Superbly Connected Contemporary Apartments in the Lakeside Environment of Green Park, Reading

Total Page:16

File Type:pdf, Size:1020Kb

Superbly Connected Contemporary Apartments in the Lakeside Environment of Green Park, Reading Superbly connected contemporary apartments in the lakeside environment of Green Park, Reading. A new perspective on urban living. Reading is one of the UK’s economic success stories. Set in 7 acres beside a beautiful lake and surrounded by Home to major corporations such as Microsoft, Oracle parkland and countryside, this is a design-led development and PepsiCo – and with the onset of Crossrail providing of uber-chic 1 and 2 bedroom apartments, with fabulous yet quicker links into Central London and beyond – the town proposed onsite amenities such as a state-of-the-art gym, is predicted to outperform London, Birmingham and other Wi-Fi bars and residents-only cinema room. The new Green major UK cities making it the ideal place to invest. It is for Park Station will provide rapid access into Reading town these reasons that St Edward has been inspired to present centre offering residents the best of both worlds – an idyllic Bankside Gardens. waterside location conveniently situated within minutes of the town’s busy hub and all that it has to offer. Computer Generated Image of Bankside Gardens, indicative only THE DEVELOPMENT - A 7 acre (2.8 hectare) site, 3 miles from Reading town centre, 36 miles west of central London and 27 miles west of London Heathrow airport - 461 high-quality, design-led apartments including 98 affordable homes, in 7 blocks positioned by the lake, enjoying country and lakeside views - A mix of 1 and 2 bedroom apartments with stylish contemporary interiors featuring chic industrial accents Computer Generated Image of Bankside Gardens, indicative only - A lakeside setting with 3 acres of landscaped parkland and gardens, footpaths, cycle ways THE DEVELOPER and trim trails - St Edward – a joint venture - Private podium gardens offer company owned by Prudential quiet and secluded spaces for Assurance Company and Berkeley residents to enjoy - Excellent road links to Reading LOCATION town centre, London and major motorways - Green Park, Reading, Berkshire (adjacent Green Park Village) - Onsite Reading Green Park Station with trains to Reading Central community including global Station in 6 minutes companies; and Green Park LOCAL AUTHORITY Village, a development of 587 - Reading to London Paddington in - Reading Borough Council family homes under 30 minutes - Neighbouring Green Park - Proposed amenities include 12 Village has further amenities ARCHITECTS hour concierge, state-of-the-art including a planned primary - Broadway Malyan gym, coffee shop, residents-only school and a market square - Brookes Architects cinema room, Wi-Fi bar and with proposed café. A gym, co-working studio swimming pool, bar and LANDSCAPE - Adjacent to Green Park Business restaurants can also be enjoyed Park Centre, a 195 acre business at Green Park Business Centre ARCHITECTS - Macfarlane Associates ACCOMMODATION MIX BUILDING INSURANCE No. 1, 2 & 3 - NHBC Warranty Quantity Size (sq ft) Size (Sq m) Starting Price Starting £ per sq ft ESTIMATED 1 Bed 37 481 – 490 45 – 46 £289,000 £597 psf RENTAL YIELD 2 Bed 83 731 - 997 68 – 93 £389,000 £517 psf - Up to 4.8% p.a. No. 5, 6 & 7 Quantity Size (sq ft) Size (Sq m) Starting Price Starting £ per sq ft COMPLETION - Q2 2021 (No.1) 1 Bed 89 468 – 487 43 – 45 £275,000 £588 psf 2 Bed 153 653 - 890 60 – 82 £360,000 £551 psf 20 M25 M ile s Gerrards 3 0 Cross M i l e N Marlow s Wembley HENLEY- ON-THAMES M25 Paddington Maidenhead Slough LONDON River West Ealing Thames River Thames M4 M4 WINDSOR Reading HEATHROW Richmond AIRPORT M4 Twickenham M4 READING Bracknell Kingston Wokingham ASCOT upon Thames River M3 Thames M25 Epsom ABOUT READING M3 TRANSPORT LINKS - Reading sits at the heart of the BY TRAIN Shortest travel times as per nationalrail.co.uk Leatherhead M4 corridor and has the highest Basingstoke M3 M25 density of tech businesses in the UK* 6 mins - It has been identified as one of Bankside Reading Paddington Bond Tottenham Canary Gardens 26 mins Street Court Road Wharf the leading economic growth (Reading 53 mins 55 mins 74 mins points in Europe Green Park station) - Reading was voted one of the best BY CROSSRAIL Shortest estimated travel times as per crossrail.co.uk places to live and work.** It has an Crossrail to be completed 2019 expanding employment market - a key driver for property demand - Major corporations located in Reading Bond Street Liverpool Street Canary Wharf Reading include Prudential, 54 mins 61 mins 68 mins Microsoft, Oracle, PepsiCo, Huawei and Verizon N To London via Reading - Reading is now a premier shopping and leisure destination. For world- class shopping and entertainment, Station central London is within easy reach pavilion with gym, by train co-working studio and cinema room - The Madejski Stadium is just Reading minutes from Bankside Gardens. Green Park Reading Football Club and station London Irish RFC share this impressive facility Proposed retail Picnic EDUCATION area Primary - Excellent education opportunities School LAKE for all age groups, including top Market ranking grammar schools Square - University of Reading, a research intensive university with global reach, including Henley Business School and University of Reading Malaysia To Basingstoke - Planned on-site Primary School * TechNation 2017 ** Good Growth for Cities 2018 index (PwC/Demos) Computer Generated Image of Bankside Gardens, indicative only SERVICE CHARGE TERMS OF PAYMENT - Confirmation of source of funds, such as proof of cash - Estimated £3.03 per sq ft - £1,000 payable on reservation (exclusive of heating charges) - Confirmation of purchase as - 10% or the purchase price is To be confirmed owner/occupier or investor payable on exchange of contracts (less reservation fee already paid) Should the purchase be made in a Company name, the following STAMP DUTY - Further 10% of purchase price is is required: - Stamp Duty Land Tax (SDLT) payable no later than 6 months is payable in the UK for owner/ after exchange of contracts - Certificate of Company occupier purposes and at a Incorporation and Memorandum - Balance payable on completion higher rate for investors who own of Articles and Association multiple properties. Details are - Full list of Directors and available from the sales team DOCUMENTATION Shareholders or your solicitor Documentation required to reserve: - Evidence of the Company’s registered address TENURE - One form of photo identification is required for each purchaser – - Photo Identification and Proof - Leasehold – 999 years Passport, Driving Licence, of Address for all Directors and State ID Card Shareholders (as individual CAR PARKING purchasers above) - One form of proof of address for - One allocated parking space each individual – current utility bill or bank statement showing name and home address no older than 3 months Bankside Gardens - Marketing Suite opening soon Green Park, Reading, Berkshire, RG2 6AB Call us: 0118 402 3530 | www.banksidegardens.co.uk Proud to be a member of the Berkeley Group of companies Disclaimer: Please be aware that these details are intended to give a general indication of properties available and should be used as a guide only. The company reserves the right to alter these details at any time. The contents herein shall not form any part of any contract or be a representation including such contract. These properties are offered subject to availability. Applicants are advised to contact the sales office or the appointed agents to ascertain the availability of any particular type of property so as to avoid a fruitless journey. The property areas are provided as gross internal areas under the RICS measuring practice 4th edition recommendation. Planning permission 171019 (Reading Borough Council). Apartments are acquired with a 999 year leasehold. Computer generated images of Bankside Gardens are indicative only..
Recommended publications
  • People, Places and Policy
    People, Places and Policy Set within the context of UK devolution and constitutional change, People, Places and Policy offers important and interesting insights into ‘place-making’ and ‘locality-making’ in contemporary Wales. Combining policy research with policy-maker and stakeholder interviews at various spatial scales (local, regional, national), it examines the historical processes and working practices that have produced the complex political geography of Wales. This book looks at the economic, social and political geographies of Wales, which in the context of devolution and public service governance are hotly debated. It offers a novel ‘new localities’ theoretical framework for capturing the dynamics of locality-making, to go beyond the obsession with boundaries and coterminous geog- raphies expressed by policy-makers and politicians. Three localities – Heads of the Valleys (north of Cardiff), central and west coast regions (Ceredigion, Pembrokeshire and the former district of Montgomeryshire in Powys) and the A55 corridor (from Wrexham to Holyhead) – are discussed in detail to illustrate this and also reveal the geographical tensions of devolution in contemporary Wales. This book is an original statement on the making of contemporary Wales from the Wales Institute of Social and Economic Research, Data and Methods (WISERD) researchers. It deploys a novel ‘new localities’ theoretical framework and innovative mapping techniques to represent spatial patterns in data. This allows the timely uncovering of both unbounded and fuzzy relational policy geographies, and the more bounded administrative concerns, which come together to produce and reproduce over time Wales’ regional geography. The Open Access version of this book, available at www.tandfebooks.com, has been made available under a Creative Commons Attribution-Non Commercial-No Derivatives 3.0 license.
    [Show full text]
  • Location, Location, Location
    Focus: Luxury brands w Location, location, room for value throughout the chain... I think ARM creation of a safe social network for children. ose is probably the keystone in that process.” companies flourish because of Tech City itself. e e dotcom bubble would burst in the early 00s, community acts as an extended support group. Its location but ARM, with its strategy of forging ahead through job fairs draw thousands of hopefuls and its pubs In our ongoing series on reputation, Brittany partnerships and communications, avoided the act as real-life chatrooms for the countless businesses Golob charts the development of the British disaster that befell its contemporaries. “Have many finding their feet in tech entrepreneurship. technology industry of them sold up and become satellites of mainly US Places like Stockholm and Berlin have established firms? Yes, but that’s true elsewhere too,” Cellan- technology bases, Gaza and Glasgow boast a startup Jones adds. “It has a positive side – small UK tech culture and Kenya will develop the so-called Silicon arold Wilson stood in front of the Labour start-ups have been quick to grasp the need to go Savannah by 2030. What makes London different, Party Conference at Scarborough in global and often that means they need access to the however is something it has boasted for centuries 1963 and declared that Britain needed a kind of capital only available in the US.” – the financial industry. Both geographically and Hrevolution. Revolution in the name of capitalism, As the 20th century faded into the 21st, Britain economically, the tech startups that crowd the streets of democracy and of science, a revolution that began developing a tech industry that seems of Shoreditch and the country’s signature financial would forge a new Britain.
    [Show full text]
  • London to Wales Route Strategy March 2017 Contents 1
    London to Wales Route Strategy March 2017 Contents 1. Introduction 1 Purpose of Route Strategies 2 Strategic themes 2 Stakeholder engagement 3 Transport Focus 3 2. The route 5 Route Strategy overview map 7 3. Current constraints and challenges 9 A safe and serviceable network 9 More free-flowing network 9 Supporting economic growth 10 An improved environment 10 A more accessible and integrated network 10 Diversionary routes 14 Maintaining the strategic road network 15 4. Current investment plans and growth potential 17 Economic context 17 Innovation 17 Investment plans 17 5. Future challenges and opportunities 21 6. Next steps 27 i R Lon ou don to Scotla te nd East London Or bital and M23 to Gatwick str Lon ategies don to Scotland West London to Wales The division of rou tes for the F progra elixstowe to Midlands mme of route strategies on t he Solent to Midlands Strategic Road Network M25 to Solent (A3 and M3) Kent Corridor to M25 (M2 and M20) South Coast Central Birmingham to Exeter A1 South West Peninsula London to Leeds (East) East of England South Pennines A19 A69 North Pen Newccaastlstlee upon Tyne nines Carlisle A1 Sunderland Midlands to Wales and Gloucest M6 ershire North and East Midlands A66 A1(M) A595 South Midlands Middlesbrougugh A66 A174 A590 A19 A1 A64 A585 M6 York Irish S Lee ea M55 ds M65 M1 Preston M606 M621 A56 M62 A63 Kingston upon Hull M62 M61 M58 A1 M1 Liver Manchest A628 A180 North Sea pool er M18 M180 Grimsby M57 A616 A1(M) M53 M62 M60 Sheffield A556 M56 M6 A46 A55 A1 Lincoln A500 Stoke-on-Trent A38 M1 Nottingham
    [Show full text]
  • A Description of London's Economy Aaron Girardi and Joel Marsden March 2017
    Working Paper 85 A description of London's economy Aaron Girardi and Joel Marsden March 2017 A description of London's economy Working Paper 85 copyright Greater London Authority March 2017 Published by Greater London Authority City Hall The Queens Walk London SE1 2AA www.london.gov.uk Tel 020 7983 4922 Minicom 020 7983 4000 ISBN 978-1-84781-648-1 Cover photograph © London & Partners For more information about this publication, please contact: GLA Economics Tel 020 7983 4922 Email [email protected] GLA Economics provides expert advice and analysis on London’s economy and the economic issues facing the capital. Data and analysis from GLA Economics form a basis for the policy and investment decisions facing the Mayor of London and the GLA group. GLA Economics uses a wide range of information and data sourced from third party suppliers within its analysis and reports. GLA Economics cannot be held responsible for the accuracy or timeliness of this information and data. The GLA will not be liable for any losses suffered or liabilities incurred by a party as a result of that party relying in any way on the information contained in this report. A description of London's economy Working Paper 85 Contents Executive summary ...................................................................................................................... 2 1 Introduction ......................................................................................................................... 3 2 The structure of London’s local economies .........................................................................
    [Show full text]
  • Ecology and Nature Conservation
    Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 Chapter 10: Ecology and Nature Conservation M4CAN-DJV-EBD-ZG_GEN--REP-EN-0021.docx At Issue | March 2016 CVJV/AAR 3rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 Contents Page 10 Ecology and Nature Conservation 10-1 10.1 Introduction 10-1 10.2 Legislation and Policy Context 10-2 10.3 Assessment Methodology 10-10 10.4 Baseline Environment 10-45 Statutory Designated Sites 10-45 Non-Statutory Designated Sites 10-49 Nature Reserves 10-52 Habitats 10-52 Species (Flora) 10-76 Species (Fauna) 10-80 Invasive Alien Species 10-128 Summary Evaluation of Ecological Baseline 10-132 Ecological Units 10-135 Future Baseline Conditions 10-136 10.5 Ecological Mitigation and Monitoring 10-140 10.6 Effects Resulting from Changes in Air Quality 10-159 10.7 Assessment of Land Take Effects 10-165 Designated Sites 10-166 Rivers (Usk and Ebbw) 10-171 Reens, Ditches, Reedbeds and Ponds 10-173 Grazing Marsh 10-182 Farmland 10-187 Industrial Land 10-196 Bats 10-200 Breeding Birds 10-203 Wintering Birds 10-204 Complementary Measures 10-206 10.8 Assessment of Construction Effects 10-206 Designated Sites 10-206 Rivers (Usk and Ebbw) 10-210 Reens, Ditches, Reedbeds and Ponds 10-226 Grazing Marsh 10-245 Farmland 10-249 Industrial Land 10-260 Bats 10-263 Breeding Birds 10-291 Wintering Birds 10-292 Welsh Government M4 Corridor around Newport Environmental Statement Volume 1 Complementary Measures 10-295 10.9
    [Show full text]
  • M25 OFFICES Investment, Development & Occupier Markets
    research Q3 2012 M25 OFFICES Investment, development & occupier markets Highlights • Take-up improved in Q3, driven by a resurgence of activity in the Thames Valley. In the M25, Q3 take-up was only 12% below the ten-year quarterly average with 35 transactions following just 20 in Q2. M4 take-up was its highest since Q3 2010 and 58% above average. • Supply continues to fall, reflecting limited speculative development completions over the last three years. The M4 vacancy rate fell sharply in Q3 to 9.6%, its lowest level since Q3 2008, while the M25 vacancy rate fell to 7.9%, its lowest level in two years. • New build construction activity stood unchanged at a three year high of 823,000 sq ft in the M25. Speculative development will increase further in Q4, with several new schemes forecast to commence in the Thames Valley. • In the investment market, Q3 turnover was a robust £340m, 13% below Q2’s level but nonetheless 7% above the five-year quarterly average. Activity for good quality secondary assets also improved in Q3, with vendors’ aspirations now softening to a level which is proving attractive to buyers. Q3 2012 M25 OFFICES Investment, development & occupier markets Demand and take-up • M25 take-up rebounded to 552,522 sq ft in ten-year quarterly average. Of Q3’s Figure 1 Q3 2012, 27% above Q2’s total and only 12 deals in the M3, none exceeded M25 take-up 12% below the 10-year quarterly average. 20,000 sq ft, with the largest comprising 1.0 While Q2 take-up was skewed by Aker’s Capita’s lease of 17,417 sq ft at Benchmark major 215,755 sq ft pre-let at Chiswick Park, House, Weybridge.
    [Show full text]
  • A Powerhouse for the West July 2019
    Great Western Powerhouse March 2019 A Powerhouse for the West July 2019 3 Waterhouse Square Elliot House 138 Holborn 151 Deansgate London EC1N 2SW Manchester M3 3WD 020 3868 3085 0161 393 4364 Designed by Bristol City Council, Bristol Design July 19 BD11976 Great Western Powerhouse March 2019 A Powerhouse for the West July 2019 CONTENTS EXECUTIVE SUMMARY 2 THE UK POLICY CONTEXT 8 DEVOLUTION AND THE EMERGING REGIONAL DIMENSION TO UK ECONOMIC AND INDUSTRIAL POLICY 10 INTERNATIONAL MODELS OF CROSS-BORDER COLLABORATION 15 GREAT WESTERN POWERHOUSE GEOGRAPHY 18 ECONOMIC STRENGTHS AND OPPORTUNITIES 30 WHAT THE GREAT WESTERN POWERHOUSE SHOULD BE AIMING TO ACHIEVE 44 c 1 A Powerhouse for the West July 2019 A Powerhouse for the West July 2019 EXECUTIVE SUMMARY The economic map of Britain is being reshaped by devolution and the • The Northern Powerhouse and the Midlands The economic geography emergence of regional powerhouses that can drive inclusive growth at scale, Engine have established themselves as formidable regional groupings driving economic The inner core of the region is the cross-border through regional collaboration But, there is a missing piece of the jigsaw in rebalancing and promoting trade and economic relationship between the two metro regions the West of Britain along the M4 from Swindon across the Welsh Border to investment through the internationalisation of of the West of England Region (including Bristol and Swansea, and the intersecting M5 axis, through Bristol, north to Tewkesbury their regions These powerhouses have been
    [Show full text]
  • ECON the Corridor Strategies in the Megacity Development
    Wenjing L, Zhongyin S, Li XU The Spatial Strategies of Knowledge Corridors in Megacity Development Case Study Paper The Spatial Strategies of Knowledge Corridors in Megacity Development: Case Study of the Optical Valley Knowledge Corridor, China Wenjing LUO, Wuhan Planning & Design Institute; China Zhongying SONG, Wuhan Planning & Design Institute; China LI XU, Wuhan Planning & Design Institute; China Abstract As a comprehensive spatial concept, corridors especially mega-corridors and knowledge corridors have played irreplaceable roles in developing megacities. This paper uses the case of the Optical Valley Knowledge Corridor in China as an example to illustrate how to make spatial strategies of knowledge corridors in the dimensions of innovation networks, knowledge economies, environments and urban amenities, transportation systems and urban governance towards making a liveable, sustainable and efficient megacity in the backgrounds of knowledge-based urban development. Keywords Corridors, Knowledge-based urban development, Knowledge economies, Megacities 1. Introduction Originated from the linear city model more than a century ago, the term “corridor” is not only an urban model fully tailored to the transport technology but also a comprehensive spatial concept in dimensions of infrastructures, economics, urbanizations and ecology. It is in the 1990s that the modern version of the corridor concept namely mega-corridor has been brought up in the Europe 1992 project, which aimed at the physical integration of European Territory. Especially with the addition of a prefix “mega”, mega-corridors have been assumed to play key roles not only in physical but economic integrations together with the cross-border and transnational infrastructures. In a similar way, cities especially megacities are also growing out of their borders towards regional collaboration, which has given a new role for corridors in the aspects of achieving spatial, economic and social integrations to enhance regional competitiveness.
    [Show full text]
  • Berkshire Functional Economic Market Area Study
    Berkshire Functional Economic Market Area Study Thames Valley Berkshire Local Enterprise Partnership Final Report February 2016 Berkshire Functional Economic Market Area Study Final Report Thames Valley Berkshire Local Enterprise Partnership February 2016 14793/MS/CGJ/LE Nathaniel Lichfield & Partners 14 Regent's Wharf All Saints Street London N1 9RL nlpplanning.com This document is formatted for double sided printing. © Nathaniel Lichfield & Partners Ltd 2016. Trading as Nathaniel Lichfield & Partners. All Rights Reserved. Registered Office: 14 Regent's Wharf All Saints Street London N1 9RL All plans within this document produced by NLP are based upon Ordnance Survey mapping with the permission of Her Majesty’s Stationery Office. © Crown Copyright reserved. Licence number AL50684A Berkshire Functional Economic Market Area Study: Final Report Executive Summary This report has been prepared by Nathaniel Lichfield & Partners (‘NLP’) on behalf of the Thames Valley Berkshire Local Enterprise Partnership (‘TVBLEP’) and the six Berkshire authorities of Bracknell Forest, Reading, Slough, West Berkshire, Windsor and Maidenhead and Wokingham. It establishes the various functional economic market areas that operate across Berkshire and the wider sub-region, in order to provide the six authorities and the TVBLEP with an understanding of the various economic relationships, linkages and flows which characterise the sub-regional economy. The methodological approach adopted for this study has been informed by national Planning Practice Guidance for assessing economic development needs and investigating functional economic market areas within and across local authority boundaries, and been subject to consultation with a range of adjoining authorities and other relevant stakeholders. A range of information and data has been drawn upon across a number of themes as summarised below: Economic and Sector Characteristics Berkshire has recorded strong job growth in recent years, outperforming the regional and national average.
    [Show full text]
  • LONDON Mobility City
    v city, transformed LONDON Mobility City Greg Clark Tim Moonen Jake Nunley years city, transformed LONDON 1 LONDON Mobility City Greg Clark Tim Moonen Jake Nunley London: Mobility city © European Investment Bank, 2019. All rights reserved. All questions on rights and licensing should be addressed to [email protected] The findings, interpretations and conclusions are those of the authors and do not necessarily reflect the views of the European Investment Bank. Get our e-newsletter at www.eib.org/sign-up pdf: QH-06-18-218-EN-N ISBN 978-92-861-3895-9 doi:10.2867/631170 eBook: QH-06-18-218-EN-E ISBN 978-92-861-3894-2 doi:10.2867/214300 4 city, transformed LONDON Rail lines, tunnels, a revamped Underground, and bigger, better airports were decisive in London’s transformation into one of the world’s great global centres. Direct project loans from the European Investment Bank worth £7.3 billion between 2006 and 2016 have also been of fundamental importance. Despite the uncertainties of Brexit, London continues to be rated as a leading location in Europe and the world for business, knowledge, and talent. It is routinely benchmarked among the top performing large cities globally in terms of quality of life, infrastructure and accessibility. But 30 years ago, when London had no citywide government, a transport system in crisis, and no successful track record of continuous large-scale upgrades to the urban fabric, this scenario would have seemed highly unlikely. In this essay we examine how London’s unpromising 1980s gave rise to three decades of reinvestment and we explain how the European Investment Bank played an essential catalytic role in successive cycles of London’s evolution from an under-governed de-populating national capital into a diverse global centre benefiting from integrated urban systems management.
    [Show full text]
  • M4 Corridor Around Newport Sustainable Development Report
    M4 Corridor around Newport Sustainable Development Report Welsh Government M4 Corridor around Newport Sustainable Development Report M4CaN-DJV-EGN-ZG_GEN-AX-EN-0004 March 2016 CVJV/AAR 3rd Floor Longross Court, 47 Newport Road, Cardiff CF24 0AD Welsh Government M4 Corridor around Newport Sustainable Development Report Contents Page Executive Summary 1 Introduction 2 2 Welsh Sustainable Development Policies and Objectives 3 3 Strategic Decision Making 6 4 Summary of Key Sustainability Measures 12 5 Conclusions 23 References 24 Welsh Government M4 Corridor around Newport Sustainable Development Report Executive Summary The Well-being of Future Generations Act 2015 places a duty on public bodies in Wales to carry out sustainable development. The sustainable development report considers how the proposed M4 Corridor around Newport (M4CaN) (referred to as the Scheme) aligns to the Welsh Government’s principles of sustainable development, in the context of the well-being goals (illustrated in figure 1 below) defined in this Act. Figure 1 – Well-being Goals of the Well-being of Future Generations Act 2015 (source: Welsh Government, 2015) In considering the principles of sustainable development and the well-being goals, this report summarises the wide range of opportunities and benefits of the Scheme having regard to the potential impacts and proposed mitigation. The report demonstrates that the Scheme would generate opportunities to improve the economic prosperity of the region, as well as to help create a healthier and more cohesive community. Relevant assessments have been undertaken to understand the environmental effects of the Scheme, identifying impacts on important ecological resources, the loss of heritage assets and impacts arising from the proposed land take of the new section of motorway.
    [Show full text]
  • Welsh Government M4 Corridor Around Newport Summary Proof of Evidence – Traffic
    Welsh Government M4 Corridor around Newport Summary Proof of Evidence – Traffic Adran yr Economi a’r Seilwaith Department for Economy and Infrastructure The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting Road) Scheme 201- The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East of Magor) Connecting Road) (Amendment) Scheme 201- The London to Fishguard Trunk Road (East of Magor to Castleton) Order 201- The M4 Motorway (West of Magor to East of Castleton) and the A48(M) Motorway (West of Castleton to St Mellons)(Variation of Various Schemes) Scheme 201- The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and the M48 Motorway (Junction 23 (East of Magor) Connecting Road) and The London to Fishguard Trunk Road (east of Magor to Castleton) (Side Roads) Order 201- The Welsh Ministers (The M4 Motorway (Junction 23 (East of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and the M48 Motorway (Junction 23 (East of Magor) Connecting Road) and the London to Fishguard Trunk Road (East of Magor to Castleton)) Compulsory Purchase Order 201- The M4 Motorway (Junction 23 (East Of Magor) to West of Junction 29 (Castleton) and Connecting Roads) and The M48 Motorway (Junction 23 (East Of Magor) Connecting Road) (Supplementary) Scheme 201- The Welsh Ministers (The M4 Motorway (Junction 23 (East Of
    [Show full text]