicators Quality and quantity of recovered data Number of distribution activities promoted and breadth of public interest

KNOWLEDGE PLAN Campello sul Clitunno territory Objective 25 INVESTIGATION ON THE TERRITORY DURING THE LONGOBARD ERA Project 25.2 Further research into middle ages churches

Description Churches usually preserve works or testimonies of art regarding their background and the transformations that have taken place there over time A systematic analysis of these contexts is planned, with the aim of collecting more

66 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

data to enable an investigation into development in the territory in the late- mediaeval period and the artistic and architectural production characteristics, also enabling a greater valorisation of the properties. An investigation into the materials is also planned, along with the construction techniques used in works of sculpture across the territory Actions 1. Investigation and analysis of data on the late mediaeval churches 2. Territorial and place-name research aimed at recognising the areas in which ancient churches once stood 3. Investigation and study of artistic and architectural testimonies linked to the places of worship and monasteries 4. Analysis geared towards an understanding of the materials and construction techniques of the works of sculpture 5. Organization and archiving of data 6. Distribution and publication of results Parties involved Office for Architectural, Landscape, Historical, Art and Local Heritage; University of Perugia; International Centre for Research and Documentation on Late Mediaeval Art and Architecture; Phases and time frame Short to medium term, from 2009 Financial resources Funds to be procured by: Regione Umbria; bank and private sponsors Expected results Investigation of churches, monasteries and works of art from the Longobard era across the territory; acquisition of up-to-date data and setting up of consultable archives Result indicators Quantity of data collected Breadth of area involved Frequency of consultation of the data collected Number of distribution activities promoted and breadth of public interest

KNOWLEDGE PLAN Campello sul Clitunno territory Objective 25 INVESTIGATION INTO THE TERRITORY DURING THE LONGOBARD ERA Project 25.3 Further research into middle ages fortified sites Description The castra were the main settlements in the territory during the late mediaeval period. Planned, systematic research of these sites, beginning with a complete investigation into the locations of the fortified settlements, to arrive at improving understanding and documentation of all centres, with emphasis on their characteristics and idiosyncrasies, including thanks to specific archaeological surveys

Map with archaeological sites and elements of the ancient landscape

Actions 1. Investigation of site and fortification structures 2. Acquisition and computerization of data 3. Survey campaigns of fortified centres and promotion of new surveys 4. Study and publication of results Parties involved Municipalities; Perugia Provincial Council; Regione Umbria; Office for Architectural, Landscape, Historical, Art and Local Heritage; Phases and time frame Short to medium term, from 2009 Financial resources Funds to be procured by: Regione Umbria; bank and private sponsors Expected results Improved understanding of late mediaeval castra of Longobard duchy Increased valorisation and creation of a "network of Castles" Result indicators Quantity of data obtained Number of sites involved Breadth of areas investigated Number of distribution activities promoted and breadth of public interest

67 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Campello sul Clitunno territory Objective 26 COMPUTERIZATION OF DATA Project 26.1 Creation of an online database Description An understanding of the historical and artistic heritage of Campello sul Clitunno can be made easier if the organization of data is entered as part of a wider panorama of understanding that can easily be reached and consulted by all. This will be made possible by implementing an information system, which will contain the part concerning the archaeological, historical and artistic aspects, in particular, regarding the Longobard period. This data bank will be consultable online via the official website and the site of the Longobard network. Actions 1. Computerization of data collected 2. Entry onto information platform 3. Activation of online consultation Parties involved Regione Umbria; Campello sul Clitunno Municipal Council; Office for Architectural, Landscape, Historical, Art and Local Heritage, Perugia; University of Perugia; International Centre for Research and Documentation on Late Mediaeval Art and Architecture; Promotion Committee of the Aquileia Patriarchate Project; Phases and time frame Medium term from 2009 Financial resources Funds to be procured by: Regione Umbria Expected results Increasing possibility of distribution and consultation of data on Longobard culture Result indicators Amount of data collected and computerized Breadth of territory involved Frequency of consultation and utilization of data for other projects

68 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Benevento site and buffer zone Objective 27 TO INCREASE THE KNOWLEDGE ABOUT THE SANTA SOFIA COMPLEX

Project 27.1 Launch an in-depth study of the Longobard phase of cloisters Description The project includes an in-depth archaeological survey to identify the cloister of Santa Sofia prior to the Romanic one – in line with the complex built at the behest of Arechi II – and the reconstruction of the chronological and artistic phases. Traces of this original cloister can be seen in the reuse of some “a stampella” capitals, with decorations in the form of geometric motifs, which was typical of the Lombard era. Other capitals were recovered from excavations of the cloister’s cistern. In addition to this, traces of another cistern were found that, due to its logical and structural aspects, could belong to a pre-existing cloister.

Parties involved Superintendency for Architectural Heritage in the provinces of Salerno, Avellino, and Benevento. BAPPSAE Superintendency of Caserta and Benevento. Benevento State Archives. Phases and time frame Short term (2009) Financial resources To be found: local, national and EU funding. Expected results Identification of layers preceding the current phase of the Cloister.

69 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Benevento site and buffer zone Objective 28 TO INCREASE THE KNOWLEDGE ABOUT ARCHAEOLOGY AND LOCAL HERITAGE

Project 28.1 Finishing and increasing urban archaeological excavations Description This action is consistent with the vision of local authorities that provides for sustainable development of the town and of its territory. It sees in the cultural heritage an important engine even for social and economic development. Action will be taken in various stages: · Inventory of new findings of Piazza Sabariani (medieval affrescos in a hypogeum of the age of the Duchy of Benevento) and of the Cathedral (mosaics and structures from Roman and Medieval times).

· Archaeological investigation of Piazza Piano del Corte near the Church of Santa Sofia that, given its place name, is indicated as the probable site of the Sacrum Palatium. The extent of the investigations in this area could provide new data on common dwelling construction in the Lombard period, about which little is currently known.

· Creation of an archaeological-monumental centre located between Piazza Orsini and the “Arco del Sacramento” where some of the most important relics of Roman and Medieval times are to be seen.

70 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Arco del Sacramento

· A larger inventory on the area of Cellarulo, where important remains have been found of the commercial and craft area of the Roman town, the harbour on the river, and Roman baths. · A programme of archaeological surveys and restoration of the area located between Ponte Leproso and Piazza Cardinal Pacca, which includes important monuments for shows (theatre and amphitheatre) and thermal buildings (Via S. Cristiano, Piazza Cardinal Pacca, and Vico Bagni) from the Roman era. Parties involved Municipality of Benevento Campania Regional Authority Superintendency for Architectural Heritage in the provinces of Salerno, Avellino, and Benevento. BAPPSAE Superintendency of Caserta and Benevento. Benevento State Archives. Phases and time frame Long term (2015) Financial resources To be found: local, national and EU funding. Expected results Extension of knowledge about the urban development of Benevento, especially as regards the Lombard phase. Result indicators Number of areas investigated. Overall size of archaeological areas.

71 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Benevento site and buffer zone Objective 28 TO INCREASE THE KNOWLEDGE ABOUT ARCHAEOLOGY AND LOCAL HERITAGE

Project 28.2 Start a census and study of the “spolia” re-used in buildings in the old city Description The practice of stripping, as seen in Benevento, was introduced immediately by the and continued in subsequent centuries. In fact, already in the wall the Lombards rebuilt as soon as they reached Benevento, one finds construction materials from the Roman era being reused. And that’s not all, here and there in the defences one finds sculptural fragments from the classical era positioned especially at the gateways, that are carefully and sometimes tastefully positioned. The old city is also strewn with funerary sculptures, inscriptions, and architectural elements from the Roman age, built into the external facades of homes. These relics, which form a type of open-air museum, need to be organised to allow in-depth study and, at the same time, suitable restoration that makes it possible to use them. See Knowledge Plan – Gather and organise all existing data and documentation on the GIS.

Parties involved Superintendency for Architectural Heritage in Salerno, Avellino, and Benevento. BAPPSAE Superintendency of Caserta and Benevento. Municipality of Benevento - Benevento Provincial Authority - Campania Regional Authority Phases and time frame Medium term: 2010 Financial resources To be found: POR FESR Campania Regional Authority 2007-2013 Expected results Upgrading of knowledge about the ancient town of Benevento in the various archaeological strata. Result indicators Number of cataloguing schedules completed.

72 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Benevento site and buffer zone Objective 28 TO INCREASE THE KNOWLEDGE ABOUT ARCHAEOLOGY AND LOCAL HERITAGE

Project 28.3 Gather and organise all existing data and documentation on the GIS. Description The project of cataloguing that has started and is to be started in the old city of Benevento – with particular reference to the relics reused in public and private buildings, the study of public buildings, archaeological surveys,. and sporadic archaeological finds – brings about a need for organising and contextualising the data. This contextualisation must be both spatial (geographic) and temporal. The tool that can be used to meet this need could be GIS (Geographical Information System) software that, thanks to continuous updating of the database, would allow experts to compare items, even from different sites in Italy and in other countries. Parties involved Superintendency for Architectural Heritage in Salerno, Avellino, and Benevento. BAPPSAE Superintendency of Caserta and Benevento. Municipality of Benevento Campania Regional Authority Phases and time frame Medium term: 2010 Financial resources To be found: regional and EU funding Expected results To set up and develop an integrated system over time covering the body of knowledge that is accessible and available as a source of information in order to divulge, study, and optimise management of the cultural heritage of the site.

Result indicators Number of pieces of data organised in terms of subject matter. Quantity of data stored. Number of schedules produced

KNOWLEDGE PLAN Benevento site and buffer zone Objective 28 TO INCREASE THE KNOWLEDGE ABOUT ARCHAEOLOGY AND LOCAL HERITAGE

Project 28.4 Create an inventory of documentation on Longobard cultural heritage in the Benevento State Archives Description A study of the parchment fragments written in Beneventana in the State Archives and the significant corpus of documents on the “suppressed monasteries” currently kept by the Museum in Sannio, will make it possible to gain further knowledge of the activity of the Scriptorium in Benevento. This study will coincide with the Exhibition entitled: “Langobardia Minor: Images and documents from the Duchy of Benevento”. Parties involved State Archives Phases and time frame Medium term: 2008 Financial resources Ordinary State Archive Funds Expected results Raising the level of knowledge about the documentary heritage on the City’s Lombard period. Result indicators Number of documents catalogued. Number of experts that consult the catalogued documentation.

KNOWLEDGE PLAN Benevento site and buffer zone Objective 28 TO INCREASE THE KNOWLEDGE ABOUT ARCHAEOLOGY AND LOCAL HERITAGE

Project 28.5 Complete the study of the stucco fragments coming from Sant’ Ilario in Port’Aura

Description During recent works in the Church of St Ilario in Port Aures some fragments of stucco were found that came from the internal decoration of the church. Upon initial examination, these stuccoes seemed to come from the time the building was constructed. This can also borne out by comparison that could be done with similar stuccoes from the Temple in Cividale del Friuli and the Church of S. Salvatore in Brescia. The project involves promoting and publishing specialist studies, as well as putting the finds in a museum, in order to increase knowledge about this decorative practice.

73 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Church of St Ilario in Port Aures - fragments of stucco Parties involved Superintendency for Architectural Heritage in Salerno, Avellino, and Benevento;BAPPSAE Superintendency of Caserta and Benevento. Phases and time frame Medium term: 2010 Financial resources To be found: regional and EU funding Expected results Raising the level of knowledge about Lombard items produced in Benevento. Result indicators Number of fragments studied, catalogued, and restored.

KNOWLEDGE PLAN Benevento territory Objective 29 TO INCREASE TH E KNOWLEDGE ABOUT THE TERRITORY

Project 29.1 Gather and organise all existing data and documentation on the GIS

Description Starting with the wealth of archaeological – architectural heritage, this system makes it possible to direct the actions required to the best knowledge, taking into account, based on the censused resources, all the data on the protective measures applied, state of conservation, interfering disturbing elements, and any other resources that can be related to these. The project will strive to take in the cataloguing and putting on the web of documentary and bibliographic sources, in order to create a Virtual Library covering the territories included in the UNESCO Site. “Planning and management the SIT system with the help of GIS software” involves: Creating a computer system fro acquiring / filing / editing data (databanks) on a GIS basis, in order to read geographical data on the relevant territory via the SIT (Territorial Computer System). The first phase will be to design the software model (database and GIS interface) and to experiment with the effectiveness of the database architecture, by entering territorial data associated with basic maps. The second phase involves translating all the data available on the wealth of cultural heritage, within the GIS system. The flexibility of the system will allow the software to be updated over time to meet needs that may arise from time to time as the wealth of knowledge increases. The basic actions to create the network therefore include activating a system for gathering and managing computerised data that involves the entire network of the serial Site, and reporting of information available on the heritage, documentary sources and studies available. Parties involved Superintendency for Architectural Heritage in Salerno, Avellino, and Benevento. BAPPSAE Superintendency of Caserta and Benevento. State Archives Municipality of Benevento Phases and time frame Long term: 2015 Financial resources To be found: regional and EU funding Expected results To set up and develop an integrated system over time covering the body of knowledge that is accessible and available as a source of information in order to divulge, study, and optimise management of the cultural heritage of the site Result indicators Number of pieces of data organised in terms of subject matter Quantity of data stored Number of schedules produced.

74 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Benevento territory Objective 29 TO INCREASE THE KNOWLEDGE ABOUT THE TERRITORY

Project 29.2 Plan systematic analysis and research in the Territory Description The creation of an integrated system for cultural heritage, aimed at more in-depth and wider- reaching studies, also presupposes wide-ranging study campaigns on specific topics. In fact, the presence of Lombard culture over a large portion of the central-southern territory leads one to suppose that it had a significant influence on architectural and artistic works, and material culture in general. On the other hand, knowledge outside the City of Benevento is scarce. One may suppose that many settlements of medieval origin or older – located on the Highlands surrounding Benevento, along the main communication routes (Via Appia, Via Traiana, Regio Tratturo, etc.) – were strongly influenced by Lombard culture. It is therefore necessary to plan systematic analysis and research of the territory in order to bring to light these cultural influences and relate them to one another, including by using computerised cataloguing and geo-referencing tools (SIT). Parties involved Superintendency for Architectural Heritage in Salerno, Avellino, and Benevento. BAPPSAE Superintendency of Caserta and Benevento. State Archives Phases and time frame Short term: 2009 Financial resources To be found: regional and EU funding Expected results Launch of a research and analysis campaign on the territory Result indicators Number of research projects launched

75

76 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Monte Sant’Angelo site and buffer zone Objective 30 IN-DEPTH EXAMINATION OF KNOWLEDGE OF THE LONGOBARD HERITAGE

Project 30.1 Realisation of other survey campaigns Description The exploitation of the Longobard Sanctuary requires an in-depth knowledge of its architectural and decorative structure. The promotion of new cognitive investigations aimed at improving existing data, sometimes incomplete of based on past analyses with outdated techniques, appears to be of extreme importance. In particular possible examinations regarding building techniques and phases are of great interest. With this objective, the realisation of a precise organic survey in digital format is foreseen which will permit the planning and realisation of further analytical examinations. The survey can be carried out with photogrammatic type methods or laser-Scanning, with rendering in vectorial and digital format. It is necessary to start from a survey on the stratification of the walls and the remains of frescos (with aimed probes) on the surface. This phase is introductory to the planning of a systematic total survey which includes metric measurement of the building materials. Actions 1. Survey project 2. Realisation of georeferenced metric and descriptive surveys 3. Analysis of building stratification 4. Rendering of data 5. Realisation of three-dimensional rendered models of the status quo 6. Realisation of three-dimensional rendered models of the transformation phases Parties involved Municipality of Monte Sant’Angelo; Superintendency for the BAPPSAE (architectural assets for the landscape and for historical heritage) of the Region of Puglia; University of Bari; Region of Puglia; International Centre of Research and Documentation on Art and Medieval Architecture. Phases and time frame Short-medium term, starting from 2009. Financial resources Funds to be raised charged to: Municipality of Monte Sant’Angelo; Ministry for Cultural Assets and; Region of Puglia. Expected results Obtain a precise, georeferenced survey of the existent and define the historical sequence of evolution of the asset (analysis of the phases of transformation). The survey will also become the basis for: a) setting the new museumification and maintenance project for the sanctuary b) plan and realise further analysis aimed at building elements c) realise a GIS (databank) d) supply material for divulgation. Result indicators Quantity of obtained data. Frequency of use of the results for other projects of conservations, valorisation and use of the assets.

KNOWLEDGE PLAN Monte Sant’Angelo site and buffer zone Objective 30 IN-DEPTH EXAMINATION OF KNOWLEDGE OF THE LONGOBARD HERITAGE

Project 30.2 In-depth examination of historical research on the Longobard Sanctuary Description The research which has involved the Longobard Sanctuary dates back to archaeological digs in the fifties. Only in 1999 were other essays on digs carried out by some specialists from the Department of classic and Christian Studies of the University of Bari, which were aimed at identifying and describing burials id limina of the sanctuary. These findings witness how in the full Longobard era, when the sanctuary assumed a more complete structural form, the tombs were located inside the “Longobard gallery” and in the area in front of the facade. The documentation on these interventions is not homogeneous and is dispersed. The censoring and gathering of all known data and research on new data in the archives will constitute a fundamental moment for the knowledge on matters of the Longobard Sanctuary. Actions 1. Acquisition and organisation of archived data on past research. Parties involved Municipality of Monte Sant’Angelo; Superintendency for the BAPPSAE of the Region of Puglia; University of Bari; International Centre of Research and Documentation on Art and Medieval Architecture.

77 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Phases and time frame Medium term, starting from 2009. Financial resources Funds to be raised charged to: Italian State (financing for research); European Community. Expected results Widening of knowledge on the Longobard Sanctuary. Creation of an updated and complete databank. Result indicators Quantity of gathered data. Frequency of use of the databank.

KNOWLEDGE PLAN Monte Sant’Angelo site and buffer zone Objective 30 IN-DEPTH EXAMINATION OF KNOWLEDGE OF THE LONGOBARD HERITAGE

Project 30.3 Censoring of the structures and existing data on the walls, with definition of the property of the remains Description The walls constitute a monumental element of the ancient urban space of Monte Sant’Angelo which were involved over time in phenomena of re-use and modern urban development. Knowledge on the remaining sections therefore becomes a fundamental aspect for understanding some of the dynamics of urban development to obtain better protection and conservation of the remains. There are still now some examinations on the question of the urban walls but there is not yet a systematic approach. Foreseen therefore is the planning and completion of systematic censoring and the documentation on the existing sections of wall by means of categorisation and survey, with the verification of their ownership. At the end of this there will be a precious databank to be used both for conserving the walls and for valorisation, as well as favouring divulgation of the historical aspect to a wider public. Actions 2. Censoring of existing sections or those seen in the past 3. Categorising the existing sections of wall 4. Verification of the ownership 5. Verification and recovery of documentation 6. Promotion of surveys on the missing parts 7. Organisation of data and archiving 8. Edition of divulgative and scientific material Parties involved Municipality of Monte Sant’Angelo; Superintendency for the BAPPSAE of the Region of Puglia; University of Bari. Phases and time frame Short-medium term. Financial resources Municipality of Monte Sant’Angelo; Region of Puglia. Expected results Widening of knowledge on the walls. Production of material for implementation of the GIS and the archives on the heritage of Monte Sant’Angelo Result indicators Quantity of obtained data Frequency of use of data in other conservation, valorisation and exploitation projects Number of publications edited on the matter

KNOWLEDGE PLAN Monte Sant’Angelo site and buffer zone Objective 30 IN-DEPTH EXAMINATION OF KNOWLEDGE OF THE LONGOBARD HERITAGE

Project 30.4 Planning and realisation of new archaeological research in the area to the north of the Longobard Sanctuary Description The lack of data regarding the situation of the most ancient phases of the Sanctuary and the results of the digs in the fifties, invite the planning of cognitive interventions outside of the known area of the Sanctuary in order to verify the existence of other antique structures linked to the monument. Actions 1. Planning of non-invasive investigations according to different methods: georadar, electromagnetism etc. 2. Realisation of investigations 3. Elaboration of results and compilation of interpretative plans Parties involved Sanctuary of San Michele Arcangelo, Superintendency BAPPSAE of Puglia, International Centre of Research and Documentation on Art and Medieval Architecture

78 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

Phases and time frame Medium term Financial resources Funds to be raised charged to: Region of Puglia; private sponsors. Expected results Widening of knowledge on the ancient structure of the Sanctuary Result indicators Expansion of the area undergoing investigation. Quantity of data obtained. Frequency of use of the data for other research and valorisation projects.

KNOWLEDGE PLAN Monte Sant’Angelo site and buffer zone

Objective 30 IN-DEPTH EXAMINATION OF KNOWLEDGE OF THE LONGOBARD HERITAGE

Project 30.5 Planning and realisation of research on the ancient wall belt Description Starting from the hypothesis formulated by scholars regarding the progress of the ancient wall belt, the intention is to start up a systematic verification of the places where it is possible to identify evidence of the structures that are not visible today. The intention is that of elaborating a virtual reconstruction of the wall belt and verify the possibility of defining new valorisation paths. Actions 1. Instrumental survey of the sites with execution of essays to verify the eventual presence of the structural parts of the towers. 2. Coding data on specific software for virtual 3D re-elaboration 3. Study and publication of the results 4. Divulgation and preparation for use (see Conservation Plan; Enhancement Plan) Parties involved Municipality of Monte Sant’Angelo Superintendency for the BAPPSAE of the Region of Puglia. Phases and time frame Short-medium term, programmed to start from 2009. Financial resources Funds to be raised charged to: Municipality of Monte Sant’Angelo; Region of Puglia. Expected results Increase in knowledge on the development phases and dating the walls Production of material useful for conservation and valorisation Result indicators Expansion of the area undergoing investigation. Quantity of data obtained. Frequency of use of the data in the projects of conservation, valorisation and divulgation Number of divulgation activities promoted

KNOWLEDGE PLAN Monte Sant’Angelo territory Objective 31 IN-DEPTH EXAMINATION OF KNOWLEDGE OF THE TERRITORY IN THE LONGOBARD ERA Project 31.1 Analysis and study of archaeological documentation in the territory Description Numerous are the findings already made and the available evidence of Longobard era scattered over the territory. The improvement of knowledge must therefore be based not only on new acquisitions but also on the collection and verification of all the data that is already available in order to create a wide documentary base which may also become a fundamental tool for preserving the heritage and stimulating and addressing the realisation of new research Actions 1. Censoring of the existing data relative to cult locations located in Longobard itineraries (see Enhancement Plan) 2. Organisation of data and computerised archiving for the creation of a Data Base 3. Study of the evidence of the data and initiation of examinations on specific themes 4. Publication and divulgation of the results Parties involved Municipalities of Monte Sant’Angelo, San Marco in Lamis, San Giovanni Rotondo Province of Foggia Gargano National Park Mountain Community Superintendency BAPPSAE Region of Puglia University of Bari Phases and time frame Short-medium period, starting from 2009 Financial resources Funds to be raised charged to: Region of Puglia; European Community Expected results Acquisition of all existing data and examination Result indicators Quality and quantity of recovered data Number of divulgative activities promoted and expansion of the interested public sphere

79 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Monte Sant’Angelo territory Objective 31 IN-DEPTH EXAMINATION OF KNOWLEDGE OF THE TERRITORY IN THE LONGOBARD ERA Project 31.2 Continuation of archaeological research in the cult locations situated along la Via Sacra Langobardorum Description Along the Via Sacra many monasteries, churches and hospitals were built for pilgrims, often superimposed on more ancient structures: Santa Maria di Stignano, San Giovanni de Lama, Sant’Egidio, San Nicola al Pantano, San Lorenzo di Siponto. Having surpassed the valley of Fratta, the road continued near to a late antique or medieval settlement in the Cassana quarter; and then it lead to the abbey of Santa Maria di Pulsano and to Monte Sant’Angelo. Pilgrims could proceed towards the Tavoliere and visit the church of Santa Maria di Siponto, the abbey of San Leonardo di Siponto, the dome of Santa Maria Icona Vetere a Foggia and the sanctuary of the Incoronata di Foggia. Actions 1. Examination of historical research on known buildings 2. Territorial and toponomastic research aimed at recognising the areas in which ancient churches rose which have disappeared 3. Organisation and archiving of data 4. Divulgation and publication of results Parties involved Municipalities of Monte Sant’Angelo, San Marco in Lamis, San Giovanni Rotondo Province of Foggia Gargano National Park Mountain Community Superintendency BAPPSAE Region of Puglia University of Bari Phases and time frame Short-medium period, starting from 2009 Financial resources Funds to be raised charged to: Region of Puglia; bank and private sponsoring. Expected results Examination of knowledge on the churches, monasteries and works of art in the territory in the Longobard era; acquisition of updated data and formation of consultable archives; Result indicators Quantity of data gathered Expansion of the area subject matter of the interventions. Frequency of consultation of gathered data Number of divulgative activities promoted and expansion of the interested public sphere

KNOWLEDGE PLAN Monte Sant’Angelo territory Objective 32 MEMORISATION OF COGNITIVE DATA ON THE SITE AND ON THE TERRITORY Project 32.1 Realisation of an archaeological map of Monte Sant’Angelo and the Gargano Description The existing data on the Longobard period both in Monte Sant’Angelo and all the Gargano territory is numerous and form a base of primary importance for the knowledge of the Longobard people and their settlement in Italy. Given that the data is not homogeneous, using it and distributing it is more complicated and impedes the emergence of its full potential. For this reason it seems necessary ot obtain a total collection of this evidence, working systematically and then making it available in a sole data bank which will become a true document on the archaeological evidence. Actions 1. Censoring the documentation 2. Categorising and cataloguing the findings 3. Study and organisation of data with creation of a digital archive 4. Realisation of the Document 5. -Publication and divulgation of the document Parties involved Municipality of Monte Sant’Angelo, Mountain Community of Gargano, Gargano National Park, Region of Puglia, Superintendency for the BAPPSAE of the Region of Puglia; University of Studies of Bari; International Centre of Research and Documentation on Art and Medieval Architecture . Phases and time frame Brief – medium term, starting from 2009 Financial resources Funds to be raised charged to: Region of Puglia Expected results Arrive at the collection and reorganisation of all archaeological data and make it consultable. This will serve the realisation of a territorial GIS on the evidence and to compile archaeological risk documents Result indicators Quantity of data gathered Expansion of the territory involved. Frequency of consultation and use of gathered data for other projects Number of divulgative activities promoted and expansion of the interested public sphere

80 8.1 KNOWLEDGE PLAN DETAILED SCHEDULES

KNOWLEDGE PLAN Monte Sant’Angelo territory Objective 32 MEMORISATION OF COGNITIVE DATA ON THE SITE AND ON THE TERRITORY

Project 32.2 Implementation of the regional GIS Description The management of heritage of knowledge on Monte Sant’Angelo and the Gargano territory in the Longobard era may come about more easily if the organisation of data is inserted into a wider viewpoint of knowledge that is easily reached and consultable by everybody. This could happen thanks to the implementation of the regional GIS (Geographical information system), inserting therein also the part concerning archaeological aspects, in particular those on the Longobard period. Connection of the regional informative system implemented thus may be made usable and available by using the computer platform linked to the Monte Sant’Angelo Web site constituting the web site of the network of locations included in the Site Italia Langobardorum. Actions 1. Implementation of existing regional GIS 2. Implementation of the GIS on web application Parties involved Municipality of Monte Sant’Angelo, Mountain Community of Gargano, Gargano National Park, Region of Puglia, Superintendency for the BAPPSAE of the Region of Puglia; University of Studies of Bari; International Centre of Research and Documentation on Art and Medieval Architecture Phases and time frame Medium term, starting from 2010 Financial resources Funds to be raised charged to: Region of Puglia Expected results Expand the regional data bank on GIS base Result indicators Quantity of data gathered Expansion of the territory involved. Frequency of consultation and use of gathered data for other projects

81

82 8.2 PROTECTION Protection and Conservation Plan are areas, i.e. both stone and fresco AND CONSERVATION PLAN aimed, on the one hand, at further surfaces. improving the state of conservation

by means of programmed maintenance works that make 8.2.1 CIVIDALE DEL FRIULI Site, buffer zone and Territory constant monitoring possible. On 8.2.6 BENEVENTO the other hand they involve carrying Site, buffer zone and Territory

The relative good state of out conservation works in the archaeological areas most subject to The Protection and Conservation conservation of the properties included in the Site of Cividale del decay due to vegetation. As to the Plan site and buffer zone defines environmental context of the Park, medium and long-term safeguards Friuli provides the foundation for the definition of objectives, projects and particular attention is given to works to conserve both the heritage site to stabilise slopes and constant relative actions of the Protection and and buffer zone of Benevento. It maintenance of the woods. Conservation Plan. Taking into also programmes some important account the variety of conditions conservation projects, actions 8.2.4 SPOLETO which characterize the single covering a vast area that will make Site, buffer zone and Territory properties, specific maintenance parts that are currently little known programmes – integrated with the accessible and useable, while contents of the Knowledge and In SPOLETO a Diagnostic Laboratory valorising the cultural heritage that Enhancement Plans – need to be – now operational – was created in marked the Samnite Territory. implemented. the context of the Framework The objectives it covers includes: Programme State-Region (APQ) in 8.2.2 BRESCIA 2004. This Laboratory – being · Improving the state of Site, buffer zone and Territory equipped for damage and risk conservation of the site. diagnosis for initial intervention and · Improving the state of Both the monastic complex of Santa recovery of properties through conservation of Longobard Giulia in Brescia and the single innovative methods and techniques assets included in the buffer monuments enjoy an optimal state of – could act as a point of reference as zone. to prevention of seismic risk and conservation. An organic · Raising the conservation status conservation plan has been cognitive diagnostic projects on the of the old city. properties, not only for the implemented for the Site in the years · Monitoring the state of 1979-2005, after in-depth studies Longobard monuments of the Duchy conservation of the site. and stratigraphic archaeological of Spoleto, but also for all the · Upgrading and extending the excavations which addressed the properties included in the Italia human resources involved in subterranean structures, the Langobardorum Network. At this conservation of the site. buildings’ elevation as well as the Centre – in cooperation with the · Improving prevention of the interior and exterior decorated Italian Centre for Early Middles Ages seismic risk in the old city. surfaces. Studies (CISAM), also present in · Extending the human resources The organic recovery intervention on Spoleto – a data-archive could be involved in safeguarding the the monumental area, which is in a created. It will concern the building site. relative good condition, includes techniques and material of the · Improving the state of significant intervention of various Longobard artefacts (from conservation of the Lombard extraordinary conservative architecture to sculpture and heritage in the territory. maintenance, which will be carried paintings, etc.) and include all out using the highest quality information acquired thanks to 8.2.7 MONTE SANT’ANGELO standards. The results of such studies, research and surveys Site, buffer zone and Territory interventions will directly nfluence,i throughout Italy. This archive could above all, the contents of the be extended to a wider network of In MONTE SANT’ANGELO the city Knowledge Plan. other European Longobard walls dating back to the Norman properties in the future. period included in the buffer zone proposed consist of remaining 8.2.3 CASTELSEPRIO-TORBA 8.2.5 CAMPELLO SUL CLITUNNO pieces with a different degree of Site, buffer zone and Territory Site, buffer zone and Territory conservation, the piece South to the monastic complex of San Francesco The state of conservation of the The Clitunno Tempietto is in a good which is the firmer portion included. various monuments that make up state of conservation. It has been The state of conservation is different the Castelseprio-Torba subject to several recent depending on the various pieces but, archaeological area is good, thanks interventions which guaranteed its as a whole, is good and does not to the numerous restoration and correct conservation. In particular, require any action as to both stability maintenance works carried out over the last intervention was structured and structure. Invading vegetation the years by owning bodies and in a series of operations which differently concerns the pieces managers. The objectives of the concerned both external and internal particularly in the period between 83 spring and summer. During planned manual operations aimed at removing it the inspection of the wall coat as well as reparations to avoid water infiltration and structure disintegration are carried out. The castle, already restored and strengthened in the past, returned to its functional condition after further restoration works concluded in summer 2009. The systematic rehabilitation of the complex is aimed at streamlining and better using this piece of heritage. Recently, the consolidation of the church supporting structures was completed and the place of worship was reopened to public during 2009. With respect to the state of conservation of both the bell tower and the left wing of the complex, timely restoration works are being planned.

84 8.6.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

CIVIDALE 1 1.1 DEL FRIULI ENHANCEMENT OF THE STATE OF Maintenance interventions with special SITE CONSERVATION OF THE reference to the presbytery LONGOBARD TEMPIETTO 1.2 Project and maintenance intervention on the wooden chancel and beam of the iconostasis 2 2.1 DEVELOPMENT OF A Completion of the research on existing MAINTENANCE PROGRAMME FOR data on past conservation operations THE LONGOBARD TEMPIETTO and systematization of these data (history) 2.2 Carrying out of thematic surveys aimed at diagnostic projects and analytical investigations 2.3 Maintenance programme and launch of the first cycle of interventions 2.4 Project, creation and implementation of a database for the monitoring of the state of conservation and the transfer into the archives of past and current conservation interventions 2.5 Maintenance interventions on damaged frescos and stone furnishings of the Tempietto 3 3.1 ENHANCEMENT OF THE STATE Maintenance intervention OF CONSERVATION OF THE on the Church of San Giovanni MONASTERY OF SANTA MARIA IN VALLE 4 4.1 DEVELOPMENT OF A Completion of the research on existing MAINTENANCE PROGRAMME FOR data on past restoration operations and THE RATCHIS ALTAR, THE electronic systematization of these data BAPSTISPERY OF CALLISTO 4.2 AND THE DUOMO Carrying out of thematic surveys aimed at diagnostic projects and analytical investigations and intervention projects 4.3 Completion of the survey cognitive phase on the surfaces of the Duomo and relative intervention 5 5.1 CONSERVATION Carrying out of thematic surveys of wall OF THE PATRIARCHAL PALACE stratification and deterioration and relative project and conservation intervention in the archaeological area A 5.2 Intervention for the restoration of protection architectural structures of the archaeological area B and maintenance intervention on ancient structures CIVIDALE 6 6.1 DEL FRIULI ENHANCEMENT Maintenance projects and intervention BUFFER ZONE OF THE STATE on visible parts of the first circle of walls AND TERRITORY OF CONSERVATION to improve knowledge and use of the OF THE WALLS walls

85 8.6.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

6.2 Restoration and planned maintenance projects and interventions on quarters’ walls 7 7.1 COMPLETION Completion of the restoration of the OF CONSERVATION PROJECTS Church of San Giovanni in Xenodochio OF THE CHURCHES 7.2 Restoration intervention of the Church of San Silvestro

7.3 Maintenance of external surfaces of the Church of Santa Maria di Corte and church square 7.4 Maintenance of plaster on the façade and apse of the Church of San Martino and restoration project and intervention on the sacristy 8 8.1 PROTECTION AND CONSERVATION Completion of the restoration of the OF CONVENTS AND HISTORICAL complex comprising the church and the PALACES former convent of San Francesco

9. 9.1 IMPROVEMENT Completion of protection interventions OF NATURAL AND SEISMIC on River. RISKS PREVENTION

BRESCIA 10 10.1 SITE AND MAINTENANCE ON MASONRY Maintenance measures for plastered BUFFER ZONE AND SURFACES walls and masonry pertaining to the IN THE S. SALVATORE – S. GIULIA southern side of the Monastery and MONASTERY COMPLEX Santa Maria in Solario 10.2 Conservation measures on the plaster and masonry pertaining to the side chapels in San Salvatore 10.3 Conservation measures on the archeological structures below the San Salvatore flooring (Roman domus, the first church and Early middle ages tombs) 10.4 Conservation measures on the archaeological structures below the nuns’ parlor 10.5 Conservation measures on structures of archaeological interest located in the entrance area to San Salvatore - Santa Giulia City museum 11 11.1 INTERVENTIONS ON MOBILE Cleaning, consolidation, identifying FINDINGS PERTAINING couplings and any assemblage onto TO THE EARLY MIDDLE AGES panels PHASES OF THE MONASTERY of significant portions of painted plaster relating to the Early Middle Ages phase of the Church of San Salvatore

86 8.6.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

11.2 Completion of the cleaning and consolidation, identification of the original arrangement and any on site relocation of stucco fragments pertaining to the architectural decoration of the Church of San Salvatore 12 12.1 IMPROVEMENT Substitution of the access door OF THE PROTECTION STRUCTURES to the San Salvatore cloister 12.2 Substitution of the windows’ wood frames on the first floor of the monastery complex 13 13.1 RECLAMATION OF THE Conservation and maintenance ARCHEOLOGICAL AREA OF THE interventions on various structures CAPITOLIUM pertaining to the Republican sanctuary 13.2 Conservation and maintenance interventions on various structures pertaining to the Capitolium 14 14.1 CONSERVATION MEASURES Conservation interventions on the ON HISTORICAL BUILDINGS structures and surfaces of Palazzo della Loggia, seat of the City Hall 14.2 Conservation interventions on the roofing of Palazzo Bonoris, seat of the Ateneo di Scienze Lettere ed Arti of Brescia 14.3 Conservation interventions on the roofing and Early Middle Ages painted plaster in Palazzo Broletto 14.4 Conservation interventions on the roofing of Mastio Visconteo within the Castle of Brescia 14.5 Extraordinary conservation interventions in the Tosio Martinengo Palace BRESCIA TERRITORY 15 15.1 CONSERVATION OF THE Restoration and definitive cataloguing LONGOBARD CONTEXTS of findings and funeral artifacts found IN THE BRESCIA TERRITORY in the settlements and the recently excavated necropolis in Manerbio, Leno, Montichiari and Sirmione and from ecclesiastical buildings 16 16.1 PREVENTION AND MITIGATION PRIM – Regional integrated program OF THE PRINCIPAL RISKS for mitigating risks FOUND IN THE TERRITORY 16.2 Works to make the road s.s. 45 BIS “Gardesana occidentale” safe CASTELSEPRIO – TORBA 17 17.1 SITE, MAINTENANCE OF THE CHURCH Maintenance plan and works for the BUFFER ZONE OF SANTA MARIA FORIS PORTAS surfaces of the Church of Santa Maria AND TERRITORY foris portas

87 8.6.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

18 18.1 IMPROVEMENT OF THE STATE Recovery and restoration of the OF CONSERVATION Baptistery OF THE CASTRUM of S. Giovanni and creating a new roof 18.2 Recovery and restoration of walls in the intermediate area between the Cistern and the Bell Tower in the San Giovanni Basilica Complex 18.3 Conservation work on the Church of S. Paolo 18.4 Conservation work on building I 18.5 Conservation work on the door and access bridge for the castrum 18.6 Restoration and maintenance work on the wall circuit 19 19.1 PREVENTION AND MITIGATION Refurbishing of the slopes OF THE NATURAL, SEISMIC AND ANTHROPIC RISKS

20 20.1 IMPROVING THE STATE Completion of restoration of the internal OF CONSERVATION plaster and frescoes fragments OF THE TORBA COMPLEX in the Church of Santa Maria of Torba 20.2 Drawing up a maintenance project for the external surfaces of the Tower 20.3 Restoration of the external plaster of the Church, Farmhouse, and Barn 20.4 Conservation, restoration of the existing archaeological structures as part of refurbishing of the connection with the castrum of Castelseprio-Torba SPOLETO 21 21.1 SITE, DEVELOPMENT Systematization of data relative BUFFER ZONE OF A MAINTENANCE PROGRAMME to the carried out restoration AND TERRITORY FOR THE BASILICA interventions (see Documentation OF SAN SALVATORE centre) 21.2 Carrying out of thematic surveys aimed at diagnostic project and analysis 21.3 Planning of routine maintenance interventions and launch of the first cycle of interventions 21.4 Maintenance intervention of stone material stored in the museum warehouse 22 22.1 CARRYING OUT Launch of conservation and restoration OF CONSERVATION interventions of the ex convent complex INTERVENTIONS OF THE EX CONVENT COMPLEX

88 8.6.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

23 23.1 IMPROVEMENT Installation of a video surveillance OF RISK PREVENTION system on the basilica 24 24. 1 IMPROVEMENT OF RISK Creation of a Centre of Excellence for PREVENTION IN ORDER the recovery of Cultural Heritage in TO THE CULTURAL HERITAGE case of a disaster.

24. 2 Opening of the Cultural Heritage Diagnostic Laboratory at the Rocca Albornoziana CAMPELLO SUL CLITUNNO 25 25.1 SITE IMPROVEMENT OF THE STATE Maintenance work particularly on OF PROTECTION tombstone materials and walls of AND CONSERVATION pronaos OF THE CLITUNNO TEMPIETTO 25.2 AND THE CLITUNNO RIVER Relief and reduction of rising damp problems and condensation in the walls exposed to north and north-east 25.3 Conservation work and aesthetic aspect of the fresco on back wall of cell 26 26.1 DRAWING UP OF A MAINTENANCE Creation of thematic relief work PROGRAMME FOR THE CLITUNNO for the diagnostic project TEMPIETTO and analytical surveys 26.2 Maintenance programme and start up of first cycle of work CAMPELLO SUL CLITUNNO 27 27.1 BUFFER ZONE CONSERVATION AND UPGRADING Conservation and refunctioning of AND TERRITORY OF THE INDUSTRIAL ENEL power station and water pumping ARCHAEOLOGY STRUCTURES station, destined to be used as exhibition site for the Eco/Museum Project 28 28.1 CONSOLIDATION Work to secure and consolidate AND RESTORATION structure of the Sanctuary OF HERITAGE DAMAGED of the Madonna della Bianca BY THE 1997 EARTHQUAKE

BENEVENTO 29 29.1 SITE IMPROVING THE STATE OF Maintenance and conservation AND BUFFER ZONE CONSERVATION OF THE SITE improvement of the Church of Santa Sofia

30 30.1 IMPROVING THE STATE OF Maintenance of the Longobard tomb CONSERVATION OF LONGOBARD in the Church of S. Salvatore ASSETS INCLUDED IN THE SITE 30.2 AND IN THE BUFFER ZONE Maintenance work on the Longobard boundary wall 31 31.1 RAISING THE CONSERVATION Implement incentives for private owners STATUS OF THE ANCIENT to effect eco-sustainable recovery CITY CENTRUM of the ancient city

89 8.6.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

32 32.1 MONITORING THE STATE Programme for periodic monitoring OF CONSERVATION OF THE of the state of conservation ASSETS of the archaeological areas

33 33.1 UPGRADING AND EXTENDING Setting up a building school focussing THE HUMAN RESOURCES on restoration as part of a restoration INVOLVED network IN CONSERVATION OF THE SITE

34 34.1 IMPROVING PREVENTION Drawing up a plan to mitigate the OF THE SEISMIC RISK seismic risk IN THE ANCIENT CITY

35 35.1 EXTENDING THE HUMAN Training courses in civil protection RESOURCES INVOLVED for cultural heritage IN SAFEGUARDING THE SITE

BENEVENTO 36 36.1 TERRITORY IMPROVING THE STATE Programme for monitoring of the state OF CONSERVATION of conservation of the archaeological OF THE LONGOBARD HERITAGE areas along Via Sacra Langobardorum IN THE TERRITORY MONTE SANT’ANGELO 37 37.1 SITE HEIGHTENING OF THE STATE Project and intervention for the OF CONSERVATION realisation OF THE SANCTUARY of a system for the detection, control and correction of the rate of humidity in the locations of the Longobard Gallery, the adjoining rooms, the Angioina staircase, the cave-sanctuary and the connected rooms 37.2 Maintenance on the external wall covering north side 37.3 Planning and conservation of the bronze doors 37.4 Planning and intervention on the portcullis and the column of the upper atrium 38 38.1 ELABORATION OF A MAINTENANCE Completion of research on existing data PROGRAMME FOR THE SANCTUARY on restorations carried out in the past and their arrangement (anamnesis) 38.2 Realisation of topical surveys finalised to the diagnostic project and analytic investigations 38.3 Maintenance programme and start up of the first cycle of interventions 38.4 Planning and implementation of a data bank for monitoring the state of conservation and archiving of past and current restorations

90 8.6.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

38.5 Maintenance interventions on frescos and tombstones in the sanctuary 38.6 Monitoring and conservation plan of the inscriptions on the wall structures, internal and external 38.7 Maintenance plan for the wood choir 39 39.1 ELABORATION OF A MAINTENANCE Research on existing data on past PROGRAMME ON THE STRUCTURES restorations and computer-based ANNEXED TO THE SANCTUARY memorisation of the same 39.2 Realisation of topical surveys finalised to the diagnostic project and analytical survey and project of interventions 39.3 Maintenance and start-up programme of the first cycle of interventions MONTE SANT’ANGELO 40 40.1 BUFFER ZONE IMPROVE THE STATE Maintenance on the visible parts of the AND TERRITORY OF CONSERVATION wall belt to implement knowledge OF THE NORMAN WALL BELT and use of the same

41 41.1 ENSURE THE STATE Monitoring and programmed OF CONSERVATION maintenance plan OF THE SAN PIETRO - TOMBA DI ROTARI - SANTA MARIA MAGGIORE COMPLEX 42 42.1 COMPLETION OF THE CASTLE Completion of the restoration project for RESTORATION PROJECT the castle 42.2 Elaboration of a programmatic maintenance and conservation plan 43 43.1 MAINTENANCE AND RESTORATION Verification of property and restoration of OF THE CHURCHES public use of the churches of: S. AND THE MONASTIC COMPLEXES OF Salvatore, Santa Apollinare, Eremo di S. THE HISTORICAL CENTRE Aniello 43.2 Elaboration of a programme of interventions for the conservation and valorisation of the assets 44 44.1 IMPROVE THE STATE Completion of the cognitive phase OF CONSERVATION introductory to the completion OF THE SAN FRANCESCO COMPLEX of the restoration in progress with realisation of topical surveys finalised at analytical investigations 44.2 Completion of the restoration project

44.3 Elaboration of a programmatic maintenance plan

91 8.6.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

45 45.1 HEIGHTENING OF THE STATE Study and programming of forms of OF CONSERVATION support for the owners of the private OF THE URBAN FABRIC properties to incentivate the recovery IN THE HISTORICAL CENTRE and maintenance in good efficiency of the properties and traditional fixtures in line with the technical norms of actuation in force 45.2 Optimisation of the controls and new interventions to guarantee the observance of the norms for protecting and safeguarding the historical centre

92 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site Objective 1 ENHANCEMENT OF THE STATE OF CONSERVATION OF THE LONGOBARD TEMPIETTO

Project 1.1 Maintenance interventions with special reference to the presbytery

Description The first phase of maintenance of the Tempietto Longobardo aims at improving the state of conservation especially of one part of the Tempietto before starting the systematic planning of maintenance interventions of the whole complex. The part concerned is the Eastern wall – partially in the north wing – of the presbytery where traces of moisture are visible. It is necessary to identify the causes of moisture through the verification of both environmental conditions and surface, and the waterproof resistance of external walls in order to plan an intervention project to eliminate the causes and visible effects of deterioration. It is necessary to verify the state of conservation of the frescos on the eastern wall which are partially damaged. Consolidation operations should also be planned. This phase also includes interventions on the floor of the presbytery so as to improve its state of conservation especially regarding floor joints which are now missing.

1

2 3

1. Plan of Tempietto 2. Soft humidity damage on the easthern wall 3. Floor of the presbitery: disgregation of the mortar between marble slabs Actions 1. Verification of the environmental conditions of the Tempietto and survey/ analysis to identify the causes of moisture on the wall and the flaking off of some fragments of frescos and relative project. 2. Carrying out of the intervention Parties involved Municipality of Cividale del Friuli, Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage of Friuli Venezia Giulia. Phases and timeframe Short term: within 2008. Financial resources Funds earmarked by the Municipality of Cividale: €. 8,000.00 Expected results Elimination of the causes of deterioration on the presbytery wall. Mitigation of the vulnerability of the property.

93 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site Objective 1 ENHANCEMENT OF THE STATE OF CONSERVATION OF THE LONGOBARD TEMPIETTO

Project 1.2 Project and maintenance intervention on the wooden chancel and beam of the iconostasis

Description The causes of alteration on wooden parts must be identified and thus removed so as to mitigate visible effects. As for the wooden beam of the iconostasis, the small areas of the painting layer which have flaked off require maintenance intervention.

1 2 1.Seats of the wooden chancel 2 .Wooden chancel with clear signs of alteration. Actions 1. Carrying out of analyses to identify the causes of alteration on the wooden chancel 2. Project and intervention. 3. Maintenance of the beam of the iconostasis. Parties involved Municipality of Cividale del Friuli BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of Friuli Venezia Giulia. Phases and timeframe 2009 Financial resources Funds to be raised by: Municipality of Cividale del Friuli; State (Ministry for Cultural Heritage and Activities); Region Friuli Venezia Giulia. Expected results Elimination of causes of alteration and improvement of visible condition of the wooden surfaces. Result indicators Mitigation of the vulnerability of the property

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site Objective 2 DEVELOPMENT OF A MAINTENANCE PROGRAMME FOR THE LONGOBARD TEMPIETTO

Project 2.1 Completion of the research on existing data on past restoration operations and systematization of these data (history) Description In order to plan a maintenance programme, it is necessary to know the history of the state of conservation of the property. First, data relative to past restoration interventions must be systematically collected in order to identify the problems which have risen over time and understand how they have been solved (intervention techniques and materials used) in order to contribute also to the description of the part of the artefact which are currently unavailable. Moreover, it is necessary to identify and acquire all studies-analyses already carried out on the state of conservation of the property to contribute to its correct description. The series of data must be transferred into electronic archives through a specific programme (see Knowledge Plan – network-). Actions 1. Completion of the research and acquisition of existing data. 2. Arrangement of data by transferring them into electronic archives. Parties involved Municipality of Cividale del Friuli. BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-

94 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

Anthropological Heritage) of Friuli Venezia Giulia. Phases and timeframe Starting from 2008 Financial resources Funds by the Municipality of Cividale del Friuli: €. 3,000.00 Funds to be raised by private and bank sponsorship Expected results Completion and systematization of data on past restoration interventions; Arrangement of tools and definition of procedures allowing the planning of maintenance interventions. Result indicators Number and quality of collected and systematized data Publication of data

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site Objective 2 DEVELOPMENT OF A MAINTENANCE PROGRAMME FOR THE LONGOBARD TEMPIETTO

Project 2.2 Carrying out of thematic surveys aimed at diagnostic projects and analytical investigations Description The project envisages thematic surveys aimed at the description of the state of conservation of the property. These include: geometry surveys (metric survey); surveys of material and building techniques (descriptive survey and analytical investigations); surveys of past restoration interventions which left visible marks (stratigraphic analysis); surveys of visible effects of deterioration (deterioration and damage surveys and analytical investigations). The surveys will be carried out through photogrammetric or laser Scanner methods, for the geometric part. All renderings will be carried out on thematic vector/ digital mapping and in photogrammetric format. Actions 1. Carrying out of metric survey campaigns through photogrammetric or laser Scanner methods (see Knowledge Plan) with relative vector/ digital rendering. 2. Stratigraphic analysis of elevations in order to identify past restoration interventions (see Knowledge Plan) 3. Survey and description of materials and building techniques (see Knowledge Plan) 4. Survey of deterioration types 5. In-depth analysis of analytical surveys to classify materials and types of deterioration 6. Renderings on thematic maps and description of the state of conservation. Parties involved Municipality of Cividale. BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of Friuli Venezia Giulia. Regional Centre for Cataloguing and Restoration of Villa Manin di Passariano Phases and timeframe Actions 1: within 2008 Actions 2-7: starting from 2009. Financial resources Action 1: Funds earmarked by the Ministry through BAPPSAE as to the metric survey with laser Scanner of the four walls of the hall: €. 15,000.00 Actions 2-7: Funds to be raised by: Municipality of Cividale del Friuli; State (Ministry for Cultural Heritage and Activities); Region Friuli Venezia Giulia; private and bank sponsorship Expected results Obtaining the most complete picture possible of thematic precision surveys and paper and digital renderings. Result indicators Number and quality of collected and systematized data.

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site Objective 2 DEVELOPMENT OF A MAINTENANCE PROGRAMME FOR THE LONGOBARD TEMPIETTO

Project 2.3 Maintenance programme and launch of the first cycle of interventions Description On the basis of completed surveys, a maintenance programme is planned for the Tempietto enabling the identification of intervention priorities and implementation timeframes. The objective is to carry out continuous maintenance intervention also for small lots. Actions 1. Identification of intervention priorities and definition of the general programme 2. Launch of the first maintenance cycle. Parties involved Municipality of Cividale. BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of Friuli Venezia Giulia. Phases and timeframe Starting from 2009 and following. Financial resources Funds to be raised by: Municipality of Cividale del Friuli; State (Ministry for Cultural Heritage

95 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

and Activities); Region Friuli Venezia Giulia; private and bank sponsorship Expected results Arrangement of maintenance programme with identification of interventions to be carried out, timeframes and relative controls. Result indicators Mitigation of the vulnerability of the property

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site Objective 2 DEVELOPMENT OF A MAINTENANCE PROGRAMME FOR THE LONGOBARD TEMPIETTO

Project 2.4 Project, creation and implementation of a database for the monitoring of the state of conservation and the transfer into the archives of past and current restoration interventions Description A specific electronic programme which allows the transfer into the archives, the management and correlation of the data relative to past restoration interventions in the Tempietto, including future interventions, is planned. It refers to the historical data relative to building and transformation phases of the Tempietto; historical data relative to restoration interventions carried out to identify materials, techniques, timeframes and building phases; metric and descriptive surveys, stratigraphic analyses, deterioration surveys and analytical surveys, etc. The objective is to find a connection among the different data relative to various phases and sources of knowledge in order to allow both the improvement of knowledge on the Tempietto and the description of the state of conservation of materials on which maintenance programmes are planned. This database can be created only for the properties included in the Site of Cividale or it can be used as a common and shared tool for all sites included in the network (see Knowledge Plan – network-) Actions 1. Planning of the IT system 2. Entering and implementation of data Parties involved Municipality of Cividale; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of Friuli Venezia Giulia; Regional Centre for Cataloguing and Restoration of Villa Manin di Passariano Phases and timeframe Starting from 2009 and following

Financial resources Funds to be raised by: Municipality of Cividale del Friuli; State (Ministry for Cultural Heritage and Activities); Region Friuli Venezia Giulia; private and bank sponsorship Expected results Obtaining systematized data on the state of conservation of the Tempietto; Obtaining a cognitive electronic base to carry out maintenance interventions; Improving knowledge on past restoration interventions, materials and building techniques; Increasing dissemination potential and consultation of data. Result indicators Number of data collected and entered in the database.

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site Objective 2 DEVELOPMENT OF A MAINTENANCE PROGRAMME FOR THE LONGOBARD TEMPIETTO

Project 2.5 Maintenance interventions on damaged frescos and stone furnishings of the Tempietto. Description During restoration interventions on the Tempietto carried out between 1950 and the end of the 60s a number of frescos flaked off. The state of conservation of the material used to create the support of the frescos and the condition of the painting layer must be examined to plan possible maintenance interventions which could be needed in case properties are moved to the soon-to-be Museum of the Monastery and the Tempietto (see Enhancement Plan–Site- Project 1.5)

1

96 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

2

3 1-2-3 Frescos flaked off and put on a frame Actions 1. Verification of the state of conservation of damaged frescos of the Tempietto and of stone elements 2. Maintenance intervention Parties involved Municipality of Cividale; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of Friuli Venezia Giulia.

Phases and timeframe 2009 and following Financial resources Funds to be raised by: Municipality of Cividale del Friuli; State (Ministry for Cultural Heritage and Activities); Region Friuli Venezia Giulia; private and bank sponsorship Expected results Improvement of the state of conservation of the properties. Result indicators Mitigation of the vulnerability of the property

97 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site Objective 3 ENHANCEMENT OF THE STATE OF CONSERVATION OF THE MONASTERY OF SANTA MARIA IN VALLE

Project 3.1 Maintenance interventions on the Church of San Giovanni Description The Church of San Giovanni has some problems linked to moisture (widespread efflorescence) which caused the disintegration of part of the plasters constituting masonry and part of altar plinths. The causes of disintegration must be verified by analysing the environmental conditions of the Church and by working on the damaged plaster – recently created – and the stones of altar plinths.

1 2 1. View of the church of San Giovanni 2. Same humidity damage on the altar Actions 1. Verification of environmental conditions of the Church to identify the causes of moisture and relative maintenance project. 2. Intervention to replace damaged plaster 3. Restoration intervention on altar plinth Parties involved Municipality of Cividale, BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of Friuli Venezia Giulia. Phases and timeframe Starting from 2009 and following

Financial resources Funds to be raised by: Municipality of Cividale del Friuli; State (Ministry for Cultural Heritage and Activities); Region Friuli Venezia Giulia; private and bank sponsorship Expected results Elimination of causes of deterioration and visible signs. Result indicators Mitigation of the vulnerability of the property

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site Objective 4 DEVELOPMENT OF A MAINTENANCE PROGRAMME FOR THE RATCHIS ALTAR, THE FONT OF CALLISTO AND THE DUOMO

Project 4.1 Completion of the research on existing data on past restoration operations and electronic systematization of these data Description In order to plan a maintenance programme, it is necessary to know the history of the state of conservation of the property. First, data relative to past restoration interventions must be systematically collected in order to identify the problems which have risen over time and understand how they have been solved (intervention techniques and materials used) in order to contribute also to the description of the part of the artefact which are currently unavailable. Moreover, it is necessary to identify and acquire all studies-analyses already carried out on the state of conservation of the property to contribute to its correct description. The series of data must be transferred into electronic archives through a specific programme. Actions 1. Acquisition of existing data

98 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

2. Implementation of data 3. Arrangement of data through transfer into electronic archive Parties involved BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of Friuli Venezia Giulia; Parish of Santa Maria Assunta Phases and timeframe 1. Ratchis Altar,Under way. 2. Font of Callisto. Starting from 2009 and following. Financial resources 1. Ratchis Altar Funds coming from 2007-2008 appropriations of BAPPSAE and the Region Friuli Venezia Giulia (see, Project 4.2) 2. Font of Callisto. Funds to be raised by: State (Ministry for Cultural Heritage and Activities); Region Friuli Venezia Giulia; private and bank sponsorship Expected results Completion and systematization of data on past restoration interventions; Arrangement of tools and definition of procedures allowing the planning of maintenance interventions. Result indicators Mitigation of the vulnerability of the property

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site Objective 4 DEVELOPMENT OF A MAINTENANCE PROGRAMME FOR THE RATCHIS ALTAR, THE FONT OF CALLISTO AND THE DUOMO

Project 4.2 Carrying out of thematic surveys aimed at diagnostic projects and analytical investigations and intervention projects Description The project envisages thematic surveys carried out with advanced technology with the objective of describing the state of conservation of the property. These include: geometry surveys (metric survey); surveys of material and building techniques (descriptive survey and analytical investigations); surveys of past restoration interventions which left visible marks (stratigraphic analysis); surveys of deterioration and analytical investigations. Surveys will be carried out through photogrammetric or laser Scanner methods, for the geometric part; surveys will be the digital foundation on which to enter other data on thematic analyses. All renderings will be in vector/digital format. The analytical phase will be followed by the maintenance project and intervention. As for the Tempietto, descriptive data on each intervention will be electronically transferred into archives and systematized (see Knowledge Plan). As to the Ratchis Altar, the analytical and maintenance phase is under way. Actions 1. Carrying out of thematic surveys aimed at diagnostic projects and analytical investigations. 2. Project and maintenance intervention. 3. Implementation of the database after each intervention Parties involved BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of Friuli Venezia Giulia; Parish of Santa Maria Assunta Phases and timeframe 1. Ratchis Altar: surveys are under way and will be completed in 2008. 2. Font of Callisto: starting from 2009. Financial resources 1. Ratchis Altar. Funds allocated in 2007 by BAPPSAE: €. 20,000.00 Funds earmarked by Region Friuli Venezia Giulia: €. 50,000.00 Funds earmarked for 2008 by BAPPSAE: €. 20,000.00 2. Font of Callisto. Funds to be raised by: State (Ministry for Cultural Heritage and Activities); Region Friuli Venezia Giulia; private and bank sponsorship Expected results Obtaining the most complete picture possible of thematic precision surveys and paper and digital renderings; Arranging the material for dissemination and didactic tools of the Christian Museum.

99 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site Objective 4 DEVELOPMENT OF A MAINTENANCE PROGRAMME FOR THE RATCHIS ALTAR, THE FONT OF CALLISTO AND THE DUOMO

Project 4.3 Completion of the survey cognitive phase on the surfaces of the Duomo and relative intervention Description The Cathedral of Santa Maria Assunta is currently subject to a maintenance intervention concerning internal surfaces; studies on plaster and fresco stratification are also under way. They are financed by the Ministry for Cultural Heritage. These studies will be completed so that the reference layer for the spread of new plaster will be identified. Actions 1. Completion of cognitive surveys. 2. Completion of studies on existing stratification. 3. Choice of reference layer and intervention on surfaces. Parties involved BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of Friuli Venezia Giulia; Parish of Santa Maria Assunta Phases and timeframe Within 2008-2009. Financial resources Funds earmarked by the Ministry for Cultural Heritage and Activities which will be allocated within 2007: €. 600,000.00 Expected results Improvement of layout of the interior of the Duomo. Result indicators Mitigation of the vulnerability of the property

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site Objective 5 CONSERVATION OF THE PATRIARCHAL PALACE

Project 5.1 Carrying out of thematic surveys of wall stratification and deterioration and relative project and conservation intervention in the archaeological area A Description The project envisages surveys of the state of conservation of wall stratification, plaster and mortar in the archaeological area A aimed both at improving knowledge on building phases of the complex of the Patriarchal Palace(see Knowledge Plan, Project 1.1) and the planning of the conservation project and the verification of the state of conservation of the mosaic floor.

Plan of the Patriarchal Palace. Identification of archaeological areas

1

2

1-2. Detail of the late roman and medieval walls under the Arcaheological Museum Actions 1. Carrying out of surveys of wall stratification. 2. Carrying out of surveys of the deterioration of various materials; 3. Verification of the state of conservation of the mosaic floor. Parties involved Superintendence for Archaeological Heritage of Friuli Venezia Giulia. Phases and timeframe Within 2009. Financial resources Funds to be raised by: BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of Friuli Venezia Giulia; private and bank sponsorship .

100 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

Expected results Removal of deterioration causes and improvement of the intelligibility of various archaeological remains, both walls and flooring levels. Result indicators Mitigation of the vulnerability of the property

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site Objective 5 CONSERVATION OF THE PATRIARCHAL PALACE

Project 5.2 Intervention for the restoration of protection architectural structures of the archaeological area B and maintenance intervention on ancient structures n Description Efficiency of the structure for the protection of archaeological area B must be verified to eliminate the causes of water seepage. Later it is necessary to intervene to restore the small sections of archaeological wall ruins which are partially damaged owing to seepage.

1

2 1-2. Archaeological areas ander the Arcaheological Museum with some humidity damage Actions 1. Survey of the state of conservation of the covering and relative maintenance intervention 2. Verification of water seepage on the walls. 3. Maintenance intervention of the wall sections damaged by seepage Parties involved Superintendence for Archaeological Heritage of Friuli Venezia Giulia. Phases and timeframe Within 2010 Financial resources Funds to be raised by: State (Ministry for Cultural Heritage and Activities); private and bank sponsorship Expected results Removal of the causes of deterioration and improvement of visible conditions. Result indicators Mitigation of the vulnerability of the property

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site and buffer zone Objective 6 ENHANCEMENT OF THE STATE OF CONSERVATION OF WALLS

Project 6.1 Maintenance projects and intervention on visible parts of the first circle of walls to improve knowledge and use of the walls Description These are interventions aimed at improving the state of conservation of the first circle of walls and at the same time improving its use; interventions comprising both maintenance of sections already brought to light or visible and the excavation of some significant areas to improve knowledge and use of this wall circle (see Knowledge Plan, Project 2.3). Actions 1. Interventions to bring to light ruins of the first circle of walls through

101 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

excavation and relative project and conservation intervention (Blockhouse area 2). 2. Project and maintenance intervention near the archaeological ruins in the area of the Craigher Canussio Palace (3) 3. Project and maintenance intervention near the North-Eastern area (1) and in the area of via Mulinus (5-6)

Plan of Cividale with indication of intervention areas

1

2 3 1. Area North East 2. Area Fortino 3. Area Craigher Canussio

Parties involved BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) and Superintendence for Archaeological Heritage of Friuli Venezia Giulia, Municipality of Cividale, Foundation Craigher Canussio, private citizens or bodies. Phases and timeframe 1. 2009 2. 2009-2010 3. 2009-2010 Financial resources Funds to be raised with the Regional Law 10/2000: “Interventions for the protection, conservation and enhancement of fortified architecture in Friuli Venezia Giulia”. Expected results Increase of the sections of the urban walls which can be visible in the archaeological remains or used as knowledge data. Result indicators Increase in the extension of renovated wall sections

102 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site and buffer zone Objective 6 ENHANCEMENT OF THE STATE OF CONSERVATION OF WALLS

Project 6.2 Restoration and planned maintenance projects and interventions on quarters’ walls Description The knowledge phase preliminary to restoration interventions must be launched to identify both the area characterized by a larger number of conservation problems and those needing simple maintenance. The survey phase also aims at improving knowledge on walls and to produce information boards on the history of the fortified walls (see Knowledge Plan, Project 1.4 and Enhancement Plan, Project 6.2). The restoration of the section of Borgo di Ponte (San Lazzaro) is now being planned.

Proposal for the organization of interventions on the wall to be verified during planning phase

Detail of the state of conservations of the walls Actions 1. Verification of walls’ properties.

103 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

2. Verification of the geometric survey of walls, its implementation and graphic rendering of visible sectors. 3. Ortophotographic or photogrammetric surveys. 4. Stratigraphic analysis of masonry and deterioration survey. 5. Identification of intervention priorities (maintenance programme) and launch of restoration projects for single sectors according to conservation conditions. 6. Launch of restoration-maintenance interventions Parties involved Municipality of Cividale; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of Friuli Venezia Giulia; private citizens or bodies. Phases and timeframe Starting from 2008 with the general planning of interventions. Financial resources Funds to be raised with the Regional Law 10/2000: “Interventions for the protection, conservation and enhancement of fortified architecture in Friuli Venezia Giulia”. Expected results Improvement of conservation conditions of walls; improvement of their visibility.

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site and buffer zone Objective 7 COMPLETION OF CONSERVATION PROJECTS OF THE CHURCHES

Project 7.1 Completion of the restoration of the Church of San Giovanni in Xenodochio Description Ongoing restoration intervention in the Church of San Giovanni in Xenodochio must be completed. The intervention focused on structural consolidation. The completion of restoration operations in the interior (false ceiling, vault and plaster surfaces) and paintings on the ceiling by Palma the Young (which flaked off during the emergency intervention in 1998-2000).

San Giovanni in Xenodochio Church Actions 1. Completion of restoration of interior and façades Parties involved BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of Friuli Venezia Giulia; Parish of Santa Maria Assunta

Phases and timeframe Within 2009 Financial resources Funds earmarked by Banca Popolare di Cividale for paintings restoration: €. 50,000.00 Funds to be raised in compliance with the law of the Region Friuli Venezia Giulia, R.L. no. 53/85. Funds to be raised by BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of Friuli Venezia Giulia Expected results Improvement of conservation conditions and use of the church and exhibited works of art. Result indicators Mitigation of the vulnerability of the property

104 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site and buffer zone Objective 7 COMPLETION OF CONSERVATION PROJECTS OF THE CHURCHES

Project 7.2 Restoration intervention of the Church of S. Silvestro Description The general planning of the restoration of the church is under way. The church is in a rather poor state of conservation both in the main hall and in the sacristy.

S.Silvestro Church

Actions 1. Completion of the restoration project of the church 2. Carrying out of the intervention Parties involved BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of Friuli Venezia Giulia. Parish of Santa Maria Assunta Phases and timeframe Completion of planning within 2008. Beginning of interventions within 2008. Financial resources Funds allocated by Region Friuli Venezia Giulia (R.L. 53/85), with a 20-year-long contribution €. 19,000.00. Expected results Improvement of the conservation conditions and use of the church and exhibited works of art. Result indicators Mitigation of the vulnerability of the property.

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site and buffer zone Objective 7 COMPLETION OF CONSERVATION PROJECTS OF THE CHURCHES

Project 7.3 Maintenance of external surfaces of the Church of Santa Maria di Corte and church square. Description The project envisages the maintenance of plasters on the church façade which are characterized by deterioration (flaking off, gaps and disintegration). Cognitive tests will be completed both on internal and external surfaces. As to the interior, the Organ – now kept in the Duomo of Santa Maria Assunta – will be moved.

Santa Maria di Corte Church

105 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

Actions 1. Study of the stratification of external plasters and continuation of survey campaign inside the nave. 2. Project and maintenance intervention of plaster 3. Rearrangement of church square Parties involved BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of Friuli Venezia Giulia. Parish of Santa Maria Assunta Phases and timeframe Starting from 2009-2010. Financial resources Funds to be raised in compliance with the law of the Region Friuli Venezia Giulia, R.L. no.53/85. Expected results Improvement of conservation conditions and use of the church and exhibited works of art. Result indicators Mitigation of the vulnerability of the property.

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site and buffer zone Objective 7 COMPLETION OF CONSERVATION PROJECTS OF THE CHURCHES

Project 7.4 Maintenance of plaster on the façade and apse of the Church of San Martino and restoration project and intervention on the sacristy Description The façade must be repainted or reintegrated and the plasters of the apses must be subject to intervention to improve layout. As for the interior, interventions concern only the area where plaster is eroded by seepage after the causes of seepage have been found out. The complex of the sacristy requires a maintenance intervention and structural verification.

San Martino Church Actions 1. Verification of covering resistance 2. Maintenance intervention on façade and apse plasters and on deteriorated areas in the interior. 3. Maintenance project for the sacristy and intervention. Parties involved BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of Friuli Venezia Giulia. Parish of Santa Maria Assunta Phases and timeframe 1. 2. within 2009 3. starting from 2010. Financial resources Funds to be raised in compliance with the law of the Region Friuli Venezia Giulia, R.L. no.53/85. Expected results Improvement of layout of the façade. Result indicators Mitigation of the vulnerability of the property.

106 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Cividale del Friuli site and buffer zone Objective 8 PROTECTION AND CONSERVATION OF CONVENTS AND HITORICAL PALACES

Project 8.1 Completion of the restoration of the complex comprising the church and the former convent of San Francesco Description The church and the structure of the convent of San Francesco – property of the Parish Santa Maria Assunta in Cividale – were built in the 13th century and stand in a place rising vertically on the gorge of the river Natisone, where the popular tradition uses to indicate the presence of the “Castello dei Duchi” (Castle of the Dukes). During the centuries, and especially after the Napoleonic era, the complex (built on 3 levels) was used in a variety of ways, even if it kept its cult functions. In the inside the church and the convent preserve pictorial and stucco decorations of high artistic esteem, which witness – especially in the Sagrestia nobile – the high level and the prestige of the Franciscan community. The San Francesco complex – which is part of the buffer zone - has never been extensively researched from an archaeological point of view, but it has suffered damages in the earthquake of 1976. The restoration works have been carried on slowly because of the progressive availability of funds. The structure is destined to keep its religious functions, but its use also as a place for meetings, congresses, seminars and exhibitions is now consolidated. The main hall can host approximately 400 seats; the upper hall 120, the Arches hall 60. Actions 1. End of the restoration works 2. Arrangement of the external gardens 3. Restoration of furniture in the sacristies 4. Renewal of the internal furniture 5. Renewal of internal and external lighting systems 6. Adjustment of the lower floor for youth activities 7. wiring of the structure 8. Restoration of the church roof Parties involved Parish Santa Maria Assunta Phases and timeframe 2009 -2012 Financial resources € 600,000.00 from the State € 60,000.00 from the Udine Province Expected results Availability of a multi-purpose structure as a congress centre and exhibitions centre of high prestige and with a high capacity Availability of the lower floor for youth activities Result indicators fitness for habitation of the complex Number of hosted events

107 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Cividale del Friuli buffer zone and territory Objective 9 IMPROVEMENT OF NATURAL AND SEISMIC RISKS PREVENTION

Project 9.1 Completion of protection interventions on Natisone River Description The Municipality intends to preserve and protect the environmental value of Natisone River through timely consolidation interventions on banks and in general through natural engineering interventions. The following operations have already been accomplished: a) Renovation intervention and completion of dams on Natisone River; b) Interventions aimed at the stabilization of hydrogeological conditions along Natisone River in the Municipalities of Manzano and Cividale del Friuli; c) Prevention operations for geostatic instability in the gorge of Natisone River; d) Urgent Civil Protection interventions along the right bank of Natisone River near the Convent of San Francesco to protect a dam and implementation of safety measures in surroundings areas; e) Urgent Civil Protection intervention for public safety to prevent erosion on the right bank of Natisone River on the municipal territory of Cividale del Friuli.

Consolidation works of the rock walls of the Natison gorge Actions 1. Completion of interventions on the gorge of Natisone River. 2. Consolidation of the left bank of Natisone River below the Devil’s Bridge. Parties involved Municipality of Cividale Phases and timeframe -intervention/ completion operations on the gorge of Natisone River, Beginning 2007 end 2008 - Consolidation of the left bank of Natisone River below the Devil’s Bridge,

108 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

Beginning 2008 end 2009

Financial resources The costs relative to interventions which have already been completed on the gorge of Natisone River have been borne by the Region Friuli Venezia Giulia and the Civil Protection and amounted to around 1,600,000 Euros. The costs for the interventions to be carried out on the gorge of Natisone River will be borne by the Region Friuli Venezia Giulia and the Civil Protection and will amount to around 1,400,000 Euros. Expected results Protecting the valuable aspects of Natisone River while guaranteeing safety.

109

110 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia site Objective 10 MAINTENANCE ON MASONRY AND SURFACES IN THE SAN SALVATORE – SANTA GIULIA MONASTERY COMPLEX

Project 10.1 Maintenance measures for plastered walls and masonry pertaining to the southern side of the Monastery and Santa Maria in Solario Description The property involved in the intervention refers to the entire south front of the monastery and also includes the south side of the Romanesque Santa Maria in Solario. 80% of the surface of the side is covered by lime plaster that was realized at the beginning of the 1980’s, while the profile masonry on the remaining 20% is visible along with a few pieces of plaster painted during Late Middle Ages phase of the monastery. Due to the atmospheric pollution but primarily to traffic pollution, the modern plaster is in a state of deterioration: the plaster has lost its characteristic compactness and in several points is severely flawed and pulverulent. Even the large stone blocks in Santa Maria in Solario show signs of severe deterioration on the surface, with chipping and cracking. The lower part of the stone wall, moreover, shows evidence of black crusts, caused by vehicular traffic in the vicinity. The intervention to be carried out calls for an initial diagnostic phase in order to correctly understand the factors that contributed to the deterioration, followed by a second phase to identify the proper methods to be used in order to preserve the Late Middle Ages masonry. During this phase a portion of the masonry with modern plaster will be removed in order to verify the conditions of the original masonry and to evaluate whether or not all of said plaster should be removed with the consequent restoration of the underlying masonry or whether it should be kept in place after the surfaces have been cleaned and consolidated.

Actions 1. Diagnostic awareness surveys 2. Trials for removing modern lime plaster to be carried out on a portion of the wall, to be agreed upon 3. Consolidation tests on the original mortar settings 4. Cleaning test on the materials that constitute the ancient masonry 5. Plans for interventions; - Start-up of works Parties involved City of Brescia; Brescia Museum Foundation Superintendent for Environmental and Architectural Assets Phases and timeframe - executive plan 2008 - works carried out 2009 Financial resources Funds to be identified Expected results Improvement of the conservation conditions and the aesthetic aspects of the building Result indicators Conservation intervention on an area of at least 500 square meters; 10 analysis samples

111 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia site Objective 10 MAINTENANCE ON MASONRY AND SURFACES IN THE SAN SALVATORE – SANTA GIULIA MONASTERY COMPLEX

Project 10.2 Conservation measures on the plaster and masonry pertaining to the side chapels In San Salvatore Description Three religious chapels were realized between the 13th and 14th centuries on the north side of San Salvatore. At the present time these are used for exhibition purposes and show Earlyly noteworthy fresco decorations on the walls. The 13th century central chapel still shows parts of white plaster that cover the more ancient decorations. The 13th century visible decorations show separations from the supporting plaster from the pictorial film on the underlying wall. The east and west chapels instead, notwithstanding the fact that they underwent restoration measures in the 1950’s, are in mediocre condition. The material utilized for the previous restoration is altered and no longer functional. The intervention to be carried out consists in completing the removal of the layers that cover the fresco decorations, in cleaning and consolidating the painted plaster and in the removal, where possible, of the materials applied in previous restorations and which are no longer functional, in addition to the reconstruction using appropriate products.

Actions 1. diagnostic surveys on ancient materials (setting mortar, plaster mortar, materials constituting the masonry, pictorial pigments) in order to acquire data on ancient techniques as well as on the deterioration factors 2. plans 3. -works carried out Parties involved City of Brescia Brescia Museum Foundation Superintendent of Monument and Environmental Assets Phases and timeframe - executive plan 2009 - works carried out 2010 Financial resources Funds to be identified Expected results Improvement of the conservation conditions and the aesthetic aspects of the building in general Result indicators 15 diagnostic surveys; conservation measures on at least 50 square meters of surface

PROTECTION AND CONSERVATION PLAN Brescia site Objective 10 MAINTENANCE ON MASONRY AND SURFACES IN THE SAN SALVATORE – SANTA GIULIA MONASTERY COMPLEX Project 10.3 Conservation measures on the archeological structures below the San Salvatore flooring (Roman domus, the first church and Early middle ages tombs) Description The intervention pertains to the archeological structures dating back to Roman/Early Middle Ages periods located beneath the modern flooring of the Church of San Salvatore. The structures pertain to a portion of the Roman domus, to the remains of pavement in stone slabs and mortar relating to the first church and to three cappuccina tombs, the insides of which show a painted woven decoration. The intervention calls for an initial diagnostic phase to identify the materials and ancient techniques utilized and to identify any particular deterioration factors. Once the diagnostic and survey details that pertain to the deterioration factors of the materials

112 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

are known, cleaning, consolidation, stuccoing and integration of same can be carried out

Actions 1. Diagnostic awareness surveys 2. Consolidation tests on the original mortar settings 3. Sample cleaning tests on materials constituting the ancient masonry 4. Intervention plans 5. Start-up of works Parties involved City of Brescia Brescia Museum Foundation Superintendent for Environmental and Architectural Assets Phases and timeframe - executive plan 2009 - works carried out 2010 Financial resources Funds to be identified Expected results Improvement of the conservation conditions and of the aesthetic aspect of the archeological area Result indicators 15 diagnostic surveys; conservation measures on at least 30 square meters of surfaces and masonry

113 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia site Objective 10 MAINTENANCE ON MASONRY AND SURFACES IN THE SAN SALVATORE – SANTA GIULIA MONASTERY COMPLEX

Project 10.4 Conservation measures on the archaeological structures below the nuns’ parlor Description The intervention refers to a series of rooms located beneath the monastery building known as the nuns’ parlor. The four rooms are pertinent to the Roman domus excavated below the monastery structures, with the presence of mosaic flooring, fresco painted plaster and various masonry. Moreover, the phases of abandonment of the Roman building and of its reutilization in Late Ancient / Early Middle Ages times are conserved and visible (pole holes for huts, hearths). Until now the rooms brought to light between 1986 and 1988 have not been subjected to any type of restoration measures. The conditions are mediocre: the surfaces show compact deposits and crusts that alter and hide the painted and mosaic work surfaces. The intervention calls for localized consolidation and cleaning of all the ancient surfaces found in the area

Actions 1. Diagnostic awareness surveys 2. Consolidation tests on painted plaster, on the original mortar settings and on parts of the mosaic that have been detached from the nucleus setting 3. Sample cleaning tests on painted surfaces 4. Intervention plans 5. Start-up of works Parties involved City of Brescia Brescia Museum Foundation Superintendent for Environmental and Architectural Assets Phases and timeframe · executive plan 2008 · -works carried out 2008 Financial resources Cost of the works € 50.000,00, of which € 25.000,00 allocated by the City of Brescia and € 25.000,00 by the Lombardy Region. Expected results Improvement of the conservation conditions and aesthetic aspect of the archeological area Result indicators 10 diagnostic surveys; conservation measures on at least 70 square meters of surfaces and masonry

114 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia site Objective 10 MAINTENANCE ON MASONRY AND SURFACES IN THE SAN SALVATORE – SANTA GIULIA MONASTERY COMPLEX

Project 10.5 Conservation measures on structures of archaeological interest located in the entrance area to San Salvatore - Santa Giulia City museum Description The intervention refers to various rooms located in the entrance area of the Santa Giulia Museum and pertinent to two Roman domus and to the remains of a roadway (cardo). The rooms in the two domus contain the following, all well preserved: polychrome mosaics, pavement slabs, bricked pavements, wall elevations with pieces of painted plaster still in place. The cardo instead includes part of the paving stones that constituted the roadway. During the excavation phases a portion of the Early Middle Ages street that was constructed on the ruins of a Roman street was also conserved. The excavation of the structures was completed in 1998 and the structures are in mediocre condition: a considerable part of the wall elevations and of the various types of floorings shows signs of separation from the mortar settings with the consequent detachment of the original material. The intervention will consist in various types of consolidation, based on the various ancient structures found in the area, and in the specialized cleaning, carried out by hand, with chemical products or with precision instruments (micro-drill, etc.).

Actions 1. Diagnostic awareness surveys 2. Consolidation tests on the mortar settings in the masonry, on the plaster and on the various types of flooring materials 3. Intervention plans 4. -Start-up of works Parties involved City of Brescia Brescia Museum Foundation Superintendent for Environmental and Architectural Assets Phases and timeframe · executive plan 2008 · works carried out 2008 Financial resources Cost of the intervention € 122.000,00 of which € 70.000,00 allocated by the City of Brescia and € 52.000,00 by the Lombardy Region. Expected results Improvement of the conservation conditions and of the aesthetic aspects of the building Result indicators 15 diagnostic surveys; conservation measures on at least 50 square meters of surfaces and masonry

115 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia site Objective 11 INTERVENTIONS ON MOBILE FINDINGS PERTAINING TO THE EARLY MIDDLE AGES PHASES OF THE MONASTERY

Project 11.1 Cleaning, consolidation, identifying couplings and any assemblage onto panels of significant portions of painted plaster relating to the Early Middle Ages phase of the Church of San Salvatore Description The intervention concerns the numerous Early Middle Ages fresco fragments found in the archeological surveys and in the filling of the extrados of the 16th century vault in the 1950’s in order to bring to light the on-site frescoes from the Early Middle Ages period. The intervention will start off with the search for attachment points of the numerous fragments, followed by a subsequent phase, should it be necessary to recompose significant portions of the decorations, of assembling same on the appropriate panels. The recomposed panels could then subsequently be exhibited in the Church of San Salvatore. Actions 1. Diagnostic awareness surveys to catalog the plaster mortar required to distinguish the various ages of the plaster fragments (Roman, Early Middle Ages and Late Middle Ages) 2. Search for attachment points 3. Re-assembly of re-composed fragments on alveolar panels Parties involved City of Brescia;Superintendent for Environmental and Architectural Assets Phases and timeframe · search for attachment points 2008 · conducting work of re-assembling fragments and exposition 2009 Financial resources Funds to be identified Expected results Improvement of the conservation conditions and of the aesthetic aspects of the building Result indicators Study of at least 200 painted plaster fragments; at least 15 diagnostic surveys

PROTECTION AND CONSERVATION PLAN Brescia site Objective 11 INTERVENTIONS ON MOBILE FINDINGS PERTAINING TO THE EARLY MIDDLE AGES PHASES OF THE MONASTERY

Project 11.2 Completion of the cleaning and consolidation, identification of the original arrangement and any on site relocation of stucco fragments pertaining to the architectural decoration of the Church of San Salvatore Description The intervention concerns the numerous stucco fragments found during the archeological surveys and in filling the extrados of the 16th century vault, demolished in the 1950’s. The stuccos pertain to the arched lintels and to the under-arches of the three naves in the 8th century church. The partially completed intervention (with the identification of the original position of certain fragments and their subsequent replacement in situ) will continue with an initial search for the position of the numerous fragments not covered by the previous intervention and a subsequent phase for the replacement in their original position of said fragments. Some of the recomposed fragments (of which the original position was not identified) that are pertinent to the decoration of the church could be assembled on a panel and subsequently exhibited inside the Church of San Salvatore. Actions 1. cleaning and consolidation of the fragments not involved in the previous intervention 2. search for and identification of the on site couplings 3. re-assembly of the matching fragments for which their original location was not found, on alveolar panels Parties involved City of Brescia; Superintendent for Environmental and Architectural Assets Phases and timeframe · search for attachment points 2008 · conducting work of re-assembling fragments and exposition 2009 Financial resources Funds to be identified Expected results Improvement of the conservation conditions and of the aesthetic aspects of the building Result indicators Study of at least 200 fragments; re-composition of at least two panels

116 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia site Objective 12 IMPROVEMENT OF THE PROTECTION STRUCTURES

Project 12.1 Substitution of the access door to the San Salvatore cloister Description Extraordinary maintenance for safety purposes with the substitution of the entrance door in Via Piamarta

Actions 1. Structural verification of the outside wall (including any interventions calling for repairs, static consolidation and conservative restoration) 2. Plan for the realization of an automatic iron gate to show the view of the south cloister 3. Intervention with the placement of the gate and electrical connections Parties involved City of Brescia Brescia Museum Foundation Phases and timeframe Plan executed Realization: by June 2008 Financial resources Total cost: approximately 30.000 € Funds allocated by the City of Brescia Expected results Possibility of seeing the San Salvatore cloister, the nuns’ choir, the Longobard Church of San Salvatore and the base of the cupola of Santa Maria in Solario from the external street. Result indicators Acquisition of a new view of the San Salvatore - Santa Giulia complex

117 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia site Objective 12 IMPROVEMENT OF THE PROTECTION STRUCTURES

Project 12.2 Substitution of the windows’ wood frames on the first floor of the monastery complex Description Extraordinary maintenance entailing the substitution of the wood frames in the central galleries in the area identified for temporary showings in order to solve the problem of water leakages in the open areas.

Actions 1. Intervention Parties involved City of Brescia Brescia Museum Foundation Phases and timeframe By January 2008 Financial resources Total cost: € 28.800,00 Funds allocated by the City of Brescia Expected results Improvement of the aesthetic aspect of the building; lowering the thermal loss and elimination of leaks Result indicators Substitution of 20 window’s frames

118 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia site Objective 13 RECLAMATION OF THE ARCHEOLOGICAL AREA OF THE CAPITOLIUM

Project 13.1 Conservation and maintenance interventions on various structures pertaining to the Republican sanctuary Description Identified as far back as the early 1800’s, it was excavated several times up to the last surveys carried out in 2006. The building dates back to the 1st century BC and is composed of four parallel rooms separated by hollow spaces, one of the richest and unique examples in northern Italy.

Actions 1. Archeological surveys in the area south of the podium in the western cell to verify the presence of ulterior structures pertinent to the sanctuary and to envisage a new access to the area 2. Completion of the conservation measures currently underway on the pavements (mosaic works and opus signinum) and on the frescoes in the western cell 3. Conservation maintenance on the remains of the ulterior three cells located below the podium, from the Flavia era 4. Monitoring of the micro-climate conditions, through the use of sophisticated equipment Complete with environmental peripheral sensors in contact with the painted surfaces that register and send data to a central computerized unit 5. Study of the data taken from the station and the plans for a micro-climate system Parties involved City of Bresciam; Superintendent for Lombardy Archeological Assets Cariplo Foundation Phases and timeframe 1st lot financed by the Cariplo Foundation nearly completed, with which the following was realized: structural intervention on Palazzo Pallaveri in order to complete the excavation of the western cell, the completion of the excavations and the restoration of the frescoes and the ancient flooring 2nd lot financed by the Cariplo Foundation realized the initial project and the definitive project is nearly completed for the surveys south of the western cell, for the realization of a new access, for the monitoring of the areas by means of instruments to track and record the micro-climate and for the realization of a micro-climate system definitive project 2008 works carried out 2008/2009 3rd lot conservation maintenance on the structures pertinent to the sanctuary located below the podium, from the Flavia project 2009 - works carried out 2009/2010 amount: funds still to be identified Financial resources Cost currently financed € 415.000 (Cariplo Foundation – City of Brescia) Expected results Improvement of the conservation conditions and of the aesthetic aspects of the building Result indicators 150 square meters of surfaces (object of the intervention)

119 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia site Objective 13 RECLAMATION OF THE ARCHEOLOGICAL AREA OF THE CAPITOLIUM

Project 13.2 Conservation and maintenance interventions on various structures pertaining to the Capitolium Description Identified and brought to light in 1822, this is the principal temple of the Roman city of the 1 st century, to a goodly extent conserved in elevation. It is composed of three large worship rooms, originally dedicated to Jove, Juno and Minerva, preceded by a deep pronaos built on a High open terrace on the forum’s piazza. A good part of the marble decorations (floors and walls) is still conserved in situ. In 1830, the first city museum was created inside, the Museo Patrio, later known as the Museo Romano.

Actions 1. consolidation of the 18th century vault in the central cell, recently completed 2. consolidation of structural wood in the 18th century roofing of the three cells recently completed 3. maintenance intervention on the roofs of the three cells recently completed 4. conservation intervention on the flooring in opus sectile and on the structures from the Flavia era (podiums) 5. conservation intervention on the 18th century inside walls of the three cells 6. conservation intervention on the external structures from the Flavia era (pronaos, columns, tympanum, side porticos 7. realization of closing structures for the doors of the three cells Parties involved City of Brescia; Lombardy Archeology Superintendent;Ministery of Fine Arts Phases and timeframe 1st lot financed b y the City of Brescia and terminated in December 2007, with which the following was realized: consolidation 18th century vault, structural wood of the roofing, roofing 2nd lot to be financed for conservation interventions on the flooring in opus sectile, on the 18th century walls, realization of closing structures for the large access portals to the three cells. Conservation intervention on all the external structures pertinent to the Capitolium (columns, capitals, tympanum, elevations, pronaos, side porticos) definitive project 2008 works carried out 2009/2011 Financial resources Total cost € 1.300.000, of which € 300.000 borne by the City of Brescia and the remaining amount to be identified Expected results Improvement of the conservation conditions and of the aesthetic aspects of the building Result indicators 500 square meters of surface, approximately 50 architectural elements subject to intervention; at least 30 diagnostic surveys

120 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia buffer zone Objective 14 CONSERVATION MEASURES ON HISTORICAL BUILDINGS

Project 14.1 Conservation interventions on the structures and surfaces of Palazzo della Loggia, seat of the City Hall Description These measures are needed in order to guarantee the proper conservation of the monument, through a series of steps that include the redoing or the adjustment of the functional elements to make them efficient, in addition to a whole series of operations aimed at blocking the deterioration and to enhancing the unchanged conservation over time of the external surfaces, both with respect to plaster as well as with respect to stone, with special emphasis on the decorations, through consolidation, cleaning and restoration measures.

Actions 1. Restoration and cleaning of the east and north prospects and the entrance portico 2. Restoration and cleaning of the entrance portico 3. Conservative measures on the north Palazzotto, new roofing, new frames (window and door), new plaster, updating of technological systems 4. Restoration and cleaning of the stone decorations on the eastern and southern sides of the north Palazzotto 5. Internal restructuring works in the areas used as offices on the first and second floors and in the bathrooms 6. Consolidation of the foundations, on the western and southern sides 7. Realization of scaffolding below the ceiling in order to monitor the roof support structure, initially, followed by subsequent consolidation works. Parties involved City of Brescia University of Brescia – Faculty of Engineering Superintendent for Monumental and Architectural Assets Brescia Mobility Private sponsors Phases and timeframe Works completed by 2008 Financial resources Approximately one million Euro; City of Brescia and private sponsors Expected results Static and aesthetic restoration of the building Result indicators One conference presenting the interventions; one publication of the results of the works

121 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia buffer zone Objective 14 CONSERVATION MEASURES ON HISTORICAL BUILDINGS

Project 14.2 Conservation interventions on the roofing of Palazzo Bonoris, seat of the Ateneo di Scienze, Lettere ed Arti of Brescia Description These measures are necessary in order to guarantee the correct conservation of the monument: in fact water leakages caused damages to the decorated ceilings (the decorations dated back to the 16th century). The intervention calls for a series of operations aimed at blocking the deterioration in the roofing (work on the historical wood beams, caulking, waterproofing, substitution of the broken brickwork) and consequently to safeguarding the underlying historical painted surfaces. The intervention is also linked to the realization of the Ateneo of Brescia’s library. Actions 1. realization of scaffolding and uncovering certain areas of the roofing 2. consolidation and chemical treatments on the wood pertinent to the supporting beams and to those that constitute the lower levels 3. caulking, waterproofing and repositioning the roof tiles 4. maintenance and restoration work on the parts of the painted plaster that were damaged by leakage Parties involved City of Brescia Phases and timeframe Works completed by 2008 Financial resources € 500.000,00 Expected results Guarantee of appropriate space at the Ateneo with relative library Result indicators 2,000 square meters covered by the conservation intervention

PROTECTION AND CONSERVATION PLAN Brescia buffer zone Objective 14 CONSERVATION MEASURES ON HISTORICAL BUILDINGS

Project 14.3 Conservation interventions on the roofing and Early middle ages painted plaster in Palazzo Broletto Description In 2004 the Province and the City, owners of the property, entered into an understanding, aimed at equalizing the measures promoted by the two Administrations, especially with respect to the restoration of the building facades. With respect to activities promoted by the City of Brescia through the Building & Monument Service, starting from 2003 a series of measures were implemented to restore certain portions of the building. Certain works have already been concluded, others are underway, while still other projects are in the development phase and included in the three-year 2007-2009 program for public works. In general, these refer to measures required to guarantee the proper conservation of the monument, through a series of steps aimed at blocking the deterioration and to enhancing the unchanged conservation over time.

Actions For various reasons (economic but also operating), the conservation maintenance will need to be divided in at least two subsequent phases: 1. the first, subject to the present intervention, will naturally cover all those operations that can be carried out with the structure open to the sky and that can no longer be

122 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

postponed, especially the static consolidations; 2. all the works pertaining to the intrados, especially those relative to the consolidation of the materials and to the restoration of the surfaces, will be covered in the subsequent phase. Parties involved City of Brescia Phases and timeframe Restoration and cleaning of the facade of Broletto (southern body facing Via Cardinal Querini) - 2007 Cleaning and consolidation of the inside facade of the western body of Palazzo Broletto - 2007 · INTERVENTIONS UNDERWAY Work on certain areas on the ground floor of the western body of Palazzo Broletto to make new offices - 2006/2007 Extraordinary maintenance on the roofing of Palazzo Broletto (southern body facing Via Cardinal Querini) - 2007 · INTERVENTIONS PLANNED - Project for the conservation restoration of the wood roofing structures conducted by the intrados - Project for creating the museum “Salone dei Cavalieri” (below the roof of the southern body) Program 2007/2008 Restoration and cleaning of the facade of Broletto (facing Piazza Paolo VI) Program 2008/2009 Financial resources Total amount € 1.290.000 borne by the City of Brescia and Cariplo Foundation Expected results Improvement of the conservation conditions and partial opening to guided tours in the more important parts Result indicators 4,000 square meters of surface subjected to intervention

123 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia buffer zone Objective 14 CONSERVATION MEASURES ON HISTORICAL BUILDINGS

Project 14.4 Conservation interventions on the roofing of Mastio Visconteo within the Castle of Brescia Description Building located in the top part of the Castle of Brescia and constructed in 1343 (Visconti era) above the remains of a Roman temple, of which at the present time the staircase and certain perimeter walls are visible. The City of Brescia acquired the property in 1900 from the Military Property Office. It underwent restoration between 1968/1974 that, once recent plaster had been removed, made it possible to recover a goodly part of the Visconti era wall decorations and those dating back to the 14 th century. The building is composed of four floors. One lower ground floor, not open to the public, preserves Roman era structures (large tubs from local stone quarries). The ground floor and the first floor at the present time are dedicated to the Museum of Arms. The second floor is used as storage space for historical material belonging to the museum. These measures on the roofing are necessary in order to guarantee the correct conservation of the monument: in fact water leakages caused damages to the historical material stored in the attic and to the painted decorations dating back to the Late Middle Ages. Moreover, since the roof was not caulked properly it did not offer the proper micro-climate suitable for conserving the above-indicated artifacts.

Measures 1. Realization of scaffolding and uncovering certain areas of the roofing 2. Caulking, waterproofing and repositioning the roof tiles 3. Maintenance and restoration work on the parts of the painted plaster that were damaged by leakage Parties involved City of Brescia Phases and timeframe By 2008 Financial resources Cost of the intervention € 150.000,00 borne by the City of Brescia Expected results Improvement of the conservation conditions and of the aesthetic aspects of the building Result indicators 400 square meters of surface subjected to intervention

PROTECTION AND CONSERVATION PLAN Brescia buffer zone Objective 14 CONSERVATION MEASURES ON HISTORICAL BUILDINGS

Project 14.5 Extraordinary conservation interventions in the Tosio Martinengo Palace Description This is a conservation measure on some of the decorated ceilings and vaults (1550-1700) These structures located in the Pinacoteca Tosio Martinengo are in mediocre conservation condition, primarily due to the accumulation over time of dust and various types of dirt (heating vapors) that alter the colors of the paintings

124 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

Actions 1. Scaffolding and controlling adhesion of the plaster to the masonry supports in the various areas involved it the measure 2. Localized in-depth consolidation in order to reattach the plaster to the masonry and to avoid that material becomes detached 3. Cleaning the pictorial film 4. Stuccoing the cracks Parties involved City of Brescia Phases and timeframe Project 2008 Works carried out 2008 Financial resources Funds to be identified Estimated cost of the intervention € 60.000,00 allocated by the City of Brescia Expected results Improvement of the conservation conditions and of the aesthetic aspects of the building Result indicators 200 square meters of surface subjected to intervention

125 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia territory Objective 15 CONSERVATION OF THE LONGOBARD CONTEXTS IN THE BRESCIA TERRITORY

Project 15.1 Restoration and definitive cataloguing of findings and funeral artifacts found in the settlements and the recently excavated necropolis in Manerbio, Leno, Montichiari and Sirmione and from ecclesiastical buildings Description A small part of the artifacts recovered in the past thirty years from settlements and from the Longobard necropolis in the central-eastern Brescia countryside has been transferred to the Sirmione National Archeological Museum and to the municipal historical/archeological museums that in the meantime have been established, first in Remedello, then in Leno and in Manerbio. The majority, however, can be found, duly inventoried, in the Superintendent of Brescia and Milan warehouses. The artifacts kept in the museums have all been subjected to restoration. Most of the artifacts conserved by the Superintendent need conservation restoration measures and definitive cataloguing. Moreover, conservation measures and improvements on certain of the more significant ecclesiastical structures in the southeastern part of the territory and the relative archeological areas are envisaged.

Actions 1. Cataloguing of the archeological finds from the territories of Manerbio, Leno, Calvisano, Montichiari, Sirmione and surrounding townships. 2. Conservation measures on the above-indicated artifacts. 3. Restoration of the building and realization of the archeological area in the early Christian church of San Pietro in Mavino in Sirmione and of the Early Middle Ages churches of San Giorgio in Montichiari and Saints Nazaro and Celso in Leno. Parties involved Ministry for Fine Arts and Cultural Activities Lombardy Region Municipalities of Brescia, Manerbio, Leno, Calvisano, Montichiari, Sirmione Regional Department for Fine Arts and Landscape of Lombardy Superintendent for Archeological Heritage of Lombardy CAB Foundation Dominato Leonense Foundation Civiltà Bresciana Foundation Phases and timeframe Five-year period 2008-2013 Financial resources To be quantified and identified Expected results Improvement of the conservation conditions of artifacts and structures Result indicators Conservation measures on at least 1,000 Longobard artifacts

126 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia territory

Objective 16 PREVENTION AND MITIGATION OF THE PRINCIPAL RISKS FOUND IN THE TERRITORY

Project 16.1 PRIM – Regional integrated program for mitigating risks Description The new Regional Integrated Program for Mitigating Risks (PRIM) 2007-2010 represents the instrument to coordinate the policies for safety and prevention on a provincial level. Conceived as an evolution of the Regional Program for Forecasting and Prevention pursuant to national law 225/92 on civilian protection, the PRIM is aimed at calling more attention to the aspects of mitigating risks and, principally, at a wider and more global vision of safety, which is the basis of the needs of citizens. The PRIM takes into consideration five “significant risks”, natural and technological, (hydro-geological, seismic, forest fires, meteorological, industrial), two types of accidents due “with significant social impact” (automobile accidents and accidents in the workplace) and the risk represented by social unrest that refers to the context of urban safety. With respect to these risks the PRIM will conduct a scientific reading not just sectorial but also integrated, in order to photograph the real situation and to identify those areas subject to a combination of risks and to propose policies to reduce risks. Actions Analysis of the information collected referring to 108 measures to mitigate risks made known by 21 local agencies in the various contexts: 1. 56 measures concerning “hydro-geological and flood risks” 2. 3 measures concerning “seismic risks” 3. “x” measures concerning “meteorological risks” 4. 6 measures concerning “risks from forest fires” 5. 6 measures concerning “urban safety risks” 6. 33 measures concerning “automobile accident risks” 7. 2 measures concerning “industrial risks and dangerous transports” 8. 2 measures concerning “risks of accidents in the work place”. Parties involved Lombardy Region Also: Province of Brescia, Mountain Communities, Municipalities. Phases and timeframe Different for each project included in the program to develop tourism. It is estimated that the project will be completed before the end of 2010. Financial resources The total investment amounts to € 71 million. The Lombardy Region has contributed € 35 million and the other subjects € 11 million. The rest will come from national and EU resources. Expected results Share the measures to reduce risks with the principal subjects involved in prevention and with consumer associations, in order to provide visibility and unity to the numerous actions. See the risks in an integrated manner and develop area plans for the selected territories, in order to evaluate the joint impact of more than one source of risks in the same area. Evaluate the impact of the risk-prevention measures by means of the application of a scientific method based on indicators for effectiveness. Finance strategic interventions through the opportunities provided by the EU 2007-2010 funds. Create a computerized information pool so that the various agencies involved in the Safety Pact can exchange information. Result indicators Fewer real and perceived social risks, sensation motivated by increased safety, control of the potential risk situations by effective preventive monitoring

127 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Brescia territory Objective 16 PREVENTION AND MITIGATION OF THE PRINCIPAL RISKS FOUND IN THE TERRITORY

Project 16.2 Works to make the road s.s. 45 BIS “Gardesana occidentale” safe Description The project relates to ensuring safety along the road from Limone to the border with and the realization of the natural gallery in the Nanzel area refers to a section of the artery that extends for approximately 3.5 kilometers, subject to periodic episodes of falling rocks, which require fencing and buttressing, in order to guarantee transit along the strategic artery towards the north of this important road. The realization of the natural gallery in the Nanzel area, situated between kilometer 10.200 and kilometer 10.900 of the Gardesana Occidentale, will provide a definitive solution to one of the most critical parts of that artery, due to the frequency of slides and due to the possibility of falling rocks and boulders from the rocky walls above the artery. Actions 1. Identification of the priority measures and the definition of the general program 2. Commencement of the cycle of measures in temporal succession with the relevant program agreements. Parties involved ANAS s.p.a. Also: Province of Brescia, Mountain Community Parco Alto Garda Bresciano. Phases and timeframe It would be advisable that the measures, in order not to compromise transit along the artery, be realized in temporal succession. It is estimated that the work will be completed before the end of 2011. Financial resources The total investment estimated amounts to € 34 million, borne by ANAS s.p.a. Expected results Safety and for this important western coast road heading north, fewer cases of continuous interventions that slow traffic due to the constant danger of frequent slides. A long-lasting, stable and effective solution. Result indicators Driving safely, without any problems or interruptions, from Limone towards the north, as far as the border with Trentino, of the important western coast artery of Lake Garda.

128 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Castelseprio-Torba site Objective 17 MAINTENANCE OF THE CHURCH OF SANTA MARIA FORIS PORTAS

Project 17.1 Maintenance plan and works for the surfaces of the Church of Santa Maria foris portas Description Conservation work was carried out on the Church of S. Maria foris portas at the end of the 1990s on all wall structures. This also included refurbishing the roof and rainwater systems, as well as creating a chemical barrier against rising damp. Previously, in the 1950s the apse walls, which are home to famous frescoes had also been the subject of work to combat damp, which is still fully effective. The project involves creating a maintenance programme that makes it possible to monitor the state of conservation of the Church, especially the frescoes. This programme will be based on carrying out descriptive surveys of the materials, stratographic analysis of the plaster and frescoes, and analytical investigations to characterise the materials (see Knowledge Plan). Actions 1. Carrying out surveys and analytical investigations 2. Drawing up a maintenance programme 3. Carrying out maintenance works Parties involved Varese Provincial Administration; Superintendency for Historic, Artistic, and Demoethnoanthropoligical Heritage and the Superintendency for Architectural Assets and the Landscape of Milan and Lombardy. Phases and timeframe As from 2008 Financial resources Varese Provincial Administration; Superintendency for Historic, Artistic, and Demoethnoanthropoligical Heritage and the Superintendency for Architectural Assets and the Landscape of Milan and Lombardy. Expected results Provision of a maintenance programme identifying the works to be carried out, timescales, and relevant checks. Result indicators Mitigation of the vulnerability of the asset.

PROTECTION AND CONSERVATION PLAN Castelseprio-Torba site Objective 18 IMPROVEMENT OF THE STATE OF CONSERVATION OF THE CASTRUM

Project 18.1 Recovery and restoration of the Baptistery of S. Giovanni and creating a new roof Description The Baptistery presents problems of decay due to the growth of micro-vegetation, disintegration of mortar and plaster, the state of preparation of the floor in opus sectile only fragments of which are conserved, and detachment of flooring and structural elements of the baths. A further element of decay on the floors is the dripping of water due to thawing on the roof, especially during autumn and winter, due to the cold, wet climate. In fact, the current roof is losing its efficiency to the point of needing to be replaced. Actions 1. Cleaning and consolidation of the various elements of the structure 2. Consolidation and restoration of the plaster on the walls and the floor slabs. 3. Replacement of the now obsolete roofing. Parties involved Regional Directorate for Cultural Assets and the landscape in Lombardy. Superintendency of Archaeological assets in Lombardy. Phases and timeframe By 2008 – 2009 Financial resources MIBAC funds: € 30,280.56 for conservation works. € 147,600 has been allocated for the roof, which includes the funds for the roof planned for building I (see Project 4.1). Expected results Improved state of conservation of the asset, also in order to valorise it. Result indicators Mitigation of the vulnerability of the asset.

129 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Castelseprio-Torba site Objective 18 IMPROVEMENT OF THE STATE OF CONSERVATION OF THE CASTRUM

Project 18.2 Recovery and restoration of walls in the intermediate area between the Cistern and the Bell Tower in the San Giovanni Basilica Complex Description The area between the Cistern and the Bell Tower has problems with infestation by vegetation, decay of mortar, and extensive problems on the walls that make maintenance and repair works essential. Actions 1. Decay survey and conservation project 2. Action to remove vegetation and conservation work on the wall structure. Parties involved Regional Directorate for Cultural Assets and the landscape in Lombardy. Superintendency of Archaeological assets in Lombardy. Phases and timeframe By 2008 Financial resources MIBAC funds: € 15,353.40 (this figure also includes the works described in Project 5.1). Expected results Consolidation of the walls and valorisation of the same. Result indicators Mitigation of the vulnerability of the asset.

PROTECTION AND CONSERVATION PLAN Castelseprio-Torba site Objective 18 IMPROVEMENT OF THE STATE OF CONSERVATION OF THE CASTRUM

Project 18.3 Conservation work on the Church of S. Paolo Description As part of the Project: “Recovery of the archaeological area of the Castrum of Castelseprio”, initially drawn up in 2003, provision is made for conservation restoration of the hexagonal Church of S. Paolo, which dates back to the , and that has many pieces of the ground floor walls missing, the only floor remaining. This building, built of pebbles and pieces of stone in fairly regular courses, with fishbone inserts, still has half-columns at the corners of the walls made of brick and travertine limestone.

Currently, the church is a ruin and the walls are still standing around the internal core, with outer walls built of properly dressed stone blocks and pebbles laid regularly (some fishbone courses), and a chaotic inner core made of undressed pebbles, with a significant amount of mortar. The collapse of large sections of the walls has revealed the inner core that is Highly detached on the surface, which has caused individual lithic elements to fall in many sections.

So far the walls have undergone general cleaning, which made it possible to see that the surface detachment does not only affect the stones at the surface, directly exposed to the weather, but also the inner stones to a total depth of 40 – 50 cm from the surface. Experimental work has therefore been done, of injecting grout into the worse detached part of the south-west wall (the only one that retains traces of the upper floor) to check the state of the inner walls and to stabilise subsequent consolidation works. Samples have also been taken of mortar and plaster to gain greater knowledge of the materials used at the time. Actions 1. Carrying out of conservation and restoration works Parties involved Regional Directorate for Cultural Assets and the landscape in Lombardy. Superintendency of Archaeological assets in Lombardy. Phases and timeframe By 2008 Financial resources MIBAC funds: €. 78.000,00 Expected results Elimination of the causes of general decay and especially the detachment of the parts without decoration and generally making the building safe, especially the few traces of the upper floor, for the purposes of conserving and using it. Result indicators Mitigation of the vulnerability of the asset.

130 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Castelseprio-Torba site Objective 18 IMPROVEMENT OF THE STATE OF CONSERVATION OF THE CASTRUM

Project 18.4 Conservation work on building I Description Building I, located a short way from the S. Giovanni basilica Complex and recognised as a canonical building, requires further works to rid it of vegetation, general cleaning of the surfaces, and consolidation of the mortar and elements in clay used in the walls, as well as refurbishing of the door jambs for the doorways to the various rooms. The building has a few fragments of painted plaster that is from the renaissance era and has been rendered crumbly by persistent damp in the area, characterised by cracks and detachment. The current roof is also to be replaced in traditional elements to protect the plaster. To gain more knowledge about the structure and its foundations, excavation is necessary inside the rooms and along the outer perimeter (in this regard see the Knowledge Plan). Actions 1. Carrying out of restoration works and replacing the roof. Parties involved Regional Directorate for Cultural Assets and the landscape in Lombardy. Superintendency of Archaeological assets in Lombardy. Phases and timeframe By: 2008. Financial resources MIBAC funds: € 20,468.40 for the restoration. The figure for replacing the roof is included in the funds allocated for the roofs and also includes the roof on the baptistery. For the archaeological excavations and relevant documentation: funds to be found Expected results Elimination of the causes of general decay of the building, replacing of the roof in order to conserve the plasters and archaeological investigations to gain more knowledge about the building and medieval building practices Result indicators Mitigation of the vulnerability of the asset

PROTECTION AND CONSERVATION PLAN Castelseprio-Torba site Objective 18 IMPROVEMENT OF THE STATE OF CONSERVATION OF THE CASTRUM

Project 18.5 Conservation work on the door and access bridge for the castrum Description The access bridge and door of the castrum require removal of vegetation, general cleaning of the surfaces, and consolidation of the mortars and elements of the walls Actions 1. Carrying out of conservation and restoration works Parties involved Regional Directorate for Cultural Assets and the landscape in Lombardy Superintendency of Archaeological assets in Lombardy Phases and timeframe By: 2008. Financial resources MIBAC funds: € 15,353.40 Expected results Elimination of the causes of decay and making the building safe for conservation and use Result indicators Mitigation of the vulnerability of the asset

PROTECTION AND CONSERVATION PLAN Castelseprio-Torba site Objective 18 IMPROVEMENT OF THE STATE OF CONSERVATION OF THE CASTRUM

Project 18.6 Restoration and maintenance work on the wall circuit Description The circuit of the castrum walls has sections of wall already uncovered and sections to be cleared. In this regard, work is planned to improve the state of conservation and use of the circuit of the castrum walls, also in connection with the exposure of new sections, already inspected, and partly detached. Actions 1. Continuation of uncovering of sections of wall 2. Carrying out of conservation and restoration works Parties involved Regional Directorate for Cultural Assets and the landscape in Lombardy Superintendency of Archaeological assets in Lombardy Phases and timeframe From 2008 Financial resources MIBAC funds: Funds requested for 2008-2010 Planning Expected results Elimination of the causes of general decay and making the building safe for conservation and use Result indicators Mitigation of the vulnerability of the asset

131 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Castelseprio-Torba site Objective 19 PREVENTION AND REDUCTION OF HYDROGEOLOGICAL, SEISMIC AND ANTHROPIC RISKS

Project 19.1 Refurbishing of the slopes

Description Given the nature of these locations, it is deemed essential that the slopes be stabilised and

that the woods be maintained constantly, and that this must also be done in the buffer zone

that surrounds the Castelseprio site.

Actions 1. Preliminary investigations

2. Completion of the work

3. Final documentation Parties involved FAI – Italian Environmental Fund; Superintendency for Historic, Artistic, and Demoethnoanthropoligical Heritage and the Superintendency for Architectural Assets and the Landscape of Milan and Lombardy; Pinin Brambilla Bariclon (restorer). Phases and timeframe 2008: Funds sought Financial resources Application for co-financing in progress: Bando Non-Profit Community Organisation of Varesotto Art and Culture N° 2/2007; private financing sought Expected results Completion of restoration and elimination of state of decay of internal plaster and fresco fragments Expected results Improved state of conservation of the asset Result indicators Mitigation of the vulnerability of the asset

PROTECTION AND CONSERVATION PLAN Castelseprio-Torba site Objective 20 IMPROVING THE STATE OF CONSERVATION OF THE TORBA COMPLEX

Project 20.1 Completion of restoration of the internal plaster and fresco fragments in the Church of Santa Maria in Torba Description In 2007 a laser scanner was used to survey the interior and the initial restoration work was done on the bell tower area (where a fragment of fresco was rehoused). These works were necessary in order to prepare a project for the remaining two walls in the Church and the apse area, which provides for restoring the fragments of fresco and plaster inside the Church of S. Maria. Actions 1. Surveys and preliminary documentation 2. Project 3. Completion of the work Parties involved FAI – Italian Environmental Fund; Superintendency for Historic, Artistic, and Demoethnoanthropoligical Heritage and the Superintendency for Architectural Assets and the Landscape of Milan and Lombardy. Phases and timeframe 2008: Funds sought Financial resources Funds to be sought from Private sources, bank foundations, and public sources Expected results Improvement of the state of conservation of external plaster of the Tower Result indicators Mitigation of the vulnerability of the asset

PROTECTION AND CONSERVATION PLAN Castelseprio-Torba site Objective 20 IMPROVING THE STATE OF CONSERVATION OF THE TORBA COMPLEX

Project 20.2 Drawing up a maintenance project for the external surfaces of the Tower Description The project provides for maintenance of the external surfaces of the Tower, characterised by the presence of ancient mortar of various compositions, wall finishes (stone outline plaster, whitewashing, and covering plaster) and walls in stone, pebbles, and brick that has limited phenomena of decayed material. Actions 1. Surveys and preliminary documentation 2. Conservation project 3. Completion of the work Parties involved FAI – Italian Environmental Fund; Superintendency for Historic, Artistic, and

132 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

Demoethnoanthropoligical Heritage and the Superintendency for Architectural Assets and the Landscape of Milan and Lombardy. Phases and timeframe 2008: Funds sought Financial resources Funds to be sought from Private sources, bank foundations, and public sources Expected results Improvement of the state of conservation of external plaster of the Farmhouse and Barn. Result indicators Mitigation of the vulnerability of the asset.

PROTECTION AND CONSERVATION PLAN Castelseprio-Torba site Objective 20 IMPROVING THE STATE OF CONSERVATION OF THE TORBA COMPLEX

Project 20.3 Restoration of the external plaster of the Church, Farmhouse, and Barn Description This project involves restoring the external surfaces of the Church, Farmhouse, and Barn. The Church in particular is characterised by extensive stratification of the walls, mortars and plasters. Stratification surveys will be carried out to extend knowledge about the history of the building and to set up the conservation works. Actions 1. Surveys and preliminary documentation 2. Archaeological excavations 3. Cleaning of the walls 4. Restoration and consolidation of archaeological structures Parties involved FAI – Italian Environmental Fund, Superintendency for Archaeological Assets in Lombardy. Phases and timeframe 2008 Financial resources Co-financing:Regione Lombardia - Bando Patrimonio Archeologico Lombardo – Year 2007 Regional laws 39/84 & 39/91 Expected results Improvement of the state of conservation, and making safe for the purposes of conservation and use.

PROTECTION AND CONSERVATION PLAN Castelseprio-Torba site Objective 20 IMPROVING THE STATE OF CONSERVATION OF THE TORBA COMPLEX

Project 20.4 Conservation, restoration of the existing archaeological structures as part of refurbishing of the connection with the castrum of Castelseprio-Torba Description As part of the excavations to be carried out at the fortifications along the route that connects to the archaeological area of Castelseprio-Torba, this project provides for the restoration and consolidation of the archaeological structures, which will include works of careful cleaning, detaching of infesting vegetation, repair and consolidation of the masonry parts as necessary, where structural stability needs to be increased. Actions 1. Drainage and collection of water to stabilise loose areas. 2. Maintenance and reducing the age of the woods in part to make the slopes lighter. Parties involved Regional Directorate for Cultural Assets and the landscape in Lombardy. Superintendency of Archaeological assets in Lombardy. Territorial Bodies Phases and timeframe By: 2008-2012. Financial resources Funds to be found in collaboration with the Territorial Bodies. Expected results Elimination of the causes of decay and making the slopes safe for conservation and use Result indicators Mitigation of the vulnerability of the asset.

133

134 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Spoleto site Objective 21 DEVELOPMENT OF A MAINTENANCE PROGRAMME FOR THE BASILICA OF SAN SALVATORE

Project 21.1 Systematization of data relative to the carried out conservation interventions (see Documentation centre) Description Prior to the development of a routine maintenance plan it seems to be essential to proceed with an accurate analysis of the state of conservation of the property, also through the collection and systematic analysis of the data relative to the restoration interventions the object has been subject to over the years.

San Salvatore before and after the conservation intervention of 90s

Actions 1. Collection and systematization of data through transfer into electronic archives in the documentation centre. Parties involved Municipality of Spoleto. BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of the Region Umbria. Archive Superintendence of the Region Umbria. State Archive of Perugia – Section of Spoleto. Private citizens and companies Phases and timeframe After completing restoration of the ex convent. Financial resources Funds to be raised in the municipal budget and from private contributions. Expected results Systematization of knowledge on the restoration interventions carried out in the past; preparation of instruments and definition of procedures allowing for the planning of maintenance interventions. Result indicators Number and quality of collected and systematized data

PROTECTION AND CONSERVATION PLAN Spoleto site Objective 21 DEVELOPMENT OF A MAINTENANCE PROGRAMME FOR THE BASILICA OF SAN SALVATORE

Project 21.2 Carrying out of thematic surveys aimed at diagnostic project and analysis Description The project envisages thematic surveys aimed at describing the state of conservation of the property; metric surveys; surveys on the materials used and building techniques; surveys of restoration interventions carried out in the past which left a visible mark (stratigraphic analysis); survey on the visible effects of deterioration (deterioration and damage surveys and analytical investigations). Surveys must be carried out with non invasive methods which make use of innovative technological devices.

135 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

Actions 1. Survey project 2. Carrying out of geo-referenced metric survey campaigns with relative restitution in vector and digital format. 3. Stratigraphic analysis of elevations to identify restoration interventions carried out in the past 4. Survey and description of materials and building techniques 5. Surveys on deterioration state 6. Restitution of data on thematic maps and description of the state of conservation. Parties involved Municipality of Spoleto. BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of the Region Umbria Phases and timeframe From 2008 Financial resources Funds to be raised in the municipal budget and by other public and private bodies. Expected results Production of information material to be available at the Documentation centre Result indicators Number and quality of collected and systematized data

PROTECTION AND CONSERVATION PLAN Spoleto site Objective 21 DEVELOPMENT OF A MAINTENANCE PROGRAMME FOR THE BASILICA OF SAN SALVATORE Project 21.3 Planning of routine maintenance interventions and launch of the first cycle of interventions Description On the basis of the carried out surveys a maintenance programme for the basilica will be planned. It will identify intervention priorities and implementation time limits. The surveys will be carried out periodically by a group of experts of the Municipality, according to the attached risk file. The objective is to carry out constant routine maintenance interventions in order to prevent restoration interventions as much as possible. Actions 1. Identification of intervention priorities and definition of a general programme 2. Launch of the first cycle of maintenance interventions. Parties involved Municipality of Spoleto. BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of the Region Umbria. Phases and timeframe From 2008 Financial resources Funds to be allocated in the municipal budget; search for sponsorship. Expected results Planning of maintenance programmes with identification of interventions that need to be carried out, time limits and relative controls. Result indicators Increase in the protection level for the property.

PROTECTION AND CONSERVATION PLAN Spoleto site Objective 21 DEVELOPMENT OF A MAINTENANCE PROGRAMME FOR THE BASILICA OF SAN SALVATORE

Project 21.4 Maintenance intervention of stone material stored in the museum warehouse Description Many sculptures – mainly fragmented, which used to be part of the walls of the naves of the Basilica – were removed during restoration interventions in the Basilica in the 90s and transferred into the Museum Warehouse of the Municipality of Spoleto. It is necessary to plan constant monitoring for them as well as routine maintenance interventions in order to guarantee excellent conservation. Actions 1. Verification of the state of conservation of the stone elements removed from the Basilica 2. Launch of maintenance intervention Parties involved Municipality of Spoleto. BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of the Region Umbria. Superintendence for Archaeological Heritage of the Region Umbria. Phases and timeframe From 2008 Financial resources Funds to be allocated in the municipal budget; possible sponsorship. Expected results Guarantee to preserve the properties. Result indicators Improvement of conservation and exhibition conditions of the properties.

136 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Spoleto site Objective 22 CARRYING OUT OF CONSERVATION INTERVENTIONS OF THE EX CONVENT COMPLEX

Project 22.1 Launch of conservation and restoration interventions of the ex convent complex Description The project envisages the integral restoration of the complex in order to transform it into a multipurpose Centre (Welcoming; visits; documentation) which can be used for all activities related to the use and visits to the Basilica and the buffer zone and for studies, training and research on Longobard topics. Actions 1. Drawing up of a restoration project 2. Launch of restoration interventions Parties involved Municipality of Spoleto. BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of the Region Umbria. Region Umbria. Expected phases and time frame From 2008 Financial resources Funds to be allocated in the municipal budget and regional funding: € 300,000.00 Expected results Restoration of buildings and opening of areas to the general public Result indicators Number of access requests

PROTECTION AND CONSERVATION PLAN Spoleto site Objective 23 IMPROVEMENT OF RISK PREVENTION

Project 23.1 Installation of a video surveillance system on the Basilica Description The project envisages the installation of a video surveillance plant composed by two video cameras placed outside the Basilica and two video cameras inside, connected to the Municipal Police station. The video cameras will be of the dome type, swivel, day-night, equipped against theft and with an integrated video server which allows immediate direct connection with Telecom plants without any other device. Actions 1. Drawing up of the installation project 2. Approval of the project and acquisition of necessary authorizations by BAPPSAE 3. Installation of equipment Parties involved Municipality of Spoleto. BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage) of the Region Umbria. Phases and timeframe From 2008 Financial resources Funds to be raised in the municipal budget (around 6,000.00 Euro/each) Expected results Guarantee for conservation of properties Result indicators Installation of video cameras

137 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Spoleto territory Objective 24 IMPROVEMENT OF RISK PREVENTION IN ORDER TO THE CULTURAL HERITAGE

Project 24.1 Creation of a Centre of Excellence for the recovery of Cultural Heritage in case of a disaster Description In Spoleto, a regional Centre of Excellence for the recovery of Cultural Heritage in case of emergency is now being created, as a point of reference for the entire territory of Umbria. The structure is composed by a shed – almost entirely built – in the industrial area of Santo Chiodo, in the vicinity of the municipal warehouse for works of art thus creating a department for the protection and conservation of the cultural heritage. The operation benefitted from the assistance, also economic, of the Ministry for Cultural Heritage and Activities, the Presidency of the Council of Ministers (Civil Protection Department), the Region Umbria and Confindustria. The Centre will be used to collect any kind of paintings, sculptures, prints, books, textiles and artistic artefacts of any kind which are in an emergency condition due to earthquakes, floods, fires, static problems of the buildings where they are placed, etc. It is the only structure created in the Region Umbria for this kind of emergencies and was designed according to technological and logistic criteria adjusted to the type of properties and activities which will be carried out. In particular, it has a total surface of 3600 m2, of which 70% at full height (around 7.5 m) and 30% at double height. The internal division envisages a warehouse of around 1900 m2, a file archive and a photographic archive, the management offices, a secretariat, a meeting hall, a locker room for employees, an area for the guardian, a garage and various services. Actions 1. Photographic and inventory cataloguing 2. Emergency services: safety devices and cleaning interventions for properties 3. Placing in warehouse on purposely made racks/shelves/showcases 4. Constant monitoring of the state of conservation Parties involved Municipality of Spoleto. Ministry for Cultural Heritage and Activities; Presidency of the Council of Ministers (Civil Protection Department); Region Umbria; Confindustria. Phases and timeframe end 2008 Financial resources Region, Ministry for Cultural Heritage and Activities, Presidency of the Council of Ministers: € 6,000,000.00 Confindustria: € 480,000.00 Expected results Keeping the same state of conservation Result indicators Number of carried out interventions

138 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Spoleto territory Objective 24 IMPROVEMENT OF RISK PREVENTION IN ORDER TO THE CULTURAL HERITAGE

Project 24.2 Opening of the Cultural Heritage Diagnostic Laboratory at the Rocca Albornoziana

Description In Spoleto the Cultural Heritage Diagnostic Lab, housed in the Rocca Albornoziana in the frame of the 2004 Accordo di Programma Quadro APQ (agreement between State and Region concerning territorial strategic planning), is about to become operational. This Laboratory is equipped with innovative methodologies and techniques for the diagnostics of damages and risks, for first aid and conservation of cultural heritage. The competent institutions for the Laboratory and the stakeholders of the Longobard network are defining agreements aiming at making this structure the reference centre for seismic risk and diagnostic studies on the Longobard heritage, not only for the monuments of the "Duchy of Spoleto", but also for those of the entire Italia Langobardorum network. Data Archives concerning techniques and materials used in different types of Longobard artefacts (from architecture to sculptures, paintings etc.) and collecting all the information obtained through studies, researches and inquiries all over Italy, could be created in this Centre, in collaboration with CISAM (Italian Centre of Studies on Early-Middle Ages), situated in Spoleto. The Archives, that could manage data on the conservative operations implemented or to be implemented on the same heritage, could be extended in the future to a larger network including all Italian and European sites that have been characterized by the Longobard presence.

Rocca Albornoziana seat of the Cultural Heritage Diagnostic Lab

Parties involved Municipality of Spoleto, Ministry for Cultural Heritage and Activities, Central Institute for Restoration, CISAM (Italian Centre of Studies on Early-Middle Ages), Umbria Region, all the stakeholders Phases and timeframe 2010 Financial resources Region, Ministry for Cultural Heritage and Activities, Municipality of Spoleto Expected results Cultural Heritage Diagnostic Lab as a national reference Centre, especially for Longobard artefacts. Result indicators Number of analysis and research projects

139

140 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Campello sul Clitunno site Objective 25 IMPROVEMENT OF THE STATE OF PROTECTION AND CONSERVATION OF THE CLITUNNO TEMPIETTO AND THE CLITUNNO RIVER

Project 25.1 Maintenance work with particular reference to tombstone materials and internal walls of cell and walls of pronaos Description The maintenance work on the Temple aims to improve the state of conservation of the tombstone and wall surfaces. It is mainly necessary to remove biological films and clean consistent and inconsistent surface deposits and also integrate some slight gaps.

This phase also includes maintenance work on the cell floor and the wooden windows. Actions 1. Planning of work 2. Carrying out of maintenance work Parties involved Superintendence Department for the Architectural, Landscape, Historical, Artistic and Ethno-anthropological Heritage of Umbria (SPAPPSAE). Municipality of Campello sul Clitunno, Phases and timeframe Planning by 2008 Commencement of work from 2009 Financial resources Funds allocated for routine maintenance (including context): 8,065.00€ on average each year. Funds to be found by: Municipality of Campello sul Clitunno; Ministry for Cultural Heritage and activities; Umbria Region; private and bank sponsorships Expected results Elimination of deterioration phenomena Result indicators Mitigation of site’s vulnerability

141 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Campello sul Clitunno site Objective 25 IMPROVEMENT OF THE STATE OF PROTECTION AND CONSERVATION OF THE CLITUNNO TEMPIETTO AND THE CLITUNNO RIVER

Project 25.2 Relief and reduction of rising damp problems and condensation in the walls exposed to north and north-east Description The main problems in the building are mainly linked to damp and condensation, caused by the particular environmental conditions that the building experiences, partly built against land. For this reason in the past, a perimeter drainage system and rainwater disposal system was created; however, damp still affects the northern face, along the external base of the apse, where rising damp has produced biological films such as musk and efflorescence. It is necessary to constantly monitor the phenomena linked to the presence of damp, foreseeing constant maintenance that removes any damaging effects Actions 1. Checking of temple’s environmental conditions and surveys/analysis to identify cause and effect of damp in north and north-eastern walls 2. Maintenance work Parties involved Superintendence Department for the Architectural, Landscape, Historical, Artistic and Ethno-anthropological Heritage of Umbria (SBAPPSAE); Municipality of Campello sul Clitunno Phases and timeframe From 2009 Financial resources Funds allocated for routine maintenance (including context): 8,065.00€ on average per year. Funds to be found by: Municipality of Campello sul Clitunno; Italian Government (Ministry for Cultural Heritage and Activities); Umbria region; private and bank sponsorships Expected results Removal of causes of deterioration of walls exposed to north-northeast Result indicators Reduction of site’s vulnerability

PROTECTION AND CONSERVATION PLAN Campello sul Clitunno site Objective 25 IMPROVEMENT OF THE STATE OF PROTECTION AND CONSERVATION OF THE CLITUNNO TEMPIETTO AND THE CLITUNNO RIVER

Project 25.3 Conservation work and aesthetic aspect of the frescoes on back wall of cell Description General condition of the painting layer must be checked which, although it underwent important restoration work in 1984, has some critical factors and then proceed with the necessary work for the aesthetic appearance with suitable reintegration of painting gaps

142 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

cellar

Actions 1. Analysis to check current state of conservation of painting layer and choice of reintegration method for gaps 2. Project and work. Parties involved Superintendence Department for the Architectural, Landscape, Historical, Artistic and Ethno-anthropological Heritage of Umbria BAPPSAE Phases and timeframe Planning by 2008 Commencement of work 2009 Financial resources Funds allocated for routine maintenance (including context): 8,065.00€ on average per year. Funds to be found by: Municipality of Campello sul Clitunno; Italian Government (Ministry for Cultural Heritage and Activities); Umbria region; private and bank sponsorships Expected results Elimination of any causes of deterioration and improvement of final aesthetic appearance Result indicators Reduction of site’s vulnerability

PROTECTION AND CONSERVATION PLAN Campello sul Clitunno site Objective 26 DRAWING UP OF MAINTENANCE PROGRAMME FOR THE CLITUNNO TEMPIETTO

Project 26.1 Creation of thematic relief work for the diagnostic project and analytical surveys Description The project foresees the carrying out of thematic surveys, aimed at describing the state of conservation of the site and the systematic gathering of data on restoration work carried out in the past (work history). This entails mapping: a) Materials used in work b) Construction techniques (descriptive survey and analytical surveys); c) Restoration work carried out in past that left visible trace (stratigraphic analysis); d) Visible effects of deterioration (survey of deterioration and deformity and analytical surveys). All surveys will be recorded on thematic maps in digital/carrier form and in photographs Actions 1. Stratigraphic analysis of models to identify restoration work carried out in past 2. Survey and description of construction-execution materials and techniques 3. Survey of the state of conservation and the gaps in the structure 4. Study of specific analytical surveys in order to characterise the materials

143 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

and forms of deterioration found Parties involved Superintendence Department for the Architectural, Landscape, Historical, Artistic and Ethno-anthropological Heritage of Umbria BAPPSAE Municipality of Campello sul Clitunno Phases and timeframe Actions: by 2008 – preliminary preparation for conservative maintenance work Financial resources Com: Municipality Campello sul Clitunno; Ministry for Cultural Heritage and Activities; Umbria region; private and bank sponsorships Expected results Arrange a full as possible group of thematic findings and returns in paper or digital format, prior to conservative maintenance work Result indicators Number and quality of data found and entered into system

PROTECTION AND CONSERVATION PLAN Campello sul Clitunno site Objective 26 DRAWING UP OF MAINTENANCE PROGRAMME FOR CLITUNNO TEMPIETTO

Project 26.2 Maintenance programme and start up of first cycle of work Description On the basis of surveys carried out, a maintenance programme will be prepared for the temple that also identifies work priority and implementation times. The goal is to carry out maintenance work in small lots, continuing over the years Actions 1. Identification of work priorities and definition of general programme 2. Start up of first cycle of maintenance work Parties involved Superintendence Department for the Architectural, Landscape, Historical, Artistic and Ethno-anthropological Heritage of Umbria BAPPSAE Municipality of Campello sul Clitunno Phases and timeframe From 2009 Financial resources Funds to be found by: Municipality Campello sul Clitunno; Ministry for Cultural Heritage and Activities; Umbria Region; private and bank sponsorships Expected results Drawing up of maintenance programme with identification of work to be carried out, timeframes and relative checks Result indicators Reduction of site’s vulnerability

144 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Campello sul Clitunno buffer zone and territory Objective 27 CONSERVATION AND UPGRADING OF INDUSTRIAL ARCHAEOLOGICAL STRUCTURES

Project 27.1 Conservation and refunctioning of ENEL power station and water pumping station, destined to be used as exhibition site for the Eco/Museum Project Description Conservative maintenance work of disused structures, destined for use as permanent exhibition sites in the area’s Eco-Museum. In particular, the areas will house sections 3 / 4: “Clitunno river as a "Genius Loci" and as a resource” High aesthetic value of "Topoi”: The Tempietto and the Springs of Clitunno” (See Enhancement plan) Actions 1. Conservative Maintenance work Parties involved Municipality of Campello sul Clitunno Phases and timeframe From 2009 onwards Financial resources Part of funds allocated through state funding, further to the environmental accident in 2006 (see Conservation analysis), for the reclamation, recovery and enhancement of the area of the Clitunno river: € 6,000,000.00 Expected results Improvement of the state of conservation

PROTECTION AND CONSERVATION PLAN Campello sul Clitunno buffer zone and territory Objective 28 CONSOLIDATION AND RESTORATION OF THE SITES DAMAGED BY THE 1997 EARTHQUAKE

Project 28.1 Work to secure and consolidate structure of the Sanctuary of the Madonna della Bianca Description Securing consolidation of structure and conservative restoration of the Santuario della Madonna della Bianca, currently closed due to serious damage from the earthquake in 1997. This is the last of the series of 11 interventions for consolidation and restoration funded by the Umbria region with the annual plan for cultural heritage damaged by earthquakes (DGR 94/2000), to deal with the considerable damage caused by the earthquake to the region’s architectural heritage, and for which the Municipality of Campello sul Clitunno has carried out work for a total of € 2,639,436.53. Heritage already consolidated and restored from 1999 include: the castle of Pissignano, the church of San Lorenzo, the church of San Michele Arcangelo, the church of San Pietro, Palazzo Casagrande Chillotti, the church of San Giovanni and the bell tower of Santa Maria. Actions 1. Safety interventions 2. Structural consolidation work and conservative restoration Parties involved Umbria Region Spoleto- Norcia Archbishop’s curia Superintendence Department for the Architectural, Landscape, Historical, Artistic and Ethno-anthropological Heritage of Umbria SBAPPSA Phases and timeframe End of work summer 2008 Usable by 2009 Financial resources Funds allocated by the Umbria Region (Regional law 12.08.98, n° 32 – Annual plan for cultural heritage damaged by earthquakes): € 250,000.00 Expected results Seismic Improvement Improvement of the overall state of conservation of the site

145

146 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Benevento site and buffer zone Objective 29 IMPROVING THE STATE OF CONSERVATION OF THE SITE

Project 29.1 Maintenance and conservation improvement of the Church of Santa Sofia Description The city’s attention to its cultural heritage is expressed in the numerous programmes and works in recent decades, which have aimed both to improve the physical state and to valorise the numerous emergencies related to the monuments concentrated in the old city. Thanks to the Integrated Project “Benevento: The future in history” widespread redevelopment and modernisation of the infrastructure of the city has begun, and has already produced significant results in terms of the state of conservation of assets. The project forms part of a strategy of valorisation and coordinated management of Assets, which will see the signing of a specific Protocol of Intent by the Bodies responsible for identifying common rules for how to maintain use of the Church as a place of worship that is also useable and accessible for tourist purposes (see valorisation plan). The Santa Sofia complex, which has already been the subject of maintenance restoration, will be subjected to programmed maintenance, necessary due to wear resulting from its use as a place of worship. The maintenance work, in the form of a project by the BAPPSAE Superintendency of Caserta and Benevento, will involve cleaning the stone surfaces inside, and the plaster sections and external decorations of the church structure. In addition, the floor will be refurbished, having been laid during the restorations in the 1950s by Arch Rusconi and now deemed not compatible with the monument’s image, the carrying out of archaeological investigations, and upgrading of the lighting system.

Parties involved Municipality of Benevento Benevento Provincial Authority Prefecture of Benevento Cultural Heritage Regional Directorate Phases and timeframe Short term: First semester of 2008 Financial resources Available: € 650,000 from POR Campania 2000-2006 Expected results Seeing to the quality of the state of conservation of the cultural heritage of the site. Result indicators Carrying out of the work

147 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Benevento site and buffer zone Objective 30 IMPROVING THE STATE OF CONSERVATION OF LONGOBARD ASSETS INCLUDED IN THE BUFFER ZONE

Project 30.1 Maintenance of the Longobard tomb in the Church of S. Salvatore Description The Benevento buffer zone includes relics of Longobard artistic culture that is unique, and so the Municipality of Benevento intends implementing actions to valorise the same, which have been brought forward due to the need for maintenance work. In relation to the Church of S. Salvatore, which has already undergone maintenance restoration, programmed maintenance is planned of the burial sites from the Longobard era it contains. Of these, the tomb of the Priest Auderisio stands out due to its peculiar pictorial decoration that includes the dedication inscription and two crosses. The project must also include restoration of the external facades of the church and the final arrangement of the tombs, introducing plants and systems to conserve and protect these assets from natural agents (damp, light, etc.).

The Church of S. Salvatore

Longobard tomb in the Church of S. Salvatore.

Parties involved Archaeological Superintendency and BAPPSAE Municipality of Benevento Phases and timeframe Short term: (2009) Financial resources To be found: From POR FESR 2007-2013 Expected results Seeing to the quality of the state of conservation of the cultural heritage of the site. Result indicators Carrying out of the work

148 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Benevento site and buffer zone Objective 30 IMPROVING THE STATE OF CONSERVATION OF LONGOBARD ASSETS INCLUDED IN THE SITE AND IN THE BUFFER ZONE

Project 30.2 Maintenance work on the Longobard boundary wall Description The Benevento buffer zone includes relics of Longobard material culture that is unique, and so the Municipality of Benevento intends implementing actions to valorise the same. In relation to the Wall of the Longobard town, which has already undergone maintenance restoration, completion of the task is planned in the form of programmed maintenance. The city wall that surrounded the ancient medieval Longobard city is in a reasonable state of conservation. The buffer zone does not fully coincide with the area of the ancient wall, but only in some parts of its layout to the east of the town, below the Trescene quarter, along Via del Pomerio as far as the Ark of Traiano and continuing along the River Calore. From the end of the 18th century to the start of the 20th century, the walls were subject to demolition works and in some parts they were included in the outside walls of civil dwellings. (Via Torre della Catena). Further damage and destruction were caused by bombardment in 1943.

Via Torre della Catena, in an old image

The part of the wall that is best preserved, thanks in part to conservation refurbishing work done by the Superintendency in the 1990s is the part that coincides with the perimeter of the buffer zone and that demarcates the ancient Trescene quarter. This part of the wall does not require maintenance work.

The conservation plan of the longobard wall

149 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

Other problems are involved for the stretch of the wall to the north-west of the town, from the Arch of Traiano to the Bridge on the River Calore, and then from Port Arsa, along Via Torre della Catena, to the convent of the Ursuline Sisters. This stretch also includes a lot of circular towers and square towers, almost all of which are well preserved. The main conservation problem is the decay due to the presence of shrubs, scrub, and roots that have got into the fabric of the walls, the decay of the mortar, subsequent damage to the wall itself and thus the infiltration of rainwater. The small circular tower on Via Torre della catena, which was an important medieval fortification, requires static consolidation work (cleaning out and injection of mortar) since it was badly damaged by bombing during the war. Work currently in progress (2006-2007) involves maintenance work on the entire section of the wall not yet refurbished, with financing from POR CAMPANIA scale 5, as part of the Integrated Programme. This work includes removing weeds by hand, careful picking away of the plaster, treatment with disinfectant biocides, refurbishing of the alignment of the cappings on the wall creating sacrificial surfaces, closing of the holes passing through, consolidating the joints, building small sections of boundary wall, cleaning the stone elements used as construction elements in the wall at a number of points. Parties involved Municipality of Benevento Archaeological Superintendency and BAPPSAE Phases and timeframe Work in progress by 31.12.2008 Further work by 31.12.2015 Financial resources Available: € 2,000,000 from POR Campania 2000-2006 To be found: From POR FESR 2007-2013 Expected results Seeing to the quality of the state of conservation of the cultural heritage of the site. Result indicators Carrying out of the work

PROTECTION AND CONSERVATION PLAN Benevento site and buffer zone Objective 31 RAISING THE CONSERVATION STATUS OF THE ANCIENT CITY CENTRUM

Project 31.1 Municipal incentives for eco-sustainable refurbishing in the old city Description Building refurbishing in an eco-sustainable manner is a matter that is currently important to and applied by the contemporary building world. This becomes an arduous challenge with applied to historical dwellings. In Benevento, refurbishing and valorisation of the old city has thus far been undertaken in the form of various restoration works, conservative refurbishing, and health and functional upgrading, without any intention to take action in terms of the eco- sustainability of the works done. In addition to regulating building redevelopment works (mainly renovation, refurbishing, and restoration), the city’s administration intends involving the citizens in being aware of the importance of doing these works in a sustainable way in their old city. Thus it intends providing incentives for those that intend to retrieve properties, guaranteeing the use of techniques that reduce the pollutant impact and reducing wastage of raw materials. This action relates to parts of the minor historical building fabric, mainly with a private residence function, within the Longobard city wall in Benevento, where one can still see the signs of abandonment following seismic events and damage caused during the second world war. The incentives offered for sustainable recovery that the Benevento Municipality will propose to private citizens for the retrieval of their heritage dwelling and property is in the form of a reduction in municipal tax, for a period of five or ten years for example, provided they undertake to do the work adopting the Municipal Bio-construction Regulations (using alternative sources of energy, construction products with a low environmental impact, and reducing water consumption). See Protection Plan – Issuing of the Municipal Bio-Construction Regulations. Parties involved Municipality of Benevento Phases and timeframe Medium – long term: by 2015 Financial resources To be found: POR FESR Campania Regional Authority 2007-2013 Expected results Creation of an old city that is a model of integration of the traditional cultural values and environmental sustainability requirements expressed in the way it is used daily. Result indicators Adoption of the Regulations

150 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Benevento site and buffer zone Objective 32 MONITORING THE STATE OF CONSERVATION OF THE ASSETS

Project 32.1 Programme for periodic monitoring of the state of conservation of the archaeological areas Description In recent years the Benevento Municipality has started many works to refurbish the old city. These have brought to light the quality and quantity of significant archaeological sites that it includes. For example, as part of the implementation of the Integrated project for the City of Benevento (financed with EU funds), important discoveries were made when rendering Corso Garibaldi a pedestrian area and redeveloping Piazza Sabarini. Other unexpected finds came about during the works to replace the flooring inside the Cathedral. The presence of such cultural resources was stressed in the debate promoted by the Benevento Municipality in 2005 about the peri-urban archaeological area of Cellarulo - the river port from Roman times, amphitheatre with gladiator school, and the cellarium, which had already been the subject of attention for years – the major speakers at which were the competent Superintendencies in the territory. This monitoring will take the form of video surveillance and periodic inspections of the sites by specialist personnel, the Superintendencies, and the Municipality. Monitoring will be managed using a GIS system that will also make it possible to compare the state of conservation of the sites at various times. Parties involved Archaeological Superintendency and BAPPSAE Municipality of Benevento Phases and timeframe Long term Financial resources To be found: Resources of the Bodies involved Expected results Setting up an integrated system for the wealth of knowledge and increasing it over time, in order to optimise management of the cultural heritage. Result indicators Number of sites monitored Frequency of monitoring

PROTECTION AND CONSERVATION PLAN Benevento site and buffer zone Objective 33 UPGRADING AND EXTENDING THE HUMAN RESOURCES INVOLVED IN CONSERVATION OF THE SITE

Project 33.1 Setting up a building school focussing on restoration as part of a restoration network Description Along with the processes of conserving and valorising the cultural assets in the city and territory, it is useful to launch actions to raise the level of knowledge of the operators of various kinds, involved in working on the cultural and environmental heritage. Professional training has become a necessity, both because it shortens learning time and because training enriches the tradition of new theoretical and practical knowledge required for technical and economic development. This does not relate only to operators, but also to middle and High-ranking technical personnel, which today are more and more important for correct, economic management of sites and companies. The building restoration school will implement the most useful cultural and professional connections - Universities, Superintendencies, and Local Bodies, at both a national and a European level. This training activity must concentrate on three goals: 1. Qualification of retrieval and restoration skills. 2. Qualification of complex operating tasks (operating and maintenance of operating machinery). 3. Qualification of normal trades (carpenters, blacksmiths, etc.) of which there is a numerical lack on the local market. The school may also promote the setting up of an Innovation Centre dedicated to research in the area of restoration of architectural assets, a network that can create virtual links between research centres at public bodies and university institutes, industry, and companies operating in the sector. The prime objective is to produce certifications that are valid throughout Europe for Small and Medium-Sized Businesses that work in the sector of restoring cultural assets. Parties involved Campania Regional Authority Municipality of Benevento Superintendency for Architectural Heritage in the provinces of Salerno, Avellino, and Benevento and BAPPSAE Superintendency of Caserta and Benevento.

151 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

Phases and timeframe by 2015 Financial resources Source to be obtained from POR FESR 2007-2013, POR FSE 2007-2013 Campania Regional Authority Expected results Creation of a reference structure for training specialised operators for the restoration sector. Result indicators Number of operators trained Number of bodies and companies involved in the network.

PROTECTION AND CONSERVATION PLAN Benevento site and buffer zone Objective 34 IMPROVING PREVENTION OF THE SEISMIC RISK IN THE ANCIENT CITY

Project 34.1 Drawing up a plan to mitigate the seismic risk Description In Benevento there have been seismic monitoring activities for the urban area with a view to studying the effects on the site since 2000, as part of the three-year GNDT (National Earthquake Defence Group) project “Traiano: Project for estimating and reducing the Vulnerability of the Built-up Environment”. The results of these surveys were generally positive in that they found an absence of phenomena of amplification of the seismic movement in the old city. On the other hand phenomena of amplification, and therefore of greater risk, were found in the Sabato River Valley and the south-western sector of the old city. The question of protecting areas that are characterised by human presence and the concentration of properties that are most vulnerable must be dealt with in terms of an overall organic framework that is first cognitive and then regulatory. For the second aspect, the plan is to draw up a plan to mitigate the risk that gives particular consideration to the old city. The action involves Drawing up a Plan, starting with a census of information on the seismic vulnerability of the historical buildings and architectural emergencies, to arrive at seismic micro-zoning and the identification of measures to mitigate and/or reduce the risk to people and assets. This action can be taken on completion of the activities carried out as a result of the Campania Regional Law N° 26/02 “Standards and incentives for valorising old cities in Campania and for cataloguing Environmental Assets of a landscape nature. Amendments to Regional Law N° 3 of 19th February 1996” especially for the activities of scheduling the urban heritage of the old city. Collaboration can be set up between Institutions and with Research Bodies (GNDT). Parties involved Municipality of Benevento Campania Regional Authority Benevento Provincial Authority Phases and timeframe Medium term: (2013) Financial resources To be found: Regional, state, and community financing for activities relating to protection against seismic risk Expected results Drawing up of seismic micro-zoning maps, directives, prescriptions, and operating instructions (technical disciplines for works to mitigate the risk). Result indicators Completion of the Plan

152 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Benevento site and buffer zone Objective 35 EXTENDING THE HUMAN RESOURCES INVOLVED IN SAFEGUARDING THE SITE

Project 35.1 Training courses in civil protection for cultural heritage Description The Benevento Municipality intends working with environmental associations at a national and international level, to implement training activities for volunteers for protecting cultural and environmental assets, with particular attention being given to the risks related to calamities (earthquakes, floods). Great public pressure often results in a risk of decay of the cultural assets spread around the centre of the cities. In addition to voluntary vandalism, it is often unawareness and incorrect use of assets that increases the risk of decay and damage. In these events the voluntary organisations and forces of law and order concentrate on dozens of aspects, but nobody looks at safeguarding cultural assets. One can think about forging conventions to make volunteers available for exceptional manifestations, for tasks of surveillance of strategic points and notifying the forces of law and order of acts of vandalism, dissuading and explaining to citizens the risks related to improper use of cultural assets, and to valorise and make people aware of the minor assets in the city. Training courses for safeguarding the cultural heritage against natural risks are made up of two types of activity: Making moveable assets safe and recording damage to immovable assets.

Parties involved Campania Regional Authority Municipality of Benevento Superintendency for Architectural Heritage in the provinces of Salerno, Avellino, and Benevento and BAPPSAE Superintendency of Caserta and Benevento. Phases and timeframe by 2015 Financial resources Funds to be found from POR FSE 2007-2013 Campania. Expected results Creation of a reference structure for training specialised operators for the restoration sector. Result indicators Number of volunteers trained

PROTECTION AND CONSERVATION PLAN Benevento territory Objective 36 IMPROVING THE STATE OF CONSERVATION OF THE LONGOBARD HERITAGE IN THE TERRITORY

Project 36.1 Programme for monitoring of the state of conservation of the archaeological areas along Via Sacra Langobardorum Description The Via Sacra Langobardorum is an ancient pilgrim’s route that, following the Appia Traianea, connects Benevento to the Sanctuary of St. Michael on Monte Sant'Angelo sul Gargano. The route along the “Via” is scattered with remains of votive chapels, xenodochia, and stopping places with wells. Over time, some of these places have become famous abbeys (like San Giovanni in Lamis in Puglia, now the Convent of San Matteo and San Leonardo of Siponto), others have been developed as urban centres (San Giovanni Rotondo and Monte Sant’Angelo). Ruins and scattered traces have been conserved pf others, and of some only the place name has survived, shown on old geographic maps. The project envisages the setting up of a monitoring service for monumental assets and archaeological areas for the purpose of both periodic maintenance of the same, and for surveillance for security purposes. This monitoring will take the form of video surveillance and periodic inspections of the sites by specialist personnel, the Superintendencies, and the Municipalities in whose territory the assets lie. Monitoring will be managed using a GIS system that will also make it possible to compare the state of conservation and evolution of the sites at various times. Parties involved Superintendencies Phases and timeframe Long term Financial resources To be found: Resources of the Bodies involved Expected results Setting up an integrated system for the wealth of knowledge and increasing it over time, in order to optimise management of the cultural heritage. Result indicators Number of sites monitored Frequency of monitoring

153

154 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo site Objective 37 HEIGHTENING OF THE STATE OF CONSERVATION OF THE SANCTUARY

Project 37.1 Project and intervention for the realisation of a system for the detection, control and correction of the rate of humidity in the locations of the Longobard Gallery, the adjoining rooms, the Angioina staircase, the cave-sanctuary and the connected rooms Description This regards intervening for stabilising the different rates of humidity found in the various internal areas of the sanctuary complex in order to allow the establishment of better environmental conditions for the conservation of the wall coverings on which there are inscriptions of every type and period, as well as the conservation of prestigious architectural elements and remains in stone kept within the Sanctuary. In particular the areas encompassed in the zone underneath the current floor of the cave, located in correspondence of the wall covering the north of the sanctuary, show phenomena of more advance degradation. It is necessary to intervene on the conservation in relation to degradation because of humidity and for the maintenance in full efficiency depending on the continuation of the archaeological digs in the area to which they pertain. Actions 1. Execution of specific surveys and analysis 2. Diagnosis of current general conditions of the rooms in relation to temperature and humidity 3. Project and intervention Parties involved Sanctuary of San Michele Arcangelo Superintendency for the BAPPSAE (architectural assets for the landscape and for historical heritage) of the Region of Puglia Municipality Monte Sant’Angelo Phases and timeframe By 2010. Financial resources Funds to be raised by the Municipality of Monte Sant’Angelo and the Superintendency BAPPSAE of the Region of Puglia. Expected results Stabilisation of temperature and rate of humidity inside the various rooms. Disappearance of mould and slurry Result indicators Mitigation of the vulnerability of the assets

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo site Objective 37 HEIGHTENING OF THE STATE OF CONSERVATION OF THE SANCTUARY

Project 37.2 Maintenance of external wall covering north side

Description The purpose of the intervention is to improve the state of conservation of a part of the north wall covering of the Sanctuary. This is the last lot of works already carried out using funds of the Jubilee 2000. This intervention does not lead to valorisations of a static nature and/or structural interventions but only of cleaning the surfaces and sealing the blocks with eventual replacement of degraded elements. Actions 1. Realisation of maintenance Parties involved The Superintendency BAPPSAE of the Region of Puglia Sanctuary of S. Michele Arcangelo Phases and timeframe Short term: by 2009. Financial resources Funds: Sanctuary of S. Michele Arcangelo. Expected results Elimination of the state of degradation.

CONSERVATION AND SAFEGUARDING PLAN Monte Sant’Angelo site Objective 37 HEIGHTENING OF THE STATE OF CONSERVATION OF THE SANCTUARY

Project 37.3 Planning and conservation of the bronze doors Description Intervention on the causes of alteration in the wooden parts and restoration of the full efficiency of the hinges. Moreover, it is necessary to clean the bronze panels and restore the ‘niellated’ images. Actions 1. Execution of analyses to verify the causes of alteration in wooden components 2. Diagnosis of the general conditions of the bronze components 3. Project and intervention Parties involved Sanctuary of San Michele Arcangelo

155 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

Municipality of Monte Sant’Angelo Superintendency BAPPSAE of the Region of Puglia Phases and timeframe By 2009. Financial resources Funds to be raised by the Municipality of Monte Sant’Angelo and the Superintendency BAPPSAE of the Region of Puglia. Expected results Elimination of the causes of alteration, recovery of full functionality of the doors, improvement in the visible condition of the bronze surface and niellated images. Result indicators Mitigation of the vulnerability of the asset.

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo site Objective 37 HEIGHTENING OF THE STATE OF CONSERVATION OF THE SANCTUARY

Project 37.4 Planning and intervention on the portcullis and the column of the upper atrium Description The objective is that of obtaining chromatic continuity and the same level of maintenance to the columns and the portcullis which delimit the upper atrium accessing the Basilica, respect to the octagonal bell tower and the facade of the Sanctuary on which there have been interventions quite recently. It will be necessary to proceed with sanding the stone surfaces, rebuilding the degraded blocks and reconstructing the iron elements missing in respect to their decorative typology. Actions 1. Project and intervention Parties involved Sanctuary of San Michele Arcangelo Superintendency for the BAPPSAE of the Region of Puglia. Municipality of Monte Sant’Angelo Phases and timeframe By 2010. Financial resources Sanctuary of San Michele Arcangelo Funds to be raised by the Municipality of Monte Sant’Angelo and the Superintendency BAPPSAE of the Region of Puglia. Expected results Recovery of visual uniformity of the upper atrium. Result indicators Maintenance of the conditions of visual balance of the atrium as whole.

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo site Objective 38 ELABORATION OF A MAINTENANCE PROGRAMME FOR THE SANCTUARY

Project 38.1 Completion of research on existing data on restorations carried out in the past and their arrangement (anamnesis) Description In order to set up a maintenance programme it is necessary to carry out an anamnesis of the status (of conservation) of the asset. A first step concerns the systematic collection of data relative to restorations carried out in the past to identify the problems there were over time and how they were solved (intervention techniques and materials used), this is also for describing parts of the building currently not measurable. Next to this it is necessary to identify and acquire all the studies and analyses made on the state of conservation of the asset to contribute to its correct definition. The whole of the data is to be archived in a computer using a specific dedicated programme. Actions 1. Completion of the research and acquisition of existing data 2. Memorisation of data through computer-based archiving Parties involved Municipality of Monte Sant’Angelo Sanctuary of San Michele Arcangelo Superintendency BAPPSAE of the Region of Puglia Phases and timeframe Starting from 2009. Financial resources Funds to be raised by the Municipality of Monte Sant’Angelo, the Superintendency BAPPSAE of the Region of Puglia and private sponsors. Expected results Completion and memorisation of the framework of knowledge on past restorations; preparation of tools and definition of procedures which allow maintenance to be programmed. Result indicators Number and quality of found and memorised data.

156 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo site Objective 38 ELABORATION OF A MAINTENANCE PROGRAMME FOR THE SANCTUARY

Project 38.2 Realisation of topical surveys finalised to the diagnostic project and analytical investigations Description The project foresees the realisation of topical surveys finalised at describing the state of conservation of the asset. This involves geometric surveys (metric survey); surveys on the materials used in the work and building techniques (descriptive survey and analytical investigations); surveys on restoration carried out in the past which have left a visible trace (stratigraphic analysis); surveys on the visible effects of degradation (survey of degradation and ruin and analytical surveys). The survey must be carried out using photogrammatic methods or laser Scanners for the geometrical part. All renderings will be in vectorial or digital format. Actions 1. Survey project 2. Realisation of geo-referenced metric surveys (see Knowledge Plan) with relative return in vectorial and digital format. 3. Stratigraphic analysis of elevations to identify past restorations 4. Survey and description of materials and constructive-executive techniques 5. Survey on the forms of degradation 6. In-depth examination of specific analytical investigations for categorising the materials and forms of degradation present 7. Return of the data on topical documents and description of the state of conservation. Parties involved Sanctuary of San Michele Arcangelo Municipality of Monte Sant’Angelo Superintendency BAPPSAE of the Region of Puglia Phases and timeframe Actions 1.1 and 1.2: by 2009. Actions 1.3-1.7: by 2010. Financial resources Funds to be raised by: Sanctuary of San Michele, Municipality of Monte Sant’Angelo, Superintendency BAPPSAE Region of Puglia, Private sponsors. Expected results Prepare a set of precise topical surveys, as complete as possible, and renderings in paper and digital format, useful for monitoring the asset and setting up the programmed maintenance plan. Result indicators Number and quality of data found and memorised.

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo site Objective 38 ELABORATION OF A MAINTENANCE PROGRAMME FOR THE SANCTUARY

Project 38.3 Maintenance programme and start-up of cycle of interventions

Description The Sanctuary is made up of a complex of buildings realised in different phases, built around the central fulcrum constituted by the cave. Their formulation and stratification imposes intervals of monitoring on the static hold of supporting structural elements, to be carried out using suitable tools, in order to prevent the occurrence of critical conditions following possible seismic events. Planning the monitoring will allow each structural component to be kept under control continuously over time. The data will be collected and memorised also on a computer and managed in order to consent the planning of conservation in short times. Moreover, the chalkstone which constitutes the predominant building material of the sanctuary is subject to disintegration in some parts. This process constitutes one of the main threats to the site above all in relation to the documentary value of the inscriptions on the walls. Already in the past, even if without much success, the owner of the candidate asset intervened to reduce this phenomenon. Now a more careful mapping of the area of risk is imposed together with the search for technological solutions in order to preserve this heritage. On the basis of surveys made, the plan is to set up a maintenance programme which allows the identification of priorities for intervention and actuation times. The objective is to realise maintenance even for small lots, but continuous over time. Actions 1. Mapping of the structures to undergo systematic monitoring

157 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

2. Planning of interventions of: instrumental verification of the static hold of supporting structures; detailed verification of the degree of conservation of the buildings; identification of critical points 3. Plan for monitoring the degree of erosion and degree of efficiency of adopted actions 4. Collection and management of data. 5. Planning of conservation and/or consolidation 6. Identification of priorities of intervention and definition of the overall programme 7. Start up of the first maintenance cycle. Parties involved Sanctuary of San Michele Arcangelo Municipality of Monte Sant’Angelo Superintendency BAPPSAE Region of Puglia Phases and timeframe Starting from 2009 onwards Financial resources Funds to be raised by: Municipality of Monte Sant’Angelo, Superintendency BAPPSAE of the Region of Puglia, Private sponsors. Expected results Preparation of the maintenance programme with identification of the interventions to be realised, times and relative checks. Result indicators Mitigation of the vulnerability of the asset.

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo site Objective 38 ELABORATION OF A MAINTENANCE PROGRAMME FOR THE SANCTUARY

Project 38.4 Planning and implementation of a data bank for monitoring the state of conservation and archiving of past and current restorations Description This concerns a specific computer programme which will allow archiving, management and correlation of data relative to restorations carried out in the Sanctuary over time, including those that will be realised in the future. Reference is made to historical data relative to the phases of construction and transformation of the structures of the Sanctuary over time; the historical data relative to restoration carried out to document materials, technique, times and phases of realisation; metric surveys, descriptive surveys, stratigraphic analyses, surveys on degradation, analytical investigations, etc. The purpose is to correlate data originating from different phases and sources of knowledge to allow both the implementation of knowledge of the Sanctuary in itself and to describe the state of conservation of the materials on which to set up the maintenance programme. This data bank can be realised as a common tool shared all over the network. Actions 1. Designing the computer system 2. Insertion and implementation of data Parties involved Sanctuary of San Michele Arcangelo Municipality of Monte Sant’Angelo Superintendency BAPPSAE of the Region of Puglia Centres specialised in Categorisation and Restoration, to be identified Phases and timeframe Medium term: starting from 2009 onwards. Financial resources Funds to be raised by: Sanctuary of San Michele, Municipality of Monte Sant’Angelo, Superintendency BAPPSAE of Puglia, Private sponsors. Expected results Preparation of memorised data on the state of conservation of the Sanctuary; Preparation of a cognitive base to realise the maintenance programme and implement knowledge on past restorations. Result indicators Quantity of data inserted into the data bank.

158 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo site Objective 38 ELABORATION OF A MAINTENANCE PROGRAMME FOR THE SANCTUARY

Project 38.5 Maintenance interventions on frescos and tombstones in the sanctuary Description During the progress of digs and restoration of the sanctuary carried out from 1950 to the end of the 60s, some frescos were detached from the walls. The project foresees the verification of the state of conservation of the materials used for realising the support of the frescos and the conditions of the pictorial film; on this data it will be possible to plan eventual maintenance in predictions of their exposure in the museum of the Sanctuary. The same verification will be made on the frescos still on the site and present in various points of the Sanctuary buildings and on the lapidus and tombstone remains, the latter are conserved in lapidus museum of the Sanctuary. Actions 1. Verification of the state of conservation of the detached frescos and lapidus elements 2. Intervention Parties involved Sanctuary of San Michele Arcangelo Superintendency BAPPSAE of Puglia Municipality of Monte Sant’Angelo Phases and timeframe Starting from 2009 onwards. Financial resources Funds to be raised by: Sanctuary of San Michele Arcangelo, Municipality of Monte Sant’Angelo, Superintendency BAPPSAE, Private sponsor. Expected results Improvement of the state of conservation of assets. Result indicators Mitigation of the vulnerability of the asset.

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo site Objective 38 ELABORATION OF A MAINTENANCE PROGRAMME FOR THE SANCTUARY

Project 38.6 Monitoring and conservation plan of the inscriptions on the wall structures, internal and external Description After the digs uncovered locations of the Longobard era, dedicatory and Runic inscriptions of inestimable documentary value were discovered on the most ancient walls which constitute the most wide and important corpus of medieval inscriptions. All the structures of the sanctuary are characterised by the presence of true inscription programmes and symbols scratched onto the stone. The necessity to take every precaution for documentary survey and conservation of these inscriptions therefore imposes the activation of an effective monitoring system for the retaining wall surfaces, subjected to different environmental conditions according to their location. It is also necessary to make casts of the most important inscriptions in order to ensure secure evidence. Actions 1. Verification of the state of conservation of the inscriptions and the wall structures on which they lie. 2. Execution of detailed surveys and casts. 3. Protection Parties involved Sanctuary of San Michele Arcangelo Superintendency BAPPSAE of Puglia Municipality of Monte Sant’Angelo Phases and timeframe Starting from 2009 onwards Financial resources Funds to be raised by: Sanctuary of San Michele Arcangelo, Municipality of Monte Sant’Angelo, Superintendency BAPPSAE, Private sponsors. Expected results Survey and detailed categorisation of all the inscriptions and improvement of their state of conservation. Result indicators Mitigation of the vulnerability of the inscriptions.

159 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo site Objective 38 ELABORATION OF A MAINTENANCE PROGRAMME FOR THE SANCTUARY

Project 38.7 Maintenance plan for the wood choir Description Recently restored, the wooden coir of the Sanctuary requires regular monitoring in order to prevent further degradation. Actions 1. Monitoring of wooden elements 2. Planning of interventions 3. Interventions Parties involved Sanctuary of San Michele Arcangelo Superintendency BAPPSAE of Puglia Municipality of Monte Sant’Angelo Phases and timeframe Starting from 2010 onwards. Financial resources Funds to be raised by: Sanctuary of San Michele Arcangelo, Municipality of Monte Sant’Angelo, Superintendency BAPPSAE, Private sponsors. Expected results Form on the vulnerability of the wooden structures of the chancel. Result indicators Mitigation of the vulnerability of the chancel.

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo site Objective 39 ELABORATION OF MAINTENANCE PROGRAMME ON THE STRUCTURES ANNEXED TO THE SANCTUARY

Project 39.1 Research on existing data on past restorations and computer-based memorisation of the same Description The complex of the Sanctuary includes a series of minor buildings dedicated to cult and not. These are the: a) CHURCH MADONNA DELLA LIBERA b) CHAPEL DI S. LUCIA c) CHAPEL DI S. ROCCO d) MONASTERY e) EX ORPHANAGE ROOMS The current state of conservation of these buildings is generally good. Recent maintenance carried out during works for the 2000 Jubilee have also determined the solution of some structural criticalities which still require careful monitoring and consequent planning of conservation. The maintenance programme should follow the anamnesis of the state (of conservation) of the considered buildings. This will lead to the systematic collection of data relative to past restorations to identify which problems came up over time and how they were solved (techniques of intervention and materials used), also to contribute to the description of parts of the buildings which cannot be surveyed. In parallel, it is necessary to identify and acquire all the study-analysis carried out on the state of conservation of the asset to contribute to its correct definition. The set of data must be archived on a computer using a specific dedicated programme. These are the same actions programmed for the Sanctuary and explained in Objective 2. Actions 1. Completion of research and acquisition of existing data 2. Memorisation of data through computer-based archiving Parties involved Sanctuary of San Michele Arcangelo Superintendency BAPPSAE of Puglia Municipality of Monte Sant’Angelo. Phases and timeframe Starting from 2010 onwards Financial resources Funds to be raised by: Sanctuary of San Michele Arcangelo, Municipality of Monte Sant’Angelo, Superintendency BAPPSAE, Private sponsors. Expected results Completion and memorisation of the framework of knowledge on past restorations; preparation of tools and definition of procedures which allow programming of maintenance. Result indicators Number and quality if data found and memorisation.

160 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo site Objective 39 ELABORATION OF A MAINTENANCE PROGRAMMED FOR THE ANNEXES TO THE SANCTUARY

Project 39.2 Realisation of topical surveys finalised to the diagnostic project and analytical survey and project of intervention Description The project foresees the realisation of topical surveys finalised at describing the state of conservation of the buildings annexed to the sanctuary. This involves geometric surveys (metric survey); surveys on the materials used in the work and building techniques (descriptive survey and analytical investigations); surveys on restoration carried out in the past which have left a visible trace (stratigraphic analysis); surveys on the visible effects of degradation (survey of degradation and ruin and analytical surveys). The survey must be carried out using photogrammatic methods or laser Scanners for the geometrical part. All renderings will be in vectorial or digital format. Actions 1. Survey project 2. Realisation of geo-referenced metric surveys (see Knowledge Plan) with relative return in vectorial and digital format. 3. Stratigraphic analysis of elevations to identify past restorations 4. Survey and description of materials and constructive-executive techniques 5. Survey on the forms of degradation 6. In-depth examination of specific analytical investigations for categorising the materials and forms of degradation present 7. Return of the data on topical documents and description of the state of conservation. Parties involved Sanctuary of San Michele Arcangelo Municipality of Monte Sant’Angelo Superintendency BAPPSAE of the Region of Puglia Phases and timeframe Actions 1.1 and 1.2: by 2009. Actions 1.3-1.7: by 2010. Financial resources Funds to be raised by: Sanctuary of San Michele, Municipality of Monte Sant’Angelo, Superintendency BAPPSAE Region of Puglia, Private sponsors. Expected results Prepare a set of precise topical surveys, as complete as possible, and renderings in paper and digital format. Result indicators Number and quality of data found and memorised.

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo site Objective 39 ELABORATION OF A MAINTENANCE PROGRAMME FOR THE ANNEXES TO THE SANCTUARY

Project 39.3 Maintenance and start-up programme of the first cycle of interventions Description On the basis of surveys carried out, a maintenance programme will be set up for all the buildings annexed to the Sanctuary, which allows the identification of the priority of intervention and actuation times. The objective is to realise maintenance even for small lots, but continuous over time. Actions 1. Identification of priorities of intervention and definition of the overall programme 2. Start up of the first maintenance cycle Parties involved Sanctuary of San Michele Arcangelo Municipality of Monte Sant’Angelo Superintendency BAPPSAE Region of Puglia Phases and timeframe Starting from 2010 onwards Financial resources Funds to be raised by: Municipality of Monte Sant’Angelo, Superintendency BAPPSAE of the Region of Puglia, Private sponsors. Expected results Preparation of the maintenance programme and identification of the interventions to be realise with times and relative checks. Result indicators Mitigation of the vulnerability of the site.

161 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo buffer zone Objective 40 IMPROVE THE STATE OF CONSERVATION OF THE NORMAN WALL BELT

Project 40.1 Maintenance on the visible parts of the wall circle to implement knowledge and use of the same Description Little evidence remains of the ancient wall belt which, due to its location and state of conservation, makes valorisation difficult with the exception of the largest block to the south of the monastic complex of S. Francesco. The current state of conservation does not required interventions of a static and/or structural nature but only of cleaning the surfaces and sealing the blocks with eventual replacement of degraded elements with the dual purpose of implementing knowledge of it and how to use this circuit. Actions 1. Identification of the visible parts and total planning of interventions on the entire wall circuit 2. Survey on the state of conservation and relative maintenance Parties involved Municipality of Monte Sant’Angelo Superintendency for BAPPSAE of the Region of Puglia Phases and timeframe By 2010. Financial resources Municipality of Monte Sant’Angelo Mountain Community of Gargano Expected results Increase in the parts of the urban circle which are visible and removal of the state of degradation. Result indicators Increase in the extension of the parts of requalified walls.

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo buffer zone Objective 41 ENSURE THE STATE OF CONSERVATION OF SAN PIETRO - TOMBA DI ROTARI – SANTA MARIA MAGGIORE THE COMPLEX

Project 41.1 Monitoring and programmed maintenance plan Description The current state of conservation can be considered as good, also in consideration of recent conservation, still in progress, by the Superintendency of Puglia. The preset objective is to prepare an effective monitoring plan, also in relation to the conservation of decorative stone elements which characterise the complex. The monitoring plan will be realised based on a databank into which they will be collected and implemented: a) all data on interventions done and in progress by the Superintendency, b) the topical surveys finalised at describing the state of conservation of the asset (metric surveys with photogrammatic or laser scanner techniques, surveys on the material used in the work and building techniques; survey on past restoration which have left visible traces; surveys on the visible effects of degradation. Actions 1. Survey project 2. Realisation of georeferenced surveys (see Knowledge Plan) with relative return in vectorial and digital format. 3. Stratigraphic analysis of the elevations to identify past restorations 4. Survey and description of material and construction-execution techniques 5. Survey of forms of degradation 6. In-depth examination of specific analytical investigations for categorising the materials and forms of degradation present 7. Return of the data on topical documents and description of the state of conservation 8. Formation of databank of restorations 9. Elaboration of monitoring plan Parties involved Sanctuary of San Michele Arcangelo Parish S. Maria Maggiore Superintendency BAPPSAE of Puglia Municipality of Monte Sant’Angelo Phases and timeframe Actions 1.1 and 1.2: by 2009. Actions 1.3-1.8: by 2010. Action 1.9 to follow Financial resources Funds to be raised by: Sanctuary of S. Michele Arcangelo, Municipality of Monte Sant’Angelo,

162 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

National Park of Gargano, Superintendency BAPPSAE Region of Puglia, Private sponsors. Expected results Elaboration of monitoring plan and programmed maintenance Result indicators Number and data acquired and memorised Elaboration of topical maps for monitoring Planning aimed at future interventions

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo buffer zone Objective 42 COMPLETION OF THE CASTLE RESTORATION PROJECT

Project 42.1 Completion of the restoration project for the castle Description The castle, subject of restoration and consolidation work in the past, is now undergoing restoration. The main guide lines consist of conservative restoration of the east and west towers and the southern prospect; new definition of quota of utilisation of the “Piazza d’Armi”; restoration of the areas situated at + 9.50m; and finally, the external arrangement. Actions 1. Completion of the restoration project Parties involved Superintendency BAPPSAE of Puglia Municipality of Monte Sant’Angelo Phases and timeframe By 2010. Financial resources Funds existent originating from the Region of Puglia. Expected results Improvement in the conditions of conservation and use. Result indicators Number and quality of interventions carried out.

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo buffer zone Objective 42 COMPLETION OF THE CASTLE RESTORATION PROJECT

Project 42.2 Elaboration of a programmatic maintenance and conservation plan Description On the basis of acquired data, a maintenance programme will be set up which allows the identification of the priority of intervention and actuation times. The objective is to realise maintenance even for small lots, but continuous over time. Actions 1. Identification of the priorities of intervention and definition of the overall programme Parties involved Superintendency BAPPSAE of Puglia Municipality of Monte Sant’Angelo Phases and timeframe By 2010. Financial resources Funds to be raised by: Sanctuary of S. Michele Arcangelo, Municipality of Monte Sant’Angelo, Gargano National Park, Superintendency BAPPSAE Region of Puglia, Private sponsors. Expected results Programming of maintenance interventions to be realised with the times and relative controls. Result indicators Number and quality of interventions carried out.

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo buffer zone Objective 43 MAINTENANCE AND RESTORATION OF THE CHURCHES AND THE MONASTIC COMPLEXES OF THE HISTORICAL CENTRE

Project 43.1 Verification of property and restoration of public use of the churches of: San Salvatore, Santa Apollinare, Eremo di S. Aniello Description All the routes trodden by the travelling pilgrims towards the cave of Arcangelo were scattered with hermitages, hostess, monasteries, hospitals, xenodocheions, cells, priories, rock churches and abbeys which played the part of intermediate stops for rest and prayer. The presence of these places became even more common near to the Sanctuary, within the wall belt, where still today there are various religious settlements of different sizes and importance. Among the minor settlements are those listed. Their dedication is often a reminder of saints

163 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

visiting this place (St. Aniello); in other cases it is an indication of cult in the first phase of Christianity. In the case of St. Salvatore, some scholars hypothesise its dating to the Longobard period and consider it to be the last testimonial of a Longobard Palatium which was during the course of later transformations of the places over the centuries. Given that these assets are private property, verification of ownership is required to consent the actuation of private/public participate formulae for recovery and use. Actions 1. Identification of ownership 2. Elaboration of public/private participate formulae for recovery and use Parties involved Municipality of Monte Sant’Angelo Superintendency for BAPPSAE of the Region of Puglia Phases and timeframe By 2009. Financial resources Municipality of Monte Sant’Angelo Expected results Realise the possibility of intervention and recovery Result indicators Number of agreements realised

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo buffer zone Objective 43 MAINTENANCE AND RESTORATION OF THE CHURCHES AND THE MONASTIC COMPLEXES OF THE HISTORICAL CENTRE

Project 43.2 Elaboration of a programme of interventions for the conservation and valorisation of the assets Description The project foresees the realisation of topical surveys finalised to describing the state of conservation of the churches and monastic complexes of the historical centre: Church of S. Salvatore, Santa Apollinare, Hermitage of S. Aniello and monastic complexes of the Cappuccini with annex to the church of S.S. Sacramento and the complex of Clarisse with annexed Church S.S. Trinità’. This involves geometric surveys (metric survey); surveys on the materials used in the work and building techniques (descriptive survey and analytical investigations); surveys on restoration carried out in the past which have left a visible trace (stratigraphic analysis); surveys on the visible effects of degradation (survey of degradation and ruin and analytical surveys). The survey must be carried out using photogrammatic methods or laser Scanners for the geometrical part. All renderings will be in vectorial or digital format. On the basis of the data acquired, a programme of conservation and maintenance will be set up which allows the identification of priorities of intervention and actuation times. The objective is that of realising maintenance interventions even for small lots, but continuous over time. Actions 1. Realisation of topical surveys finalised to the diagnostic project and analytical investigations 2. Elaboration of the programme of conservative interventions and identification of the priorities of intervention Parties involved Municipality of Monte Sant’Angelo Superintendency BAPPSAE of the Region of Puglia Phases and timeframe By 2012. Financial resources Funds to be raised by: Municipality of Monte Sant’Angelo, Gargano National Park, Superintendency BAPPSAE Region of Puglia, Private sponsors. Furthermore, for the monastic complexes: Sanctuary of San Michele Arcangelo Parish S. Maria Maggiore Archbishop’s administration. Expected results Preparation of the maintenance programme with identification of interventions to be realised, times and relative checks. Result indicators Number and quality of data found and memorised Number of interventions of conservation and maintenance planned.

164 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo buffer zone Objective 44 IMPROVE THE STATE OF CONSERVATION OF THE SAN FRANCESCO COMPLEX

Project 44.1 Completion of the cognitive phase introductory to the completion of the restoration in progress with the realisation of topical surveys and analytical investigations Description The project foresees the realisation of topical surveys finalised at describing the state of conservation of the Complex of San Francesco, including the Church, the Monastery and the Museum of art and popular traditions. This involves geometric surveys (metric survey); surveys on the materials used in the work and building techniques (descriptive survey and analytical investigations); surveys on restoration carried out in the past which have left a visible trace (stratigraphic analysis); surveys on the visible effects of degradation (survey of degradation and ruin and analytical surveys). The survey must be carried out using photogrammatic methods or laser Scanners for the geometrical part. All renderings will be in vectorial or digital format. Actions 1. Realisation of topical surveys finalised to the diagnostic project and analytical investigations Parties involved Archbishop ‘s administration Parish S. Francesco Superintendency BAPPSAE of Puglia Municipality of Monte Sant’Angelo Phases and timeframe Starting from 2008 onwards. Financial resources Funds to be raised by: Archbishop ‘s administration, Municipality of Monte Sant’Angelo, Superintendency BAPPSAE Region of Puglia, Private sponsors. Expected results Prepare a set of precision topical surveys as complete as possible and renderings in paper and digital format. Result indicators Number and quality of data found and memorised.

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo buffer zone Objective 44 IMPROVE THE STATE OF CONSERVATION OF THE SAN FRANCESCO COMPLEX

Project 44.2 Completion of the restoration project Description The project currently in progress is finalised to the definitive recovery of all the area of the complex for the optimisation and increased use of the asset in relation to the destined usages already present therein. The church is currently the subject of consolidation of the retaining structures, financed by the municipality of Monte Sant’Angelo. Among the main objectives is the recovery of the east wing of the complex and the restoration of the bell tower, up to now excluded from the interventions of restoration in progress. Actions 1. Structural planning of the bell tower and recovery of the east wing 2. Intervention Parties involved Sanctuary of San Michele Arcangelo Parish S. Maria Maggiore Archbishop ‘s administration Superintendency BAPPSAE of Puglia Municipality of Monte Sant’Angelo Phases and timeframe Starting from 2008 onwards. Financial resources Funds to be raised by: Archbishop ‘s administration, Municipality of Monte Sant’Angelo, Gargano National Park, Superintendency BAPPSAE Region of Puglia, Private sponsors. Expected results Improvement in conditions of conservation Result indicators Mitigation of the vulnerability of the asset.

165 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo buffer zone Objective 44 IMPROVE THE STATE OF CONSERVATION OF THE SAN FRANCESCO COMPLEX

Project 44.3 Elaboration of a programmatic maintenance plan Description On the basis of acquired data, a maintenance programme will be set up which allows the identification of the priority of intervention and actuation times. The objective is to realise maintenance even for small lots, but continuous over time. Actions 1. Identification of the priorities of intervention and definition of the overall programme Parties involved Archbishop ‘s administration parish S. Francesco Superintendency BAPPSAE of Puglia Municipality of Monte Sant’Angelo Phases and timeframe 2013 onwards. Financial resources Funds to be raised by: Archbishop ‘s administration, Municipality of Monte Sant’Angelo, Superintendency BAPPSAE Region of Puglia, Private sponsors. Expected results Programming of the interventions effective over time. Result indicators Number and quality of interventions carried out.

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo buffer zone Objective 45 HEIGHTENING OF THE STATE OF CONSERVATION OF THE URBAN FABRIC IN THE HISTORICAL CENTRE

Project 45.1 Study and programming of forms of support for the owners of the private properties to incentivate the recovery and maintenance in good efficiency of the properties and traditional fixtures in line with the technical norms of actuation in force Description Taking into account that are already in force the norms for landscape protection and specific technical norms of actuation to guarantee safeguarding the historical centre with particular attention to the characteristic fixtures and constructive and architectural elements, following the success of the initiative promoted by the Gargano National Park, a few years ago, by virtue of which numerous non-conform fixtures were replaced, the intention is to study forms of direct intervention for private owners of properties in zone A1, in order to give a concrete motivation for the total recovery of non-conform situations currently in existence. The idea is to activate, in concert with the other Bodies, methods of economic sustenance for private owners which are “structural”, or continuous over time, to consent recovery despite the yearly financial statement of the involved Bodies. In particular it will be necessary on one side to study forms of tax cut on the part of the Municipality, from the other attempt to build a common economic fund among various Bodies which they tap into for supporting private initiatives. Actions 1. Study of forms of tax cut 2. Co-ordination among the Bodies for the construction of the common fund for recovering private properties in the historical centre 3. Actuation Parties involved Municipality of Monte Sant’Angelo Gargano National Park Body Mountain Community of Gargano other territorial Bodies Phases and timeframe 2009 onwards. Financial resources Funds to be raised: Municipality of Monte Sant’Angelo, Gargano National Park Body Mountain Community of Gargano Other territorial Bodies. Expected results Sensitisation of private owners and recovery of situations of degradation. Result indicators Mitigation of the state of degradation and improvement of the general facies generale of the historical centre.

166 8.2 PROTECTION AND CONSERVATION PLAN DETAILED SCHEDULES

PROTECTION AND CONSERVATION PLAN Monte Sant’Angelo buffer zone Objective 45 HEIGHTENING OF THE STATE OF CONSERVATION OF THE URBAN FABRIC IN THE HISTORICAL CENTRE

Project 45.2 Optimisation of controls and new interventions to guarantee the observance of the norms for protecting and safeguarding the historical centre Description Intervention is foreseen on all the recent renovations carried out by private owners on the properties in zone A1 in which the norms in force are not expected. In particular, the intent is to intervene in a short time with adequate administrative actions (ordinance of removal), to order the replacement of non-conform roofing layers and the recovery of the colour white on all the prospects of the private buildings. With regard to this, the Drawing Office of the Municipality has already carried out a punctual photographic survey and has prepared the ordinances for the restoration of the roofing system using curved and Roman tiles according to that established by the technical norms. Actions 1. Punctual completion of the photographic survey of Zone A1 2. Notification of prepared ordinances 3. Control of the compliance of the same 4. Activation of new procedures in the cases of non-compliance (emission of ordinances for the removal of each architectural element and finishing material with the recovery of the status of the locations). Parties involved Municipality of Monte Sant’Angelo Phases and timeframe 2009 onwards Financial resources Municipality of Monte Sant’Angelo Expected results Re-establishment of the uniformity of the general vision of the historical centre. Result indicators Improvement of the general facies of the historical centre.

167

168 8.3 ENHANCEMENT PLAN that foresees the redistribution of history and the structuring that they some artefacts according to the gave to the Territory. specific nature of the various 8.3.1 NETWORK exhibition sites (the Archaeological 8.3.3 BRESCIA Museum, The Christian Museum and Site, buffer zone and Territory A more far-reaching valorisation of Duomo’s Treasure) – is in fact based the traces of Lombard civilisation and on two main projects: the The monastery of San Salvatore- culture within the network and, more organisation of the visiting system at Santa Giulia presents high standards generally, in Italy and Europe will be the Cividale site heritage by creating a of valorisation, thanks to its recent attempted by creating greater single ticket that allows the total recuperation and its destine as a coordination and a closer relationship rationalisation and management of museum. In relation to the cultural between the places in the network tourist flows; the creation of the new and tourist offer moreover, it plays a and the other Lombard sites of “Tempietto and Monastery Museum”, leading part and is constantly present interest that fall within the planned as part of the upgrading of in the actions and objectives of the programme for extending the network the Monastery of Santa Maria in Valle. administration of the Municipality of to other Italian sites and those in the Upgrading of the Monastery also Brescia. Lastly, the comments and Geo-Cultural corridor of Lombard foresees the creation of new links suggestions of the thousands of migration from Northern Europe to between the Monastery itself, the visitors who regularly visit the site Italy. Longobard Tempietto and the city of contribute to an effective identification In addition to furthering relations due Cividale by means of designing more of the most suitable actions to take to activities for extending common connection routes between the sites, for a continuous increase in the knowledge (see Knowledge Plan), it thus increasing the role of this part of present standards. will be possible to facilitate diffusion the town – and the Tempietto – within The next recovery of the near of the value of these sites and extend the context of the entire monumental area will guarantee the knowledge about role the Lombards centre. Moreover, the Monastery, same standards achieved by had in the formation of Italian and thanks to the wealth and quality of the monastery also in this zone; the European culture. spaces contained therein, is suited to objective of the enhancement Connections between the various becoming both a "museum of itself" intervention being carried out at the sites can be forged by creating routes and a reference place for the entire moment is that of creating one and itineraries, which must be town, with the creation of a Visitors' organic complex without interruption promoted in various ways: bulletin Centre and the setting up of a Multi- between the Museum of the town and boards, publications, illustrative function Cultural Centre that will entail the archaeological area. brochures, etc – which help to various levels of interest and use, In the buffer zone there are understand how the events of the such as the Archives and Document interventions of considerable capacity Longobards can be followed over a Centre, the International Early middle in progress, above all regarding the large area and can constitute a guide ages Art and Architecture Research recovery and valorisation of for visits and more detailed discovery and Document Centre and an numerous historical buildings, among by all. This applies particularly to the Archaeo-osteological Archive which palaces and churches rich in monasteries that represent the points Laboratory. works of art. of greatest interest and where the With regards to the buffer zone, the With regard to the Territory, priority most important traces of the main projects are aimed at: has been given to the objective of Lombard period are conserved. · Creating thematic visiting routes making the numerous contexts which for the walls and the churches, recently emerged during 8.3.2 CIVIDALE DEL FRIULI with preparation of suitable archaeological survey campaigns Site, buffer zone and Territory educational material; usable through valorisation; suitable · Creating panoramic routes along showcase sites will also be identified The main goals for improvement of the banks of the Natisone river for the numerous findings, in some the heritage of Cividale included in the expanding relations between cases in the Museums already candidacy are: natural spaces and monuments; present in the territory, in other cases · Creating a coordination system · continuing to improve the to be designed from scratch. for the entire museum offer; quality of spaces in the · Upgrading the Monastery of Historical city centre. 8.3.4 CASTELSEPRIO-TORBA Santa Maria in Valle and The visiting itineraries to be promoted Site, buffer zone and Territory strengthen the role of the in various ways, publications, Longobard Tempietto in the city illustrative brochures etc, are also In view of better co-ordinating the and in the tourist route system; planned for the Territory in order to valorization activities performed in the · Improve possibilities for the use improve the results of the various whole Territory of Castelseprio and and presentation of the studies carried out in recent years Torba (as per the institutional archaeological area of and to make the presence of the agreement undersigned by the Patriarchal Palace. Longobard culture understandable, in managing bodies), the area will be re- These three goals are linked to each both its specific aspects but also in unified also physically by opening up other. The creation of a coordination order to enhance the settlement a new trail connecting the remains on system for the entire museum offer – the summit plateau with the buildings 169 in the valley. An expanded cultural small information point and city, which can coincide with the offer and the enhanced availability of book shop; boundaries of the old city or could touring arrangements are also · Improvement of the presentation extend to areas in the Samnite envisaged. of the Clitunno Tempietto with hinterland and a vast territorial area. The most important valorization the placement of some initiative as for the Castelseprio illustrative educational panels 8.3.8 MONTE SANT’ANGELO Archaeological Park (including the and a copy of the monumental Site, buffer zone and Territory upper castrum and the church of St. inscription that is now in Maria foris portas) consists in Perugia; The main objectives of the completing layout and opening to the · Increase of the Tempietto’s role enhancement of the candidate site public (2009) of the Antiquarium, in relation to the Clitunno river are: located in the former monastery of and the ancient Via Flaminia. · Optimise the museum system San Giovanni with the explanation The Municipality of Campello is inside the Sanctuary (Lapidus panels upgraded by including multi- working on a project for this very Museum and Devotional language texts and pictures on the purpose that will allow the monument Museum) through the realisation monuments. area to be expanded, including the a new museum set-up and the Enhanced qualification and route of the ancient Via Flaminia, creation of a new independent valorization initiatives are also which is now of local value, owned by internal route. This objective has envisaged for the Torba complex in and the responsibility of the the purposes of decongesting order to make it more easily Municipality; this means that the the Angoine staircase and accessible by creating new enclosed area can be equipped with determining a notable increase explanation panels for educational better facilities. in the potential capacity of and popularization purposes. accommodation of the sanctorial As for the surrounding Territory, a 8.3.7 BENEVENTO complex. link will be created between the Site, buffer zone and Territory · In-depth of archaeological individual historical, monumental and investigations in the external archaeological components as related The uniqueness of the city that results area to the north of the to the presence of Longobards in the from its layers of thousands of years Sanctuary and its Giudicaria of Seprio. is the starting point for highlighting museumification. action in Benevento. These actions · Ordinary, extraordinary 8.3.5SPOLETO are based on the usefulness of maintenance and Site, buffer zone and Territory enhancement its heritage, principally refunctionalisation of the spaces archaeological and historical, and currently available not in use One of the main preoccupations of associating it with the services next to the Sanctuary. the administrative strategy should available that are directly related, such The three objectives are connected concern, other than the preservation as extending the local museum between them as they aim at and enhancement of its architectural, system and extending the optimising the capacity of the artistic and environmental assets, relationships between the city’s museum offer equipping the also the possibility of making it plentiful archaeology and the urban Sanctuary with new spaces. functional for its local population and functions of everyday life. As far as the buffer zone is visitors, so as to assert the idea of a The objectives of the Plan are: concerned, the main projects are living, shared, and fertile culture. · To coordinate management of finalised at: Hence, there is a need not only for the assets in the site. · Realising topical visiting routes enhancement, restoration, and · To extend museum activity to the walls and churches with expansion of the already existing · To valorise the urban the preparation of opportune libraries, archives, museums, archaeological heritage didactic devices; theatres, parks, villas, gardens and · To improve redevelopment of · Continue to improve the quality historic homes, but also for the ancient city of the areas in the Historical promoting initiatives aimed at · To extend museum activity centre. opening these places to the public, · To valorise the territory’s The visiting itineraries, to be and turning them into cultural archaeological heritage promoted in different forms of centers, albeit in the respect of · To valorise the Longobard publication, explanatory brochures specific rules and regulations. cultural heritage etc, are foreseen for the Territory as · To extend services to those well in order to valorise the results of 8.3.6 CAMPELLO SUL CLITUNNO visiting the site the numerous research carried out Site, buffer zone and Territory The Enhancement Plan for Benevento above all in recent years and to highlights the need to take direct and distribute knowledge of the Via Sacra The aims of the Enhancement Plan indirect action on the widespread Langobardorum which has regarding the site and its pertaining quality of a large portion of the old contributed to the structuring of the Territory are to: city, with a view to social and Territory. · Improve the usability of the area environmental sustainability. Many by expanding the service actions simultaneously involve the offered, with the creation of a buffer zone and a larger portion of the 170 8.6.3 ENHANCEMENT PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

NETWORK 1 1.1 EXTENDING RELATIONS BETWEEN Creation of “Longobard Itineraries”: LOCATIONS IN THE NETWORK Places of Worship – Necropolises – AND OTHER ITALIAN LONGOBARD Settlements SITES 1.2

Creation of a network of “Longobard Monasteries in Italy” 2 2.1 EXTENDING RELATIONS Creation of theme itineraries: “Routes BETWEEN LOCATIONS of Longobard origins and civilisation" IN THE NETWORK AND THE EUROPEAN GEO-CULTURAL CORRIDOR

CIVIDALE 3 3.1 DEL FRIULI UPGRADING OF MONASTERY Implementation of preparatory phases SITE OF SANTA MARIA IN VALLE of the restoring of the Monastery to be AND INCREASE IN DEGREE usable as a Visitors’ centre and Cultural OF ENHANCEMENT Centre OF THE LONGOBARD TEMPIETTO 3.2 Improvement work on the Longobard Tempietto 3.3 Maintenance of the exterior surfaces of the Cloisters (windows) 3.4 Creation of the “Visitors’ centre” 3.5 Design and creation of the “Monastery and Tempietto Museum” 3.6 Preparation of spaces for the housing of the Archaeo-osteological Centre (preliminary phase) 3.7 Conservation project of site to place new functions and carry them out 4 4.1 ENHANCEMENT OF RUINS Improvement of exhibition area OF THE PATRIARCHAL PALACE in Patriarchal Palace and AND EXTENSION archaeological area at Palazzo dei OF THE ARCHAEOLOGICAL Provveditori MUSEUM 4.2 Improvement of educational equipment in the Archaeological Museum’s exhibition rooms 5 5.1 EXPANSION OF CHRISTIAN Completion and extension of Christian MUSEUM Museum and Duomo’s Treasure AND IMPROVEMENT 5.2 OF CULTURAL OFFER Conservation and improvement work IN CATHEDRAL AREA on Crypt 6 6.1 CREATION OF COORDINATION Organisation of museum visiting system SYSTEM FOR MUSEUM OFFER with single ticket 6.2 Governing access to monuments- museums and booking of visits

171 8.6.3 ENHANCEMENT PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

7 7.1 ENHANCEMENT Creation of Archives and Documents OF HERITAGE Centre OF CODICOLOGICAL ARCHIVES 8 8.1 ENHANCEMENT Definition of wall visiting routes OF HISTORICAL WALLS 8.2 Identification of improvement work for the visibility and use of the walls CIVIDALE 9 9.1 DEL FRIULI ENHANCEMENT OF CHURCHES Definition of visiting systems BUFFER ZONE AND MONASTERIES IN CIVIDALE for the churches and monasteries 9.2 Identification of improvement work for visibility-use 10 10.1 ENHANCEMENT OF HISTORICAL Upgrading squares and streets CITY CENTRE 10.2 Improvement of urban image quality 10.3 Setting up of panoramic routes along the Natisone river CIVIDALE 11 11.1 DEL FRIULI TERRITORY EXPANSION OF THE CULTURAL Creation of Longobard itineraries: OFFER “Longobard places of art and power” IN THE DUCHY OF FRIULI 11.2 TERRITORY Expansion of museum network “The Castra of Paolo Diacono and the Duchy of Friuli” 11.3 Extension of use of the Abbey of Sesto al Reghena 12 12.1 ENHANCEMENT OF ENDOGENOUS Creation and enhancement of the RESOURCES IN THE AREA “Vines and Wine Park” 12.2 Creation of thematic routes: “The Archive Vineyards” BRESCIA 13 13.1 SITE AND HEIGHTENING Arrangement of the green area to the BUFFER ZONE OF THE ENHANCEMENT LEVEL south of the Ortaglia domus OF THE SITE STRUCTURES 13.2 Completion of the irrigation plant for the green areas 13.3 Internal illumination for the Church of Santa Maria in Solario 13.4 External illumination for the monastery

14 14.1 INCREASE IN THE QUALITY Realisation of a visitor centre on the OF SERVICES OFFERED monastery and on the Longobard TO VISITORS sites network 14.2 Automation of the ticket sales system and expansion of the management software

172 8.6.3 ENHANCEMENT PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

14.3 Activation of the e-commerce service relating to the City museums commodities 14.4 Improvement of the video systems available to users 14.5 Improvement of the services offered to the users of the Santa Giulia Auditorium and the side gallery annexe 15 15.1 EXPANSION Dig and museumification of the domus OF THE ARCHAEOLOGICAL AREAS to the south of Ortaglia MADE INTO MUSEUMS IN THE SITE 15.2 Museumification of the domus in the southern cloister of the site 16 16.1 ENHANCEMENT Recovery project of the archaeological OF THE ARCHAEOLOGICAL area of Capitolium AREA OF THE CAPITOLIUM 16.2 Urban equipment of via Musei and the Forum 16.3 Expansion of museum set-up in the archaeological area of the Roman basilica in Labus square 17 17.1 COMPLETION OF MUSEUM SPACES Adaptation and expansion AND HEIGHTENING OF THE of the Museum of Arms STATUS 17.2 OF ENHANCEMENT IN THE CASTLE Re-arrangement and re-opening AREA of the Museum of Risorgimento 17.3 Unified management of the whole area 17.4 Temporary exhibitions programme 18 18.1 REQUALIFICATION Requalification of the Tosio Martinengo AND ENHANCEMENT Picture Gallery OF THE SO-CALLED HERITAGE BUILDINGS 18.2 Requalification of Palazzo Bonoris, site of the Athenaeum of Science, Letters and Arts 18.3 Requalification of Palazzo Tosio as museum site of the Nineteenth Century Collection 19 19.1 INCREASE AND REQUALIFICATION Hillside Park Project OF GREEN AREAS 19.2 Water Park Project BRESCIA TERRITORY 20 20.1 ENHANCEMENT OF THE OTHER Re-equipping of the Natural Science MUSEUM SITES OF THE Museum MUNICIPALITY OF BRESCIA

173 8.6.3 ENHANCEMENT PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

21 21.1 ENHANCEMENT OF LONGOBARD Re-organisation and implementation of FINDINGS, OF THE RELATIVE the collections conserved at the Civic MUSEUM SITES historical archaeological Museums of AND ARCHAEOLOGICAL AREAS Manerbio, Leno, Remedello and at the National Archaeological Museum of Sirmione 21.2 Set-up of the Archaeological-exhibition Centre of Montichiari and organisation of the collection of Longobard findings in the territory of Montichiari

21.3 Set-up of the archaeological area of the Paleochristian Church of San Pietro in Mavino in Sirmione and the Early medieval Churches of San Giorgio in Montichiari and Saints Nazaro and Celso in Leno 22 22.1 EALISATION OF MUSEUMS LINKED Realisation of the Museum of Industry TO THE VOCATION OF THE and Work (MUSIL) TERRITORY

CASTELSEPRIO-TORBA 23 23.1 SITE AND BUFFER ZONE COMPLETING THE ANTIQUARIUM IN Completing the upgrade SAN GIOVANNI MONASTERY of the building of the Monastery to turn it into an exhibition area 23.2 Completing the layout of the Antiquarium 24 24.1 ENHANCING THE TOURING Creating a trail to connect the upper ARRANGEMENTS castrum with the outpost in the valley FOR THE CASTELSEPRIO-TORBA (Torba) ARCHAEOLOGICAL COMPLEX 24.2 Upgrading the educational and explanatory apparatus along the route to the castrum and close to Santa Maria foris portas 24.3 Enhancing the educational and explanatory apparatus close to the Tower of Torba and the Church of Santa Maria 24.4 Creating a touring route to the village and restoring the old entrance ways

24.5 Creating a new lighting and protection system for the frescoes in the Tower and in the Church of Santa Maria at Torba. CASTELSERPIO-TORBA 25 25.1 TERRITORY IMPROVING SIGNAL POSTS Placing signaling posts along the main AND COMMUNICATION TOOLS traffic routes and nodes

174 8.6.3 ENHANCEMENT PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

25.2 Creating bilingual (Italian/English) information panels 25.3 Implementing communication and photographic campaigns 26 26.1 LINKING THE EARLY MIDDLE AGES Creating theme-based itineraries FINDINGS IN THE GIUDICARIA OF by including the other findings related SEPRIO to the Early medieval and Longobard period in the Giudicaria of Seprio. 27 27.1 SPOLETO EXPLOITATION OF THE BASILICA Identification of the Basilica as an SITE AND OF S. SALVATORE exhibition centre BUFFER ZONE 27.2

Creation of a visitors’ centre

27.3

Creation of a documentation centre

28.1 28 Insertion of the lodging facilities into the EXPANSION OF SERVICES network of “Places of the spirit” IN THE LODGING FACILITIES ANNEXED TO THE CHURCH OF S. PONZIANO 28.2 Creation of a visitors’ centre

29 29.1 RAISING OF THE LEVEL OF Enlargement of the usability of the EXPLOITATION OF THE CHURCH OF church S. PONZIANO

SPOLETO 30.1 TERRITORY 30 Plan for use of historically and culturally EXPANSION OF THE CULTURAL significant buildings OFFER 30.2 OF THE HISTORIC CENTRE OF Planning of a city Trekking project SPOLETO through the identification of new tourist- cultural routes 30.3 Exploitation of Archaeological Routes

30. 4

Revitalisation of the historic centre

30. 5 Plan for Street Fixtures

31 31.1 EXPANSION OF THE CULTURAL Opening of Mining Museum of OFFER Morgnano IN THE TERRITORY 31. 2

Creation of “identity routes”: Works of Fortification in the environs of Spoleto;

Itineraries of Giovanni di Pietro, “lo Spagno”

31. 3

Completion of the Spoleto -

bicycle path. (from the Arezzo dam to

the Azzano Bridge)

31. 4

Creation of a city park near the historic centre

175 8.6.3 ENHANCEMENT PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

31. 5 Exploitation of the mountain and sustainable development. “LUCUS” Project 32 32. 1 EXPLOITATION OF NATURAL Environmental reclamation of Parco AND CULTURAL RESOURCES della Rocca in Monteluco

33 33.1 EXPLOITATION OF THE Plan for Management of the SCI area ENVIRONMENT AND THE NATURAL (Site of Community Interest) IT5210064 AND ACCESSIBLE LANDSCAPE – Monteluco di Spoleto

CAMPELLO 34 34.1 SUL CLITUNNO RAISING OF OPTIMISATION LEVEL Expansion of visitor services inside the SITE, BUFFER ZONE OF CLITUNNO TEMPIETTO Tempietto area AND TERRITORY 34.2 Placement on site of a copy of monument inscription of the Tempietto 34.3 Improvement of internal and external illumination of the Tempietto 34.4 Creation of connection between the Tempietto and the underlying Clitunno river 35 35.1 PROTECTION AND ENHANCEMENT Creation of permanent educational- PLAN FOR THE CLITUNNO RIVER exhibition centres on the environment AND THE “TEMPIETTO ECO- the site culture MUSEUM” 35.2 Recomposition of landscape unit of the area 36 36.1 EXPANSION OF THE CULTURAL Setting up of new cultural and tourist OFFER venues

36.2 Recovery and new functional use of a group of buildings that make up the network of infrastructures for visitor services BENEVENTO 37 37.1 SITE, BUFFER ZONE TO COORDINATE MANAGEMENT Drawing up of a local protocol AND TERRITORY OF ASSETS IN THE SITE for controlling use of the Church of Santa Sofia 38 38.1 TO EXTEND MUSEUM ACTIVITY To re-arrange and extend the Longobard collections in the Sannio Museum 39 39.1 TO VALORISE THE URBAN Creating an urban archaeological park ARCHAEOLOGICAL HERITAGE (P.A.U.) in Benevento 39.2 Creating the museum of the archaeological digs in Piazzetta Sabariani 40 40.1 TO IMPROVE REDEVELOPMENT Refurbish functioning of the public OF THE ANCIENT CITY fountains 40.2 To re-develop the piazzas in the

176 8.6.3 ENHANCEMENT PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

cathedral and Rocca dei Rettori areas

41 41.1 TO EXTEND SERVICES Multi-mode information centre TO THOSE VISITING THE SITE

42 42.1 TO EXTEND MUSEUM ACTIVITY Design a Civic Contemporary Art gallery at Hortus Conclusus

43 43.1 TO EXTEND SERVICES TO THOSE Multi-mode information centre – VISITING THE SITE Information point network

44 44.1 TO VALORISE THE URBAN Plan itineraries for the PAU ARCHAEOLOGICAL HERITAGE

45 45.1 TO IMPROVE REDEVELOPMENT Draw plans for decorative lighting OF THE ANCIENT CITY 45.2 Drawing up the colour plan 46 46.1 TO VALORISE THE TERRITORY’S Create an archaeological ARCHAEOLOGICAL HERITAGE and green space park in Cellarulo

47 47.1 TO VALORISE Create the Via Sacra Langobardorum THE LONGOBARD archaeological park CULTURAL HERITAGE

MONTE SANT’ANGELO 48 48.1 SITE HEIGHTENING OF THE LEVEL New set-up project for the Lapidus OF VALORISATION Museum and execution thereof OF THE SANTUARY’S 48.2 MOST ANCIENT STRUCTURES Museumification of the area subject to archaeological digs to the north of the sanctuary 49 49.1 HEIGHTENING Project and intervention for the creation OF THE ENHANCEMENT LEVEL of conditions of continuity in decoration OF THE SANCTUARY of the external space connecting the upper atrium and the roof of the Cave 49.2 Completion of equipping the Devotional Museum

49.3 Optimisation of the access system to the Casa del Pellegrino and creation of a new internal route 50 50.1 ENHANCEMENT Adaptation and refunctionalisation OF THE STRUCTURES ANNEXED project of the internal spaces TO THE SANCTUARY

MONTE SANT’ANGELO 51 51.1 BUFFER ZONE ENHANCEMENT Definition of visiting routes to the wall AND TERRITORY OF THE WALLS system

177 8.6.3 ENHANCEMENT PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

51.2 Identification of interventions of improvement in visibility-use of the walls 52 52.1 ENHANCEMENT OF THE CHURCHES Definition of visiting routes AND MONASTERIES around the system of churches OF MONTE SANT’ANGELO and monasteries 52.2 Interventions of improvement of visibility- use 53 53.1 HEIGHTENING OF THE LEVEL OF Re-functionalising plan for the areas USE and review of showcase routes OF THE MUSEUM OF ART AND POPULAR TRADITIONS

54 54.1 ENHANCEMENT THE ACTIVITIES General survey on internal pathways OF REQUALIFICATION and planning for the restoration of IN THE HISTORIC CENTRE uniformity of the materials 54.2 Study of new internal connecting routes between the car parks in the initial welcoming areas and the Sanctuary Highlighted by bilingual signs 54.3 Re-order of publicity boards and definition of a detailed regulation for installing shade tents, publicity sings and informative panels 54.4 Study and planning of the valorisation of piazza Carlo d’Angiò with the elimination of the car park, organisation of a green area of connection with the Castle and review of existing services 55 55.1 ENHANCEMENT OF THE Identification and valorisation TERRITORIAL CULTURAL OFFER of the Via Sacra Langobardorum route 55.2 Optimisation of the regional museum network

178 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Network Objective 1 EXTENDING RELATIONS BETWEEN LOCATIONS IN THE NETWORK AND OTHER ITALIAN LONGOBARD SITES

Project 1.1 Creation of “Longobard Itineraries”: Places of Worship – Necropolises – Settlements Description The Site’s heritage is the Highest expression of Longobard civilisation. The creation of stronger connections between these assets by identifying integrated, privileged routes will facilitate their valorisation. In Italy there are also other traces of the Longobard presence, made up of remains of settlements, places of worship, necropolises, and museum collections of artefacts that can contribute to better understanding of this people’s culture. Putting this evidence in the network and creating specific visitor routes on a wider territorial scale will make it possible to obtain a wider knowledge of Lombard civilisation. Actions 1. Identification of places to be added to Lombard itineraries. 2. Drawing up agreements with interested institutions and bodies in the various areas. 3. Creating itineraries and routes. 4. Creating specific bulletin board for the itineraries. 5. Creating instructive and scientific multi-media materials on the itineraries and on themes that link the various locations. 6. Creation of a specific space on this topic in the website. Parties involved All the stakeholders Phases and timeframe As from 2009 Financial resources To be found. Expected results Extension of knowledge about Lombard culture Result indicators Number of locations involved Number of itineraries created Quantity of material produced

ENHANCEMENT PLAN Network Objective 1 EXTENDING RELATIONS BETWEEN LOCATIONS IN THE NETWORK AND OTHER ITALIAN LOMBARD SITES

Project 1.2 Creation of a network of “Longobard Monasteries in Italy” Description Monasteries founded by the Longobard are the principal places of worship and centres of power from the Lombard age. They represent the Highest expression of their civilisation still to be found and contain most of the assets of greatest historical, artistic, and architectural value. Many of the assets in the Site network’s heritage come from monasteries (in Cividale, Brescia, Castelseprio Torba, and Benevento). Many of the initiatives proposed on the management plan relate to extending knowledge about and valorising these monasteries that, in some cases, involve structures of similar importance in the territory in which they belong (see Valorisation Plan for Cividale, Objective 4; valorisation Plan for Cividale, Project 9.3; Knowledge Plan for Brescia, Project 2.1). Actions 1. Censusing and scheduling the Lombard monasteries and their assets 2. Drawing up agreements with interested institutions and bodies in the various areas. 3. Including in the network and creating itineraries and routes that are dedicated to them in the various areas. 4. Creating specific bulletin boards. 5. Producing scientific and informative multi-media material 6. Creating a specific space in for the network on the Website. Parties involved All stakeholders in the Site; Bodies and institutions in the locations involved in the project Phases and timeframe As from 2010 Financial resources To be found. Expected results Extending the possibility of understanding and visiting Lombardic monastic structures. Result indicators Number of sites involved Quantity of material produced

179 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Network Objective 2 EXTENDING RELATIONS BETWEEN LOCATIONS IN THE NETWORK AND THE EUROPEAN GEO-CULTURAL CORRIDOR

Project 2.1 Creation of theme itineraries: “Routes of Longobard origins and civilisation" Description The extent of the Network to sites in the European geo-cultural corridor of Longobard migration to Italy, is intended to include the situations touched by the Longobards in regions outside Italy in the valorisation programme as well, as these keep remnants and evidence of their presence and culture and exhibit the same in museums. Reconstruction of this route can come about, in addition to improving knowledge about the traces conserved (see Knowledge Plan for the Network), by creating theme itineraries linking the various locations in order to allow in-depth study of various aspects of the Lombard tradition and better use of the traces kept. Actions 1. Identifying and censusing the locations to be included in theme itineraries 2. Drawing up of bilateral or multi-lateral agreements with countries affected by the routes. 3. Creating itineraries and routes. 4. Creating specific bulletin boards. 5. Producing scientific and informative multi-media material 6. Creating a specific space in for this area on the Website. Parties involved Stakeholders: Institutions and bodies in European countries covered by the itineraries Phases and timeframe As from 2010 Financial resources To be found among financing programmes from the European Community (Cultural Programme 2007-2013; Interreg …). Expected results Extension of the possibility of understanding and use of the traces of the Lombard civilisation on a larger scale. Result indicators Number of countries involved Number of locations involved Number of itineraries created Quantity of material produced

180 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Cividale del Friuli site Objective 3 UPGRADING OF MONASTERY OF SANTA MARIA IN VALLE AND INCREASE IN DEGREE OF ENHANCEMENT OF THE LONGOBARD TEMPIETTO

Project 3.1 Implementation of preparatory phases of the restoring of the Monastery to be usable as a Visitors’ centre and Cultural Centre Description An approximate feasibility project will be carried out to check the compatibility of the Monastery of Santa Maria in Valle’s spaces with the allocation of use required by the functions associated with the Cultural Centre; these include: the Monastery and Temple Museum, the Archives and Documents Centre, the International Early Middle Ages Art and Architecture Research and Document Centre and the Archaeo-osteological Centre. The aim of the study is: a) to decide whether it is possible to carry out some work in phases (e.g. the creation of the Monastery and Temple Museum) before starting planning of the renovation of the entire complex; b) checking the relationship between the work required to adapt the complex to its new functions and the potential of the Monastery space in order to reduce modifications of the structure and type to a minimum. Agreements must be drawn up between the various institutions who will be involved in creating the Cultural Centre before any action is taken.

1. View of the site 2. Drowing of the Gastaldaga: Santa Maria in Valle Monastery, the Longobard Tempietto, the church of San Giovanni

181 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

Outline of functions to be checked in feasibility 1)Visitors’ centre and speaking area project 2) Access route to Temple and relative spaces CREATION OF “VISITORS’ CENTRE” 3) Spaces tied to Monastery and its possibility of use as a “museum of itself” 4) Ursuline Vegetable Garden 5) Temple Courtyard 6) Temple 7) Monastery and Temple Museum 8) History of Art Specialised School (already set up) 9) Spaces to be used during first Map of ground floor. creation phase as the Archaeo- osteological laboratory

Table. 2b-2c. 1) Archives and Documents Centre. 2) Early Middle Ages Art and CREATION OF THE CULTURAL CENTRE Architecture Research and Document Centre and hospitality area 3) Museum spaces linked to Monastery and its use as a “museum of itself” 4) Common space for educational activities 5) History of Art Specialised School (already set up) 6) Regional Archaeo-osteological Archive. Map of first floor 7) Lodgings

Map of second floor.

Actions FEASIBILITY STUDY 1. Approximate check on existing surveys with any additions of sections needed to identify the volumetric measurements of the site. 2. Preliminary check on static conditions, referring to current regulations for the new uses allocated to the various parts of the complex. 3. Check of current plants system with relative checks on available plant plans. 4. Check on adaptations required by the currently safety regulations in force, according to new destination of use (Fire prevention regulations and Local Health Authority and competent Superintendence Dept rules). 5. Definition of work strategies for the recovery of the complex. SETTING UP OF CULTURAL CENTRE 6. Definition and approval of protocols of intents between competent authorities for the transfer-sharing of archives making up the “Archives and Documents Centre”. 7. Framework agreement with University of Udine for the creation of the Information Technology-Multimedia Laboratory. 8. Finalisation of the setting up and management of the International Early Middle Ages Art Research and Document Centre. 9. Definition of interconnections and collaboration agreements between the Early Middle Ages Art and Architecture Research and Document Centre and parties from the Cultural Centre with other cultural institutions, such as the Norway Science , CISAM and the Saint Michael Study Centre. Parties involved Municipality of Cividale del Friuli; Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept; Parish of Santa Maria Assunta, University of Udine, Norway Science

182 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

Academy, CISAM and the Saint Michael Study Centre. Phases and timeframes Feasibility study by first half of 2008 Protocols by 2009 Financial resources Feasibility study financed by Municipality of Cividale del Friuli funds: €. 9,000.00 Expected results Indication of dimensional and performance impact that the new uses of the Cultural Centre will have on the Monastery spaces, from a structural, safety system and architectural barrier point of view.

ENHANCEMENT PLAN Cividale del Friuli site Objective 3 UPGRADING OF MONASTERY OF SANTA MARIA IN VALLE AND INCREASE OF DEGREE OF ENHANCEMENT OF LONGOBARD TEMPIETTO

Project 3.2 Improvement work on Longobard Tempietto Description To increase the current enhancement level of the Temple, and depending on the upgrading of the entire monastery of Santa Maria in Valle site, it is necessary to modify and expand the access system for the Monastery and Temple, in order to create visiting routes that aim at better possibilities of appreciating the monuments. The projects will be carried out in three phases. The first phase foresees the creation of a new entrance for the Monastery itself and for the Longobard temple, extending the route from Via Monastero Maggiore through the San Giovanni courtyard and also reaches some important areas of the Monastery. The work includes both maintenance work on the surfaces (plaster, windows, and floors) and work to set up the new access system to the Temple, including the extension of the lighting and safety systems. Access from Via Monastero Maggiore will also allow disabled persons to enter the temple, who will be able to enjoy a part of the Temple without entering the hall, with the opening on request of the antique wooden door that leads to the cloisters.

Description of work foreseen in first phase

A second phase foresees the creation of a visiting route for the upper floors of the

183 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

Monastery, which will provide visibility of the temple's exterior walls with relative frescoes. The stairs to the upper floors will be checked for this purpose, with the route being bordered by partition walls and the creation of a surveillance system. A third phase will involve the planning and creation of access to the entire Ursuline Vegetable Garden, the position of which, compared to the Monastery, the Longobard temple and the River Natisone is of enormous interest in the town. After archaeological survey a flooring system will be created (green or paved differently) that will allow this space to be identified from the entrance from the Temple Courtyard.

Outline of access route to monastery and temple with Highlighting of routes

Actions FIRST PHASE (see table 3). 1. Maintenance of San Giovanni courtyard façade and restoration of the wooden entrance door (1- 1.a). Creation of lighting system for courtyard and Church of San Giovanni and proposal for the building of an iron entrance door (1b) to allow visibility of the courtyard from Via Monastero Maggiore, while keeping the wooden entrance door open. 2. Restoration of wooden windows (2). 3. Recovery and renovation of existing bathrooms (3) 4. Maintenance of pronaos façade in the Church of San Giovanni (4). 5. Maintenance of Monastery entrance surfaces with restoration and creation of windows (5). 6. Creation of a lighting system for cloisters (6). 7. Project for demolition and carrying out of archaeological digs needed to improve use of area around Temple and relative new flooring (7-8) (see Knowledge Plan, Project 2.1) 8. Removal of buffered door next to sacristy to create new entrance to the Temple from the Monastery, with exit from walkway on River Natisone (9). 9. Restoration of façade windows on first and second floor of cloisters (10) 10. Maintenance work on Temple and expansion of lighting system (11). 11. Restoration and adaptation to safety regulations of iron parapet on Temple exit route (12) 12. Creation of fencing to allow limited access to a part of the Ursuline Vegetable Garden (13) 13. Checking, planning and creation of a surveillance system. SECOND PHASE 14. Planning and creation of visiting route to first floor of Monastery limited to area adjacent to Temple. 15. Placement of temporary partition walls to limit access to Monastery areas. 16. Checking, design and creation of a surveillance system.

184 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

THIRD PHASE 17. Creation of an archaeological dig campaign (see Knowledge Plan, project 2.1) 18. Arrangement of area with new flooring. 19. Parapet on River Natisone to be made safe. Parties involved Municipality of Cividale del Friuli; Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept; International Early Middle Ages Art and Architecture Research and Document Centre Phases and timeframe First phase: by 2008 Second phase: by 2009 Third phase: by 2010 Financial resources First phase: funds already allocated by the Municipality of Cividale del Friuli: €. 176.000,00 Other funds to be found through private and bank sponsorship. Second and third phase: funds to be found by: Municipality of Cividale del Friuli in the context of the Three-year Work Plan 2008-2010 (total €. 1,500,000.00); Region of Friuli Venezia Giulia; private and bank sponsorship. Expected results Making some parts of the ground floor of the Monastery visitable, with improvement of the state of conservation and optimisation of the more prestigious architectural parts; improvement of visibility of Temple architecture; improvement of Temple access system; increase of knowledge of history of the Monastery and the Temple; favour the understanding of the link between the Temple architecture and the Monastery architecture; increase the tourist load capacity of the entire complex. Result indicators Increase in quality and number of useable spaces

ENHANCEMENT PLAN Cividale del Friuli site Objective 3 UPGRADING OF THE MONASTERY OF SANTA MARIA IN VALLE AND INCREASE IN DEGREE OF ENHANCEMENT OF THE LONGOBARD TEMPIETTO

Project 3.3 Maintenance of external surfaces of the Cloisters (windows) Description The work aims to improve the aesthetic appearance of the cloisters of the Monastery through the recovery of the wooden window shutters, shutters that have various problems regarding maintenance.

1 2 1. A view of the cloisters 2. Detail of the windows to be conserved

Actions 1. Recovery project for wooden window shutters 2. Carrying out of work. Parties involved Municipality of Cividale del Friuli; Friuli Venezia Giulia BAPSAE Superintendence Dept Phases and timeframes By 2008 Financial resources Funds already allocated by the Municipality of Cividale del Friuli: €. 24.000,00 Expected results Improvement of the aesthetic view of the cloister area and the state of conservation of the wooden elements.

185 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Cividale del Friuli site Objective 3 UPGRADING OF THE MONASTERY OF SANTA MARIA IN VALLE AND INCREASE IN THE DEGREE OF ENHANCEMENT OF THE LONGOBARD TEMPIETTO

Project 3.4 Creation of the “Visitors’ centre” Description The project foresees the creation of a Visitors’ centre in the part of the building adjacent to the courtyard of San Giovanni, i.e. a place where visits to the town and the area are organised, both logistically and as an offer of information services of various levels. The centre will also include the Single Ticket office for the site, a bookshop, spaces to be used as multimedia “virtual routes” stations, as an introduction to the entire heritage contained in the site itself, in the Buffer Zone, and in the area (see table 1). This service will contribute to easing tourist flows to the site heritage, offering alternatives to visits.

1 2 1. A view the courtyard of San Giovanni 2. Map with the location of the Visitors’ Centre Actions 1. Recovery project for a part of the Monastery of Santa Maria in Valle at the entrance from Porta San Giovanni with the creation of the Visitors’ Centre, ticket office and bathrooms. 2. Recovery work. 3. Creation of a computerised info point on the site and the network and a bookshop. Parties involved Municipality of Cividale del Friuli; Friuli Venezia Giulia BAPSAE Superintendence Dept Phases and timeframe designing phase by 2009 Work phase after 2009. Financial resources Funds to be found by: Municipality of Cividale del Friuli in the context of the Three-year Work Plan 2008-2010 (total €. 1,500,000.00); Region of Friuli Venezia Giulia; private and bank sponsorship. Expected results Control and organisation of tourist flows directed towards the Longobard temple and the site heritage; Increase of information on the site heritage. Result indicators Increase of diffusion of quality and quantity of information about site.

ENHANCEMENT PLAN Cividale del Friuli site Objective 3 UPGRADING OF MONASTERY OF SANTA MARIA IN VALLE AND INCREASE IN DEGREE OF ENHANCEMENT OF LONGOBARD TEMPIETTO

Project 3.5 Designing e creation of the “Monastery and Tempietto Museum”. Description In the context of the expansion of the cultural offer of the Monastery, linked to the visits to the Longobard temple, a museum exhibition will be set up adjacent to the temple to help visitors to understand and know the history of the evolution of the Monastery and the Temple, using traditional and multimedia exhibition modes (see table 1). This aim could also be fulfilled by the exhibition of artefacts that are evidence of the complex’s various happenings, that can “tell” its history; in particular what remains of the items placed in the tombs of the Longobard aristocrats who were buried in San Giovanni; the Early middle age stone fragments of the church furnishing of the religious buildings of the site (S. Giovanni

186 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

and Temple); medieval frescoes detached from the Temple walls. The carrying out of this project, together with project 1.2, will allow tourist flows to be distributed in a better manner throughout the tourist sites included in the candidacy, offering alternatives for visits. Actions 1. Formalisation of the agreements between the various Authorities involved in the setting up of the “Monastery and Temple Museum” (Municipality of Cividale, Friuli Venezia Giulia BAPSAE Archaeological and Archive Superintendence Dept, Parish of Santa Maria Assunta, Archbishop’s Curia of Udine). 2. Project for the restoration of rooms next to the Temple to adapt museum space including the preparation of the portico and static work connected with the recovery of the upper floors. 3. Preparation project of museum spaces with creation of educational devices that will illustrate the history of the Temple and the Monastery. 4. Maintenance work on the tombstones being moved in the museum. Parties involved Municipality of Cividale del Friuli; Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept; Parish of Santa Maria Assunta Phases and timeframe Designing by 2009 Work carried out in 2009-2010. Financial resources Funds to be found by: Municipality of Cividale del Friuli in the context of the Three-year Work Plan 2008-2010 (total €. 1,500,000.00); Region of Friuli Venezia Giulia; private and bank sponsorship. Expected results Rationalisation and increase of quality of museum offer; Check and organisation of tourist load within monastery site. Result indicators Increase of usable monument and museum surface area.

ENHANCEMENT PLAN Cividale del Friuli site Objective 3 UPGRADING OF THE MONASTERY OF SANTA MARIA IN VALLE AND INCREASE IN THE DEGREE OF ENHANCEMENT OF THE LONGOBARD TEMPIETTO

Project 3.6 Preparation of spaces for the housing of the Archaeo-osteological Centre (preliminary phase) Description The setting up of the Cultural Centre in the Monastery of Santa Maria in Valle foresees the creation of an Archaeo-osteological laboratory that is considered to be extremely important for the start up of specific studies on the skeleton remains found in several Longobard burial sites and for the acquisition of anthropological information that will be added to the archaeological knowledge. In this first phase, the project foresees the temporary transfer of the osteological material – kept by the archaeological superintendence dept in various locations – to the Monastery and the preparation of a laboratory in a dedicated area. The permanent housing for the Archaeo-osteological laboratory will be decided during the main monastery conservation project phase Actions 1. Temporary transfer of materials to ground floor of monastery. 2. Creation of laboratory. Parties involved Municipality of Cividale del Friuli; Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept Phases and timeframes By 2008-2009 Financial resources Funds to be found by Friuli Venezia Giulia Archaeological Superintendence Dept. Expected results Reorganisation of anthropological findings located in various superintendence department sites; possibility of cataloguing and study of finds.

ENHANCEMENT PLAN Cividale del Friuli site Objective 3 UPGRADING OF THE MONASTERY OF SANTA MARIA IN VALLE AND INCREASE IN THE DEGREE OF ENHANCEMENT OF THE LONGOBARD TEMPIETTO

Project 3.7 Conservation project of site to place new functions and carry them out Description This is the general planning for the conservation of the Monastery with relative studies and calculations for functional adaptation, structural improvement and the introduction of all the technological and system equipment necessary for the new allocations of use. After planning, the work will then be carried out. Actions 1. Site restoration project for placement of new functions with relative analytical investigations (see Knowledge Plan)

187 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

2. Creation of the project. Parties involved Municipality of Cividale del Friuli; Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept Phases and timeframes Planning phase: 2009-2012 Work phase: after 2012 Financial resources Estimated cost: €. 6,500,000.00 Funds to be found by: Municipality of Cividale del Friuli in the context of the Three-year Work Plan 2008-2010 (total €. 1,500,000.00); Region of Friuli Venezia Giulia; private and bank sponsorship. Expected results Revitalisation of the Monastery as a central reference place for the town of Cividale’s cultural and tourist life.

ENHANCEMENT PLAN Cividale del Friuli site Objective 4 ENHANCEMENT OF RUINS OF THE PATRIARCHAL PALACE AND EXTENSION OF THE ARCHAEOLOGICAL MUSEUM

Project 4.1 Improvement of exhibition area in Patriarchal Palace and archaeological area at Palazzo dei Provveditori Description The enhancement of the ruins of Palazzo Patriarcale foresees the extension of the visiting itinerary of the ruins, with bilingual Italian-English panels, after moving part of the archaeological materials currently stored on site; overall adaptation of rooms to safety regulations and adaptation of lighting system. Actions 1. Classification of materials currently kept in the archaeological area of Palazzo Patriarcale and relative moving 2. Adaptation of safety and lighting systems for archaeological area of Palazzo Patriarcale and the archaeological area at Palazzo dei Provveditori 3. Improvement of exhibition space inside archaeological area at Patriarcale with creation of mobile walls. 4. Increase of educational equipment Parties involved Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept Phases and timeframes By 2008 Financial resources Funds allocated by Friuli Venezia Giulia Archaeological Superintendence Dept: €. 27,540.00 Expected results Improvement of presentation of use of archaeological ruins of Palazzo Patriarcale; Improvement of educational offer.

ENHANCEMENT PLAN Cividale del Friuli site Objective 4 ENHANCEMENT OF RUINS OF THE PATRIARCHAL PALACE AND EXTENSION OF THE ARCHAEOLOGICAL MUSEUM

Project 4.2 Improvement of educational equipment in the Archaeological Museum’s exhibitions rooms Description The enhancement of the National Archaeological Museum (ground floor, first and second floors) foresees the increase of education equipment with the inclusion of bilingual Italian- English texts, the expansion and adaptation of the video-surveillance system. Actions 1. Copying and translation of existing educational material into English 2. Creation of new educational material 3. Adaptation and extension of video-surveillance circuit. Parties involved Friuli Venezia Giulia Archaeological Superintendence Dept Phases and timeframes By 2008 Financial resources Funds allocated by the Friuli Venezia Giulia Archaeological Superintendence Dept: €. 1,428.00 Expected results Expansion and arrangement of Museum’s educational equipment.

188 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Cividale del Friuli site Objective 5 EXPANSION OF CHRISTIAN MUSEUM AND IMPROVEMENT OF CULTURAL OFFER IN CATHEDRAL AREA

Project 5.1 Completion and and extension of Christian Museum and Duomo’s Treasure Description The aim is to extend the cultural offer intended to understand the heritage kept in the museum, in particular the Ratchis altar and the Callisto baptismal font. After further studies on these items (see Knowledge Plan, Project 1.1 and Conservation, Project 4.1-4.2) the educational equipment on the exhibition route being prepared, including multimedia equipment will also be finalised. Work, in its final stages, is currently being carried out on the museum, which has included the arrangement of the Cathedral courtyard – the restoration of the halls next to the Cathedral to expand exhibition space from one to four rooms, thus allowing materials to be reorganised. The expansion of the museum will be possible thanks to the recovery of further space in the bell tower. The recovery of the tower has two goals: making the tower fit for visits up to the belfry, the creation of a museum about the history of the “Cividale towers” and creating spaces for the exhibiting of liturgical furniture. This project is part of the general organisation of exhibition space in the Cividale complex, with the thematic specialisation of each museum.

Project map of Archaeological Museum

Project Section of Archaeological Museum Actions 1. Increase of educational equipment in museum exhibitions. 2. Adaptation project for tower, in order to visit belfry. 3. Creation of exhibition space in the tower. Parties involved Parish of Santa Maria Assunta; Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept Phases and timeframes 1. Work ongoing, completion by first half of 2008. 2. 3. Starting from 2010 Financial resources 1. - Funds found in context of funding allocated in 2007 by the Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept: €. 20,000.00 and the Friuli Venezia Giulia Regional Administration: €. 50,000.00 2.3 - Funds to be found according to the Friuli Venezia Giulia Regional Administration law, R.L. n.53/85. Expected results Increase and preparation of museum’s educational equipment. Result indicators Increase of exhibition areas; Quantity of data illustrating history of heritage.

189 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Cividale del Friuli site Objective 5 EXPANSION OF CHRISTIAN MUSEUM AND IMPROVEMENT OF CULTURAL OFFER IN CATHEDRAL AREA

Project 5.2 Conservation and improvement work on Crypt Description This is a project to restore the eighteenth-century area of the Cathedral Crypt, to solve the problem of damp, for system adaptation and for accessibility so that the space can be used for both liturgical functions and for the organisation of temporary exhibitions. Parties involved Parish of Santa Maria Assunta; Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept Phases and timeframes Starting from 2010-2011. Financial resources Funds to be found according to Friuli Venezia Giulia Regional Administration law, R.L. n.53/85. Expected results Expansion of Cathedral exhibition offer.

ENHANCEMENT PLAN Cividale del Friuli site Objective 6 CREATION OF COORDINATION SYSTEM FOR MUSEUM OFFER

Project 6.1 Organisation of museum visiting system with single ticket Description The project foresees the organisation of the visiting system for the main Cividale heritage sites (Archaeological Museum, Palazzo de Nordis Museum – about to be opened, the Christian Museum, the Monastery and Temple Museum, the Monastery of Santa Maria in Valle) by creating a Single Ticket that will allow visiting routes to be rationalised and tourist flows to be managed in a better manner, in order to reduce impact. The single ticket will be distributed at the Visitors’ centre in the Monastery of Santa Maria in Valle (see Project 1.4). Actions 1. Agreements between various parties involved and protocols of intent. 2. Creation of visiting system using single ticket. Parties involved Municipality of Cividale del Friuli; Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept; Parish of Santa Maria Assunta Phases and timeframes By 2009 Financial resources To be found by the Institutions involved Expected results Rationalisation and better management of tourist flow.

ENHANCEMENT PLAN Cividale del Friuli site Objective 6 CREATION OF COORDINATION SYSTEM FOR MUSEUM OFFER

Project 6.2 Governing access to monuments-museums and booking of visits Description This project is to control visits to the site heritage by organising and controlling the tourist flow, in order to reduce the number of visitors to the most sensitive areas, and offering alternative visits and uses, reducing tourist impact. A first project concerns the creation of the “Monastery and Temple Museum” (Project 1.5) – which will allow alternatives to visiting the Temple – and the creation of planned tourist packages. Actions 1. Controlling access to the Temple, to the ruins of Palazzo Patriarcale and to the Christian Museum. 2. Organisation of the visit to the Monastery with access to the temple further to bookiing. Parties involved Municipality of Cividale del Friuli; Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept; Parish of Santa Maria Assunta. Phases and timeframes By 2009 Financial resources To be found by institutions involved Expected results Rationalisation and better management of tourist flow. Result indicators Increase of diffusion of the quality and quantity of the information about the site; Increase of load capacity of heritage included in candidacy.

190 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Cividale del Friuli site Objective 7 ENHANCEMENT OF HERITAGE OF CODICOLOGICAL ARCHIVES

Project 7.1 Creation of Archives and Documents Centre

Description The city of Cividale possesses a wealth of historical document archives that permit the study of the city's history together with that of a wide area in the North of Italy and Central Europe, which was part of the patriarchal state. These Archives – belonging to various parties – are currently kept in several sites and some of these, for example the Historical Archive of the Magnificent Community and the Capital Archives have been dispersed. The goal is to create an Archives and Documents Centre within which these archives can be joined together and kept, promoting various types of activity: continuing reorganisation, cataloguing and replanning; digitalisation of materials to include them in a scientifically organised database (www. partiarcatoaquiliea.it); promotion of research and diffusion activities linked to the possibility of the exhibiting of some documents in the Monastery of Santa Maria in Valle (see Project 1); the possibility of connection with other archive holders that contain materials on the history of the Aquileia Patriarchy. In order to create the Centre, it is necessary to stipulate agreements of intent among the various owners of the archives themselves.

1 2 1. The works in the Cividale Archievs 2 .A page of Edgberto Codex Actions 1. Recognition and census of archives 2. Stipulation of agreements for the physical joining of documents into a single archive at the Monastery of Santa Maria in Valle 3. Moving of archives 4. Digitalisation and implementation of a consultable databank Parties involved Municipality of Cividale del Friuli; Parish of Santa Maria; Archbishop’s Curia of Udine; Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept; Regional Archive Superintendence Dept, Promoting committee of the Aquileia Patriarchy Project Phases and timeframes 1 and 4 – currently being carried out 2 – starting in 2009 3 – starting in 2011 Financial resources 1 and 4- are now funded by the Friuli Venezia Giulia Regional Administration and the Banca Popolare Friuladria bank 2 and 3: funding to be found by Subjects involved. Expected results To bring together archives in one single place and make them consultable; create a rapid consultation system to be used via digital technology; allowing access and consultation of archives online. Parties involved Number of documents in archive; amount of data filed in computers; amount and frequency of consultations; number of publications

191 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Cividale del Friuli site and buffer zone Objective 8 ENHANCEMENT OF HISTORICAL WALLS

Project 8.1 Definition of wall visiting routes

Description

Hypotheses for the organisation of wall visiting routes

The wall system of Cividale includes the urban ring that formed the boundary of the town in the Roman Era and in the Early Middle Ages and the ring that forms the boundary of the four villages. The ruins of the walls from the first ring can currently only be seen in some parts of the town - as archaeological traces and as stretches incorporated into later constructions - while its possible development is documented by both the historical sources and by the digs carried out in various periods. The second ring- that of the villages - instead, has been preserved in rather long stretches and is mainly elevated. The wall visiting route has the following goals to achieve: a) Identify all visible parts of the first ring of wall and the beginning of a route that allows the direction of the circuit to be understood (table 7); b) For the village walls, identify the most important segments from the point of view of construction characteristics and of the best visibility conditions (table 7);

192 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

c) Identifying areas where panels explaining the history of the walls can be positioned; d) Organise a guided tour programme that allows access to parts of the walls now part of private property. It is also necessary to plan and create specific illustrative brochures of the walls’ history and educational panels to be placed in various areas along the route. Actions 1. Designing and identification of the routes for the town and village walls 2. Organisation of a guided tour programme including entrance to private property. 3. Creation of illustrative brochures. 4. Creation of educational panels about history of walls. Parties involved Municipality of Cividale del Friuli; Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept, Italian Institute of Castles (Friuli Venezia Giulia area). Phases and timeframes Starting from 2009 Financial resources Funds to be found by the Municipality of Cividale del Friuli Funds to be found by the Friuli Venezia Giulia Region, Regional law 10/2000: “Interventions for the protection, conservation and enhancement of the fortified architecture of Friuli Venezia Giluia”. Expected results Increase the possibility of identifying the parts of urban and village walls in the town; integrate the development and progress of the wall circuit adequately in relation to the urban fabric; Increase of stretches of walls that are visible and optimised by the urban and village rings. Parties involved Increase of visible surface area

ENHANCEMENT PLAN Cividale del Friuli buffer zone Objective 8 ENHANCEMENT OF HISTORICAL WALLS

Project 8.2 Identification of improvement work for the visibility and use of the walls Description There are some contexts in the urban and village walls circuit that have various types of potential for enhancement. These are parts that need archaeological digs to bring to light the direction of the Roman and Early Middle Ages walls (Fortress - 2); parts where pedestrian paths can be created to help visibility of walls (car park North Building Area – 1) or where recently built additions can be removed (3a). Two parts are especially interesting: the part relating to the urban wall circuit, brought to light at the base of Palazzo Craigher Canussio that could be improved by expanding the exhibition space with an exhibition of the dig findings and by the creation of appropriate educational panels; the stretch corresponding to the Brossana village walls, the only village where it is possible to see the direction of the defence system without interruption. The creation of a view – or a partial possibility for access to the courtyards – next to the Church of San Biagio (15) would allow the use of this system and the enhancement of the entire square in front of it. Actions 1. Work on the fortress with digs (see Knowledge Plan forms) and relative arrangement of the area. 2. Arrangement of green area at the Edil Nord Area car park. 3. Expand use of ruins at Palazzo Craigher Canussio with creation of new educational equipment and extension of exhibition after completion of dig data (see Knowledge Plan). 4. Modify visibility of defence wall at Palazzo Craigher Canussio by removing added parts. 5. Making area in Borgo Brossana visible. Parties involved Municipality of Cividale del Friuli; Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept; Craigher Canussio Foundation, Italian Castles Institute (Friuli Venezia Giulia section); private subjects. Phases and timeframes Starting from 2008-2009 to 2011. Financial resources Funds to be found by the Municipality of Cividale del Friuli Funds to be found according to the Friuli Venezia Giulia Regional Administration law, R.L. 10/2000: “Interventions for the protection, conservation and enhancement of fortified architecture in Friuli Venezia Giluia”. Expected results Improve visibility of urban and village walls; integrate the development and progress of the wall circuit adequately in relation to the urban fabric. Parties involved increase of stretches of urban and village walls that are visible ; Increase of wall spaces used.

193 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Cividale del Friuli buffer zone Objective 9 ENHANCEMENT OF CHURCHES AND MONASTERIES IN CIVIDALE

Project 9.1 Definition of visiting systems for the churches and monasteries Description The visiting route aims to optimise the Longobard aristocracy churches, in some cases founded by the Longobards or privileged burial sites; in particular, San Giovanni in Xenodochio, Santa Maria di Corte, San Salvatore (now San Silvestro) and San Martino. A system of routes and educational materials must be created that allows the signs of Longobard presence in Cividale to be recognised, Also in contexts that have undergone several changes in the architectural organisation over the centuries. The monasteries of San Giorgio in Vado, of San Domenico and of San Francesco are ancient and artistically and architecturally prestigious. The latter will be included in this route, also in its role as a conference centre.

View of the city with the main churches

Hypotheses for the organisation of churches and monasteries visiting routes

Actions 1. Designing and identification of routes. 2. Organisation of a guided tours programme with set access. 3. Creation of illustrative brochures. 4. Creation of educational panels on the history of churches.

194 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

Parties involved Municipality of Cividale del Friuli Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept Parish of Santa Maria Assunta Phases and timeframes Starting in 2009 Financial resources Funds to be found by: Municipality of Cividale del Friuli; Friuli Venezia Giulia Regional Administration; private and bank sponsorships. Expected results Increase of knowledge of places and heritage linked to the Longobard presence in Cividale; Increase of attention on places and heritage linked to the Longobard presence in Cividale. Parties involved Increase of amount of information on heritage. Increase of amount of illustrative material available for visitors

ENHANCEMENT PLAN Cividale del Friuli buffer zone Objective 9 ENHANCEMENT OF CHURCHES AND MONASTERIES IN CIVIDALE

Project 9.2 Identification of improvement work for visibility-use Description In the context of the visiting route foreseen for the churches (Project 7.1) work will be carried out to reorganises spaces in front of churches to improve visibility and use. Actions 1. Arrangement of area near to the Church of San Giovanni in Xenodochio 1. Arrangement of area near to the Church of Santa Maria di Corte. Parties involved Municipality of Cividale del Friuli; Friuli Venezia Giulia BAPSAE and Archaeological Superintendence Dept; Parish of Santa Maria Assunta Phases and timeframes 1. By 2009 2. By 2009-2010. Financial resources 1. Funds to be found by the Municipality of Cividale del Friuli, R.L. n.2/83. 2. Funds to be found by the Parish of Santa Maria Assunta with contributions from the Friuli Venezia Giulia Regional Administration: R.L.53/85. Expected results Increase of attention on places and heritage linked to the Longobard presence in Cividale. Parties involved Increase in quality of used space.

ENHANCEMENT PLAN Cividale del Friuli buffer zone Objective 10 ENHANCEMENT OF HISTORICAL CITY CENTRE

Project 10.1 Upgrading squares and streets Description Through annual and three-year plans, the Administration foresees the carrying out of public works on the entire municipal area. In particular, for the Historical town centre and the buffer zone area, work is planned that aims to improve the current urban and architectural set-up, upgrading existing structures, with particular attention paid to streets and squares. Repaving work will be carried out using traditional materials adapted for the various contexts; stone walls will be restored in Piazza San Biagio; improvement of access to river; creation of some pedestrian areas

Actions 1. Restoration of piazza Foro Giulio Cesare: rip; 2. Restoration of piazza Picco named “ex area Q8”; 3. Restoration of piazza San Biagio (I lot); 4. Restoration of piazza San Biagio (II lot) and relative pedestrian area; 5. Restoration of piazza San Francesco, piazza San Giovanni and piazza Garibaldi; 6. Restoration of paving in via Monastero Maggiore and relative pedestrian area. Parties involved Municipality of Cividale del Friuli Phases and timeframes 1. Commencement work September 2007 Completion of work 2008 2. Commencement and completion of work 2008 3. Commencement and completion of work 2008 4. Commencement work 2009 Completion of work 2010 5. Commencement work 2010 Completion of work 2012 6. Commencement and completion of work 2010 Financial resources Funding foreseen, 2,000,000, responsibility of Municipality of Cividale del Friuli and partly already allocated Expected results Improvement and upgrading of urban set up of roads and squares in the historical town centre; safeguarding of prestigious aspects of River Natisone, also guaranteeing safety at the same time

195 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

Result indicators Number of interventions carried out and number of areas restored

ENHANCEMENT PLAN Cividale del Friuli buffer zone Objective 10 ENHANCEMENT OF HISTORICAL CITY CENTRE

Project 10.2 Improvement of urban image quality Description The Administration reserves considerable attention to the protection and conservation of the Historical town centre and the entire surrounding inhabited area. In this context, the updating and adaptation of the Construction Regulations and the approval and activation of the "Urban Colour and Furnishing Plan", a project that the municipal administration intends to use as an operational instrument to monitor and control actions on “buildings” and include indications for urban furnishing for the town in it. The conservation of the urban apparatus, in fact, cannot be separated from the identification of a method that encodes a practice for interventions that provide the necessary monitoring and control instruments for actions on work by the competent bodies. The urban colour and furnishing plan must appoint and provide indications for the treatment of public and private land (pavements, paved and unpaved surfaces, gardens etc.), furnishing elements (shelters, bus stop poles, benches, flower tubs, clocks, fences, newsagent’s, platforms, waste bins, public parking structures and signs in general) and on the choice of colours. Actions 1. Preliminary analyses; 2. Surveys; 3. Drawing up of Colour and furnishing plan 4. Application and monitoring. Parties involved Municipality of Cividale del Friuli Phases and timeframes 1-3 already implemented 4 starting from 2008 Financial resources The project foresees a cost for the Municipal Administration of about 8,000.00 Euro for the creation of the project. Expense for implementing urban furbishing of work was foreseen in the municipal budget with its own resources and dedicated income (R.L. 2/1983). Expected results Encoding of files on stated work; further improvement of Historical town centre image Result indicators Number of interventions for improvement of urban image

ENHANCEMENT PLAN Cividale del Friuli buffer zone Objective 10 ENHANCEMENT OF THE HISTORICAL CITY CENTRE

Project 10.3 Setting up of panoramic routes along the Natisone river Description The River Natisone is one of the most important water routes in Friuli Venezia Giulia due to its size, geo-morphological characteristics and position; it is one of the elements that characterises the entire municipal territory and in particular its historical town centre. The action acknowledges the strategic location of this river and aims to enhance the environmental qualities and all the landscape characteristics of the place, by creating some panoramic routes along the banks of the river. In particular, the restoration of the path from Borgo di Ponte to the “Belvedere” on the left bank, the creation of the path from Riva della Broscandola to Piazza San Biagio on the right bank and generally the arrangement of access to the river in the buffer zone.

196 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

View of the Natisone river gorge Actions 1. Arrangement of access to the River Natisone also expanding the Gorge lighting system. 2. Restoration of pedestrian path from Borgo di Ponte to the “Belvedere” on the left bank; 3. Creation of path from Riva della Broscandola to Piazza San Biagio. 4. Designing and creation of a lighting system that optimises the Natisone gorge Parties involved Municipality of Cividale del Friuli Phases and timeframes 1 - Commencement and completion of work 2009 2 e 3 -Commencement and completion of work 2010 Financial resources €. 750,000.00 funding, already partly allocated by the Municipality of Cividale del Friuli partly by the Friuli Venezia Giulia Regional Administration Expected results To enhance the area of the River Natisone further and the environmental and landscape characteristics of the area. Result indicators Number of accesses and panoramic points on the River Natisone

ENHANCEMENT PLAN Cividale del Friuli territory Objective 11 EXPANSION OF THE CULTURAL OFFER IN THE DUCHY OF FRIULI TERRITORY

Project 11.1 Creation of Longobard itineraries:: “Longobard places of art and power” Description Structuring of thematic routes with specific signs, educational equipment and publication of specific maps that concern both places in Friuli and in nearby Slovenia, directly involved in the Longobard route from Pannonia towards Italy. Actions 1. Definition of sites involved and stipulation of agreements. 2. Creation of cultural itineraries on the route “Art and power in the Longobard era: Places of worship and monasteries”. 3. Creation of the route “The Longobard roads: necropolis in the area”, with expansion of the exhibition of Romans d’Isonzo and the identification of other exhibition centres. 4. Creation of the notice boards and the explanatory devices for the thematic routes. 5. Creation of educational and scientific material to illustrate itineraries and the territory. 6. Definition of inter-relation system between Friuli Duchy itineraries and the other sites of the network, with other Italian locations linked to the history and presence of the Longobards and with the sites on the Geocultural Corridor. Parties involved Friuli and Slovenia municipalities; Province of Udine, ; Friuli Venezia Giulia Regional Administration; Slovenia Cultural Institutions (Academy of Lubiana); Slovenian State; Ministry of Culture; Secretarial Office for Cultural Heritage. Phases and timeframes Mid-term Financial resources Funds to be found by: Friuli Venezia Giulia Regional Administration; European Community funds Expected results Increase of cultural and tourist offer in region Result indicators Number of sites involved and breadth of area involved by routes. Relations with other initiatives in Italy and Europe. Increase of tourist flow

197 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Cividale del Friuli territory Objective 11 EXPANSION OF THE CULTURAL OFFER IN THE DUCHY OF FRIULI TERRITORY

Project 11.2 Expansion of the museum network “The Castra of Paolo Diacono and the Duchy of Friuli” Description The museum network on fortified sites foresees the organisation of a connection system for the visiting routes to the sites with Early middle ages fortification ruins, in the context of a common circuit, linked to some exhibition centres such as the one currently being created in Artegna that will become the visiting centre of Colle di San Martino, an exhibition centre of findings and the centre of the Early middle ages castra network system. A route that involves the Early middle ages fortifications must also take into consideration the ones in the in Slovenia, as, for example, in the case of the Tonocov-grad castrum, above Caporeto, which guards the entrance to the Natisone valley that leads to Cividale.

1 2

3 4

5 1. View of Gemona Castrum 2. View of Artegna Castrum 3. View of Cormons Castrum 4. View of Ragogna Castrum 5. View of the river valley with the hilltop of Invillino Actions 1. Definition of sites to which the network between Friuli and Slovenia will be extended 2. Creation of routes part of the “Longobard Friuli – places of art and power” itineraries 3. Creation of notice boards 4. Creation of educational equipment 5. Completion of main network centre in the castle of Artegna Parties involved Municipalities of Artegna, Osoppo, Gemona, Nimis, , Udine, Villa Santina, Ragogna, Cormons, Castelnovo del Friuli; Province of Udine; Province of Pordenone Phases and timeframes Short-mid term

198 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

Financial resources Funds to be found by: Municipality of Cividale del Friuli; Province of Udine; Friuli Venezia Giulia Regional Administration; European Community Funds. € 2,000,000.00 have been allocated by the Friuli Venezia Giulia Regional Administration, R.L. 10/2000 for the restoration of the castle of Artegna Expected results Creation of an integrated routes system and increase in use of sites Result indicators Number of sites involved and extent of territory; increase in number of visitors

ENHANCEMENT PLAN Cividale del Friuli territory Objective 11 EXPANSION OF THE CULTURAL OFFER IN THE FRIULI DUCHY TERRITORY

Project 11.3 Expansion of the use of the Abbey of Sesto al Reghena Description Improvement of the offer for visits for the Abbey and the use of the Urn of Sant’Anastasia. Connection of abbey visiting route to the group of Longobard itineraries in the network, also by means of the expansion of the already existing programme for the entry to the network and the enhancement of the monastic sites entitled “Along the Abbey route”: Sesto al Reghena »

View of the Monastery and its park Actions 1. Designing and creation of the visiting route 2. Creation of specific notice boards and multimedia equipment 3. Creation of relations with other sites 4. Creation of tourist-cultural guidebooks Parties involved Municipality of Sesto al Reghena; Province of Pordenone Phases and timeframes Short-mid term Financial resources Municipality of Sesto al Reghena, Province of Pordenone; FVG Regional Administration A request was made to the Region for a total of €35,000 for 2008, according to the Regional Law no. 68/81 Title IV, for the improvement of the urn of Sant’Anastasia. € 2,000 were allocated by the Municipality and a request for funds has been made to the Region, R.L. no. 12/06 – article 6 for € 15,000 for the creation of a tourist-cultural guide Expected results Expansion of visiting system and tourist-cultural offer Result indicators Quality, variety and extent of explanatory education equipment, increase in number of visitors and of diffusion of information-providing material

199 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Cividale del Friuli territory Objective 12 ENHANCEMENT OF ENDOGENOUS RESOURCES IN THE AREA

Project 12.1 Creation and enhancement of the Vines and Wines Park Description Vines and wines are symbols of the economy but is also an aspect of the landscape, part of the culture and the design of the territory. By means of the territorial planning tool entitled the “Vines and Wines Park”; the intention is to help, and qualify the winemaking use of the areas surrounding the Municipality of Cividale del Friuli, the sub-hill area of the Province of Udine known as Colli Orientali del Friuli. The project aims to enhance the cultural and landscape context of an area with a High-level enogastronomic vocation. Later steps will be carried out to prepare tool that regulate the specific interventions and development plans. The preparation of the Thematic project “Vines and Wines Park”, under the form of a supra- municipal “Master Plan” coordinated by the province, foresees the construction of a planning tool with guided proposals for operational projects concerning work, development plans, planning tools for the enhancement of the local particular and specific characteristics of the vine areas, the protection of the landscape and the environment , the conservation of natural and cultural elements etc.

View of vineyards on the Colli Orientali del Friuli Actions 1. Recovery and upgrading of existing agricultural buildings 2. Creation of recreational routes (excursions, cycling paths, horse-riding tracks) 3. Optimisation of hotel and farmhouse-tourist accommodation Parties involved Ministry of Agricultural, Food and Forestry Policies Friuli Venezia Giulia Regional Administration Province of Udine Municipalities of the Colli Orientali (20 municipalities, including Cividale del Friuli) Consortium DOC Colli Orientali del Friuli Association “Movimento Turismo del vino” National Association “Città del Vino”. State Technical Agricultural Institute Paolino d’Aquleia University of Udine Phases and timeframes 2007-2013 (implementation time for the Friuli Venezia Giulia Rural Development Programme, connected to the plan in question)

Financial resources approx €. 2,000,000,00 Funds to be found by: Ministry of Agricultural, Food and Forestry Policies, Friuli Venezia Giulia Regional Administration, Province of Udine; European Union

Expected results Optimising and promoting of candidate site, including it in its cultural, environmental and typical landscape context

Result indicators Number of cultural, recreational and enogastronomic activities and initiatives linked to surrounding area of Site and buffer zone.

200 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Cividale del Friuli territory Objective 12 ENHANCEMENT OF ENDOGENOUS RESOURCES IN THE AREA

Project 12.2 Creation of thematic routes: “The Archive Vineyards” Description It is possible to trace the historical presence of vines and vineyards in various parts of the area from the parchments and antique documents kept in the various historical-document archives in Cividale del Friuli. The identification search of the places – started in 2007 – will allow mapping of the winemaking areas in the territory and the formation of historically certified routes, also connected to current winemaking production. This search – that is also connected to similar archives on the history of the Aquileia Patriarchy – will allow greater knowledge of local wine culture traditions and an expansion of current economic activities. Actions 1. Completion of archive research 2. Completion of territorial research 3. Construction of maps and itineraries 4. Formation of dedicated database 5. Agreements with regional, provincial, local institutions, producers’ organisations and wine-making companies 6. Production of signs, maps and brochures 7. organisation of guided tours coordinated with the Vines and Wines Park and with the Alpe Adria Enogastronomy Centre Parties involved Promoting committee for the Aquileia Patriarchy Project Local, provincial, regional public institutions FVG archaeological and archive superintendence departments Producer category organisations Wine-making companies Observatory on the evolution of the landscape-cultural mosaic Vines and Wines Park Alpe Adria Centre of Eno-gastronomy Public and Private Sponsors Phases and timeframes 2008-2012 Financial resources €. 25,000.00 acquired for 2008 with funding from the Banca Popolare FriulAdria/Credit Agricole and the Friuli Venezia Giulia Region €. 150,000.00 to be acquired by: Friuli Venezia Giulia Regional Administration (Rural Development Plan); private firms and bank sponsorships Expected results Creation of a specialised route (wine tourism) certified by verified historical documents; enhancement of overall territorial tourist proposal Result indicators Presentation of research Production of maps, brochures and signs Number of companies involved Number of guided tours

201

202 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Brescia site Objective 13 HEIGHTENING OF THE ENHANCEMENT LEVEL OF THE SITE STRUCTURES

Project 13.1 Arrangement of the green area to the south of the Ortaglia domus Description Extraordinary maintenance of the green areas and realisation of a car park for service vehicles in the space to the south of the Ortaglia domus.

Actions 1. Clearing of building waste currently stored 2. Realisation of automated irrigation plant 3. Realisation of green area with grass seeding and shrub planting 4. Realisation of the car park area Parties involved Municipality of Brescia Brescia Museum Foundation Phases and timeframe Design of irrigation plant and green spaces already realised Realisation of car park foreseen by June 2008 Financial resources Total cost circa € 80,400.00 Funds set by the Municipality of Brescia Expected results New use of the area also for the organisation of exhibitions and open-air events Result indicators Increase in available surface area of about 800mq

ENHANCEMENT PLAN Brescia site Objective 13 HEIGHTENING OF THE ENHANCEMENT LEVEL OF THE SITE STRUCTURES

Project 13.2 Completion of the irrigation plant for the green areas Description Realisation of an automatic irrigation plant in the San Salvatore cloister Actions 1. Installation of distribution networks, of the programming control box, valves, irrigators, etc. 2. Re-integration of medium sized shrubs Parties involved Municipality of Brescia Brescia Museums Foundation Phases and timeframe Realisation foreseen by June 2008 Financial resources Total cost: €8,835.00 Funds set by the Municipality of Brescia Expected results Improvement in the decorum and green equipment in the site Result indicators Automatic irrigation of circa 1000mq

203 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Brescia site Objective 13 HEIGHTENING OF THE ENHANCEMENT LEVEL OF THE SITE STRUCTURES

Project 13.3 Internal illumination for the Church of Santa Maria in Solario Description The intervention foresees the renovation of the lighting system of the Cross of Desire with new LED (1) technology for the church of Santa Maria in Solario in order to make the frescos decorating walls more visible.

Actions 1. Renovation of the ceiling of the showcase containing the Cross of Desire in order to prepare it for the installation of the LEDs 2. Installation of the LEDs and realisation of the electric plant 3. Installation of the new spotlights Parties involved Municipality of Brescia Brescia Museums Foundation Phases and timeframe Realisation by January 2008 Financial resources Total cost: €7,123.60 Resources allocated by the Municipality of Brescia Expected results Preparation of the maintenance programme with identification of interventions to be realised, times and relative controls. Result indicators Renovation of 15 light sources

ENHANCEMENT PLAN Brescia site Objective 13 HEIGHTENING OF THE ENHANCEMENT LEVEL OF THE SITE STRUCTURES

Project 13.4 External illumination for the monastery Description The external illumination of the buildings of the monastery is currently poor. The proposal is to realise a lighting project to renovate it, paying particular attention to Highlight Santa Maria in Solario on the via Musei side and the bell tower of the church of San Salvatore, on the via Piamarta side which leads to the Cidneo hills Actions 1. Compilation of the lighting project 2. Verification test 3. Realisation of operation Parties involved Municipality of Brescia Brescia Museums Foundation Phases and timeframe Starting from 2009 Financial resources Funds to be raised Expected results The site is more visible and the extraordinary effect of the monastic complex is increased Result indicators

204 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Brescia site Objective 14 INCREASE IN THE QUALITY OF THE SERVICES OFFERED TO VISITORS

Project 14.1 Realisation of a visitor centre on the monastery and on the Longobard sites network Description Set-up at the entrance of San Salvatore-Santa Giulia city Museum of an information centre dedicated to the monumental site and the other centres that are part of the Longobard sites network Actions 1. Acquisition of new locations 2. Preparation of informative graphic material 3. Preparation of informative multimedia products Parties involved Municipality of Brescia- Museum Sector; Brescia Museums Foundation Phases and timeframe From 2009 Financial resources To be quantified and raised Expected results Distribution of knowledge on Italian Longobard sites Result indicators Number of visitors

ENHANCEMENT PLAN Brescia site Objective 14 INCREASE IN THE QUALITY OF THE SERVICES OFFERED TO VISITORS

Project 14.2 Automation of the ticket sales system and expansion of the management software Description Creation of an integrated system for till management for both the ticket office and the museum book-shop (with relative warehouse management). In this way the system will allow a set of data on visitors to be computerised which is important for monitoring the visitors for statistics and for improving the design of marketing operations. Actions 1. Analysis of the current system 2. Purchase of new machines 3. Installation of the system 4. Training for museum operators on the use of the system Parties involved Brescia Museums Foundation Phases and timeframe Realisation foreseen by June 2008 Financial resources Total cost: approx. €20,000.00 Funds set by the Brescia Museums Foundation Expected results Speed up ticket and book-shop sales and computerise visitor data Result indicators Number of tickets sold on-line

ENHANCEMENT PLAN Brescia site Objective 14 INCREASE IN THE QUALITY OF THE SERVICES OFFERED TO VISITORS

Project 14.3 Activation of the e-commerce service relating to the City museums commodities Description Creation of a web e-commerce system for selling tickets and book-shop merchandising of the Santa Giulia museum Actions 1. Design the solution 2. Activation of on-line sales system Parties involved Brescia Museums Foundation Phases and timeframe Realisation foreseen by 2008 Financial resources Total cost: €12,000.00 Funds set by Brescia Museums Foundation Expected results Increase in the service offered to visitors Result indicators Number of on-line sales

205 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Brescia site Objective 14 INCREASE IN THE QUALITY OF THE SERVICES OFFERED TO VISITORS

Project 14.4 Improvement of the video systems available to users Actions 1. Replacement of 3 PCs and relative monitors displaced along the museum path (Roman section) available for visitors for didactic videos for knowledge of the site 2. Supply and installation of a projector and screen to replace the existing projection system 3. Interventions Parties involved Municipality of Brescia Brescia Museums Foundation Phases and timeframe By January 2008 Financial resources Total cost: €1,944.00 Funds set by the Municipality of Brescia Expected results Better use on the part of visitors Result indicators Number of users

ENHANCEMENT PLAN Brescia site Objective 14 INCREASE IN THE QUALITY OF THE SERVICES OFFERED TO VISITORS

Project 14.5 Improvement of the services offered to the users of the Santa Giulia Auditorium and the side gallery annexe Description a) Darkening the windows to improve vision of the projections in the auditorium; b) Improvement of the audio system; c) News lighting in the gallery annexes to improve the setting at the time of temporary exhibitions and events d) Agreement with Brescia Trasporti s.p.a. for a shuttle service available to those wishing to reach the auditorium

Actions 1. Intervention a) and b) 2. Intervention d) 3. Intervention c) / Replacement of the electrified bars and relative supports; installation of LEDs and relative programming control panel Parties involved Municipality of Brescia Brescia Museums Foundation Phases and timeframe Realisation foreseen by June 2008 Financial resources Total cost: to be defined Funds set by the Municipality of Brescia Expected results Better conditions of use for users Result indicators Number of users

206 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Brescia site Objective 15 EXPANSION OF THE ARCHAEOLOGICAL AREAS MADE INTO MUSEUMS IN THE SITE

Project 15.1 Dig and museumification of the domus to the south of Ortaglia Description The project, in line with that already realised in 2003, foresees archaeological investigation to the south of the Ortaglia domus, where there are known to be archaeological structures relative to other habitations of the Roman era. The characteristics of the current structure, which protects the domus and consents visits, can be extended to the south to encompass eventual new archaeological structures, guaranteeing a considerable extension to the visiting area.

Actions 1. Archaeological dig to the south of the Ortaglia domus 2. Design of cover 3. Camping for pre-consolidation and protection of the emerged structures 4. Realisation of cover 5. Final consolidation and cleaning of archaeological remains 6. Museographic set-up and didactics for the visiting route Parties involved Municipality of Brescia; Superintendency for the Archaeological heritage of Lombardy; Brescia Museums Foundation Phases and timeframe About three years Financial resources Necessary 5,000,000.00 Euros, to be raised Expected results Increase in the extension of the museumificated archaeological areas Result indicators Museumification of circa 2000mq

ENHANCEMENT PLAN Brescia site Objective 15 EXPANSION OF THE ARCHAEOLOGICAL AREAS MADE INTO MUSEUMS IN THE SITE

Project 15.2 Museumification of the domus in the southern cloister of the site Description In the cloister of San Salvatore from 1982 to 1990 an extended district of the Roman era was uncovered, with about 60 environments paved with mosaics and decorated with frescos, with courtyards, stairs and interconnecting corridors,. The structures were completely re-covered awaiting museumification and two volumes of study were dedicated to them. After the complete opening of the city Museum it is opportune to continue with the museumification study of this extraordinary archaeological complex in which there are traces of the first Longobard settlement.

207 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

Actions 1. Design of a museographic project 2. Restoration of the previously dug structures 3. Realisation of cover 4. Final consolidation and cleaning of archaeological remains 5. Museographic set-up and didactics for the visiting route Parties involved Municipality of Brescia; Superintendency for the Archaeological heritage of Lombardy; Brescia Museums Foundation Phases and timeframe 30 months Financial resources 3000,000.00 to be raised Expected results Increase in the extension of the museumificated archaeological areas Result indicators Museumification of circa 1500mq

ENHANCEMENT PLAN Brescia site Objective 16 ENHANCEMENT OF THE ARCHAEOLOGICAL AREA OF CAPITOLIUM

Project 16.1 Recovery project of the archaeological area of Capitolium Description The project consists of furthering knowledge regarding the archaeological area of Capitolium of Brescia, its completed archaeological and architectural restoration, its valorisation and the complete and final opening to the public. In the archaeological area located in the centre of the urban fabric the most ancient and significant buildings of the Roman city are still visible: the sanctuary of the republican era (first century AD), the Capitolium (73 AD), the theatre (first to third century AD) and part of the decumanus maximus. Furthermore, the area opens onto the present piazza del foro, which conserves remnants of the roman square (first century AD). Archaeological remains (forum and spa; basilica) can also be visited under the palazzi which today constitute the limits of the legal auditorium. Apart from these Roman buildings, there are also Early medieval, renaissance and modern palazzi of the nobility which “rise” directly from ancient ruins (Palazzo Maggi Gambara, Casa Pallaveri, both communal property). In this well circumscribed area of the city, therefore, there is uninterrupted stratigraphical evidence which extends from the second century AD to the Eighth century, particularly rich, articulated and dense in content. In the capitolium in 1830, moreover, the site of the Patrio Museum was placed (afterwards the Romano Museum) the first public museum to inaugurate the museological vocation of this area. Following the first circumscribed interventions, carried out by the FIO (first of all regarding the monastery of Santa Giulia- the City Museum and then, as far as the capitolium are is concerned, the partial recovery of Casa Pallaveri and the late republican sanctuary) and with the FRISL project, financed for the first lot of works on the theatre and Palazzo Maggi Gambara. Starting from 1990 there were archaeological digs, consolidation and restoration aimed specifically at a better knowledge of the archaeological and architectural stratigraphy, making all that was progressively uncovered safe and modern buildings involved in the

208 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

operations. The opening of this special area to the public (at the moment it is open now and again), apart from giving the most important urban portion of the ancient city back, constitutes the completion of the museum routes of the City Museum in Santa Giulia in about ten year’s time.

Actions 1. Recognition of movable material and property 2. Allocation of study tasks 3. Completion of archaeological investigations 4. Conservation of the various types of structure and decorative apparatus 5. Compilation of museological project 6. Compilation of museographical project 7. Compilation of didactic tools project 8. Compilation of executive project 9. Realisation of intervention 10. Opening to the public Parties involved Municipality of Brescia; Ministry for Cultural Assets and Activities –Regional Management for Cultural Assets and Landscapes of Lombary – Superintendency for the Archaeological Assets of Lombardy; Brescia Museums Foundation; CAB Foundation

Phases and timeframe 3-5 years starting from 2008

209 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

Financial resources 11,000,000.00 Euros. As from January 2008 1,250,000.00 Euros are available (Ministry and Municipality of Brescia); the rest are to be raised Expected results Museumification of the entire archaeological area Result indicators Opening to the public of about 4000 square metres of visitable archaeological area and 3 visiting routes inside historical buildings

ENHANCEMENT PLAN Brescia site Objective 16 ENHANCEMENT OF THE ARCHAEOLOGICAL AREA OF CAPITOLIUM

Project 16.2 Urban equipment of via Musei and the Forum Description To valorise the archaeological area of Capitolium in the best way and to connect it more efficiently with San Salvatore-Santa Giulia. City museum, it is opportune to intervene also on the urban equipment along via Musei Actions 1. Replacement of road surface (remove asphalt and replace with porphyry in alignment with the other streets of the historical centre) 2. Design of suitable lighting 3. Design of suitable road signs 4. Insertion of green areas and parking structures Parties involved Municipality of Brescia, Brescia Museums Foundation Phases and timeframe By 2010 Financial resources To be quantified and raised Expected results Improvement in use of this urban space, full of the most significant testimonials of archaeology and art in Brescia Result indicators Placement of a congruous number of benches, flower pots, light sources and signs.

ENHANCEMENT PLAN Brescia buffer zone Objective 16 ENHANCEMENT OF THE ARCHAEOLOGICAL AREA OF CAPITOLIUM

Project 16.3 Expansion of museum set-up in the archaeological area of the Roman basilica in Labus square Description In the palazzo at number 3 in piazza Labus, characterised by a plant which goes back to the seventeenth century, when a long series of changes and adaptations was made to the block which in medieval times was back-to-back with the Roman remains now ruins, there is the site of the offices of the Superintendency for the Cultural Assets of Lombardy. Digs and restoration of the complex were carried out from 1993 and 1998; inside on the underground floor, it is possible to visit the internal areas of the Flavian Basilica: in particular the marble opus sectile floors and parts of the elevation are visible. In the same space parts of the forum flooring have been left in sight, these date back to the - Julius Claudius era, medieval walls with significant elements of reuse, bases with inscriptions (one which mentions the cursus honorum of Nonio Macrino) and architectural elements. In a small area next to the archaeological area is foreseen the exhibition of the materials recovered in the dig. Visitors will find all the findings originating from the site, from Iron-age ceramics to those of the Celtic and Etruscan-Padan settlement, up to medieval and renaissance materials. An important glimpse of articulate Brescian archaeological reality and its rich stratigraphy. Actions 1. Preparation of new set-up 2. Realisation of multimedia station 3. Realisation of didactic material for schools Parties involved Ministry for Cultural Assets and Activities Superintendency for the Archeological Assets of Lombardy Phases and timeframe By January 2008 Financial resources 25,000.00 Euros on ministerial funds Expected results Enrichment of the museum offer inside the building Result indicators Insertion of about 50 new archaeological findings; 1 computer station

210 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Brescia buffer zone Objective 17 COMPLETION OF MUSEUM SPACES AND HEIGHTENING OF THE STATUS OF ENHANCEMENT IN THE CASTLE AREA

Project 17.1 Adaptation and expansion of the Museum of Arms Description The Museum of Arms is set up inside the viscount look-out tower of the castle. Currently extraordinary maintenance work is in progress on the structures and wooden furniture and the roof is being rebuilt. Requalification work is in the design phase, this foresees a wide study for the destruction of architectural barriers (including the whole area of Torre Mirabella), the realisation of a new entrance, arrangement of access areas, standardisation of technical plant and the realisation of surrounding hygiene services. In particular, restoration and structural interventions are foreseen for opening “big tanks” on the lower floor of the large room for positioning services and creating a welcoming area for the public with presentation of the museum and the structures that house it.

Actions First phase: extraordinary maintenance on wooden floors and fixtures (entrance doors and windows) general review of windows, the stairs to the upper floors, parapets and handrails compilation of the evacuation plan, integration of emergency and safety signs, adaptation of safety exits Second phase: 1st lot 1. Design and destruction of external architectural barriers 2nd lot 2. Design and destruction of museum architectural barriers 3. Design and realisation of new entrance 4. Arrangement of access areas 5. Standardisation of technical plant 6. Realisation of internal hygiene services Parties involved Municipality of Brescia Brescia Museums Foundation Phases and timeframe First phase : starting January 2008 Second phase: 1 st lot from June 2008 2nd lot to be defined Financial resources Total cost first phase: circa €60,000.00 Total cost second phase: 1st lot 250,000.00 2nd lotto 2,100,000.00 Funds set by the Municipality of Brescia Expected results Possibility of a complete museum visit, with introductory informative apparatus and adequate services Result indicators Preparation of: 1 entrance; 1 bookshop; 1 ticket office; 1 service; 1 lift

211 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Brescia buffer zone Objective 17 COMPLETION OF MUSEUM SPACES AND HEIGHTENING OF THE STATUS OF ENHANCEMENT IN THE CASTLE AREA

Project 17.2 Re-arrangement and re-opening of the Museum of Risorgimento Description Extraordinary maintenance work is in progress on the Grande Miglio building which currently houses temporary exhibitions dedicated to the risorgimento era which in the next few years will be the subject of refurnishing work for the future re-opening of the Museum of the Risorgimento with the exhibition of the permanent collection according to the studies carried and the refurnishing of three “sample” sections opened in 2005, 2006 and 2007. The new order of the museum foresees time scheme-topical distribution which tends to underline the interconnections in a complex society such as that of the eighth century

Actions First phase: extraordinary maintenance work on the buildings 1. Replacement of fixtures and fittings in the Grande Miglio 2. Renovation of technological plant 3. Compilation of evacuation plans 4. Realisation of emergency signs Second phase: new permanent exhibition 5. Preparation of order project 6. Conservation of works 7. Compilation of didactic-explanatory apparatus 8. New set-up of museum

Parties involved Municipality of Brescia Brescia Museums Foundation Phases and timeframe First phase: 2008-2009 Second phase: 2009-2010 Financial resources Total estimated cost 4,500,000.00 € Funds set by the Municipality of Brescia Expected results Total re-opening of the museum, updated according to the most current criteria Result indicators Number of visitors

ENHANCEMENT PLAN Brescia buffer zone Objective 17 COMPLETION OF MUSEUM SPACES AND HEIGHTENING OF THE STATUS OF ENHANCEMENT IN THE CASTLE AREA Project 17.3 Unified management of the whole area

Description The area of Castello, into which the competence of different and numerous municipal offices and private associations converge, requires a unified management system. A study is therefore being carried out, on the part of the Municipality of Brescia and the involved stakeholders, of a management system which, apart from co-ordinating all the initiatives and activities of the Castello, should also lead to the re-qualification of some green areas, the realisation of permanent service structures (public exercises) and the realisation of itineraries of access and connection with the urban centre (by means of lifts and escalators, for

212 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

example).

Actions 1. Total design Parties involved Municipality of Brescia Brescia Museums Foundation Phases and timeframe Year 2009 Financial resources Resources to be found Expected results More usability on the part of the citizenry; co-ordination of activities carried out in the area Result indicators Number of activities and co-ordinated initiatives

ENHANCEMENT PLAN Brescia buffer zone Objective 17 COMPLETION OF MUSEUM SPACES AND HEIGHTENING OF THE STATUS OF ENHANCEMENT IN THE CASTLE AREA

Project 17.4 Temporary exhibitions programme Description The buildings of the Piccolo and Grande Miglio in Castello are used throughout the year for organising temporary exhibitions, particularly dedicated to the evaluation and promotion of works of art by local contemporary artists. Actions 1. Programming of exhibitions 2. Setting up exhibitions 3. Opening to the public with free entrance Parties involved Municipality of Brescia Brescia Museums Foundation CAB Foundation Phases and timeframe Year 2008 Financial resources Total cost: circa €100,000.00 Funds set by CAB Foundation Expected results More usability of the museum sites and the whole area of the Castle by the public Result indicators Confluence of public

213 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Brescia buffer zone Objective 18 REQUALIFICATION AND ENHANCEMENT OF THE SO-CALLED HERITAGE BUILDINGS

Project 18.1 Requalification of the Tosio Martinengo Picture Gallery Description The words “Palazzi dell’arte” refer to an area to the south of via dei Musei characterised by the presence of three imposing palazzi which should be put forward, according to one project, for the conservation and valorisation of figurative, pictorial, sculptural and graphic heritage. This vocation stems from the presence in this area of the palazzo Martinengo da Barco which for over one hundred years has housed the Tosio Martinengo Picture Gallery and by the vicinity of another historical palazzo linked to the formation of the museums, the noble residence of count Paolo, a fine and cultured collector, which he transformed precisely for receiving art collections bought over the years. To this prestigious site could also be added, as proposed for some time, for an opportune expansion of permanent exhibitive spaces and for an area destined for temporary exhibitions, palazzo Martinengo Colleoni, very near to the other two sites, which, of municipal property, would free itself of the functions of justice palace, performed up to now. In particular palazzo Martinengo da Barco, site of the Tosio Martinengo Picture Gallery, requires air conditioning, re-design of the exhibition area, to be expanded according to the most recent studies on the works and finally suitable storage.

Actions 1. Set-up of new exhibitive rooms located on the ground floor 2. Opening of eighth century garden with requalification work in the green area and drawing up of the lighting project with renovation of the lighting plant 3. Renovation of the air conditioning plant 4. Restoration of flooring in the exhibitive areas through the removal of the current covering now worn; 5. Video surveillance plant in the museum rooms 6. Expansion of storage areas 7. Compilation of the evacuation plan, integration of emergency and safety signs, installation of more fire detectors in the storage areas; adaptation of safety exits 8. Replacement of all fixtures in the exhibition gallery Parties involved Municipality of Brescia Brescia Museums Foundation Phases and timeframe By the end of 2008 Financial resources 140,000.00 Euros. Funds set by the Municipality of Brescia + 300,000.00 Euros for the air conditioning plant Expected results Expansion of exhibitive areas Result indicators Number of visitors

214 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Brescia buffer zone Objective 18 REQUALIFICATION AND ENHANCEMENT OF THE SO-CALLED HERITAGE BUILDINGS

Project 18.2 Requalification of Palazzo Bonoris, site of the Athenaeum of Science, Letters and Arts

Description Palazzo Bonoris, of municipal property, was destined as site of the historical Athenaeum of Science, Letters and Arts of Brescia and there are now structural adaptation works in progress and preparation for the opening of a modern library which will house the archive of the historical cultural institution and the numerous volumes pertaining to it. The ample spaces of the palazzo also allow preparation for meetings, conferences and offices in the large living room with seventh century frescos. Actions 1st lot: 1. Extraordinary maintenance of the cover, realisation of elevator plant and specialist electrical and safety work. 2nd lot 2. construction of library tower and public opening Parties involved Municipality of Brescia Phases and timeframe 1st lotto by the end of 2008 2nd lot starting from 2009 Financial resources Funds set by the Municipality of Brescia Total cost of the 1st lot: Building works €504,445.97 Plant € 106,130.00 Expected results Adaptation of the site to the activities of the Academy Result indicators Number of library users; number of promoted initiatives

ENHANCEMENT PLAN Brescia buffer zone Objective 18 REQUALIFICATION AND ENHANCEMENT OF THE SO-CALLED HERITAGE BUILDINGS

Project 18.3 Requalification of Palazzo Tosio as museum site of the Nineteenth Century Collection Description The palazzo Tosio, formerly site of the Athenaeum, of municipal property, will be restored as a museum site for the exhibition of civic collections of the Eighth century. The Palazzo itself, moreover, fruit of the intervention of the architect Rodolfo Vantini, fully reflects the neoclassic taste of the time, both in architecture and furnishings, constituting a true “home-museum” .

Actions 1. Conservative recovery 2. Museum set-up 3. Opening to public Parties involved Municipality of Brescia Phases and timeframe Starting from 2009 Financial resources To be quantified and raised Expected results In the city, pen the only museum site dedicated to this important historical, cultural and artistic period Result indicators Number of visitors

215 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Brescia buffer zone Objective 19 INCREASE AND REQUALIFICATION OF THE GREEN AREAS

Project 19.1 Hillside Park Project Description Founded in 2002, the P.L.I.S. (Parco Locale di Interesse Sovraccomunale- Local Park of Supra-municipal Interest) of the Hills of Brescia includes several hill and foothill areas (Municipalities of , Brescia, , and Rodengo Saiano for a surface area of over 3500 hectars) and a portion infiltrates the heart of the buffer zone, including the whole Cidneo hillside and its public and private areas. The Parco della Montagnola, of municipal property and outside of the defensive system north of the hillside, is currently involved in a requalification project which will see, on completion, the realisation of a topical Botanic Garden, in order to re-introduce the characteristic phytocenosis of the Park. It is also the intention of the Hillside Park of Brescia to develop environmental educational programmes which will involve the Municipality, the managers of the Pusterla vineyards, which with its circa 4 hectares is the largest urban productive vineyard in Europe, and schools with the realisation of didactic routes on conservation techniques for the hillside territory, maintenance of the biodiversity and reminiscence of agricultural traditions. Actions 1. Final structural arrangement of the Parco della Montagnola 2. Set-up of the Botanic Garden 3. Definition of agreements with the managers of the Posterla vineyard 4. Drawing up of environmental education programmes and training Parties involved Municipality of Brescia, Municipality of Bovezzo, Municipality of Cellatica, Municipality of Collebeato, Municipality of Rodendo Saiano, Museums of Art, History and Science, Higher education Institutes, managers of Pusterla vineyard, associations and individual citizens involved in botanic conservation, didactics and training Phases and timeframe 2008 re-opening to the public of Parco della Montagnola 2009 completion of insertion of species in the Botanic Garden 2009 start-up of didactic and training activities Financial resources Use of membership fees to the Park of each Municipality, resources of the Municipality of Brescia and possible public financing of training activities Expected results Parco della Montagnola is returned to the citizenry and recovery of access to the northern Cidneo hillside Divulgation of the phytocenosis of the Park through their re-proposal in an urban environment

Result indicators Number of plant species; number of users

ENHANCEMENT PLAN Brescia buffer zone Objective 19 INCREASE AND REQUALIFICATION OF THE GREEN AREAS

Project 19.2 Water Park project Description The area of 11,400sqm which housed the fish farming factory which was active for nearly 100 years with the function of study and fish repopulation of river and lake species, situated between via Lechi and via Spalti San Marco, was purchased by the Region of Lombardy and will become a park dedicated to infancy and adolescence. Its peculiarity is that of being inserted in an historic context, the preservation of which is guaranteed by the complete restoration of medieval bastions and Venetian walls therein which conserve the original aspect. The project in its realisation phase foresees the creation of areas dedicated to various activities: an artificial lake will be realised in the area of the aquarium to recreate an environment with lake flora and fauna and an underwater tunnel to look at the fish; in the various buildings, a bar with a restaurant service, a library, a literary café, an internet point and an info point for the visit to the city and the territory will be opened; an area will be dedicated to the “city of children” with a game room, spaces for didactic laboratories and a skating rink.

Actions 1. Recovery of the area with a project aimed at the valorisation of the existing buildings for games and recreation 2. Creation of an aquarium 3. Creation of a refreshment area Parties involved Region of Lombardy

216 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

Municipality of Brescia Asm s.p.a. Phases and timeframe Project in the realisation phase Park opening foreseen for April 2008 Financial resources Total cost: circa €5,000,000.00 Funds charged to the subjects involved Expected results Usability on the part of the citizenry Result indicators Number of users

ENHANCEMENT PLAN Brescia territory Objective 20 ENHANCEMENT OF THE OTHER MUSEUM SITES OF THE MUNICIPALITY OF BRESCIA

Project 20.1 Re-equipping of the Natural History Museum Description Part of the Civic Museums are also the Science Museums; after the recent opening of the specialist institute library, a re-furnishing project is starting next to those already in operation, of the rooms of the entire Natural History Museum which boasts collections of primary importance in the national panorama, fruit of the legacies of Brescian scholars and collectors.

Actions 1. Compilation of the museological project 2. Compilation of the musiographic project 3. Conservation of the collections 4. Furnishing 5. Opening to the public Parties involved Municipality of Brescia Phases and timeframe From 2009 Financial resources € 1,800,000 to be raised Expected results Completely re-open the museum to the public, it was closed for some years for adaptation work and standardisation Result indicators Number of visitors

217 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Brescia territory Objective 21 ENHANCEMENT OF LONGOBARD FINDINGS, OF THE RELATIVE MUSEUM SITES AND ARCHAEOLOGICAL AREAS

Project 21.1 Re-organisation and implementation of the collections conserved at the Civic historical archaeological Museums of Manerbio, Leno, Remedello and at the National Archaeological Museum of Sirmione Description The numerous material that has emerged from recent archaeological investigations impose a review of the context exposed in the museum sites of the territory for a consequent update and enrichment, also given the new acquired data.

Actions 1. Expansion and modernisation of the exhibitive spaces 2. Restoration of items 3. Recovery and exposure of items originating from the territory currently in storage at different sites Parties involved Superintendency for the Archaeological assets of Lombardy, Municipalities involved, provincial administration Phases and timeframe Five year period 2008-2013 Financial resources To be defined and raised Expected results Increase in the museum offer relative to the Longobard period Result indicators Number of findings exhibited; number of visitors

ENHANCEMENT PLAN Brescia territory Objective 21 ENHANCEMENT OF LONGOBARD FINDINGS, OF THE RELATIVE MUSEUM SITES AND ARCHAEOLOGICAL AREAS

Project 21.2 Set-up of the Archaeological-exhibition Centre of Montichiari and organisation of the collection of Longobard findings in the territory of Montichiari Description The findings currently on show in Montichiari are a High selection of that which was returned to the territory during the course of the years. It is therefore opportune to guarantee an ideal site to the Early medieval heritage of this location. Actions 1. Expansion of the exhibitive spaces of the Giacomo Bergomi Museum 2. Set-up of new exhibitive spaces 3. Set-up of the collections 4. Optimisation of didactic laboratories Parties involved Superintendency for the Archaeological assets of Lombardy; Municipality of Montichiari; Monticlarense Archaeological Group; provincial Administration Phases and timeframe Five year period 2008-2013 Financial resources To be quantified and raised Expected results Expansion of the current museum site Result indicators Number of findings exhibited; number of visitors

218 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Brescia territory Objective 21 ENHANCEMENT OF LONGOBARD FINDINGS, OF THE RELATIVE MUSEUM SITES AND ARCHAEOLOGICAL AREAS

Project 21.3 Set up of the archaeological area of the Paleochristian Church of San Pietro in Mavino in Sirmione and of the Early medieval Churches of San Giorgio in Montichiari and Saints Nazaro and Celso in Leno Description These important monastic contexts deserve to be valorised through the completion of archaeological digs and opening to the public.

Actions 1. Church of S. Pietro in Mavino (Sirmione): completion of the dig at the archaeological site; conservative restoration of the property; interventions to make the pertaining archaeological area usable. 2. Church of San Giorgio (Montichiari): restoration of the crypt in order to make it accessible to the public; set-up of the space. 3. Church of Saints Nazaro and Celso (Leno): securing the building and conservative restoration; realisation of the cover; start-up of site archaeological dig. Parties involved Superintendency for the Archaeological assets of Lombardy, Municipalities involved, provincial administration Phases and timeframe Five year period 2008-2013 Financial resources to be quantified and raised Expected results Increase in the number of visitable Longobard sites Result indicators Number of visitors

ENHANCEMENT PLAN Brescia territory Objective 22 REALISATION OF MUSEUMS LINKED TO THE VOCATION OF THE TERRITORY

Project 22.1 Realisation of the Museum of Industry and Work (MUSIL) Description The objective of the project is the representation of industry and work as the main driving forces of modernisation in the last two centuries, through the realisation of a network of museum structures dedicated to industrial archaeology. Actions The intervention foresees: 1. recovery of the building ex Tempini in Brescia as the central site of the Museum 2. modernisation of the Iron Museum of San Bartolomeo in Brescia 3. recovery of the ex Hydroelectric Power Station of and its reconversion into a Museum 4. set-up in Rodengo Saiano, of large visitable warehouse called “ The city of Machines”. As this is a formulated programme, the degree of definition varies from project to project.

219 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

Parties involved Leader body: Museum Association of Industry and Work Promoter bodies: Brescian Civilisation Foundation and Luigi Micheletti Foundation Also: the Region of Lombardy, Province of Brescia, Municipality of Brescia, Municipality of Cedegolo, Municipality of Rodengo Saiano, Mountain Community of Valle Camonica, University of Studies of Brescia, Asm Brescia Spa, Chamber of Commerce. Phases and timeframe Agreement of programme: conclusion by 2010; Hydroelectric Energy Museum of Cedegolo: inauguration foreseen for April 2008; Warehouse in Rodendo Saiano :ready for inauguration; Iron Museum: beginning 2008. Financial resources Total cost of project quantified at €26,885,000.00 of which RL FIP (regional law 31/96) €4,300,000; RL Doc. ob.2 €2,200,000.; Municipality of Brescia €12,685,000.; Province of Brescia €1,500,000.; University of Brescia €2,500,000.; Mountain Community of Valle Camonica €250,000.; ASM Brescia Spa €2,500,000.; Municipality of Cedegolo €250,000.; other private €700,000. Expected results Counting on the variety and abundance of the documentation and collections in the possession of the Luigi Micheletti Foundation and Brescian Civilisation, promoters of the Museum, the machines, items, tools which constitute them will not lead to simple sets of findings, but to integrated systems for which the allocation into the historical container sites of the Museum and striking method of set-up will allow the reading of testimonials, evocative and monumental, of the largest process of industrialisation and modernisation, up to the current objectives of technological innovation. Result indicators Visitors to the museum sites, opportunities for comparison and critical study with social spill-over in matters of history and research.

220 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Castelseprio-Torba site Objective 23 COMPLETING THE ANTIQUARIUM IN SAN GIOVANNI MONASTERY

Project 23.1 Completing the upgrade of the building of the Monastery to turn it into an exhibition area Description The premises of San Giovanni Monastery are the subject of an intervention that is about to be concluded, consisting in the restoration of the ancient halls and re-organization of the materials in the wing used as a warehouse. There remain to be completed works to upgrade the halls of the Monastery to facilitate access to the monument and the findings to be exhibited. Actions 1. Upgrading the premises 2. Improving the technical apparatus and equipment as required for the new planned use Parties involved Regional Directorate for Cultural and Landscape Heritage of Lombardy Superintendant's Office for Cultural Heritage of Lombardy Phases and timeframe Within 2008 Financial resources MIBAC funds: euro 247,000.00 Expected results Streamlining and upgrading the quality of the museum experience in the Castelseprio Archaeological Park Result indicators Area intended for exhibitions and welcoming visitors

ENHANCEMENT PLAN Castelseprio-Torba site Objective 23 COMPLETING THE ANTIQUARIUM IN SAN GIOVANNI MONASTERY

Project 23.2 Completing the layout of the Antiquarium Description The exhibition project for the Antiquarium has already been laid down. As well as in-depth information on the history of the castrum, to be provided prior to visiting the remains, a description of the structures and buildings of the Monastery where the exhibition is hosted will be also made available. Many activities aimed at gathering in-depth information and preparing the relevant materials have already started. They have yet to be completed along with the final layout of the premises, which envisages the following: a) exhibition of the findings from the excavations; b) explanatory notes and a multi-language guide; c) an interactive computer workstation to view multimedia materials with differently detailed information; d) a model reconstruction of the castrum and its buildings to afford a bird's-eye view of the whole complex Actions 1. Selecting, studying and restoring the exhibition materials (already started) 2. In-depth analysis of the existing documents as related to the topics addressed in the exhibition layout, with particular regard to the historical phases of development of the castrum 3. Implementing graphical reconstructions of the castrum and its main monuments 4. Creating the model 5. Creating the showcases for exhibiting the materials and implementing the layout 6. Creating the educational apparatus (panels, texts) 7. Creating the multimedia materials 8. Creating the multimedia educational workstation 9. Creating the guide Parties involved Regional Directorate for Cultural and Landscape Heritage of Lombardy Superintendant's Office for Cultural Heritage of Lombardy Phases and timeframe Within 2008 Financial resources MIBAC funds: euro 250,000.00 Expected results Streamlining and upgrading the quality of the museum experience in the Castelseprio Archaeological Park Result indicators Increase in the number of visitors Increased quality and amount of site-related information for all types of visitor and for scholars

221 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Castelseprio-Torba site Objective 24 ENHANCING THE TOURING ARRANGEMENTS FOR THE CASTELSEPRIO-TORBA ARCHAEOLOGICAL COMPLEX

Project 24.1 Creating a trail to connect the upper castrum with the outpost in the valley (Torba) Description The project envisages restoration of the trail leading to the Castelseprio archaeological area, consolidation of the hillsides, and conservational restoration of the existing archaeological structures. Up to a few years ago, a trail connected the Monastery of Torba, which is located at the foot of the hill 270 m asl, with the former San Giovanni Monastery, which will be hosting the Antiquarium and is located on the hill inside the Castelseprio Archaeological Park. This trail is currently impassable because of landslides that have occurred in several areas. The Superintendant's Office for Archaeological Heritage of Lombardy approved, in 2005, a project for a new trail running close to the extant walls, although those walls are currently covered by vegetation and creepers. Project-designing for the final portion of the trail, in the area owned by FAI, was subsequently completed in line with the features set out as above. To create the trail, a route with a cross-sectional width of 110 cm and a 20% maximum slope will have to be implemented, for a total length of 140 m in the area owned by FAI and additional 340 m in an area owned by the State. Where the slope is found to be in excess of 15%, a set of steps will be put in place with their cutting edge located externally; where the slope is found to be less than 15%, diggings and fillings will be used. The walking surface will be created by using suitably stabilised materials; transverse cuttings will be created and coated in wood to ensure water channeling, and the surface will be leveled out with the help of diggings and fillings. Since the area touches upon a portion of the walls that has yet to be investigated and restored, located mostly in the FAI's grounds, the project envisages archaeological activities to analyse and bring to light any existing structures in addition to restoration of such structures so as to make them accessible and valorize the touring arrangements in the Castelseprio Archaeological park. The objectives sought by this activity consist mainly in creating a trail for tourism and cultural purposes, allowing access to, visit and maintenance of the archaeological findings and the woods, and strengthening the slope of the hill at the level of the trail Actions 1. Preliminary investigations 2. Implementation activities Parties involved Regional Directorate for Cultural and Landscape Heritage of Lombardy Superintendant's Office for Cultural Heritage of Lombardy Lombardy Region FAI - Fondo per l'Ambiente Italiano (Fund for Italy's Environment) Phases and timeframe As from 2008 Financial resources As for the portion of the trail located in FAI's property: Co-funding by FAI and Lombardy Region, based on the Call for Tenders related to the Archaeological heritage of Lombardy (2007) - see regional Acts no. 39/84 and no. 39/91 - Euro 43,000 To be found as for completing the upward trail. Expected results Enhanced availability and integration of the areas making up the Castelseprio Archaeological Park Result indicators Enlargement of the area accessible to visitors.

222 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Castelseprio-Torba site Objective 24 ENHANCING THE TOURING ARRANGEMENTS FOR THE CASTELSEPRIO-TORBA ARCHAEOLOGICAL COMPLEX

Project 24.2 Upgrading the educational and explanatory apparatus along the route to the castrum and close to Santa Maria foris portas Description Although the Park and the church of St. Maria foris portas are already equipped with explanatory panels describing the history of the monuments and their building and artistic features, it is appropriate to update the panels and translate the texts into English for the sake of our foreign guests, so as to make available more adequate, effective cultural information. Actions 1. Carrying out the analysis and gathering the in-depth information required in respect of the monuments and remains to implement new explanatory panels 2. Drafting multi-language texts and diagrams showing reconstructions of the visible remains 3. Creating and placing the panels Parties involved Regional Directorate for Cultural and Landscape Heritage of Lombardy Superintendant's Office for Cultural Heritage of Lombardy Province of Varese Municipality of Castelseprio Phases and timeframe Within 2009 Financial resources To be found Expected results Streamlining and upgrading the quality of the museum experience in the Castelseprio Archaeological Park Result indicators Increase in the number of visitors, both Italian and foreign Increased quality and amount of site-related information for all types of visitor and for scholars

ENHANCEMENT PLAN Castelseprio-Torba site Objective 24 ENHANCING THE TOURING ARRANGEMENTS FOR THE CASTELSEPRIO-TORBA ARCHAEOLOGICAL COMPLEX

Project 24.3 Enhancing the educational and explanatory apparatus close to the Tower of Torba and the Church of Santa Maria Description No panels or signposts are available inside the Tower and the structures of the Torba complex to facilitate visiting the area, which means that Torba is without the basic tools to provide information and facilitate comprehension by the public as a whole. Actions 1. Carrying out the analysis and gathering the in-depth information required to draft new, updated explanatory materials (researches into art and history; archival surveys; analysis of archaeological documents) 2. Creating graphical reconstructions of the building phases 3. Drafting texts for panels and signposts 4. Translating the texts 5. Publishing scientific papers and/or popularization papers Parties involved FAI - Fondo per l'Ambiente Italiano Lombardy Region Phases and timeframe Starting from 2008 Financial resources Cofunding by Lombardy Region - Call for tenders for the archaeological heritage of Lombardy (2007) - Acts no. 39/84 and 39/91 Expected results Improved knowledge of and access to the cultural heritage; creating historical and artistic links with the Castelseprio area Result indicators Number of the analyses and reconstructive attempts Number of the created panels Number of published materials

223 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Castelseprio-Torba site Objective 24 ENHANCING THE TOURING ARRANGEMENTS FOR THE CASTELSEPRIO-TORBA ARCHAEOLOGICAL COMPLEX

Project 24.4 Creating a touring route to the village and restoring the old entrance ways Description Outside the walls of the castrum there is evidence of a burg (village) including the church of St. Maria foris portas. Apart from the church, no other valorization initiatives and/or trails are currently available to identify other remains in the woods that have covered this area. There are old trails in the woods, which further add to the value of this territory in terms of landscape; those trails are no longer passable because they are covered by vegetation. They were historically the main routes connecting with the neighbouring areas. As well as improving knowledge about the development of the village and the entrance ways to the castrum (see Knowledge Plan), a system of routes will be created to enable valorizing the items in question, which will become a part of the nature experience in the area close to the castrum. Actions 1. Analysis and assessment of the available data concerning the burg 2. Project-designing and implementing the touring routes as for the area and the burg remains 3. Detecting and analysing the original routes to access the castrum 4. Restoring the old trails 5. Creating educational and explanatory apparatuses Parties involved Regional Directorate for Cultural and Landscape Heritage of Lombardy Superintendant's Office for Cultural Heritage of Lombardy Province of Varese Municipality of Castelseprio and neighbouring municipalities Private bodies Phases and timeframe Starting from 2010 Financial resources To be found Expected results Enhancing the opportunities to experience the cultural and landscape values of the Castelseprio Archaeological Park. Result indicators Number of the opened and/or restored trails/routes Areas that can be visited and/or accessed

ENHANCEMENT PLAN Castelseprio-Torba site Objective 24 ENHANCING THE TOURING ARRANGEMENTS FOR THE CASTELSEPRIO-TORBA ARCHAEOLOGICAL COMPLEX

Project 24.5 Creating a new lighting and protection system for the frescoes in the Tower and in the Church of Santa Maria at Torba. Description The whole complex of the Torba Monastery will be the subject of activities aimed at improving its preservation and access conditions. In particular, a new protection and lighting system is being designed for the frescoes in the Tower as well as for the plastering and the fragmentary frescoes preserved within the Church of Santa Maria. The project envisages a new lighting system for the first floor of the Tower, consisting in the insertion of lighting sources from a wooden platform that will be installed on top the original flooring and bordered by steps to better protect the delicate frescoes. As for the church of Santa Maria, a new indoor lighting system is envisaged along with the revamping of the existing platform and the apparatus for viewing the archaeological remains (tomb), whose protective glass cover will be replaced. Parties involved 1. Drawing up the project and assessing its feasibility 2. Implementing the project Phases and timeframe FAI - Fondo per l'Ambiente Italiano; Superintendant's Office for Historical, Artistic and Demo- Etno-Anthropological Heritage; Superintendant's Office for Architectural and Landscape Heritage of Milan and Lombardy Financial resources 2008: Fund procurement Expected results To be found (private bodies, banking foundations, public bodies) Result indicators Improved preservation, protection and public availability of the Tower and the church of St. Maria at Torba

224 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Castelseprio-Torba site, buffer zone and territory Objective 25 IMPROVING SIGNAL POSTS AND COMMUNICATION TOOLS

Project 25.1 Placing signaling posts along the main traffic routes and nodes Description The project envisages mapping the signals that are currently available along the main traffic routes and nodes to Highlight possible flaws and replace them by new signals Actions 1. Mapping of the existing signals and Highlighting flaws 2. Placing new signals at key locations Parties involved Municipality of Castelseprio, Province of Varese Phases and timeframe Short-term (by 2008) Financial resources Co-funded by Municipality of Castelseprio and Lombardy Region - Call for tenders for the archaeological heritage of Lombardy (2007) - Regional Acts no. 39/84 and 39/91 - Euro 6,500.00 Expected results Improved identification and access from all directions in respect of the Castelseprio archaeological area Result indicators Number of created signals

ENHANCEMENT PLAN Castelseprio territory Objective 25 IMPROVING SIGNAL POSTS AND COMMUNICATION TOOLS

Project 25.2 Creating bilingual (Italian/English) information panels Description The project envisages the creation of information panels in Italian and English including the relevant pictures, to be located at key locations in the territory of the municipality to invite visitors to the archaeological area Actions 1. Drafting of bilingual texts on the archaeological area, the church of St. Maria foris portas and the environmental features of the area 2. Determination of the key locations in the territory of the municipality outside the archaeological park 3. Placing the panels Parties involved Municipality of Castelseprio Phases and timeframe Short-term (by 2008) Financial resources Co-funded by Municipality of Castelseprio and Lombardy Region - Call for tenders for the archaeological heritage of Lombardy (2007) - Regional Acts no. 39/84 and 39/91 - Euro 4,000.00 Expected results Enhanced knowledge and appreciation of the archaeological area by citizens; fostering visits of the area Result indicators Number of created panels Number of the languages used for the panels

ENHANCEMENT PLAN Castelseprio territory Objective 25 IMPROVING SIGNAL POSTS AND COMMUNICATION TOOLS

Project 25.3 Implementing communications and photographic campaigns Description The project envisages implementing a new photographic campaign with regard to the Archaeological Park and the church of St. Maria foris portas, to be used for the aforementioned valorization initiatives as well as to enhance the contents of the websites related to this area Actions Phase A 1. Photographic campaign Parties involved Municipality of Castelseprio, Province of Varese, Superintendant's Office for Archaeological Heritage of Lombardy Phases and timeframe Short-term (by 2008) Financial resources Co-funded by Municipality of Castelseprio and Lombardy Region - Call for tenders for the archaeological heritage of Lombardy (2007) - Regional Acts no. 39/84 and 39/91 - Euro 1,000.00 Expected results Creation of exhaustive, updated photographic documentation to fill in the existing gaps Result indicators Number of new available pictures

225 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Castelseprio territory Objective 26 LINKING THE EARLY MIDDLE AGES FINDINGS IN THE GIUDICARIA OF SEPRIO

Project 26.1 Creating theme-based itineraries by including the other findings related to the Early medieval and Longobard period Description The district of the Giudicaria of Seprio, which was headed by the Flavia [imperial] city of Castelseprio under Longobards' rule, is one of the main areas of the Longobard Kingdom by having regard to its key role with a view to controlling and defending the routes leading from the north to the capital of the kingdom, i.e. Pavia. Its boundaries reached northwards as far as Bellinzona, in the current Ticino Canton, in , covered the whole province of Varese (up to the banks of Lake Maggiore and the Ticino river) and took up part of the provinces of Como (the western banks of Lake Como and the Severo river) and Milan (southwards) as well. The importance of this area during the Early middle ages period is shown by major archaeological findings, monuments and documentary evidence - Longobard tombs and necropolises, remarkable places of worship, monasteries, castles and settlements. Part of this heritage has already been the subject of valorization initiatives in the specific contexts, however there is as yet no integrated system that can make available these items to a broader circle within the framework of a full-fledged cultural and tourism offer. Therefore, the project envisages the theme-based networking of these components so as to link the archaeological findings, the monuments and works of art, museum collections and other types of heritage via different routes. This will also allow better appreciating and understanding the environmental features and the social and economic components of the area at issue. To valorize the Early middle ages heritage in the Giudicaria, after establishing the links referred to above, suitable educational and explanatory apparatuses will be made available in respect of the various routes and items by creating ad-hoc panels; additionally, joint valorization initiatives will be waged and multimedia materials will be published on the routes and topics related to the presence of Longobards in this territory. Actions 2. Analysis of the data related to findings and monuments of the early medieval period (see Knowledge Plan) to set out the theme-based routes and the components to be taken into consideration 3. Stipulation of bilateral and/or multilateral agreements with the entities involved 4. Project-designing and implementation of theme-based routes 5. Creating the educational and explanatory apparatus 6. Implementing joint initiatives to valorize the Lombard heritage and components 7. Creating publications related to the routes and themes taken into consideration Parties involved Regional Directorate for Cultural and Landscape Heritage of Lombardy Superintendant's Office for Cultural Heritage of Lombardy Lombardy Region; Province of Varese Province of Como; Province of Milan Municipalities in the areas concerned Swiss State and other institutions in the area concerned within the Ticino Canton Phases and timeframe As from 2008-2009 Financial resources To be found Expected results Improved access to and appreciation of the heritage of the Lombard period in the territory of the Giudicaria of Seprio Result indicators Scope of the territory involved Number of entities involved Number of the networked items Number of routes created Amount of joint initiatives Amount of published materials

226 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Spoleto site Objective 27 EXPLOITATION OF THE BASILICA OF S. SALVATORE

Project 27.1 Identification of the Basilica as an exhibition centre Description The aim of the project is the acquisition of equipment necessary to fully exploit the architectural features and spaces of the building in order to set up temporary art exhibits, with the previous, accurate selection of artists and proposals, including contemporary works. The spaces in the former convent, adjacent to the building, in which a documentation centre, centre for visitors and coordination of teaching activities will be installed, will house a bookshop, where illustrated materials (brochures, catalogues, etc.) can be found concerning the exhibit in progress. Actions 1. Analysis of the equipment necessary for setting up temporary exhibits (supports, exhibitors, lighting installation, sequences of panels, totems, …) 2. Creation of a Reception and Information Office with a bookshop annex 3. Programming of teaching activities 4. Creation/updating of useful teaching documentation 5. Acquisition of computer systems Parties involved Office for Architectural Assets, Landscape and Historic, Artistic and Ethno-Anthropological Heritage of Umbria (BAPPSAE ) Municipality of Spoleto Italian Centre for the Study of the Early Middle Ages (CISAM) Records Office for Umbria State Archives in Perugia – Spoleto Section University of Perugia City and regional schools and sites of the Lombard network Phases and timeframe Starting from 2009 Financial resources Funds to be derived from the Municipality of Spoleto budget, Region of Umbria, Ministry of the University and Research, CISAM, and other public and private organisations. Expected results Enlargement of the allocated space inside the Basilica, to include activities other than those currently in practice (worship, guided tours, teaching activities). Systemising the activities already undertaken. Creation of a specialist, computerised documentation centre. Increase in number of information centres in the city. Result indicators Number and quality of the temporary exhibits set up, requests for access to/consultation of the documentation centre, participation in teaching activities and guided tours.

ENHANCEMENT PLAN Spoleto site Objective 27 EXPLOITATION OF THE BASILICA OF S. SALVATORE

Project 27.2 Creation of a visitors’ centre Description The aim of the project is to create a visitors’ centre, to be located in the space gained following conservative restoration operations and reorganization of the entire complex of the former convent, adjacent to the Basilica. The visitors’ centre will deal with coordinating guided tours to the site and the buffer zone, i.e. historic-artistic and naturalistic tours and excursions, as well as organising museum teaching activities for all school levels, a task which is currently carried out in the municipal offices. The centre will be in close contact with the tourist offices in order to ensure an efficient service and offer tourists a variety of information and services related to the site and buffer zone. Actions 1. Creation of a Reception and Information Office with a bookshop annex. 2. Programming of teaching activities. 3. Production/updating of useful teaching documents. 4. Acquisition of computer systems. Parties involved Municipality of Spoleto. Office for Architectural Assets, Landscape and Historic, Artistic and Ethno-Anthropological Heritage of Umbria (BAPPSAE ) City and regional schools and sites of the Lombard network

227 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

Phases and timeframe Starting from 2009 Financial resources Funds to be derived from the Municipality of Spoleto budget, th Region of Umbria, Ministry of the University and Research, and BAPPSAE office of Umbria. Expected results Systemising the activities already undertaken. Increase in the number of information centres in the city. Result indicators Opening of the centre. Requests for participation in the teaching activities and guided tours.

ENHANCEMENT PLAN Spoleto site Objective 27 EXPLOITATION OF THE BASILICA OF S. SALVATORE

Project 27.3 Creation of a documentation centre Description The aim of the project is to create a documentation centre, to be located in the space recovered following conservative restoration operations and reorganization of the entire complex of the former convent, adjacent to the Basilica. The centre shall deal with collecting publications and studies on the Longobards; reviews and projects of the Basilica, former convent and cemetery; and graphic, photographic and descriptive documentation on the restorations performed. These shall be made easy to consult through computerised equipment. It will also be enriched with a specialist library with books for comparing the buildings of the entire Longobards network. The material, which is to concern Spoleto and the other cities involved, will be available, if possible, in both paper versions and consultable on-line through connections with other available databases possessing information on the subject. The support that could be supplied by the Italian Centre for the Study of the Early middle ages is fundamental; the above centre has dedicated numerous weeks of study on the subject. Actions 1. Analysis and acquisition of existing data. 2. Archiving of data through cataloguing and computerisation. 3. Acquisition of all bibliographic and documentary material. 4. Acquisition of data processing equipment. Parties involved Municipality of Spoleto. Italian Centre for the Study of the Early middle ages (CISAM) Records Office for Umbria State Archives in Perugia – Spoleto Section University of Perugia. Phases and timeframe Starting from 2009 Financial resources Funds to be derived from the Municipality of Spoleto budget, Region of Umbria, Ministry of the University and Research, CISAM and other public and private organisations. Expected results Creation of a specialist, computerised documentation centre. Systemising of existing documents – implementation of archives in other seats of the project and at CISAM. Result indicators Opening of the centre. Requests for access to/consultation of the documentation centre, visits to the centre.

ENHANCEMENT PLAN Spoleto buffer zone and territory Objective 28 EXPANSION OF SERVICES IN THE LODGING FACILITIES ANNEXED TO THE CHURCH OF S. PONZIANO

Project 28.1 Insertion of the lodging facilities into the network of “Places of the spirit” Description From 2004-2006, the Municipality of Spoleto participated in a European project called “European places of the spirit”, within the CADSES - INTERREG IIIB programme. Its objective was to network places in Europe that are rich in cultural-religious heritage (monasteries, retreats, abbeys, etc.) in order to exploit their potential to attract tourists and create real cutting-edge Area Products, hereby overcoming the traditional concept of religious tourism and setting up an integrated, quality “package” linked not only to sacred sources, but also to picturesque areas, sources of water, nature and wellness centres. The project considered various areas in Umbria (Monteluco and Valnerina), the Marches

228 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

(Romanic itinerary), Greece (Meteora Monasteries) and (Painted monasteries of the Bukovina). Upon completion of the works, with the collaboration of financial agents from all of the European countries concerned, a Map of Quality was draw up, with which public and private agents in the network of “European Places of the Spirit” committed themselves to satisfying some points deemed essential in characterising a site as a “place of the spirit”. The results are then to be taken and verified, to see if it is possible to continue the project on a European level during the applications stage following the now concluded study stage. If this is not the case, the idea that arose from the European project will be created in the lodging facilities known as “Monastero di S. Ponziano”

Monastery of S. Ponziano

Actions 1) Verification of the possibility of continuing the project with those European partners already involved (Region of the Marches, Greece, Romania) 2) Otherwise, creation of the idea that arose during the final stage of the European project shall be created in the lodging facilities known as “Monastero di S. Ponziano” (with the application of the principles of the Map of Quality) and tourist packages will be set up that link the values of the sacred, nature and wellness in an integrated, High quality manner. Parties involved Municipality of Spoleto Archdiocese of Spoleto – Norcia Religious hospitality house “Monastero di S. Ponziano” Sviluppumbria (Umbria development) as coordinator of the European project “European Places of the Spirit” and, possibly, the other project partners (Region of the Marches, Greece, Romania) Phases and timeframe Starting from 2009 Financial resources Funds to be derived from the Municipality of Spoleto budget, Archdiocese of Spoleto .- Norcia, and Region of Umbria Expected results Creation of cutting-edge Area Products and tourist packages that supply an integrated, quality offer, linked to sacred sources, picturesque areas, sources of water, nature and wellness centres. Result indicators Increase in the persons booking at the lodging facilities and the arrival of tourists in town

229 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Spoleto buffer zone and territory Objective 28 EXPANSION OF SERVICES IN THE LODGING FACILITIES ANNEXED TO THE CHURCH OF S. PONZIANO

Project 28. 2 Insertion of a convention area, inside the monastery, into the town convention circuit Description The Municipality of Spoleto is already in the process of organising a Convention Bureau that will allow convention organisers to have a coordination office enabling them to supply information in real time on the numerous conventions sites present in the surrounding area. There are already many public-owned sites in the database of the Convention Bureau; thus, it is a matter of defining the methods and drawing up agreements for insertion into the databank, this including privately owned convention sites. The religious hospitality house “Monastero S. Ponziano” has a conference room with 100 seats, which is equipped with the devices necessary for conference activities (monitor, loud-speaker system, projector, internal and external areas for small meetings, buffets and business breakfasts). Actions 1. Agreements with the Archdiocese of Spoleto – Norcia and with the director of the religious hospitality house “Monastero S. Ponziano” 2. Insertion of the conference room into the database of the Convention Bureau and into promotional activities Parties involved Municipality of Spoleto Archdiocese of Spoleto – Norcia Phases and timeframe Approx. six months, starting from end-2008 Financial resources Funds derived from the Municipality of Spoleto budget Expected results Enlargement of the range of convention sites to be placed on the market Result indicators Requests for sites for organising conventions and meetings by agents in the sector

ENHANCEMENT PLAN Spoleto buffer zone and territory Objective 29 RAISING OF THE LEVEL OF EXPLOITATION OF THE CHURCH OF S. PONZIANO

Project 29.1 Enlargement of the usability of the church

Description The church can currently only be visited upon request, by contacting the adjacent monastery. Consideration of the value of the church and crypt below it makes it necessary to define regular opening hours like the other city churches and monuments. Expansion of the usability of the church would also allow the citizens of Spoleto to visit the church of the patron saint of the city regularly. Actions 1) Verify the possibility of having recourse to the staff of the Archdiocese or the cooperative society already managing the archaeological sites and museums or the director of the lodging facilities adjacent to the church. 2) Drawing up of an agreement with the pre-selected manager. Parties involved Municipality of Spoleto Archdiocese of Spoleto – Norcia Phases and timeframe Short period, starting from end-2008 Financial resources Possible contribution for managing costs of the new opening hours, as a benefit from the Municipality of Spoleto budget Expected results Improvement of the usability of the asset Result indicators Number of visitors/devotees of the patron saint

ENHANCEMENT PLAN Spoleto buffer zone and territory Objective 30 EXPANSION OF THE CULTURAL OFFER OF THE HISTORIC CENTRE OF SPOLETO.

Project 30.1 Plan for use of historically and culturally significant buildings

Description The project provides for defining the use of historic buildings, and their culturally significant contents, the restoration of which has just been completed or is almost completed, following the seismic events of 1997, and inserting them into the broader plan for revitalisation of the

230 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

historic centre. A) Works already completed and use already defined: - City Hall – restoration as the seat of institutional bodies and some management offices, with the use of some spaces for housing temporary exhibits; - Palazzo Collicola – City Gallery of Modern Art and art exhibitions; - Teatro Nuovo – restoration of the function of hosting plays, events, conventions, etc. B) Works to be completed: - Palazzo Mauri – seat of the Library and City Mediateca (Multimedia centre) and Museum of Printing Works; - Complex of the Chiostro di San Nicolò, works in progress to set up a new function as a Convention Centre (a PIT “Project of Territorial Interest” – network of Tourism- Environment-Culture) - Teatro Caio Melisso and former City Museum – works in progress to adapt and create a new function for plays, events, conventions and exhibits. (PIT – network of Tourism- Environment-Culture)

City Hall Teatro Nuovo Actions point B: 1) Verify the trend of the worksite and that the time schedule set forth in the contract is being respected Parties involved Municipality of Spoleto Phases and timeframe Starting from 2008, at least two years to complete all stages Financial resources Funds already earmarked for the works Funds to be found for using some buildings (in collaboration with local financial agents) Expected results Completion and systemising of culturally significant historic buildings and their contents, for institutional use by the Municipality of Spoleto and for commercial and cultural aims, within the broader project for revitalising the historic centre Result indicators Full use of culturally significant historic buildings and their contents, following their renovation

ENHANCEMENT PLAN Spoleto buffer zone and territory Objective 30 EXPANSION OF THE CULTURAL OFFER OF THE HISTORIC CENTRE OF SPOLETO.

Project 30. 2 Planning of a city Trekking project through the identification of new tourist-cultural routes. Description In Spoleto, the project for non-invasive mobility is in an advanced state of fulfilment (the first “Spoletosphera” parking lot is ready; by the end of the year, the motorised route from Spoletosphera to Piazza della Libertà will be operative); thus, the Historic Centre will be closed to traffic to the benefit of pedestrians and to view the city at a friendly human pace. This planned action is developed by setting up of four pedestrian itineraries to guide tourists through the streets, lanes, large and small squares, panoramic views, etc., in search of ancient Spoleto, sometimes even hidden, but “new” at the same time, without noise and pollution, thus offering sustainable, quality tourism. The four itineraries being studied are each marked by a colour and suitable signs, to be noted

231 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

in the layout of the new regional tourist signs, currently being prepared: a) Most famous monuments – (possibly yellow). Advisable for people visiting Spoleto for the first time; b) Museum route – (possibly red). Basically follows itinerary 1, but with deviations to allow for visiting the many museums, such as: the City Gallery of Modern Art, Municipal Pinacoteca, Museum of Archaeology, Roman Home, Museum of the Diocese, Museum of the Duchy. c) Outside the Walls – (possibly green). Winds around the outside of the medieval city walls. This route is more difficult, since it is long and on foot. However, it is a must for those who wish to gain closer knowledge of the city. d) Archaeological Itinerary – (possibly blue). Guides the visitor to sites, finds and monuments of archaeological interest, often less or not well known. e) Apart from installing signs, the following are also foreseen: f) a multi-lingual editorial route, with guidebooks that describe the various aspects of development (monumental, religious, environmental, architectural, etc.) located and able to be visited along the four routes; the average times needed for covering the routes are indicated, and a map of the city that includes the four options shall be made available g) targeted marketing that will also be developed with the aid of street entertainers, who will perform along the tourist walking routes and promote the events and initiatives programmed in the city The project is partly in collaboration with the Chamber of Commerce of Perugia

the Spoletosphera, the work of Fuller behind the elevator to the motorised route Actions 1) Historic-cultural research, identification and cartographic definition of the itineraries 2) Preparation and installation of signs 3) Preparation of guidebooks in various languages 4) Targeted marketing Parties involved Municipality of Spoleto Mapping experts Chamber of Commerce of Perugia Phases and timeframe Definition of itineraries: within the year 2008 Installation of signs: within one year of defining itineraries Preparation of guidebooks in various languages: within one year of defining itineraries Targeted marketing: to begin as soon as the previous stages are completed Financial resources Funds from the budget of the Municipality of Spoleto and co-financing by the Chamber of Commerce of Perugia Expected results Define a more organised way, diversified by interests, to tour the city Result indicators Installation of signs Publication of guidebooks and maps in several languages

232 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Spoleto buffer zone and territory Objective 30 EXPANSION OF THE CULTURAL OFFER OF THE HISTORIC CENTRE OF SPOLETO.

Project 30.3 Exploitation of Archaeological Routes. Description Activation and expansion of itineraries for archaeological discovery, including the National Museum of Archaeology, monuments and architectural sites (Roman domus, Roman Theatre, Amphitheatre, Arch of Drusus and Germanicus, Ponte Sanguinario [Bloody Bridge], City Walls), findings that came to light following excavations (Colle S. Elia), restorations of historic buildings (Palazzo Mauri, Palazzo Pianciani, Teatro Nuovo) and chance discoveries (Necropolis of Cortaccione).

The Arch of Drusus

The Roman domus

Actions 1) Activation of various tourist routes with guided tours. 2) “Archaeobike” routes: archaeology and bicycles 3) Affixing of explanation panels in the monuments and along the itinerary routes. 4) Production of a map of the archaeological sites and routes, available at tourist offices. 5) Creation of a data and documentation centre containing photographic and graphic material and film clips of the individual finds Parties involved Municipality of Spoleto Office for the Archaeological Assets of Umbria Italian Centre for the Study of the Early Middle Ages University of Perugia Other public and private organisations

233 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

Phases and timeframe Starting from 2008 Financial resources Municipality of Spoleto Office for the Archaeological Assets of Umbria Other public and private organisations Expected results Re-appropriation of identifying processes and knowledge of historic and cultural roots; interpretation of the vocation of the territory in order to adopt appropriate choices. Result indicators Affixing of panels; activation of routes; number of supports and participants.

ENHANCEMENT PLAN Spoleto buffer zone and territory Objective 30 EXPANSION OF THE CULTURAL OFFER OF THE HISTORIC CENTRE OF SPOLETO.

Project 30.4 Revitalisation of the historic centre Description From an economic standpoint, the main objective of revitalisation is to transform the Historic Centre into a “natural business centre”, consistent with the outline of Regional Legislation for revitalising Umbrian historic centres. Starting with the analysis of recognition of historic, cultural and environmental heritage, the project shall follow regulations of use marked by the exploitation of spaces, roads, squares and buildings. Within this context, the Plan for the allocation of historic and culturally significant buildings, as in prog. 4.1, takes on importance.

Actions 1) Preliminary analysis 2) Proposal for changes of allocation of use, without charges, for business and handicrafts activities; Multi-functional centres 3) Reductions and award-giving for new investments and/or renovations of existing activities marked by criteria of reuse of the asset, quality of the activities and sustainable development Parties involved Municipality of Spoleto, Chamber of Commerce, Professional organisations Phases and timeframe Starting from 2008, at least two years to complete all stages Financial resources Funds already partially earmarked and partially to be found Expected results Transformation of the historic centre into a multi-functional centre equipped with multiple quantitative and qualitative services, benefiting citizens and tourists. Result indicators Number of investments and/or restorations, operations and initiatives

234 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Spoleto buffer zone and territory Objective 30 EXPANSION OF THE CULTURAL OFFER OF THE HISTORIC CENTRE OF SPOLETO.

Project 30.5 Plan for Street Fixtures Description The plan for upgrading the Street Fixtures falls within the project for revitalising the Historic Centre. This plan is intended as a qualifying and harmonising component of the city spaces as a whole, setting itself up in its role of control and suggestion with respect to private operations and planning policy and scheme for public works, according to a unitary component need. The Municipal Government has already started up the initial designs and creation of City Fixtures, but the transformation of the territory and dissemination of the architectural culture shall be the object of a national competition. Actions 1) Preliminary analysis 2) Drawing up of the competition notification 3) Application and monitoring Parties involved Municipality of Spoleto, Ministry for Cultural Heritage and Activities Phases and timeframe 1 already implemented 2-3 starting from 2008 Financial resources Funds to be found Expected results Transformation of the historic centre, in conformity with a uniform architectural culture. Result indicators Number of improvements of the city fixtures

ENHANCEMENT PLAN Spoleto buffer zone and territory Objective 31 EXPANSION OF THE CULTURAL OFFER IN THE TERRITORY

Project 31.1 Opening of Mining Museum of Morgnano Description The project concerns the opening of a museum on the historic site of the lignite mines of Morgnano (hamlet outside Spoleto), starting with the remains of industrial archaeology in the area. The museum will emerge as evidence of a chief production activity for the economy of Spoleto from the end of the 1800s until the 1960s Museum finds will be contextualised through the exhibition in the original locations and will be equipped with a centre documenting the mining activity. 1) Setting up the site; Actions 2) Opening of the documentation centre with recordings and film clips of the testimonies of the former miners and bibliographic, documentary and photographic material that have been catalogued and computerised; 3) Carrying out teaching and laboratory activities; 4) Expansion of international cultural exchanges and twinning with other mining sites, partly already started up (Sardinia, Marcinelle, Charleroi); 5) Promotion of seminars on economic and social themes. Parties involved Municipality of Spoleto; Laboratory of Earth Sciences; Friends of Mines Association; Community Montana of the Martani Mountains and Serano; European Union. Phases and timeframe Starting from 2009 (opening of Museum) Financial resources Municipal budget; Community Montana of the Martani Mountains and Serano; regional financing; European funding. Expected results Expansion of city museums; increase of training offered and amplification of teaching activities, reactivation of identifying processes. Result indicators Opening of the museum and documentation centre; support for the activities proposed; visitor affluence.

235 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Spoleto territory Objective 31 EXPANSION OF THE CULTURAL OFFER IN THE TERRITORY

Project 31. 2 Creation of “identity routes”: Works of Fortification in the environs of Spoleto; Itineraries of Giovanni di Pietro, “lo Spagno” Description The projects concentrate on: the activation of tour itineraries, whether guided or not, to the Spoleto “fortress” district, so as to recreate the historic bond between town and country, by linking it to routes of knowledge of historic-artistic, cultural traditions and material culture; resumption of itineraries (already tested) in search of places and works of the painter Giovanni di Pietro, “lo Spagna”, starting from the centre of Spoleto across the Valle Umbra and Valnerina. Actions 1) Affixing of signs along the routes; 2) Activation of thematic guided tours, which also include tasting traditional country cooking; 3) Connections between the territory and local museums. Parties involved Municipality of Spoleto; Municipalities of Valle Umbra and Valnerina, within which fall sites where “lo Spagno” was active; local communities (Associations, Pro loco, etc.) Phases and timeframe Starting from 2008 Financial resources Municipalities and local (Associations, Pro loco, etc.) and private (holiday farms and such) communities. Expected results Widespread knowledge of the territory Result indicators Participation in and support for proposed activities; autonomous execution of the routes.

ENHANCEMENT PLAN Spoleto territory Objective 31 EXPANSION OF THE CULTURAL OFFER IN THE TERRITORY

Project 31.3 Completion of the Spoleto - Assisi bicycle path. (from the Arezzo dam to the Azzano Bridge). The project is aimed at supporting the tourist-sports development of the territory by means Description of a non-invasive viability system, i.e. a 59km-long bicycle path, one of the longest in Europe, which crosses 8 Umbrian municipalities. Since it is located inside a Highly valued natural area, the route lends itself to all types of motorial activities (light amateur athletics) such as jogging, fast walking and such, in synergy with sports structures the path will “meet” as it develops (greens for bowls, “ruzzolone”, tennis, areas equipped for multi-purposes, etc.). In the partially completed Spoleto section, (the section between the Dam and San Nicolò Terminal is still to be completed), 5 service areas are foreseen along the path o Terminal of the Path at the former tile factory in San Nicolò, where a structure is to be erected for refreshment, garaging bicycles, repairing bicycles, changing rooms, sanitary facilities and parking, and a park-like area. The removal from state ownership of the area must be completed. o Former Casale Galli, the idea being to create a structure at the service of the path, located between the terminal and the town of Pontebari, through renovation of the existing building. Procedure for removal from state ownership still to be started up. o Casale La Torretta, with lodging facilities, already completed: 5 rooms with WC and ground floor used for refreshment and reception. This building is located in Pontebari. The allocation of use must be carried out. o Casale della Stella, located in Protte, with the renovation (50% already completed) of a building to be used as lodgings (3 mini flats) and a ground floor of ca. 200 sqm for services linked to the lodgings. Funds must be found to complete the works. o Equipped area of Crocemarroggia, located in the section not yet completed, which provides for a structure for parking cars and bicycles, as per the final project.

236 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

Pontebari, works for the cycle lane

Actions 1) Removal of the areas from state ownership 2) Change of allocation of use of Casale La Torretta 3) Construction of the section between the Dam and San Nicolò Terminal 4) Building of 5 service areas on the path Parties involved Group for Umbrian Redevelopment Phases and timeframe Time schedules restricted by the criticalities mentioned Financial resources The project is currently financed with 800,000 Euro, or 80.5% of the overall amount for the works to be created, through an integrated multi-measure public notice for the Tourism- Environment-Culture network. Expected results Creation of part of the Spoleto-Assisi bicycle path from the Arezzo Dam to the Azzano Bridge Result indicators Completion of the works and service structures

ENHANCEMENT PLAN Spoleto territory Objective 31 EXPANSION OF THE CULTURAL OFFER IN THE TERRITORY

Project 31. 4 Creation of a city park near the historic centre Description The project provides for the reconversion of the area where the municipal stadium is located, hereby respecting the restrictions imposed by the Superintendence and boundary of the landslide zone. Feasibility of the work is subject to problems linked to the boundary of the landslide zone, with respect to which specific technical studies are in progress, as well as finding the funds required through project financing Actions 1) Definition of the problems relative to the landslide zone 2) Project financing 3) Performance of the works 4) Outsourcing Parties involved Municipality of Spoleto Region of Umbria Province of Perugia Private parties interested in the project financing Phases and timeframe Once the problems related to the landslide zone have been defined, the time schedule shall be dictated by the project financing that provides for selection procedures for the offer, calling of the tender, any negotiated procedures, and assigning the works (minimum 1.5 years) Financial resources Operation subject to finding funds through project financing Expected results Improvement of conditions for using the area Result indicators Creation of the park and its management

237 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Spoleto territory Objective 31 EXPANSION OF THE CULTURAL OFFER IN THE TERRITORY

Project 31.5 Exploitation of the mountain and sustainable development. “LUCUS” Project Description The project proposes the protection and use of the environmental and cultural heritage of Monteluco and the Spoleto mountain district, in view of the value and singularity of the area. Actions 1) Activation of historic-artistic and naturalistic itineraries and spiritual routes (retreats and Franciscanism); 2) Opening of tourist accommodations; 3) Setting up of a naturalistic museum and documentation centre for species of flora and fauna; 4) Affixing of panels and signs for the various itineraries; 5) Activation of events and sports competitions; 6) Opening of centres for the preparation of individual athletes and teams, subject to the reconversion of existing structures. Parties involved Municipality of Spoleto; sports associations; private parties; hotel groups; environmental organisations. Phases and timeframe To be defined following agreements with the organisations involved Financial resources Municipality of Spoleto, Community Montana, private parties, organisations Expected results Recognition of the specificity of Monteluco as a diversified, specialist tourist area Result indicators Opening of structures; affluence of tourists and athletes.

ENHANCEMENT PLAN Spoleto territory Objective 32 EXPLOITATION OF NATURAL AND CULTURAL RESOURCES

Project 32.1 Environmental reclamation of Parco della Rocca in Monteluco The project provides for works for systemising the park, uncovering a section of the ancient Description walls of the Rocca Albornoziana and creating a path of packed earth, descending from the peak down to Porta del Duomo, recently brought to light, and then rising up again to reach the mechanised route rising from the parking lot of the shooting range. It is configured as a restoration of the historic pedestrian path and will be implemented within public notification “code C3 Docup Ob. 2 – Measure 3.2”.

Actions 1) Works for systemising the park 2) Excavation works to uncover a section of the wall of the Rocca and Porta del Duomo 3) Works for reinforcing the wall Parties involved Region of Umbria Regional Superintendence Municipality of Spoleto Phases and timeframe By the end of 2008 Financial resources Regional funds € 1,000,000.00 Municipal funds € 20,000.00 Expected results Expansion of the use of part of the area of Colle Sant’Elia, off limits to the public until now Result indicators Re-opening to the public of the area of Colle S.Elia, including the Rocca and pedestrian path encircling it

238 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Spoleto territory Objective 33 EXPLOITATION OF THE ENVIRONMENT AND THE NATURAL AND ACCESSIBLE LANDSCAPE

Project 33.1 Plan for Management of the SCI area (Site of Community Interest) IT5210064 – Monteluco di Spoleto Description This is one of the sites identified by the region of Umbria as being of special naturalistic value due to its considerable biodiversity, natural and semi-natural habitats and species of flora and fauna. These features place it among the sites indicated in the European ecological network “Natura 2000”, which unites all of the areas of major biological and naturalistic value in EU Member States. The planning in progress, resulting in an interdisciplinary study of the characteristics of the site, will set forth possible anthropic actions and the protection to be put into effect inside the area. Actions 1) Interdisciplinary study of the area by experts from various naturalistic and environmental branches. 2) Preparation of maps. 3) Drawing up of a Management Plan for the area. 4) Adoption of the Management Plan for the area by the regional government. Parties involved Region of Umbria Community Montana of the Martani Mountains and Serano Municipality of Spoleto University Phases and timeframe 31.01.2008 presentation of the draft of the Management Plan to the Region of Umbria by the Community Montana, charged with drawing it up. End-2008 Adoption of the Management Plan Financial resources Communities and Regions Expected results The formal naturalistic and environmental exploitation of the Monteluco area through the adoption of the Management Plan could be an occasion to develop naturalistic tourism and upgrading towards associated tourist-receptive activities, especially those already existing in the Monteluco area. Result indicators Adoption of the Management Plan

239

240 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Campello sul Clitunno site Objective 34 RAISING OF OPTIMISATION LEVEL OF CLITUNNO TEMPIETTO

Project 34.1 Expansion of visitor services inside the Tempietto area Description The current kiosk, which is used only as a ticket office, will be expanded to make it suitable for being an info-point and a bookshop that offers information material about the temple and the area. Multi-lingual illustrative panels will also be created, with the history and description of the building. Actions 1. Increase of the surface area to be destined to ticket office and visitor services 2. Preparation of info-point and bookshop 3. Creation of illustrative panels Parties involved Superintendence Department for the Architectural, Landscape, Historical, Artistic and Ethno-anthropological Heritage of Umbria. Municipality of Campello sul Clitunno Phases and timeframe Starting from 2009 and following.

Financial resources Funds to be found by: Ministry for Cultural Heritage and Activities); Municipality of Campello sul Clitunno; Umbria Region; private and bank sponsorships Expected results Expansion of services inside the temple visiting area

ENHANCEMENT PLAN Campello sul Clitunno site Objective 34 RAISING OF OPTIMISATION LEVEL OF CLITUNNO TEMPIETTO

Project 34.2 Placement on site of a copy of monument inscription of the Tempietto Description At the Superintendence offices in Perugia, there is a fragment of the architrave of the temple’s north temple door, with part of the dedication inscription in Capital Roman letters. This inscription, like the others still in place in the building, are especially important as it is not just one of the few examples of monumental inscription on the facade of an Early middle age building, but also proves the extraordinarily classical level of the monument. A copy of the inscription will therefore be created and placed in the area of the temple, to improve understanding of the building Actions 1. Creation of mould for architrave fragment 2. Creation of copy in resin, containing marble powder 3. Placement of copy on site Parties involved Superintendence Department for the Architectural, Landscape, Historical, Artistic and Ethno-anthropological Heritage of Umbria Phases and timeframe Starting from 2009 Financial resources Funds to be found by: Ministry for Cultural Heritage and Activities); private and bank sponsorships Expected results Improvement of monument presentation

ENHANCEMENT PLAN Campello sul Clitunno site Objective 34 RAISING OF OPTIMISATION LEVEL OF CLITUNNO TEMPIETTO

Project 34.3 Improvement of internal and external illumination of the Tempietto

Description Work requires integration of the external illumination, currently only dedicated to the main facade, by planning it for the other three sides too replacement of current internal illumination with a system that uses equipment adapted to accented lighting of the apsidiole with frescoes and Augustan age shrine Actions 1. Integrate external illumination of temple with additional equipment; 2. Creation of new accent lighting system for decorative elements on apsidiole Parties involved Superintendence Department for the Architectural, Landscape, Historical, Artistic and Ethno-anthropological Heritage of Umbria Phases and timeframe Starting from 2009 Financial resources Funds to be found by: Ministry for Cultural Heritage and Activities; Umbria Region; private and bank sponsorships Expected results Functional and accent lighting for all important architectural and artistic elements in temple

241 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Campello sul Clitunno site Objective 34 RAISING OF OPTIMISATION LEVEL OF CLITUNNO TEMPIETTO

Project 34.4 Creation of connection between Tempietto and underlying Clitunno river Description The work aims to recreate part of the ancient connection between the Tempietto and Clitunno river re-establishing the vital relationship between the heritage and the surrounding environment, using the cellar grotto underneath the building, which, once acquired, will also increase the space available for visitor services. Actions 1. Acquisition of cellar grotto 2. Conservative maintenance work on structure 3. Creation of path from Tempietto to Clitunno river Parties involved Superintendence Department for the Architectural, Landscape, Historical, Artistic and Ethno-anthropological Heritage of Umbria Phases and timeframe Starting from 2008 Financial resources The funds for acquiring the grotto have already been planned in the Superintendence department’s 2008 programmes. Funds for the work are to be found Expected results Recreate ancient relationship between heritage and river

Result indicators Possibility of descending to river directly from current temple area

ENHANCEMENT PLAN Campello sul Clitunno buffer zone Objective 35 PROTECTION AND ENHANCEMENT PLAN FOR THE CLITUNNO RIVER AND THE “TEMPIETTO ECO-MUSEUM”

Project 35.1 Creation of permanent educational-exhibition centres on environment the site culture Description The ENEL power station and some rooms in the water pumping station, a short distance from the temple, will be renovated to be transformed into permanent exhibition sites, part of a larger enhancement project for the area of the Clitunno river called ECO-MUSEUM. In particular, the two industrial archaeology structures will house the sections 3 and 4 of the territorial museum. Section 3 will concern the Clitunno river as "Genius Loci" and as a resource while Section 4 the Highly aesthetic "tòpoi": The Tempietto and the Springs of Clitunno Actions 1. Acquisition of structures by the Municipality of Campello; 2. Carrying out of work aimed at improving the state of conservation of the structures; 3. Preparation of Eco-Museum sections Parties involved Municipality of Campello sul Clitunno. Phases and timeframe Starting from 2008 for next stages Financial resources Part of the funds already allocated from the government funding provided after the 2006 environmental accident (see point 11.5.2. - Conservation analysis) will be used for the project, for the reclamation, recovery and overall enhancement, of the River Clitunno area: € 6,000,000.00 Expected results Extend tourist’s and visitor’s attention to the environmental system as a whole, observed in its multitude of aspects that includes, the hydraulic system – natural and artificial of the River Clitunno, in addition to the elements of a Higher historical and symbolical degree

242 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Campello sul Clitunno Territory Objective 35 PROTECTION AND ENHANCEMENT PLAN FOR THE CLITUNNO RIVER AND THE “TEMPIETTO ECO-MUSEUM”

Project 35.2 Recomposition of the landscape unit of the area Description As part of the protection plan for the entire area, the distancing of the fast road - that is now further down the valley – offers the opportunity of recomposing the landscape unit lost in the 1950s with the creation of state Highway 3. By means of a series of upgrading and re-functionalisation work of green areas and structures, and through the recovery, optimisation and extension of the internal road and pedestrian connection network, it will be possible to increase and guarantee the conservation of the area’s landscape identity. Identification and recovery of the existing nearby roads, paths and pedestrian routes, connected without interruption, will allow the networking of the several aspects of the territory, including the hydraulic system – natural and artificial of the River Clitunno, traditional crops and agricultural set up, archaeological sites and medieval settlements, in addition to the elements of a Higher historical and symbolical degree. Actions 1. Recovery and functional integration of the stretch of the ancient Via Flaminia 2. Identification, recovery and extension of nearby roads, paths and pedestrian routes 3. Upgrading of green areas Parties involved Municipality of Campello sul Clitunno Phases and timeframe Starting from 2009 for later stages of work Financial resources Part of the funds already allocated from the government funding provided after the 2006 environmental accident (see point 11.5.2. - Conservation analysis) will be used for the project, for the reclamation, recovery and overall enhancement, of the River Clitunno area: € 6,000,000.00 Expected results Connecting all territorial components with the Highest historical, symbolic and naturalistic degree

ENHANCEMENT PLAN Campello sul Clitunno Territory Objective 36 EXPANSION OF THE CULTURAL OFFER

Project 36.1 Setting up of new cultural and tourist venues Description Extension of cycling track The project foresees the extension of the existing cycling track that develops alongside the ancient Via Flaminia that will connect the main architectural sites and environmental sites in the Clitunno area Actions 1. Creation of cycling track Parties involved Municipality of Campello sul Clitunno Phases and timeframe Work carried out by 2008 Financial resources Funds already allocated by the Municipality of Campello sul Clitunno: € 170,000.00

243 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Campello sul Clitunno Territory Objective 36 EXPANSION OF THE CULTURAL OFFER

Project 36.2 Recovery and new functional use of a group of buildings that make up the network of infrastructures for visitor services Description In some buildings, partly already identified and some still to be found, exhibition spaces, document archives, welcome points, a video library and a project room will be created; The historical-document documentation on the area will be divided into 4 sections, which will have the task of introducing the visitors to an understanding of anthropological, historical, aesthetic, and natural values influenced by the settlements in the area. The planned thematic sections are as follows: a) SECTION 1:the area’s agricultural identity and the forms of the agricultural landscape. b) SECTION2: the natural geo-system and its influence on the historical evolution of human settlements. c) SECTION 3:The River Clitunno as "Genius Loci" and as a resource. d) SECTION 4: The Highly aesthetic "Topoi": the Temple and the Springs of Clitunno Section a) will be housed outside the protected and optimised area, in the Museum of Peasant Civilisation currently be prepared in Palazzo Casagrande at La Bianca. Section b) will be set up in some room of Palazzo Lungarotti belonging to the Municipality of Campello in Pissignano. Sections c) – d) will be located partly in the building of the ENEL power station, now disused, at the temple and partly in the unused rooms of the nearby pumping station. A projection room, indoor exhibition space and a bookshop will also be created in the renovated depots currently used as warehouses and workshops belonging to Mr. Zuccari at Pissignano. In the renovated rooms of the ENEL power station and in the small building next to the Church of San Cipriano, placed next to the three main vehicle entrances to the area, other information points and visitor centres will be created. Actions 1. Identification of structures suitable for destination of use foreseen 2. Conservative maintenance work and preparation of visitor’s services Parties involved Municipality of Campello sul Clitunno, Superintendence Department for the Architectural, Landscape, Historical, Artistic and Ethno-anthropological Heritage of Umbria. Phases and timeframe Starting from 2008 for later stages of work Financial resources Part of the funds already allocated from the government funding provided after the 2006 environmental accident (see point 11.5.2. - Conservation analysis) will be used for the project, for the reclamation, recovery and overall enhancement, of the Clitunno river area: € 6,000,000.00 Expected results Multiply attractions that the area will offer to visitors. Result indicators Expansion of tourist and visitor’s attention to the environmental system as a whole

244 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Benevento site Objective 37 TO COORDINATE MANAGEMENT OF ASSETS IN THE SITE

Project 37.1 Drawing up of a local protocol for controlling use of the Church of Santa Sofia Description Various functions coexist in the Church of Santa Sofia: It is an important place of worship in the city, has the Sannio Museum annexed to it, and it is a monument that offers users its historical – monumental value. In order to better valorise the cultural aspects it is best to draw up guidelines and principles agreed to by the owner and management Bodies as to how the Church of Santa Sofia is to be used, in light of its symbolic and worship functions. Defining the content and signing a protocol of intent between the Ministry of the interior (owner) and the Bodies involved in managing and protecting the asset, relates to continuing to use the Church as a place of worship, while making it accessible and useable as a monumental asset. The regulation will therefore define the roles of the various subjects involved in running it. Especially the Curia will continue to use it for the purposes of worship, while the Benevento Provincial Authority will see to managing the asset from a touristic-cultural point of view. The regulation will also include rules as to the fixed furnishings and fittings and moveable systems (lighting, amplification, musical) agreed to. Recommendations may be made as to the addition of further fittings and accessories over time.

Parties involved Ministry of the Interior – FEC – Prefecture of Benevento Benevento Provincial Authority Archbishop’s Curia in Benevento Phases and timeframe By 2008 Financial resources To be found in the budgets of the Bodies Expected results Safeguarding of the unique value of the Santa Sofia complex. Result indicators

ENHANCEMENT PLAN Benevento site Objective 38 TO EXTEND MUSEUM ACTIVITY

Project 38.1 To re-arrange and extend the Longobard collections in the Sannio Museum. Description The Sannio Provincial Museum’s collections include historical – archaeological artefacts from the period of the Lombard domain. These very valuable artefacts are grouped in a wing on the ground floor of the Cloister in the Santa Sofia complex. Here, in the rooms dedicated to the Southern Lombards, there are inscriptions from the 5th to the 11th century, sculptures, jewellery and items of female clothing, arms (many come from the necropolis in the Cretarossa quarter), and coins from the Duke's mint. It seems useful to renovate the arrangement of the collection in the museum, also as part of the publicising and communication activities in 2008. A new layout for the two rooms on the ground floor, dedicated to the Lombard period, is planned. The plan, drawn up by the Benevento Provincial Authority, provides for adding new display cabinets for recently acquired artefacts, renewing

245 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES the captions system used for the artefacts, and upgrading the lighting system. Parties involved Benevento Provincial Authority Archaeological Superintendency and BAPPSAE Phases and timeframe By 2008 Financial resources To be found: POR FESR 2007-2013 Funds - Campania Regional Authority Expected results Improvement of the quality of the exhibition spaces for the cultural heritage, in order to facilitate use by the users and allow better conservation of the assets. Result indicators Number of artefacts displayed Number of visitors

ENHANCEMENT PLAN Benevento site Objective 39 TO VALORISE THE URBAN ARCHAEOLOGICAL HERITAGE

Project 39.1 Creating an Urban Archaeological Park (P.A.U.) in Benevento Description Many urban redevelopment works that the City of Benevento has started in recent years on the old city have Highlighted the quality and quantity of the significant archaeological relics it possesses. Sharing the importance of expressing and valorising these, gave rise to the wish to create a PAU – Urban Archaeological Park.

Urban Archaeological Park

The Urban Archaeological Park involves a programme of actions aimed at valorising the archaeological heritage and cultural history of the city. Urban redevelopment – building of the walled city, already an objective of the Integrated Plan for the city, by means of which the Administration has taken far-reaching action as to the image of High quality that the city presents, is to be incentivised with further actions to control urban quality, especially in order to guarantee protection of the historical, documental, and cultural value of the original environment in which the Santa Sofia complex stands. These actions range from urban and archaeological redevelopment, to agreements between the Bodies to make it possible to manage the Archaeological Park, and to updating cognitive data, especially in relation to the traces spread around minor buildings as recycled items, as well as het control of problems related to the protection and possible usability where archaeological relics are located, such as private homes for example.

The action plans to review the entire system for the archaeological areas in the Bagni - Pacca area, a key point in the city, both due to its location (in the old city on the city's central axis, Madonna delle Grazie, Bagni area, Cathedral area, Corso Garibaldi, and Rocca dei Rettori), and the importance of the archaeological finds. Two works are planned on adjacent sites behind the Cathedral of Benevento: The Ark of the Sacrament and the Urban Archaeological Area. The “Ark of the Sacrament” project provides for building boundary walls and fixing up the

246 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES Lombard wall, reopening the second Roman Arch, creation of services for the quarter, and reconstruction of the ancient route of Via S. Gaetano.

The “Ark of the Sacrament”, in an old image and now

For the Bagni – Pacca archaeological area, the project provides for two types of work: Archaeological digs for the Cardinal Pacca area and for the Bagni area Parties involved Benevento Provincial Authority Municipality of Benevento Archaeological Superintendency and BAPPSAE Phases and timeframe By 2010 Financial resources Available: Community resources from POR Campania 2000/2006: “Area Archeologica Urbana – Cardinal Pacca – Bagni – Teatro Romano” for € 3,040,514.94 “Arco del Sacramento” for € 2,013,629.20 “Piazza Ponzio Telesino” for € 975,445.66 “Area Teatro Romano” for € 1,475,000.00 “Pedestrian paving of the old city” for € 3,098,741.39 To be found: POR FESR Campania Regional Authority 2007-2013 Expected results Redevelopment of the old city, combining the safeguarding of archaeological assets with the possibility of using and new usability of the same areas. Extending the tourist system by putting the cultural assets in the network and valorising them. Result indicators Completion of the work

247 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Benevento site Objective 39 TO VALORISE THE URBAN ARCHAEOLOGICAL HERITAGE

Project 39.2 Creating the museum of the archaeological digs in Piazzetta Sabariani Description During the works to make the old city suitable for pedestrians, a crypt of the original church of S. Marco dei Sabariani was found in Piazza Sabariani. The archaeological excavation of the crypt is still in progress. The frescoes found are of great interest, and studies of them are still in progress to establish their chronology and iconography. The crypt is certainly from medieval times, although further research is required to date it exactly. Once the works have been completed the archaeological area will be suitably protected, while making it available for viewing, by setting up a cover with glass surfaces, a lighting system, and protection. This site will also be covered by the tourist signage system for the “Italia Langobardorum” site. Parties involved Municipality of Benevento Archaeological Asset Superintendency and BAPPSAE Phases and timeframe By 2008 (first phase) by 2015 (completion) Financial resources Available: “Pedestrian paving of the old city” for € 3,098,741.39 To be found: POR FESR 2007-2013 Campania Regional Authority Expected results Redevelopment of the old city, combining the safeguarding of archaeological assets with the possibility of using and new usability of the same areas. Extending the tourist system by putting the cultural assets in the network and valorising them. Result indicators Completion of the work

ENHANCEMENT PLAN Benevento site Objective 40 TO IMPROVE REDEVELOPMENT OF THE OLD CITY

Project 40.1 Refurbish functioning of the public fountains Description This activity, based on a cluster of urban decoration plans, is part of the Municipality of Benevento’s current action to increase the widespread quality of the urban environment, especially the centre of the city. It consists of a programme of maintenance works that involve restoring, reinstating functionality, and experimenting with systems to recycle rainwater, as well as programmed maintenance of the existing fountains (Piazza Santa Sofia, Piazza Orsini, and the fountains on Corso Garibaldi).

The fountain of piazza Orsini, in an old image

248 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

The fountain of piazza Matteotti

This action will be carried out along with other important activities planned as part of the program for Valorising Benevento’s Cultural Assets Parties involved Municipality of Benevento Campania Regional Authority Phases and timeframe By 2008 (first phase) by 2015 (completion) Financial resources Available: POR 2000-2006 for € 600,000 To be found: POR FESR 2007-2013 Campania Regional Authority Expected results Redevelopment of the old city, combining the safeguarding of archaeological assets with the possibility of using and new usability of the same areas. Extending the tourist system by improving the urban image. Result indicators Number of redevelopment works

249 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Benevento site Objective 40 To improve redevelopment of the ANCIENT city

Project 40.2 Urban redevelopment of the Piazzas in the Cathedral and Rocca dei Rettori areas Description Along with the PI of the City of Benevento, the Benevento Municipality has taken on extensive works to valorise its own historical, architectural, and urbanistic heritage. As an extension of that logic, it intends continuing with recovering existing buildings and central urban areas. The plan of action stresses the creation of new cultural content, which can be achieved by changing the functions of the city’s architectural complexes, as well as redeveloping the major urban invasions that border on the city's civic centre, coinciding with the buffer area. At the edges of the buffer zone the plan is to complete valorisation of the heart of the city by redeveloping major empty urban spaces, that is, a system of piazzas that demarcate the ends of Corso Garibaldi.

Corso Garibaldi after the bombardment of the second mondial war

Resolving these areas is crucial for valorising Benevento, since, having been damaged by bombardment in the second world war, apart from the areas opposite the Cathedral and the Rocca dei Rettori there are key points linking the old city and the significant urban extensions that have been built in more recent times (The Atlantici, Mellusi, and Rione Libertà quarters, which are examples of rationalistic town planning and architecture). The elimination of spaces for vehicles to stop in the areas is possible as part of a new layout of the city's traffic patterns and the service infrastructures, which will gradually move traffic to outside the walled city. For designing the works for Piazza Duomo (Cathedral) and Piazza Orsini, included in the City of Benevento's PI, the Municipal Administration made used of advanced forms of involvement in design choices, creating final and working drawings with new cultural functions and public services, starting with the International Ideas Competition that was held in 2000 and won by the Gabetti & Isola Studio.

Design for Piazza Duomo by the Gabetti & Isola Studio

250 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

The Rocca dei Rettori in Piazza Castello

Piazza Castello, for which planning is to be started as part of redesigning the Strategic Plan for the City of Benevento, appears to be ideal for an urban gateway from the north to the walled city, clearing vehicular traffic from it and adding upgrading elements, which is next in line to the city's major monumental emergences. Provision is made for the inclusion of works commissioned from artists that are famous internationally.

Parties involved Municipality of Benevento Phases and timeframe By 2010 (first phase) by 2015 (completion) Financial resources Available: Institutional Programme Intent (CIPE Resources) for € 5,000,000 To be found: POR FESR 2007-2013 Campania Regional Authority Expected results Improving and valorising urban quality, Highlighting the monumental emergences that the city contains.

ENHANCEMENT PLAN Benevento site Objective 41 TO EXTEND SERVICES TO THOSE VISITING THE SITE

Project 41.1 Multi-mode information centre Description In addition to the material infrastructures supporting the tourist system, it is deemed necessary to create virtual infrastructures with a High degree of technological and computer content that can improve accessibility to and use of the assets. To this end a tourist information system is to be created both for information on assets and of a logistics nature on the availability of additional services. The information system available to the tourist, based on GIS technology, will provide an interactive vocal telephonic guide able to provide information (general, on location and accessibility, etc.) in relation to monuments and archaeological routes, the museum network, cultural events and entertainment ion the city, as well as the availability of hospitality services. Parties involved Municipality of Benevento Phases and timeframe First phase: First semester of 2008 Second phase: By 2009 Financial resources First phase: Drawing up the project with resources from the Benevento Municipality. Second phase: Works done with funds from POR FESR 2007-2013 - Campania Regional Authority Expected results Increase in the level of knowledge about cultural assets covered by the project. Increase in the number of assets and monuments that can be accessed via the system.

Result indicators Number of assets included in the tourist information system. Quality of information guaranteed. Number of users of the service

251 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Benevento buffer zone Objective 42 TO EXTEND MUSEUM ACTIVITY

Project 42.1 Design a Civic Contemporary Art gallery at Hortus Conclusus Description The actions promoted by the Municipality of Benevento for promoting valorisation of the cultural heritage, include actions that increase the number of cultural containers to be used for retrieving and displaying artefacts and traces of ancient and contemporary art. The museums offered by the city, which recently added new public exhibition structures, will be enriched with a civic art gallery. The Hortus Conclusus, set on the historical San Domenico complex, currently a seat of the University of Sannio, is recognised as a small open-air museum in the city. Built in the early 190s in a walled garden adjacent to the Convent Cloister, it can still be valorised more by making it a venue for showing off the works of art that Benevento has. The sculptures installed there were donated to the city by the artist, Mimmo Paladino. This provides an occasion for creating a civic gallery dedicated to contemporary art, located in the ground floor rooms of the cloister itself, which will be ceded to the Municipality by the University.

Hortus Conclusus by the artist Mimmo Paladino

The refurbishing already underway on the san Vittorino convent with change the function of this fine architectural complex as part of the infrastructure of the Atheneum of Sannio University. The Municipal Administration has provided for the terraced roof to be transformed into a space that is accessible to the public, to be used for cultural and artistic events, in direct relation to the Hortus Conclusis and the planned Civic Gallery. The plan to design and build the Civic Contemporary Art Gallery, located in the ground floor rooms of the San Domenico cloister, facing onto the Hortus Conclusus, which will be ceded to them by the University of Sannio. The work provides the possibility of connecting to the adjacent San Vittorino complex, making use of part of the terraced roof, where there is currently a fibreglass theatrical installation by Maestro Paladino, in order to create a series of spaces for theatrical and artistic shows, as n extension of the Hortus.

Hortus Conclusus by the artist Mimmo Paladino

Parties involved Municipality of Benevento Phases and timeframe By 2015 Financial resources To be found: POR FESR 2007-2013 Funds - Campania Regional Authority Expected results Extending of museum activity in the city of Benevento.

252 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES Result indicators Number of works of art displayed Number of visitors

ENHANCEMENT PLAN Benevento buffer zone Objective 43 TO EXTEND SERVICES TO THOSE VISITING THE SITE

Project 43.1 Multi-mode information centre – Information point network Description The creation of a network linking the elements in the Cultural assets system and guaranteeing accessibility to information on the locations, makes it necessary to create a multi-mode information point and to locate it in a central position in relation to the urban system covered by the project. Initially, this function will be located at the bookshop in the 16th century palazzo Paolo V, seat of the Municipal Representative.

Corso Garibaldi and palazzo Paolo V

In the future the plan is to use municipal means to acquire a property on Piazza Matteotti (Piazza S. Sofia) and adjacent to the Santa Sofia Complex, palazzo Casiello, chosen due to the unique presence of the Garden of Marvels, or Garden of the Wizard, that houses sculptures of figures from the surreal or metamorphic world, created by Architect Riccardo Dalisi. This multi-language desk for tourist accessibility will provide information in access to monuments, museums, routes, hospitality structures, public offices and locations, and the existence of specific transport and assistance services. This structure will be connected to a network of information points spread around the municipal area to serve the people and tourists. Each information point will be located near the old city and will be identified by applying fixed criteria to promote a coordinated image of the UNESCO site. Parties involved Municipality of Benevento Benevento Provincial Authority - EPT Body Phases and timeframe First phase: by 2008 Second phase: by 2015 Financial resources POR FESR 2007-2013 Funds - Campania Regional Authority Interregional Operating Program (POIN) “Cultural, Natural, and Tourist Attractions” Expected results Offering a quality service that guarantees up-to-date and detailed information, supported by cultural activities aimed at valorising the city’s cultural assets. Result indicators Number of visitors recorded in museums, art venues, and archaeological sites.

ENHANCEMENT PLAN Benevento buffer zone and territory Objective 44 TO VALORISE THE URBAN ARCHAEOLOGICAL HERITAGE

Project 44.1 Plan itineraries for the PAU The idea behind the project, using knowledge of the historical archaeological characteristics of some areas of the city, including the extent and depth of archaeological layers, as well as the resulting safeguarding and valorising of the same areas, meets the need to create a tourist system that is currently lacking. The Urban Archaeological Park involves a programme of actions aimed at valorising the archaeological and architectural heritage and cultural history of the city. As part of this initiative, tourists in the city will be able to choose urban trekking itineraries that are free of charge, but for which booking is required, with guides in English and Italian. Urban trekking is a new way of touring, which is less structured and off the famous routes. This type of tourism provides greater freedom and is full of surprises focussing on panoramas, less known monuments, and places in which the citizens live their daily lives. Urban trekking is a form of sustainable tourism that decongests the monument centres and slows the passage of tourists. When walking tourists have an active, hands-on rapport with the city they are visiting and create an emotive bond that promotes fidelity. For residents,

253 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES Urban Trekking is a healthy lifestyle and a way of rediscovering the place they live in. Parties involved Benevento Provincial Authority Municipality of Benevento Phases and timeframe By 2010 Financial resources To be found: POR FESR 2007-2013 Campania Regional Authority Expected results Raising the level of accessibility and usability of the assets in the city. Result indicators Number of itineraries Number of visitors

ENHANCEMENT PLAN Benevento buffer zone Objective 45 To improve redevelopment of the ANCIENT city

Project 45.1 Draw plans for decorative lighting Description Campania regional Law N° 12 of 25 th July 2002 provides for the drawing up of a Municipal Lighting Plan (PIC). The Lighting Plan the Municipal Administration intends drawing up integrates the norms and requirements both for reducing light pollution, and for night-time valorisation of the important cultural assets, based in specific technical studies of the quality of the assets to be valorised in the urban centre (town planning fabric, and historical, architectural, and monumental assets). In 2005 a laser survey was completed for producing 3D images of areas of the Old City as a support for drawing up the implementation plan. This action, which is to be taken as part of the municipal programming for urban sector plans, provides for zoning of lighting, and the establishing of standards and technical performance requirements for public lighting, in order to come up with a plan that minimises light pollution. A specific cluster will be formed within the plan, dedicated to lighting the areas of greatest significance in terms of historical, town planning, and artistic aspects (Decorative Lighting Plan). Parties involved Municipality of Benevento Campania Regional Authority Phases and timeframe By 2015 Financial resources To be found: POR FESR 2007-2013 Funds - Campania Regional Authority Expected results Valorisation of the urban environment by accepting quality standards and checking elements that indicate perceptible quality. Valorisation of the old city by correct lighting of monuments and urban areas. Reducing light pollution by installing new lighting units designed according to the latest lighting theories in terms of energy saving.

ENHANCEMENT PLAN Benevento buffer zone and territory Objective 45 TO IMPROVE REDEVELOPMENT OF THE OLD CITY

Project 45.2 Drawing up the colour plan Description Regional Law 26/02 provided the Municipalities in Campania with a draft standard for conserving and valorising old cities, especially disciplining both censusing and cataloguing actions, and restoration, decoration, and colouring of the facades of the historical civil buildings and curtain walls more than 50 years old in Campania. Implementation of this discipline in Benevento started with censusing and cataloguing all the building structures in the urban area that are of historical and artistic interest and, as a run up to drawing up the Colour Plan for the old buildings, a survey of all curtain walls in the city walls of the old city. This was done using advanced instrumentation (laser surveying equipment for producing 3D images). This Highly scientific instrument’s output will be used to create the Colour Plan, which the City’s Administration, in collaboration with the BAPPSAE Superintendencies of Caserta and Benevento and Archaeological Assets of Salerno, Avellino and Benevento, will produce with the help of technical support from companies that specialise in producing natural pigments for colouring the facades. Parties involved Municipality of Benevento Superintendency for Architectural Heritage in the provinces of Salerno, Avellino, and Benevento. BAPPSAE Superintendency of Caserta and Benevento. Campania Regional Authority Phases and timeframe By 2009 – Devising the plan is expected to take 6 months, plus one year to complete the

254 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES approval process. Implementation times will depend on the contents of the plan itself. Financial resources To be found: POR FESR 2007-2013 Funds - Campania Regional Authority Regional Law 26/2002 Expected results Valorising and guaranteeing the perceptive quality of the urban context by correct regulation of ordinary maintenance works on the building fabric (colour and finish of facades). Result indicators Number of works for refurbishing properties located in the old city

ENHANCEMENT PLAN Benevento buffer zone and territory Objective 46 TO VALORISE THE TERRITORY’S ARCHAEOLOGICAL HERITAGE Project 46.1 Create an Archaeological and green space Park in Cellarulo Description The Archaeological Park and green space, the executive planning for which has already been financed, covers an area on the edge of the city covering about 50 hectares. It is relevant in terms of its landscape – environmental aspects, and is bounded by a bend in the River Calore and the confluence with the River Sabato. It is mainly used for agricultural irrigation and as an expansive wooded area that was recently created. The work involves environmental redevelopment of the area by building a theme park. It is intended to be used for storing, restoring, and valorising the archaeological excavations carried out in 1991/94/98 and the continuation of the investigations in adjacent areas, in order to definitively mark out the progressive development lines of the old city, until the city walls were built. In addition, the site will be refurbished in general from an environmental point of view, having been compromised by gradual decay and marginalisation caused by the construction and subsequent abandonment of the road infrastructure known as the “Asse interquartiere ovest”, which has meanwhile become obsolete compared with the original idea behind it.

The archaeological area of Cellarulo

Parties involved Municipality of Benevento Superintendency for Architectural Heritage in the provinces of Salerno, Avellino, and Benevento. BAPPSAE Superintendency of Caserta and Benevento. Campania Regional Authority Phases and timeframe First phase: By 2008 Second phase: by 2015 Financial resources Available: (First phase, currently in progress): POR Campania 2000-2006 PI “Benevento: the future in history” for € 4,999,996 Institutional Programme Intent (CIPE Resources) for € 5,250,000 To be found: (Second phase) POR FESR 2007-2013 Campania Regional Authority Expected results Valorising the archaeological emergences in the city of Benevento. Result indicators Surface areas refurbished.

255 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Benevento buffer zone and territory Objective 47 TO VALORISE THE LONGOBARD CULTURAL HERITAGE

Project 47.1 Create the “Via Sacra Langobardorum” archaeological park Description The Via Sacra Langobardorum is an ancient pilgrim’s route that, following the Appia Traianea, connects Benevento to the Sanctuary of St. Michael on Monte Sant'Angelo sul Gargano. The route along the “Via” is scattered with remains of votive chapels, xenodochia, and stopping places with wells. Over time, some of these places have become famous abbeys (like San Giovanni in Lamis in Puglia, now the Convent of San Matteo and San Leonardo of Siponto), others have been developed as urban centres (San Giovanni Rotondo and Monte Sant’Angelo). Ruins and scattered traces have been conserved pf others, and of some only the place name has survived, shown on old geographic maps. Actions 1. Planning strategic action aimed at valorising integrated tourism of the territories this cultural itinerary passes through, starting with the following assets: 2. Supporting the development of integrated tourism along the route. 3. Planning and implementing promotional actions. 4. Valorising local resources in the areas touched on by the route. 5. Start-up and development of relations between institutions, populations, and local production activities. 6. Economic and entrepreneurial valorisation of the territories the route passes through. 7. In light of experience with a previous Protocol of Intent for valorising the Appia Traianea promoted by the Municipality of Benevento in 1998, involving various urban and rural bodies that wee administratively separate but linked by a common cultural profile, definition of a feasibility study is proposed for refurbishing and valorising the Route of the Via Sacra Langobardorum. 8. Before the programme can be developed a partnership must be forged between the Local institutions interested in the process, which must certainly involve the Municipality of Benevento acting as the promoter of the proposal for the part that falls within the Province of Benevento, as well as Avellino, and the Municipalities of Paduli, Sant’Arcangelo Trimonte, Buonalbergo, Castelfranco in Miscano, Casalbore, Montecalvo Irpino, and Ariano Irpino. Actions Protocol of Intent between the territorial bodies affected by the route. Programme of works to valorise the route of the Via Sacra Langobardorum. Parties involved Superintendency for Architectural Heritage in Salerno, Avellino, and Benevento. BAPPSAE Superintendency of Caserta and Benevento. Benevento Provincial Authority Campania Regional Authority Municipality of Benevento Phases and timeframe Medium – long term action Financial resources To be found: POR FESR 2007-2013 Funds - Campania Regional Authority POIN Funds “Natural, cultural, and tourist attractions”. Expected results Improved valorisation of the Lombard heritage in the Samnite area. Result indicators Number of works programmed and planned. Number of subjects involved

256 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Monte Sant’Angelo site Objective 48 HEIGHTENING OF THE LEVEL OF VALORISATION OF THE SANTUARY’S MOST ANCIENT STRUCTURES

Project 48.1 New set-up project for the Lapidus Museum and execution thereof Description The Lapidus Museum located in the so-called Longobard Gallery was realised in the eighties by the will and inspiration of the Benedictine Fathers who were custodians of the sanctuary at the time. The current arrangement does not meet the most updated criteria of museographical set-up. The recently terminated study on the important collections of sculptures makes the plan of a new set-up possible today, according to a route which encompasses the contiguous crypts B and C, re-organised and made more understandable by new captions and illustrative panels Actions 1. Review of the set-up of the remains in the Longobard gallery continuing from the architectural spaces, the frescos and the epigraphs of crypts B and C 2. Optimisation of didactic apparatus Parties involved Sanctuary of San Michele Arcangelo Superintendency BAPPSAE of Puglia Municipality of Monte Sant’Angelo Phases and timeframe Starting from 2010 onwards. Financial resources Funds to be raised from: Sanctuary of San Michele Arcangelo, Municipality of Monte Sant’Angelo, Superintendency BAPPSAE (architectural assets for the landscape and for historical heritage), private sponsors. Expected results Improvement of the presentation of relics and improvement of the didactic offer. Result indicators Increase in the quality of explanatory data on the conserved relics.

ENHANCEMENT PLAN Monte Sant’Angelo site Objective 48 HEIGHTENING OF THE LEVEL OF VALORISATION OF THE SANTUARY’S MOST ANCIENT STRUCTURES

Project 48.2 Museumification of the area subject to archaeological digs to the north of the sanctuary Description The area to the north of the Sanctuary, in correspondence with the zone included between the so-called entrance of Peter and Paul and the more internal part of the Longobard Gallery, was the subject of archaeological digs finalised at clarifying the stratification of the most ancient buildings in the Sanctuary in the pre-Longobard era. The state of the art is incomplete in that the continuation of the digs requires a complex intervention in order to guarantee the static safety of the structures, after having emptied the rooms still buried. Actions 1. Execution of essays aimed at delimiting the dig area 2. Planning of interventions 3. Interventions of digging an contextual securing of the structures 4. Set-up of the latter for use Parties involved Sanctuary of San Michele Arcangelo Superintendency BAPPSAE of Puglia Municipality of Monte Sant’Angelo Phases and timeframe Starting from 2010 onwards Financial resources Funds to be raised from: Sanctuary of San Michele Arcangelo, Municipality of Monte Sant’Angelo, Superintendency BAPPSAE, private sponsors. Expected results Recovery of still buried rooms and structures Result indicators Definition of the primary organisation for the structures in the Sanctuary.

257 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Monte Sant’Angelo site Objective 49 HEIGHTENING OF THE ENHANCEMENT LEVEL OF THE SANCTUARY

Project 49.1 Project and intervention for the creation of conditions of continuity in decoration of the external space connecting the upper atrium and the roof of the Cave Description From the upper atrium of the Basilica, to the left of the entrance to the Angioine staircase, a small door leads to the open space onto which face the church of the Madonna della Libera, the entrance to the roof area of the Cave and a small rock band behind which, in the background there are minor buildings, also private, onto which the octagonal bell tower lies. The space delimited thus requires interventions of improvement to correct architectural elements and fixtures in contrast with the locations. As this open space is delimited and served by an entrance which is accessed from the main road, it is reasonable to hypothesise its use as a show area as well as a secondary access road to the Sanctuary. This space is moreover connected to the so-called “small steps”, the roof of the Cave realised in steps of chalky stone where once the pilgrims completed a much felt devotional path. Actions 1. Planning and realisation of the intervention. Parties involved Sanctuary of San Michele Arcangelo Superintendency for BAPPSAE of the Region of Puglia Municipality of Monte Sant’Angelo Phases and timeframe By 2011. Financial resources Sanctuary of San Michele Arcangelo Funds to be raised from the Municipality of Monte Sant’Angelo Expected results Valorisation of the area and recovery of its function as devotional connection route to the “small steps”. Result indicators Realisation of conditions of balance in the overall view of the area.

ENHANCEMENT PLAN Monte Sant’Angelo site Objective 49 HEIGHTENING OF THE ENHANCEMENT LEVEL OF THE SANCTUARY

Project 49.2 Completion of equipping the Devotional Museum

Description In May 2008 some new rooms were inaugurated, built for the expansion project of the House of Pilgrims annexed to the Sanctuary. These spaces will be part of the visit open to the public with direct access to the inside of the Sanctuary. Actions 1. Completion of the intervention Parties involved Sanctuary of San Michele Arcangelo Superintendency for the BAPPSAE of the Region of Puglia Municipality of Monte Sant’Angelo Phases and timeframe By May 2008. Financial resources Sanctuary of San Michele Arcangelo Expected results Rationalisation and heightening of the quality of the museum offer Result indicators Increase in usable surface area.

ENHANCEMENT PLAN Monte Sant’Angelo site Objective 49 HEIGHTENING OF THE ENHANCEMENT LEVEL OF THE SANCTUARY

Project 49.3 Optimisation of the access system to the Casa del Pellegrino and creation of a new internal route Description The creation of a new “pilgrim’s route” has the following purposes: - create independent possibility of vesting the devotional museum and the lapidus museum; - create a new influx and deflux route for pilgrims in the Sanctuary; - create new roads able to evacuate the Sanctuary in emergencies. These last two objectives, in particular, define the final decongestion of the actual amount of pilgrims and a considerable increase of potential capability of accommodation inside the sanctorial complex. Moreover the whole will allow further lightening of the Angioine staircase capacity which currently reaches its limits on days of major afflux, even if effectively regulated with two-way pathways and served by emergency routes. Actions 1. Opening of the Devotional Museum and creation of the new pathway 2. Start of expansion works to the hall of the House of Pilgrims

258 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES Parties involved Sanctuary of San Michele Arcangelo Superintendency for the BAPPSAE of the Region of Puglia. Phases and timeframe By May 2008. By 2010. Financial resources Sanctuary of San Michele Arcangelo Expected results Increase in the capability of accommodation for visitors. Result indicators Improvement in the state of conservation of the Angioine staircase

ENHANCEMENT PLAN Monte Sant’Angelo site Objective 50 ENHANCEMENT OF THE STRUCTURES ANNEXED TO THE SANCTUARY

Project 50.1 Adaptation and refunctionalisation project of the internal spaces Description Following conservation of the rooms of the ex-orphanage it will be necessary to start a study for the new refunctionalisation of recovered spaces and the structures annexed tot eh Sanctuary: the Church of the Madonna della Libera, the Chapel of Santa Lucia, the Chapel of San Rocco and the Monastery. Actions 1. Definition of the new destined use 2. Elaboration of the project Parties involved Sanctuary of San Michele Arcangelo Municipality of Monte Sant’Angelo Phases and timeframe Starting from 2010 onwards Financial resources Funds to be raised from: Sanctuary of San Michele, Municipality of Monte Sant’Angelo, private sponsors. Expected results Recovery of areas destined for exhibition spaces, training locations, sites for housing specialised archives on the site etc. Result indicators Quantity of recovered rooms destined for the valorisation of the site.

ENHANCEMENT PLAN Monte Sant’Angelo site Objective 51 ENHANCEMENT OF THE WALLS

Project 51.1 Definition of visiting routes to the wall system Description Starting from the hypotheses formulated by local scholars regarding the progress of the ancient wall belt, the intention is a systematic verification of the places where it is possible to identify evidence of the structures that are not visible today. The idea is to elaborate a virtual reconstruction of the wall belt and verify the possibility of defining valorisation routes. At the same time there will be a more detailed idea of the development, even stratigraphical, of the historical centre in relation to the identification of the progress of the original campaign plan. The visiting route of the walls has the following objectives: a) Identify all the visible parts of the wall circle; b) Organise a guided tour visit which allows access to the parts of the wall conserved in private properties. c) In addition to this it is necessary to plan and realised specific illustrative depliants on the history of the walls and didactic panels to be placed in the different areas of the route. Actions 1. Instrumental survey of the sites with execution of essays to verify the eventual presence of structural parts of the towers. 2. Coding of data on specific software for virtual 3D elaboration 3. Planning and realisation of specific signs equipped with bilingual explanatory Parties involved Municipality of Monte Sant’Angelo Superintendency for the BAPPSAE of the Region of Puglia Phases and timeframe By 2011. Financial resources Municipality of Monte Sant’Angelo Mountain Community of Gargano Gargano National Park Expected results Identification of the ancient wall circle. Result indicators Creation of visiting route for tourists

259 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Monte Sant’Angelo site and buffer zone Objective 51 ENHANCEMENT OF THE WALLS

Project 51.2 Identification of interventions of improvement in visibility-use of the walls Description The different portions of the walls present different valorisation potential. The section to the south of the monastic complex of San Francesco could be improved by optimising the area in front of it with the realisation of opportune didactic panels while those conserved in private habitations could have signs along a pedestrian path opportunely studied. Actions 1. Organisation of the area in front of the sections to the south of the monastic complex of San Francesco 2. Identification of the spaces in which to allocate the explanatory panels on the history of the walls. Parties involved Municipality of Monte Sant’Angelo Superintendency for the BAPPSAE of the Region of Puglia Phases and timeframe By 2011. Financial resources Municipality of Monte Sant’Angelo Moutain Community of Gargano Gargano National Park Expected results Improve visibility of the walls and Highlight their progress respect to the urban fabric. Result indicators Increase in the visible wall sections, Increase in the spaces of use of the walls.

ENHANCEMENT PLAN Monte Sant’Angelo site and buffer zone Objective 52 ENHANCEMENT OF THE CHURCHES AND MONASTERIES OF MONTE SANT’ANGELO

Project 52.1 Definition of visiting routes around the system of churches and monasteries Description The realisation of a system of routes and didactic devices which allows the history of these buildings to be known and their development in relation to the life phases of the inhabited areas. Actions 1. Planning and identification of the routes. 2. Organisation of a guided tour with established accesses. 3. Creation of illustrative depliants. 4. Creation of didactic panels on the history of the churches. Parties involved Municipality of Monte Sant’Angelo, Superintendency BAPPSAE Region of Puglia, Sanctuary of San Michele Arcangelo, Parish S. Maria Maggiore, Archbishops’ Administration. Phases and timeframe Starting from2009 Financial resources Funds to be raised from: Municipality of Monte Sant’Angelo, Parco Nazionale del Gargano, Superintendency BAPPSAE Region of Puglia, Sanctuary of San Michele Arcangelo, Parish S. Maria Maggiore, Archbishop’s Administration, Private sponsors. Expected results Optimisation of the knowledge of the places and assets. Result indicators Increase in the quantity of information on the assets. increase in the quantity of illustrative material available for the visitors

260 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Monte Sant’Angelo site and buffer zone Objective 52 ENHANCEMENT OF THE CHURCHES AND MONASTERIES OF MONTE SANT’ANGELO

Project 52.2 Interventions of improvement of visibility-use Description In relation to the foreseen visits to the churches, re-organisation is foreseen for the spaces in front of them to improve their visibility and use. Actions 1. Organisation of the area of Largo le Monache near to the Monastery of Clarisse 2. Organisation of the area Largo San Oronzo facing the monastery of San Francesco 3. Organisation of the area Piazza Beneficenza delimited by the Villa comunale and the Monastery of the Cappuccini Parties involved Municipality of Monte Sant’Angelo, Superintendency BAPPSAE Region of Puglia, Sanctuary of San Michele Arcangelo, Parish of S. Maria Maggiore, Archbishop’s Administration. Phases and timeframe 1. By 2009 2. By 2009-2010 3. By 2012 Financial resources Funds to be raised from: Municipality of Monte Sant’Angelo, Gargano National Park, Superintendency BAPPSAE Region of Puglia, Sanctuary of San Michele Arcangelo, Parish S. Maria Maggiore, Archbishop’s Administration, private sponsors. Expected results Increase in attention regarding the places and assets. Result indicators Increase in the quality of spaces to be used.

ENHANCEMENT PLAN Monte Sant’Angelo buffer zone Objective 53 HEIGHTENING OF THE LEVEL OF USE OF THE MUSEUM OF ART AND POPULAR TRADITIONS

Project 53.1 Re-functionalising plan for the areas and review of showcase routes Description Following a new definition of ownership, new organisation of museum spaces is foreseen to be realised on the basis of a specific scientific set-up project carried out by the faculty of demoethnoanthropolgy of the Universities of Bari and Foggia. Actions 1. Elaboration of a plan of refunctionalisation and set-up 2. Intervention Parties involved University of Bari University of Foggia Municipality of Monte Sant’Angelo. Phases and timeframe 2013 onwards Financial resources Funds to be raised from: Municipality of Monte Sant’Angelo at sponsorings Expected results Expansion and new set-up of the G. Tancredi museum

261 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Monte Sant’Angelo buffer zone Objective 54 ENHANCEMENT THE ACTIVITIES OF REQUALIFICATION IN THE HISTORIC CENTRE

Project 54.1 General survey on internal pathways and planning for the restoration of uniformity of the materials Description The intention is that of detecting all internal pathways in the historical centre in order to carry out monitoring of its state of maintenance and isolate cases of non-uniformity of materials incompatible with the technical norms in force. Actions 1. Detection 2. Preparation of maps also on digital support 3. Planning of interventions 4. Interventions Parties involved Municipality of Monte Sant’Angelo. Phases and timeframe 2009 onwards Financial resources Municipality of Monte Sant’Angelo Expected results Re=establishment of uniformity of the general view of the historical centre. Result indicators Improvement in the general facies of the historical centre.

ENHANCEMENT PLAN Monte Sant’Angelo buffer zone Objective 54 ENHANCEMENT THE ACTIVITIES OF REQUALIFICATION IN THE HISTORIC CENTRE

Project 54.2 Study of new internal connecting routes between the car parks in the initial welcoming areas and the Sanctuary Highlighted by bilingual signs Description The intention is that of verifying the possibility of implementing the current topical itineraries in the historical centre in order to improve their efficiency through the arrangement of bilingual explanatory panels which refer also to the urban aspects of the historical centre and its development over the centuries. Actions 1. Study and planning of itineraries 2. Actuation of forms of targeted promotion 3. Planning of interventions 4. Interventions Parties involved Municipality of Monte Sant’Angelo Phases and timeframe 2010 onwards Financial resources Municipality of Monte Sant’Angelo Expected results More visits from tourists to the historical centre. Result indicators Increase in the duration of excursions.

ENHANCEMENT PLAN Monte Sant’Angelo buffer zone Objective 54 ENHANCEMENT THE ACTIVITIES OF REQUALIFICATION IN THE HISTORIC CENTRE

Project 54.3 Re-order of publicity boards and definition of a detailed regulation for installing shade tents, publicity signs and informative panels Description Currently the historical centre shows conditions of non-uniformity regarding the type of materials for shade tents, publicity panels and signs. The cause of this is the lack of regulation regarding planning of the urban furnishings. Even foreseeing the building reference regulation norms in force, over the years the consolidated result does not perfectly respond to the rules of decorum of the locations. For this reason a new detailed regulation for the historical area is being studied at the UTC which considers all kinds of decorum and allows the re-ordering of all signs and boards in this area. Actions 1. Completion and approval of the new regulations 2. Actuation Parties involved Municipality of Monte Sant’Angelo Phases and timeframe 2009 onwards Financial resources Municipality of Monte Sant’Angelo Expected results Recovey of uniformity and decorum in the historical centre. Result indicators Mitigation of the current state of non-uniformity.

262 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES

ENHANCEMENT PLAN Monte Sant’Angelo buffer zone Objective 54 ENHANCEMENT OF THE TERRITORIAL CULTURAL OFFER

Project 54.4 Study and planning of the valorisation of piazza Carlo d’Angiò with the elimination of the car park, organisation of a green area of connection with the Castle and review of existing services Description This is one of the most qualifying interventions for the area that directly confines with the Sanctuary. The basic idea is to confer Piazza Carlo D’Angiò an aspect and function that is more suited to the place, through the study of architectural solutions and furnishing which can give it an aspect and decorum in harmony with the nearby Sanctuary. For this purpose the current car park will be eliminated and its thoroughfare with vehicles will be limited. Hygiene services will be re-organised in terms of more discretion and the route which leads from this to the green area contiguous to the Castle currently limited in thoroughfare will be valorised. Actions 1. Appointment of charge for planning 2. Approval of project 3. Actuation Parties involved Municipality of Monte Sant’Angelo Superintendency of Puglia Phases and timeframe 2009 onwards Financial resources Municipality of Monte Sant’Angelo Expected results Implementation of decorum and functionality of sanctorial area. Result indicators Valorisation of considered space.

ENHANCEMENT PLAN Monte Sant’Angelo buffer zone and territory Objective 55 ENHANCEMENT OF THE TERRITORIAL CULTURAL OFFER

Project 55.1 Identification and valorisation of the Via sacra langobardorum route Description Structuring of the via Sacra Langobardorum with apposite signs, didactic apparatus and publication of specific maps concerning the cult locations situated along the itinerary which from the plains rises towards Monte Sant’Angelo, San Marco in Lamis, San Giovanni Rotondo. Actions 1. Definition of the sites involved and stipulation of agreements. 2. Creation of cultural itineraries. 3. Realisation of signboards and explanatory apparatus. 4. Realisation of didactic and scientific material. Parties involved Municipalities of Monte Sant’Angelo, San Marco in Lamis, San Giovanni Rotondo Province of Foggia Gargano National Park, Mountain Community Superintendency BAPPSAE Region of Puglia, University of Bari Phases and timeframe Medium term. Financial resources Funds from Region of Puglia; community funds. Expected results Increase in cultural and tourist offer in the regional territory. Result indicators Quantity of sites involved and expansion of the area involved in the routes. Increase in tourist flow

ENHANCEMENT PLAN Monte Sant’Angelo buffer zone and territory Objective 55 ENHANCEMENT OF THE TERRITORIAL CULTURAL OFFER

Project 55.2 Optimisation of the regional museum network Description An important role can be carried out, in the sector of valorisation and use of cultural assets, by the creation of a museum network in Puglia for the neighbouring centres of San Giovanni Rotondo, San Marco in Lamis, Manfredonia, already foreseen by the Region of Puglia Actions 1. Creation of a museum network 2. Realisation of signboards 3. Realisation of didactic apparatus Parties involved Municipalities of Sant’Angelo, San Giovanni Rotondo, San Marco in Lamis, Manfredonia Province of Foggia Gargano National Park

263 8.3 ENHANCEMENT PLAN DETAILED SCHEDULES Mountain Community Superintendency BAPPSAE Region of Puglia University of Bari Phases and timeframe Short-medium term Financial resources Funds of the Region of Puglia; community funds. Expected results Creation of an integrated system of routes and increase in use of the sites Result indicators Number of sites involved and expansion of the territorial area. Increase in number of visitors.

264 8.4 AWARENESS BUILDING · Events – comprising a wide material, brochures, guidebooks) and AND PROMOTION PLAN range of activities: exhibitions, also through the website. conferences, seminars on the

Property; participation in great As to events, exhibitions, conferences events (specialized culture and and study days in cooperation with 8.4.1 NETWORK tourism fairs), national and qualified universities and cultural international initiatives; cultural institutions, also foreign, operating in The Plan aims both at raising awareness of people living in the areas and economic initiatives, the area will be organized. Moreover, promotion of the endogenous the complex will participate in all included in the Site on the values of the Longobard Heritage and at resources of the area, etc. cultural initiatives promoted by the Ministry for Cultural Heritage and universally disseminating these values in each possible way: from training to 8.4.2 CIVIDALE DEL FRIULI Activities at national and European level (Culture Weeks, European information; from adequate and its Terri tory Heritage Days). Following successful documentation, to the study and past initiatives, guided tours also implementation of advanced The activities linked to promotion and awareness of the population regarding linked to music, theatre and poetry technological solutions in order to events, will be organized upon special enhance communication; from cultural assets in general have always been very intense and of a Higher level occasions during the year. In network initiatives to initiatives launched by single partners of the Site also due to the presence of numerous cooperation with other local bodies, cultural associations in the city and the complex will also participate in and reference micro -territories. territory. Recently there was the specialized culture and tourism fairs development of some specific (BIT, Mediterranean Exchange for The three pillars of the Awareness Building and Promotion Plan, along initiatives concerning Longobard Archaeological Tourism, etc.). heritage and for which optimisation is with the strengthening of technological systems, are the following: in progressed or already planned. In order to establish a constant connection with local people,

8.4.3 BRESCIA cooperation with local schools of any · Training – comprising interaction kind and level – already successfully with education institutions (from and its Territory launched in the past – will be primary schools ot universities) strengthen so as to create new and social systems (employers The site of S. Salvatore – S. Giulia has education opportunities at different and employees, pensioners, the been the focus of growing attention levels, involving both students and elderly, people with special through the realization of various teachers and to experiment new forms needs); the creation of specialized activities, advertised with special didactic Laboratories; the illustrated brochures and with printed of communication for the properties.

retraining of human resources material on the museum and the that operate at any level on the monastery. The site is appropriately 8.4.5 SPOLETO 8.4.6 CAMPELLO SUL CLITUNNO properties (from curators, marked by a system of road signs, which also indicates walking itineraries and their Territory historians to tourist guides, etc.),

both those operating in the for visitors. Such signs can be found at The effective promotion of Longobard sectors indirectly linked to the the train station and on main roads of testimonials in the Territory of Spoleto property and those linked to access to the city. The site is also and Campello sul Clitunno, obviously accommodation and services indicated among the main tourist with particular reference to the Basilica systems. attractions on the sign that welcomes travelers approaching the city over the of San Salvatore and the Clitunno · Information – comprising both – Tempietto, will be realised through direct and indirect – production Highway exit “Brescia Centro.” More educationals purposefully dedicated to of publishing and multimedia signs and totem poles advertising the Site are present in the area in front of tour operators and journalists active in material (guides, brochures, maps, boards, documentaries, the Museum and disseminated in the sector of cultural assets and various parts of the city. tourism. etc.) which help to promote and disseminate information on the The city of Spoleto will, moreover, be a 8.4.4 CASTELSEPRIO-TORBA carrier of the applications o f promotion products and the reference Territories, and the strengthening and its Territory of the territory where it will participate both individually and in collaboration of network communication technological systems, like The promotion of awareness and with the Agency for the Promotion of Tourism of Umbria and Tourist Fairs websites, the network’s promotion about the complex of connected database, specialized Castelseprio-Torba, both at national such as BIT of Milan, TTI of Rimini, the World Trade Market of London, the software, and the targeted and international level, will be strengthening of relations with enhanced by publishing products in Salon des Vacances of Paris and media, with house-organs and various languages (general and/ or Brussels and the Fitur of Madrid. with other information centres. thematic didactic and scientific Specific actions of promotion are

265 foreseen for this year and will be technologies for passing repeated in 2009, on the market of the information on to the user on United Kingdom and the United States site. of America. · The creation and activation of a vocal information portal as part of 8.4.7 BENEVENTO a virtual cultural infrastructure and its Territory system. · A multi-modal information centre The main objectives of promoting and and a network of information awareness building in relation to the points in a material cultural Longobard heritage are: infrastructure system. · Laying out itineraries for creating · Increasing awarness about the “Via Sacra Langobardorum” archaeology and local heritage in archaeological park. general. In detail, the actions to be taken to · Improving cultural promotion on pursue the objectives, broken down on the site the basis of reference Territory, · Increasing sensitivity among children of school-going age. 8.4.8 MONTE SANT’ANGELO and its Territory The actions included in the local projects are broken down in terms of The presence of a complex system of location and involve: promotion activities for the artistic- monumental and landscape- · Network conventions and a environmental heritage in Monte website to create an “Italia Sant’Angelo e its Territory is strictly Langobardorum” network by linked to a more general enhancement presenting an overall picture that policy which concerns the whole is as complete as possible of the Region Puglia. The Municipalities, cultural, touristic, and Provinces, Region and cultural recreational attractions of the institutions are all involved in projects Longobard heritage protected by – at a different level – whose main UNESCO in general. objective is to promote this heritage, · An exhibition of images and considered a precious resource to be documents of the Duchy of protected. The objectives of the Plan Benevento and an exhibition of are therefore to enhance didactic Longobard crosses, are two activities, already existing at various items in the project: levels, which promote the awarness of “Langobardia Minor: Images and the site and its Territory. documents from the Duchy of Moreover, the interaction among Benevento”. universities, Superintendences, · Research and school teaching Companies and other institutions can and an exhibition of comic strips enhance the correct management of about Longobard Benevento to the heritage by involving suitable create a network for the study of professionals, able to combine the Longobard heritage including interdisciplinary competences for the the artistic – cultural history of a dissemination of knowledge and city using forms of telling the awareness. story other than canons, such as for example, comic strip accounts, which offers the possibility of easily reaching the school-going age group. · The implementation of a computerised tourist system added to by the creation of an Urban Archaeological Park for Benevento by means of virtual networks serving the tourist service that uses innovative

266 8.6.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

NETWORK 1 1.1 STRENGTHENING THE Study, implementation and support INTERACTION to targeted training courses WITH THE EDUCATION COMMUNITY for teachers of all school levels 1.2 Activation of cultural exchanges between Universities and post-graduate Schools 1.3 Broadening of the educational project “I Longobardi – Gemellaggi formativi e itinerari turistici per le scuole” (The Longobards – Educational twinning and touristic routes for schools) 2 2.1 STRENGTHENING THE Support and promotion of awareness INTERACTION initiatives for specific population sectors WITH SOCIAL SYSTEMS (world of labour, pensioners) 2.2 Support and promotion of initiatives of awareness, information and participation for the weakest segments of the population (elderly, individuals with special needs) 3 3.1 RETRAINING AND UPDATING Network initiatives for the training OF TOUR OPERATORS and updating of tour Guides

4 4.1 STRENGTHENING Strengthening of the Network’s Website OF TECHNOLOGICAL SYSTEMS FOR THE AWARENESS BUILDING 4.2 AND PROMOTION OF HERITAGE Development of technological systems and products 5 5.1 CONSTRUCTION Extension of the network of relations AND CONSOLIDATION to important national and European OF THE EUROPEAN centres of Longobard interest GEOCULTURAL CORRIDOR (Geocultural corridor) 5.2 Implementation of aimed agreements at the national and European level and co-participation in EU projects 6 6.1 STRENGTHENING Initiation of permanent relations OF INFORMATION with information bodies and regional-national media 6.2 Investigation and implementation of targeted initiatives and events concerning the world of information 7 7.1 PROMOTIONAL INITIATIVES Participation and promotion AND MAJOR EVENTS of major specialised events 7.2 Participation and promotion of Communication and Information events 7.3 Study, implementation and co- participation in information productions of large circulation (television, film, audiovisual)

267 8.6.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

CIVIDALE 8 8.1 DEL FRIULI ENHANCEMENT OF TRAINING Projects to improve knowledge about TERRITORY ACTIVITIES RELATED TO the Heritage in relation to education EDUCATION (from primary schools to universities) 8.2 Development of didactic and experimental activities 8.3 Project and implementation of didactic laboratories focused on the Heritage

8.4 Carrying out or enhancing and adjusting guided tours of the territorial network of the “Heritage and Science Laboratories” 9 9.1 ENHANCEMENT OF INFORMATION Study and implementation of publishing ACTIVITIES initiatives for promotion and public awareness 9.2 Improvement of web-related technological systems to put the Heritage on the web 9.3 Enhancement of relations with information centres 10 10.1 ENHANCEMENT OF RAISING Carrying out of activities to enhance AWARENESS ACTIVITIES dissemination of Heritage values 10.2 Project and carrying out of cultural and economic initiatives 10.3 Promotion of endogenous resources BRESCIA 11 11.1 TERRITORY RISE AND INCREASE Design and realisation of new didactic IN THE EDUCATIONAL OFFER paths

12 12.1 INCREASE IN ACTIONS Realisation of new multimedia OF COMMUNICATION promotional material 12.2 Creation of cartoon strips and gadgets for youth 12.3 Production of new merchandising products on the Longobards 12.4 Fostering promotion through the use of more means of advertisement 12.5 Organisation of exhibitions 13 13.1 ORGANISATION OF EVENTS AT THE Event “Feast of Santa Giulia” SITE 13.2 “Discover Brescia” project 14 14.1 USER RETENTION Implementation of the “Desiderio card” project

268 8.6.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

15 15.1 LONGOBARD ITINERARIES Public pathway dedicated to the main Early middle ages emergencies 16 16.1 PROMOTION OF AWARENESS Diffusion of awareness on the ON THE LONGOBARDS characters and events of the Longobard WITH SUSTAINABLE ACTIONS OF era TOURISM 16.2 Promotion of sustainable tourism in the development of the territories of Langobardia 16.3 Promotion of intercultural exchange, visits to neighbouring sites and in-depth examinations on wines and characteristic local products 16.4 Training of Cultural and Environmental Promoters (A.C.A.) 16.5 Promotion of formation and realisation of dedicated publications 16.6 Intercultural exchanges between the Langobardia sites 16.7 Distribute knowledge of the brand and supply work to operators in the sector 17 17.1 PROMOTION OF AWARENESS ON Protocol of programmed agreement for THE ARCHAEOLOGICAL AREAS, the constitution of a Committee of co- MONUMENTAL EMERGENCIES, ordination for the enhancement and ARCHAEOLOGICAL FINDINGS promotion of the Brescian Longobard CONSTITUTING THE NETWORK heritage OF LONGOBARD BRESCIAN SITES 17.2 Promotion of the activities of the museums in the territory which conserve findings of the Longobard heritage 17.3 Exhibitions on craftsmanship in the Longobard era in Brescia and the sites in the territory CASTELSEPRIO-TORBA 18 18.1 TERRITORY ENHANCEMENT OF TRAINING Study and creation of new informational ACTIVITIES RELATED TO materials and actions to involve schools EDUCATION and tourism 18.2 Study and implementation of artistic initiatives 19 19.1 ENHANCEMENT OF PUBLIC Projects to improve the enhancement AWARENESS ACTIVITIES FOR on of the Heritage at various social ADULTS levels

19.2 Enhancement of targeted relations with the media

19.3 Promotion activities of FAI (Italian Environmental Fund) for the Monastery of Torba

269 8.6.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

20 20.1 ENHANCEMENT OF TOURIST Study and subscription of agreements PROMOTION INITIATIVES with tour-operators

20.2 Implementation of the international project “Nature and Culture in a part of Insubria” 20.3 Tourist promotion “Welcome to Lombardy: the Land of FAI Treasures “ - The values of Torba-Castelseprio 21 21.1 INCREASE THE NUMBER CISAM realization of a slip-case SPOLETO TERRITORY OF PROMOTIONAL ACTIVITIES on San Salvatore CONNECTED WITH THE SITE 21.2 st 1 Congress “Italia Langobardorum (568-774)” 21.3 Implementing ad hoc educationals for tour operators and journalists from the tourist-cultural sector; assistance to journalists and Radio TV crew members 22 22.1 INCREASE THE NUMBER Studying and implementing OF INFORMATION, accommodation, promotion and ACCOMMODATION awareness raising-related publishing AND PROMOTION ACTIVITIES initiatives 22.2 City course on the subject of Longobard culture, with closing tasting of food products 22.3 Outsourcing the management of the IAT tourist information and accommodation office, offering extended working hours and a wider range of services 22.4 Planning of communication activities for the dissemination of knowledge of the Longobard heritage, through various information channels 22.5 Improving technological systems in order to exploit assets via the Internet 23 23.1 TOURIST PROMOTION OF THE Participation in trade show events TERRITORY and initiatives, mainly in the national and foreign markets

23.2 Tourist accommodation and promotion of the territory through the organization of artistic and cultural events of significant depth 24 24.1 DEVELOP TRAINING ACTIVITIES Projects for increasing knowledge CONNECTED WITH of the Heritage in relation THE EDUCATIONAL SPHERE to the sphere of education

270 8.6.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

FIELD OBJECTIVES PROJECTS

CAMPELLO 25 25.1 SUL CLITUNNO EXPANSION OF INFORMATION Implementation of promotional and TERRITORY ACTIVITIES awareness-raising publishing initiatives

25.2 Actions aimed at supporting awareness-raising and promotion initiatives BENEVENTO 26 26.1 TERRITORY TO INCREASE AWARENESS Exhibition “Langobardia Minor: Images BUILDING and documentation from the Duchy of ABOUT ARCHAEOLOGY Benevento” AND LOCAL HERITAGE

27 27.1 IMPROVING CULTURAL Laying out itineraries for the Via Sacra PROMOTION ON THE SITE Langobardorum archaeological park 27.2 Implementing the tourist information system – augmented reality 28 28.1 INCREASING AWARENESS AMONG Research and school teaching and a CHILDREN OF SCHOOL-GOING AGE comic strip exhibition about Benevento in the Longobard era MONTE SANT’ANGELO 29 29.1 TERRITORY ENHANCEMENT OF TRAINING Projects to increase awareness on the ACTIVITIES RELATED TO Heritage in relation to education (from EDUCATION primary schools to universities)

29.2 Development of didactic and experimental activities 30 30.1 ENHANCEMENT OF INFORMATION Study and implementation of publishing AND PROMOTION ACTIVITIES activities for promotion and public awareness 30.2 Improvement of web-related technological systems to put the Heritage on the web 30.3 Enhancement of relations with information centres 31 31.1 ENHANCEMENT OF PUBLIC Scientific and information meetings, AWARENESS ACTIVITIES seminars, exhibitions ands touristic tours

271

272 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Network Objective 1 STRENGTHENING THE INTERACTION WITH THE EDUCATION COMMUNITY

Project 1.1 Study, investigation, implementation and support to targeted training courses for teachers of all school levels Description Training of trainers: is a strategic policy for the awareness and promotion of the exploitation of longobard Heritage and of the awareness of its historic, cultural and artistic values among the younger generations. The project foresees the adoption of specific measures: a) in the context of ministerial activities for the updating of teachers of training Institutes of all levels, starting form the ones active in the territories of the “Italia Langobardorum” Site b) in the context of specific updating activities promoted by the Stakeholders of the Site’s territory Actions 1. To cooperate with the Sites’ Universities and training bodies at the purpose of formulating training “packages” in the context of mandatory updating courses for teachers 2. Local awareness initiatives and targeted information 3. Awareness initiatives for the arrangement of school outings in the Site’s territory Parties involved Network management Body Stakeholders Universities School administrations and complexes Phases and timeframe 2008-2011 1, 2, 3 Cyclical process initiative Financial resources Funding yet to be identified Expected results Increasing the teachers’ level of sensitization Increasing interest and participation in the promotion of the longobard Heritage Supporting scholastic tourism fluxes in the Site’s territory Result indicators Number of activated courses Number of involved teachers Number of activated school outings

AWARENESS BUILDING AND PROMOTION PLAN Network Objective 1 STRENGTHENING THE INTERACTION WITH THE EDUCATION COMMUNITY

Project 1.2 Activation of cultural exchange between Universities and post-graduate Schools Description Many of the cities which are part of the Italia Langobardorum Site are home to Universities or post-graduate Schools offering courses and master degrees in history, architecture, history of art, archaeology. Specialised internships on the Longobard age offering the opportunity of University accommodation are to be established. In substance, it’s a question of organising “exchanges” between students of different universities in order to sustain the direct knowledge of the studied Longobard heritage. Such initiatives could be supported by the Territorial bodies of the territories of reference that could take on the accommodation of students Actions 1. Agreements between Universities and post-graduate Schools 2. Organisation of specialised internships Parties involved Universities of the network’s locations Ministry of University and Scientific Research Territorial bodies Phases and timeframe From 2010 Financial resources Funding yet to be identified Expected results Strengthening of university training on the Longobards Result indicators Number of activated internships Number of involved students

273 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Network Objective 1 STRENGTHENING THE INTERACTION WITH THE EDUCATION COMMUNITY

Project 1.3 Broadening of the educational project “I Longobardi – Gemellaggi formativi e itinerari turistici per le scuole” (The Longobards – Educational twinning and tourist routes for schools) Description Exposcuola, the Show comparing educational activities in Europe and the Mediterranean, launched in 2000 under the patronage of the Ministry of Education and of the Ministry of Foreign Affairs, is an important point of reference for educational activities. In fact, the Show brings together the leading figures of the education community (students and teachers) to the institutional and associative world of communications, arts, sciences and sports. In this context, the research-action “Museo didattico della Memoria e delle Tradizioni” (Learning museum of Memory and Traditions) which promotes common initiatives among teachers and cultural operators, schools and associations, aiming at the exploitation of local culture systems and at the promotion of the culture of safeguard and conscious enjoyment of heritage and of its values of identity, was established in 2004. Subsequently, the project “I Longobardi – Gemellaggi formativi e itinerari turistici per le scuole” (The Longobards – Educational twinning and touristic routes for schools) networking 10 schools and 12 institutions and associations of Italian areas interested in the longobard presence (among which Benevento, Salerno, Caserta and Pavia) was undertaken in 2007 within the cultural and educational course of the above mentioned research-action. A first moment of encounter and exchange between partners occurred in Atripalda (in the Region of Campania) in November 2007, where the achieved results were presented. The project’s progresses, aiming at the reinforcement of the already undertaken network of relations, in order to produce qualitative tourist routes for schools among the Longobard paths, from the North to the South of Italy, were discussed and defined on this occasion. These itineraries will be portrayed as “cognitive labs” of the territories where art, science, history, traditions and environment constitute the different “stages” of the journey.

Actions 1. To involve other schools which are part of the Italia Langobardorum Site’s network or that are, nevertheless, touched by the longobard presence 2. Implementation of educational projects 3. Exchange of experiences and meetings between the students and the teachers of the schools Parties involved Ministry of Education Ministry of Foreign Affairs Ministry for Cultural Heritage and Activities Schools Exposcuola Management Organisations active in the field of school tourism Phases and timeframe Stage 1 – first semester 2008 Stages 2 and 3 – starting from the school year 2008-2009 Financial resources To be gathered from the funds of the various involved institutions Expected results To promote knowledge of the Longobard culture and to increase a common sense of identity among the young Result indicators Number of schools, institutions and associations involved in the project

274 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Network Objective 2 STRENGTHENING THE INTERACTION WITH SOCIAL SYSTEMS

Projects 2.1 – Support and promotion of awareness initiatives for specific population sectors 2.1, 2.2 (world of labour, pensioners) 2.2 – Support and promotion of initiatives of awareness, information and participation for the weaker segments of the population (elderly, individuals with special needs) Description Giving attention to the world of social work requires special attention, in particular when the most vulnerable groups of the population are concerned. Therefore, special importance must be given to actions oriented at sustaining the accessibility to the Heritage and the Territories of reference on the part of the world of labour, pensioners, individuals with special needs. The detected project guidelines aim at favouring the awareness building on the values of Heritage and at the promotion of places carried out by public Bodies, trade union organisations, recognised and qualified organisations and bodies of voluntary social services and solidarity, religious associations. The Network management Body is entrusted with the task of facilitating these initiatives, in alliance with Stakeholders. Actions 1. Dissemination of information among interested national organisations 2. Support to courses for the Third Age dedicated to the Early middle ages and the Longobard culture 3. Dissemination of targeted tour package offers 4. Discounts for the elderly and for individuals with special needs in the context of Network services Parties involved Network management Body Stakeholders of the Site’s territory Workers and pensioners unions Recognised and qualified organisations of voluntary social services and solidarity Religious organisations Langobardia Association Associations-network of social, youth and religious tourism (CTG, CTS, CT Acli) Universities of the Third Age active in several cities Phases and timeframe 2008-2009 1, from 2010 actions 2, 3 e 4 Financial resources Yet to be identified: Funds: regional, national, vacation-vouchers Expected results Balance of contacts Number of signed agreements Commenced initiatives Result indicators Periodic verification of the number of initiatives and of visitors

AWARENESS BUILDING AND PROMOTION PLAN Network Objective 3 RETRAINING AND UPDATING OF TOUR OPERATORS

Project 3.1 Network initiatives for the training and updating of tour Guides Description This project responds to the need of making available, in every place of the Site, variously qualified personnel which will illustrate to visitors, not only the essential prerogatives of the longobard Heritage, but especially the prerogatives of the Places and Territories (national and of the European geocultural corridor). Such personnel will be adequately trained to favour tourist-cultural links and to promote tours in the other realities of the Network. The educational activities could be carried out, also in cooperation with Universities and the Association of professional guides, by other training bodies and by recognized associations of social, youth and religious tourism which include basic training activities in their statutory purposes. Actions 1. Definition of partnerships with Universities, the National and European association of Tour Guides, specialised training and social, youth and religious tourism centres (CTG, CTS, CT Acli, ecc.) 2. Organisation and activation of training projects

275 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES Parties involved Network management Body Network scientific committee Stakeholders of the Site’s Territories National university system National Association of Tour Guides European Association of Tour Guides CTG - Centro Turistico Giovanile (Tourist Centre for Young People) CTS - Centro Turistico Studentesco (Student Tourist Centre) Tourist Centre ACLI Associazione Langobardia Pastoral Tourism Regional, national and International institutions Ministry for Cultural Heritage and Activities Ministry of University The Site’s Superintendencies Phases and timeframe 2009 - Initiation of Action 1 2010 - Initiation of Action 2 Financial resources To be identified at the regional, national, EU level Expected results Activation of training courses and availability of qualified personnel capable of illustrating the Site’s thematic itineraries Higherer quality of guided tours in the Site’s Places and Territories Result indicators Progressive agreements with the various involved bodies Number of training courses Number of trained persons

AWARENESS BUILDING AND PROMOTION PLAN Network Objective 4 STRENGTHENING OF TECHNOLOGICAL SYSTEMS FOR THE AWARENESS BUILDING AND PROMOTION OF HERITAGE Project 4.1 Strengthening the Network’s Website Description The gradual implementation of the Website (www.italialangobardorum.it) is foreseen in order to give the Site immediate and broad visibility. Three basic functions are foreseen: PROMOTION a) Showcase of the artistic-monumental Heritage b) Site’s cities’ and Territories’ guide c) Information on training initiatives d) Information on exhibitions, conventions, seminars e) Proposal of integrated itineraries NETWORK COORDINATION f) Organisational guide for the extended Italy network and for the European geocultural Corridor LINKS TO SPECIALISED WEBSITES g) Websites of stakeholders h) www.langobardia.it, website of the Associazione Langobardia (Longobardia Association – Social, youth, religious tourism and links to national and European CTG, CTS, CT Acli networks) i) Other relevant websites Actions Implementation of the website with data provided by the Stakeholders and the Network management Body Parties involved Network management Body Stakeholders Organising Committee of the Aquileia Patriarchate Project (Progetto Patriarcato di Aquileia) Phases and timeframe 2008-2009 Full functionality and implementations Financial resources 10.000 Euro already collected; 5.000 euro (Patriarchate Committee) Other funding to be identified; sources: Stakeholders, Network management Body Expected results Visibility and efficiency of the integrated tourism system and of the Site’s Places Result indicators Number of accesses Number of online bookings

276 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Network Objective 4 STRENGTHENING OF TECHNOLOGICAL SYSTEMS FOR THE AWARENESS BUILDING AND PROMOTION OF HERITAGE

Project 4.2 Development of technological systems and products Description For the general purpose of sensitisation and promotion of the “Italia Langobardorum” Site, the development of scientific-technological cooperation is of key importance for the implementation and strengthening of the Site’s visibility, thus favouring the greater and swifter diffusion of the knowledge of Heritage and of its values. Therefore, the projects has the aims at: a) implementing the multifunctional website (www.italialangobardorum.it) already launched in 2007 by the Data Processing Lab of the Aquileia Patriarchate’s Organising Committee b) allowing timely information on initiatives and events c) favouring coordinated access to the specialised databases regarding Heritage and foreseen in the management Plan d) implementing technological products for the Network e) making available finalised services for users f) researching different technical solutions of support and service

Actions 1. Investigation and implementation of animated characters which will accompany the website’s navigation 2. Rendering systems for the optimisation of the Knowledge of artistic-monumental Heritage 3. Investigation and implementation of a specialised computing platform for the (organisational, scientific, economical) multi-functions required by the administration of the integrated system in its different ramifications 4. Investigation and implementation of technologies for palmtops and telecommunications 5. Investigation and implementation of aimed holograms 6. Investigation and implementation of advanced computing platforms (GRID Computing) Parties involved Stakeholders Network management Body University system Research Centres Organising Committee of the Aquileia Patriarchate Project (Progetto Patriarcato di Aquileia) Phases and timeframe 2008 1, 2, 5 initiation of planning procedures and cooperation agreements 2009-2011 3, 6, 7 initiation of studies, researches, implementations Financial resources Action 1 Collected funds : 5.000,00 euro (Patriarchate Committee) Other funds yet to be identified; funds: regional, national, EU Actions 2, 3, 4 Collected funds: 10.000 euro (Patriarchate Committee) Other funds yet to be identified, from regional, national, EU funding Actions 5, 6, 7 Resources to be identified; funds: regional, national and EU Expected results Visibility of the Heritage, of it’s values, of the territories and of their endogenous resources Development of technologies and involvement of Universities and of Research centres in the fields of application of High technological level Strengthening of the of the system’s cultural and touristic-economical global quality Result indicators Initiation and implementation of each project Quantification of the human resources engaged in research and implementation activities Placement of a permanent hit counter on the website in order to track contacts and for individual Network functions Number of databases liked to the system

277 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Network Objective 5 CONSTRUCTION AND CONSOLIDATION OF THE EUROPEAN GEOCULTURAL CORRIDOR

Project 5.1 Extension of the network of relations to important national and European centres of Longobard interest (Geocultural corridor) Description The construction of a system of macro-itineraries connecting the “Italia Langobardorum” Site to other European places characterised by longobard history is considered of great importance and attractiveness, in order to increase the knowledge of longobard culture and traditions – which have left significant traces in the traditions of many Countries. A solution which allows, on one hand, to promote the values of the “Italia Longobardorum” Heritage and the sensitisation and involvement of a larger public and, on the other, to promote comparative studies on the cultural and traditional elements originating from the common longobard background. Therefore, the guidelines of macro-itineraries which are configured as a European “Geocultural Corridor”, spin off from the unique and excellent Places of the “Italia Langobardorum” Site. This corridor is characterised by two orientations: a) IItalian Area (places of the territories of the longobard Dukedoms and routes of tradition, among which the Via Sacra Langobardorum – Longobards’ Sacred Route); b) European Area, with two orientations: Via delle Origini (Route of origins - Itinerary from Scandinavia to the Ionian sea, across Northern and Eastern Europe, following the original historic trail of the Longobards) Via micaelica del Paradiso (Route of spreading St. Michael’s worship, transferred by the Longobards from the original Sanctuary of St. Michael in the Gargano (Mount. S. Angelo) towards the western part of Europe and the strongholds in the Susa Valley (the “Sacra” of Mount Pirchiriano) and in Normandy (Sanctuary of Mont Saint-Michel [World Heritage List UNESCO]) and towards , England - Ireland, Lake Constance, Rhine Valley. Actions 1. Preliminary studies for the definition of significant places for longobard history in the extended Italia network and in the European geocultural corridor 2. Relations and agreements with the institutions of the places identified by the investigation indicated in point 1 3. Establishment of equipped areas for the knowledge of the “Italia Langobardorum” Heritage at the junction points of the two guidelines Parties involved Stakeholders, Network management Body Institutions, Bodies, Universities, Study and research centres Economic trade organisations Eurispes Institute, Institutes, Bodies, Universities, Study and research centres, enterprises from the Countries of the geocultural Corridor: OECD-LEED Programme Paris CEI-Central European Initiative Banca Popolare FriulAdria Association “Carta di Cividale” Phases and timeframe 2009 1, 2 2009-2012 3, 4 Financial resources Yet to be identified: regional, national, EU sources Expected results Establishment of the two additional networks Greater dissemination Result indicators Establishment of the “junctions” of the two new networks Preparation of information points on the “Italia Langobardorum” Heritage at the “junctions” Quantification of visitors

278 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Network Objective 5 CONSTRUCTION AND CONSOLIDATION OF THE EUROPEAN GEOCULTURAL CORRIDOR

Project 5.2 Implementation of aimed agreements at the national and European level and co-participation in EU projects Description The establishment of the European Geocultural corridor also foresees the implementation of targeted bilateral/multilateral agreements between Italy and the involved European Countries on topics concerning culture, environment, economy and training. The contact and relation actions were initiated in 2007 with the initiative - promoted by the Friuli Venezia Giulia Region and recognized by the Italian Government, by the OECD LEED Programme and by the Central European Initiative - entitled “International Desk Italy South East Europe” The works of the technical Table for the “Exploitation of the Territory/Environment and Culture” was held in , on the 29th of October 2007 - with the active participation of representatives of Stakeholders from “Italia Langobardorum” (Cividale, Spoleto, Mount St. Angelo-Foggia). On this occasion the planning guidelines of the management plan for UNESCO were analysed in-depth. The International Desk has a permanent nature and will be useful to the initiation of relations and projects with institutional partners of the “Geocultural corridor” (Slovenia, Austria, Hungary, Czech Republic, and ). Actions 1. Constitution of a Network workgroup on national and International projects and adhesion to the “International Desk / Italy South East Europe” (Technical Table “Exploitation of the Territory”) 2. Processing of planning priorities 3. Identification of International partners 4. Preparation and execution of projects Parties involved Stakeholders, Network management Body Institutions, Bodies, Universities, Study and research centres Economic trade organisations Eurispes Institute, Rome Institutes, Bodies, Universities, Study and research centres, enterprises form the Coutries of the geocultural Corridor: OECD-LEED Programme Paris CEI-Central European Initiative Banca Popolare FriulAdria / Crédit Agricole Association “Carta di Cividale” Phases and timeframe 2008 1, 2, 4 2008-2009 3, 4 Financial resources Action 1 From Friuli Venezia Giulia 2007 (beginning) and 2008 Aggregate 450.000,00 euro of which collected: 108.000,00 euro (FVG Region, Banca Popolare FriulAdria) to be collected: 342.000,00 euro (budget commitments FVG Region, FVG Chambers of Commerce, Friulia spa, Finest spa, Banca Popolare FriulAdria/Crédit Agricole, Informest spa Actions 2,3, 4 Regional, national, EU funds (EU financing sources: Cultura 2007-2013. Life+, Leader plus, Interreg Programmes) Expected results Development of International study and economic cooperation initiatives Result indicators Annual balance of carried out activities Implemented projects in the context of the International Desk / Italy - South East Europe

279 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Network Objective 6 STRENGTHENING OF INFORMATION

Project 6.1 – Initiation of permanent relations with information bodies and regional-national 6.1, 6.2 media 6.2 – Study and implementation of targeted initiatives and events concerning to the world of information Description With the definition of the management Plan a new phase is opened, in the relations with the information bodies and the regional and national “media” as well, where the totality of new projects and scenarios deriving from them for the local, regional, national and international contexts will be participated. The actions, to be developed concurringly by the Stakeholders and the Network management Body, will aim at: a) Spreading the Values of Heritage, b) Favouring the re-interpretation of the longobard experience, c) Illustrating the originality and complexity of the “Italia Langobardorum” Site and its extension to the extended Italy Network and to the European geocultural Corridor; d) Promoting the system of macro-itineraries and of local micro-itineraries e) Illustrating the contextual requalification of the Territories, even from the agricultural and food, oenogastronomic and handcraft point of view. All actions to be developed at the network and local level with press conferences, contacts with daily papers and magazines, public and private television, radio and other information media. Actions 1. National and local press conferences 2. Interviews to Stakeholders 3. Dissemination of informative material 4. Organisation of dedicated tours with information workers 5. Specific events 6. National thematic competition for information workers Parties involved Network management Body Stakeholders of the Site’s Places Phases and timeframe 2008-2009 1, 2, 3, 4, 5 2010 6 Financial resources Yet to be identified – Sources: Stakeholders, Network management Body, privates Expected results Diffusion of information and sensitisation of the public opinion regarding the Site’s values and the innovative fundamental qualitative development actions of Territories promoted by the management Plan Result indicators Periodic and annual press review Observatory of dedicated radio-television productions

AWARENESS BUILDING AND PROMOTION PLAN Network Objective 7 PROMOTIONAL INITIATIVES AND MAJOR EVENTS

Project 7.1 Participation and promotion of major specialised events 7.1, 7.2, 7.3 7.2 Participation and promotion of Communication and Information events 7.3 Study, implementation and co-participation in information productions of large circulation (television, film, audiovisual) Description The promotion of the Site and of the annexed tourist-cultural opportunities will be the object of coordinated planning at the Site level and at the level of individual places, in coordination with the Network management Body and the Stakeholders. Specific initiatives at the Highest levels will accompany the investigation, implementation and promotion of major specialised events, as previously occurred in 2006, with the initial presentation at the International Tourism Exchange of Milan, and in 2007, with the television programme “Superquark” (RAI 2) and the exhibition on the Longobards set up in Turin and Novalesa. Important information initiatives - like different kinds of exhibitions (even virtual), conventions, seminars, television and film productions - will be promoted and redefined with an annual scheduling on behalf of the Stakeholders in coordination with and/or the planning and direct intervention of the Network management Body. Actions 1. Scheduling of the annual interventions of Stakeholders

280 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES 2. Coordination with the Network management Body 3. Production of events and related information and promotion activities Parties involved Network management Body Stakeholders Regions Ministry for Cultural Heritage and Activities Phases and timeframe 2008-2009 and on. Financial resources Yet to be identified – Funding sources: Stakeholders, regional, national, EU, privates Expected results Production of events of cultural value for the promotion of Heritage Result indicators Number of events Number of visitors or of users attending the events Results of merit derived from press reviews

281

282 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Cividale del Friuli Territory Objective 8 ENHANCEMENT OF TRAINING ACTIVITIES RELATED TO EDUCATION

Project 8.1 Projects to improve knowledge about the Heritage in relation to education (from primary schools to universities) Description The project envisages a number of activities. Among these, training of teachers by planning refresher courses on specific topics related to Longobard culture and the Cividale and the network’s heritage. Another activity concerns the involvement of students on an annual basis coming from any kind of school in the Province of Udine (with successive extension to students of the other provinces of Friuli Venezia Giulia) in order to study and carry out projects concerning the enhancement of culture, art, properties and tradition of the Longobard Heritage. All studies and works – carried out by using any means (multimedia, objects, drawings, graphics, artefacts, photographs, etc.) will participate in a competition and relative exhibitions (also itinerant). The best works will be included in publications aimed at disseminating and promoting knowledge about the Longobard Heritage. The topics of the competition will be chosen in relation to the proposals for the enhancement of the Management Plan (see Enhancement and Knowledge Plans), like: a) “Early-Medieval fortified sites”; b) “The walls of Cividale del Friuli: enhancement proposals” c) “Longobard necropolises” d) “The Church of San Giovanni: virtual rendering of transformation phases” e) “The façade of the Church of San Giovanni: drawings by Sturolo, Early-Medieval traces and stone fragments of liturgical furnishings. Multimedia displays ” f) “Controlling the territory: from Eastern Alps to Istria”. Other projects concern the organization of school trips to the heritage of the site and the production of specific information material for young people. In general, schools will be involved in all projects described in the Public Awareness and Promotion Plan. Actions 1. Carrying out of refresher courses for teachers. 2. Planning of the initiative with promoters and schools concerned. 3. Preparation of the competition 4. Launch of the initiative 5. Distribution of results at network level Parties involved Municipality of Cividale del Friuli; Municipalities included in Longobard itineraries; schools of any kind and level; Italian Castle Institute (section Friuli Venezia Giulia); Italia NostraStrad; FAI (Italian Environmental Fund); Region Friuli Venezia Giulia; Provinces of Udine, Gorizia, Pordenone, Trieste; Friuli Archaeological Association; City Museums of History and Art of Udine; Heritage and Science Laboratories; Longobardia Association; Social and young tourism associations, UNESCO Club of Udine Phases and timeframe 2008-2009 1, 2 , 3 2009-2010 Launch of initiatives and carrying out of the first edition of the competition Financial resources Funds to be raised by: Region Friuli Venezia Giulia; Provinces of Udine, Gorizia, Pordenone, Trieste; private funds Expected results Increase in the direct participation of young people in knowledge and promotion activities on UNESCO Heritage values Result indicators Number of schools and classes involved Number of papers Number of organized visits to the properties of the Heritage and territory to prepare papers Number of activities conducted by the Heritage and Science Laboratories

283 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Cividale del Friuli Territory Objective 8 ENHANCEMENT OF TRAINING ACTIVITIES RELATED TO EDUCATION

Project 8.2 Development of didactic and experimental activities Description As to primary schools, an “Illustrated Guide of the Town” will be drawn up by pupils with special reference to the Longobard period and heritage. At university level, information will be enhanced to provide guidelines for a number of competitions for the already existing Biennial Competition “Forum Julii” for degree thesis with reference to topics related to the Longobard culture. Concerning aspects related to didactic games, the organization of game or on-stage experimentations will be enhanced in Holiday Centres for secondary schools. Actions 1. Didactic project of the “Illustrated Guide of the Town”, implementation and publication 2. Definition of topics linked to Longobard culture for the Biennial Competition “Forum Julii” 3. Organization of game or on-stage experimentations related to the Heritage in the activities f Holiday Centres (secondary schools) 4. School trips and information initiatives on the local Heritage and Site 5. Organization of guided tours to the Heritage, territory and Heritage and Science Laboratories Parties involved Municipality of Cividale del Friuli; Schools; Province of Udine; Longobardia Association; Friuli Archaeological Association; Italian Castle Institute (section Friuli Venezia Giulia); International Centre for Research and Documentation on Early Medieval Art and Architecture; Cultural and social and youth tourism associations. Phases and timeframe Under way 1, 2 2008-2009 3, 4, 5 Financial resources To be defined for each project – Funding: municipal, provincial, regional, private funds. Expected results Greater knowledge and participation of young people in the promotion activities of the Heritage and territory Result indicators Number of institutions involved Number of carried out initiatives Number of participants Number of targeted publications and printed copies

AWARENESS BUILDING AND PROMOTION PLAN Cividale del Friuli Territory Objective 8 ENHANCEMENT OF TRAINING ACTIVITIES RELATED TO EDUCATION

Project 8.3 Project and implementation of didactic laboratories focused on the Heritage Description The project envisages the preparation of specific Didactic Laboratories in the context of scientific Laboratories (existing, to be enhanced or to be created) which deal with specialized topics concerning the knowledge and conservation of the Heritage. The objective of the project is to draw young people closer to applied Sciences in order to favour the dissemination of knowledge about the heritage, also thanks to relevant activities which result in tangible and promotable projects. This refers to a series of laboratories, like: a) The laboratory related to the soon-to-be archival-historical Centre which will be enhanced in the Convent of Santa Maria in Valle; b) The laboratory related to the soon-to-be biological archive Centre also in the Convent of Santa Maria in Valle; c) The didactic-archaeological laboratory existing in the National Archaeological Museum Actions 1. Strengthening of the laboratory referred to the historical-archival Centre and first exhibition of archives and documentation. 2. Project for the first initiative of the laboratory: “The Sign: experimentations on the evolution of writing” linked to the historical-archival Centre. 3. Project for the first didactic initiative of the laboratory of the Biological Archive Centre linked to the collaboration of schools in the cataloguing of findings and the dissemination of the first data in relation to the activities carried out in the laboratory.

284 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

4. Project for specific didactic activities to be carried out in the didactic archaeological laboratory of the National Archaeological Museum. 5. Project and implementation of didactic activities on the study of Early-Medieval history, art and architecture in the International Centre for Research and Documentation on Early Medieval Art and Architecture. Parties involved Municipality of Cividale del Friuli; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage), Superintendence for Archaeological and Archive Heritage of Friuli Venezia Giulia; Parish of Santa Maria Assunta; Project Promoting Committee of the Patriarchy of Aquileia; Province of Udine; Region Friuli Venezia Giulia; Universities of Udine and Trieste; Schools. Phases and timeframe 2008-2009 1 and 3 (under way) 2008-2010 2, 4, 5 Financial resources Action 1 Euro 15,000 already allocated, funding by Banca Popolare FriulAdria/Crédit Agricole. Action 3 funds by the Superintendences of Friuli Venezia Giulia. Actions 2, 4 and 5 to be raised with regional, provincial and private funds. Expected results Promotion among young people of both the Longobard Heritage and a series of scientific elements concerning the Heritage Preparation of young people to a systematic and coordinated approach to the Heritage and knowledge in a broad sense Support to teachers in educating young generations towards a more responsible way of understanding the value of historical-human heritage and sciences. Result indicators Number of visitors Number of student visitors Number of student projects carried out thanks to Laboratories’ support

AWARENESS BUILDING AND PROMOTION PLAN Cividale del Friuli Territory Objective 8 ENHANCEMENT OF TRAINING ACTIVITIES RELATED TO EDUCATION

Project 8.4 Carrying out or enhancing and adjusting guided tours of the territorial network of the “Heritage and Science Laboratories” Description The project envisages the enhancement of the “Heritage and Science Laboratories ” concerning the territory and of its endogenous resources by strengthening those already existing and creating new ones open to the general public through guided tours and to planned school experimentations. In particular, a structural cooperation with schools of any kind and level involved will be established for the implementation of the initiatives linked to project 1.1. There are four types of Laboratories, concerning applications and research on: a) Agrifood and food and wine production (Taste Laboratory; didactic-experimental greenhouses; Essence and Olfactory laboratory) b) Other territorial resources (Tradition and Knowledge; Green Room – Mountain and Water culture [(I)/Litvek (Slo)*]; Astronomic observatory [Mount Matajur]) c) Areas of the regional Longobard itineraries (Longobard Workshops) d) Astronomic observatory of Mount Matajur (archaeoastronomy and connection between astronomic observations and agricultural-productive Traditions)

* In cooperation and exchange with BlueLab– Sea Culture, already active in Trieste-Muggia and in cooperation with Koper /Slovenia and school complexes of the Actions 1. Creation of: Taste Laboratory, linked to the Food an Wine Centre, of the Essence and Olfactory Laboratory and of the Green Room – Mountain and Water Culture (see Socio-Economic Development Plan Cividale Project Objective ) 2. Creation of “Longobard Workshops”, i.e. multimedia didactic rooms in crucial points of the Longobard historical and natural itineraries. 3. Enhancement of laboratories: Tradition and Knowledge (see Socio-Economic Development Plan Cividale Project Objective ) 4. Enhancement of already existing didactic-experimental Greenhouses of the Technical Agricultural Institute with the plants to be designed and implemented in the context of the Food and wine Centre (see Socio-Economic Development Plan Cividale Project Objective )

285 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

5. Organization of visits to the Astronomic observatory of the Mount Matajur (already existing) 6. Systematic launch of visits and stage 7. Launch of information activities and events 8. Collaboration with promoters and schools for visits to the Laboratories and scientific contribution to projects (utilization of resources of connected databases) Parties involved Municipality of Cividale BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno- Anthropological Heritage), Superintendence for Archaeological and Archive Heritage of Friuli Venezia Giulia National Archaeological Museum Parish of Santa Maria Assunta Project Promoting Committee of the Patriarchy of Aquileia Universities of Udine, Trieste, Padova, Nova Gorica, Koper,Lubjana Technical Agricultural Institute Paolino d’Aquileia of Cividale Regional Education Department Municipalities of Savogna and Muggia Municipalities of Koper and Litvek (Slovenia) Municipalities included in regional Longobard itineraries UNESCO Club of Udine International Centre for Research and Documentation on Early Medieval Art and Architecture Food and wine centre Observatory on landscape-cultural heritage Community of Cepletischis Astrophilic Association Phases and timeframe 2008-2009 4, 5, 6, 7, 8 2009-2012 1,2, 3, Financial resources Referred to basic projects created for the Laboratories to be implemented or enhanced - Funding: regional, provincial, private funds Expected results Improvement and enhancement of the didactic-training offer of the territory Improvement of scientific knowledge applied on the Heritage and territory Enhancement of the territory Result indicators Number of visits Number of visitors Number of promoted initiatives

AWARENESS BUILDING AND PROMOTION PLAN Cividale del Friuli Territory Objective 9 ENHANCEMENT OF INFORMATION ACTIVITIES

Project 9.1 Study and implementation of publishing initiatives for promotion and public awareness Description The project envisages the production of targeted information material about the Heritage and territory, namely tourist-cultural guides, maps, brochures, information boards, multimedia information material related to the various Promotion, Public awareness and Enhancement initiatives of the territory. Among these: The properties of the site “Italia Langobardorum”; Visit routes: “The walls of Cividale; “The churches and Monasteries of the Longobard aristocracy”; Longobard itineraries: “Longobard Friuli – centres of art and power”; The museum network: “Paolo Diacono’s Castra and the Duchy of Friuli”; The Park of Vine and Wine; Multimedia guide: The Urn of Santa Anastasia and the Abbey of Sesto”. The project envisages also the production of documentaries on topics related to Longobard culture and heritage. All this initiatives will be enriched by the documentary material produced in single projects of the Knowledge Plan, among which the virtual reconstructions of architecture and works of art of Cividale and its Territory. Actions 1. Study and implementation of promotion and public awareness publishing initiatives 2. Production and dissemination of materials 3. Choice of topics and production of documentaries Parties involved Municipality of Cividale del Friuli; Parish of Santa Maria Assunta; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) and Superintendence for Archaeological Heritage of Friuli Venezia Giulia; Municipality of Sesto al

286 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

Reghena and other municipalities linked to the itineraries; Region Friuli Venezia Giulia; Province of Udine; Chamber of Commerce; Tourism Association Friuli Venezia Giulia; Association of Regional Tourist Guides. Phases and timeframe Starting from 2008-2009 Financial resources € 20,000.00, funds at disposal of the Municipality of Cividale del Friuli, already allocated by various Institutions like: Crup Foundation, Banca Popolare FriulAdria, Province of Udine. Funds to be raised by: Region Friuli Venezia Giulia; Provinces of Udine and of Pordenone; Municipality of Sesto al Reghena; private funds Expected results Improvement of visibility and knowledge about the Heritage Improvement of orientation services for visitors Result indicators Number of publications ;Number of printed copies Number of installed information boards

AWARENESS BUILDING AND PROMOTION PLAN Cividale del Friuli Territory Objective 9 ENHANCEMENT OF INFORMATION ACTIVITIES

Project 9.2 Improvement of web-related technological systems to put the Heritage on the web Description The project envisages the creation of a specific area dedicated to multimedia illustration (both continuous video playback and information material) of the Heritage of “Italia Langobardorum” of both Cividale and the extended network. The area consists of a Multimedia Heritage Orientation Room located in the context of the Visitor Centre – inside the Monastery of Santa Maria in Valle, where information on the history of Cividale’s Longobard Heritage will be provided – and in general information related to the history of the town, the features of the territory, the areas which are important for alternatives cultural itineraries and tours (for example, the Alpe Adria Food and Wine Centre), to the cultural, socio-economic and folk initiatives which are under way or scheduled to welcoming, accommodation and catering services. Regarding the extended network, information on macro-itineraries (geocultural Corridor) along with all necessary data will be provided to improve knowledge about other places of the Site and with the contacts to plan tours. The objective is to provide visitors with a first-level knowledge about the properties of the Site to allow them to orientate in the general visit system and tourist routes which characterize the Enhancement and Promotion proposals for the properties themselves. The Visitor Centre will also host the ticket office and various services (authorized guides, bookshop, brochures and maps, multimedia products). The project envisages the production of multimedia material for the room and the strengthening of the website, also with a virtual tour to the heritage through webcam. Actions 1. Project and implementation of programmes and multimedia material 2. Activation of the Multimedia Room 3. Activation of a virtual tours to the site and webcam Parties involved Municipality of Cividale del Friuli; Parish of Santa Maria Assunta; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) Superintendence for Archaeological Heritage of Friuli Venezia Giulia; Region Friuli Venezia Giulia; Province of Udine; University; Project Promoting Committee of the Patriarchy of Aquileia; International Centre for Research and Documentation on Early Medieval Art and Architecture. Phases and timeframe 2009-2011 Financial resources Funds to be raised by: Municipality of Cividale del Friuli; Region Friuli Venezia Giulia; Province of Udine; private funds Expected results Offer to visitors of an organic access system to the Heritage and Orientation. Promotion of visits and other tourist-cultural aspects of the territory Promotion of visits and other areas of the Site “Italia Langobardorum” Result indicators Number of activated contacts Number of planned visits starting from the Visitor Centre

287 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Cividale del Friuli Territory Objective 9 ENHANCEMENT OF INFORMATION ACTIVITIES

Project 9.3 Enhancement of relations with information centres Description The project envisages the involvement of various information bodies and regional and national media to disseminate information related to the series of initiatives which concern the following aspects: knowledge, conservation, enhancement and promotion of the Longobard heritage. The objective is to enhance the effectiveness of information – both through targeted initiatives, according to the events carried out and periodical information which contribute to arousing and increasing interest in the Longobard Heritage and relative projects. Actions 1. Launch of permanent relations with information bodies and regional and national media in order to produce an illustrative “bulletin” (also online) on the initiatives and the progress of knowledge. 2. Study and carrying out of initiatives and targeted events dedicated to information, such as press conferences, interviews to Stakeholders. 3. Organization of tours dedicated to information operators. Parties involved Stakeholders Information bodies Professional associations and companies Private citizens Phases and timeframe 2008 1, 2 2009 3. Financial resources Funds to be raised by Stakeholders and private funds Expected results Dissemination of information and raising awareness among the general public of the Values of the Site Dissemination of information and increase of raising awareness of development projects of the Territory Result indicators Number of articles and services published on the press and broadcast on television Number of radio-television programmes dedicated to the Heritage and development projects of the territory

AWARENESS BUILDING AND PROMOTION PLAN Cividale del Friuli Territory Objective 10 ENHANCEMENT OF RAISING AWARENESS ACTIVITIES

Project 10.1 Carrying out of activities to enhance dissemination of Heritage values Description The project aims at activating a coordinated series of interventions with the objective of raising awareness among local people of the Heritage and territory values. The activities will envisage the arrangement of scientific-information meetings open to the general public to be held both in Cividale and other sites of the Duchy of Friuli and a guided tour programme for the Heritage. In order to increase knowledge about Cividale within the network, organized tours to other Longobard places of interest will be organized in cooperation with local cultural associations and service Clubs. To this end, first in Cividale and later in Brescia, a meeting of the National Association of Tourist Guides was organized to plan agreements and cooperation projects among the various Italian bodies, while the Rotary Club of Cividale has already undertaken an action for the operational and promotional involvement of Rotary Districts included in the Site. An exchange programme on initiatives (exhibition and seminars) with other sites will favour the dissemination of local specificities and common values of the Heritage. Actions 1. Intensification of coordination between local bodies and cultural associations in order to prepare an annual schedule dedicated to the promotion of the Heritage. 2. Definition of exchange programmes for public awareness initiatives (meetings, seminars, exhibitions, visits) with other places included in the network and other Longobard places of interest in Italy and in the European geocultural corridor. 3. Preparation of an annual schedule for meetings involving the general public and business categories. 4. Continuation of the meeting programme in the context of the “Longobard Days” organized by the Municipality of Cividale del Friuli. 5. Preparation of an annual programme of scientific-information meetings on the

288 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

relation between the Longobards and the territory. 6. Planning of meeting in the various sites of the Territory. 7. Planning of seasonal cycles of guided tours to the Heritage. 8. Organization and promotion of tours to enhance knowledge about the other properties of the Site. 9. Arrangement of information exhibitions on the Heritage Parties involved Municipality of Cividale del Friuli Province of Udine Region Friuli Venezia Giulia Parish Santa Maria Assunta Superintendences of Friuli Venezia Giulia International Centre for Research and Documentation on Early Medieval Art and Architecture Friuli Archaeological Association City Museums of History and Art of Udine Italian Castle Institute (section Friuli Venezia Giulia) Project Promoting Committee of the Patriarchy of Aquileia Cultural Associations and Service Clubs Longobardia Association Cultural and social and young tourism associations Tourist companies Schools National Association of Tourist Guides with regional sections Phases and timeframe Starting from 2008; some actions have already been launched. Financial resources Euro 20,000 allocated in 2007 Budget of the Municipality of Cividale del Friuli. € 15,000.00, funds at disposal of Municipality of Cividale del Friuli, already allocated by various Institutions like: Crup Foundation, Banca Popolare FriulAdria, Province of Udine. Expected results Increased awareness and knowledge of the values of the Heritage Result indicators Number of institutions involved Number of carried out initiatives Number of participants in various initiatives

AWARENESS BUILDING AND PROMOTION PLAN Cividale del Friuli Territory Objective 10 ENHANCEMENT OF RAISING AWARENESS ACTIVITIES

Project 10.2 Project and carrying out of cultural and economic initiatives Description The liveliness of the cultural fabric and local folklore makes it possible to enhance existing initiatives, targeted to the promotion of the Longobard Heritage and to launch studies and planning of a wide range of new initiatives. In particular, public awareness of the heritage should be raised during the local, regional and extra-regional events, by disseminating the features of Cividale and its territory through various public awareness initiatives (stands, meetings, distribution of promotional material). Moreover, new cultural and folk initiatives concerning the heritage and the Longobard history will be studied and carried out. They will contribute to convey local traditions to the general public and promote their dissemination also elsewhere thanks to cultural exchanges with other places of interest or similar sites (“Longobard Initiatives”). This will be possible thanks to: a) The orientation of cultural associations and local folklore for new initiatives on Longobard culture of Cividale and Friuli b) The promotion of the application for UNESCO Heritage in all major events related to local tradition, folklore and trade c) The study and participation in events organized by other places of the Site and invitation to held them in Cividale too. d) The participation to major promotion events (BIT – International Tourism Exchange of Milan) e) The enhancement of culture and the heritage in the context of the annual events of Mittel Fest which takes place in Cividale. Actions 1. Orientation of animation activities 2. Coordinated planning of events with companies and cultural bodies 3. Study and implementation of initiatives Parties involved Municipality of Cividale del Friuli Province of Udine

289 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

Region Friuli Venezia Giulia Parish of Santa Maria Assunta Superintendences of Friuli Venezia Giulia Cultural Associations and service Clubs Longobardia Association Cultural and social and young tourism associations Tourism companies Schools Phases and timeframe Starting from 2008; some actions have already been launched Financial resources € 15,000.00, funds at disposal of Municipality of Cividale del Friuli, already allocated by various Institutions like: Crup Foundation, Banca Popolare FriulAdria, Province of Udine. Funds to be raised by: Region Friuli Venezia Giulia; Provinces of Udine and Pordenone; private funds Expected results Enhancement of knowledge and public awareness of the values of the Heritage Result indicators Number of institutions involved Number of carried out initiatives Number of participants

AWARENESS BUILDING AND PROMOTION PLAN Cividale del Friuli Territory Objective 10 ENHANCEMENT OF RAISING AWARENESS ACTIVITIES

Project 10.3 Promotion of endogenous resources Description Like Cividale, the whole territory of the Duchy of Friuli preserves traditional, historical, monumental and archaeological elements which remind of their ancient origin and the Longobard presence. These features are plunged into a rich ensemble of specific elements and traditions (naturalistic, cultural, food-agricultural) which can contribute to the conservation and dissemination of specific aspects and founding local values. The enhancement and use prospects of these aspects are the main elements of the programmes for the widening and promotion of the knowledge of Cividale and its territory. Therefore, dissemination activities on the territorial offer will continue thanks to better information on the initiatives which are carried out and on both cultural and landscape specificities, especially in relation to the enhancement projects linked to the Management Plan of the network “Italia Langobardorum” (see Enhancement Plan, Objectives 9 and 10) Actions 1. Launch of coordination with associations or other bodies operating on the territory 2. Improvement of information activities on the territory and events 3. Enhancement of dissemination of knowledge about visit routes ni the territory (“Longobard Friuli – centres of art and power”; “Paolo Diacono’s Castra and the Duchy of Friuli”; The Park of Vine and Wine (see Enhancement Plan, Projects 9.1,2; 10.1) 4. Enhancement of dissemination of visit routes to the landscape heritage and recreational routes (excursions, cycle tracks, horse tracks) 5. Systematic launch of visits and stage 6. Preparation of specific information material 7. Creation and updating of a specific area for the dissemination of existing or planned activities on the Website 8. Organization of events for the promotion of agricultural-productive traditions and typical products 9. Coordination in the promotion of accommodation and rural accommodation facilities Parties involved Municipality of Cividale; Superintendences of Friuli Venezia Giulia National Archaeological Museum; Parish of Santa Maria Assunta Project Promoting Committee of the Patriarchy of Aquileia Universities of Udine, Trieste, Padova, Nova Gorica, Koper,Lubjana Technical Agricultural Institute Paolino d’Aquileia of Cividale Regional Education Department; Municipalities of Savogna and Muggia Municipalities of Koper and Litvek (Slovenia) Municipalities included in regional Longobard itineraries UNESCO Club of Udine International Centre for Research and Documentation on Early Medieval Art and Architecture Friuli Archaeological Association;City Museums of History and Art of Udine Italian Castle Institute (section Friuli Venezia Giulia)

290 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

Food and Wine Centre Observatories on landscape-cultural heritage Community of Cepletischis; Astrophilic Association Phases and timeframe Short-medium term, starting from 2008. Financial resources Funds to be raised by: Region Friuli Venezia Giulia; Provinces of Udine and Pordenone; private funds Expected results Enhancement of public awareness and knowledge about the territory Enhancement of knowledge about didactic-education offer on the territory Improvement of enhancement and conservation of the territory Result indicators Number of promoted initiatives and produced information material

291

292 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 11 RISE AND INCREASE IN THE EDUCATIONAL OFFER

Project 11.1 Design and realisation of didactic paths Description There are 23 types of laboratory characterised by practical activities and visits to specific sections of the museum and to the works shown therein. From school year 2007-2008 the proposal for didactic activities was extended to a new expressive typology, the cinema, and in the future this will widen to the theatre and music. Furthermore didactic activities are being organised with other cultural institutions among which the Museum System of Valle Trompia (Brescia) and the Sigurtà Garden Park ().

Actions 1. Design of new didactic paths 2. Activation of collaborations with other departments 3. Activation of didactic laboratories Parties involved Municipality of Brescia- Museum Sector Brescia Museums Foundation Phases and timeframe Activity in progress of realisation, end of June 2008 Financial resources The project is self-financing with income from ticket sales Expected results More involvement from schools and further education of the museum public Results indicators Number of laboratories booked and set up

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 12 INCREASE IN ACTIONS OF COMMUNICATION

Project 12.1 Realisation of new multimedia promotional material Description In order to promote the site and the art treasures contained therein and the participation of the Network of Longobard sites more and more, a multimedia video was recently realised on the Cross of Desire, visible to the user at the site www.bresciamusei.com, on radio-taxis in Brescia and at info-points of the Santa Giulia Museum; those on the monastery of Santa Giulia and the Network of Longobard sites are in the process of being designed. Actions 1. Realisation video on the Cross of Desire 2. Realisation video on the Monastery of Giulia 3. Realisation video on the network of Longobard sites Parties involved Municipality of Brescia Brescia Museums Foundation Soroptimist International Club of Brescia

293 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

Phases and timeframe 1. Video realised in October 2007 2. Being defined 3. Being defined Financial resources 1. Total cost: €3,500.00 set by Soroptimist International Club di Brescia 2. Being defined 3. Being defined Expected results Further distribution of knowledge of the site and Longobard sites Results indicators Realisation of 2 videos

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 12 INCREASE IN ACTIONS OF COMMUNICATION

Project 12.2 Creation of cartoon strips and gadgets for youth Description The story of Ermengarda, her brother Adelchi, King Desiderio and Queen Ansa, together with that of Carlo Magno, narrated in a riveting and fun way through elegant drawings in a cartoon strip which will not only fascinate the young. The publication, 40 pages long, all in colour has the objective of making an ever wider and heterogeneous public aware of the Museum of Santa Giulia and its wonders.

Actions 1. Employ illustrator 2. Design the volume 3. Agreements on sponsoring 4. Realisation and print 5. Sale to the public through the book-shop of the museum of Santa Giulia; city bookshops; conveyed through the local newspaper “Giornale di Brescia” Parties involved Municipality of Brescia Brescia Museums Foundation Giornale di Brescia Teletutto Phases and timeframe Design: in progress Print foreseen for January 2008 Financial resources Total cost: € 20,200.00 set by the Brescia Museums Foundation and private sponsoring Expected results Promotion of awareness of the Longobard people towards younger users Results indicators Collected financing and number of sales

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 12 INCREASE IN ACTIONS OF COMMUNICATION

Project 12.3 Production of new merchandising products on the Longobards Description Over the course of 2008, new museum merchandising items connected to Longobard symbols and works of art (cups, necklaces, magnets, ties, paper holders, pins) will widen the offer of the Santa Giulia museum book-shop for an ever increasing promotion of the museum. Actions 1. Design 2. Partnership research 3. Realisation Parties involved Brescia Museums Foundation Phases and timeframe Realisation by June 2008

294 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

Financial resources Merchandise consigned Expected results Further distribution of images linked to Longobard artistic culture Results indicators Number of acquisitions

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 12 INCREASE IN ACTIONS OF COMMUNICATION

Project 12.4 Fostering promotion through the use of more means of advertisement Description The Brescia Museums Foundation press office which works permanently on promoting the site, with the objective of reaching an ever increasing number of users, started up new collaborations with the mass media: with journalistic and sector newspapers on a national and international level, with television programmes both local and national and divulgation through new dynamic means of publicity Actions The actions below are given as an example: 1. Publication of a wide service on the domus of Ortaglia in the English magazine “Archaeology” by Judith Harris; notification in the French guide “Cities of Art in the North of Italy” by Francesca Mariath showing the site www.bresciamusei.com; 2. Conveyance of promotional material through the national newspapers La Repubblica and Corriere della Sera; 3. The archaeological area of the site was presented in two parts in the programme “ATLANTIS: Stories of men and Worlds” transmitted by the national broadcaster LA7; from the month of January the local television “Teletutto” will show in-depth programmes on culture in the high evening and on other museums in the city; 4. Transmission of the video Cross of Desire on screens inside Brescian taxis Parties involved Municipality of Brescia Brescia Museums Foundation Phases and timeframe 1. Publication by June 2008 2. First intervention on LA7: 8 October 2007/ Second intervention: 23 December 2007/from January on TELETUTTO 3. In progress Financial resources No financial intervention Expected results Promotion of the site on a local, national and international level Increase in the number of visitors Results indicators Number of visitors to the site following these interventions

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 12 INCREASE IN ACTIONS OF COMMUNICATION

Project 12.5 Organisation of exhibitions Description Temporary exhibitions organised both by Civic Museums and the Brescia Museums Foundation, as well as third parties, take place in sequence throughout the year, valorising the cultural offer of the museum. In a particular way the Municipal Administration approved the Brescia project for the period 2004-2008. The Splendour of Art, consisting in the realisation of a series of exhibitions of great importance and recall organised by an external company appointed by the Brescia Museums Foundation. Actions Realisation of exhibitions: 1. “America! Painting stories from the New World” (24 November 2007- 4 May 2008) 2. “A treasure of Celtic people in the plains north of the . The drachma of Manerbio” (1 December 2007-4 May 2008) 3. “Cardinal Maria Querini. A collector in Brescian in the Seventh century between antiquity and erudition” (until 2 June 2008); 4. International Biennial of Photography (June-September 2008) 5. “Works from private art collections” from Autumn 2008 Parties involved Municipality of Brescia Brescia Museums Foundation CAB Foundation CAB Linea d’Ombra Phases and timeframe During the year 2008

295 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

Financial resources Total cost: €7,000,000.00 Resources allocated by the Municipality of Brescia, Brescia Museums Foundation, CAB Foundation, Linea d’Ombra and private sponsors Expected results Increase in the cultural offer and in the number of visits to the site Results indicators Number of visitors coming to the site following these interventions

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 13 ORGANISATION OF EVENTS AT THE SITE

Project 13.1 Event “Feast of Santa Giulia” Description Having arrived at its seventh edition in 2007, the Feast of Santa Giulia is a unique opportunity for visitors to meet in the Museum and in its district. Several appointments are included which take place on a weekend: exhibitions, didactic visits and topical routes in Santa Giulia museum for adults and children; theatrical and musical shows which entertain during the dinner served in the striking setting of the Monastery; historical evocations for a dive into the past of the monastery; the exhibition of Santa Giulia which is displaced around the streets of the district of the Museum offers an opportunity to get to know the museums of Lombardy, local craftsmanship and oenogastronomic and garden flower products.

Actions 1. Design of the event 2. Communication of the event 3. Realisation of the event Parties involved Municipality of Brescia Brescia Museums Foundation CAB Foundation Museum bodies and local producers participating in the exhibition Phases and timeframe A weekend between the end of May and beginning of June 2008 Financial resources Total estimated cost: €30,000.00 Resources allocated by the Brescia Museums Foundation and CAB Foundation Expected results Increase in use of the Museum on the part of citizens Results indicators Number of visitors; number of participants in the exhibition

296 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 13 ORGANISATION OF EVENTS AT THE SITE

Project 13.2 “Discover Brescia” project Description The “Discover Brescia” project, created in 2006, with a programme formulated of several initiatives, foresaw the insertion of a specific itinerary on the presence of the Longobards in Brescia in the 2007-2008 edition, with the organisation of a guided tour to the church of San Salvatore and to the Early medieval section of the Santa Giulia museum. Actions 1. Project conception and activation 2. Conception of a specific plan of communication 3. Project start-up Parties involved Municipality of Brescia Brescia Museums Foundation AGTA (authorised tour guide associations) City cultural associations Phases and timeframe From October 2007 to April 2008 Financial resources Total cost: approx. € 56,000.00 Funds set by the marketing plan office of the Municipality of Brescia Expected results Involvement of Brescian citizens and tourists staying in the city for the exhibition “America! Painting stories from the New World” set up at Santa Giulia Museum Results indicators Number of participants in the initiative

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 14 USER RETENTION

Project 14.1 Implementation of the “Desiderio card” project Description In order to increasingly promote the museum heritage of the city, particularly the Santa Giulia Museum, Brescia Museums Foundation is working on the realisation of a museum card, practical and convenient, aimed at establishing loyalty with visitors for whom it will be possible to approach the past every time they wish, having all the time that the works of art require. The “Brescia Museums Club”, against a membership fee, allows members free and unlimited visits to Civic Museums and to enjoy special discounts (reductions for tickets to conventional museums), participate in initiatives dedicated to the Club and always be updated on museum activities. Four categories of membership are foreseen: single, family, sponsor and company. Actions 1. Design of the card typology and management system 2. Activation of agreements with museum institutions in the north of Italy 3. Design of cultural initiatives dedicated to club members 4. Design of a specific plan of communication 5. Installation at ticket offices of management software systems and card readers 6. Start-up of promotional campaigns 7. Realisation of dedicated initiatives Parties involved Brescia Museums Foundation Phases and timeframe Project in phase of realisation Activation foreseen for the month of April 2008 Financial resources Estimated total cost: €25,000.00 Resources allocation by the Brescia Museums Foundation Expected results Increase in the number of visitors; user retention, involvement of companies and productive realities of the territory so that the site is recognised as a heritage of the whole community; incentivation of the tourist flow towards Brescia and towards museum site approved by the site Results indicators Number of museum card sales

297 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 15 LONGOBARD ITINERARIES

Project 15.1 Public pathway dedicated to the main Early medieval emergencies Description The Early medieval tracks are distributed in a capillary manner within the urban fabric and some of these are visible inside buildings already open to the public for visits. It is a good idea, in order to valorise the remains in the best way, to offer the tourists and visitors in general a topical itinerary which connects all the sites that can be visited and the tracks present in the city (San Salvatore-Santa Giulia; Palazzo Martinengo; archaeological area of Capitolium; Basilica in Labus square, etc.). Actions 1. Identification of the itinerary 2. Design of common signs which guide the visitor from the main points of the city (station, squares, tourist bus stops) 3. Design of a depliant on the route 4. Realisation of self-guides (MP3 file downloadable from the stakeholders sites) which the tourists can use along the itinerary Parties involved Municipality of Brescia, Brescia Museums Foundation, Provincia di Brescia, Bresciatourism Phases and timeframe From 2009 Financial resources To be found Expected results Better knowledge of Early medieval historical heritage in the city Results indicators Number of tourists following the proposed itinerary

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 16 PROMOTION OF KNOWLEDGE OF THE LONGOBARDS WITH SUSTAINABLE ACTIONS OF TOURISM

Project 16.1 Diffusion of awareness on the characters and events of the Longobard era Description Realisation of pamphlets (especially dedicated to schools) and organisation of cycles and meetings in order to promote knowledge of the history of the Longobard people ever more profoundly. Actions 1. Design and realisation of didactic notebooks for schools 2. Organisation of informative evenings 3. Publication of tourist guides Parties involved Brescia Museums Foundation Longobardia Association CAB Foundation Municipality of Brescia- Museums Sector Wine path “the Longobard Hills” Local authorities Phases and timeframe From 2008 Financial resources Funds to be found Expected results Distribution of knowledge on the Longobard people Results indicators Number of participants in the meetings; number of publications sent

298 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 16 PROMOTION OF AWARENESS ON LONGOBARD PEOPLE WITH SUSTAINABLE ACTIONS OF TOURISM

Project 16.2 Promotion of sustainable tourism in the development of the territories of Langobardia Description Conception of tourist packages dedicated to schools, groups and individuals Actions 1. Design of tourist packages 2. Promotion of the same Parties involved Longobardia Association CTS Youth Point Public and private bodies involved Phases and timeframe From 2008 Financial resources Funds to be found Expected results Increase in scholastic tourism in the Longobard areas Results indicators Number of packages sold

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 16 PROMOTION OF AWARENESS ON THE LONGOBARDS WITH SUSTAINABLE ACTIONS OF TOURISM

Project 16.3 Promotion of intercultural exchange, visits to neighbouring sites and in-depth examinations on wines and characteristic local products Description Organisation of farming work camps in wineries Actions 1. Work Camp Parties involved Longobardia Association “Longobard Hills Wine Path” Association Involved co-operatives Parties involved From Summer 2008 Phases and timeframe Self-financing and fee charged to participants Financial resources Further knowledge of the oenogastronomic tractions linked to traditional production Expected results Number of participants

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 16 PROMOTION OF AWARENESS ON THE LONGOBARDS WITH SUSTAINABLE ACTIONS OF TOURISM

Project 16.4 Training of Cultural and Environmental Promoters (A.C.A.) Description Organisation of specific courses Actions 1. Work Camp Parties involved Longobardia Association Training institutes Phases and timeframe From 2008 Financial resources European financings and fees charged to participants Expected results Increase in the quality of cultural assistance on tourism Results indicators Number of operational cultural promoters

299 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 16 PROMOTION OF AWARENESS ON THE LONGOBARDS WITH SUSTAINABLE ACTIONS OF TOURISM

Project 16.5 Promotion of formation and realisation of dedicated publications Description Organisation of study camps, Realisation of training manuals and in-depth publications Actions 1. Work Camp (Archaeological study and digs) 2. Publications Parties involved Longobardia Association University Archaeologists Competent Ministry Phases and timeframe From summer 2009 Financial resources European financing and fee charged to participants Expected results Increase in the number of publications on the Longobard people Results indicators Number of participants and number of publications sold

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 16 PROMOTION OF AWARENESS ON THE LONGOBARDS WITH SUSTAINABLE ACTIONS OF TOURISM

Project 16.6 Intercultural exchange among the Langobardia sites Description Organisation of the exchange of young people and adults among the cities of the geocultural corridor Actions 1. Twinnings 2. Organisation of common activities Parties involved Longobardia Association Municipality of Brescia Municipality and tourist departments of the single member cities Phases and timeframe From 2010 Financial resources Financing charged to involved public and private authorities Expected results Further knowledge of common cultural identity Results indicators Number of participants

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 16 PROMOTION OF AWARENESS ON THE LONGOBARDS WITH SUSTAINABLE ACTIONS OF TOURISM

Project 16.7 Distribute knowledge of the brand and supply work to operators in the sector Description Production of objects linked to the tipicities and brand of the geocultural corridor Actions 1. Conception and design of objects 2. Realisation of gadgets 3. Sale of the same Parties involved Longobardia Association “Wine path of the Longobard hills” Association Craftsmen and involved authorities Phases and timeframe From 2012 Financial resources Self-financed Expected results Heightening of standards in local craftsmanship Results indicators Number of products showing the brand

300 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 17 PROMOTION OF AWARENESS ON THE ARCHAEOLOGICAL AREAS, MONUMENTAL EMERGENCIES, ARCHAEOLOGICAL FINDINGS CONSTITUTING THE NETWORK OF LONGOBARD BRESCIAN SITES

Project 17.1 Protocol of programmed agreement for the constitution of a Committee of co-ordination for the enhancement and promotion of the Brescian Longobard heritage Description In order to render the collaboration aimed at realising maximum subsidiary between the Province of Brescia, the Municipality of Brescia and Foundation CAB, with the objective of agreeing on a common working programme for the implementation of a general management plan with reference to the local territorial context, the above bodies thought it appropriate to proceed with the constitution of a common co-ordination Committee. This Committee will be valid independently from the expected favourable result of the UNESCO candidature. Actions 1. Compilation of the programmatic protocol of agreement 2. Approval and undersigning of the protocol 3. Start-up of the common work programme Parties involved Province of Brescia Municipality of Brescia CAB Foundation Any other involved bodies Phases and timeframe From 2008 Financial resources Not necessary Expected results Co-ordination of all the activities Results indicators Number of co-ordinated initiatives

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 17 PROMOTION OF AWARENESS ON THE ARCHAEOLOGICAL AREAS, MONUMENTAL EMERGENCIES, ARCHAEOLOGICAL FINDINGS CONSTITUTING THE NETWORK OF LONGOBARD BRESCIAN SITES

Project 17.2 Promotion of the activities of the museums in the territory which conserve findings of the Longobard heritage Description The didactic activity of promotion and sensitisation developed in the last few years by the historical-archaeological Civic Museums of Manerbio, Leno, Remedello, by the municipality of Montichiari and by the Superintendency for Archaeological Assets at the National Archaeological Museum of Sirmione and in particular from the Dominato Leonense Foundation at the time of the exhibitions set up at the site of the monastery of San Benedetto in Leones, recorded considerable interest, which advises the expansion and completion of the formative offer aimed at schools, which from as soon as 2008 will be enriched by the activation of didactic laboratories for working iron and for the production of combs which are a frequent accompaniment in the burials of Montichiari. The project also has the purpose of promoting sensitisation in the inhabitants of the area, with particular regard to school pupils, in order to make the inhabitants of the area aware not only of the cultural value and that of identity, but also economic, of the testimonials relative to the Longobard presence. Finally to promote co-ordination of the exhibition centres, activate didactic laboratories in a co- ordinated way, promote initiatives of divulgation in the most varied forms: historical romance, videos, cartoon strips, dramatisation, events and musical products and new folklore proposals.

301 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

Actions 1. Co-ordinate and optimise the activities of the didactic laboratories annexed to the Civic Museums of the network. 2. Sustain and optimise the new folklore proposals. 3. Organise periodic training courses for post graduates dedicated to the various functions of cultural institutions and of promotion and valorisation of the cultural heritage of the area. 4. Promote and sustain the initiatives of divulgation through the various experimental forms in the programmes carried over the last few years of the Dominato Leonense Foundation. 5. Produce videos which document the heritage of Longobard collections set up in the Civic Museums of the municipalities inserted in the “Longobard site network” and the results of research and interventions of restitution of Longobard monuments of the sites in the network. 6. Organisation of the virtual Longobard Archeopark Parties involved Ministry for Assets and Cultural Activities Region of Lombardy Province of Brescia Municipality of Brescia Municipalities inserted in the “Longobard site network” and neighbouring communities Regional Management for Cultural Assets and Landscapes of Lombardy Superintendency for Archaeological Assets of Lombardy CAB Foundation Dominato Leonense Foundation Brescian Civilisation Foundation Phases and timeframe Verification and Censoring of activities currently carried out, Identification of strategies of intervention, Design of common activities, Start-up of the experimentation phase, Verification of results: Five years 2008-2013 Financial resources By Stakeholders, Public Institutions, private Expected results Optimised didactic laboratories Products of multi-topical divulgation available from the co-ordination of the network of Longobard sites of the Brescian territory Virtual Longobard Archeopark active Availability of qualified personnel Results indicators Number of inscriptions and participants

302 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Brescia Territory Objective 17 PROMOTION OF AWARENESS ON THE ARCHAEOLOGICAL AREAS, MONUMENTAL EMERGENCIES, ARCHAEOLOGICAL FINDINGS CONSTITUTING THE NETWORK OF LONGOBARD BRESCIAN SITES

Project 17.3 Exhibitions on the craftsmanship in the Longobard era in Brescia and the sites of the territory Description The recent urban archaeological digs and those in the territory have uncovered numerous Longobard relics originating above all from necropoli, which allow the main characteristics of Early medieval craftsmanship in the area of Brescia to be traced using a significant sampling. This consists mostly of ceramics decorated ‘a stralucido’, a very shiny effect and imprinting, finely decorated bone objects, metals with precious damascening. In some cases some of the production structures were also fine. The intention is therefore to dedicate an exhibition to these findings, divided into two showcase sites, one for remains found in the city and one for those found in the territory, rich with didactic apparatus and informative tools which allow the technique and profound ability of the Longobard craftsmen to be understood.

Actions Selection of findings and contexts Ordering project Compilation of the didactic-informative apparatus Set up of the two exhibition sites Parties involved Province of Brescia Municipality of Brescia Ministry for Assets and Cultural Activities Regional Management for Cultural Assets and Landscapes of Lombardy Superintendency for Archaeological Assets of Lombardy CAB Foundation Phases and timeframe Spring 2008 Financial resources Total cost about 40,000 Euros, divided among the subjects involved Expected results Distribution of knowledge on the Longobard contexts in the city and province and the artistic techniques of the Longobard people. Results indicators About 50 findings studied and restored; number of visitors

303

304 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Castelseprio-Torba Territory Objective 18 ENHANCEMENT OF TRAINING ACTIVITIES RELATED TO EDUCATION

Project 18.1 Study and creation of new informational materials and actions to involve schools and tourism Description Project and establishment of cooperation between FAI (Italian Environmental Fund) and the Lakes library system, for the promotion of joint actions in the field of communication, promotion and distribution of material concerning cultural events, in particular events dedicated to children. This agreement – which, as experimental cooperation project, recently envisaged that the Library system be included in one of the big events organized by FAI for children – is particularly important in relation to the natural tendency of the Monastery of Torba for hosting youth-oriented events. In May 2007 the experimental event “A day in the Middle Ages” saw the participation of more than 1,000 visitors. Actions 1. Enhancement of initiatives already experimented in 2007 2. Creation of new youth-oriented initiatives Parties involved FAI (Italian Environmental Fund) Lakes library system School institutes and complexes Phases and timeframe 2008 1, 2 Repetitive annual initiatives Financial resources Euro 10,000 Funding: FAI, regional, provincial funds Expected results Involving young people in enhancing knowledge of the Site and Longobard culture Result indicators Number of launched initiatives Number of classes involved Number of school visits

AWARENESS BUILDING AND PROMOTION PLAN Castelseprio-Torba Territory Objective 18 ENHANCEMENT OF TRAINING ACTIVITIES RELATED TO EDUCATION

Project 18.2 Study and implementation of artistic initiatives Description The Project “Beyond stage” (only experiment in Italy promoted by the Region Lombardy in cooperation with the Provinces of Bergamo, Brescia, Como, , Lecco, Lodi, Pavia, Sondrio, Varese and a large number of municipalities and with the support of AGIS- Italian Show Business Association) aims at promoting – also benefiting students of schools of any kind and level – events which usually concern only metropolis areas, thus proving that investing in culture is fruitful and is a source of development for the local economy. “Beyond stage” promotes language pluralism, experimentation, contamination of visual art and performing arts in theatres but also in non-conventional places, thus discovering and letting others discover places and historical buildings, parks and waterways, industrial archaeological buildings and archaeological sites. Within the Project, three archaeological areas have been identified as fascinating venues for theatre and music events on the occasion of the Heritage European Days. One of these is the area of Castelseprio, which will host the initiatives and thus attract a heterogeneous group of people composed by teachers, students, well-read people. Actions 1. Preparation of the 2008 schedule for “Beyond stage” (coordinated by the Region Lombardy) 2. Layout of the site of Castelseprio-Torba 3. Involvement of schools and education bodies in general Parties involved Region Lombardy Province of Varese FAI (Italian Environmental Fund) Superintendences Municipality of Castelseprio Schools Universities Phases and timeframe 2008 1, 2, 3

305 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES Annually repeatable events Financial resources To be defined– Funding: regional, provincial funds Expected results Involvement of adults in the knowledge of the site Result indicators Number of planned initiatives Number of the spectators

AWARENESS BUILDING AND PROMOTION PLAN Castelseprio-Torba Territory Objective 19 ENHANCEMENT OF PUBLIC AWARENESS ACTIVITIES FOR ADULTS

Project 19.1 Projects to improve the enhancement on the Heritage at various social levels Description The Project envisages the organization of direct meetings with economic, social and cultural organizations (trade unions, Third-age universities, service club), social voluntary associations to promote knowledge of the values of the site and to plan organized tours to Castelseprio-Torba and other sites of the “Italia Langobardourm” Actions 1. Creation of an annual schedule for meetings with people and business categories to raise awareness and promote the Heritage in view of the application for UNESCO 2. Creation of an annual programme of scientific-information meetings on relations between the Longobards and the territory 3. Systematic promotion of the Heritage during big cultural events in the area 4. Planning of seasonal schedule for guided tours to the Heritage 5. Organization and promotion of knowledge visits to other places of the Site Parties involved Local stakeholders Trade unions Cultural and voluntary associations Service Clubs Tourist companies National Tourist Guides Association Network management body Phases and timeframe 2008 1, 2, 3, 4 2008-2009 5, 6 Financial resources To be defined– Funding: stakeholders, regional, private funds Expected results Better awareness of the adult population on the values of the Heritage Result indicators Number of institutions involved Number of implemented initiatives Number of participants

306 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Castelseprio-Torba Territory Objective 19 ENHANCEMENT OF PUBLIC AWARENESS ACTIVITIES FOR ADULTS

Project 19.2 Enhancement of targeted relations with the media Description The Project envisages the involvement of various information bodies and regional media for the dissemination of information linked to the initiatives which will be implemented at different levels of interest: from knowledge, conservation, and enhancement to the promotion of the Longobard heritage. Information must be enhances both through targeted initiatives according to the events which will be organized and through periodical information which contribute to arouse and cultivate interest in the Longobard heritage and the projects related to it. Actions 1. Launch of permanent relations with Information bodies and regional and national media in order to create an illustrative “bulletin” (also online) on the initiatives and the progress of knowledge. 2. Study and implementation of initiatives and targeted events dedicated to information, such as press conferences, interviews to Stakeholders, 3. Organization of tours dedicated to information operators 4. Thematic national competition for information operators Parties involved Stakeholders Information bodies Business associations and companies Private citizens Phases and timeframe 2008 1, 2 2009 3, 4 Financial resources To be raised– Funds by Stakeholders and private citizens or companies Expected results Dissemination of information and raising public awareness on the values of the Site Dissemination of the information and raising public awareness on the development projects of the Territories Result indicators Number of articles and reports published in the press and broadcast on the television Number of radio-television programmes dedicated to the Heritage and development programmes on the Territory

AWARENESS BUILDING AND PROMOTION PLAN Castelseprio-Torba Territory Objective 19 ENHANCEMENT OF PUBLIC AWARENESS ACTIVITIES FOR ADULTS

Project 19.3 Promotion activities of FAI (Italian Environmental Fund) for the Monastery of Torba Description With the direct presence of 18 Italian regions and almost 100 Delegations, FAI (Italian Environmental Fund) plays a fundamental role in the dissemination on a large scale – beyond the objectives of the Fund – of the promotion programmes which are annually prepared to raise awareness of the general public on the values of the property and in particular of the artistic-monumental properties of great prestige, like the Monastery of Torba. The scientific material concerning the property of Torba is spread through all other properties of FAI around Italy and any institutional promotion action of the Fund. Along with the specific material of Torba, the property is included in the illustrative collections of FAI Properties. Complete information relative to the Monastery and events here organized are available on the institutional website of FAI; specific articles concerning the property areas also included in the institutional newsletter of FAI sent to around 72,000 users and within the newsletter distributed to all 75,000 members. Special attention is given to the events - specific material is produced in various formats (A3 posters, pictures, brochures) which will be distributed in the area and in the sites included in FAI. The leaflet “FAI meetings” is published three times a year (spring, summer, autumn) and is dedicated to the spread of the event schedule organized in all FAI properties. Actions 1. Planned information, public awareness and promotion actions within the

307 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES institutional activities of FAI Parties involved FAI (Italian Environmental Fund) National public institutions Schools of any kind and level Phases and timeframe 2008 1 The action is annually reproposed according to the methods established each time Financial resources FAI funds according to annual budget allocations Expected results Dissemination of information and raising awareness of the artistic-monumental Heritage of FAI and, specifically, of the site of Castelseprio-Torba Result indicators Number of publications distributed at national level Number of scheduled initiatives Number of visitors to the Monastery of Torba

AWARENESS BUILDING AND PROMOTION PLAN Castelseprio-Torba Territory Objective 20 ENHANCEMENT OF TOURIST PROMOTION INITIATIVES

Project 20.1 Study and subscription of agreements with tour-operators Description This Project of FAI (Italian Environmental Fund) is structured – in parallel with the direct socio-economic development action carried out through the Information Office of Malpensa of the Province and the Chamber of commerce of Varese (see Socio-Economic Development Plan Castelseprio,Objective 2 Project 2.3) – on two main strategies: the first is dedicated to an international audience; the second dedicated to tour operators. Actions to be developed in agreement with local stakeholders of “Italia Langobardourm” Actions 1. Study and enhancement of communication strategies and targeted promotion of the site and events here organized dedicated to an international audience 2. Monitoring of large tour operators and launch of agreements for the drawing up of specific advantageous agreements Parties involved Stakeholders of “Italia Langobardorum” Network management body Province of Varese Region Lombardy Private citizens and companies Phases and timeframe 2008-2009 1,2 Annual repetitive actions Financial resources To be defined– Funding: Stakeholders, private funds Expected results Insertion of visit proposals to the site in the widespread catalogues of large tour operators Increase in the number of visitors Result indicators Number of articles in specialized catalogues of international tour operators Number of visitors involved on the basis of the agreements

308 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Castelseprio-Torba Territory Objective 20 ENHANCEMENT OF TOURIST PROMOTION INITIATIVES

Project 20.2 Implementation of the international project “Nature and Culture in a part of Insubria” Description The Monastery of Torba was included in the product “Nature and culture in a part of Insubria”, which was the result of the multiannual project of Interreg IIIA “Naturalness and communication in the Contado del Seprio” between Italy and Switzerland, which envisaged – among other things – the creation of tourist packages aimed at the development and promotion of local areas as possible destination for tourism flows. The Monastery of Torba will therefore become part of the tourist circuits of the Canton Ticino and inland Switzerland, also thanks to the promotion of the package within specialized fairs organized in the abovementioned areas. Actions 1. Preparation of fours cross-border tourist packages with a focus on the Monastery of Torba and Castelseprio Parties involved FAI (Italian Environmental Fund) Municipality of Castiglione Olona Tourist Office of Mendrisiotto and Basso Ceresio Vienord Park Authority of Lanza Valley Association of the Valmorea Railway Friends Club Association of San Gottardo Rile Tenore Olona Park Phases and timeframe 2008 under way Financial resources Euro 35,000 - Funding: EU (Interreg III A), FAI and other project stakeholders funds Expected results International promotion of the site Increase in tourist flows Result indicators Number of organized groups adopting tourist packages Number of visitors coming from Switzerland

AWARENESS BUILDING AND PROMOTION PLAN Castelseprio-Torba Territory Objective 20 ENHANCEMENT OF TOURIST PROMOTION INITIATIVES

Project 20.3 Tourist promotion “Welcome to Lombardy: the Land of FAI Treasures - The values of Torba-Castelseprio” Description Starting from 2006, FAI (Italian Environmental Fund) launched a tourist development project aimed at enhancing its properties as integral part of corresponding local areas. The Project is based on a new way of understanding the concept of incoming tourism: attention is focused not on single services offered in the area (hotels, cultural attractions, sport, etc.), but on the geographic area in its entirety and ability to offer an integrated group of properties and tourism services which could be sold as “products”. The enhancement of FAI properties, as tourism catalysts also aims at attracting more visitors to the areas, but also direct them to benefit from the complementary services provided by other bodies present in the area, like catering services (local food and wine offer), visit to the local consortium’s cellars with tasting and purchase of souvenirs, typical products or other, participation in events organized by local associations and tourist offices. The specific project “Welcome to Lombardy: the Land of FAI Treasures” where an eminent role is given to the Heritage of Torba-Castelseprio is also significant in this context. Actions 1. Meetings with regional, provincial and local administrators 2. Organization of specific educational programmes for journalists, PR, communication, marketing and event managers 3. FAI Catalogue for Lombardy now being developed 4. Direct presence in the main fairs related to tourism (BIT, GLOBE, TTG, TTI, WTM, etc…),

309 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES Parties involved FAI (Italian Environmental Fund) – section Lombardy Stakeholders Network management body Private citizens and companies Phases and timeframe 2008-2009 1, 2, 3, 4 Financial resources To be defined– Funding: FAI (Italian Environmental Fund), Stakeholders, private funds Expected results Improvement of raising awareness and promotion at national and international level Result indicators Number of contacts with local administrators, media representatives, tourist operators Number of news and television reports

310 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Spoleto Territory Objective 21 INCREASE THE NUMBER OF PROMOTIONAL ACTIVITIES CONNECTED WITH THE SITE

Project 21.1 CISAM realization of a slip-case on San Salvatore Description The project focuses on the realization of a three-volume slip-case: the first one with the anastatic reprint of the study by Salmi on San Salvatore; the second one with the most significant literature on San Salvatore; the third one with a short essay by architect Renzo Pardi on San Salvatore. Actions 1. Collecting and elaborating materials to publish 2. Realization of the three volumes and of the spli-case 3. Promoting and spreading the publication, either through the publishing channels of the CISAM Foundation and the website www.cisam.org and through the organization of a study day or a round table for the presentation of the publication 4. Communication of the publication and related actions, through banner to post on the institutional website with links to websites of the other institutional parties

Palazzo Ancaini, today hosing the seat of CISAM

Parties involved Foundation CISAM; Foundation Cassa di Risparmio di Spoleto; Municipality of Spoleto Phases and timeframe Within 2008 Financial resources Estimated costs € 40.000,00 to be raised through the involved parties, public and private sponsors Expected results Sale of the slip-cas thorugh traditional channels and thorugh the website www.cisam.org Increase of visits to the institutional website Higher attention to all scientific activities of the Foundation CISAM Results indicators Realized number of copies of the publication Web stats for the website www.cisam.org

AWARENESS BUILDING AND PROMOTION PLAN Spoleto Territory Objective 21 INCREASE THE NUMBER OF PROMOTIONAL ACTIVITIES CONNECTED WITH THE SITE

Project 21.2 1st Congress “Italia Langobardorum (568-774)” Description The action focuses on the organization of a congress, to which the major scholars of thematic related to the Longobard heritage in Spoleto will be invited (professor Judson Emerck, William Thopre, Carola Jaeggy). During the congress, the conservation works of the conventual buildings close to San Salvatore and the adjustments of the area around the church (as per Protection and Conservation Plan) will be presented. The planning of an exhibition of drawings and surveys of the buildings is also related to the congress (architects Antonio da Sangallo, Francesco di Giorgio Martini, , Ireneo Aleandri, Emerich and so on). The congress may represent the starting point for a coordinated series of interventions of awareness building on the Longobard heritage and on the whole network “Italia Langobardorum”. Other congresses and scientific-divulging meetings may follow, to be organized in all places of the network. Actions 1. Gathering and elaboration of the material to publish for the congress 2. Organization of the congress 3. Organization of the exhibition 4. Promotion and spreading of the initiative through all channels of the network Parties involved Municipality of Spoleto, Foundation CISAM, public and private bodies to be identified Phases and timeframe Within 2008 Financial resources € 10.000,00 to be raised through the involved parties and public and private sponsorships Expected results A higher awareness of the citizens not only for the candidacy project Results indicators Number of partecipants

311 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS-BUILDING AND PROMOTION PLAN Spoleto Territory Objective 21 DEVELOP PROMOTIONAL ACTIVITIES

Project 21.3 Implementing ad hoc educationals for tour operators and journalists from the tourist- cultural sector; assistance to journalists and Radio TV crew members Description Independently, but also in collaboration with the various ENIT offices in the world, with Agenzia di Promozione Turistica of the Region of Umbria, and with Consorzio Conspoleto of the tourist operators of the district territory, a number of educationals are organized for single journalists, or for groups of journalists, both Italian and foreign, from the tourist – cultural sector, as well as for Italian and foreign tour operators. Actions 1. Organization of educationals; 2. Follow-ups also to obtain feedback, in the case of journalists, on the published editorials Parties involved Municipality of Spoleto, Campello sul Clitunno, Castel Ritaldi and Giano of Umbria. Staff of the Servizio Turistico Associato, Staff of the Consorzio Conspoleto, Cooperativa Sistema Museo Phases and timeframe 2008 and subsequent years Financial resources To be defined. The financial resources are not presently quantifiable, and will be proportional to the number of educationals that will be proposed by ENIT, Agenzia di Promozione Turistica of the Region of Umbria and other subjects, including those directly concerned. Depending on their value, a selection will be made of those which will be most useful within an effective and targeted (Longobard heritage) promotion of the territory Expected results Double results are expected at the promotional level. a) As regards the educationals reserved for tour operators, we are expecting an increase in the number of proposals of trips to Umbria and, in particular, to Spoleto, entered into the catalogue produced by them on a yearly basis. b) As regards the educationals for the press, we are expecting more space reserved for Spoleto (with particular attention to the UNESCO candidature within Italia Langobardorum) both in the national and in the foreign tourist guides, which are updated on a periodical basis by the journalists assigned by the various publishing companies, and in the press agencies of the journalists who request assistance in order to develop ad hoc programs on Spoleto Result indicators A 10 % increase with respect to the past in the number of educationals for each tour operator, and in the number of educationals and of single assistance cases for tourist- cultural press journalists

AWARENESS-BUILDING AND PROMOTION PLAN Spoleto Territory Objective 22 INCREASE THE NUMBER OF INFORMATION, ACCOMMODATION AND PROMOTION ACTIVITIES

Project 22.1 Studying and implementing accommodation, promotion and awareness raising-related publishing initiatives Description The project focuses on the production of information material in a double version: the paper and the virtual formats, the latter through the uploading of the brochure into the official tourist website of the district of Spoleto www.visitspoleto.it . More precisely, it will focus on the publication of an easy-to-read pamphlet – brochure which will provide a description of the various historical and artistic itineraries offered to tourists visiting Spoleto, but also disseminate information on some peculiarities of the monumental and environmental assets of the territory. It will be supported by the Museo Nazionale del Ducato of Spoleto, hosted at the Rocca Albornoziana, which will be the starting point of several itineraries for visiting the district at issue. Particular attention will be dedicated to the presence of Longobard evidence in the territory Actions 1. Studying and publishing the illustrative brochure of the Museo Nazionale del Ducato of Spoleto and the itineraries connected with the latter 2. Producing and disseminating paper materials and, at the same time 3. Implementing the guide and the itineraries in the official tourist website Parties involved Municipality of Spoleto, Servizio Turistico Associato of Spoleto, Cooperativa Sistema Museo, Consorzio Operatori Turistici, Arcivescovado of Spoleto and Norcia, Municipalities of Campello sul Clitunno, Castel Ritaldi and Giano dell’Umbria, Agenzia Regionale di Promozione Turistica , SSIT - Società Spoletina Imprese di Trasporto Phases and timeframe Over the course of 2008

312 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

Financial resources Municipality of Spoleto € 5,000 Expected results a) Targeted message to tourists and citizens on the historical and artistic peculiarities offered by the Museo Nazionale del Ducato and by the territory; b) Increasing the number of visitors to the Museum; providing an incentive to come to Spoleto specifically to visit the Museo del Ducato and related itineraries, including those connected with Italia Langobardorum Result indicators Number of printed publication copies Contact numbers entered into the website www.visitspoleto.it Percentage of variation of visits to the Museo Nazionale del Ducato

AWARENESS-BUILDING AND PROMOTION PLAN Spoleto Territory Objective 22 INCREASE THE NUMBER OF INFORMATION, ACCOMMODATION AND PROMOTION ACTIVITIES

Project 22.2 City course on the subject of Longobard culture with closing tasting of food products Description Publication of an easy-to-use illustrative fold-up brochure of the city itinerary, with the aim to highlight monuments and Longobard finds. Such itinerary will start from the Museo Nazionale del Ducato of Spoleto (hosted by the imposing ‘albornoziano’ castle) and will guide you through, respectively: Palazzo Mauri (wonderful mosaics), Palazzo Pianciani (finds), Church of San Salvatore, and return to the historic centre at Palazzo Leti – Sansi (palazzo of excellencies and of typical products, for food tasting). The closing tasting will probably be held at the typical pastry shop of Spoleto, which offers two kinds of pastries of Longobard origin: the Attorta (a sort of Strüdel with some variants) and the Crescionda (cake made with chocolate, biscuits and milk) . In agreement with the Municipal administration of Campello sul Clitunno, it will be possible to extend the Longobard circuit illustrated in the folder by including, also, the Tempietto del Clitunno, which is only 12 km away from Spoleto, and which is part of the Italia Langobardorum project Actions 1. Examining the folder 2. publishing and distributing the latter 3. stipulating agreements with private entities and, if possible, organize tastings of Longobard food products Parties involved Municipality of Spoleto, Servizio Turistico Associato of Spoleto, Associazione Commercianti and, if possible, also other trade associations Phases and timeframe Starting from 2008 Financial resources To be defined Expected results Greater attention on the part of the indigenous people and foresters to monuments and Longobard finds in the Spoleto territory Result indicators At least 15% increase on a yearly basis of the number of visits to the Longobard sites in the territory

AWARENESS-BUILDING AND PROMOTION PLAN Spoleto Territory Objective 22 INCREASE THE NUMBER OF INFORMATION, ACCOMMODATION AND PROMOTION ACTIVITIES

Project 22.3 Outsourcing the management of the IAT tourist information and accommodation office, offering extended working hours and a wider range of services Description The municipal administration of Spoleto and of the other municipalities of the district, that is, both of Campello sul Clitunno, Castel Ritaldi and Giano dell’Umbria, have planned to outsource the IAT tourist accommodation and information office to a subject yet to be identified through ad hoc tender Actions 1. resolution by the Council of the Municipality of Spoleto 2. resolution by the Municipal councils of Spoleto, Campello sul Clitunno, Castel Ritaldi and Giano dell’Umbria 3. Tender and related regulations 4. Awarding of contract Parties involved District municipalities: Spoleto, Campello sul Clitunno, Castel Ritaldi, Giano dell’Umbria; potential subjects participating in the future tender; Servizio Turistico Associato of Spoleto Phases and timeframe Year 2008 Financial resources To be defined, based on the instructions that each single Municipality will provide through

313 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

their own official deeds Expected results Extended working hours for the IAT Tourist Information and Accommodation Office, expanding the range of services offered to tourists and citizens thanks to the merchandising of tourist, multimedia, editorial, and typical products. Some products will concern the Italia Langobardorum project, such as the ad hoc Brochure, DVD, etc. The outsourcing of the IAT front office should allow for greater flexibility in the management of the latter Result indicators Increasing the number of opening hours (an average of 3 additional hours) of the IAT Front Office; merchandising of several dozens of various products as shown above

AWARENESS-BUILDING AND PROMOTION PLAN Spoleto Territory Objective 22 INCREASE THE NUMBER OF INFORMATION, ACCOMMODATION AND PROMOTION ACTIVITIES Project 22.4 Planning of communication activities for the dissemination of knowledge of the Longobard heritage, through various information channels Description The project requires the involvement of various information agencies, and of the regional and national “media” for the dissemination of information connected with the entire set of initiatives that will be developed at the various levels of interest: knowledge, preservation, awareness-raising and promotion of the Longobard heritage. The aim is to increase the effectiveness of information both through targeted initiatives based on the events that will be organized, and through periodical information that will contribute to promoting and nourishing interest in the Longobard heritage and in the projects connected with the latter Actions 1. Establishing solid relations with the information agencies: TV, radio and regional and national newspapers, with the aim to promote and disseminate information on the promoted initiatives and on the state of progress of the awareness-raising, value- enhancement and knowledge-related projects. 2. Creating and developing television formats to be developed in synergy with the local broadcasting stations, with the aim to promote the activities related to the Italia Langobardorum project 3. Information and project promotion activities in synergy with the regional and local information portals, with the aim to create ad hoc theme sections dedicated to the history of the Longobards in our territory. The information can be spread through interviews (also audio and/or video interviews), editorials, periodical in-depth studies of a historical-cultural nature. 4. Studying and implementing targeted initiatives and events dedicated to the sphere of information, such as press conferences and interviews with Stakeholders. 5. Carrying out an editorial project, published as a supplement to the periodical “Città ” (heading duly registered at the Court of Spoleto) which will also be developed on the net through the set up of an information portal, linked to the institutional website www.comune.spoleto.pg.it, and to the one on the net ww.italialangobardorum.it, dedicated to the Longobard Spoleto, through which it will be possible to disseminate the history of the Longobards in our territory, the “treasure” that we have inherited, and the promoted initiatives 6. Organization of tours dedicated to information operators Parties involved Stakeholders; Information agencies; other communication channels Phases and timeframe Points 1 – 2: 2008 Point 3: 2009 Financial resources Funds to be collected from Stakeholders and private entities Expected results Disseminating information and raising awareness of public opinion about the Value of the site and the connected development for the Territory Result indicators Number of articles and reports published in the press and broadcasted on TV Number of radio and television programs dedicated to the Heritage and to the projects related to the development of the territory Number of visits to the website dedicated to the Longobard Spoleto

314 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS-BUILDING AND PROMOTION PLAN Spoleto Territory Objective 22 INCREASE THE NUMBER OF INFORMATION, ACCOMMODATION AND PROMOTION ACTIVITIES Project 22.5 Improving technological systems in order to exploit assets via the internet Description The project includes the set up of a specific space dedicated to multimedia illustration through the use of a continuous cycle video, both through the various information materials of the “Italia Langobardorum” Network and through Spoleto. This is a Spazio Multimediale di Orientamento al Patrimonio housed by the Visitors Centre, located inside the former Monastery adjacent to the Basilica of San Salvatore (see Enhancement plan). As regards Spoleto, information on the history of the assets connected with the Longobard heritage will be provided – as well as on the history in general of the cities – on the characteristics of the territory, on the important sites for visits and alternative cultural itineraries (for example, the Wine and Food Center, Spoleto Tipica project and ”Italia Langobardorum” Brand, see social economic development plan objectives 5 and 6), on the initiatives related to cultural, social and economic, and naturalistic entertainment. Actions 1. Project and implementation of multimedia programmes and material 2. Opening of the Multimedia Space Parties involved Municipality of Spoleto, Superintendence for the Architectural Assets, the Landscape, and the Historical, Artistic and Ethnic-anthropological Heritage of Umbria (BAPPSAE) Phases and timeframe Starting from 2009 Financial resources Funds to be collected from the budget of the Municipality of Spoleto, from the Region of Umbria, from the Ministry of University and research, and from the superintendence BAPPSAE of Umbria Expected results Offering visitors an organic system providing access to the Heritage and guidance. Incentive to visit other tourist-cultural spheres of the territory Incentive to visit other places of the “Italia Langobardorum” Site Result indicators Number of contacts activated Number of planned visits starting from the Visitors Centre

AWARENESS-BUILDING AND PROMOTION PLAN Spoleto Territory Objective 23 TOURIST PROMOTION OF THE TERRITORY

Project 23.1 Participation in trade show events and initiatives mainly in the national and foreign markets Description Participating in various initiatives and tourist fairs such as the WTM – World Trade Market of London, the Salon des Vacances of Paris, promotional action in Charleston – South Carolina (USA), and other actions in London for accommodation of University and non- University student groups. In Charleston, in the month of May, the signing of the twinning pact with the city of Spoleto, which share the Spoleto Festival (Spoleto) and the Spoleto Festival USA (Charleston), both cities were founded by the maestro Gian Carlo Menotti. The promotion of Spoleto’s candidature within the Italia Langobardorum project will be systematically carried out in all the promotional events in which they will directly or indirectly participate Actions 1. Organization, in collaboration with the Agenzia di Promozione dell’Umbria and the trade Associations of the Spoleto and Umbria territory, of a promotional initiative in Charleston, a city in South Carolina (USA). 2. Continuation of the initiative with a number of subjects from London, aimed to organize language, culture and courses in Spoleto, including the opportunity to enjoy tourist itineraries among which, one related to Longobard art. 3. Participation in trade shows in London (WTM), Paris, and Berlin (ITB); 4. Signing of the twinning pact between Spoleto and Charleston in the month of June 2008, which will constitute an important platform for the tourist promotion of Spoleto and Umbria in the USA Parties involved Municipality of Spoleto, Consorzio Operatori Turistici of Spoleto “Conspoleto”, Fondazione Cassa di Risparmio of Spoleto, Mayor Joseph Riley Jr various subjects of Charleston SC (USA), tourist operators of London; ENIT offices in London and New York Phases and timeframe Charleston SC (USA) last week-end in March 2008; signing of the twinning pact in Charleston : June 2008;

315 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

Spoleto: July 2008; London all year Financial resources In synergy with the Consorzio Operatori turistici of Spoleto “Conspoleto”: approx. 80,000.00 € allocated for promotional activities for the year 2008 Expected results Increase the effectiveness of promotional actions especially with regards to the Anglo- Saxon market (USA and GB) Result indicators Two events in Charleston (promotional initiative held in March and in June 2008); expected increase of presence of Americans in South Carolina (estimated at 20% increase) in the district territory

AWARENESS-BUILDING AND PROMOTION PLAN Spoleto Territory Objective 23 TOURIST PROMOTION OF THE TERRITORY

Project 23.2 Tourist accommodation and promotion of the territory through the organization of artistic and cultural events of significant depth Description Organization of artistic and cultural events which have strongly characterized and still strongly characterize the significant cultural and artistic vocation of the city of Spoleto. For more than 60 years, Spoleto has held the Stagione del Teatro Lirico Sperimentale di Spoleto (62nd edition in 2008) and, in particular, this year the Festival dei Due Mondi will be re-launched in its 51st edition. For many years, it has been the most important cultural and artistic Italian initiative, and it is the ambition of the city and of the Ministry for Cultural Assets and Activities that it soon regains its past splendor. From a more strictly cultural aspect, the 56th edition of the Settimana Internazionale di Studi sull’Alto Medioevo, by CISAM, will be held. Other initiatives of major import include the following: the XVI Stagione Musicale e Musicologia dell’Associazione Culturale l’Orfeo (entire year); the Carnevale di Spoleto (February / March); the Premio Concorso Nazionale “Ercole Oliario” (March); the Settimana Internazionale della Danza (April); the 12th Festival Pianistico di Spoleto (April/May); the Rassegna di Concerti D’Organo (May June); the 3rd Fiera Mercato “Vini nel Mondo” (June); Spoleto Estate (July-September); Stelle Europee del Gusto (September): Frantoi Aperti (November); End of year events (December/January)

Poster of the Festival of Two Worlds 2007

Actions 1. Input of experimental and consolidated initiatives 2. Collaboration with institutions, artists, theatre companies, economic trade organizations, public and private companies 3. System training and information initiatives 4. Setting up relations with other sites 5. Coordinated territorial enhancement Indicators and systems of a high quality level

316 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

6. Enhancement of the reception facilities and of the wine and food business activities Parties involved Institutions, trade associations, public and private companies Phases and timeframe Starting from 2008, on a yearly basis (monthly in some cases) Financial resources They are not quantifiable, given that the organization of the various events reports to different subjects, both public and private Expected results a) Increase the quality of the activities and initiatives. b) Activate new resources and collaborations towards shared objectives. c) Increase the national and international tourist flow and the related average term of stay -strengthen the public – private network d) Increase the knowledge of the places and assets connected with the city culture and enhancement of the latter Result indicators The expected results are mainly connected to the re-launching of the festival dei Due Mondi: a 30% increase in the sale of Festival tickets versus 2007; a 25 % increase in the number of arrivals and presences connected with the Festival dei Due Mondi; we are also expecting a slight increase in the annual average period of stay, especially during the Festival dei Due Mondi of 2008

317 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS-BUILDING AND PROMOTION PLAN Spoleto Territory Objective 24 DEVELOP TRAINING ACTIVITIES CONNECTED WITH THE EDUCATIONAL SPHERE

Project 24.1 Projects for increasing knowledge of the Heritage in relation to the sphere of education Description The need to raise the awareness of the new generations, and not only them, of a wider knowledge of their own artistic assets has provided the Municipality of Spoleto and the Liceo Classico “Pontano Sansi” with the incentive to execute the “Adotta un monumento” project, established in 1998 with a memorandum of understanding through which the participating students, all volunteers, guarantee in the summer period the opening to the public of important city monuments, among which also the basilica of San Salvatore. The project will be proposed again in a more exhaustive manner with, in addition to the opening shifts, also a guided tour service in different languages. Always within the context of the didactical programming the Istituto d’Arte of Spoleto will offer for the school year 2007/2008 the teaching, for the goldsmith section, of the embossing and chasing methods for creating crosses and jewels of the Longobard type; within the stagecraft section, a three-dimensional wooden model of the basilica of San Salvatore will be built. The Hotel institute will try to raise the awareness of young people by proposing a research study on the food and dishes connected with the Longobard period, as well as the preparation and enhancement of the recipes that, thanks to tradition, have been preserved until today. Other projects concern the dissemination and promotion of knowledge of the Longobard heritage through the organization of school trips targeted towards the assets of the site and of the territory, and the production of information materials for young people. In general, the schools will be involved in all the projects included in the Awareness-raising and Promotion Plan. All the material produced at the various levels will be exhibited at the Conference on the Longobards, which will be organized in 2008 in Spoleto Actions 1. Adotta un monumento” (Adopt a monument) project 2. Start of didactical initiatives 3. Distribution of the results through the Network Parties involved Municipality of Spoleto, Liceo Classico “Pontano Sansi”, Istituto d’Arte “L. Leonardi”, Istituto Alberghiero, all schools from elementary to high schools, Ufficio Informazione Accoglienza Turistica of the Servizio Turistico Associato of the District, Province of Perugia, Region of Umbria Phases and timeframe 2008 The ”adopt a monument” project will be proposed again every school year Financial resources Funds to be collected from the Municipality of Spoleto and from public and private entities of the city, the Province and the Region of Umbria Expected results Increase the direct participation of young people in the knowledge and promotion of the values of the UNESCO assets Result indicators Number of institutes and classes involved Number of organized visits to the Heritage assets and to the territory by the preparation of documents Number of documents and their quality level

318 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS-BUILDING AND PROMOTION PLAN Campello Territory Objective 25 EXPANSION OF INFORMATION ACTIVITIES

Project 25.1 Implementation of promotional and awareness-raising publishing initiatives

Description The project foresees the production of information material about the Temple and the entire territory. These will be new tourist-cultural brochures, maps, specific boards, the updating of tourist signs, all linked to the various initiatives for Optimising the Heritage. The project also foresees the creation of an information point where it will be possible to find illustrative education material needed for a more complete understanding of the area’s cultural and environmental values, with particular attention on the area of the River Clitunno. Actions 1. Study and creation of editorial initiatives for promoting and increasing awareness of the area 2. Production and diffusion of the materials Parties involved Municipality of Campello sul Clitunno, GAL (Local Action Groups), Superintendence for the Architectural Heritage, Landscape, Historical, Artistic and Ethno anthropological Heritage of Umbria (SPAPPSAE). Phases and timeframes Starting from 2008 Financial resources Funds allocated: €. 40,000.00 based on the Leader Programme + “Terre dell’Olio” Expected results Improvement of visibility and knowledge of Heritage Improvement of visitor orientation service Result indicators Number of publications and information providing equipment Number of copies printed Number of tourist signs and boards installed

AWARENESS-BUILDING AND PROMOTION PLAN Campello Territory Objective 25 EXPANSION OF INFORMATION ACTIVITIES

Project 25.2 Actions aimed at supporting awareness-raising and promotion initiatives

Description Project for a projection room and a video library for the educational and scientific diffusion of the area’s cultural and environmental values The project foresees the creation of a specific space, found in some sheds currently used for storing materials, for the illustration of multimedia material (video and computer) for the collection and scientific and education diffusion of documentary materials concerning the history and characteristic aspects of the area and its heritage. It will be a useful instrument to divulge the current initiatives of cultural, socio- economic and folklore animation and foreseen for the future in the calendars of activities, in hospitality and catering. The purpose is to provide the visitor with top level knowledge of the site heritage, allowing him to find his way around the general visiting and tourist itinerary system that characterise the proposals for the enhancement and promotion of the heritage itself. The Visitor’s Centre will also house other services (authorised guides, bookshop, brochures and maps, multimedia products). Actions 1. Project and creation of programmes and multimedia material 2. Activation of the Projection Room and Video Library Parties involved Municipality of Campello sul Clitunno Phases and timeframes Starting from 2009 Financial resources Part of funds allocated part of the funds issued by the Government further to the 2006 environmental accident (see point 11.5.2. - Conservation analysis), for the reclamation, recovery and overall optimisation of the River Clitunno area: € 6,000,000.00 Expected results Diffusion of information and increase of awareness in public opinion on Site and territorial values. Diffusion of information and increase of awareness in public opinion on territorial development projects Result indicators Number of articles and services published in the press and broadcast on television Number of projections dedicated to Heritage and to territorial development projects

319

320 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Benevento Territory Objective 26 TO INCREASE AWARENESS BUILDING ABOUT ARCHAEOLOGY AND LOCAL HERITAGE

Project 26.1 Exhibition “Langobardia Minor: Images and documentation from the Duchy of Benevento” Description By exhibiting new archaeological data, this exhibition intends proposing a review of the settlement events and the major traces of the Longobard period in Benevento. The exhibition route will be made up of various sections, dedicated to in-depth information on specific topics: Fortifications, religious buildings, necropolises and funerary rites, epigraphic documents, craft activities, and artistic culture. The exhibition will include documents and images from the Duchy of Benevento. The objective is to integrate archaeological data known to date, most of which is exceptionally important but is taken from old finds and is thus out of context, with recently acquired documents that make it possible to put together a new summary of the Longobard domination in Benevento. The exhibition will be held simultaneously at various places in the city centre: In the exhibition halls at the old S. Felice prison, seat of the Superintendency for Archaeological Heritage of Benevento, Avellino, and Salerno, and the ground floor (exhibition space and bookshop) of Palazzo Paolo V, seat of the representative of the Benevento Municipality. The planned date for the event is spring 2008. The running of the Exhibition “Langobardia Minor: Images and documents from the Duchy of Benevento” will be run by the Superintendency of Archaeological Heritage of Salerno, Avellino, and Benevento, and they will see to the scientific management, planning and setting up, in collaboration with the State Archives and BAPPSAE Superintendency of Benevento. Parties involved Municipality of Benevento Superintendency for Architectural Heritage in the provinces of Salerno, Avellino, and Benevento and BAPPSAE Superintendency of Caserta and Benevento. Phases and timescales First phase: by 2008 Second phase: by 2013 Financial resources To be found: € 300,000 from Campania Regional Authority Expected results Extension of involvement of all in cultural and training events Result indicators Number of visitors

AWARENESS BUILDING AND PROMOTION PLAN Benevento Territory Objective 27 IMPROVING CULTURAL PROMOTION ON THE SITE

Project 27.1 Laying out itineraries for the “Via Sacra Langobardorum” archaeological park Description Starting with the major sites already known along the route known as the Via Sacra Langobardorum, thematic itineraries will be defined. First of all places of worship will be included, such as the caves dedicated to the Archangel Michael, the bridges for crossing the rivers that have characterised the route since Roman times, following the ancient Via Traiana; the ancient stopping points, and the defence systems and fortifications. Parties involved Municipality of Benevento Benevento Provincial Authority Superintendency for Architectural Heritage in the provinces of Salerno, Avellino, and Benevento and BAPPSAE Superintendency of Caserta and Benevento. Phases and timescales First phase: By 2008 Second phase: By 31.12.2015 Financial resources First phase: Funds to be obtained from POR FESR 2007-2013, POR FSE 2007-2013 Campania Regional Authority Interregional Operating Program (POIN) “Cultural, Natural, and Tourist Attractions” Expected results Valorisation of the vast area of influence of Benevento. Result indicators Number of itineraries planned

321 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS BUILDING AND PROMOTION PLAN Benevento Territory Objective 27 IMPROVING CULTURAL PROMOTION ON THE SITE

Project 27.2 Implementing the tourist information system – augmented reality Description The idea behind the project, using knowledge of the historical archaeological characteristics of some areas of the city, including the extent and depth of archaeological layers, as well as the resulting safeguarding and valorising of the same areas, meets the need to create a tourist system that is currently lacking. The project provides for activating virtual networks to serve the tourist system by using innovative technologies for providing the user with information in situ. This initiative involves creating virtual reality modules that reconstruct the city’s monuments in various historical ages as well as the Roman and then Longobard plan of the city. Augmented reality means superimposing a computer generated virtual reality over the reality perceived by the subject, thereby providing additional information on the actual setting. The use of these technologies as tourist services that can be used via optic visors connected to a WiFi network could be based on a high quality database (photographs of all the facades of the buildings in the old city, recently taken by the Benevento Municipality as the basis for the Colour Plan), which, with the help of a GIS tool would make it possible to catalogue in detail the architectural elements on facades, stone fragments built into walls, wall textures, etc – within the ancient city. Parties involved Municipality of Benevento Benevento Provincial Authority Superintendency for Architectural Heritage in the provinces of Salerno, Avellino, and Benevento and BAPPSAE Superintendency of Caserta and Benevento. Phases and timescales First phase: By 2008 Second phase: By 31.12.2015 Financial resources First phase: To be done using “Local development” APQ funds for the feasibility study of the old city in Benevento of € 300,000. Second phase: Funds to be obtained from POR FESR 2007-2013, POR FSE 2007-2013 Campania Regional Authority Interregional Operating Program (POIN) “Cultural, Natural, and Tourist Attractions” Expected results Development of the TOURIST INFORMATION SYSTEM Result indicators Increase in spaces accessible and useable by tourists. Increase the overall number of visitors

AWARENESS BUILDING AND PROMOTION PLAN Benevento Territory Objective 28 INCREASING AWARENESS AMONG CHILDREN OF SCHOOL-GOING AGE

Project 28.1 Research and school teaching and a comic strip exhibition about Benevento in the Longobard era Description The creation of a network for studying the Longobard heritage is made up of various initiatives that involve students and experts in didactic lessons and research activities aimed at dealing with important documents and images. Presenting the artistic – cultural history of a city using alternative forms of recounting to canons, such as in the form of comic strips, makes it possible to easily get to users in the school-going age group. “Benevento in comic strips” or “Benevento a history of art” has this very aim. In addition, it has an artistic quality if one imagines developing it with the involvement of artists supported by experts in local history. Parties involved Municipality of Benevento Superintendency for Architectural Heritage in the provinces of Salerno, Avellino, and Benevento and BAPPSAE Superintendency of Caserta and Benevento. Phases and timescales First phase: by 2008 Second phase: by 2013 Financial resources POR FSE 2007-2013 Campania Regional Authority Expected results Extension of involvement of schools in cultural and training events. Result indicators Number of research activities launched. Number of readers reached

322 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

AWARENESS-BUILDING AND PROMOTION PLAN Monte Sant’Angelo Territory Objective 29 ENHANCEMENT OF TRAINING ACTIVITIES RELATED TO EDUCATION

Project 29.1 Projects to increase awareness on Heritage in relation to education (from primary schools to universities) Description The Project envisages: a) Training of teachers by planning refresher courses on specific topics connected to the Sanctuary of San Michele in relation to the Longobard culture and the heritage of Monte Sant’Angelo and its territory; b) Annual involvement of students coming from schools of any kind and level of the Provinces of Foggia and Bari in the study of the above-mentioned topics by promoting visits to Monte Sant’Angelo and its territory. c) Production of specific information material for young people Actions 1. Carrying out of refresher courses for teachers. 2. Planning cooperation with the schools concerned. Parties involved Municipality of Monte Sant’Angelo, Municipalities involved in the itineraries of the via Sacra Langobardorum, Mountain Community of Gargano, University of Bari, Centre for San Michele and Gargano Studies, Schools of any kind and level; regional museum network Phases and timeframe 2008-2009 Financial resources Funds to be raised by: Region Puglia; private funds Expected results Increase in the direct participation of young people in knowledge and promotion activities on UNESCO Heritage values Result indicators Number of schools and classes involved Number of organized visits to the properties of the Heritage and territory to prepare papers

AWARENESS-BUILDING AND PROMOTION PLAN Monte Sant’Angelo Territory Objective 29 ENHANCEMENT OF TRAINING ACTIVITIES RELATED TO EDUCATION

Project 29.2 Development of didactic and experimental activities Description The enhancement of information at university level requires the establishment of thesis competitions with special reference to the topics related to the Longobard heritage and territory Actions 1. Choice of topics Parties involved Municipality of Monte Sant’Angelo, University of Bari, Centre for San Michele and Gargano Studies Phases and timeframe 2008-2009 Financial resources To be defined for every single project – Funding: municipal, provincial, regional, private funds Expected results Better knowledge and participation of young people in the promotion activities of the Heritage and its territory Result indicators Number of institutions involved Number of carried out initiatives Number of participants Number of targeted publications and printed copies

AWARENESS-BUILDING AND PROMOTION PLAN Monte Sant’Angelo Territory Objective 30 ENHANCEMENT OF INFORMATION AND PROMOTION ACTIVITIES

Project 30.1 Study and implementation of publishing activities for promotion and public awareness Description The project envisages the production of information material on the Heritage and territory, namely tourist-cultural guides, maps, brochures, information boards, multimedia information material related to various Promotion, Public awareness and Enhancement initiatives. Among these: a) the site: “The origins of the Longobard Sanctuary of San Michele”; b) the “Via Sacra Langobardorum”; c) the visit routes: “The walls, the churches and the monasteries of Monte Sant’Angelo”; d) the museum network of Monte Sant’Angelo and bordering towns; e) visit routes inside the National Park of Gargano The documentary material produced in the context of the single projects of the Knowledge Plan

323 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

will be used in all initiatives. The Visitors Centre, now being established at the castle of Monte Sant’Angelo will act as a point of reference for these activities. Actions 1. Study and implementation of publishing initiatives for promotion and public awareness 2. Production and dissemination of material Parties involved Municipality of Monte Sant’Angelo, Municipalities involved in the itineraries of the via Sacra Langobardorum, Mountain Community of Gargano, University of Bari, Centre for San Michele and Gargano Studies; regional museum network; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of the Region Puglia, Tourism Board Phases and timeframe Starting from 2008-2009 Financial resources Funds to be raised by: Region Puglia; Province of Foggia and Bari; Municipality of Monte Sant’Angelo; private funds Expected results Improvement of visibility and knowledge of the Heritage Improvement of orientation services for visitors Result indicators Number of publications and multimedia information material Number of printed copies Number of installed information boards

AWARENESS-BUILDING AND PROMOTION PLAN Monte Sant’Angelo Territory Objective 30 ENHANCEMENT OF INFORMATION AND PROMOTION ACTIVITIES

Project 30.2 Improvement of web-related technological systems to put the Heritage on the web Description The project envisages the production of multimedia material for the strengthening of the already existing websites on Monte Sant’Angelo and its territory and the direct connection with the sites Italia langobardorum”, also through a virtual tour to the heritage through webcam. Actions 1. Project and implementation of programmes and multimedia material 2. Activation of a virtual tour to the site and webcam Parties involved Municipality of Monte Sant’Angelo, Municipalities involved in the itineraries of the via Sacra Langobardorum, Mountain Community of Gargano, University of Bari, Centre for San Michele and Gargano Studies, Phases and timeframe 2009-2011 Financial resources Funds to be raised by: Region Puglia; Provinces of Foggia and Bari; Municipality of Monte Sant’Angelo; private funds Expected results Providing visitors with an organic access and orientation system on the Heritage. Promotion of other tourist-cultural properties of the area Promotion of other places belonging to the site “Italia Langobardorum” Result indicators Number of activated contacts Number of planned visits starting from the Visitor Centre

AWARENESS-BUILDING AND PROMOTION PLAN Monte Sant’Angelo Territory Objective 30 ENHANCEMENT OF INFORMATION AND PROMOTION ACTIVITIES

Project 30.3 Enhancement of relations with information centres Description The project envisages the involvement of various information bodies and regional and national media to disseminate information related to the series of initiatives which concern the following aspects: knowledge, conservation, enhancement and promotion of the Longobard heritage. The objective is to enhance the effectiveness of information – both through targeted initiatives, according to the events carried out and through periodical information which contribute to arousing and increasing interest in the Longobard Heritage and relative projects. Actions 1. Launch of permanent relations with information bodies and regional and national media in order to produce an illustrative “bulletin” (also online) on the initiatives and the progress of knowledge 2. Study and carrying out of initiatives and targeted events dedicated to information, such as press conferences, interviews to Stakeholders 3. Organization of tours dedicated to information operators

324 8.4 AWARENESS BUILDING AND PROMOTION PLAN DETAILED SCHEDULES

Parties involved Stakeholders Information bodies Business associations and companies; Private citizens Phases and timeframe 2008 1, 2 2009 3. Financial resources Funds to be raised by Stakeholders and private funds Expected results Dissemination of information and raising awareness among the general public of the Values of the Site Dissemination of information and raising awareness of development projects of the Territory Result indicators Number of articles and services published on the press and broadcast on television Number of radio-television programmes dedicated to the Heritage and development projects of the territory

AWARENESS-BUILDING AND PROMOTION PLAN Monte Sant’Angelo Territory Objective 31 ENHANCEMENT OF PUBLIC AWARENESS ACTIVITIES

Project 31.1 Scientific and information meetings, seminars, exhibitions ands touristic tours Description The project aims at activating a coordinated series of interventions with the objective of raising awareness among local people on the Heritage and territory values. The activities will envisage the organization of scientific-information meetings open to the general public to be held both in Monte Sant’Angelo and bordering towns and a guided tour programme for the Heritage. In order to increase knowledge about Monte Sant’Angelo within the network, organized tours to other Longobard places of interest will be organized in cooperation with local cultural associations and service Clubs. An exchange programme on initiatives (exhibitions and seminars) with other sites will favour the dissemination of local specificities and common values of the Heritage. Actions 1. Intensification of coordination between local bodies and cultural associations in order to prepare an annual schedule dedicated to the promotion of the Heritage. 2. Definition of exchange programmes for public awareness initiatives (meetings, seminars, exhibitions, visits) with other places included in the network and other Longobard places of interest. 3. Preparation of an annual schedule for meetings involving the general public and business categories. 4. Continuation of the meeting programme organized by the Centre for San Michele and Gargano Studies 5. Planning of meetings in various sites of the Territory. 6. Planning of seasonal cycles of guided tours to the Heritage. 7. Organization and promotion of tours to enhance knowledge about the other properties of the Site. 8. Arrangement of exhibitions on the Heritage. Parties involved Municipality of Monte Sant’Angelo, Province of Foggia, Region Puglia, University of Bari, Centre for San Michele and Gargano Studies; regional museum network; BAPPSAE (Superintendence for Architectural, Landscape, Historical, Artistic, Ethno-Anthropological Heritage) of the Region Puglia, tourist companies, National Tourist Guides Association with relative regional sections Phases and timeframe Starting from 2008 Financial resources Funds to be raised by: Region Puglia; Provinces of Foggia and Bari; Municipality of Monte Sant’Angelo; private funds. Expected results Improved awareness and knowledge of the Heritage values Result indicators Number of institutions involved Number of carried out initiatives Number of participants in various initiatives

325

326 8.5 SOCIO-ECONOMIC A quality relaunch of the hospitality (see Awareness Building and DEVELOPMENT PLAN and services in the locations in the Promotion Plan). network provides for spreading a · Implementation of Information specific "Hospitality Culture", that is, an and Communication 8.5.1 NETWORK innovative system of contact with and Technologies (ICT) for the approach to those using the Heritage Network (see Awareness Building The Socio-Economic Development on the part of local operators in the and Promotion Plan). Plan involves a two-pronged action various sectors (hoteliers, restaurant owners, traders, craftsmen, etc.). A In particular, as far as the coordinating · The first level relates to the specific culture – regulated by a Code structure is concerned, this is made up planning guidelines adopted to of Conduct for the operators – to be of personnel in the Municipal give the overall site a uniform expressed in dealing with visitors and Administrations of the seven sites, structure and to create system that is of use for directing and specifically assigned to network efficiency in it. assisting them and for improving the activities. The structure will develop · The second level relates to the approach to both the Heritage and the its own organisation according to the projects that each location in the relevant territory, as well as their times and methods related to Site has developed, basing the endogenous resources (a goal that implementing the GECT (European way they are set up on integrated combines protection of the Heritage in Territorial Cooperation Group) for valorisation of the (material and sustainable terms). which more information in the immaterial) cultural and natural European partners will be required. heritage and sustainable Addition potential of the economic endogenic resources. system of the network made up of This structure will have a virtual base, locations in the Italia Langobardorum since the local offices will be The principal aim of the Socio- Site also comes from providing real connected using Information and Economic Development Plan is to services via the web (tourist packages, Communication Technological create an integrated Network-system bookings, hospitality services, e- instruments, such as a video- capable of representing, promoting, commerce for agroalimentary, wine conference system, database of and managing a complex combination and food, and editorial products); the information shared via the web, and a of activities in areas that are at some adoption of a brand that covers the shared interactive back office for the distance from one another and territory; bank-insurance cards; single portal for the serial site. structurally varied. exchange of typical quality products; organisation of events markets; The objectives of the Socio-Economic In principle, the general objectives upgrading and training of human Development Plan are as follows: pursued are therefore: resources to raise the quality level in the territories and to promote · OBJECTIVE 1 – · Realising the potentiality that innovative economic activity. Construction/enhancement of the emerges from the socio- net system finalized at orienting, economic analyses Following consolidation of the network regulating, organizing and · Identifying possible synergies linked to the Longobard Heritage as promoting (using the most · Translating potential and synergy the WHL candidate, further reinforcing advanced information and into sustainable activities to be of the “Italia Langobardorum” system communication technologies) the run in the network. is planned by extending the Network to cultural and research proposals other Italian and European locations stimulated by the Longobard The basic element of the integrated with a Lombard setting (“Extended heritage and transforming the system is the Longobard Heritage, as a Italian Network” and “European Geo- opportunities of the coordinated source of direct and indirect cultural Cultural Corridor”). projects of the socio-economic elements that can be translated into development of the territories. advantages and stimuli for economic The strategies for the planning outline activities: development of tourism and are based on some achievements that · OBJECTIVE 2 – Strengthening the technology; upgrading and are considered fundamental to Managing Authority of the implementation of structures and guarantee coordination of the Network Longobard network with the hospitality services; valorisation and activities: functions of supervising and upgrading of traditions as driving monitoring the functionality and elements for the new models of · Setting up of a specific the efficacy of the system and of sustainable agriculture; valorisation of coordination and management its cultural proposals as well as quality products that are typical of the structure for the Network of of socio-economic development territories; upgrading of services; and Longobard sites (see Chap 3) proposals also in relation to training of new entrepreneurs and · Establishing of a coordinated customer satisfaction. dedicated new companies. image and Network instruments

327 · OBJECTIVE 3 – Favouring the areas, for which there are different public-private initiatives for the instruments for supporting the running · Initiatives aimed at urban development of useful of socio-economic programmes / development; infrastructures, structures and projects and to help to professionalize · Optimisation of access to the services to provide the territories economic operators and create heritage and implementation of with suitable answers to the companies. In this regard, financing of tourist stays; requests of transport services, actions in the various locations will · Upgrading and relaunching of mobility and hospitality made by have a composite architecture, which landscape-cultural resources and the International public and all the means that the same action or the food and wine traditions; users. same project will use different funds – · Upgrading, management and community, national, regional, local, relaunching of complex · OBJECTIVE 4 – Creating and private – depending on agribusiness. (regional, national and European) usefulness. “Longobard Itineraries” so that 8.5.3 BRESCIA they become highly visible 8.5.2 CIVIDALE DEL FRIULI and Territory international channels for the and Territory study, the research but also for The Social Economic Development the awareness and promotion of The candidacy offers Cividale and a Plan was drawn up on the basis of the shared historical-cultural large part of the area of the Duchy of indications expressed by the Brescian values of the Longobard heritage Friuli the possibility of fully optimising General States of Economy and (Geocultural European Corridor), their Longobard heritage and of accepted in the Framework Agreement as well as instruments and building a local development system of Territorial Development (AQST) opportunities for tourist- around it, aimed at the upgrading and undersigned on 29 November 2007. economic interchanges and for relaunching of a territory that is filled The signees are: Region of Lombardy, organic and shared policies of with other exceptional historical- Province of Brescia, Municipality of regional, national and natural, cultural, specialised and Brescia, Chamber of Commerce, State international development and economic-productive values . University of Studies and Catholic planning. University which institutionally It must pointed out that the removal of participate in the meeting of the · OBJECTIVE 5 – Increasing the the borders with Austria and Slovenia, Brescian General States of Economy. quality and coordination of the together with the traditional relations hospitality system and related between the bordering territories – The Agreement is of strategic services, by drafting and distinguished for about 500 years by significance and importance and establishing rules and regulations the centrality of Cividale (capital of the foresees the realisation of 53 projects for the awarding of the brand Longobard Duchy, of the oriental of great social-economic impact aimed “Italia Langobardorum” Marchland of and of the at favouring the development of the Patriarchal State of Aquileia) - and territory in its different meanings: from · OBJECTIVE 6 – Creation of a strengthened by the strong trading the large infrastructures to the coordinated system for typical relations with the South East and valorisation of the human capital, from products and quality in the North Europe, favours renewed surge protecting health to sustaining agroalimentary and crafts lines, of transnational cooperation, aimed at employment, from the development of by drafting and establishing rules the sustainable development of a tourism to social cohesion, up to the and regulations for the awarding vaster area. sustainable use of resources in the of the brand “Italia territory and the implementation of Langobardorum The socio-economic development plan public services and technological for Cividale welcomes these prospects development. · OBJECTIVE 7 – Supporting and is therefore divided into goals and entrepreneurship and new consequent projects that run alongside In the management plan there is an professionalism related to the upgrading of the heritage inserted explanatory synthesis with the sustainable development of in the candidacy: the implementation integration of further projects. tourism of the endogenous resources of the area, creating new conditions for 8.5.4 CASTELSEPRIO-TORBA The schedules below lay out the socio-economic development, through and Territory objectives and projects required to initiatives for study, research and achieve them, broken down into direct training coordination and through the The framework that supports the and across the board projects. setting up of specific promotions of social-economic development Plan of the quality, traditions and knowledge the area of Varese – strongly One methodological pre-requisite is of the area. reinforced at an international level by that the various locations in the serial the values of the Heritage of site belong to different geographic The main goals of the area are: Castelseprio-Torba/Gornate Olona – is

328 given by some key elements of the prospects for sustainable development At the moment, a new trade plan for total planning: which are strengthened by the cultural medium and large shopping centres is and historical heritage as well as being studied. In the 13 production · Optimisation of interregional, landscape value vocation of the area. areas existing on the municipal international transport Tourism, culture, services and trade territory, expansion and requalification infrastructures operators are already cooperating in interventions are planned according to · Procedure of realisation of a close synergy with the Municipality – an “Integrated system of production Quality Brand for hotels and as lead body in the Project – in relation areas” which respects the combination restaurants (activated for to the places of identity, memory, of economy-environment, in collaboration of the provincial history and culture, the places of spirit accordance with sustainable Associations of category) to be and the props of sustainable development and in line with current co-ordinated with the foreseen development from the Cycle Track to European, national and regional territorial brand-umbrella of the the ex Railway Spoleto Norcia to the standards. Site “Italia Langobardorum” Olive Grove Path. · Training for tourist operators (improvement in the quality of The rules of the General Urban the offer from Varese in all tourist Development Plan – operational part – environments from hotel introduce new development accommodation to catering) opportunities aimed at strengthening · Protocol of agreement between the whole sector and entire economic the Chamber of Commerce and system. From the point of view of the Province of Varese – sustainable development, the thick undersigned in 2004 – for the network of tracks (practicable on foot, promotion and development of by bicycle and / or on horseback, e.g. the agricultural sector through Monteluco trekking, Martani Trekking, the realisation of common Giro dei Condotti, hermitage itinerary) initiatives, with particular is particularly interesting, as is the reference to the actuation of quality agri-food production. Quality policies, to planning and realisation of interventions for One of the priorities of the Socio- valorisation and promotion of Economic Development Plan is the local agro-food products, and to revival of the Historical Centre both participation in fairs on the through a new road system – in some agricultural sector. cases mechanized – and through the recovery of the existing building 8.5.5 SPOLETO heritage, for house, cultural, trade and and Territory also production purposes (see enhancement plan). The inter- In compliance with the guidelines directional project for the revival of the provided by the Region Umbria in the Historical Centre, through a thorough Development Plan 2, the main socio-economic, historical-cultural and objective of the socio-economic plan environmental analysis of the heritage, of the Municipality of Spoleto is to identifies new props for the enhance the identity of the territory: a development of production, cultural territory rich in historical-cultural, craft and tourist activities; these props are and naturalistic-landscape resources. identified in accordance with new tourist cultural routes in order to Through the Territorial Integrated enhance the utilization of the historical Project (PIT), Tourism–Environment– centre which benefits from a new road Culture sector, which is now in an system and the recovery of the public advanced implementation phase, the and private heritage. The main Municipal Administration summed up objective of the revival, from the point and integrated the programmatic of view of the economic approach, is framework defined by EU provisions a) the transformation of the Historical of the ex Objective 2, b) of the Centre into a natural trade centre in integrated development Project in the accordance with the bill for the areas hit by the Earthquake (PIAT), c) Regional Law on the revival of of the Rural Development Plan d) of Umbria’s historical centres. the Local Action Group (GAL) Umbria Valley and Sibillini, by opening new

329 8.5.6 CAMPELLO SUL CLITUNNO 8.5.7 BENEVENTO Western Christianity. Because of this and Territory and Territory connotation in particular, Monte Sant’Angelo has enormous potential After the earthquake of 1997, complex The main objectives to be continued for the reconstruction of a local planning also started in the territory of for the social-economic development development system – already Campello sul Clitunno, finalised to the of Benevento, in relation to valorisation strongly linked to the economy recovery, renovation, requalification projects of its cultural resources, are: generated by the Michaelic cult in the and relaunch of historical sites, · Improve mobility and past – and which today can be directed properties, productive activities ad accessibility to the historical towards the requalification and services, especially those connected to centre; relaunch of a territory rich in many one of the most important traditional · Valorise culture as an other exceptional historical- resources of the whole of Umbria: endogenous engine of naturalistic, cultural values and those tourism. development; of specialisations and economic- For the Municipality of Campello sul · Optimise the infrastructures for productive potential. Clitunno and its fascinating historical culture; Moreover, the possibility of starting up villages, but also for the enterprises of · Adapt and impro ve human integrated development processes on the tourism-hotel sector, catering, resources for the sustainable concrete areas, constantly wider, the characteristic agro -feed production valorisation of cultural assets. centre of which is the Michaelic cult, and artistic craftsmanship a season of leads to economic and social intensive activity has begun for the The identified formative project, in scenarios of great interest for the reorganisation of the total particular, foresees a formulation able valorisation of the site. The sole idea of accommodation “system” in the most to develop all the basic, instrumental, creating a network between all the modern and efficient way. managerial and organizational populated areas, locations, nations, In particular, both the laws on post- professionalism, in order to represent public and private organisations, earthquake reconstruction and the a concrete answer to the need to insert places of cult linked to the Archangel regional laws have allowed the more incisiveness to the formation- Michael which in some way can be Municipality and private subjects to territory-world of work, confronting traced back to their devotion or have a sum just short of 50 million the considerable potential for dedications at that time of great Euros, 15 million of which are engaged development, hardly utilized up to diffusion spread by the Longobards, or in a complex of integrated now. consequently to it, offers opportunities reconstruction projects but also The activation of the various courses, of virtuous harmony able to start up requalification and relaunch of the in synthesis, will allow the formation of development and valorisation territory in which there will be the professional figures connected to processes which cannot and must not conclusion of works and the full entry safeguarding of architectural, artistic be ignored. into operation of the new local and archaeological heritage, the The social-economic development development model in the last few promotion of cultural events and Plan of Monte Sant’Angelo therefore months of 2007 and in 2008. valorisation of the oenogastronomic encompasses these perspectives and Flanked to this commitment are the production of the territory. is formulated in objectives which adds parallel initiatives of optimising the the integration of other resources tourism-environment-culture chain 8.5.8 MONTE SANT’ANGELO which the territory expresses to the and agro-productive traditions, and Territory valorisation and requalification of the especially as far as the production of asset, creating innovative conditions olive oil is concerned, which The candidature of the Sanctuary of for the development of the Main characterises not only the local San Michele Arcangelo offers the city objectives which are: economy, but also the landscape- of Monte Sant’Angelo the opportunity · Improvement of accessibility to cultural mosaic of the area, acting as a of playing a leading part in the social the Heritage and increase in further element of tourist-economic economic system of the Gargano and tourist stays; attraction. It is useful to remember that the entire province of Foggia, · Initiatives finalised at the the olive tree groves in the Municipality correlated to the possibility of incre ase optimisation of the urban and of Campello occupy 350 hectares, and new valorisation of the tourist economic development system; which is 7% of the communal flows which already make this territory Requalification and relaunch of the territory. the main driving force of the tourist landscape of cultural resources, agro- sector of the region of Puglia. food and craftsmanship knowledge The fascination of the medieval period, (Saperi) and oenogastronomic focussed on the Longobard Traditions. population, has an extraordinarily striking impact in this land thanks to the Michaelic cult, which, in the Gargano, brings to life an unequalled harmony between Eastern and

330 8.6.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES FIELDS OBJECTIVES PROJECTS

NETWORK 1 1.1 DEVELOPMENT OF THE NETWORK Coordinating objectives, projects ECONOMIC SYSTEM and network actions

1.2 Creation of an integrated system for promoting hospitality and typical production activities 1.3 Joint running of promotional economic initiatives for the serial site 1.4 Creating a system brand

2 2.1 INCREASING THE QUALITY Creating a discipline for hospitality AND COORDINATION services and related (catering, bar) OF THE HOSPITALITY SYSTEM services, AND RELATED SERVICES and the related common brand 2.2 Creation of an automatic centralised system of hospitality services with an indication of the availability of beds and eating places 2.3 Creation of a system to monitor the services offered and measure customer satisfaction 3 3.1 SUPPORTING ENTREPRENEURSHIP Running training courses for AND NEW PROFESSIONALISM professional refreshing of economic RELATED operators TO SUSTAINABLE DEVELOPMENT and related employees in the tourism OF TOURISM market and typical agroalimentary products and crafts 3.2 Support with creating new entrepreneurship in the area of sustainable tourist development, and tourist services in particular 3.3 Running of training courses for creating new professionals in the tourism field

4 4.1 CREATION OF A COORDINATED Identification of typical products and SYSTEM FOR TYPICAL PRODUCTS, quality for the agroalimentary and crafts QUALITY IN THE lines AGROALIMENTARY AND CRAFTS LINES AND RELATED RESEARCH 4.2 Creation of regulations for producing typical, quality products of the Longobard network 5 5.1 CIVIDALE IMPROVEMENT OF ACCESSIBILITY Strengthening of railway infrastructures DEL FRIULI TO THE HERITAGE and connections and local public TERRITORY transports 5.2 Interventions to improve the road system

331 8.6.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES FIELDS OBJECTIVES PROJECTS

5.3 Strengthening of parking areas

5.4 Improvement of road signs 6 6.1 INCREASE OF OVERNIGHT STAYS Creation of differentiated tourist packages and offers 6.2 Creation of a network of historical buildings for conferences, exhibitions, cultural events to increase specialized tourism flows 7 7.1 DEVELOPMENT AND Requalification of the area where the ENHANCEMENT OF THE URBAN cement factory was located and PRODUCTION SYSTEM surroundings 7.2 Enhancement and relaunch of productive activities and new companies 8 8.1 REQUALIFICATION AND RELAUNCH Protection of agri-food traditions OF ENDOGENOUS RESOURCES and their use to economically relaunch innovative quality products

8.2 Activation of food and wine services and agricultural services for tourist- economic development 9 9.1 ENHANCEMENT OF TRAINING Retraining of human resources ACTIVITIES FOR HERITAGE- operating RELATED SECTORS at different levels on the Heritage 9.2 Retraining of human resources operating in accommodation facilities and services BRESCIA 10 10.1 TERRITORY IMPROVEMENT OF MOBILITY Realisation of automated light underground railway, in a viewpoint of integrated transport services

11 11.1 IMPROVEMENT OF ACCESS New motorway for fast and direct TO THE TERRITORY connection between Brescia and Milan (Brebemi) 11.2 Strategic optimisation of the civil airport of Montichiari 11.3 Motorway junction A4 – A21 – Airport of Montichiari 11.4 Railway optimisation Brescia – Iseo – 11.5 Motorway junction of Valle Trompia

12 12.1 OPTIMISATION OF TERRITORIAL “The sublimation of water” tourist TOURIST SYSTEM system

332 8.6.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES FIELDS OBJECTIVES PROJECTS

12.2 “Adamello” Interregional tourist system 12.3 “Garda bresciano” tourist system 12.4 “The rail road from Valle Trompia to Brescia” tourist system” 13 13.1 SUSTAINABLE DEVELOPMENT Actuation of integrated programmes OF TERRITORY of local development (PISL)

14 14.1 ECONOMIC ANIMATION Valorisation and promotion OF THE TERRITORY IN VIEW of local products linked to Longobard OF THE TURISTIC DEVELOPMENT Culture and the tourist offer

15 15.1 ECONOMIC ENHANCEMENT Reutilization and relaunch OF THE RESOURCES of endogenous resources OF THE TERRITORY

CASTELSEPRIO-TORBA 16 16.1 TERRITORY IMPROVEMENT OF ACCESSIBILITY Requalification and optimisation TO THE TERRITORY of the railway node of Varese

16.2 Realisation of the international railway Mendrisio-Varese-Malpensa 16.3 Realisation of north-east trunk road of Varese and completion of doubling the A8 motorway link 17 17.1 WIDENING OF TOURIST OFFER TO Study and realisation of tourist INCREASE DURATION OF STAY “packages” Culture-Nature/Co- ordination with the “Lakes and Alps” project 17.2 Improvement of the bike tracks and of the integrated bike-pedestrian track in the Provinces of Varese, Como, Lecco 17.3 Optimisation of the tourist counter at Malpensa intercontinental airport 18 18.1 OPTIMISATION AND Optimisation and co-ordination REQUALIFICATION of the “system” OF LOCAL TOURIST BUSINESSES and of the didactic Factory offer 19 19.1 ECONOMIC PROMOTION Co-ordination for the development OF AGRO-FOOD PRODUCTION of the territorial brand of reference AND QUALITY OENOGASTRONOMY 19.2 Co-ordination for the development of oenogastronomic tourism initiatives (oenogastronomy Facility) SPOLETO TERRITORY 20 20.1 IMPROVEMENT OF ACCESSIBILITY Enhancement of railway infrastructures TO THE HERITAGE and connections and public local transport 20.2 Interventions for an integrated transport system

333 8.6.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES FIELDS OBJECTIVES PROJECTS

21 21.1 URBAN REQUALIFICATION Creation of an integrated system AND DEVELOPMENT of production areas OF THE PRODUCTION SYSTEM

22 22.1 ENHANCEMENT Franciscan Itinerary – Olive Grove Path OF THE ENVIRONMENT AND THE NATURAL AND HUMAN- AFFECTED LANDSCAPE FOR ECONOMIC PURPOSES

23 23.1 ENHANCEMENT OF EXCELLENCE Development initiative of agricultural- AGRI-FOOD TYPICAL PRODUCTS productive and food and wine quality FOR ECONOMIC PURPOSES sectors “Spoleto Tipica”

24 24.1 INTEGRATED PROMOTION Recovery and reutilization of traditional OF THE TERRITORY methods and products AND PRODUCTS IN THEIR T 24.2 OURIST-ENVIRONMENTAL- Initiative for the integrated promotion of CULTURAL ASPECTS both territory and produce: “Spoleto, Piazza of Agricultural and Food Excellencies” 24.3 Recovery and requalification of traditional methods and products: creation of the brand “Spoleto Tipica” CAMPELLO 25 25.1 SUL CLITUNNO URBAN INTERVENTIONS Recovery and requalification of the TERRITORY TO INCREASE TOURIST STAYS medieval villages for the purposes of re-settlement and tourist hospitality 25.2 Realisation of pedestrian pathways, new roadways and parking in the area of the Sources of Clitunno Clitunno and related improving of the road system and signs 26 26.1 OPTIMISATION OF THE TOURIST Realisation of new complexes for ENTERPRISES IN THE TERRITORY hospitality and cultural initiatives

27 27.1 ECONOMIC PROMOTION Co-ordination for the development OF QUALITY AGRO-FOOD AND of the territorial Brand of reference OENOGASTRONOMIC PRODUCTION 27.2 Co-ordination for the development of initiatives for oenogastronomic tourism (oenogastronomy facility) BENEVENTO 28 28.1 TERRITORY IMPROVE MOBILITY AND ACCESS Completion and adaptation of the traffic TO THE HISTORICAL CENTRE plan; updating of the parking plan; realisation of tourist transport services

29 29.1 VALORISE CULTURE Insertion of Benevento AS AN ENDOGENOUS ENGINE in the Artecard Campania circuit OF DEVELOPMENT

30 30.1 OPTIMISE THE INFRASTRUCTURES Planning and realisation of a Congress FOR CULTURE Centre and a Theatre-tent

334 8.6.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES FIELDS OBJECTIVES PROJECTS

31 31.1 ADAPT AND IMPROVE HUMAN Activation of training courses for RESOURCES FOR SUSTAINABLE operators for marketing of cultural VALORISATION OF CULTURAL assets ASSETS 31.2 Activation of training courses of experts for the creation of businesses in the tourist section 31.3 Activation of a master in organisation of events and congresses 31.4 Activation of courses for training orientators and tourist guides

MONTE SANT’ANGELO 32 32.1 TERRITORY IMPROVEMENT OF ACCESSIBILITY Realisation of intermodal area TO THE HERITAGE with the creation of an overground railway through restarting the complementary Foggia – Handcraft- Industrial Zone of Macchia railway line and constructing a tourist arrival point 32.2 Realisation of a route alternative to the section of the trunk road 272 Monte Sant’Angelo -San Giovanni Rotondo 32.3 Implementation of consortium activities for the full utilisation of the Gino Lisa airport of Foggia as a favoured airport for tourist flows of foreign origin 32.4 Completion of the high-speed roadway network of Gargano in the section Mattinata – Vieste and internal road of connection with the trunk road 272 Monte Sant’Angelo-San Giovanni Rotondo 32.5 Realization of the Macchia Madonna delle Grazie – Historic Centre of Monte Sant’Angelo cableway 32.6 Interventions of improvement on the road network 32.7 Improvement of road signs 33 33.1 IMPLEMENTATION OF TOURIST Preparation of differentiated tourist STAYS “packages” and offers 33.2 Structuring of a plan to incentivate the creation of a receptive system

335 8.6.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES FIELDS OBJECTIVES PROJECTS

34 34.1 DEVELOPMENT AND OPTIMISATION Realisation of P.R.G. forecasts in OF THE URBAN PRODUCTIVE relation SYSTEM to the areas destined for craftsmanship production in the periurban area and relaunch of productive and new entrepreneurial activities

35 35.1 REQUALIFICATION AND RELAUNCH Safeguard ago-food traditions OF ENDOGENOUS RESOURCES and their use for the economic relaunch IN THE TERRITORY of innovative productions of quality

336 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Network Objective 1 DEVELOPMENT OF THE NETWORK ECONOMIC SYSTEM

Projects 1.1, 1.2, 1.3, 1.4 1.1 Coordinating objectives, projects and network actions 1.2 Creation of an integrated system for promoting hospitality and typical production activities 1.3 Joint running of promotional economic initiatives for the serial site 1.4 Creating a system brand Description The brand of the “Italia Langobardorum” system – owned by the Association of Stakeholders (or Body managing the network) – will have characteristics based on the indicators established by a focus group made up of experts nominated from within the Association and representatives appointed by the economic trade organisations. Companies that intend using the brand must formally accept to comply with the Regulations and Discipline for the economic category to which they belong, which is also to be drawn up by the focus group indicated above, as well as the Quality Model, Code of Conduct, and control system. The integrated system for promoting the activities that will be recognised in the system brand will be based first of all on the capacity to offer hospitality services and connected with high quality sales, especially in terms of technological innovation. The possibility of accessing all the information at any point in the system is the first characterising element: Access to the information will be available via any company that uses the brand, while financial and insurance services for the system of companies will be defined in the disciplines and will have a high added value. In addition, the system will be based in reciprocal conveyance of products. Each hospitality company or related service must have a shelf for typical products, while each typical products company is to provide detailed information on the hospitality services available in the areas involved. Promotion actions taken must be integrated and fall within a system. The logic is that of competitiveness with those outside the system by not within the system. The penetration capacity of products is interrelated with the penetration capacity of the cultural assets – tourist hospitality – typical products system. In this regard the Foreign Chamber of Commerce (Assocamere Estere) system will play a fundamental role as one of the system’s reference partners. Actions 1. Establishment of the Network Authority between the Stakeholders 2. Structuring the focus group of experts from the locations in the Site 3. Setting up of an integrated (structural) promotion system 4. Running of “system” promotional actions 5. Definition of the Regulations, Discipline, and conditions for granting use of the brand 6. Graphic design and registration of the brand 7. Implementation of the brand Parties involved Coordination structure Municipal Administrations Regional Authorities Provincial Authorities Stakeholders Universities, Research Institutes, and Regional Centres of Competence Chamber of Commerce – Foreign Chambers of Commerce Economic trade organisations Companies in the sector Phases and timeframe These actions will be carried out over a time span of January – June 2009 four years, broken down as follows: Structuring of territorial focus groups. Drawing up of the brand July – August 2009 Graphic design and registration August – November Implementation December 2009 – February 2010 Setting up the promotion system July 2010 – February 2012 Running promotion activities March 2010 – December 2012 Financial resources Euro 45,000,000 to be found Funds: UE, national, regional, local, and private Expected results Creation of an integrated system for promoting the site’s territorial system based on interconnecting the cultural assets, hospitality and related services, typical agroalimentary

337 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

products and typical crafts. Result indicators Number of companies using the system trademark Number of promotional initiatives run Number of promotional initiatives run via Assocamere Estero

SOCIO-ECONOMIC DEVELOPMENT PLAN Network Objective 2 INCREASING THE QUALITY AND COORDINATION OF THE HOSPITALITY SYSTEM AND RELATED SERVICES Projects 2.1 Creating a discipline for hospitality services and related (catering, bar) services, and 2.1, 2.2, 2.3 the related common brand 2.2 Creation of an automatic centralised system of hospitality services with an indication of the availability of beds and eating places. 2.3 Creation of a system to monitor the services offered and measure customer satisfaction Description The exceptional, unique nature of the Heritage facilitate the usefulness of raising the level of quality in the socio-economic contexts of the Site Locations, and to concentrate on setting up a quality model for hospitality and reception services, as well as hospitality related services. In the same way the plan is to codify the shared means of approach to and guidance of visitors by those working in hospitality, in order to provide the visitors with further stimuli for knowing about both the individual Locations and the Site as a whole. Regulating the hospitality and related services for “Italia Langobardorum” will specifically mean adopting a Quality Model and a specific Code of Conduct. Among other things, these instruments must identify innovative, high quality services to be proposed to tourists, especially as regards the use of Information and Communication technological instruments. As can be seen in the actions that follow, these regulations will be accompanied by the system trademark as specified in the across the board project illustrated below. Correct, systematic application of the regulations, controlled by means of a system for monitoring the services offered, will guarantee a high standard of quality for the services at the various sites. The level of service offered at every point in the network will also be assured by telematic linking of the structures, for constant updating of their availability. Actions 1. Structuring of territorial focus groups made up of representatives of institutions, economic categories, individual entrepreneurs, and experts in the sector, in order to gather proposals on the “Regulations for hospitality activities and related services” comprising a Quality Model and Code of Conduct. 2. Receiving proposals and drawing up draft regulations and a rough common trademark, to be submitted for approval by the associations and individual entrepreneurs in the sector, as well as the institutions involved. 3. Final definition of the shared Regulations and the Trademark and relevant adoption by part of participating entrepreneurs and institutions involved. 4. Connection of all the hospitality structures and related services that adopt the Regulations via the web, for real-time updating of quantitative and qualitative data on the availability of beds and eating covers, as well as other services offered in participating structures. This data will be conveyed via a single portal for the serial site and any other form of promotion that is undertaken. Visitors will be able to access the information in the system via serial system at any point, free of charge. 5. Adoption of customer-satisfaction instruments and monitoring system Parties involved Coordination structure Municipal Administrations Stakeholders Universities Chambers of Commerce Economic trade organisations Companies in the sector

Phases and timeframe These actions will be carried out over a time span of January – June 2008 about a year and a half, broken down as follows: Structuring of territorial focus groups. Receipt of proposals and draft regulations July – October 2008

338 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

Definition of regulations and related adoption November 2008 – April 2009 Connection lf the companies via the web December 2008 – June 2009 Creation of a customer satisfaction monitoring March – June 2009 system Financial resources Euro 1,000,000 to be found Funds: Community, national, regional, local, and private Expected results Adoption of an overall quality system and code of conduct for dealing with visitors that is homogenous and shared for the locations in the Site. Offer of hospitality and related services with a high technological content that are accessible from all points in the system. Result indicators Number of institutions involved Number of companies adopting the regulations Customer satisfaction monitoring over the period following implementation of the system, with quarterly checks and adoption of any necessary corrective measures and/or sanctions for non-compliance.

SOCIO-ECONOMIC DEVELOPMENT PLAN Network Objective 3 SUPPORTING ENTREPRENEURSHIP AND NEW PROFESSIONALISM RELATED TO SUSTAINABLE DEVELOPMENT OF TOURISM

Projects 3.1, 3.2, 3.3 3.1 Running training courses for professional refreshing of economic operators and related employees in the tourism market and typical agroalimentary products and crafts 3.2 Support with creating new entrepreneurship in the area of sustainable tourist development, and tourist services in particular 3.3 Running of training courses for creating new professionals in the tourism field Description The birth of the “Italia Langobardorum” Network and the consequent launch of the new tourism and cultural offer of typical local products, requires activation and use of innovative services. On the one hand this means updating existing economic operators and professionals, and on the other hand the activation of new entrepreneurship and professions. The projects included in this section are aimed at facilitating and stimulating the start of training courses for preparing entrepreneurs and professionals in the hospitality and related services, management of the cultural systems, information and communication, quality agroalimentary and wine and food products, publishing, and typical crafts. Another fundamental aspect of the actions to be taken in this regard is support of new entrepreneurship in the tourist sector in general and in innovative tourist services in particular. Forms of support will be identified for neo-entrepreneurs prepared to invest in this sector. This support will vary in term of geographic area and the financial instruments available (finding of FESR funds is a deciding factor). Actions 1. Structuring of focus groups made up of representatives of economic categories, individual entrepreneurs, local administrations, universities, and approved training bodies, for drawing up the training courses necessary for the actions in the system for socio-economic development. 2. Running of training courses for updating economic operators and employees of companies already in existence in the hospitality and related services, and quality typical products sector. These courses will be aimed at introducing innovative elements like the use of new information and communication technologies. 3. Running of training courses for starting new entrepreneurships and professions, and professional re-training for those employed in the sectors involved. 4. Promotion of the exchange of know-how between entrepreneurial undertakings in the Locations in the Site. 5. Definition and setting up of regimes to assist innovative activities in the area of sustainable development of tourism. Parties involved Coordination structure Municipal Administrations Regional Authorities Provincial Authorities Stakeholders Universities, Research Institutes, and Regional Centres of Competence Chambers of Commerce Economic trade organisations Companies in the sector

339 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

Phases and timeframe These actions will be carried out over a time span of January – June 2008 four years, broken down as follows: Structuring of territorial focus groups. Running of updating training courses for operators July 2010 – December 2012 Running training courses for new entrepreneurship July 2010 – December 2012 and professions Promotion of exchanges between entrepreneurial July 2010 – December 2012 undertakings Definition and setting up of assistance regimes for July 2010 – December 2012 new entrepreneurship Financial resources Euro 60,000,000 to be found Funds: Community, national, regional, local, and private Expected results Increase in the quality level of professionalism and the offer in specific sectors. Supporting launching of new entrepreneurship in innovative, sustainable tourist services. Result indicators Number of training courses Number of certificates issued Number of entrepreneurs trained Number of operators in the sector trained Number of economic operators trained Number of new professionals trained Number of new companies in the territories in the Site.

SOCIO-ECONOMIC DEVELOPMENT PLAN Network Objective 4 CREATION OF A COORDINATED SYSTEM FOR TYPICAL PRODUCTS, QUALITY IN THE AGROALIMENTARY AND CRAFTS LINES AND RELATED RESEARCH Projects 4.1, 4.2 4.1 Identification of typical products and quality for the agroalimentary and crafts lines 4.2 Creation of regulations for producing typical, quality products of the Longobard network Description The creation of a network of products that are typical of the locations in the site is one of the spin-off elements of candidacy, leading to and characterising the socio-economic development of the territories involved. The usefulness of opening to local agroalimentary and typical craft entrepreneurship is promoted by adopting an approach that tends to offer visitors guarantees as to the quality of the products offered and innovative services that give the products added value. Actions 1. Structuring of focus groups made up of representatives of the economic categories involved, from among entrepreneurs, local administrations, research institutes, centres of regional competence, and universities in the territories in the Site. 2. Identifying and studying typical products proposed by the focus groups and checking product quality by involving research institutes and universities. 3. Definition of product quality standards by drawing up regulations to be submitted for approval by the associations and individual entrepreneurs in the sector, as well as the institutions involved. 4. Final definition of the shared Regulations and the Trademark and relevant adoption by part of participating entrepreneurs and institutions involved. 5. Connection of all the companies that adopt the Regulations in the network, for real- time updating of data on quantities and quality of products available. This data will be conveyed via a single portal for the serial site and any other form of promotion that is undertaken. Visitors will be able to access the information in the system via serial system at any point, free of charge. 6. Adoption of customer-satisfaction instruments and monitoring system Parties involved Coordination structure Municipal Administrations Stakeholders Universities, Research Institutes, and Regional Centres of Competence Chambers of Commerce Economic trade organisations Companies in the sector Phases and timeframe These actions will be carried out over a time span of January – June 2008 two years, broken down as follows: Structuring of territorial focus groups.

340 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

Receipt of proposals and identification and study of July – December 2008 products. Definition of regulations and related adoption January – April 2009 Connection lf the companies via the web March – September 2009 Creation of a customer satisfaction monitoring September – December 2009 system Financial resources Euro 1,000,000 to be found Funds: Community, national, regional, local, and private Expected results Adoption of an overall quality system and code of conduct for dealing with visitors that is homogenous and shared for the locations in the Site. Offer of typical products of determined quality and use of innovative services that provide added value to what is on offer. Result indicators Number of institutions involved Number of companies adopting the regulations Customer satisfaction monitoring over the period following implementation of the system, with quarterly checks and adoption of any necessary corrective measures and/or sanctions for non-compliance.

341

342 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Cividale Territory Objective 5 IMPROVEMENT OF ACCESSIBILITY TO THE HERITAGE

Project 5.1 Strengthening of railway infrastructures and connections and local public transports Description As to the transport system, Cividale is provided with a railway connection to and from Udine, active since 1886. The creation of a new railway station outside the buffer-zone is under way in order to connect the area of the former cement factory (which will soon be requalified– see Socio-Economic Development Plan Cividale, Objective 2 Project 2.1) to the historical centre. Next to the railway station, a new intermodal centre will be created, in view of developing a transport system combining railway and road infrastructures and improving the local public transport. On the railway line structural and plant improvement interventions have been conducted in all stations, level crossings and a new station was created in San Gottardo (Udine). Two new locomotives were purchased and have recently become operational. The railway line Udine-Cividale is currently configured as a surface underground, with around 500,000 users/year and 14-minute travelling time between Cividale and Udine with 6 stops. Actions 1. Creation of a new railway station and renovation of the line 2. Creation of the intermodal Centre 3. Elimination of the existing level crossing Parties involved Municipality of Cividale del Friuli Province of Udine Region Friuli Venezia Giulia Ministry for Infrastructures and Transportf Sistemi Territoriali s.p.a. Phases and timeframe 1: beginning 2005, end 2007 2: beginning 2008, end 2009 3: first semester 2008 Financial Resources Euro 13,000,000 to strengthen the railway line Udine – Cividale allocated by the Ministry. The Municipal Administration contributed to the creation of a new station with a fund of € 500,000. € 1,500,000 for the intermodal centre, allocated by the Province of Udine and the Municipality of Cividale Expected results Increasing the functionality of the railway line Cividale – Udine and allow maximum level of combination between railway and road systems Result indicators Increase in the use of public transport means Improvement of the road system in the area close to the historical centre

343 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Cividale Territory Objective 5 IMPROVEMENT OF ACCESSIBILITY TO THE HERITAGE

Project 5.2 Interventions to improve the road system Description The build-up area of Cividale is an important transit area in the regional transport system, in particular for the connections with Udine in the South-West, with the Natisone Valleys and Slovenia in the North-East and with Gorizia and Trieste in the South-East. The urban traffic Plan, created in 1994 and updated in 2007 highlights the presence of a high traffic flow inside the historical centre. The new Municipal General Urban Development Plan aims at directing flows to ensure sustainability to the historical centre by redistributing traffic to external roads and creating new parking areas near the historical centre (see Socio- economic Development Plan Cividale Objective 1 Project 1.3).

Actions 1. Creation of new roads outside the buffer-zone 2. Creation of roundabouts at the main junctions outside the buffer-zone 3. Creation of cycle tracks 4. Implementation and updating of a new Urban Traffic Plan Parties involved Municipality of Cividale del Friuli – private citizens and companies Phases and timeframe Action 1 2008 - 2010 Action 2 2008 - 2010 Action 3 2009 - 2011 Action 4 from 2008 Financial Resources Euro 2,000,000 Source: municipal and private funds Expected results Improve functions and safety of road system Rationalization of the access system Result indicators Improvement of road system in an area close to the historical centre and reduction of traffic in the buffer zone

344 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Cividale Territory Objective 5 IMPROVEMENT OF ACCESSIBILITY TO THE HERITAGE

Project 5.3 Strengthening of parking areas Description The survey on demand and availability of parking areas highlighted that the town offers good facilities in the whole municipal area. However, the Municipal Administration aims at providing a substantial investment to enhance parking areas in the historical centre. The area, more than others, needs new car parks, especially for tourists, residents with no garage of their own and public offices, services and trade users: all these categories, unlike permanent employees and suburban residents, need parking areas as close as possible to the Historical Centre.

Actions For the buffer zone: a) in the North/ West At the Intermodal Centre, creation of 100 new parking spaces b) in the North/East Via delle Mura, creation of around 80 new parking spaces, of which 60 for cars and 20 for caravans c) in the North Area called “ex-Autonova”, creation of around 100 new parking spaces, to be added to the already existing 80 spaces d) in the South Borgo di Ponte, creation of around 50 new parking spaces, by demolishing the current structures/ laboratories of the Vocational Institute “IPSIA” e) in the North/ West Area near the shopping centre “Vidussi”, rearrangement and adjustment of the area currently used as a car park with around 50 parking spaces Parties involved Municipality of Cividale del Friuli Phases and timeframe In the North at the Intermodal Centre Beginning and end within 2008 In the North-East via delle Mura Beginning and end within 2009 In the North-East area called “ex-Autonova” Beginning and end within 2010 In the South Borgo di Ponte Beginning and end within 2012 In the North West area near the shopping centre “Vidussi” Beginning and end within 2009 Financial Resources Euro 3,200,000 Costs to be borne partly by the Municipal Administration and partly thanks to contributions by the Province of Udine and the Region Friuli Venezia Giulia Expected results Ensuring functionality and regulation of parking areas by responding to new tourist, trade, residential and service needs while, at the same time, improving accessibility to the Historical Centre and thus reducing traffic in it Result indicators Number of new parking areas compared to the existing

345 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Cividale Territory Objective 5 IMPROVEMENT OF ACCESSIBILITY TO THE HERITAGE

Project 5.4 Improvement of road signs Description At the moment the motorway and road systems of the Provinces of Udine and Gorizia are not adequately equipped as to orientation road signs towards Cividale. The project aims at solving the problem through agreements with supra-municipal bodies dealing with the road system and the rearrangement of road signs along the main roads and junctions of the area. Actions 1. Preliminary agreement between the Municipality of Cividale, ANAS (National Road Authority) and the Provinces of Udine and Gorizia 2. Creation of a mapping of motorway/road networks and of strategic and/ or sensitive areas for the traffic inflow to Cividale 3. Creation of road signs 4. Positioning of signs in strategic areas to indicate the most direct routes to Cividale Parties involved Municipality of Cividale del Friuli ANAS (National Road Authority) Province of Udine Region Friuli Venezia Giulia Phases and timeframe 2008-2009 1, 2, 3, 4 Financial Resources To be defined – Funding: municipal, provincial, regional Expected results More visibility of road access to Cividale Facilitation of tourist flows Result indicators Number of road signs installed Reduction of travelling times from strategic traffic junctions to Cividale

SOCIO-ECONOMIC DEVELOPMENT PLAN Cividale Territory Objective 6 INCREASE OF OVERNIGHT STAYS

Project 6.1 Creation of differentiated tourist packages and offers Description The project aims at increasing overnight stays through integrated tourist packages (itineraries on the territory) and differentiated offers for various periods of the year. Itineraries contribute to reduce tourism pressure on the Heritage by extending the benefits of tourism attraction to a broader area of Friuli Venezia Giulia. Differentiated offers aim at grasping various opportunities offered by Cividale and its territory during the year to plan tourist-economic offers also in periods different from the most popular ones (summer and spring) Actions 1. Agreements with local tour-operators for the definition of packages and alternative tourist offers at lower prices 2. Promotion of differentiated offers at national and international level 3. Start of cooperation with tour-operators and social, youth, student and religious tourism associations Parties involved Municipality of Cividale Superintendences Parish of Santa Maria Assunta Alpe Adria Food and Wine Centre Municipalities included in Longobard Itineraries of Friuli Venezia Giulia Business categories and associations Provinces of Udine, Gorizia, Pordenone, Trieste: Region Friuli Venezia Giulia Stakeholders Network Management Body Tour-operators ; Social, youth, school, religious tourism associations Phases and timeframe 2008-2009 and following 1, 2, 3 Financial Resources To be defined – Funding: municipal, regional, national, private funds Expected results Enhancement of the tourist offer on the Territory Increase in overnight stays Result indicators Increase in the number of tourists in accommodation facilities

346 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Cividale Territory Objective 6 INCREASE OF OVERNIGHT STAYS

Project 6.2 Creation of a network of historical buildings for conferences, exhibitions, cultural events to increase specialized tourism flows Description The richness of Cividale in prestigious historical buildings which can be used as venues for seminars, conferences, small and large exhibitions, music and literature festivals favours specific actions to promote integrated offers to Institutions, companies, or business associations, cultural Bodies and associations. These initiatives will determine an increase in the number of visitors and overnight stays of specialized tourist flows. Actions 1. Finding of places in Cividale and in the territory which are available for specialized tourism activities 2. Creation of coordinated illustration materials and their dissemination 3. Agreements with accommodation operators 4. Promotion activities of integrated economic proposals Parties involved Municipality of Cividale Superintendences; Parish of Santa Maria Assunta Alpe Adria Food and Wine Centre Municipalities included in Longobard Itineraries of Friuli Venezia Giulia Business categories and associations Provinces of Udine, Gorizia, Pordenone, Trieste; Region Friuli Venezia Giulia Stakeholders; Network Management Body Tour-operators; Social, youth, school, religious tourism associations Phases and timeframe 2008-2009 and following 1, 2, 3 Financial Resources To be defined – Funding: municipal, regional, national, private funds Expected results Enhancement of specialized tourist offer Increase in overnight stays Result indicators Increase in the number of tourists in accommodation facilities

SOCIO-ECONOMIC DEVELOPMENT PLAN Cividale Territory Objective 7 DEVELOPMENT AND ENHANCEMENT OF THE URBAN PRODUCTION SYSTEM

Project 7.1 Requalification of the area where the cement factory was located and surroundings Description The area, outside the buffer-zone, is located in the vicinity of the main access to the town. It is characterized by industrial buildings now in disuse, near the railway, and other buildings which are seriously physically and functionally damaged. Taking into consideration its strategic position, the area will be renovated and thus reused in order to improve the image of the access to the town in a new urban connection system. Among the possible uses of the area, new accommodation facilities for tourists will be created so as to enhance the existing. Actions 1. Creation of an area of office excellence or residential and commercial buildings. Parties involved Municipality of Cividale del Friuli; Banca Popolare di Cividale S.c.p.A.; Private companies Phases and timeframe The project for the rearrangement of the area was presented in 2007 and its completion is scheduled within three years. Interventions are going to start in 2008 Financial Resources Around Euro 70,000,000 Costs for the interventions to be borne by private citizens and companies Expected results Requalification of the production area now in disuse Creation of new office and commercial buildings Creation of new residential complexes Result indicators Cube meters of office buildings Increase of productive activities Cube meters of residential buildings available for the population Number of commercial activities

347 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Cividale Territory Objective 7 DEVELOPMENT AND ENHANCEMENT OF THE URBAN PRODUCTION SYSTEM

Project 7.2 Enhancement and relaunch of productive activities and new companies Description In order to relocate small companies operating in the historical centre and surroundings and to obtain new areas for other small companies, an area south of the trunk road no. 54 and the current industrial area was identified. The new location is functional both at connection level, because it is easily accessible from local roads and at landscape/ environmental level, thanks to a series of implementation strategies envisaged in the detailed Plan. The identified area stretches over a surface of 50 ha. Actions 1. Implementation of the Detailed Plan of Private Initiative of the new industrial/ small business Area 2. Creation of new industrial and small business plants Parties involved Municipality of Cividale del Friuli Consorzio Artigiano e Piccole Imprese di Cividale srl (Small Companies Consortium) Local companies Phases and timeframe Beginning 2007. Main urbanization interventions within 2010 Completion within 2015 Financial Resources Euro 4,700,000 for urbanization interventions, allocated by the Consorzio Artigiano e Piccole Imprese di Cividale Costs related to structures borne by private companies Expected results Meeting new settlement and repositioning needs of companies located in inadequate areas. Result indicators Number of improper activities moved from the historical centre Number of companies in the Territory Employment development

SOCIO-ECONOMIC DEVELOPMENT PLAN Cividale Territory Objective 8 REQUALIFICATION AND RELAUNCH OF ENDOGENOUS RESOURCES

Project 8.1 Protection of agrifood traditions and their use to economically relaunch innovative quality products Description The project aims at promoting new agri-food products based on recovery and reutilization of traditional methods and products. The preliminary research activity will be developed according to four main guidelines: a) Identification of agri-food, food and wine and Knowledge of the territory (interviews) and their cataloguing in a dedicated database b) Targeted research in the historical archives c) Verification of production processes related to tradition which have already been launched on the territory and support to new projects d) Support to protection initiatives relative to endemic plant species The cognitive phase – coordinated by a scientific and applied research centre (Observatory on the landscape-cultural heritage) – will follow the experimental and economic-promotional phase of agri-food high-quality products, produced with eco-friendly and sustainable methods inspired by Tradition. Actions 1. Studies on agricultural-productive micro-sectors and agri-food networks. 2. Coordination of research and actions though the Observatory on the landscape- cultural heritage 3. Identification / reconstruction of processes, production cycles, agri-food traditions and protection of endogenous species 4. Control and experimentation activities on points 1 and 3 5. Assistance to launch and economic promotion of innovative production Parties involved Department of Biology and Agricultural-Industrial Economics of the University of Udine University of Trieste, Nova Gorica, Lubiana Germplasm Bank of the Botanical Garden of the University of Padova [UNESCO WHL] Business associations Sector companies Region Friuli Venezia Giulia Phases and timeframe 2008 launch 1, 4 2009 - 2010 launch 2, 3

348 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES Financial Resources 1 Funding amounting to Euro 45,000, already acquired – Regional source 2, 3, 4, 5 Funds to be raised – Regional sources (Rural Development Plan), national, EU funds (Leader Plus; Life+; Interreg) Expected results Creation of the database Development of new company activities Coordination of requalification and relaunch actions of the agri-food and environmental sector Result indicators Operational launch of the Observatory Number of carried out actions Number of experimentations and new launched activities

SOCIO-ECONOMIC DEVELOPMENT PLAN Cividale Territory Objective 8 REQUALIFICATION AND RELAUNCH OF ENDOGENOUS RESOURCES

Project 8.2 Activation of food and wine services and agricultural services for tourist-economic development Description The objectives of the project correspond to the general objectives indicated in the Socio- Economic Development Plan of the Network. At local level a series of services will be created – through general cooperation (Alpe Adria Food and Wine Centre) – for tourist-economic development based on agri-food tradition of a territory which is a bridge among the Italian, Austrian and Slovenian cultures where food and wine production is constantly subject to new influence and adjustment. The function of the Food and Wine Centre is expected to be completed – according to the projects – with the parallel creation of agricultural services (showrooms for the promotion of typical quality products, of rural Districts, of rural tourism itineraries); of didactic- experimental greenhouses; of an essence and olfactory laboratory; of a promotion and experimentation centre for relations among food, health and wellbeing. Actions 1. Activation of the Food and Wine Centre 2. Creation of a specialized database on Alpe Adria recipe books 3. Activation of agricultural services for the didactic and commercial promotion of agricultural quality products, Districts and rural and food and wine tourism 4. Establishment of a specialized Visitor Centre coordinated with the Visitor Centre of Santa Maria in Valle 5. Promotion of food and wine traditions and their interpretations (Taste Laboratory) 6. Connection with the Vine and Wine Park Parties involved University of Udine Chamber of Commerce of Udine ITAS (Technical Agricultural Institute)“Paolino d’Aquileia” Business associations and companies Agricultural companies Banca Popolare FriulAdria Region Friuli Venezia Giulia Phases and timeframe 2008-2012 actions from 1 to 6 Financial Resources Euro 900,000.00 1, 2, 3 Regional (Rural Development Plan), national, EU (Leader plus, Life+; Interreg), private funds To be defined 4, 5, 6 Regional (Rural Development Plan), national, EU (Leader plus, Life+; Interreg), private funds Expected results Tourist attraction integrated with the Longobard heritage attraction Activation of agricultural services in favour of the territory Requalification of Natisone-Torre-Judrio Valleys at environmental and production level Result indicators Increase in specialized tourism flows Number of activated agricultural services Number of promoted initiatives

349 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Cividale Territory Objective 9 ENHANCEMENT OF TRAINING ACTIVITIES FOR HERITAGE-RELATED SECTORS

Project 9.1 Retraining of human resources operating at different levels on the Heritage Description The project envisages specific training courses for tourist guides dealing with the properties at different levels. Training and retraining courses must take into account the following: a) basic prerogatives of the Longobard Heritage of Places and territory b) prerogatives of the entire Site “Italia Langobardorum” c) general prerogatives of the Itineraries of the European geocultural Itinerary Training activities will be conducted in cooperation with universities and professional guides associations, UNESCO Club, BIT-Bureau International du Tourisme Social and other training bodies and social, youth and religious tourism recognized associations which – among other statute objectives – provide training activities. The activity will, in particular, focus on the Curators, Historians, Tourist Guides, Trainers categories with differentiated refresher courses. Special attention will be given to the training of Trainers which is a strategic way to allow a more effective and adequate didactic activity aimed at raising awareness and promotion of young generations on the values of the UNESCO Heritage and, specifically, on the values of Longobard culture and art. This section of the project envisages the adoption of specific interventions: I. in the context of compulsory refresher courses for teachers of any training body, starting from those in the territory of the Site “Italia Langobardorum” II. in the context of specific refresher initiatives promoted by the Site’s Stakeholders Actions 1. Agreement between training bodies and local stakeholders 2. Study and carrying out of differentiated training courses 3. Activation of courses Parties involved Stakeholders Universities of Udine and Trieste Professional guides association BITS- Bureau International du Tourisme Social UNESCO Club of Udine Youth Tourism Centre Association Card of Cividale Network Management Body Phases and timeframe 2008-2009: 1, 2 2009 launch 3 Financial Resources Funds to be raised by: Region Friuli Venezia Giulia; Provinces of the Region; private funds Expected results Enhancement of knowledge on the properties of the Heritage Network Enhancement of promotion of the Site “Italia Langobardorum” Increase in the quality of the approach to the Heritage and territories Result indicators Number of training courses Number of participants in courses

SOCIO-ECONOMIC DEVELOPMENT PLAN Cividale Territory Objective 9 ENHANCEMENT OF TRAINING ACTIVITIES FOR HERITAGE-RELATED SECTORS

Project 9.2 Retraining of human resources operating in accommodation facilities and services Description Despite the extraordinary unique and excellent value of the Longobard heritage, there is a rather low level of awareness and dedication among accommodation and services operators towards a dynamic and competent approach to guests and visitors. Taking into consideration the strategic importance of the creation of an adequate welcoming system, based on high quality services and able to act as a catalyst for the heritage and other resources of the territory, the project envisages the activation of several retraining courses for accommodation, service operators and training activities promotion operators to create a new specialized business class. Specific attention will be paid, also according to the strategic guidelines of the Network, to training activities related to the adoption of the Quality Model, of the Behaviour Code for the accommodation and service sector and of the Regulation for the utilization of the territorial umbrella-trademark of “Italia Langobardorum” (see Socio-Economic Development Plan Network Objective 1, Projects 1.1, 1.2; Objective 3, Projects 3.1, 3.2)

350 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES Actions 1. Agreements among local stakeholders, economic categories, universities and training bodies 2. Study and carrying out of differentiated training programmes (professional retraining of accommodation operators; training of new entrepreneurs of the sector) 3. Activation of courses Parties involved Stakeholders Universities of Udine and Trieste Chamber of Commerce Business associations and companies Companies UNESCO Club of Udine Network Management Body Phases and timeframe 2008-2009 1, 2 2009 launch 3 Financial Resources Funds to be raised by: Region Friuli Venezia Giulia; Provinces of the Region; private funds Expected results Qualitative enhancement of accommodation and service sectors Creation of new companies dealing with communication and cultural heritage management. Result indicators Number of training courses Number of participants in courses Number of new companies

351

352 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Brescia Territory Objective 10 IMPROVEMENT OF MOBILITY

Project 10.1 Realisation of automated light underground railway, in a viewpoint of integrated transport services. Description An underground railway with a route of 14km in communal territory, with the realisation of 17 stations of which 13 underground, creation of car parks near the stations accessing the city and integration with the other surface bus lines of Brescia Mobilità and with the Lam – high mobility lines. Realisation by: Ansaldo Trasporti Sistemi Ferroviari, Astaldi, AnsaldoBreda and Necso Entrecanales Cubiertas. The Metrobus, the new underground of Brescia, will become an important axis in the city public transport system, integrated by interchange car parks distributed in strategic points of the urban fabric. It is a completely automatic underground railway, with electric vehicles of a small size, without a driver on board, which travel on their own on protected track, separate from ordinary traffic (partly in tunnels, partly at ground level and partly in viaducts). Actions Excavation was chosen using the modern “shield” boring technique, the so-called “mole” because it digs like a mole does. This large machine, driven by export personnel and with sophisticated equipment, has a diameter of about 9 metres for a length of 120, it works underground with its rotating head and, automatically, consolidates and lines the circular dug tunnel with prefabricated material. All this continuously and silently, without the city realising, except for the external phases of building the stations. For further safety, the micro-stability of all the buildings on the path is continuously monitored. There is no interference with the archaeological layer and, should the water layer rise in the future, all the tunnel (as with all the other underground structures throughout the route) is integrally waterproofed Parties involved Brescia Mobilità. Also: Municipality of Brescia, Ministry of Infrastructures, Ministry of Transport, Region of Lombardy. Phases and timeframe by the end of 2012. Financial resources The expected cost of the work is a total of 750 million Euros, of which 284.4 million come from the State, 72.3 million from the Region of Lombardy, 67 million from the Municipality of Brescia and a thirty year mortgage of 240.3 million. Expected results a) protect the environment reducing atmospheric and acoustic pollution b) protect the conservation of historical monuments in the city and hinterland c) improve the liveability in the historic centre d) make the use of public transport convenient with the reduction of private circulation, also through integration systems and interchange between the various systems of public transport. e) improve connections between the various zones of the city, in particular the new areas of development (new exhibition facility, new residential areas etc.) f) improve integration and use of different means of transport: bus, railways, underground stations, private means g) contain the total costs (private and public) of the transport service h) increase the satisfied mobility on the urban system from 40 to 56 million passengers/year Result indicators Number of transported passengers, reduction in vehicular traffic pressure in the city and historical centre, air quality, liveability in the centre and metropolitan area

353 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Brescia Territory Objective 11 IMPROVEMENT OF ACCESS TO THE TERRITORY

Project 11.1 New motorway for fast and direct connection between Brescia and Milan (Brebemi). Description Realisation of the Brescia - Bergamo - Milan (Bre-Be-Mi) dual carriageway motorway between Brescia and Caravaggio, which will widen to three carriageways up to Melzo. Apart from the tow barriers, the new artery will have seven tolls. Of the total 50 kilometres, 17 will be trenched, 4 in a viaduct and 1.3 in underground galleries. The new motorway about 62 kilometres long, so-called “direttissima Brescia - Milano”, will be completely enlighten and will have fibre optic detection systems to guarantee real time traffic control. The total capacity of the BreBeMi will be of around 40-45 thousand vehicles each way. Actions 1. Junction of the 19 involved municipalities: , , , Chiari and Urago d' in the province of Brescia; Calcio, Antegnate, Covo, Fara Olivana con Sola, Fornovo San Giovanni, Bariano, Caravaggio, Calvenzano, Treviglio and Casirate d'Adda in the ; Cassano d'Adda, Truccazzano, Pozzuolo Martesana and Melzo in the area of Milan. 2. Realisation of the two barriers: one at Castrezzato and one at Cassano. 3. Creation of seven motorway tolls: Chiari, Antegnate-Calcio, Romano, Bariano, Caravaggio-Treviglio est, Treviglio ovest and Cassano d'Adda. Parties involved Brebemi Spa (awarded company composed of several motorway companies which benefit from concessions on the Lombard territory; from Autostrade Spa (35%), to Autostrada Brescia-Padova and Autostrade Centropadane (12.7% each one), as well as the company Milano Mare-Milano Tangenziali S.p.A. (ex Autostrada Serravalle Milano Chiasso), which holds a quota of 10%. The remaining quota belongs to a set of local Bodies and the Chamber of Commerce of Lombardy, to a total of 25.3%, and Banca Intesa with 3.8%). Also: Ministry of infrastructures; Regione Lombardia, CAL S.p.A., Province di Bergamo, Brescia, Cremona, Lodi, Milan and Municipalities involved in the route. Phases and timeframe Urgent realisation, works expected to start by 2009, conclusion of works by 2012. Financial resources The total cost of the project, including complementary road travel and financial charges, is 1,580 million Euros, charged to the private subject, the company Brebemi Spa, which on 18 April 2003 won the tender in project financing, promoted by Anas in December 2001. Expected results Its realisation has the purpose of lightening the traffic which exists today on the A4 Motorway Milan-Bergamo-Brescia, which constitutes one of the most critical road nodes in Italy. Result indicators Reduction in traffic on the A4, better fast connection Brescia –Milan

SOCIO-ECONOMIC DEVELOPMENT PLAN Brescia Territory Objective 11 IMPROVEMENT OF ACCESS TO THE TERRITORY

Project 11.2 Strategic optimisation of the civil airport of Montichiari. Description Interventions aimed at equipping and qualifying the airport not only as a cargo stop for merchandise, but also and above all as a primary facility for receiving passengers and servicing businesses, exhibitions and tourism, developing its potential and guaranteeing the role of intercontinental stop both for goods and above all passenger traffic. This objective is also valid in line with what expressly indicated by the Region of Lombardy as a future development strategy for the Brescian airport. Actions 1. Identification of priorities of intervention and definition of the general programme 2. Start up of the first cycle of interventions with the necessary programmatic agreements. Parties involved The company Brescia and Montichiari Airport S.p.A. (ABeM), Brescian Industrial Industries Association, Chamber of Commerce and Municipality of Brescia, Banks and Local Bodies. Phases and timeframe Starting from 2008 onwards. Financial resources Private and public funds equal to the importance of the foreseen investment. Expected results Full relaunch of the airport, integration with Orio al Serio and development of national, European and intercontinental routes. Result indicators Recovery of civil routes, increase in the number of travellers in the airport, increase in tourists in the provincial and regional area.

354 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Brescia Territory Objective 11 IMPROVEMENT OF ACCESS TO THE TERRITORY

Project 11.3 Motorway junction A4 – A21 – Airport of Montichiari. Description Completion of the Ring Road comprising the SP 19, rationalisation of radial traffic flows converging towards the main town but not going into the city, rapid service for the airport of Montichiari. The route foresees a motorway junction between the toll of the A4 Milan- motorway and the new toll of San Zeno planned along the A21 Turin-Brecisa motorway, with the transformation of part of the route of the SP19 into a dual carriageway motorway. It is in strict functional continuity with the foreseen direct connection “BreBeMi” to the West and with the “A4” motorway to the East, constituting a key infrastructural arch for road travel on corridor “5”. It makes road communication with Montichiari airport easier and faster. The total length of the operation is 30km. Actions 1. Initial completion is foreseen, with separate carriageways, of the section /. There will then be requalification, with the carriageway being doubled, of the section Ospitaletto/Capriano del Colle. Parties involved Autostrada Centro Padane s.p.a. Also: Ministry of Infrastructures, ANAS, Province of Brescia, and Municipalities territorially involved. Phases and timeframe Works begin in 2008 and end in 2011. Financial resources The total investment is expected to be 296 million €. Financial cover is insured by the Company Autostrade Centro Padane. Expected results Strategic implementation of motorway services in the area directly involved with the civil airport of Montichiari to reach, together with the foreseen interventions regarding railways with high capacity lines, making it one of the central airports by geographic position in the area of North Italy and one of the most important at European level for the volume of passenger and goods transport. Result indicators Development of air traffic in Montichiari airport, consequent better management of local flows on road and rail, advantages in regional road circulation.

SOCIO-ECONOMIC DEVELOPMENT PLAN Brescia Territory Objective 11 IMPROVEMENT OF ACCESS TO THE TERRITORY

Project 11.4 Railway Improvement Brescia – Iseo – Edolo. Description Total requalification of the public transport system of . Requalification and optimisation of the public transport system, rail and road, with execution of call to tender for awarding automobile services in respect of the national and regional directives in force, with the objective of reaching the activation of an integrated system which has as its strongpoint the railway line Brescia – Iseo - Edolo flanked by a series of lines for road travel organised so that interchange is favoured and offering a wider coverage of citizen mobility requirements even with contained management costs. Actions A. Interventions on rolling stock 1. Revamping of 8 railcars (air conditioning, seating and livery) 2. Purchase of 12 new trains 3. Renewal of bus fleet B. Interventions on the infrastructures 1. Interchange centre of Iseo 2. Interchange centre of 3. Interchange centre of Darfo Boario 4. Interchange centre of Breno C. Interventions of planning the TPL service 1. Analysis of existing automobile lines and re-planning according to integration with the railway line (e.g. suppression of duplications) 2. Planning of the service at intervals on the railway line 3. Planning of bus line times connected with the interchange lines 4. Definition of the new integrated tariff system to valid zones both for road and rail services. Parties involved Province of Brescia Also: Ministry of Transport, Region of Lombardy, LeNord S.r.l., Ferrovienord S.p.A. Phases and timeframe Different for each formulated phase of the project. The foreseen interventions are expected to end by 2010. Financial resources The foreseen investment is about 30-35 million €. Rolling stock (to be raised on capital

355 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

account) and indicatively up to a maximum of 1.5 million € per annum for optimising the service. Costs are charged to the Region of Lombardy, Province of Brescia and the State. Expected results Increase in passengers of the public service, reduction of vehicles, more customer satisfaction, minor management costs and service more in respect of environmental needs. Result indicators Number of passengers, reduction of vehicles, increase in tourist data.

SOCIO-ECONOMIC DEVELOPMENT PLAN Brescia Territory Objective 11 IMPROVEMENT OF ACCESS TO THE TERRITORY

Project 11.5 Motorway junction of Valle Trompia. Description Realisation of the motorway junction connecting the A4 Milan – Venice motorway at Valle Trompia, with a total length of about 37km. This intervention is known to be of pre-eminent national interest, the works of which will be realised in two functional parts which gather together the interventions finalised at raising safety standards and favouring better roadway flow in Valtrompia. The approved executive project, in the total design of the A4 Motorway and Valtrompia Junction, realises the itinerary between the motorway toll of Ospitaletto and that in programme for . Actions 1st Lot: Construction of section /Sarezzo and connection Concesio/SP 19 towards ; 2nd Lot: Requalification exits SP 19 (Ospitaletto, , Rodengo Saiano, Gussago); requalification section SP 19 from Ospitaletto to Rodengo Saiano and from Gussago to Concesio; requalification exit ex SS 510/SP 45 in ; 3rd Lot: Requalification section SP 19 from Rodengo Saiano to Gussago and doubling of tunnel of Gussago; 4th Lot: Construction of section Concesio/Brescia and requalification of west Brescia by-pass. Parties involved Anas s.p.a. Also: Ministry of Infrastructures, Province of Brescia, Mountain Community of Valle Trompia, territorially involved municipalities, Società Autostrade BS/PD Serenissima. Phases and timeframe The work is urgent, but realisation times are not yet exactly defined. Financial resources The total foreseen investment is € 769,318,709.00 mostly charged to the Company Autostrade BS/PD Serenissima and Anas s.p.a. Expected results More flow and facility of access from and to Valle Trompia, now served by a single road node, one of the most congested in Europe. Advantages for users, commercial activities and inhabited centres now crossed by uninterrupted road traffic, mostly heavy. Result indicators Decongestion of the Valtrompia trunk road, improvement of road service from and to Valle Trompia, reduction of vehicular mass in inhabited centres.

SOCIO-ECONOMIC DEVELOPMENT PLAN Brescia Territory Objective 12 OPTIMISATION OF THE TERRITORIAL TOURIST SYSTEM

Project 12.1 “The sublimation of water” tourist system Description Tourist system which proposes the promotion of tourist attractions of a vast area, comprising Low and Mid Val Canonica, Val di Scalve, Val Cavallina, the Sebino, Val Calepio and Franciacorta. Characterised by the common presence of water in its different forms: from snow in the mountains of Valle Camonica, to the thermal baths and to lakes. The system programme, as foreseen by regional law 8/2004, proposes a synthesis of the set of programmes, projects and services orientated at tourist development in the territory and the integrated offer of cultural, environmental assets and tourist attractions, including characteristic products of local production and oenogastronomy. Many projects valid for tourism have been inserted into the system programme, they were already identified in the different tools of local programming (PISL, programme Agreements, planning mountain communities, area Plans, etc.). Actions 1. The tourist development programme identifies a total of 585 projects. As this is an articulated programme, the degree of definition varies from project to project. Parties involved Secas Spa Also: Province of Brescia, Province of Bergamo, territorial Agency for tourism in Val Camonica, Province and Chamber of Commerce of Bergamo, Mountain Communities, 80

356 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

Municipalities, 2 Park Authorities, 43 private subjects in the territory of Bergamo and 47 private subjects of the Brescian territory Phases and timeframe Different for each project inserted in the tourist development programme. Realisation is foreseen of a first set of 236 projects in the three year period 2006 – 2008. The total programme has a medium-long term period perspective. Financial resources The total cost of the 585 identified projects is more than 400 million €. Potential financing sources are various and vary according to the type of project (regional law 8/2004, FRISL, Law 36/88, PICS, community planning, negotiated planning tools, etc.). Expected results Qualification and development of cultural and lake tourism and environmental and sporting, which is the realisation of infrastructural projects (roadway system, car parks, bicycle paths). Result indicators Increase in tourist data, improvement of use of the locations, creation of infrastructures adapted to the purposes.

SOCIO-ECONOMIC DEVELOPMENT PLAN Brescia Territory Objective 12 OPTIMISATION OF THE TERRITORIAL TOURIST SYSTEM

Project 12.2 “Adamello” interregional tourist system. Description Tourist system which proposes the valorisation of tourist excellence in the interregional land of Adamello – Passo del Tonale, which includes the six Brescian municipalities of High Valle Camonica and the Trentine municipality of Vermiglio. The reference territory of the “Adamello” tourist system is characterised by a ski station which extends over a drop of over 2000 metres, equipped with almost 100km of runs. Moreover, there is significant potential for development of other forms of tourism (naturalistic, sporting, cultural, etc.) from the viewpoint of deseasoning of presences. The tourist system, as foreseen by regional law 8/2004, proposes a synthesis set of programmes, projects and services orientated to tourist development and to the integrated offer of cultural, environmental assets and tourist attractions, including characteristic products of local production and oenogastronomy. Many projects valid for tourism have been inserted into the system programme, they were already identified in the different tools of local programming (PISL, programme Agreements, planning mountain communities, area Plans, etc.). Actions 1. The tourist development programme identifies a total of 93 projects. As this is an articulated programme, the degree of definition varies from project to project Parties involved Consortium Adamello Ski Also: Region of Lombardy, Province of Brescia, Municipality of Vermiglio in the independent province of - Municipality of , Municipality of , Municipality of , Municipality of Temù, Municipality of Vezza d’Oglio and Municipality of , in the province of Brescia – Union of the Municipalities of High Valle Camonica, individual and associated Enterprises. Phases and timeframe Different for each project inserted in to the tourist development programme. Total realisation is foreseen by 2008. Financial resources The tourist development business plan comprises 93 projects for a total investment of circa 126 million €. Potential financing sources are various and vary according to the type of project (municipal planning, regional law 8/2004, FRISL, Law 36/88, PICS, negotiated planning tools, etc.). Expected results Development of winter tourism, strongpoint of the Adamello Ski area which includes the most important ski stations of the Alpine arch; green tourism, particularly connected to mountain bikes, optimising the Adamello Bike Arena and similar agonistic manifestations and the historical-cultural flow referred to as the White War, with the valorisation of specific topical pathways. Result indicators Increase in tourist data, improvement of use of locations and creation of infrastructures adapt to the purposes.

357 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Brescia Territory Objective 12 OPTIMISATION OF THE TERRITORIAL TOURIST SYSTEM

Project 12.3 “Garda bresciano” tourist system. Description This tourist system proposes the integration and valorisation of tourist resources of the Garda riviera in the Brescian area, Valtenesi, Parco Alto Garda and the Morenic hills. The programme foresees evolution towards the interregional system of Garda, continuing the projects and initiatives already promoted by the Region of Lombardy through the resources set to be valid by law 135/2001. The tourist system of Brescian Garda, as foreseen by regional law 8/2004, proposes a synthesis of the set of programmes, projects and services orientated at tourist development in the territory and the integrated offer of cultural, environmental assets and tourist attractions, including characteristic products of local production and oenogastronomy. Many projects valid for tourism have been inserted into the system programme, they were already identified in the different tools of local programming (PISL, programme Agreements, planning mountain communities, etc.). Actions 1. The tourist development programme identifies a total of 135 projects. As this is an articulated programme, the degree of definition varies from project to project. Parties involved Riviera del Garda territorial agency for tourism Also: Province of Brescia, Consortium Riviera dei Limoni, Consortium, Riviera dei Castelli, Consortium Riviera del Gardaand Morenic Hills, 20 Municipalities, Mountain Community Parco Alto Garda, private subjects, Region of Lombardy. Phases and timeframe Different for each project inserted in to the tourist development programme. Total realisation is foreseen by 2008. Financial resources The total investment of 135 projects is more than 95 million €. The Region of Lombardy has financed 4 projects for a sum of about 0.8 million € while the other projects in the programme are financed to be valid on regional, national and communitarian resources. There will be annual monitoring on the total progress of the programme. Expected results Qualification of tourist services in the area of Brescian Garda and for promoting the “Garda tourist product”, one of the most known, visited and appreciated locations by national and international tourism. Projects aimed at differentiating and continuing the quality of the tourist offer in its different components, both of lake and mountain: the naturalistic environmental, landscape and cultural attraction and local economic fabric, with particular attention to products and services of agriculture both for small businesses and commerce, tourist reception and activities and complimentary services (catering, sport, recreation, etc.). Also to favour the consolidation, re-organisation and infrastructuring of the whole lake bank, from Gardone ato Limone, in its naturalistic and anthropic aspects – with projects of recovery and valorisation of the centres or historical nuclei – in as much as a defining area of interest for the tourist development of the whole area. Result indicators Increase in the national and international tourist data, improvement of use of the locations, conservation and valorisation of sites and resources, creation of infrastructures adapt tot eh purposes.

SOCIO-ECONOMIC DEVELOPMENT PLAN Brescia Territory Objective 12 OPTIMISATION OF THE TERRITORIAL TOURIST SYSTEM

Project 12.4 “The rail road from Valle Trompia to Brescia” tourist system Description “The rail road from Valle Trompia to Brescia” tourist system, finalised at the valorisation of historical and artistic assets of the city of Bresica, of the riverside of river , of the memory of industrialisation and work (industrial archaeology) in the sites and museums of Valle Trompia. The tourist System, as foreseen by regional law 8/2004, proposes a synthesis of the set of programmes, projects and services orientated at tourist development in the territory and the integrated offer of cultural, environmental assets and tourist attractions, including characteristic products of local production and oenogastronomy. Many projects valid for tourism have been inserted into the system programme, they were already identified in the different tools of local programming (PISL, programme Agreements, planning mountain communities, programme agreement etc.). Actions 1. The tourist development programme identifies a total of 145 projects. As this is an articulated programme, the degree of definition varies from project to project. Parties involved Mountain Community of Valle Trompia.

358 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

Also: Municipality of Brescia, Province of Brescia, Brescia Tourism, 17 municipalities adhering to the Mountain Community of Valle Trompia plus the municipality of , individual and associated companies, other private subjects. Phases and timeframe Different for each project inserted in to the tourist development programme. Total realisation is foreseen by 2008. Financial resources The tourist development business plan comprises 145 projects for a total investment over 62 million €. Potential financing sources are various and vary according to the type of project (regional law 8/2004, FRISL, Law 36/88, PICS, negotiated planning tools, etc.). Expected results Structuring and promotion of tourist services in Valle Trompia, starting with the ancient rail road, highlighting the antique Valtrumpline attitude on work and commercialisation, in connection with historical and artistic assets, assimilated by content, of the city of Brescia. Qualification of the tourist services in the area with projects aimed at differentiating and continuing the quality of the tourist offer in its different components: with particular attention to products and services of agriculture both for small businesses and commerce, tourist reception and activities and complimentary services. Result indicators Increase in the national and international tourist data, improvement of use of the locations, conservation and valorisation of sites and resources, creation of infrastructures adapt tot eh purposes.

SOCIO-ECONOMIC DEVELOPMENT PLAN Brescia Territory Objective 13 SUSTAINABLE DEVELOPMENT OF THE TERRITORY

Project 13.1 Actuation of integrated programmes of local development (PISL). Description Actuation of various and important integrated programmes of territorial development (PISL) in Valle Camonica, Valle Trompia and Valle Sabbia, based on environmental sustainability, development and valorisation of landscape, historical and artistic resources, inversion of demographic trend, interventions for giving rise to opportunities of work especially in tourism with new proposals of itineraries. Titles and leading concepts of the 14 integrated projects for local development: 1. INTEGRATED PROGRAMME OF LOCAL DEVELOPMENT – UNION OF THE MUNICIPALITIES OF THE ALTA VALLE CAMONICA Sustainable tourist development and optimisation of local tourism as a lever in the development of inversion in demographic trend 2. S.T.A.R.T. (Sci, Turismo, Ambiente, Risposta al Territorio – ski, tourism, environment, response to territory) Implementation of the level of qualification and equipping of the territory valorising potential for more tourist attractions. Development of sustainable tourism 3. THE RAIL ROAD AND NATURALISTIC HISTORICAL ROUTES Strategy of valorisation and qualification of environmental, historical and cultural excellence in the territory for relaunching the integrated tourist offer and over the four seasons 4. INTEGRATED PROGRAMME OF LOCAL DEVELOPMENT – UNION OF THE MUNICIPALITIES OF CETO, AND Social-economic development shared among public operators and social parties in a series of interventions able to valorise environmental and cultural resources in the perspective of relaunching tourism in the area 5. THE LAKE AND MOUNTAINS OF GARDA: QUALITY INTERNATIONAL TOURISM Integration between lake and valleys, able to define, in productive and tourist terms, the total development of the territory 6. IRON, FIRE AND WATER Rediscovery of the traditions of working iron and natural resources (water in particular) typical of the territory 7. VALORISATION OF THE ENVIRONMENTAL, CULTURAL AND ARCHAEOLOGICAL HERITAGE OF ALTOPIANO DEL SOLE Relaunch of local economy through tourism to solve depopulation problems and lack of work for young people. 8. INTEGRATED PROGRAMME OF LOCAL DEVELOPMENT OF CONCARENA Valorisation of the tourist offer and protection of environmental and historical heritage and local traditions 9. ENVIRONMENTAL TOURIST DEVELOPMENT Optimise and valorise existing tourist vocations 10. A NEW IDENTITY FOR VALLE SABBIA: ENVIRONMENT, CULTURE AND TOURISM Change the image of the Valley for the Future

359 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

11. VALORISATION OF THE ENVIRONMENTAL, CULTURAL AND ARCHAEOLOGICAL HERITAGE OF THE DISTRICT OF EDOLO AND SONICO Activate a common development policy founded on the optimisation of the territory’s tourist attractions 12. OF PARCO DEL BARBERINO AND OF VALLE DEI MAGLI Valorisation of total opportunities of the territorial context referring to the Municipalities through the creation of organised, equipped and promoted tourist routes, which allow the tourist to enjoy a diversified and widened offer. 13. ENVIRONMENTAL, CULTURAL AND RELIGIOUS TOURISM IN THE MID VALLE CAMONICA Realise tourist routes constituting the same natural, cultural, environmental and religious attractions and which collectively allow, especially for young people, finding work in loco, no longer exclusively linked to traditional work, but primarily to tourism. 14. P.I.S.L. of Valsaviore Favour settlement of population and favour settlement of economic activities: valorise natural resources, requalification of the tourist system and re-organisation of the urban system. Actions The tourist development programme identifies a total of 14 projects. As this is an articulated programme, the degree of definition varies from project to project. Parties involved Union of the Municipalities of Alta Vallecamonica, Municipality of , Mountain Community of Valle Trompia, Union of the Municipalities of Ceto, Cimbergo e Paspardo, Mountain Community of Parco Alto Garda Bresciano, Municipality of Casto, Municipality of Borno, Municipality of , Municipality of , Mountain Community of Valle Sabbia, Municipality of Edolo, Municipality of , Municipality of , Union of the Municipalities of Valsaviore. Also: Region of Lombardy, Province of Brescia, local Authorities of the involved territories. Phases and timeframe Different for each project inserted in to the tourist development programme. Total realisation is foreseen by 2008. Financial resources The total investment for the 14 projects is €107,413,459.26. Financing funds come from the European Regional Development Fund (FESR), the Italian State and Region of Lombardy. Expected results Innovation and qualification of tourist services in the various areas subject of the integrated intervention, in respect to the unambiguousness of the territorial reference, the necessary responsibilisation of the involved local authorities and the sustainability of the projects carried out. Inversion of demographic trend to depopulate, especially in mountain area communities and capability of developing new local employment. Particular attention to products and services in small business agriculture and commercial, and to complementary activities and services. Result indicators Inversion in the trend to depopulate in urban areas, increase in local employment, growth and development of social services and tourist infrastructures, accommodation and museums.

SOCIO-ECONOMIC DEVELOPMENT PLAN Brescia Territory Objective 14 ECONOMIC ANIMATION OF THE TERRITORY IN VIEW OF THE TURISTIC DEVELOPMENT

Project 14.1 Valorisation and promotion of local products linked to Longobard culture and the tourist offer. Description The activity of valorisation of cultural, environmental and landscape heritage run by each municipality and recently promoted in the perspective of districts and co-ordinated by the Promotions Agency of the Brescian plain, constituted by the Province of Brescia, must now raise the quality bar in order to exploit the economic added value of the heritage of Longobard evidence in the territory. This set-up requires entering into the network, didactic and divulgative readability and usability of the knowledge and evidence of Longobard people and Lombardy, but also of the entire national community. It also requires setting up organisational systems to mobilise all the resources in the territory and finalises their specific validity according to the valorisation of Longobard testimonials, so that they can become a promotional brand for a significant process of territorial marketing, capable of promoting economic development in the entire area identified as Langobardia fertilis.

Actions 2. Organisation of historic-cultural and oenogastronomic tourist routes which lead to the rediscovery of signs of the presence of Longobard people in the territory of Brescia, appreciating the products and gastronomic offer of local tradition which

360 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

plunges its roots into the same food culture of Longobard ascendancy. 3. Promotion of initiatives aimed at operators in the sector of catering for the rediscovery of local traditional dishes 4. Organisation of the network of hotel and agri-tourist offer specialised in the service to the “longobardanist”. 5. Preparation and entry into the network of the programming of cultural and promotional initiatives organised in the territory. Parties subjects Ministry for Cultural Assets and Activities Region of Lombardy Province of Brescia Municipality of Brescia Municipalities inserted into the “Longobard sites Network” and neighbouring communities Regional Management for Cultural and Landscape Assets of Lombardy Superintendency for the Archaeological Assets of Lombardy CAB Foundation Dominato Leonense Foundation Civiltà Bresciana Foundation Phases and timeframe Five year period 2008-2013

SOCIO-ECONOMIC DEVELOPMENT PLAN Brescia Territory Objective 15 ECONOMIC ENHANCEMENT OF THE RESOURCES OF THE TERRITORY

Project 15.1 Reutilization and relaunch of endogenous resources Description The project aims at launching economic initiatives referred to the guidelines of the rural development plan in the context of agri-food products and food and wine products through the protection of traditions and their use for the economic relaunch of innovative products. Moreover, the activation of food and wine services and agricultural services for tourist- economic development is envisaged Actions 1. Creation of a Database on traditions and knowledge (see Network project on the observatory on the environmental-landscape heritage) 2. Coordination activities of initiatives (Food and Wine Centre of Lombardy) 3. Participation in the exchange activities according to the Network project Parties involved Region Lombardia Province of Brescia Municipality of Brescia Chamber of Commerce of Brescia Business categories Municipalities included in the “Network of Longobard sites” and neighbouring municipalities CAB Foundation Dominato Leonense Foundation Civiltà Bresciana Foundation Pianura Bresciana Foundation Longobardia Association Catholic University of Sacro del Cuore (Milano and Piacenza) University of Milano Slow Food Castalimenti Phases and timeframe Five-year period 2008-2013 Financial resources To be quantified and raised (Funds of the Rural Development Plan) Expected results Activation of reutilization and relaunch of initiatives for the agricultural-productive and food and wine system Activation of specialized tourist initiatives Activation of a range of agricultural services in favour of the territory Coordination of reutilization and enhancement actions for the agri-food sector and the environment Result indicators Increase in tourist flows Number of activated agricultural services Number of promoted experimentations and initiatives

361

362 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Castelseprio-Torba Territory Objective 16 IMPROVEMENT OF ACCESSIBILITY TO THE TERRITORY

Project 16.1, 16.2, 16.3 16.1 Requalification and optimisation of the railway node of Varese 16.2 Realisation of international railway track of Mendrisio-Varese-Malpensa 16.3 Realisation of north east trunk road of Varese and completion of doubling the A8 motorway link Description The area of the Municipalities of Castelseprio and Gornate Olona is located back-to-back with the interregional and international large infrastructures system of motorway, railway (towards Switzerland) and air (Malpensa airport) traffic to optimise these, the Italian Government, the Region of Lombardy and the Province of Varese according to competence, undersigned a specific programme agreement in March 2007 which foresees the operations in three steps: 2009, 2012 and 2015.

Consequently the foreseen connections and junctions with the large infrastructures – which directly involve the Province of Varese in the phases of planning and realisation – predict and ensure direct effects on the territory both in terms of increased visibility and direct social- economic benefits for the optimisation of accessibility to the Heritage. In relation to this there are two railway operations and two motorway optimisation interventions of fundamental importance:

a) Requalification and optimisation of the Varese railway node b) Optimisation of the international railway section Malpensa-Varese- Mendrisio (Switzerland) with 3 million journeys forecast per year c) The realisation of the north east trunk road of Varese d) Doubling the Varese link of the A8 motorway

The whole of these works will requalify the role of Varese as one of the ports of Lombardy to Europe and one of the strategic nodes for the flow of goods along the North-South motorway.

Actions 16.1 - Reorganisation of the railway node of Varese, which includes the unification of the State Railway stations and the North Railway stations and an important urban requalification. It is an important project to requalify an area that today is strongly degraded with the realisation of a complex project on transport and it is moreover an example of how the station of the future should be, that is, also a means of gathering all the types of transport together.

16.2 - New transfrontal railway connection Varese-Mendrisio with successive connection to Malpensa. The Ministry of the Infrastructures is committed to guaranteeing the necessary financial resources, starting from 2008, considering also that the Swiss Confederation has already arranged for financing of the interventions falling into its territory.

16.3- Realisation of the north east trunk road of Varese. The final project was prepared by the Province of Varese and the procedure of regional Environmental Impact Assessment is in progress. Anas, Region of Lombardy and Province of Varese are committed to guaranteeing the foreseen financing and ensuring continuity in all the actions necessary for the respect of the foreseen times of completion of the works in time for the 2008 world cycling Championships. Completion doubling of the A8-Varese link. The Ministry of Infrastructures is committed to favouring the insertion of the financial plans of Autostrade for Italy. Parties involved 16.,1 Region of Lombardy, Province of Varese, Municipality of Varese, Rete Ferrovia Italiana S.p.A. e Ferrovie Nord S.p.A., Ministry of infrastructures and transport 16.2 Region of Lombardy, Ministry of infrastructures and transport, Railway NetworkItaliana S.p.A., Swiss Railways, Canton Ticino, Swiss Confederation,Province of Varese 16.3 Anas, Region of Lombardy, Province of Varese Phases and timeframe 2010 16.1 2012 16.2 2008-2009 16.3 € 108.7 million by institutional parties € 203.7 million the part of Italy – Sources of finance: 137,0 million Swiss Francs on the part of the Swiss Confederation - Sources of finance: 50% Confederation, 50% Canton Ticino.

363 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

€ 63,0 million Euros – Sources of finance: ANAS, Region of Lombardy, Province of Varese, Ministry of Infrastructures Expected results Requalification and optimisation of railway and motorway infrastructures Improvement of vehicle flow Organised facilitations for visitors Optimisation of tourism-economic flows Result indicators Number of travellers on the new railway sections Number of users on the new motorway sections Number of connections between the airport of Malpensa and Varese

SOCIAL-ECONOMIC DEVELOPMENT PLAN Castelseprio-Torba Territory Objective 17 WIDENING OF TOURIST OFFER TO INCREASE DURATION OF STAY

Project 17.1 Study and realisation of tourist “packages” Culture-Nature/Co-ordination with the “Lakes and Alps” project Description The project foresees the co-ordination of the proposal of excellence of the archaeological Park of Castelseprio-Torba, with the community initiatives “Insubria Lakes and Alps” to build an exceptional incentive for the development of cultural and naturalistic tourist segments and to contemporarily valorise the economic-productive quality vocation of the territory, favouring – with a variety of offers – tourists to stay. “Insubria” is the geographical name which defines the transfrontal region comprising the provinces of Varese, Como, Verbano-Cusio-Ossola, Novara, Lecco and Cantone Ticino, that is, the pre-alpine lake region (Maggiore, Como, Lugano) on the border of Italy and Switzerland. An area which also includes the territories of the Municipalities of Castelseprio and Gornate Olona and which, from the economic, cultural and landscape point of view, constitutes (despite the political division and different administrations) an open space which is strongly interconnected. In this context the “Insubria Lakes and Alps” (www.lakesandalps.com) project was started to which over 80 Institutions and economic and cultural associations are members – gathered together since 1995 in the Regio Insubrica Working Community” – and which aims at territorial promotion and integrated tourism, founded on co-operation (transnational, transregional and transprovinicial) finalised to the valorisation of endogenous resources of the territory of Insubria. Actions 1. Study and realisation of Culture-Nature integrated itineraries and “packages” 2. Study and realisation of tourist-economic initiatives of Insubria focussed on the Longobard heritage Parties involved Province of Varese Regio Insubrica Working Community Chamber of Commerce of Varese Municipalities of Castelseprio and Gornate Olona FAI – Italian National Trust Region of Lombardy Phases and timeframe 2008-2010 1, 2 Financial resources Acquired € 480,000.00 from the “Insubria Lakes and Alps” project Expected results Optimisation of the Longobard heritage attraction with the addition of a formulated territorial tourist-economic proposal Increase in tourist stays in the territory Result indicators Number of integrated tourist “packages” gravitating on Heritage Increase in tourist stays in the territory

SOCIO-ECONOMIC DEVELOPMENT PLAN Castelseprio-Torba Territory Objective 17 WIDENING OF TOURIST OFFER TO INCREASE DURATION OF STAY

Project 17.2 Improvement of the bike tracks and of the integrated bike-pedestrian track in the Provinces of Varese, Como, Lecco Description In relation to the operations connected with the realisation of the cycling-pedestrian network realised by the Province of Varese in agreement with the Municipalities involved, it is in the start-up phase of works – relatively to the basin of the river Olona – the section from Solbiate to Gornate Olona – in Torba, adjacent to the in grounds of the disused railway station of Valmorea.

364 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

The first section from Castellanza to Solbiate has already been completed, as has the trail round the lake of Varese which will connect to another trail along the lake of Cornabbio, allowing a cycling route of considerable landscape and environmental impact to be available which will be nearly 50 kilometres long. An operation – which not only incentivates sustainable mobility, but also cycle tourism – is inserted into the wider framework. The latter includes, finally, participation in the Interreg project with the Provinces of Como and Lecco for the realisation of the equipped cycle axis which is over 200km long and will connect the locations of the most important artistic and environmental testimonials of the three Lombard provinces, starting with the Longobard heritage. Actions 1. Work starts and realisation of works Parties involved Province of Varese Region of Lombardy Phases and timeframe 2008-2009 (430 days starting from 31 January 2008) Financial resources Own funds of the Province of Varese, the Region of Lombardy and Eurospei Funds (Interreg III) Set and liquidated: € 8,000,000.00 trail on lake of Varese € 2,200,000.00 trail on lake of Comabbio Set € 2,900,000.00 Castellanza – Gornate trail Expected results Connection of the cycle-pedestrian network with the archaeological area of Torba- Castelseprio Eco-compatible cultural and sporting development Result indicators Realisation of the cycle-pedestrian trail Increase in flows of specialist tourism

SOCIO-ECONOMIC DEVELOPMENT PLAN Castelseprio-Torba Territory Objective 17 WIDENING OF TOURIST OFFER TO INCREASE DURATION OF STAY

Project 17.3 Optimisation of the tourist counter at Malpensa intercontinental airport Description The role of the intercontinental airport of Malpensa is of basic importance in relation to the social economic development of the Province of Varese, the territory of which is inserted – on the basis of the executive area Plan – in the context of the “vast interregional and international area” of reference (territories of the Province of Varese, Milan, Novara and Canton Ticino/ Switzerland). The airport structure is located in an excellent position to represent – apart from the functions of travel and transport – a through-joint for international tourist flows in relation to a rich area of naturalistic, landscape (the great lakes) and cultural attractions, in which a place of absolute importance and visibility is reserved to the heritage of Castelseprio-Torba. The institution and recent operative optimisation of the Tourist Information and Accommodation Office also fits into this framework, this office was created in collaboration between the Province and the Chamber of Commerce of Varese Varese – Land of Tourism - which was already operational at the airport of Malpensa with a satisfactory flow of 100 presences per day. The project evaluations which had already emerged have in fact underlined the following necessities: a) Calibrated roadway and railway infrastructuring on the complex of the local infrastructural network and on its integration with the transEurospee networks; b) Capacity of residential response on the part of the territorial context c) Medium-long term horizon for economic development Actions 1. Extend opening time to the public by the IAT Office 2. Optimise the operational capacity of the IAT Office and the tourist and informative offer 3. Co-ordinate tourist flows and incentivate stays with particular attention to the heritage of Castelseprio-Torba Parties involved Province of Varese Chamber of Commerce of Varese Private companies Federalberghi Phases and timeframe 2008 1, 2, 3

365 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

Financial resources Own funds from the Province and the Chamber of Commerce of Varese Expected results Increase in counter activities Increase in arrivals and tourist stays in the territory Result indicators Number of visitors channelled by the activities of the IAT Office of Malpensa in the hospitality structures of the territory

SOCIO-ECONOMIC DEVELOPMENT PLAN Castelseprio-Torba Territory Objective 18 OPTIMISATION AND REQUALIFICATION OF LOCAL TOURIST BUSINESSES

Project 18.1 Optimisation and co-ordination of the “system” and of the didactic Factory offer Description The project addresses of the Province of Varese include the study and realisation of initiatives of incentivation for agricultural companies to join the Region of Lombardy’s programme for the creation of Didactic Factories finalised to the diffusion – above all among young people – of a correct knowledge of the importance of agriculture and its social-economic role. Actions 1. Study and realisation of initiatives for the creation of didactic Factories 2. Study and realisation of initiatives to increase the number of active agricultural farms Parties involved Province of Varese Region of Lombardy Chamber of Commerce Economic Associations of category Businesses Phases and timeframe 2008-2012 1, 2 Financial resources To be defined – Sources of finance: provincial, regional (rural development plan) Expected results Increase in the number of didactic factories Increase in the number of agri-tourism businesses Increase in employees in the two sectors Result indicators Number of the new didactic factories Number of the new agri-tourism businesses

SOCIO-ECONOMIC DEVELOPMENT PLAN Castelseprio-Torba Territory Objective 19 ECONOMIC PROMOTION OF AGRO-FOOD PRODUCTION AND QUALITY OENOGASTRONOMY Project 19.1 Co-ordination for the development of the territorial brand of reference Description At the level of “Italia Langobardorum” and realisation of a territorial umbrella-Brand network and relative guidelines is foreseen. In parallel, the Province and the Chamber of Commerce of Varese have realised a Protocol of intent for the creation of a trademark of recognition for the characteristic products of the area which manufacturers may request, observing certain directives. Considering the preliminary start-up state of the initiative of Varese, this project foresees co- ordination between local Bodies – Stakeholders and Managers of the “Italia Langobardorum” network to co-ordinate and uniform the two initiatives. Actions 1. Start-up of joint study group for the examination of the perspectives of the brands 2. Operational agreement for the co-ordination and/or combination of the initiatives Parties involved Province Chamber of Commerce Economic associations of category Businesses “Italia Langobardorum” network management Phases and timeframe 2008,2009 1, 2 Financial resources To be defined – Sources of finance from the Stakeholders Expected results Adoption of the territorial “Italia Langobardorum” umbrella brand Co-ordination or combination with the Varese territorial brand Result indicators Number of assigned uses of the territorial umbrella brand “Italia Langobardorum”

366 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Castelseprio-Torba Territory Objective 19 ECONOMIC PROMOTION OF AGRO-FOOD PRODUCTION AND QUALITY OENOGASTRONOMY

Project 19.2 Co-ordination for the development of oenogastronomic tourism initiatives (oenogastronomy Facility) Description The project – which referees to the project of the institutive Network of oenogastronomical Facilities in each territory of the Site – foresees organic co-ordination between the “Italia Langobardorum” network and the two territorial projects: a) “Varese da Gustare” in elaboration on the part of the Province of Varese in synergy with the local Chamber of Commerce and the Region of Lombardy. Purpose of the project “Varese da Gustare” is the protection of the associations, co-operatives and consortiums which produce and distribute the oenogastronomic heritage of the Province of Varese. b) “Insubria Art & Taste” proposes the rediscovery of characteristic dishes of the territory, their recipes or their “re-interpretation” based on contemporary inspiration and ability. Interpreters of restaurants in the entire Italo-Swiss transfrontal Region, the pre-alpine lakes and the characteristic products of the area. c) In the same way the project also addresses the increase in the number and quality of agri-tourism farms to offer citizens the possibility of exploiting rural heritage as a moment of refreshment, and at the same time, for keeping farmer families in the territory, conserving a heritage of knowledge and local traditions to be collected in turn, conserved in a database and valorised. Actions 1. Contribute and increase the proposal of agro-food and oengastronomic products in the “Italia Langobardorum” network (institution of oenogastronomic Facilities) 2. Use the visibility of the characteristic high quality products in all trade show manifestations 3. Use the visibility of the characteristic products in particular in 2008, at the time of the world cycling Championships hosted by Varese Parties involved Province Chamber of Commerce Region of Lombardy Regio Insubrica Working Community economic Associations of category Businesses Phases and timeframe 2008 3 2008-2009 1 2008 onwards 2 Financial resources Already acquired € 155,000.00 Foreseen for 2008 € 170,000.00 own provincial and regional sources Expected results Construction of an oenogastronomic network and high quality characteristic productions optimisation of international visibility of the local production Result indicators Number of initiatives realised Number of participants in the realised initiatives

367

368 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Spoleto Territory Objective 20 IMPROVEMENT OF ACCESSIBILITY TO THE HERITAGE

Project 20.1 Enhancement of railway infrastructures and connections and public local transport Description The Project for Alternative Mobility, which is now being completed, envisages three mega-car parks located next to the historical centre, from where three corresponding mechanized underground or surface tracks, moving sidewalks, escalators and lifts start, the so called hectometric system. The Project was entirely designed to have no architectural barriers. From an environmental point of view, the new system will entail a reduction of both atmospheric and acoustic pollution with values below the levels establishes by the law. Actions 1. First area, red colour: Car Park "Posterna"-Piazza Campello The car park will be created – on more levels – on a large area which was previously not used within the perimeter of the Medieval walls. There will be 450 parking spaces. The Project envisages an underground gallery – slightly sloped – which from the parking area will go through the historical centre in all its width; the mechanized transport systems installed in it – moving sidewalks – will transport users to the exchange platforms from where they will later go back to surface through lifts. The exits envisaged are in Piazza Pianciani, Piazza del Mercato and Piazza Campello. 2. Second area, green colour: Car Park "Spoletosphera"-Piazza della Libertà The multi-level car park, opened in 2006 and completely operational since 2007, is totally underground, below a green public area and provides 400 parking spaces. It is linked to Piazza della Libertà through a long mechanized track of underground moving sidewalks. 3. Third area, blue colour: "Via del Tiro a segno"-Duomo-Rocca Albornoziana The Project envisages the creation of an uncovered car park, located in the low part of the city in the vicinity of the Basilica of San Salvatore, which will provide 152 spaces for cars, campers and coaches. A non-underground mechanized track will link the car park of “Via Tiro a segno” to Piazza del Duomo and Rocca Albornoziana.

Parties involved Municipality of Spoleto, Ministry for the Environment, Ministry for Infrastructures and Transport, Region Umbria, Contracting companies

369 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

Phases and timeframe 1. procedures for tenders are now under way for the completion of 61% of works; end within 2010 2. created 3. end within 2009 Financial resources Euro 62,045,999.33 Expected results Guarantee functionality and regulation of the areas by responding to new tourist, trade, residential and services needs while ensuring accessibility to the Historical Centre and thus reducing traffic inside it. Facilitate pedestrian access to the Acropolis Result indicators Number of created parking areas and spaces Number and length of created hectometric tracks Number of tourists in the historical centre

SOCIO-ECONOMIC DEVELOPMENT PLAN Spoleto Territory

Objective 20 IMPROVEMENT OF ACCESSIBILITY TO THE HERITAGE

Project 20.2 Interventions for an integrated transport system Description The Project envisages the creation of an integrated and functional network of transport infrastructures by taking into consideration the recent evolution in some minor build-up areas and the needs to organize access to the city. The functions which the new infrastructures can perform can be summed up as follows: a) Improvement and enhancement of local connections and consequent increase of mobility with new corridors at national level b) Decongestion of traffic flows inside the city of Spoleto and hamlets concerned by heavy goods traffic c) Improvement of road safety level and reduction of accidents d) Support for the development of important urban, residential and services areas At the moment a feasibility study is under way. In particular, the intervention of the South variant which, by joining the East-West main road (the current trunk road 3 Flaminia in the South of the city) with the road of Tre Valli in the vicinity of the hamlet San Chiodo, provides an important connection point at local and supraregional level, thus improving exchange opportunities among the abovementioned trunk roads in a North-South connection system which creates a network among the Region Marche, the Umbria Valley and the Region Lazio. Moreover, a clear urban decongestion advantage will be guaranteed especially in the area of via Martiri della Resistenza where new alternative mobility systems are now being implemented. Also, the feasibility study will concern the elimination of the section of the Trunk road 3 Fliaminia which goes from the South junction to the North junction. In this way, the connection between the buffer zone and the historical centre will be resorted in accordance with the ancient tracks interrupted by the viaduct in the 60s. Actions 1. Creation of new main roads outside the buffer-zone 2. Creation of roundabouts in the main junctions outside the buffer-zone 3. Implementation and updating of the new urban traffic Plan Parties involved Municipality of Spoleto, Ministry orf the Environment, Ministry for Infrastructures and Transport, Region Umbria, Contracting companies Phases and timeframe At the moment only the time frame for projects has been established starting from 2008 to 2010 Financial resources To be raised Expected results Improving functionality and road safety Rationalizing the access system Result indicators Km of built road Percentage reduction of pollution rate

370 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Spoleto Territory Objective 21 URBAN REQUALIFICATION AND DEVELOPMENT OF THE PRODUCTION SYSTEM

Project 21.1 Creation of an integrated system of production areas Description The Project aims at creating an “integrated system of production areas”, rationally connected, which is synergic and flexible and able to offer a wide range of solutions to the various needs of productive settlements from industry and crafts to trade. On the whole, the creation of a new industrial area “Flamina”, located in Fabbreria, East to the new four-lane layout of the trunk road 3 Flaminia and the completion of the existing areas according to the rules which provide for the combination of economy and environment in compliance with European, national and regional sustainable development guidelines and in line with the intense work carried out by the municipal administration through Agenda 21 are planned. The new area, 50 ha wide, is functional also at relation level, because it is easily accessible from local roads. Awarding and de-taxation for new settlements which are built according to good practices (green housing, renewable energy resources) are envisaged; part of the green areas, 4 ha wide, will be transformed into a thematic park on new technologies for renewable energy production. Actions 1. Implementation of the project of the new industrial area Flaminia 2. Creation of industrial/ small business plants Parties involved The Municipal Administration in convention with the Consortium for Industrial Areas Development of Terni, Narni, Spoleto and structural funds of the European Community Phases and timeframe The works relative to the first areas, as a whole 18 lots and 20 hectares, are terminated and the unit price per square meter is around 33.00 Euros. This cost, at present, is the lowest price for productive area in Umbria Financial resources To be definite and found Expected results Responding to new settlement needs for industrial and craft activities Result indicators Number of companies in the area Employment rate

SOCIO-ECONOMIC DEVELOPMENT PLAN Spoleto Territory Objective 22 ENHANCEMENT OF THE ENVIRONMENT AND THE NATURAL AND HUMAN-AFFECTED LANDSCAPE FOR ECONOMIC PURPOSES

Project 22.1 Franciscan Itinerary – Olive Grove Path Description The Project envisages the creation of a track which will connect various areas related to the history of San Francesco and Franciscanism among which the City of Spoleto. In the Spoleto area, the proposed track follows the route of the Olive Grove Path, an excursion path already identified which goes through the olive area at the foot of the mountains of Spoleto characterized by banks and terraces bounded by dry stone walls. Actions 1. In the short term: The maintenance of the excursion area and the installation of safety devices, the arrangement of information boards and road signs, the recovery of historical artefacts along the path, the completion of relative cartography and a suitable information action are planned. 2. In the medium term: The creation and/ or setting up of refuges for visitors. Parties involved Region Umbria Sacred Convent of Assisi Mountain Community of Martani Mountains and Serano Municipality of Spoleto Private companies Phases and timeframe 2009-2012 Financial resources EU, national and regional funds Synergies from tourist companies directly concerned in the route Expected results Number of tourists in Spoleto area

371 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Spoleto Territory Objective 23 ENHANCEMENT OF EXCELLENCE AGRI-FOOD TYPICAL PRODUCTS FOR ECONOMIC PURPOSES

Project 23.1 Development initiative of agricoltural-productive and food and wine quality sectors “Spoleto Tipica” Description The Project aims at enhancing and promoting the excellence agri-food products through the rationalization and optimization of cooperation processes between public bodies and producers/ producers consortiums at local, regional, national and international level.

typical food products

Actions 1. Structural adjustment of the Leti Sansi Palace, hosting the Historical Centre of great historical-cultural value, located in the centre of pedestrian tourist tracks, such as the permanent area dedicated to the enhancement/ promotion of agri-food quality products. 2. Organization of an area inside the Leti Sansi Palace, as a permanent “showcase” shop according to the model “market fair” 3. Coordination of the brand “Spoleto Tipica” with the brand “Italia Langobardorum” and relative provisions 4. Planning of a schedule – pre-settled and with a regional dimension – for events/ festivals/ tours/ promotions, including territorial marketing, by receiving products to be exposed/ marketed in exchange and / or covering all expenses, both for planned events and possible other non plannable needs. 5. Creation of the Consortium Spoleto Tipica also for the brand ”Italia Langobardorum” 6. Communication and Marketing plan for the promotion of typical products. Parties involved Region Umbria, Provinces of Umbria, Chamber of Commerce, Consortium for Umbrian Reclamation, Mountain Community, Producers Consortium Phases and timeframe Medium term, within 2008 Financial resources Funds to be raised by Municipality, Region Umbria, Chamber of Commerce and contributions by consortium members. Expected results Planning and activation of an interaction process between the public and private sector aimed at developing the local market. Result indicators Number of producers involved in the project Number of promoted initiatives

372 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Spoleto Territory Objective 24 INTEGRATED PROMOTION OF THE TERRITORY AND PRODUCTS IN THEIR TOURIST- ENVIRONMENTAL-CULTURAL ASPECTS

Project 24.1 Recovery and reutilization of traditional methods and products

Description The Project aims at promoting agri-food quality products based on the recovery and reutilization of traditional methods and products both according to the new guidelines provided by the Rural Development Plan 2007-2013 for the relaunch of agriculture and the protection of traditional standards and according to the general objectives of the Socio- Economic Development Plan of the Network. In particular, in cooperation with the Observatory of the Landscape- Environmental Heritage and by using the Traditional Agricultural-Productive and Food and Wine Database, within the Leti Sansi Palace an area will be dedicated to: a) A specialized media library, provided with publications, videos, slides, etc, illustrating the history, the production/ preparation methods, the use of Spoleto traditional cuisine; b) A room for free and guided tasting; c) A welcoming room. The welcoming room will be used not only for tourist and visitors welcoming, but also for educational programmes and/ or meetings for Italian and foreign operators of trade and tourism (Chambers of Commerce, Italian Institute for foreign trade (ICE), Importers, Tour operators, authorities, etc.). Actions 1. Creation of the media library 2. Agreement between training bodies and local stakeholders 3. Study and creation of differentiated training opportunities Parties involved Region Umbria, Provinces of Umbria, Chamber of Commerce, Consortium for Umbrian Reclamation, Mountain Community, Producers Consortium Phases and timeframe Medium term, within 2008 Financial resources Funds to be raised by Municipality, Region Umbria, Chamber of Commerce and contributions by consortium members. Expected results Creation of the media library Result indicators Number of publications, video, etc. included in the media library Number of promoted initiatives Number of tourists and visitors

SOCIAL-ECONOMIC DEVELOPMENT PLAN Spoleto Territory Objective 24 VALORISATION FOR ECONOMIC PURPOSES OF AGRICULTURAL AND FOOD PRODUCTS OF EXCELLENCE Project 24.2 Initiative for the integrated promotion of both territory and produce: “Spoleto, Piazza of Agricultural and Food Excellencies”. Description The project aims at the achievement of the town at regional, national and international level, as “Piazza” of Agricultural and Food products of excellence, through a systematic action of integrated promotion of the chain, through the rationalization and optimization of the processes of collaboration with MIPAF, Public Bodies, associations of producers and events' organizers, by means of a number of prestigious town spaces and culturally prestigious containers. The project hinges on a yearly planning of events for the promotion of the chain, by the regional, national and international dimension, that systemizes the already existing events (Wines in the World, European Stars of Taste, Typical Spoleto) and the starting ones, like the International Academy of Cuisine Actions 1. Structural adjustment of Palazzo Leti-Sansi, a container in Downtown Spoleto by the high historical/cultural value, as permanent seat dedicated to the valorization/promotion of agricultural and food produce. 2. Functional organization of the spaces within Palazzo Leti Sansi: Tasting Hall, welcome, information and commercial spaces, a permanent display for the productions, also with possibility of sales, on the model of the fair, a mediateque, dedicated to the various aspects of the agricultural and food chain and to the documentation of the events organized within the project. 3. Usage of various spaces of the town for the realization of events. Parties involved Ministry for Agriculture and Forestry, Regione Umbria, Chamber of Commerce, Consorzio della Bonificazione Umbra, Comunità Montana, Producers' Association, Organizers of the events of the chain, Fund raising experts, European Planning

373 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

Phases and timeframe Medium term, within 2010 Financial resources MIPAF funds to be raised, Municipality, Regione Umbria, Chamber of Commerce, Private subjects, Sponsors Expected results Planning and activation of a process of interaction between public and private, targeted at the development of the sector market and at the promotion of both territory and produce. Strengthening of the image of the town at national and international level Result indicators Number of producers and products that will join the project Number of initiatives promoted Increase of tourism presences Economic growth of the sector

374 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Spoleto Territory Objective 24 INTEGRATED PROMOTION OF TERRITORY AND PRODUCE IN ITS TOURISM, ENVIRONMENTAL AND CULTURAL ASPECTS

Project 24.3 Recovery and requalification of traditional methods and products: creation of the mark “Spoleto Tipica” Description The project aims at the valorization of the typical agriculture and food produce, through the “historical/cultural” recovery and the requalification of the producing methods, both under the new policies provided for by the Rural Development Plan 2007-2013 for the re-launch of agriculture and the safeguard of traditional standards, and under the general aims of the Network's Social -Economic Development Plan. In particular, going back to the Osservatorio del Mosaico Paesistico Ambientale (Environmental -Landscape Observatory) and to the database of the traditional flavours. The aim is creating a mark of origin “Spoleto Tipica”, through the establishment of a municipal register of such agricultural and food produce. To support the action aiming at the economic development, the creation of an association of producers enrolled in the register will be supported, also related to the mark “Italia Langobardorum” Actions 1. Fact-finding inquiry, to identify the existence of original and characteristic agicultural and food produce, their traditional working methods, and to promote their valorization; 2. Coordination of the mark “Spoleto Tipica” with the mark “Italia Langobardorum” e related regulations; 3. Permanent exhibition of the “Spoleto Tipica” products by the display in Palazzo Leti Sansi (see Actions obj. 5.1) 4. Marketing and Communication Plan for the promotion of producers/produce of such mark, both for planned events (fairs, sector markets, educational and promotional events and so on) and for the management of the permanent exhibition space. Parties involved Regione dell’Umbria, Provincia di Perugia, Chamber of Commerce, Consorzio della Bonificazione Umbra, Comunità Montana, Producers and their Associations. Phases and timeframe Medium term, within 2008 Financial resources Funds to be raised, Municipalities, Regione Umbria, Chamber of Commerce, Producers, Sponsors. Expected results Realization of the mark Spoleto Tipica Establishment of the Association Spoleto Tipica Recovery of the original and characteristic agricultural and food productions and their working methods Result indicators Number of initiatives promoted Increase of the productions of the local tradition Involved Producers' Market and turnover growth

375

376 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Campello sul Clitunno Territory Objective 25 URBAN INTERVENTIONS TO INCREASE TOURIST STAYS

Project 25.1 Recovery and requalification of the medieval villages for the purposes of re-settlement and tourist hospitality Description In 2008 the requalification and reconstruction of the medieval villages of Campello Alto (castle), Acera add Agliano will be concluded, they were initiated after the earthquake of 1997 with financing set for reconstruction and foreseen by the Plans of integrated recovery.

Campello Alto Acera Agliano

During the last weeks of 2007 most of the work was completed with the objective of supplying further elements of attraction to the territory, allowing both re-settlement of habitations and tourist hospitality in the three characteristic medieval villages and incentivating tourists to stay. a) In Campello Alto, apart from privately owned buildings, the entire complex of the medieval walls, internal areas of the castle, the towers of the prisons and the external path of the wall have been restructured and requalified. b) In Acera public and private property recovery, maintenance work on roads and renewal of all the existing infrastructures have been carried out, as well as the re-arrangement of the church, the ancient fountain and re-qualification of the old school which will house the study Centre on sheep farming, migratory herding and mountain tradition. c) In Agliano, to the works of public and private recovery other works of public use have been added (total renovation of all infrastructures present: roadways, drainage system, water works, electrical networks, telephone networks, etc) Actions 1. Campello Alta: general technical inspection of the interventions carried out on the whole area of the castle and completion of the external path of the wall and elimination of Enel and Telecom open-air cables 2. Acera and Agliano: general technical inspection 3. Agliano: start-up of construction of road connection with the provincial road Parties involved Municipality Region of Umbria Private Phases and 2008 1, 2, 3 timeframe Financial resources 15,000,000 Euros already acquired – Sources of regional and private financing for the set of work already carried out and conclusive Expected results Revitalisation of tourism and hospitality of three medieval villages damaged by the earthquake in 1997 Result indicators Number of re-used habitations Number of hospitality structures Number of inhabitants and guest tourists

SOCIO-ECONOMIC DEVELOPMENT PLAN Campello sul Clitunno Territory Objective 25 URBAN INTERVENTIONS TO INCREASE TOURIST STAYS

Project 25.2 Realisation of pedestrian pathways, new roadways and parking in the area of the Sources of Clitunno and related improving of the road system and signs Description In the immediate vicinity of the Sources of Clitunno there will be the realisation of a new and more usable roadway system in the zone of Pissignano, of pedestrian pathways and bicycle paths and a parking area for vehicles equipped for about 120 parking spaces. The work – already defined from the planning point of view will be realised by the Municipality with distributed financing following the ordinance of the Prime Minister no. 3609 of 29.08.2007 for the reclamation and visualisation of the area – will be completed with the arrangement of flower beds Actions 1. Realisation of a new system of roadways, new pedestrian pathways and bicycle

377 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

paths and a parking area for 120 parking spaces at the Sources of Clitunno Parties involved Municipality Region of Umbria Phases and timeframe 2008 1 Financial resources 1,750,000 Euros already acquired – Source of financing: ordinance of the Prime Minister no. 3609 dated 29.08.2007 for the reclamation and valorisation of the area Expected results Optimisation of roadways, paths and parking areas Result indicators Index of seasonal and annual occupation of the parking area

SOCIO-ECONOMIC DEVELOPMENT PLAN Campello sul Clitunno Territory Objective 26 OPTIMISATION OF THE TOURIST ENTERPRISES IN THE TERRITORY

Project 26.1 Realisation of new complexes for hospitality and cultural initiatives Description The project, in progress of completion, was initiated in 2005 on the basis of financing obtained by the Region of Umbria and finalised to the requalification and optimisation of the Tourism-Environment-Culture chain. The set of integrated quality projects – co-ordinated by the Municipality of Campello – and presented by the same Municipality, by other local public and private bodies of the territory, was finalised to the realisation, renewal and optimisation of public and private structures and services for tourist hospitality (agritourism, country- houses, holiday homes and hotels). The activation of these synergies between public and private and between the various entrepreneurs operating in Campello sul Clitunno and in the other Municipalities for the compilation of the project as a whole, are the ingredients for the activation of a path of development and valorisation of the territory as well as the co-ordinated realisation of an “area product” for the purposes of tourist development, increased by the potential attraction of the Longobard heritage. Actions 1. Insertion of new realisations in the tourist circuit with special reference to the promotion of “Italia Langobardorum” Parties involved Municipality of Campello sul Clitunno Municipalities of Spoleto and Foligno Region of Umbria Mountain Community Umbrian reclamation authority Private Phases and timeframe 2008 1 Financial resources 2,000,000 Euros (1 million financed by the Region + 1 million financed by public and private subjects) already acquired – Source of financing Region of Umbria (measure C4 of the Single Document of regional programming DOCUP – Tourism-Environment-Culture Chain) Expected results Increase in the offer of tourist hospitality Improvement of tourist services Result indicators Number of guest tourists in the new structures Number of new employees

SOCIO--ECONOMIC DEVELOPMENT PLAN Campello sul Clitunno Territory Objective 27 ECONOMIC PROMOTION OF QUALITY AGRO-FOOD AND OENOGASTRONOMIC PRODUCTION

Project 27.1 Co-ordination for the development of the territorial Brand of reference Description The foreseen realisation of a territorial umbrella-Brand of the “Italia Langobardorum” network and the relative specifications which distinguish even the best agro-food and oenogastronomic productions of the territory, flanked to the parallel action already initiated by the communal Administration in concert with the economic associations of category and the business in the sector to valorise local agricultural productions and characteristic cuisine. This project therefore foresees the co-ordination between local Bodies - Stakeholders and managing Bodies of the “Italia Langobardorum” network to uniform the respective initiatives. Actions 1. Start-up of a study group for the examination of the perspectives for the brand 2. Operational agreement for the co-ordination and/or union of the initiatives Parties involved Province Chamber of commerce Economic associations of category Businesses Management of the “Italia Langobardorum” network Phases and timeframe 2008,2009 1, 2

378 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

Financial resources To be defined – Sources of financing from the Stakeholders Expected results Adoption of the territorial umbrella brand “Italia Langobardorum” Co-ordination or union with the territorial brand of Varese Result indicators Number of assignments of use of the territorial umbrella brand “Italia Langobardorum”

SOCIO-ECONOMIC DEVELOPMENT PLAN Campello sul Clitunno Territory Objective 27 ECONOMIC PROMOTION OF QUALITY AGRO-FOOD AND OENOGASTRONOMIC PRODUCTION

Project 27.2 Co-ordination for the development of initiatives for oenogastronomic tourism (oenogastronomy facility) Description The Municipality of Campello has adhered to the “City of Bio” circuit (protection and valorisation of biological agro-food production) and specifically aims at the maximum qualification and valorisation of the production of olive oil, typical of this territory and highly qualified. The same actions are in progress for the protection of the agro productive and oenogastronomic Saperi of local tradition (Museum of culture and farming civilisation and study Centre on sheep farming, migratory herding and mountain tradition) and for the qualification of the catering sector. The project foresees a further opportunity to integrally qualify both the quality agro-food system (with the protection and recovery of the Saperi of tradition) and the typical Social- economic network Objective 4 Project 4.1, 4.2).

Actions 1. Start-up of a study group for the examination of the perspectives for the brand 2. Operational agreement for the co-ordination and/or union of the initiatives Parties involved Province Chamber of commerce Economic associations of category Businesses Management of the “Italia Langobardorum” network Phases and timeframe 2008,2009 1, 2 Financial resources To be defined – Sources of financing from the Stakeholders Expected results Adoption of the territorial umbrella brand “Italia Langobardorum” Co-ordination or union with the territorial brand of Varese Result indicators Number of assignments of use of the territorial umbrella brand “Italia Langobardorum”

379

380 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Benevento Territory Objective 28 IMPROVE MOBILITY AND ACCESS TO THE HISTORICAL CENTRE

Project 28.1 Completion and adaptation of the traffic plan; updating of the parking plan; realisation of tourist transport services Description The organisation for mobility in the city comes about in the expectation of a new role of centre orderer and driving force of the dynamics of the territorial development of a vast area. Mobility is managed taking care of multiple aspects connected to the preparation of tools which limit the use of opportune means for public, tourist and commercial transport.

a) INSTITUTION OF THE COMMERCIAL TRANSPORT SERVICE (ref. form no. 9.1 in the protection plan) b) INSTITUTION OF ELECTRIC MINIBUS SERVICE OF PUBLIC TRANSPORT (ref. card no. 9.1 in the protection plan) The parking and traffic plan aim at creating the necessary preconditions for a further extension of the pedestrian island, for the valorisation of the zones of limited traffic, for improving the urban roadwork system and for sustaining the development of urban areas subject to consistent re-functionalisation. The elimination of parking areas around the major emergences in the buffer zone (Rocca zone, Duomo zone, Arco di Traiano..), to be transformed in pedestrian areas, within the parking Plan allows a significant increase in parking according to an integrated programme of interventions with material actions (new car parks in the structure and parking areas) and integrated management of the parking area. An ecological tourist shuttle service will allow the use of the historical centre following predefined courses. The shuttle terminal will be located near to the railway stations - Appia, Centrale e Rione Liberate -, to allow the intermodal exchange of transport means (from rail to wheel) and equip tourists with an efficient transport system suitable to visit historical and archaeological sites. The bus Network, with particular technological equipment, will allow the best welcoming for tourists, especially if they are foreign. Actions 1. Completion and adaptation of the traffic plan 2. Updating of the parking plan 3. Realisation of a tourist transport service Parties involved Municipality of Benevento Phases and timeframe First phase: by 2008 Second phase: by 2015 Financial resources First phase: to be realised with APQ “local development” funds relative to feasibility Studies of the historical centre of Benevento. Second phase. POR FESR Funds Regione Campania 2007-2013. Expected results Improve mobility in the historical centre Eliminate acoustic and atmospheric pollution

Result indicators Number of available parking spaces Surface area of the pedestrian areas.

381 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Benevento Territory Objective 29 VALORISE CULTURE AS AN ENDOGENOUS ENGINE OF DEVELOPMENT

Project 29.1 Insertion of Benevento in the Artecard Campania circuit Description “Campania Artecard” is an integrated system of museum-transport conceived in 2002 by Regione Campania and co-ordinated by Scabec. It was created with the objective of favouring the use of cultural heritage in the region through a card which facilitates visitors through the routes of the visit. Inserting the museums and monuments of Benvenuto into the Campania Artecard circuit becomes a choice of duty if the objective is the art heritage of the city, to build a tourist- friendly Campania which is ever more suited to European citizens. An integrated ticket lasting 3, 7, 365 days which allows access, without queuing, to the main museums and archaeological sites of the Region, to freely access 2 or more museums and, with the discount of 50%, to the remaining museums and monuments inserted into the circuit and to travel over the network of public transport inserted into the circuit and on the special dedicated shuttles. The Campania Artecard is sold in a kit which contains a guide to the museums and the services in Italian and English and the ticket for "Unico Campania" transport. The integrated museum and transport ticket has become one of the certainties of the regional programming Parties involved Regione Campania Regional Management of cultural assets of Campania Province of Benevento Municipality of Benevento Phases and timeframe By 2008 Financial resources Resources of the Authorities Expected results Insert Benevento into the art circuit at a regional level and increase tourist flows. Result indicators Number of tourists using the ticket

SOCIO-ECONOMIC DEVELOPMENT PLAN Benevento Territory Objective 30 OPTIMISE THE INFRASTRUCTURES FOR CULTURE

Project 30.1 Planning and realisation of a Congress Centre and a Theater tent Description The theatre fair “Città spettacolo” which takes place in Benevento at the beginning of September, has a history of nearly thirty years. This event has also permitted the insertion of Benevento in the theatre circuits of a national character. Contrarily the City does not have structures able to house events which foresee a high number of spectators, if not the Teatro Romano, with considerable risks to the preservation of the asset. It is therefore necessary to realise structures suited to house city events. The Administration of Benevento has foreseen for this purpose the realisation of a congress structure of a total capacity of 2000 seats. The structure will be realised on the banks of the river Sabato, in the Libertà district, for which radical urban requalification is foreseen. The position and entity of the structure will determine the constitution of a facility destined to cultural activities of social gathering. Furthermore, while the congress centre is being built, a temporary frame structure will be assembled to provisionally house cultural activities. Connected actions a) MULTIMODAL INFORMATIVE CENTRE (ref. Awareness and Prmotion plan). b) INFORMATIVE POINT NETWORK (ref. Awareness and Promotion plan). c) Design of the civic contemporary art gallery at hortus conclusus (ref. Enhancement plan). Actions Design and realisation of a congress centre Design and realisation of a tent-theatre Parties involved Municipality of Benevento Phases and timeframe First phase: by 31.12.2010. Second phase: by 31.12.2015. Financial resources POR Campania 2000-2006 measure 4.6 for € 7,500,000 POR FESR Campania 2007-2013 for € 7,500,000 Expected results Optimise the city’s tourist offer above all in relation to congress tourism and concerning the realisation of large events of a cultural nature. Result indicators Number of events realised in a year.

382 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES SOCIO-ECONOMIC DEVELOPMENT PLAN Benevento Territory Objective 31 ADAPT AND IMPROVE HUMAN RESOURCES FOR SUSTAINABLE VALORISATION OF CULTURAL ASSETS

Project 31.1 Activation of training courses of operators for marketing of cultural asset Description The training course for operators marketing cultural assets has the objective of supplying educational requirements at a local level of managing the Cultural Assets, as there is an evident lack of professional profiles with directorship functions inside the museums, management and valorisation agencies, public administrations, institutions engaged in the protection, conservation and valorisation of Cultural Assets, given the exceptional dimension of public investments finalised to restoration, recovery and valorisation of Cultural Assets and to the creation of a multiplicity of new cultural centres. The intention is to train a figure equipped with highly technical competences, for discussions with the professionals operating in the field of valorisation, a figure similar to the profile of a Project Manage Action 1. Identification of formative needs 2. Planning of courses 3. Actuation of courses Parties involved Regione Campania Municipality of Benevento Phases and timeframe First phase: by 2008 Second phase: by 2015 Financial resources POR FSE 2007-2013 Regione Campania, Expected results Increase employment in the tourist sector Develop the local economy Manage cultural heritage in a co-ordinated manner. Result indicators Number of operators trained in the sector

SOCIO-ECONOMIC DEVELOPMENT PLAN Benevento Territory Objective 31 ADAPT AND IMPROVE HUMAN RESOURCES FOR SUSTAINABLE VALORISATION OF CULTURAL ASSETS

Project 31.2 Activation of training courses of experts for the creation of businesses in the tourist section Description Training for business creators in the tourist sector is focussed on the knowledge in matters connected to the specific working typology. The topics of examination regard the different corporate legal forms, the local tourist market, the company and its organisation, computerisation for the company and marketing in the business project. Actions 1. Identification of formative needs 2. Planning of courses 3. Actuation of courses Parties involved Regione Campania Municipality of Benevento Phases and timeframe First phase: by 2008 Second phase: by 2015 Financial resources POR FSE 2007-2013 Regione Campania, Expected results Increase employment in the tourist sector Develop the local economy Manage cultural heritage in a co-ordinated manner. Result indicators Number of operators trained in the sector Number of businesses created

383 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Benevento Territory Objective 31 ADAPT AND IMPROVE HUMAN RESOURCES FOR SUSTAINABLE VALORISATION OF CULTURAL ASSETS

Project 31.3 Activation of a master in organisation of events and congresses Description The Master in organisation of events and congresses is finalised to the formation of new professionals: "Events Managers" expert in the filed of modern communication, professionals able to conceive, design, realise and promote different types of events of a cultural and artistic nature and actively participate in the realisation of conventions, meetings and congresses Actions 1. Identification of formative needs 2. Planning of courses 3. Actuation of courses Parties involved Regione Campania Municipality of Benevento Phases and timeframe First phase: by 2008 Second phase: by 2015 Financial resources POR FSE 2007-2013 Regione Campania, Expected results Increase employment in the tourist sector Develop the local economy Manage cultural heritage in a co-ordinated manner. Result indicators Number of operators trained in the sector

SOCIO-ECONOMIC DEVELOPMENT PLAN Benevento Territory Objective 31 ADAPT AND IMPROVE HUMAN RESOURCES FOR SUSTAINABLE VALORISATION OF CULTURAL ASSETS

Project 31.4 Activation of courses for training orientators and tourist guides Description The formation of tourist guides and tourism orientators has the primary objective of qualifying, in the area of Benevento and province, professionalism which, through the training before the exam of enablement to exercise the activity, may carry out the profession of Tourist Guide either as independent individual or associated work or as an employee c/o tourist agencies and hotels. This is about professionalism, the characteristics of which are standardised at national/regional level. The tourist orientator is a professional figure able to know and apply the main basics in matters of professional orientation, the methodologies of running orientative activities, the norm which governs orientation, the technical tools for supplying the balance of competences. On the other hand the guide has the task of accompanying individuals or groups of people, with the purpose of illustrating the historical, artistic, monumental, landscape attractions as well as the productive resources of the territory, supply detailed information Actions 1. Identification of formative needs 2. Planning of courses 3. Actuation of courses Parties involved Regione Campania Municipality of Benevento Phases and timeframe First phase: by 2008 Second phase: by 2015 Financial resources POR FSE 2007-2013 Regione Campania, Expected results Increase employment in the tourist sector Develop the local economy Manage cultural heritage in a co-ordinated manner. Result indicators Number of operators trained in the sector

384 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Monte Sant’Angelo Territory Objective 32 IMPROVEMENT OF ACCESSIBILITY TO THE HERITAGE

Project 32.1 Realisation of intermodal area with the creation of an overground railway through restarting the complementary Foggia – Handcraft-Industrial Zone of Macchia railway line and constructing a tourist arrival point Description Intermodal area: optimise railway transport restoring operation of the exiting railway line which, by means of a branch point of the Foggia – Manfredonia platform, directly connects Foggia airport to the Handcraft–Industrial Zone of Macchia, in the territory of Monte Sant’Angelo. It is a rail track the use of which could be dual: an arrival point road for tourists and residents, with the function of overground railway also serving the nearby habitation of Manfredonia and goods transport service for the companies working in the contiguous Handcraft–Industrial zone with the main railway node of Foggia. The airport of arrival in the territory of Monte Sant’Angelo is located in the area behind the Shopping Centre. From here, therefore, connection towards the internal roadways and then towards the candidate site, can be ensured by the integrated combination of public transport systems on the existing roadways, also including, in perspective, a cableway. Access to the sea will be guaranteed through the construction of the tourist arrival point for which works will begin by the spring of this year. Its function will be at the service of the territory of Monte San’Angelo and the contiguous Handcraft–Industrial area. It will have space for 200 moorings and at the back of the dock will be equipped with all the services related to welcoming tourists and the possibility of carrying out maintenance on the vessels and launch of the manufacture of the shipyard INSIDE s.r.l. (company of the Gruppo Bolici) operating in the nearby handcraft area. This work was conceived following an Agreement of Programme between Public and Private subjects and its realisation is charged totally to the private subject. Management will also be charged to the private subject and regulated by apposite convention with the municipality of Monte Sant’Angelo. The gruppo Bolici, manufacturer-manager of the work, has already carried out similar operations in other locations in the Mediterranean and because of the services offered in the settlement of Macchia and the other added value represented by its experience in the sector, is able to guarantee great vitality in the port also in terms of number and quality of tourist docks. Actions 1. Consultation between the public and private Bodies necessary for reaching objectives; 2. Design and planning of the interventions; 3. Execution of the interventions Parties involved Municipality of Monte Sant’Angelo Province of Foggia Region of Puglia Ministry of Infrastructures and Transport Mixed and private consortium bodies and companies. Phases and timeframe 2010-2015 Financial resources Structural funds Public funds of various authorities according to competence and the outcomes of programming Expected results Considerable improvement in the infrastructure system with maximum intermodality between the three types of transport. Result indicators Increase in tourist flows towards the site and its territory.

SOCIO-ECONOMIC DEVELOPMENT PLAN Monte Sant’Angelo Territory Objective 32 IMPROVEMENT OF ACCESSIBILITY TO THE HERITAGE

Project 32.2 Realisation of an route alternative to the section of the trunk road 272 Monte Sant’Angelo San Giovanni Rotondo Description Trunk road 272 San Giovanni Rotondo – Monte Sant’Angelo is the main roadway axis from which over 70% of tourists arrive at the candidate site. 21km long, currently has sections which slow travel down due to objective technical characteristics. It requires general revision and modernisation of the horizontal and vertical signal system as well as optimisation of protection devices on some margins. The project for the intervention has already been drawn up by ANAS and approved by the Borough Council which has approved the variation to the urban plan to allow the realisation of new sections for considerably reducing travel time, also improving the general level of safety of the road itself. Abandoned before its site set- up by ANAS, due to administrative vicissitudes which occurred during the last part of the nineties

385 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

and correlated to the re-organisation of the structure of the heritage of the roadwork network in Italy, it has currently been restored by the Borough Administration which has negotiations of consultation in progress with the Ministry of Transport and Infrastructures for refinancing and realisation of the work. Its realisation will allow safer and higher quality thoroughfare to the flow of pilgrims which reach Monte Sant’Angelo from the nearby Sanctuary of San Pio da Pietrelcina in San Giovanni Rotondo. Actions 1. Consultation between the public and private Bodies necessary for reaching objectives; 2. Design and planning of the interventions 3. Execution of the interventions Parties involved Municipality of Monte Sant’Angelo Province of Foggia Region of Puglia Ministry of Infrastructures and Transport Mixed and private consortium bodies and companies. Phases and timeframe 2010-2015 Financial resources Structural funds Public funds of various authorities according to competence and the outcomes of programming Expected results Considerable improvement in the infrastructure system with maximum intermodality between the three types of transport. Result indicators Increase in tourist flows towards the site and its territory.

SOCIO-ECONOMIC DEVELOPMENT PLAN Monte Sant’Angelo Territory Objective 32 IMPROVEMENT OF ACCESSIBILITY TO THE HERITAGE

Project 32.3 Implementation of the consortium activity for the full utilization of the Gino Lisa airport of Foggia as privileged airport for tourist flows of foreign origin Description Gino Lisa (Foggia) airport is a level III airport with tourist and religious air services, serving the area of Gargano, civil protection and general aviation services. The optimisation of tourist traffic and the development conditions of the airport in relation to its multifunctionality respect to the provincial economic system has for some time been the centre point of planning action dictated by the government organisations of the territory of the Province of Foggia. Its valorisation is among those contained in the proposal of the Agreement of Framework Programme between the Province of Foggia and the Region of Puglia prepared in 2006 for the social economic relaunch of the provincial territory of Foggia because of the planning of structural funds 2007 – 2013. Its growth it currently one of the primary objectives of Promodaunia, the agency for the promotion and valorisation of the “Sistema Capitanata”, public and private participant companies, one of which is the Province of Foggia, together with the individual municipalities, among which Monte Sant’angelo, have also appointed the mission finalised to sustaining and actuating actions and strategies which are shared for the implementation of international tourist air traffic in the airport of Foggia. The Unsesco candidature is certainly an added value for the purpose in question which will certainly produce a considerable increase in demand able to interest management companies of the airport structure with more availability and resources. Actions 1. Consultation between the public and private Bodies necessary for reaching objectives; 2. Design and planning of the interventions 3. Execution of the interventions Parties involved Municipality of Monte Sant’Angelo Province of Foggia Region of Puglia Ministry of Infrastructures and Transport Mixed and private consortium bodies and companies. Phases and timeframe 2010-2015 Financial resources Structural funds Public funds of various authorities according to competence and the outcomes of programming Expected results Considerable improvement in the infrastructure system with maximum intermodality between the three types of transport. Result indicators Increase in tourist flows towards the site and its territory.

386 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Monte Sant’Angelo Territory Objective 32 IMPROVEMENT OF ACCESSIBILITY TO THE HERITAGE

Project 32.4 Completion of the high-speed roadway network of Gargano in the section Mattinata – Vieste and internal road of connection with the trunk road 272 Monte Sant’Angelo-San Giovanni Rotondo Description The completion of the gallery system to connect Vieste to Mattinata in the programme of implementation of the high-speed roadway network of Gargano and the realisation of a new internal branch point for connection with trunk road S.S. 272 Monte Sant’Angelo-San Giovanni Rotondo, through the valley of Carbonara, is a territorial objective shared by the Province of Foggia and contained in the planning document mentioned above. It is considered of great importance for defining the elimination of the current bottleneck in the connecting infrastructures between Gargano Nord, the economic facility of which revolves around the beach tourism economy of municipalities such as Vieste and Gargano sud, characterised by a particular richness of the territory in terms of religious, cultural, gastronomic and naturalistic tourist routes. Its material realisation, even if long term, will allow better functionality for businesses and tourist flows thanks to the speed of transport and the connections between the two areas complimenting each other in terms of tourism. Actions 1. Consultation between the public and private Bodies necessary for reaching objectives 2. Design and planning of the interventions 3. Execution of the interventions Parties involved Municipality of Monte Sant’Angelo Province of Foggia Region of Puglia Ministry of Infrastructures and Transport Mixed and private consortium bodies and companies Phases and timeframe 2010-2015 Financial resources Structural funds Public funds of various authorities according to competence and the outcomes of programming Expected results Considerable improvement in the infrastructure system with maximum intermodality between the three types of transport Result indicators Increase in tourist flows towards the site and its territory

SOCIO-ECONOMIC DEVELOPMENT PLAN Monte Sant’Angelo Territory Objective 32 IMPROVEMENT OF ACCESSIBILITY TO THE HERITAGE

Project 32.5 Realization of the Macchia Madonna delle Grazie – Historic Centre of Monte Sant’Angelo cableway Description The construction of a cableway which connects the plain of Macchia with the Historical Centre of Monte Sant’Angelo is a project for which the territory has been waiting a definitive relaunch for some time. The final planning stage is already available; the section has a travelling time of about 5 minutes: sufficient time for the tourists coming from the south (Manfredonia, tourist arrival point etc.) to directly reach the buffer zone from which to make the visit to the Michaelic sanctuary. Its realisation will, moreover, give a decisive push to the valorisation of the marine of Monte Sant’Angelo, thanks to the possibility of combining the cool summer climate of the mountain to beach tourism through direct connections between the cableway station downstream and the beaches of the seacoast. For this reason its realisation will be included in a composite project of valorisation of the coast, currently in the study phase and of the territory of the Plain of Macchia from a tourism viewpoint according to regimes of environmental compatibility and in full respect of the vocations of the territory. Actions 1. Consultation between the public and private Bodies necessary for reaching objectives; 2. Design and planning of the interventions 3. Execution of the interventions Parties involved Municipality of Monte Sant’Angelo Province of Foggia Region of Puglia Ministry of Infrastructures and Transport Mixed and private consortium bodies and companies. Phases and timeframe 2010-2015

387 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

Financial resources Structural funds Public funds of various authorities according to competence and the outcomes of programming Expected results Considerable improvement in the infrastructure system with maximum intermodality between the three types of transport. Result indicators Increase in tourist flows towards the site and its territory.

SOCIO-ECONOMIC DEVELOPMENT PLAN Monte Sant’Angelo Territory Objective 32 IMPROVEMENT OF ACCESSIBILITY TO THE HERITAGE

Project 32.6 Interventions of improvement on the road network Description The internal roadway system of the inhabited centre of Monte Sant’Angelo has its weak point in the by-pass of which the north side, foreseen in PRG, has not yet been activated with consequent heavier vehicle traffic on the main road passing inside the buffer zone and in front of the external atrium, of the Basilica. Even if the urban traffic plan significantly limits the travel of vehicles by means of the pedestrian crossing time bands, to realise the best conditions of protection and valorisation of the site, it is necessary to activate the forecasts of P.R.G. concerning the north side of the by- pass. This intervention, the technical feasibility of which has already been verified, will allow the establishment of a new entrance way to the city on the north side in alternative to the current section of road which coasts the site. The distinct orographic conformation of the involved land, moreover, will allow the possibility of localising new spaces respect to the site and a car park to the north of the buffer zone, in full compatibility with the landscape of the locations. Finally, the work will be of great advantage to the residents in that it will consent safety interventions on internal urban roadways finalised to considerably lightening traffic in the city which currently travels over a long section in high density zones with consequent inconvenience to residents. PRG plan with evidence of the northern by-pass route according to the feasibility study carried out. Actions 1. Appointment of the task of compiling the executive project 2. Implementation of project approval procedures 3. Implementation of call to tender for appointing the works 4. Execution of works 5. Realisation of roundabouts in the main branch points outside the buffer-zone 6. Re-organisation of the Traffic Plan; Description Municipality of Monte Sant’Angelo Superintendency of Cultural and Landscape Assets Gargano National Park Actions 2010-2014 Parties involved Municipality of Monte Sant’Angelo Supra-municipal bodies to be defined Phases and timeframe Improve functionality and safety of the roadway network Rationalise the access system More availability of areas for parking in areas near to the buffer zone Financial resources Improvement in vehicle flow in an area near to the historical centre and reduction of traffic in the buffer zone

388 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Monte Sant’Angelo Territory

Objective 32 IMPROVEMENT OF ACCESSIBILITY TO THE HERITAGE

Project 32.7 Improvement of road signs Description The motorway and road network of the Province of Foggia currently has a good road sign system for directions towards the Gargano in general and to the city of Monte Sant’Angelo. The project proposes the implementation of these road signs and their enrichment using specific advertising boards inherent to the site with specific recalls regarding the Unisco candidature. The operation will allow the establishment of initial diffused advertising of predictable advantage which, in the case of effective inscription of the site in the Unesco list, will only have to be updated. Actions 1. Preliminary agreement between the Municipality of Monte Sant’Angelo, ANAS, Province of Foggia and private subjects managers of advertising spaces in concession; 2. Realisation of the map of motorway/road networks and the strategic and/or sensitive points respect to vehicle flow to the Gargano and within it; 3. Realisation of advertising boards and road signs 4. Appointment of the service and placement of the boards. Description Municipality of Monte Sant’Angelo ANAS Province of Foggia Private subjects Actions 2010-2014 Parties involved To be defined- sources of financing: municipal, provincial and regional Phases and timeframe Better visibility of road access towards Monte Sant’Angelo Facilitation for visitor flows Financial resources Number of road signs and advertising boards Increase in quality excursions

389 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

SOCIO-ECONOMIC DEVELOPMENT PLAN Monte Sant’Angelo Territory

Objective 33 INCREASE IN TOURIST STAYS

Project 33.1 Preparation of differentiated tourist “packages” and offers

Description The project proposes the extension of tourist stay times through the preparation of integrated tourist packages (itineraries in the territory) and differentiated offers for the various periods of the year. The itineraries have the added function of removing the pressure from Heritage and placing the benefits of the force of attraction of the Heritage itself onto the wider territorial area of the Gargano and the Province of Foggia. Differentiated offers have the function of gathering the various opportunities offered by the territory of Monte Sant’Angelo and the Gargano during the course of the year to formulate tourist-economic proposals able to deseasonalise the flows Actions 1. Agreements with local tourist operators for the definition of alternative tourist offers and packages at lower prices. 2. Promotion at national and international level of differentiated proposals 3. Activation of collaborations with tour-operators and social, juvenile, student and religious tourism associations Description Municipality of Monte Sant’Angelo Mountain Community of Gargano Gargano National Park Economic Categories and Associations Province of Foggia Region of Puglia Stakeholders Network management body Tour-operators Social, juvenile, scholastic and religious tourism associations Actions Yearly scheduled Parties involved To be defined – Sources of financing: municipal, regional, national and private Phases and timeframe Increase in the tourist offer of the Territory Implementation of stays Financial resources Increase in presences in the hospitality system

SOCIO-ECONOMIC DEVELOPMENT PLAN Monte Sant’Angelo Territory Objective 33 INCREASE IN TOURIST STAYS

Project 33.2 Structuring of a plan to incentivate the creation of a receptive system Description The distinct conformation of the historical centre and the average size of the properties which compose it, constitute ideal elements for structuring a first nucleus of habitations to be destined to the “diffused hotel” accommodation”. The good number of public services and structures in the area ensure the possibility of supply logistic support for study seminars, conventions, exhibitions, music and prose fairs. The planning of the intervention foresees the moves of the start up of forms of mixed management for the identification of surveyable properties to be restructured and placed on the hotel market in relation to tourist packages combined to the request of specialist tourist flows. Actions 1. Identification of mixed corporate structures for managing the diffused hotel 2. Recognition of the property heritage available in the historical centre 3. Planning of acquisitions and restructuring 4. Realisation of co-ordinated illustrative material and its distribution 5. Agreements with hospitality operators 6. Promotion of integrated economic proposals Description Municipality of Monte Sant’Angelo Superintendencies Economic categories and associations Province of Foggia Region of Puglia Stakeholders Network management body

390 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

Tour-operators Social, juvenile, scholastic and religious tourism associations Actions 2010-2012 Parties involved To be defined – Sources of financing: communal, regional, national and private Phases and timeframe Increase in the offers for specialist tourism implementation of stays Financial resources Increased presences in the hospitality system

SOCIO-ECONOMIC DEVELOPMENT PLAN Monte Sant’Angelo Territory Objective 34 DEVELOPMENT AND OPTIMISATION OF THE URBAN PRODUCTIVE SYSTEM

Project 34.1 Realisation of P.R.G. forecasts in relation to the areas destined for craftsmanship production in the periurban area and relaunch of productive and new entrepreneurial activities Description The municipality of Monte Sant’Angelo has areas destined to handcraft production localised to the east of the populated area in an area contiguous to the urban parameter. After years of revision of the areas in relation to the effective demand of the market and the difficulties correlated to the physical conformation of the territories involved, up to today the settlements are in the phase of concrete realisation. In particular, on the part of a consortium of private operators, in progress are the workshop areas for programmed handcraft production in the P.I.P zone – location of Stinchitiello, while in the phase of constitution is the public-private consortium for the realisation of the other P.I.P. handcraft area in the location of Santa Croce, contiguous to the former. The programmed workshops will allow the transfer of all the productive activities currently operating in the populated area to the handcraft zone, thus allowing the elimination of conditions of unease both for the operators and the residents, guaranteeing, also, the availability of productive spaces for the new entrepreneurial realities. Actions 1. Completion of area P.I.P Stinchitiello 2. Constitution of consortium to realise area P.I.P. Santa Croce Description Municipality of Monte Sant’Angelo Private entrepreneurs Actions Completion of area P.I.P. Stinchitiello and transfer of businesses: by 2011; Constitution of consortium area P.I.P Santa Croce:by 2008 Works begin: by 2009 Closure of works and transfer of businesses: 2015 onwards Parties involved Fees for the realisation of works charged to the consortium by deduction of fees Phases and timeframe 2010-2012 Financial resources Cubic metres of structures for handcraft facilities Increase in work number of commercial activities

SOCIOO-ECONOMIC DEVELOPMENT PLAN Monte Sant’Angelo Territory Objective 35 REQUALIFICATION AND RELAUNCH OF ENDOGENOUS RESOURCES IN THE TERRITORY

Project 35.1 Safeguard agro-food traditions and their use for the economic relaunch of innovative productions of quality Description The project is aimed at the valorisation and promotion of quality agro-food production based on the recovery and requalification of traditional methods and products. Preliminary research will be carried out following four guidelines: A. Recognition of agro-food and oenogastronomic traditions and the ‘Saperi’ of the territory (interviews) and their cataloguing in a dedicated data-base B. Research aimed at historical archives C. Verification of productive processes connected to the tradition and already initiated in the territory and the support of new projects D. Support of safeguarding initiatives relative to endemic vegetable species The cognitive phase – co-ordinated by a scientific centre of applied research (observatory on the landscape-cultural mosaic) – will be followed by the experimental and economic- promotional phase of the agro-food products of high qualitative content, realised using ecocompatible and sustainable methods inspired by Tradition. Actions 1. Studies on the agro-productive micro-chains and agro-food networks 2. Co-ordination of research and actions through the institution of the Observatory

391 8.5 SOCIO-ECONOMIC DEVELOPMENT PLAN DETAILED SCHEDULES

on the Landscape-Cultural Mosaic 3. Identification/reconstruction of processes, productive cycles, agro-food traditions and safeguard of endogenous species 4. Control and experimentation on points 1 and 3 5. Assistance on start-up and economic promotion of the innovative productions Description University of Bari University of Foggia Germoplasm Bank of the botanical Orchard of the University of Padua [WHL UNESCO] economic Organisations of category Sector Businesses Region of Puglia Gargano National Park Actions 2010-2012 Parties involved Financing to be found – Regional sources (Rural Development Plan), national, community, (Leader Plus; Life+; Interreg) Gargano National Park, Mountain Community of Gargano Phases and timeframe Constitution of the data-base Development of new business activities Co-ordination of requalification and relaunch of the agro-food and sector and the environment Financial resources Operational start-up of the Observatory Number of actions carried out Number of experimentations and new activities started

392 9. IMPLEMENTING THE MANAGEMENT PLAN

9.1 Mechanism for Management Plan implementation

The management of the Site whose nomination is submitted for inscription on the World Heritage List is an ongoing process that, for the past several decades, has striven to preserve and enhance its artifacts. The rationale at the basis of the Management Plan is the need to improve the link between the Longobard heritage and pertinent territories and to increase awareness of resident population concerning its cultural identity. Finally, the aim of the plan is also to favor conditions for economic growth that are respectful of the cultural value of those territories. The following are the prerequisites to achieve these objectives:

• A strong involvement of numerous interested public and private bodies; • An optimal level of integration and coordination among these bodies.

During the phases of elaboration of the Site Management Plan, the involvement of numerous public and private bodies, each in charge of a specific Longobard monumental complex and the pertinent territory, gave proof of great political and technical collaboration capacity. That collaboration has enabled the identification of common objectives and the definition of strategies, and has been officially sanctioned by a Memorandum of Understanting signed in Rome by institutional representatives during a public ceremony (see attachment 1 in Nomination Format). With this document, all the stakeholders have committed to coordinate their efforts to protect, enhance and promote Longobard heritage, together with the natural and cultural resources of their territories, with the aim to spur their socio-economic development. Over two hundred experts, located across the Site, have elaborated the main tool of this coordination: the Management Plan, which defines projects and actions to implement common objectives. Meetings and focus groups at the local, regional, and national level have been coordinated by the UNESCO World heritage List Office of the Italian Ministry for Cultural Heritage and Activities. An intranet site has been set up to provide all concerned parties with pertinent documentation, ensuring maximum coordination.

In order to guarantee the implementation of the Management Plan, and the effectiveness of the projects and actions it includes, a more structured and effective management of the Site has been necessary. To guarantee a unitary vision that will remain unmarred by possible changes in political leadership over the long term, or varying schedules of implementation for separate parts of the project, prerequisites are as follows: • Co-ordination of actions, ensuring uniformity across actions of parties marked by different areas of expertise; • common policies to create synergies among different sectors and strategies; • pooling of resources to obtain necessary support for the implementation of planned actions; • sharing and complementing various types of expertise and respective areas of responsibility to increase efficiency.

In early October 2007, a meeting of the stakeholders tackled these issues, including defining responsibilities of involved parties, and the most appropriate legal forms the Management Plan and its governing structure should adopt. Concerning areas of responsibility, the governing structure has to guarantee the following: • the coordination of parties, policies, resources and responsibilities as specified above but without taking on specific and direct responsibility for the implementation of single projects or actions. The Site is very vast and includes monuments disseminated in Italy from north to south. The implementation of specific plans and projects therefore has to be carried out by local “operative structures” that are being set up for the purpose; • the monitoring of various phases of implementation of projects and respective reports, in addition to providing possible corrective feedback that might readjust programs, modifying the sector Plans as needed.

As for the juridical form that has to be assigned to this coordinating structure of the Management Plan, it has to be such that it guarantees: • representation of all stakeholders; • the possibility to access and directly manage financing sources for network activities.

To that end, the juridical forms of organizations under common control as envisaged by the Italian law have been considered, and a few initial suggestions have been made that will be voted upon in the next stakeholders’ meeting to be held in March 2008.

393 The CAB Foundation in Brescia has offered to house the network operative structure in its headquarters and representatives of involved institutions are already at work to create the “operative structures” of management in their respective offices.

Until the management structure of the Site is in place, which should happen within a few months, the implementation of the Plan will continue being carried out by the Work Group.

As regards management structure developments see Socio-economic Development Plan – objective 1 – project 1.1. In short, in 2008 a pro-tempore Network Authority was set up; in 2009, this body led to the “Italia Langobardorum” Association, which is the current managing structure of the whole network. This Association, also through the involvement of all partners and stakeholders, the establishment of working groups on matters concerning the specific five Plan, the allocation of necessary resources, will ensure:

• the co-ordinated management of the separate components of the Serial Property, • the coordinated implementation of the networking actions provided for by the Management Plan as well as the integration of the actions planned for each site, • the monitoring, evaluation and feedback of the Management Plan,

after all:

• the effective protection, conservation, promotion and enhancement of the nominated serial property for present and future generations, • a sustainable contribution to the social and economic development and to the quality of life of local communities (with reference the Budapest Declaration adopted by the World Heritage Committee during its 26th session)

9.2 Analysis of funding sources

Concerning the implementation of projects and involved institutions in each of the network areas: Institutions and Agencies have made a commitment to improve effectiveness of regular and extraordinary financing sources with the aim to guarantee implementation of the activities included in the Management Plan for the Site whose nomination is put forward for inscription on the World Heritage List and to guarantee necessary coordination among projects. That has enabled the completion of some projects and the launching of others (see Chapters 1 and 3). In addition, the same Institutions and Agencies have set their budgets and financial agendas according to the common policies of the Management Plan and have initiated necessary procedures to obtain further financing, as envisaged by the budget law of Italy.

The territorial fragmentation of the serial property “The Longobards in Italy. Places of the power (568-774 d.C.)” entails, however, an extreme differentiation of the intensity of funding of northern and as opposed to the southern regions (Campania and Puglia), which will have to be compensated by the network. As for the EU Programs, all regions are equally entitled to access to direct funds, a specific type of structural funds, because financing rates are previously established. Territorial cooperation programs are those most apt to be effectively used for the launching and support of network activities (INTERREG VC). Another tool, the GECT (Groupe Européen pour la Coopération Territoriale REG CE 1083/2006), can also be used to establish a thematic network at the European level, which could include foreign regions that are marked by vestiges of Longobard culture. For certain specific aspects, it is also possible to refer to other EU programs, such as Culture 2007-2013, and other sources of funding for research, such as the 7th Framework Program on Research FP7.

Additional potential sources of funding for the activities included in the Management Plan are structural funds (indirect funds) managed by the Italian State on the basis of the objectives and the ten priorities that have been defined at the National level with the Strategic National Framework (QSN). They are the following:

394 MACRO-OBJECTIVES Priorities a) To develop awareness and • Improvement and enhancement of human resources (Priority 1); knowledge circuits • Promotion, enhancement and dissemination of research and innovation to increase competitiveness (Priority 2) b) To increase life quality, security and • Sustainable and efficient use of environmental resources (Priority 3); social integration over the territory • Social integration and services to improve quality of life and attractiveness of the territory (Priority 4) c) To strengthen the productive • Enhancement of natural and cultural resources to increase attractiveness and structures, services and development (Priority 5) competitiveness • Networks and connections to improve mobility (Priority 6); • Competitiveness of productive systems and increased employment rates (Priority 7); • Competitiveness and attractiveness of cities and urban systems (Priority 8). d) To Internationalize and modernize • Attraction of investment, exports, and resources from foreign countries (Priority 9); • Governance, institutional capacity, competitive and effective markets (Priority 10).

The main financial reference points for the indirect funds managed by the Italian State are the PON (Programmi Operativi Nazionali, or National Operative Programs). These include the PON for Security, Education, Research and Competitiveness, Networks and Mobility, Governance and AT. The PON are managed through the Intesa Istituzionale di Programma [Institutional Program Agreement] and the Accordi di Programma Quadro tra lo Stato e le Regioni [Framework agreements between the State and the Regions]. In addition, each region can manage structural funds through the Programmi Operativi Regionali [Regional Operative Programs] FESR and FSE. Although the various EU, national and regional funding programs can be used interchangeably and together, essentially:

1. The Fondo Sociale Europeo (FSE) [European Social Fund] can be used for research activities 2. The Fondo Europeo di Sviluppo Regionale (FESR) [European Regional Development Fund] is most suitable for activities involving preservation, protection, enhancement, promotion and economic development.

Those Regions that aim to “converge,” such as Campania and Puglia, in the case of the nominated property, can utilize the Programmi Operativi Interregionali (POIN) [Inter-Regional Operative Programs] focusing on issues of the Environment, Tourism, and Cultural Affairs. That latter program, for example, could be used to implement the Via Sacra Langobardorum project, involving Benevento and Monte Sant’Angelo.

Furthermore, the established “Italia Langobardorum” Association, which is the current managing structure of the whole network, guarantees the necessary financial support to implement the net project, by using the resources allocated by the members according to the principles of subsidiarity and proportionality set forth by the European Union.

Spoleto 5 th June, 2009. Signature of the “Italia Langobardorum” Association

395

396

10. MONITORING AND REVIEWING THE MANAGEMENT PLAN

In order to complete the management process, the monitoring system must be set up. It must be able to assess the real implementation of planned objectives and their impact on the territory at cultural, social and economic level, so as to enable the implementation of an effective error correction feedback for the Management Plan.

For the monitoring, a control model – working on more levels – which makes use of adequate analysis parameters will be used. In particular, through specific and differentiated indicators, the management plan will be evaluated and verified on three different levels which start from monitoring of single operational projects to the monitoring of the objectives achieved in the single actions and to the general impact of the entire management plan.

10.1 Key indicators for nominated Serial Property

As to the implementation of the single operational projects, described in the 5 Sector Plans, this will be verified through a traditional technical monitoring system which will enable the evaluation of the state of progress of interventions in comparison to estimated time limits and expenses, etc..

As far as the achievement of the objectives is concerned, relative to the single projects, this will be possible trough purposely created numeric indicators, many of which have been already identified and reported on the projects reports.

Concerning the indicators to be used for the monitoring of macro-objectives (on the basis of each Plan) and the effectiveness of the results achieved in the single Plans (Knowledge Plan, Conservation-Protection Plan, Enhancement Plan, Public Awareness and Promotion Plan, Socio-Economic Development Plan), starting from the analyses conducted by the Ministry for Cultural Heritage, specific performance indicators for the Site applying for WHL are now being studied.

As for the Conservation Plan, the monitoring will no doubt be based also on the updating of vulnerability indicators, defined when the nomination was prepared, according to the standards and the methods of the Risk Map of Italian Cultural Heritage (see Nomination Format; item 6.a).

Some possible numeric indicators, now under development, are indicated in the following table:

Knowledge Plan Conservation- Enhancement Plan Public-Awareness Socio-Economic Protection Plan and Promotion Plan Development Plan Number of launched Vulnerability indicators Number (and costs) of Number (and costs) of Cost and number of study projects carried out published promotional overnight stays enhancement materials interventions Number of Environmental Number of Number (and costs) of Average duration of archaeological damage indicators monuments now produced multimedia overnight stays excavations carried ready to be visited materials out Number of scientific Number (and costs) of Number of exhibited Number of visitors Utilization rate of publications carried out artefacts accommodation conservation facilities interventions Quantity of registered Number (and costs) of Number (and costs) of Number of accesses Costs for quality-label and computerized maintenance equipped tourist to the network website products information interventions itineraries Quantity of information Requalified surface Number (and costs) of Number (and costs) of Number of companies managed for each areas recovered buildings organized events; and/ or operators in property Number of participants the cultural heritage sector Accessibility level of Number of carried out Per-capita income of the information system didactic activities resident population Number of organized Number (and costs) of Unemployment rate scientific conferences advertising campaigns Number of edited Site Sponsorship Infrastructure capacity researches

397

10.2 Tourism carrying capacity

An interesting indicator – for which a specific study involving various experts of the Italia Langobardorum network is now being launched – is the tourism carrying capacity indicator. As it is known, despite the number of studies on this topic at international level, no shared method has been defined to develop a numeric indicator able to indicate the carrying capacity of a cultural property. Studies on the subject lag behind those relative to the natural heritage.

Also in Italy several experimentations have been launched on the subject. They will be taken into account in the study which is about to be launched for the nominate Property. However, each experimentation followed rather different guidelines and, in any case, the aspects assessed to develop a TCC measure are generally remotely related to the aspects linked to the heritage and indirectly linked to it (e.g. capacity of accommodation facilities, capacity of waste disposal plants, etc.).

10.3 SWOT analysis

The assessment of the results achieved with the implementation of the actions envisaged in the Management Plan can be carried out by using the SWOT analysis, already used when drawing up the Plan.

The SWOT analysis meets the needs for rationalization of decision-making processes, as a support to public intervention decisions used to analyse alternative development models.

The analysis is conducted on the strengths and weaknesses of the analysis context, as well as on the opportunities and threats which derive from the external context which specific sectors or areas are exposed to. The objective of the analysis is to define the development opportunities of an area which result from the enhancement of strengths and the limitation of weaknesses, in the light of an opportunity and risk analysis. The SWOT analysis therefore highlights the main factors – both internal and external – which can influence the results of a programme/ plan and thus give rise to possible alternative development models.

The analysis also supports the planning of a strategy which is consistent with the context applied to it.

To sum up, the SWOT analysis enables the identification of the main strategic guidelines in relation to a global territorial development objective.

It can be used: ex ante, in order to improve the integration of the programme in its context; in intermediate phase, to verify if, in relation to the changes occurred in the context, the guidelines are still relevant (thus providing an instrument to decide on possible programme changes); ex post, to contextualize the final results of plans and programmes.

The analysis usually is represented as a matrix, organized in four sections: strengths, weaknesses, opportunities and risks. A specific matrix was built for the places of the Italia Langobardorum network, and it can be re-applied as monitoring instrument in the future.

Illustrative diagram of SWOT analysis

398 COORDINATION ICCD Central Institute for Cataloguing and Castelseprio-Torba Documentation Technical-scientific coordination Fabrizio Buratta, Antonio Di Cario, Coordination Angela Maria Ferroni – Ministry of cultural Alessandro Foti, Gerardo Leone, Pietro Marina De Marchi, Maddalena Pizzo, heritage and activities, UNESCO World Roggiero, Albino Stocchi, Stefano Valentini Bruno Cesca, Alessandra Quendolo, Heritage Bureau (Director Responsible: Clemente Marsicola) Luca Villa

Collaborators Direzione regionale per i beni culturali Tiziana Brasioli, Bruno Cesca, Francesca Brescia e paesaggistici della Lombardia Morandini, Martina Murzi, Pasquale Palmieri, Marina De Marchi Alessandra Quendolo, Luigi Salierno, Coordination Maria Stovali, Renata Stradiotti, Luca Villa Francesca Morandini, Francesca Guerini, Soprintendenza per i beni archeologici Renata Stradiotti della Lombardia Organizing and technical coordination Raffaella Poggiani Keller, Umberto Spigo, Bruno Cesca, Maria Stovali Municipality of Brescia Luciano Caldera, Marina De Marchi, Giacomo Andolina, Andrea Arcai, Stefano Gianluca Latino, Luigi Monopoli, Armiraglio, Vittorio Bandera, Claudia Bosio, Carlo Schieppati, Angela Surace Gerardo Brentegani, Angelantonio Capretti, CONTRIBUTIONS Marina Corti, Paola Faroni, Loretta Festa, Collaborators of the Soprintendenza Alberto Gadola, Alessandro Gazich, Elena Giuseppina Ruggiero Cividale Lucchesi Ragni, Danilo Maiocchi, Riccardo Manetti, Francesca Monesi, Francesca Lombardia Region Coordination Morandini, Olivo Ongari, Ines Paccanelli, Tiziana Gibelli, Monica Abbiati, Bruno Cesca, Alessandra Quendolo, Armando Pederzoli, Alberto Pedrazzani, Maria Grazia Diani, Claudio Gamba, Serena Luca Villa Claudio Perotti, Marco Pilia, Nunzio Pisano, Tronca, Sergio Urbisci Marco Ponzoni, Gennaro Quaglia, Municipality of Cividale del Friuli Benedetto Rebecchi, Gianpiero Ribolla, Province of Varese Emiliano Francescut, Elisabetta Gottardo, Laura Salvinelli, Stefano Sbardella, Daniela Marco Belli, Cesare Bottelli, Roberto Bonelli, Sara Massera, Claudia Pitassi, Alessandra Scaini, Patrizia Scamoni, Paolo Schirolli, Augusto Conti, Elena Marazzi, Nadia Quendolo, Luca Villa, Attilio Vuga Renata Stradiotti, Piera Tabaglio, Marco Piantanda, Maddalena Pizzo, Angelo Zilio Trentini, Giuliana Ventura, Chiara Vezzoli Soprintendenza per i beni archeologici del Municipality of Castelseprio Friuli - Museo Archeologico Nazionale Fondazione Brescia Musei Maurizio Biscuola Luigi Fozzati, Sara Gonizzo, Fulvia Natania Arici, Maurizio Bernardelli Curuz, Lo Schiavo, Anna Carla Moretti, Serena Vitri Angela Bersotti, Alessandra Binacchi, Ciotti Collaborators of the Municipality of Bresciani Torri, Laura Capretti, Ines De Giuli, Castelseprio Soprintendenza per i beni architettonici Sergio Fantoni, Giorgio Grazioli, Francesca Federica Armiraglio e paesaggistici e per i beni storico-artistico Guerini, Tatiana Leoni, Giuseppe Mazzadi, ed etnoantropologico del Friuli Venezia Maria Repossi, Ramona Treccani Collaborators of the Municipality of Gornate Giulia Olona Paolo Casadio Soprintendenza per i beni archeologici Claudia De Cesare della Lombardia Parish of Santa Maria Assunta in Cividale Raffaella Poggiani Keller, Umberto Spigo, FAI (Fondo per l'Ambiente Italiano) Mons. Guido Genero, Guido Avon, Claudio Filli Rossi, Andrea Breda, Enzo Laidelli Veronica Ambrosoli, Clara Bianchi, Paola Mattaloni Candiani, Simona Capelli, Francesca Cerini, Lombardia Region Annalisa Faustinelli, Giorgio Rigone Università di Udine Tiziana Gibelli, Monica Abbiati, Claudio Margherita Chang Ting Fa, Sandro Gamba Clocchiatti, Roberta Giorgiutti, Luca Iseppi, Spoleto Francesco Marangon, Antonio Sortino Province of Brescia Gabriele Archetti, Angelo Baronio, Aurelio Coordination Università di Trieste Bonù, Barbara D'Attoma Vincenzo Cerami, Giorgio Flamini, Tiziana Manuela Montagnari Kokelj Brasioli, Maria Stovali Fondazione CAB Organizing Committee of Agostino Mantovani, Alessandro Piergentili Direzione Regionale per i beni culturali e ‘Patriarcato di Aquileia’ Project paesaggistici dell’Umbria Rolando Cassina, Marco Cesca, Lorena Di Diocese of Brescia Francesco Scoppola Valentin, Franco Fornasaro, Marco Gattel, Don Federico Pellegrini Elisa Morandini Soprintendenza per i beni storici, artistici Collaborators e etnoantropologici dell’Umbria Collaborators Gian Pietro Brogiolo, Monica Ibsen, Vittoria Garibaldi, Francesca Cristoferi, Nicola Badan, Federica Quendolo Università di Padova Giovanni Luca De Logu Giovanni Lessio, Vincenzo Gheroldi, Banca Popolare FriulAdria-Crédit Agricole Soprintendenza ai beni architettonici e Soprintendenza per i beni architettonici Renata Capria d’Aronco, paesaggistici per le province di Brescia, e paesaggistici dell’Umbria Club Unesco Udine Cremona e Mantova Fabio Palombaro Giovanna Stringher di Robilant, Stefania Tonni, Associazione Nazionale Guide Turistiche Restauratrice Soprintendenza per i beni archeologici Norberto Tonini, Luigi Bandera, Gianbattista Muzzi, dell'Umbria BITS-Bureau International du Tourisme Aurora Ragone,Diego Scarbolo, Gabriele Baldelli, Liliana Costamagna, Social, Paris Associazione Longobardia Laura D’Erme, Mariarosaria Salvatore Marco Ricceri, Istituto di ricerche socio-economiche Iconographic research CISAM - Cento Italiano di Studi sull'Alto EURIPES, Roma Piera Tabaglio Medioevo Vanna Forconi, Enrico Menestò, Letizia Pani Ermini, APAT - Agenzia per la Protezione Photographs Alessandra Massari, Massimiliano Bassetti dell’Ambiente e del Territorio, Roma Archivio Musei Civici d’Arte e Storia di Giancarlo Cassina, Brescia; Archivio Soprintendenza per i beni University of Perugia archeologici della Lombardia; Archivio Donatella Scortecci Fondazione Brescia Musei; Archivio Ufficio Photographs del Turismo del Comune di Brescia Umbria Region Elio e Stefano Ciol, Roberto Mancuso, Paola Gonnellini, Anna Pinna Claudio Mattaloni, Diego Petrussi, Archivio MAN di Cividale Province of Perugia Benevento University of Bari Anna Barbieri Dipartimento di Studi Classici e Cristiani Coordination Immacolata Aulisa, Ada Campione, Municipality of Spoleto Angelo Mancini, Pasquale Palmieri, Angela Laghezza, Marcello Marin, Giorgio Sandro Frontalini, Cinzia Biscarini, Alessio Luigina Tomay Otranto Buccioli, Giulio Crivelli, Francesca De Marchis, Massimo Evangelisti, Giorgio Direzione regionale per i beni culturali Università degli Studi di Foggia Flamini, Sergio Macedone, Maria Angela e paesaggistici della Campania Pasquale Pazienza Marchetti, Gelsomina Morodei, Stefania Angela Maria Cangiano, Maria Rosaria Nichinonni, Antonella Proietti, Cinzia Rutili, Nappi Basilica of S. Michele Maria Stovali Padre Wladyslaw Sucky Soprintendenza per i beni archeologici Record Office of Perugia, Division of Spoleto delle province di Benevento e Caserta Photographs Luigi Rambotti Maria Luisa Nava, Luigina Tomay ICCD Central Institute for Cataloguing and Documentation - Fabrizio Buratta, Antonio Archdioceses of Spoleto-Norcia Soprintendenza per i beni architettonici, Di Cario, Alessandro Foti, Gerardo Leone, S.E. Riccardo Fontana, Giampiero Ceccarelli paesaggistici, storico-artistici ed Pietro Roggiero, Albino Stocchi, Stefano etnoantropologici per le province Valentini Tecnici Restauro Conservazione Beni di Caserta e Benevento (Director Responsible: Clemente Marsicola) Culturali s.r.l. Salvatore Buonomo, Vega de Martini, Paolo Virilli Maria Rosaria Iacono

FR Architetti Municipality of Benevento Massimiliano Fabiani, Riccardo Rosati Raffaele Del Vecchio, Massimo Ciampi, Giovanni Coppola, Margherita D'Itria, Professional Studio Stefania Leone, Pasquale Palmieri, Elena Rapetti Luigi Salierno, Cosimo Damiano Schipani, Giancarlo Scrocco, Rino Vitelli Photographs Marcello Fedeli, Massimo Menghini, Campania Region Nicoletta di Cicco Pucci, Maria Stovali, Simonetta Volpe Archivio della Soprintendenza per i beni archeologici dell’Umbria Province of Benevento Carlo Falato, Giuseppe Marsicano, Pierina Martinelli Campello Museo del Sannio Coordination Luisa Bocciero Paolo Pacifici, Alba Contenti, Tiziana Brasioli Prefecture of Benevento Soprintendenza per i beni storico-artistici Maria Rita Circelli, Maria De Feo ed etnoantropologici dell’Umbria Francesca Cristoferi, Giovanni Luca De Archdioceses of Benevento Logu S.E. Andrea Mugione, Mons. Cristino Pompilio, Mons. Mario Iadanza Soprintendenza per i beni archeologici dell'Umbria Parish of Santa Sofia Gabriele Baldelli, Maria Laura Manca, Nazzareno Tenga Mariarosaria Salvatore Photographs Soprintendenza per i beni architettonici Pasquale Palmieri e paesaggistici dell’Umbria Archivio Museo del Sannio Fabrizio Finauri Archivio soprintendenza BAPSAE

University of Perugia Donatella Scortecci Monte Sant’Angelo

Umbria Region Coordination Paola Gonnellini, Anna Pinna Giovanni Granatiero, Martina Murzi, Francesco Nasuti, Giorgio Otranto Province of Perugia TRANSLATION Anna Barbieri Direzione regionale per i beni culturali della CSE Centro Servizi Europa Roma '92 srl; Puglia Massimo Evangelisti; Valeria Sala; Municipality of Campello sul Clitunno Marisa Milella, Vita Plantamura, Nunzio Traduzioni Quickline Alba Contenti, Giulio Crivelli, Giorgio Flamini, Tomaiuoli Maria Angela Marchetti, Moreno Marziani, TECHNICAL REVISION OF THE MAPS Domizio Natali, Paolo Pacifici Soprintendenza per i beni storico-artistici FR Architetti ed etnoantropologici della Puglia Massimiliano Fabiani, Riccardo Rosati Archdioceses of Spoleto-Norcia Fabrizio Vona, M. Giovanna Di Capua S.E. Riccardo Fontana, Giampiero Ceccarelli PUBLISHER Soprintendenza per i beni archeologici della Tipolitografia “Nuova Eliografica” - Spoleto Tecnici Restauro Conservazione Puglia di Fiori Roberto Beni Culturali s.r.l. Francesco Paolo Maolucci Laura Turchi, Paolo Virilli TRADE MARKS AND CORPORATE Municipality of Monte Sant'Angelo IDENTITY FR Architetti Giampiero Bisceglia, Matteo Gabriele, Paolo Mucciarelli Massimiliano Fabiani, Riccardo Rosati Giovanni Granatiero, Francesco Nasuti, Matteo Notarangelo COVER DESIGN Studio Forum Gabriella Tuzio Nazzareno Martinelli, Antonio Montioni Parco Nazionale del Gargano Giacomo Diego Gatta, Franca Pinto Minerva GRAPHIC DESIGN Photographs Paola Mucciarelli, Maria Stovali, Marcello Fedeli Comunità montana del Gargano Tipolitografia “Nuova Eliografica” Spoleto: Nicola Pinto, Ugo Galli Lorenzo Fiori, Roberta Pompili